ML19351E897

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Nov 1980
ML19351E897
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/15/1980
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Haller N
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19351E898 List:
References
987, NUDOCS 8012190508
Download: ML19351E897 (1)


Text

.

-s i

Vrmoxxrr ELecTurc Axn Powsu Coxiwxy o,

W.

O' V>

Jc?

w Ricnwown,Vrmoxx A 2026

$$=

  • g; w m

$5' e2 c@N v'$

==

December 15, 198C 49-m_.

m,,

1 w.

, lQ

[d

  • 3 Q

Mr.fN. M. Haller, Director I

Serial No.987 A

Office of Management and N0/RHH:ms Program Analysis Docket Nos. 50-338 U. S. Nuclear Regulatory Commission 50-339 Washington, D. C.

20555

-License Nos. NPF-4 NPF-7

Dear Mr. Haller:

Enclosed is the Monthly Operating Report for North Anna Power Station Unit Nos. I and 2 for the month of November.

Very truly yours,

, y

[/Jpti;'

B. R. Sylvia Manager - Nuclear-Operations and Maintenance Enclosure (3 copies) cc:

Mr. Victor Stello, Director (10 copies)

~

Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)

Office of Inspection and Enforcement - Region II t

b 1

i s

8012rs0F

. -.. -.