| number = ML20028E178
| number = ML20028E178
| issue date = 10/13/1982
| issue date = 10/13/1982
| title = Advises That Response to NRC 820913 Ltr Re Violations Noted in IE Insp Rept 50-410/82-10 Will Be Submitted by 821101
| title = Advises That Response to NRC Re Violations Noted in IE Insp Rept 50-410/82-10 Will Be Submitted by 821101
| author name = Mangan C
| author name = Mangan C
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8301210049
| document report number = NUDOCS 8301210049
| title reference date = 09-13-1982
| package number = ML20028E172
| package number = ML20028E172
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:- .
{{#Wiki_filter:-.
Y NIAGARA NUMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511 October 13, 1982 i
NUMOHAWK Y NIAGARA NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511 October 13, 1982 i
Office of Inspection and Enforcement Region I Attention: Mr. R. W. Starostecki, Director Division of Project and Resident Progrdas U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
Office of Inspection and Enforcement Region I Attention: Mr. R. W. Starostecki, Director Division of Project and Resident Progrdas U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406


Line 25: Line 26:


==Dear f1r. Starostecki:==
==Dear f1r. Starostecki:==
 
Your Inspection Report No. 50-410/82-10 dated September 13, 1982, identified three apparent violations resulting from an inspection conducted at the Nine flile Point - Unit 2 construction site. These apparent violations are still under investigation by Stone and Webster Engineering Corporation.
Your Inspection Report No. 50-410/82-10 dated September 13, 1982, identified three apparent violations resulting from an inspection conducted at the Nine flile Point - Unit 2 construction site. These apparent violations are still under investigation by Stone and Webster Engineering Corporation. A response will be submitted by November 1,1982.
A response will be submitted by November 1,1982.
Very truly yours, NIAGARA M0 HAWK POWER CORPORATION C W LO_A f t C. V. Mangah' Vice President Nuclear Engineering & Licensing jab cc: Mr. R.D. Schultz, Resident Inspector Director of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.C. 20555 8301210049 830114 PDR ADOCK 05000410 0                   PDR}}
Very truly yours, NIAGARA M0 HAWK POWER CORPORATION C W LO_A f t C. V. Mangah' Vice President Nuclear Engineering & Licensing jab cc: Mr. R.D. Schultz, Resident Inspector Director of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.C.
20555 8301210049 830114 PDR ADOCK 05000410 0
PDR}}

Latest revision as of 18:33, 20 December 2024

Advises That Response to NRC Re Violations Noted in IE Insp Rept 50-410/82-10 Will Be Submitted by 821101
ML20028E178
Person / Time
Site: Nine Mile Point 
Issue date: 10/13/1982
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20028E172 List:
References
NUDOCS 8301210049
Download: ML20028E178 (1)


Text

-.

NUMOHAWK Y NIAGARA NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511 October 13, 1982 i

Office of Inspection and Enforcement Region I Attention: Mr. R. W. Starostecki, Director Division of Project and Resident Progrdas U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Reference:

Nine Mile Point Unit 2 Docket No. 50-410

Dear f1r. Starostecki:

Your Inspection Report No. 50-410/82-10 dated September 13, 1982, identified three apparent violations resulting from an inspection conducted at the Nine flile Point - Unit 2 construction site. These apparent violations are still under investigation by Stone and Webster Engineering Corporation.

A response will be submitted by November 1,1982.

Very truly yours, NIAGARA M0 HAWK POWER CORPORATION C W LO_A f t C. V. Mangah' Vice President Nuclear Engineering & Licensing jab cc: Mr. R.D. Schultz, Resident Inspector Director of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.C.

20555 8301210049 830114 PDR ADOCK 05000410 0

PDR