ML20040F030: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. ._.= | {{#Wiki_filter:.._.= | ||
t | =. | ||
t EXHIBIT B License Amendment Request dated February 1, 1982 i-Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Exhibit B consists of revised pages for the Prairie Island Nu:: lear Generating Plant Technical Specifica-tions, Appendix A,'s listed below. showing the proposed a | |||
changes: | changes: | ||
TS.4.4-3 j | 4 TS.4.4-3 j | ||
l l | l l | ||
t 4 | t 4 | ||
5 8202C80226 823201 PDR ADOCK O$000282 P | 5 8202C80226 823201 PDR ADOCK O$000282 P | ||
PDR | |||
.--~ | |||
e | e TS.4.4-3 REV 4. | ||
Type A, tests will be considered to be satis factory if the acceptance criteria delineated in Appendix J. | |||
Section III.A are met. | Section III.A are met. | ||
5. | |||
Type B and C tests will be considered to be satisfactory if the combined leakage rate of all components subjected to Type B and C tests does not exceed 60% of L and if the following conditions are met. | |||
a. | |||
For pipes connected to systems that are in the ABSVZ (Designated ABSVZ in Table TS.4.4-1) the total leakage past isolation valves shall be less than 0.1 weight percent per 24 hours at pressure P,. | |||
b. | |||
For pipes connected to systems that are extrior to both the shield building and the ABSVZ (designated EXTERIOR in Table TS.4.4-1) the total leakage past isolation valves shall be less than 0.01 weight per-cent per 24 hours at pressure P. | |||
c. | |||
For airlocks, the leakage shall be less than 256 seem at 10 psig for door intergasket tests and 1500 seem at 46 psig for overall airlock tests. | |||
6. | |||
The retest schedules for Type A, B, and C tests will be in accordance with Section III-D of Appendix J. | |||
Each shield building shall be retested in accordance with the Type A test s | |||
schedule for its containment. The auxiliary building special ventilation zone shall be retested in accordance with the Type A test ' schedule for Unit I containment. | |||
\\ | |||
7. | |||
Type A, B and C tests will be in accordance with Section V x | |||
of Appendix J. | |||
Inspection and reporting requirements of each s, | |||
shield building test shall be the same as for Type A tests. | |||
The auxiliary building special ventilation zone shall have the same inspection and reporting requirements as for the Type A tests of Unit 1. | The auxiliary building special ventilation zone shall have the same inspection and reporting requirements as for the Type A tests of Unit 1. | ||
I s | I s | ||
a s | a s | ||
w | w | ||
)}} | |||
Latest revision as of 21:19, 19 December 2024
| ML20040F030 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 02/01/1982 |
| From: | NORTHERN STATES POWER CO. |
| To: | |
| Shared Package | |
| ML20040F025 | List: |
| References | |
| NUDOCS 8202080226 | |
| Download: ML20040F030 (2) | |
Text
.._.=
=.
t EXHIBIT B License Amendment Request dated February 1, 1982 i-Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Exhibit B consists of revised pages for the Prairie Island Nu:: lear Generating Plant Technical Specifica-tions, Appendix A,'s listed below. showing the proposed a
changes:
4 TS.4.4-3 j
l l
t 4
5 8202C80226 823201 PDR ADOCK O$000282 P
.--~
e TS.4.4-3 REV 4.
Type A, tests will be considered to be satis factory if the acceptance criteria delineated in Appendix J.
Section III.A are met.
5.
Type B and C tests will be considered to be satisfactory if the combined leakage rate of all components subjected to Type B and C tests does not exceed 60% of L and if the following conditions are met.
a.
For pipes connected to systems that are in the ABSVZ (Designated ABSVZ in Table TS.4.4-1) the total leakage past isolation valves shall be less than 0.1 weight percent per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at pressure P,.
b.
For pipes connected to systems that are extrior to both the shield building and the ABSVZ (designated EXTERIOR in Table TS.4.4-1) the total leakage past isolation valves shall be less than 0.01 weight per-cent per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at pressure P.
c.
For airlocks, the leakage shall be less than 256 seem at 10 psig for door intergasket tests and 1500 seem at 46 psig for overall airlock tests.
6.
The retest schedules for Type A, B, and C tests will be in accordance with Section III-D of Appendix J.
Each shield building shall be retested in accordance with the Type A test s
schedule for its containment. The auxiliary building special ventilation zone shall be retested in accordance with the Type A test ' schedule for Unit I containment.
\\
7.
Type A, B and C tests will be in accordance with Section V x
of Appendix J.
Inspection and reporting requirements of each s,
shield building test shall be the same as for Type A tests.
The auxiliary building special ventilation zone shall have the same inspection and reporting requirements as for the Type A tests of Unit 1.
I s
a s
w
)