t GP&L | t GP&L | ||
'' Carolina Power & Light Company | |||
'Apri 6, 1982 | |||
,7,, p File: SH N-2/18 CQAD 82-603 Item 69 Mr. James P. O'Reilly G | |||
4 | -Q g | ||
Atlanta, Georgia 30303 | United States Nuclear Regulatory Commission c3 | ||
/4 Region II U | |||
DOCKET NO. 50-400 SEISMIC I PIPE HANGERS WITH UNDERSIZE WELDSJ \ | 101 Marietta Street, Northwest j | ||
l7l | |||
,3 Atlanta, Georgia 30303 | |||
"(()] | |||
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT (li DOCKET NO. 50-400 | |||
\\i' SEISMIC I PIPE HANGERS WITH UNDERSIZE WELDSJ \\ | |||
'./,i. | |||
~ f; 7.. | |||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
%i _- | |||
On February 3,1982, the NRC (Mr. C. Julian) was notified by Carolina Power & | On February 3,1982, the NRC (Mr. C. Julian) was notified by Carolina Power & | ||
Light Company (Mr. N. J. Chiangi) of an item considered potentially reportabic per the provisions of 10CFR50.55(e). The NRC was informed that welds on some of the 187 previously accepted Seismic I pipe hangers were subsequently found to be rejectable; the primary problem being that the welds are undersized. | Light Company (Mr. N. J. Chiangi) of an item considered potentially reportabic per the provisions of 10CFR50.55(e). The NRC was informed that welds on some of the 187 previously accepted Seismic I pipe hangers were subsequently found to be rejectable; the primary problem being that the welds are undersized. | ||
The QA/QC Inspector, who originally performed the inspections on those 187 Seismic I pipe hangers and accepted the welds, has since been terminated. | The QA/QC Inspector, who originally performed the inspections on those 187 Seismic I pipe hangers and accepted the welds, has since been terminated. | ||
j | j The intent of this letter is to inform you that Carolina Power & Light Company has not been able to complete its evaluation concerning this matter since the reinspection and evaluation program has not been completed. It has now been determined through reinspection that there are 193 Seismic I pipe hangers involved. | ||
It is now anticipated that the reportability evaluation will be completed by April 30, 1982, at which time the NRC will be informed of the results. | |||
If reportable, a final report will be submitted by May 3, 1982 as indicated in our first interim report. | |||
Thank you for your consideration in this matter. | Thank you for your consideration in this matter. | ||
Yours very truly, W' | Yours very truly, W' | ||
nager Engineer | s N. | ||
Chian nager Engineer Construction Quality Assurance / Quality Control NJC/ecc cc: | |||
Mr. G. Maxwell Mr. V. Stello (2) | |||
.,.....w._ | |||
.,.a u | |||
.g.,,,, | |||
"' Street + P. O. Box 1551. Rale gh, N C. 27602 1''I''lClAL Q)p y M' | |||
B204160200 B2040b m y a.7 x n g m ;m PDR ADOCK 05000400 PDR | |||
_/_._f S | |||
ro}} | |||
Latest revision as of 19:15, 17 December 2024
| ML20054A847 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/06/1982 |
| From: | Chiangi N CAROLINA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, CQAD-82-603, NUDOCS 8204160200 | |
| Download: ML20054A847 (1) | |
Text
.
t GP&L
Carolina Power & Light Company
'Apri 6, 1982
,7,, p File: SH N-2/18 CQAD 82-603 Item 69 Mr. James P. O'Reilly G
-Q g
United States Nuclear Regulatory Commission c3
/4 Region II U
101 Marietta Street, Northwest j
l7l
,3 Atlanta, Georgia 30303
"(()]
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT (li DOCKET NO. 50-400
\\i' SEISMIC I PIPE HANGERS WITH UNDERSIZE WELDSJ \\
'./,i.
~ f; 7..
Dear Mr. O'Reilly:
%i _-
On February 3,1982, the NRC (Mr. C. Julian) was notified by Carolina Power &
Light Company (Mr. N. J. Chiangi) of an item considered potentially reportabic per the provisions of 10CFR50.55(e). The NRC was informed that welds on some of the 187 previously accepted Seismic I pipe hangers were subsequently found to be rejectable; the primary problem being that the welds are undersized.
The QA/QC Inspector, who originally performed the inspections on those 187 Seismic I pipe hangers and accepted the welds, has since been terminated.
j The intent of this letter is to inform you that Carolina Power & Light Company has not been able to complete its evaluation concerning this matter since the reinspection and evaluation program has not been completed. It has now been determined through reinspection that there are 193 Seismic I pipe hangers involved.
It is now anticipated that the reportability evaluation will be completed by April 30, 1982, at which time the NRC will be informed of the results.
If reportable, a final report will be submitted by May 3, 1982 as indicated in our first interim report.
Thank you for your consideration in this matter.
Yours very truly, W'
s N.
Chian nager Engineer Construction Quality Assurance / Quality Control NJC/ecc cc:
Mr. G. Maxwell Mr. V. Stello (2)
.,.....w._
.,.a u
.g.,,,,
"' Street + P. O. Box 1551. Rale gh, N C. 27602 1IlClAL Q)p y M'
B204160200 B2040b m y a.7 x n g m ;m PDR ADOCK 05000400 PDR