    ' Attachment to TXX- 93324 Page 10. of 13 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT-                                                                               l REV.3                                                                                     1 50 446      l DOCKET NO:
' Attachment to TXX-93324 Page 10. of 13 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT-REV.3 DOCKET NO:
UNIT:                                               CPSES 2 DATE:                   September 10,1993 COMPLETED BY:                                 Janet Hughes TELEPHONE                                           817-897-5331 OPERATING STATUS
50 446 UNIT:
: 1. Reporting Period: MAY 1993               Gross hours in reporting period:   ZM
CPSES 2 DATE:
: 2. Currently authorized power level (MWt):           3:111 Max. depend. capacity (MWe-Net): 1150
September 10,1993 COMPLETED BY:
* Design Electrical Rating (MWe-Net):       1MQ
Janet Hughes TELEPHONE 817-897-5331 OPERATING STATUS 1.
: 3. Power level to which restricted (if any) (MWe-Net):         E
Reporting Period: MAY 1993 Gross hours in reporting period:
: 4. Reasons for restriction (if any):
ZM 2.
THIS MONTH     YRTO DATE                                     CUMULATIVE
Currently authorized power level (MWt):
: 5. Number of hours reactor was critical                                 326           834                                             834
3:111 Max. depend. capacity (MWe-Net): 1150
: 6. Reactor reserve shutdown hours                                       418           418                                             418
* Design Electrical Rating (MWe-Net):
: 7. Hours generator on line                                               279           787                                             U
1MQ 3.
: 8. Unit reserve shutdown hours                                             0             0                                               0
Power level to which restricted (if any) (MWe-Net):
: 9. Gross thermal energy generated (MWH)                               499.853       1,165.087                                       1,165.087
E 4.
: 10. Gross electrical energy generated (MWH)                             152.610       320.680                                         320.680
Reasons for restriction (if any):
: 11. Net electrical energy generated (MWH)                               129,268       268,787                                         268,787
THIS MONTH YRTO DATE CUMULATIVE 5.
: 12. Reactor Service factor                                               NA             NA                                               NA
Number of hours reactor was critical 326 834 834 6.
: 13. Reactor availability factor                                           NA             NA                                               NA
Reactor reserve shutdown hours 418 418 418 7.
: 14. Unit service factor                                                   NA             NA                                               NA 15, Unit availability factor                                               NA           NA                                               NA
Hours generator on line 279 787 U
: 16. Unit capacity factor (Using MDC)                                       NA           NA                                               NA
8.
: 17. Unit capacity factor (Using Design MWe)                               NA           NA                                               NA
Unit reserve shutdown hours 0
: 18. Unit forced outage rate                                               NA           NA                                               NA
0 0
: 19. Shutdowns scheduled over next 6 months (Type Date, and Duration of each):
9.
: 20. If shutdown at end of report period, estimated date of startup:
Gross thermal energy generated (MWH) 499.853 1,165.087 1,165.087 10.
: 21. Units in test status (prior to commercial operation):             FORECAST       ACHIEVED Initial Criticality             930320         930324 Initial Electricity             930330         930409 Commercial Operation           930801 Estimated                                                                                                                                   ;
Gross electrical energy generated (MWH) 152.610 320.680 320.680 11.
HAY 1993 REVISION 3                                                 i 9309160289 930913 PDR     ADOCK 05000445 2W                                                                                                    !
Net electrical energy generated (MWH) 129,268 268,787 268,787 12.
R                         PDR         Q
Reactor Service factor NA NA NA 13.
Reactor availability factor NA NA NA 14.
Unit service factor NA NA NA 15, Unit availability factor NA NA NA 16.
Unit capacity factor (Using MDC)
NA NA NA 17.
Unit capacity factor (Using Design MWe)
NA NA NA 18.
Unit forced outage rate NA NA NA 19.
Shutdowns scheduled over next 6 months (Type Date, and Duration of each):
20.
If shutdown at end of report period, estimated date of startup:
21.
Units in test status (prior to commercial operation):
FORECAST ACHIEVED Initial Criticality 930320 930324 Initial Electricity 930330 930409 Commercial Operation 930801 Estimated HAY 1993 REVISION 3 9309160289 930913 2
PDR ADOCK 05000445 W
R PDR Q


Attachment to TXX-91324 Page 11 of 13 UNIT SHUTDOWNS AND POWER REDUCTIONS REV.1                         DOCKET NO:                   2 446 UNIT:                     CPSES 2 DATE:               September 10,1993 COAPLETED BY:         Janet Hughes REPORT MONTH MAY 1993 METHODOF TE                                           SHUTTING DOWN Ff0RCED           DURATION                 THEREACTOROR NO. DATE         SSCHEDUI FD       (HOURS)         REASON   REDUCING POWER CORRECTIVE ACTIONSCOAMENTS 4     930504           F               47.7           A             1       Loss of Feedwater flow to Steam Generator #1.
Attachment to TXX-91324 Page 11 of 13 UNIT SHUTDOWNS AND POWER REDUCTIONS REV.1 DOCKET NO:
5     930506           S               27.5           8             1       Remote Shutdown Test.
2 446 UNIT:
6     930508           S               109.1           B             1       Loss of Offsite Power Test.
CPSES 2 DATE:
7     930520           F               97.9           A             3       Loss of Coolant Flow to Generator Stator.
September 10,1993 COAPLETED BY:
8     930524           S               183           A             4       Feedwater isolation Valve slow closure.
Janet Hughes REPORT MONTH MAY 1993 METHODOF TE SHUTTING DOWN Ff0RCED DURATION THEREACTOROR NO.
DATE SSCHEDUI FD (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONSCOAMENTS 4
930504 F
47.7 A
1 Loss of Feedwater flow to Steam Generator #1.
5 930506 S
27.5 8
1 Remote Shutdown Test.
6 930508 S
109.1 B
1 Loss of Offsite Power Test.
7 930520 F
97.9 A
3 Loss of Coolant Flow to Generator Stator.
8 930524 S
183 A
4 Feedwater isolation Valve slow closure.
Unit 2 was already in MODE 5.
Unit 2 was already in MODE 5.
MAY 1993 REVISION 3
MAY 1993 REVISION 3 1)
: 1)     REASON                                                                               2) METFOD A: EOUiPMENT FAILURE (EXPLAIN)       E. OPERATORTRAINING ANDUCENSEEXAMINATION           1: MANUAL B: MAINTORTEST                       F: ADMINISTRATIVE                                   2: MANUALSCRAV.
REASON
C: RERJEUNG                           G: OPERATK)NALERROR(EXPLAIN)                       3: AUTOMATIC 6 CRAM D: REGLIATORYRESTRICTKW               H: OTHER (EXPLAIN)                                 4: OTHER {tiXPLAIN)
: 2) METFOD A: EOUiPMENT FAILURE (EXPLAIN)
__                _        _      _        ._- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _}}
E. OPERATORTRAINING ANDUCENSEEXAMINATION 1: MANUAL B: MAINTORTEST F: ADMINISTRATIVE 2: MANUALSCRAV.
C: RERJEUNG G: OPERATK)NALERROR(EXPLAIN) 3: AUTOMATIC 6 CRAM D: REGLIATORYRESTRICTKW H: OTHER (EXPLAIN) 4: OTHER {tiXPLAIN)
-}}

Latest revision as of 12:24, 17 December 2024

Rev 3 to Monthly Operating Rept for May 1993 for Cpses,Unit 2
ML20057A963
Person / Time
Site: Comanche Peak  
Issue date: 05/31/1993
From: Julie Hughes
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20057A961 List:
References
NUDOCS 9309160289
Download: ML20057A963 (2)


Text

.

~

' Attachment to TXX-93324 Page 10. of 13 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT-REV.3 DOCKET NO:

50 446 UNIT:

CPSES 2 DATE:

September 10,1993 COMPLETED BY:

Janet Hughes TELEPHONE 817-897-5331 OPERATING STATUS 1.

Reporting Period: MAY 1993 Gross hours in reporting period:

ZM 2.

Currently authorized power level (MWt):

3:111 Max. depend. capacity (MWe-Net): 1150

  • Design Electrical Rating (MWe-Net):

1MQ 3.

Power level to which restricted (if any) (MWe-Net):

E 4.

Reasons for restriction (if any):

THIS MONTH YRTO DATE CUMULATIVE 5.

Number of hours reactor was critical 326 834 834 6.

Reactor reserve shutdown hours 418 418 418 7.

Hours generator on line 279 787 U

8.

Unit reserve shutdown hours 0

0 0

9.

Gross thermal energy generated (MWH) 499.853 1,165.087 1,165.087 10.

Gross electrical energy generated (MWH) 152.610 320.680 320.680 11.

Net electrical energy generated (MWH) 129,268 268,787 268,787 12.

Reactor Service factor NA NA NA 13.

Reactor availability factor NA NA NA 14.

Unit service factor NA NA NA 15, Unit availability factor NA NA NA 16.

Unit capacity factor (Using MDC)

NA NA NA 17.

Unit capacity factor (Using Design MWe)

NA NA NA 18.

Unit forced outage rate NA NA NA 19.

Shutdowns scheduled over next 6 months (Type Date, and Duration of each):

20.

If shutdown at end of report period, estimated date of startup:

21.

Units in test status (prior to commercial operation):

FORECAST ACHIEVED Initial Criticality 930320 930324 Initial Electricity 930330 930409 Commercial Operation 930801 Estimated HAY 1993 REVISION 3 9309160289 930913 2

PDR ADOCK 05000445 W

R PDR Q

Attachment to TXX-91324 Page 11 of 13 UNIT SHUTDOWNS AND POWER REDUCTIONS REV.1 DOCKET NO:

2 446 UNIT:

CPSES 2 DATE:

September 10,1993 COAPLETED BY:

Janet Hughes REPORT MONTH MAY 1993 METHODOF TE SHUTTING DOWN Ff0RCED DURATION THEREACTOROR NO.

DATE SSCHEDUI FD (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONSCOAMENTS 4

930504 F

47.7 A

1 Loss of Feedwater flow to Steam Generator #1.

5 930506 S

27.5 8

1 Remote Shutdown Test.

6 930508 S

109.1 B

1 Loss of Offsite Power Test.

7 930520 F

97.9 A

3 Loss of Coolant Flow to Generator Stator.

8 930524 S

183 A

4 Feedwater isolation Valve slow closure.

Unit 2 was already in MODE 5.

MAY 1993 REVISION 3 1)

REASON

2) METFOD A: EOUiPMENT FAILURE (EXPLAIN)

E. OPERATORTRAINING ANDUCENSEEXAMINATION 1: MANUAL B: MAINTORTEST F: ADMINISTRATIVE 2: MANUALSCRAV.

C: RERJEUNG G: OPERATK)NALERROR(EXPLAIN) 3: AUTOMATIC 6 CRAM D: REGLIATORYRESTRICTKW H: OTHER (EXPLAIN) 4: OTHER {tiXPLAIN)

-