ML20057A964

From kanterella
Jump to navigation Jump to search
Rev 2 to Monthly Operating Rept for June 1993 for Cpses,Unit 2
ML20057A964
Person / Time
Site: Comanche Peak  
Issue date: 06/30/1993
From: Julie Hughes
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20057A961 List:
References
NUDOCS 9309160290
Download: ML20057A964 (1)


Text

...

Attachment to TXX-93324 Page 12 of 13 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT j

REV.2

{

DOCKET NO:

N UNIT:

CPSES 2 DATE:

September 10.1993 COMPLETED BY:

Janet Hughes TEEPHONE 817497-5331 OPERATING STATUS 1.

Reporting Period: JUNE 153 Gross hours in reporting period:

22Q l

1 2.

Currently authorized power level (MWt):

1111 Max. depend. capacity (MWe-Net): 1150

  • Design Electrical Ratir.g (MWe-Net):

1150

(

3.

Power level to which restricted (if any)(MWe Net):

NONE 4.

Reasons for restriction (if any):

TH!S MONTH YRTO DATE CUMULATIVE 0

834 834 5.

Number of hours reactor was entical M

1,138 1,138 6.

Reactor reserve shutdown nours 0

27 27 7.

Hours generator on line 0

0 8.

Unit reserve shutdown hours 0

1,165.087 1.165.087 9.

Gross thermal energy generated (MWH) 0 320,680 320.680 10.

Gross electrical energy generated (MWH) 0 268.787 268.787 11.

Net electrical energy generated (MWH) 12.

Reactor Service factor NA NA NA NA NA NA 13.

Reactor availability factor 14.

Unit service factor NA NA NA NA NA NA 15.

Unit availability factor NA NA NA 16.

Unit capacity factor (Using MDC)

NA NA NA 17.

Unit capacity factor (Using Design MWe) l NA NA NA 18.

Unit forced outage rate l

19.

Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):

20.

If shutdown at end of report period, estimated date of startup:

21.

Units in test status (prior to commercial operation):

FORECAST ACHIEVED Initial Criticality 930320 930324 Initial Electricity 930330

,930409 Commercial Operation 930801 Estimated JUNE 1993 REVISION 2 i

l 9309160290 930913 POR ADOCK 05000445 R

PDR i