{{#Wiki_filter:6 Y,J) e, NOV 011990 Docket Nos. 50-325, 50-324 License Nos. DPR-71, DPR-62 Carolina Power and Light Company ATTN:   Mr. Lynn W. Eury Executive Vice President Power Supply P. O. Box 1551                                                                         l Raleigh, NC 27602 Gentlemen:
{{#Wiki_filter:Y,J) 6 e,
NOV 011990 Docket Nos. 50-325, 50-324 License Nos. DPR-71, DPR-62 Carolina Power and Light Company ATTN:
Mr. Lynn W. Eury Executive Vice President Power Supply P. O. Box 1551 Raleigh, NC 27602 Gentlemen:


==SUBJECT:==
==SUBJECT:==
Line 22: Line 24:


==SUMMARY==
==SUMMARY==
  - BRUNSWICK This refers to the Enforcement Conference held at our request-on October 16, 1990. This meeting concerned activities authorized for your Brunswick               i facility. The issues discussed at this conference related to events                 '
  - BRUNSWICK This refers to the Enforcement Conference held at our request-on October 16, 1990.
surrounding the August 19, 1990 Unit 2 reactor scram. A list of attendees, a summary, and a copy of your handout are enclosed. We ar* continuing our review       i of these issues to determine the appropriate enforcement ,iction.
This meeting concerned activities authorized for your Brunswick facility.
In accordance with Section 2.790 of the NRC's " Rules of Practice " Part 2           ,
The issues discussed at this conference related to events surrounding the August 19, 1990 Unit 2 reactor scram.
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
A list of attendees, a summary, and a copy of your handout are enclosed.
We ar* continuing our review i
of these issues to determine the appropriate enforcement,iction.
In accordance with Section 2.790 of the NRC's " Rules of Practice " Part 2 Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this matter, please contact us.
Should you have any questions concerning this matter, please contact us.
Sincerely, (Original signed by EMerschoff/for)
Sincerely, (Original signed by EMerschoff/for)
Line 31: Line 36:


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
1.
: 2. Enforcement Conference Summary
List of Attendees 2.
: 3. Handout cc w/encls:   (Seepage 2) l 3
Enforcement Conference Summary 3.
4 .  .. s-9011160060 901101 (g ^* * * *Ri? .                                                                 ,Yn
Handout cc w/encls:
(Seepage 2) l 3
s-4 (g ^* * * *Ri?.
,Yn 9011160060 901101


4                       -      ---          .-  -    . . .
4 o
o                                                                           !
'., ~....
              ' . , ~ ....
NOV 011990 Carolina Power and Light Company 2
Carolina Power and Light Company   2   NOV 011990      I i
i i
i cc w/encis:                                             >
cc w/encis:
R. B. Starkey, Jr.
R. B. Starkey, Jr.
Vice President Brunswick Nuclear Project Box.10429 Southport, NC 28461
Vice President Brunswick Nuclear Project Box.10429 Southport, NC 28461 J. L. Harness Plant General Manager Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 R. E.. Jones. General Counsel Carolina Power & Light Company
  ,                        J. L. Harness Plant General Manager Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 R. E.. Jones. General Counsel Carolina Power & Light Company
- P. 0.. Box'1551 Raleigh, NC 27602 Ms. Frankie Rabon' Board of Commissioners
                      - P. 0.. Box'1551 Raleigh, NC 27602 Ms. Frankie Rabon'
. P. 0. Box 249 Bolivia, NC 28422
.                        Board of Commissioners
-Chrys Bagget.
                      . P. 0. Box 249 Bolivia, NC 28422
State Clearinghouse Budget and Management--
                        -Chrys Bagget.
j 116 West-Jones Street ~
State Clearinghouse                                   ;
Raleigh,.NC; 27603
Budget and Management--                               j 116 West-Jones Street ~
- Dayne H. Brown, Director Division of Radiction Protection N. C. Dcpartment'of Environment, c
Raleigh, .NC; 27603
Health & Natural Resourcesi P'. 0.- Box 27687-
                        - Dayne H. Brown, Director Division of Radiction Protection c              N. C. Dcpartment'of Environment, Health & Natural Resourcesi P'. 0.- Box 27687-
- Raleigh, NC.. 27611-7687 H. ' A. '.. Cbl e Special' Deputy Attorney General
                      - Raleigh, NC.. 27611-7687 H. ' A. '.. Cbl e Special' Deputy Attorney General
- State of North Carolina
                    - State of North Carolina
. P.' O. Box-629-Raleigh,,NC 127602:
                      . P.'   O. Box-629-Raleigh,,NC 127602:
a-
a-
                      - Robert P. Gruber-Executive Director-
- Robert P. Gruber-Executive Director-
                      ' Public Staff - NCVC
' Public Staff - NCVC P. 0. Box 29520
.'                        P. 0. Box 29520
' Raleigh, NC. 27626-0520 e
                        ' Raleigh, NC. 27626-0520 e
1 J
1 J


i 1                                                                     ,
i 1
Carolina Power and Light Company       3 NOV 01 m bec w/encls:
Carolina Power and Light Company 3
NOV 01 m bec w/encls:
Document Control Desk DRP Section Chief NRC Resident inspector U.S. Nuclear Regulatory Commission Star Rte. 1. Box 208 Southport. NC 28461 y
Document Control Desk DRP Section Chief NRC Resident inspector U.S. Nuclear Regulatory Commission Star Rte. 1. Box 208 Southport. NC 28461 y
RII:D P       Ril     P     Ril DR R1:}CRP MGhh   n       R0'arr 1     DVerrelli           s'choff 10/3V90-       10/y/90       10/jl/90  ,- ff/,( /90
R1:}CRP RII:D P Ril P
Ril DR MGhh n
R0'arr 1 DVerrelli s'choff ff/,( /90 10/3V90-10/y/90 10/jl/90


c                                                                               i
c i
;w                                                                               !
;w t
    .. t l-ENCLOSURE 1 LIST OF ATTENDEES Carolina Power and Light Company R. A. Watson, Senior VP for Nur. lear Operations                         .
l-ENCLOSURE 1 LIST OF ATTENDEES Carolina Power and Light Company R. A. Watson, Senior VP for Nur. lear Operations K. Karr, 5)ecial Assistant to Senior VP for Nuclear Operations R. B. Star <ey, Jr., VP - Brunswick Nuclear Project J. W. Moyer, Technical Assistant to Plant General Manager K. B. Altman, Manager - Regulatory Compliance P. D. Morris, Senior Specialist, Nuclear Licensing
K. Karr, 5)ecial Assistant to Senior VP for Nuclear Operations           !
R. B. Star <ey, Jr., VP - Brunswick Nuclear Project J. W. Moyer, Technical Assistant to Plant General Manager K. B. Altman, Manager - Regulatory Compliance                             '
P. D. Morris, Senior Specialist, Nuclear Licensing
,+
,+
Nuclear Regulatory Commission                                           >
Nuclear Regulatory Commission S. D. Ebneter, Regional Administrator, Region 11 (Rll)
S. D. Ebneter, Regional Administrator, Region 11 (Rll)
J. L. Milhoan, Deputy Regional Administrator, Ril L. A. Reyes, Director, Division of Reactor Projects (DRP), RIl E
J. L. Milhoan, Deputy Regional Administrator, Ril                       -
E. W.-Merschoff Deputy Director, DRP, Ri!
L. A. Reyes, Director, Division of Reactor Projects (DRP), RIl E       E. W.-Merschoff Deputy Director, DRP, Ri!                               -
G. R. Jenkins, Director, Enforcement and Investigation Coordination Staff (EICS) Ril E
G. R. Jenkins, Director, Enforcement and Investigation Coordination E
B. Uryc, Senior Enforcement Specialist EICS, RI!
Staff (EICS) Ril B. Uryc, Senior Enforcement Specialist EICS, RI!
C. A. -Julian, Chief, Engir.eering Branch, Division of Reactor Safety (DRS),RII--
C. A. -Julian, Chief, Engir.eering Branch, Division of Reactor Safety (DRS),RII--
D.'M. Verre111, Chief, Reactor Projects Branch 1. DRP, Ril             i G. A. Belisle, Chief Test Programs Section, DRS, RIl R. W. Borchardt, Regional Coordinator, Office of the Executive     ,  ;
D.'M. Verre111, Chief, Reactor Projects Branch 1. DRP, Ril i
          -Director.of Operations R.- E. Carroll, Acting Chief, Reactor Projects Section 1A, DRP, R!l H. 0. Christensen, Senior Resident inspector - Grand Gulf, DRP, Ril     ,
G. A. Belisle, Chief Test Programs Section, DRS, RIl R. W. Borchardt, Regional Coordinator, Office of the Executive
R. L. Prevatte, Senior Resident Inspector - Brunswick, DRP, RIl W. Levis, Resident Inspector - Brunswick, DRP,~ R!l .
-Director.of Operations R.- E. Carroll, Acting Chief, Reactor Projects Section 1A, DRP, R!l H. 0. Christensen, Senior Resident inspector - Grand Gulf, DRP, Ril R. L. Prevatte, Senior Resident Inspector - Brunswick, DRP, RIl W. Levis, Resident Inspector - Brunswick, DRP,~ R!l.
o      T. Lo, Project Ma"ager, Office of Nulear Reactor Projects M. M.:Glasman, Pr ject Engineer -DRP, Ril y
T. Lo, Project Ma"ager, Office of Nulear Reactor Projects o
M. M.:Glasman, Pr ject Engineer -DRP, Ril y
I
I
                                                                              +
+


O l
O l
l ENCLOSURE 2                                       j i
l ENCLOSURE 2 j
ENFORCEMENT CONFERENCE SUMMRY                             :
i ENFORCEMENT CONFERENCE SUMMRY I
I The Region II Director of Reactor Projects opened the meeting by stating the         !
The Region II Director of Reactor Projects opened the meeting by stating the issues to be discussed stemmed from the August 19, 1990 Unit 2 reactor scram which resulted from an inadequately performed / controlled surveillance test.
issues to be discussed stemmed from the August 19, 1990 Unit 2 reactor scram           ,
l Specifically, these issues involved:
which resulted from an inadequately performed / controlled surveillance test.         l Specifically, these issues involved: (1) the improprieties by Instrumentation         l
(1) the improprieties by Instrumentation l
        & Control (ISC) technicians which included the inadequate performance of the         ;
& Control (ISC) technicians which included the inadequate performance of the related surveillance test, lack of required independent verification during the i
related surveillance test, lack of required independent verification during the     i test, and the willful falsification of the test procedure to reflect                 !
test, and the willful falsification of the test procedure to reflect independent verification was performed; (2) the failure of operators to properl acknowledge and respond to annunciators induced by the surveillance test; (3) y l
independent verification was performed; (2) the failure of operators to properl     .
technicians; (4) per/ formal communications between operators and the I&Cthe failure the lack of pro J
acknowledge and respond to annunciators induced by the surveillance test; (3) y     l the lack of pro                                                                    J technicians; (4) per/ formal communications between operators and the I&Cthe failure o and (5) revealed hardware, training, and procedural deficiencies. CP&L's Senior Vice President for Nuclear Operations expressed his concern over the         !
o and (5) revealed hardware, training, and procedural deficiencies.
subject event and indicated that the above issues had been addressed by short       i term corrective actions, with long term corrective actions being ccptured           !
CP&L's Senior Vice President for Nuclear Operations expressed his concern over the subject event and indicated that the above issues had been addressed by short i
by the Brunswick Integrated Action Plan.                                             !
term corrective actions, with long term corrective actions being ccptured by the Brunswick Integrated Action Plan.
l The licensee then proceeded to address the issues of concern, providing related     !
l The licensee then proceeded to address the issues of concern, providing related corrective actions, an overview of safety significance, and a sequence of l
corrective actions, an overview of safety significance, and a sequence of           l events. it was pointed out by the licensee that the scram was investigated           j promptly, the root cause was determined, the event was initially reported,           '
events.
immediate corrective actions were taken, the plant was always within its             i analyzed conditions, and no safety limits or radiological dose limits were           l exceeded. They also stated that the willful procedural noncompliance was an       i isolated incident and not indicative of a programmatic problem or a breakdown     -l in management controls. it was further indicated that in 12 years of operating       t history this was the first incident of deliberate falsification at Brunswick.
it was pointed out by the licensee that the scram was investigated j
When questioned, tne licensee stated that the surveillance tests conducted by     1 the two I&C technicians were reperformed.                                           l f
promptly, the root cause was determined, the event was initially reported, immediate corrective actions were taken, the plant was always within its i
Command, control, and communication issues in the control room and in the           l performance of maintenance / surveillance were then discussed. The Regional         {
analyzed conditions, and no safety limits or radiological dose limits were l
Administrator indicated that he was concerned with the apparent lack of a           ;
exceeded.
questioning attitude on the part of operations. Two annunciators which clearly       1 indicated that Channel A2 was in a trip condition and that testing was underway on Channel B2 should have alerted the operator to stop the testing. In             -!
They also stated that the willful procedural noncompliance was an i
addition, when - the operator confronted the technician concerning the status       j of the balf-trip condition, communication between the individuals was imprecise     i and lacking formality, in response to this concern, the licensee indicated         !
isolated incident and not indicative of a programmatic problem or a breakdown
that training in the area of formalized communications was in progress; that       i new maintenance pre / post job briefing requirements were imposed; and on           ,
-l in management controls.
August 22, 1990, all work was suspended pending site - wide briefings to review     !
it was further indicated that in 12 years of operating t
I        this and other recent events. Additionally, in order to ensure operators do not mistakenly disregard annunciator indications during future surveillance testing, the licensee stated that annunciator procedures were revised accordingly.
history this was the first incident of deliberate falsification at Brunswick.
When questioned, tne licensee stated that the surveillance tests conducted by 1
the two I&C technicians were reperformed.
l f
Command, control, and communication issues in the control room and in the l
performance of maintenance / surveillance were then discussed.
The Regional
{
Administrator indicated that he was concerned with the apparent lack of a questioning attitude on the part of operations. Two annunciators which clearly 1
indicated that Channel A2 was in a trip condition and that testing was underway on Channel B2 should have alerted the operator to stop the testing.
In addition, when - the operator confronted the technician concerning the status j
of the balf-trip condition, communication between the individuals was imprecise i
and lacking formality, in response to this concern, the licensee indicated that training in the area of formalized communications was in progress; that i
new maintenance pre / post job briefing requirements were imposed; and on August 22, 1990, all work was suspended pending site - wide briefings to review I
this and other recent events.
Additionally, in order to ensure operators do not mistakenly disregard annunciator indications during future surveillance testing, the licensee stated that annunciator procedures were revised accordingly.
l
l


Enclosure 2                                                           2 4                                        Relative to the lack of timely notifications, the licensee indicated that the                                                             l shift technical advisor initially drew the correct conclusion relative to                                                                 l declaration of an unusual event when the five safety relief valves (SRVs)                                                                 l failed to operate properly; however, the Operations Manager elected to wait for                                                           1 an engineering evaluation. Stated corrective actions in response to these problems included evaluating operational characteristics of the SRVs; development of a simple policy for event declaration; and capturing this and the other notification problems by on-going training.
2 Relative to the lack of timely notifications, the licensee indicated that the 4
When questioned about the problems operators experienced with the startup level control valve (SULCV), the licensee indicated that the trim of the valve was changed in 1988 resulting in different flow characteristics for the valve.                                                           H
shift technical advisor initially drew the correct conclusion relative to declaration of an unusual event when the five safety relief valves (SRVs) failed to operate properly; however, the Operations Manager elected to wait for an engineering evaluation.
                                        - Since this change was accomplished as a direct replacemer.t, it was not reviewed by .the training organization, and therefore, the simulator was not upgraded to reflect the change.                                   Stated corrective actions for identified hardware, training, and procedural deficiencies included: reviewing direct replacement modifications issued before March 1989; including the Training Department as a member- of the Site Incident investigation Team; re-evaluation of thermal setpoints for selected valves; upgrade of simulator to reflect true SULCV operation, as well as thermal overload characteristics of the reactor core                                                             j isolation cooling system trip and throttle valve; revision of operating                                                               i procedures and operator aids as necessary; and implementation of a design basis reconstitution program,                                                                                                               y The Regional- Administrator closed the meeting and +"anked the licensee for                                                             [
Stated corrective actions in response to these problems included evaluating operational characteristics of the SRVs; development of a simple policy for event declaration; and capturing this and the other notification problems by on-going training.
their presentation. He then informed CPhl that th.y would be advised at a                                                             !
When questioned about the problems operators experienced with the startup level control valve (SULCV), the licensee indicated that the trim of the valve was changed in 1988 resulting in different flow characteristics for the valve.
later date as to NRC's deliberations on these matters,                                                                                 l l
H
l 1
- Since this change was accomplished as a direct replacemer.t, it was not reviewed by.the training organization, and therefore, the simulator was not upgraded to reflect the change.
i l
Stated corrective actions for identified hardware, training, and procedural deficiencies included:
I l
reviewing direct replacement modifications issued before March 1989; including the Training Department as a member-of the Site Incident investigation Team; re-evaluation of thermal setpoints for selected valves; upgrade of simulator to reflect true SULCV operation, as well as thermal overload characteristics of the reactor core j
4 1
i isolation cooling system trip and throttle valve; revision of operating procedures and operator aids as necessary; and implementation of a design basis reconstitution program, y
The Regional-Administrator closed the meeting and +"anked the licensee for
[
their presentation.
He then informed CPhl that th.y would be advised at a later date as to NRC's deliberations on these matters, l
l l
1 i
l I
l 4
1


l t                                                                                           !
t ENCLOSURE 3 BRUNSWICK NUCLEAR PROJECT 1
!.                                                                                          l ENCLOSURE 3 BRUNSWICK NUCLEAR PROJECT 1
i i
i i
l
l
'I                                           AUGUST 19, 1990 REACTOR TRIP ENFORCEMENT CONFERENCE L
'I AUGUST 19, 1990 REACTOR TRIP ENFORCEMENT CONFERENCE L
.l I                                                                                   !
.l I
I l
I l
i l'
i l'
L L                                                           OCTOBER. 16,   1990             :
L L
1 i
OCTOBER. 16, 1990 1
i


u-                                                                                                                           ,
u-ENFORCEMENT CONFERENCE OCTOBER 16, 1990 AGEND.A h
ENFORCEMENT CONFERENCE OCTOBER 16, 1990
OVERVIEW RUSS STARKEY Y
!                                                                      AGEND.A h
DESCRIPTION OF EVENTS BRUCE ALTMAN i
OVERVIEW                                           RUSS STARKEY Y
FAILURE TO FOLLOW TEST RICNARD WARDEN PROCEDURES (BRUCE ALTMAN)
DESCRIPTION OF EVENTS                             BRUCE ALTMAN i
L l
FAILURE TO FOLLOW TEST                           RICNARD WARDEN PROCEDURES                                     (BRUCE ALTMAN)
(324/90-29-01)
L l                                 (324/90-29-01)
INADEQUATE PROCEDURES JOHN M0YER AND COMPLIANCE H
INADEQUATE PROCEDURES                             JOHN M0YER H                       '
(324/90-29-02) i i
AND COMPLIANCE (324/90-29-02) i           1 i
1 I
I FAILURE TO DECLARE UNUSUAL EVENT                 JOHN M0YER
FAILURE TO DECLARE UNUSUAL EVENT JOHN M0YER AND MAKE PROMPT NOTIFICATION l
              ,                                  AND MAKE PROMPT NOTIFICATION l                                     (324/90-29-03)
(324/90-29-03)
FAILURE TO MAKE PROMPT                           JOHN M0YER NOTIFICATION OF ESF ACTUATIONS (324/90-29-04)
FAILURE TO MAKE PROMPT JOHN M0YER NOTIFICATION OF ESF ACTUATIONS (324/90-29-04)
ENGINEERING AND TRAINING                         BRUCE ALTMAN 1
ENGINEERING AND TRAINING BRUCE ALTMAN 1
;                                              SUM 4ARY                                         RUSS STARKEY t
SUM 4ARY RUSS STARKEY t
l
l


1         .
1 1
1                   .            . .
ENFORCEMENT CONFERENCE l
ENFORCEMENT CONFERENCE l                                                                                                                                 OVERVIEW 1
OVERVIEW DESCRIPTION OF EVENT (AUGUST 19.
DESCRIPTION OF EVENT (AUGUST 19. 1990)-
1990)-
4 0   I&C TECHNICIANS FAILED TO FOLLOW MAINTENANCE SURVEILLANCE TEST (MST) PROCEDURE AND
4 0
;                                          DELIBERATELY MISLED INVESTIGATION.
I&C TECHNICIANS FAILED TO FOLLOW MAINTENANCE SURVEILLANCE TEST (MST) PROCEDURE AND DELIBERATELY MISLED INVESTIGATION.
0     UNPLANNED REACTOR TRIP 4
0 UNPLANNED REACTOR TRIP 4
0       EQUIPMENT, PERSONNEL, AND PROCEDURAL WEAKNESSES EVIDENCED 1
0 EQUIPMENT, PERSONNEL, AND PROCEDURAL WEAKNESSES EVIDENCED 1
k i             -
k i
4 2
4 2


                                  ..                                                            I 1
I 1
ENFORCEMENT CONFERENCE l                                                           0VERVIEW CONT'D I                                                                                                 i
ENFORCEMENT CONFERENCE l
.                                      SAFETY SIGNIFICANCE l
0VERVIEW CONT'D I
0   N0 NUCLEAR SAFETY SIGNIFICANCE i
i SAFETY SIGNIFICANCE l
BRUNSWICK PLANT 6  ALWAYS WITHIN ANALYZED CONDITION ENVIRONMENT PUBLIC 0   NO RADIOLOGICAL DOSE LIMITS EXCEEDED l
0 N0 NUCLEAR SAFETY SIGNIFICANCE BRUNSWICK PLANT i
l                                         0   WILLFUL PROCEDURE NONCOMPLIANCE IS ROI A l                                               PROGRAMMATIC PROBLEM.                         ,
ALWAYS WITHIN ANALYZED CONDITION 6
0     NOT INDICATIVE OF A BREAKDOWN IN MANAGEMENT CONTROLS 3
ENVIRONMENT PUBLIC 0
NO RADIOLOGICAL DOSE LIMITS EXCEEDED l
l 0
WILLFUL PROCEDURE NONCOMPLIANCE IS ROI A l
PROGRAMMATIC PROBLEM.
0 NOT INDICATIVE OF A BREAKDOWN IN MANAGEMENT CONTROLS 3
~


ENFORCEMENT CONFERENCE OVERVIEW (CONT'D)
ENFORCEMENT CONFERENCE OVERVIEW (CONT'D)
CAUSAL FACTORS AND ROOT CAUSE L
CAUSAL FACTORS AND ROOT CAUSE L
0             CAUSAL FACTORS IDENTIFIED 0             ROOT CAUSES DETERMINED AND UNDERST0OD
0 CAUSAL FACTORS IDENTIFIED 0
!          IDENTIFICATION AND REPORTING 0             SELF IDENTIFIED L             0               INITIATING EVENT PROMPTLY REPORTED 0               IMMEDIATE CORRECTIVE ACTIONS TAKEN CORRECTIVE ACTIONS TO PRECLUDE RECURRENCE 0               PROMPT 0               COMPREHENSIVE 0               SELF INITIATED 0               SITE WIDE APPLICATION 0               HEIGHTEN AWARENESS OF PLANT AND PERSONAL CONSEQUENCES 4
ROOT CAUSES DETERMINED AND UNDERST0OD IDENTIFICATION AND REPORTING 0
SELF IDENTIFIED L
0 INITIATING EVENT PROMPTLY REPORTED 0
IMMEDIATE CORRECTIVE ACTIONS TAKEN CORRECTIVE ACTIONS TO PRECLUDE RECURRENCE 0
PROMPT 0
COMPREHENSIVE 0
SELF INITIATED 0
SITE WIDE APPLICATION 0
HEIGHTEN AWARENESS OF PLANT AND PERSONAL CONSEQUENCES 4


ENFORCEMENT CONFERENCE OVERVIEW (CONT'D)
ENFORCEMENT CONFERENCE OVERVIEW (CONT'D)
PAST PERFORMANCE O   ISOLATED OCCURRENCE AND NO PAST VIOLATION 0   ACKNOWLEDGED PRIOR PERSONNEL, EQUIPMENT, AND PROCEDURAL CONCERNS DILIGENTLY WORKING TO CORRECT MATERIAL CONDITION IMPROVING CONTINUALLY PERFORMANCE INDICATORS (UNTIL THIS EVENT) SHOWED CONTINUING PROGRESS PRIOR NOTICE OF SIMILAR EVENTS 0   NONE SPECIFIC TO THIS COMBINATION OF EVENTS e
PAST PERFORMANCE O
ISOLATED OCCURRENCE AND NO PAST VIOLATION 0
ACKNOWLEDGED PRIOR PERSONNEL, EQUIPMENT, AND PROCEDURAL CONCERNS DILIGENTLY WORKING TO CORRECT MATERIAL CONDITION IMPROVING CONTINUALLY PERFORMANCE INDICATORS (UNTIL THIS EVENT) SHOWED CONTINUING PROGRESS PRIOR NOTICE OF SIMILAR EVENTS 0
NONE SPECIFIC TO THIS COMBINATION OF EVENTS e
5
5


l       ., ,,
l i
i 1
1 ENFORCEMENT CONFERENCE DESCRIPTION 0F EVENT AUGUST 19. 1990 21:37 INITIATED PERFORMANCE OF 2MST-PCIS24M 4
ENFORCEMENT CONFERENCE DESCRIPTION 0F EVENT AUGUST 19. 1990                                                       4 21:37           INITIATED PERFORMANCE OF 2MST-PCIS24M i
i 21:54 CHANNEL D TEST INITIATED WITHOUT RESETTING PREVIOUS CHANNEL C TEST TRIP i
21:54           CHANNEL D TEST INITIATED WITHOUT RESETTING i
GROUP 1 ISOLATION OCCURS - MAIN STEAM i
PREVIOUS CHANNEL C TEST TRIP i
l ISOLATION VALVES CLOSE REACTOR SCRAMS - REACTOR RECIRC. PUMPS TRIP HPCI AND RCIC AUTO START i
                            -      GROUP 1 ISOLATION OCCURS - MAIN STEAM l                                   ISOLATION VALVES CLOSE
i 21:55 SAFETY. RELIEF VALVES (SRV) AUT0 OPEN DUE TO HIGH PRESSURE (3.4-4 SEC DURATION)
                            -      REACTOR SCRAMS - REACTOR RECIRC. PUMPS TRIP i                            -      HPCI AND RCIC AUTO START i
REACTOR FEED PUMPS TRIP HPCI AND RCIC SECURED 21:56 SRVs MANUALLY OPENED TO CONTROL PRESSURE 22:00 HPCI MANUALLY STARTED FOR PRESSURE CONTROL 22:14 TORUS COOLING INITIATED
21:55           SAFETY. RELIEF VALVES (SRV) AUT0 OPEN DUE TO HIGH PRESSURE (3.4-4 SEC DURATION)
~22:15 NOTIFIED SENIOR NRC RESIDENT INSPECTOR OF EVENT
REACTOR FEED PUMPS TRIP
                            -      HPCI AND RCIC SECURED 21:56           SRVs MANUALLY OPENED TO CONTROL PRESSURE 22:00           HPCI MANUALLY STARTED FOR PRESSURE CONTROL 22:14           TORUS COOLING INITIATED
            ~22:15           NOTIFIED SENIOR NRC RESIDENT INSPECTOR OF EVENT
]
]
22:16           RCIC MANUALLY STARTED FOR LEVEL CONTROL i           22:26           GROUP 1 ISOLATION OCCURS-LOW CONDENSER VACUUM       l 22:34           HPCI AND RCIC' SECURED 23:05/09         RCIC AND HPCI MANUALLY STARTED FOR PRESSURE CONTROL (HPCI STOP VALVE CYCLES)                   j i
22:16 RCIC MANUALLY STARTED FOR LEVEL CONTROL i
23:17           REACTOR PROTECTION SYSTEM TRIP - LOW LEVEL 23:23           HPCI AND RCIC TRANSFERRED TO LEVEL CONTROL         ;
22:26 GROUP 1 ISOLATION OCCURS-LOW CONDENSER VACUUM l
MSIVs OPENED                                       l
22:34 HPCI AND RCIC' SECURED 23:05/09 RCIC AND HPCI MANUALLY STARTED FOR PRESSURE CONTROL (HPCI STOP VALVE CYCLES) j i
23:17 REACTOR PROTECTION SYSTEM TRIP - LOW LEVEL 23:23 HPCI AND RCIC TRANSFERRED TO LEVEL CONTROL MSIVs OPENED l
(
(
i 23:27           HPCI AND RCIC SECURED 23:53           2B REACTOR FEED PUMP STARTED-SULCV PROBLEM ENCOUNTERED 6
i 23:27 HPCI AND RCIC SECURED 23:53 2B REACTOR FEED PUMP STARTED-SULCV PROBLEM ENCOUNTERED 6


[             .
[
1
1
                                                                                                                                                                                                )
)
ENFORCENENT CONFERENCE                                                                                                 l DESCRIPTION 0F EVENT (CONT'D) ll                                                                                                                                                                                               l 2
ENFORCENENT CONFERENCE DESCRIPTION 0F EVENT (CONT'D) ll 2
AUGUST 20, 1990                                                                                                                                                   ,
AUGUST 20, 1990 i
i l
~00:00 SCRAM INCIDENT INVESTIGATION TEAM MEETS ON-SITE 00:04 REACTOR PROTECTION SYSTEM TRIP-LOW LEVEL 00:05 HPCI MANUALLY STARTED FOR LEVEL CONTROL AND THEN SECURED (HPCI STOP VALVE CYCLES) 00:06 LEVEL CONTROL INITIATED BY CONTROLLING SPEED OF 28 REACTOR FEED PilMP 00:23 2B REACTOR FEED PUMP IRIPS DUE TO HIGH LEVEL 00:27 GROUP 3 ISOLATION (RWCU) DUE TO HI DIFFERENTIAL FLOW 00:31 SECURED CONDENSATE BOOSTER PUMPS DUE TO INCREASING LEVEL i
                                ~00:00                 SCRAM INCIDENT INVESTIGATION TEAM MEETS ON-SITE 00:04                 REACTOR PROTECTION SYSTEM TRIP-LOW LEVEL 00:05                 HPCI MANUALLY STARTED FOR LEVEL CONTROL AND THEN SECURED (HPCI STOP VALVE CYCLES) 00:06                 LEVEL CONTROL INITIATED BY CONTROLLING SPEED OF 28                                                                                       .
REACTOR FEED PilMP 00:23                 2B REACTOR FEED PUMP IRIPS DUE TO HIGH LEVEL 00:27                 GROUP 3 ISOLATION (RWCU) DUE TO HI DIFFERENTIAL FLOW 00:31               SECURED CONDENSATE BOOSTER PUMPS DUE TO INCREASING i
LEVEL
(
(
01:52               10CFR 50.72 FOUR HOUR RED PHONE REPORT MADE FOR SCRAM                                                                                   4 02:00               RCIC TRIP AND THROTTLE VALVE TRIPS ON OVERLOAD WHILE ALIGNING SYSTEM TO STANDBY 02:00               SCRAM INCIDENT INVESTIGATION TEAM CONCLUDES SURVEILLANCE TEST PROCEDURE NOT FOLLOWED AND DETERMINES RECORDS FALSIFIED i                                 02:17               2A CONDENSATE B0OSTER PUMP STARTED-DISCHARGE VALVE TRIPS ON OVERLOAD 02:20               2B CONDENSATE B0OSTER PUMP STARTED FOR VESSEL LEVEL CONTROL AND SULCV PLACED IN AUTO END OF EVENT 7
01:52 10CFR 50.72 FOUR HOUR RED PHONE REPORT MADE FOR SCRAM 4
y -t   <      y     wg----vr.r-.e,,---w---.---.-   v,,e,-e~--.- +-*e-- -i..+v.,..w.,. , - .-%---s-w           -=--.-w.--- - . ~,-.v- . - - - - . . . ,-- -. - - -- - -
02:00 RCIC TRIP AND THROTTLE VALVE TRIPS ON OVERLOAD WHILE ALIGNING SYSTEM TO STANDBY 02:00 SCRAM INCIDENT INVESTIGATION TEAM CONCLUDES SURVEILLANCE TEST PROCEDURE NOT FOLLOWED AND DETERMINES RECORDS FALSIFIED i
02:17 2A CONDENSATE B0OSTER PUMP STARTED-DISCHARGE VALVE TRIPS ON OVERLOAD 02:20 2B CONDENSATE B0OSTER PUMP STARTED FOR VESSEL LEVEL CONTROL AND SULCV PLACED IN AUTO END OF EVENT 7
y
-t y
wg----vr.r-.e,,---w---.---.-
v,,e,-e~--.-
+-*e--
-i..+v.,..w.,.
, -.-%---s-w
-=--.-w.--- -.
~,-.v-


t                                                                                                                     .
t ENFORCEMENT CONFERENCE DESCRIPTION OF EVENT (CONT'D)
ENFORCEMENT CONFERENCE DESCRIPTION OF EVENT (CONT'D)                                   ;
AUGUST 20. 1990 17:45 UNUSUAL EVENT DECLARED AND 7 RMINATED AUGUST 21, 1990 11:08 FOLLOWUP 10CFR50.72 REPORT COMPLETED FOR:
.                        AUGUST 20. 1990 17:45                 UNUSUAL EVENT DECLARED AND 7 RMINATED AUGUST 21, 1990 11:08                 FOLLOWUP 10CFR50.72 REPORT COMPLETED FOR:
GROUP 1 ISOLATION-LOW VACUUM RPS TRIPS (2)-LOW LEVEL i
GROUP 1 ISOLATION-LOW VACUUM RPS TRIPS (2)-LOW LEVEL i
SEPTEMBER 7, 1990 11:05                 FOLLOWUP 10CFR50.72 REPORT COMPLETED FOR GROUP 3 ISOLATION (RWCU) l^
SEPTEMBER 7, 1990 11:05 FOLLOWUP 10CFR50.72 REPORT COMPLETED FOR GROUP 3 ISOLATION (RWCU) l^
I i
I i
i l
i l
i l
i l
8 l
8 l
l                                                                                                                     ;
l


3 ENFORCEMENT CONFERENCE FAILURE TO FOLLOW TEST PROCEDURES (324/90-29-01) i i
3 ENFORCEMENT CONFERENCE FAILURE TO FOLLOW TEST PROCEDURES (324/90-29-01) i l
l IISI                                                                                                 :
IISI 0
i 0                MST ON PCIS 24M -LOGIC TRIP TEST F012 HIGH L                                                             CONDENSER PRESSURE l
MST ON PCIS 24M -LOGIC TRIP TEST F012 HIGH L
ERRORS 1
CONDENSER PRESSURE ERRORS l
0                 MISSED PROCEDURE STEPS INDEPENDENT VERIFICATION i
0 MISSED PROCEDURE STEPS INDEPENDENT VERIFICATION i
RESETOFCHkNNELC i
RESETOFCHkNNELC i
0                 MISCOMMUNICATION WITH CO-0                 FALSIFIED SURVEILLANCE TEST RECORD 0                 INITIAL DENIAL OF ERROR 1                                                                                                                                   ,
0 MISCOMMUNICATION WITH CO-0 FALSIFIED SURVEILLANCE TEST RECORD 0
: 1.           N 9
INITIAL DENIAL OF ERROR 1
1.
N 9
i l
i l
l:
l:


)
)
ENFORCEMENT CONFERENCE FAILURE TO FOLLOW TEST PROCEDURES (CONT'D)                                                                   ;
ENFORCEMENT CONFERENCE FAILURE TO FOLLOW TEST PROCEDURES (CONT'D)
;                                N0 GENERIC IMPLICATIONS (ISOLATED OCCURRENCE) 0                     HIGH MST PERFORMANCE VISIBILITY
N0 GENERIC IMPLICATIONS (ISOLATED OCCURRENCE) 0 HIGH MST PERFORMANCE VISIBILITY CDs, FOREMEN, MANAGERS, STAS, CJ-WORKERS, NRC, 0A 0
                                                                              -                    CDs, FOREMEN, MANAGERS, STAS, CJ-WORKERS, NRC, 0A
HIGH FREQUENCY OF MSTs a 200/ MONTH r
;                                                        0                    HIGH FREQUENCY OF MSTs a 200/ MONTH                                                             r I                                                                                                                                                                             ,
I 0
0                    NRC INSPECTIONS AND OBSERVATIONS 4/ MONTH FORMAL 0                   QA/QC AUDIT AND SURVEILLANCE                                                                 t ON-G0ING I
NRC INSPECTIONS AND OBSERVATIONS 4/ MONTH FORMAL 0
0                     MAINTENANCE AUDITS WEEKLY i
QA/QC AUDIT AND SURVEILLANCE t
ON-G0ING I
0 MAINTENANCE AUDITS WEEKLY i
i 10
i 10
    --                . . - . - , . , - - . . . . . . . . . - . - . . . . . , _ . , ~ . . . _ . . .
.. -. -,., - -......... -. -....., _., ~... _...


ENFORCEMENT CONFERENCE FAILURE TO FOLLOW TEST PROCEDURE (CONT'D)
ENFORCEMENT CONFERENCE FAILURE TO FOLLOW TEST PROCEDURE (CONT'D)
PERSONNEL 0     TWO MAINTENANCE TECHNICIANS I
PERSONNEL 0
  .                                          SIGNIFICANCE OF UNDERLYING VIOLATION L                                                                                                                                                                                                                                 ,
TWO MAINTENANCE TECHNICIANS SIGNIFICANCE OF UNDERLYING VIOLATION I
O        ISOLATED OCCURRENCE                                                                       -
L O
0        NO PREVIOUS VIOLATION INTENT OF INDIVIDUAL EMPLOYEE 4
ISOLATED OCCURRENCE 0
0         OVER CONFIDENCE LED T0. GROSS NEGLIGENCE h
NO PREVIOUS VIOLATION INTENT OF INDIVIDUAL EMPLOYEE 4
0           DID NOT DELIBERATELY INTEND TO CAUSE PLANT PROBLEMS
0 OVER CONFIDENCE LED T0. GROSS NEGLIGENCE h
_                                                      0              N0. ECONOMIC INCENTIVE INVOLVED
0 DID NOT DELIBERATELY INTEND TO CAUSE PLANT PROBLEMS 0
_                                                                                                                                                                                                                    11 M                       _      -__a-_     __m_mm__._.___.m__---m-______mm       ._-___mm.=m___-_.-__.__----_.--m_m-..-_-*--._ _ ____z_ m--.. -a.____mm-_._. ___.__mu__._a__._______.-_-m.-___a.:.__-m_-
N0. ECONOMIC INCENTIVE INVOLVED 11 M
-__a-_
__m_mm__._.___.m__---m-______mm
._-___mm.=m___-_.-__.__----_.--m_m-..-_-*--._
_ ____z_
m--..
-a.____mm-_._.
___.__mu__._a__._______.-_-m.-___a.:.__-m_-


ENFORCEMENT CONFERENCE I                                         FAILURE TO FOLLOW TEST PROCEDURE (CONT'D) l l
ENFORCEMENT CONFERENCE I
FAILURE TO FOLLOW TEST PROCEDURE (CONT'D) l l
INTENT OF LICENSEE (CP&L)
INTENT OF LICENSEE (CP&L)
C   PROVIDED STANDARDS AND PROCEDURES TO PREVENT SUCH ACTIONS                                                                                                                                                   i 0   POLICY REINFORCED VIA TRAINING, MANAGEMENT EXAMPLE, AND CONDUCT OF OPERATION                                                                                                                             l 1
C PROVIDED STANDARDS AND PROCEDURES TO PREVENT SUCH ACTIONS i
0    HAD N0 PRIOR KNCWLEDGE OF INTENT OF INDIVIDUAL 0   TECHNICIAN SELECTION STANDARDS ALL'MSTTECANICIANSAREI&CTECHNICAL                                                                                                                 t LEVEL ONE (ANS QUALIFIED)
0 POLICY REINFORCED VIA TRAINING, MANAGEMENT EXAMPLE, AND CONDUCT OF OPERATION 0
HAD N0 PRIOR KNCWLEDGE OF INTENT OF INDIVIDUAL 0
TECHNICIAN SELECTION STANDARDS ALL'MSTTECANICIANSAREI&CTECHNICAL t
LEVEL ONE (ANS QUALIFIED)
ONLY TOP QUALITY I&C TECHNICIANS ASSIGNED TO MST CREWS MST CREWS RECEIVE PRIORITY MANNING MST CREWS EXPERIENCE LEVELS ARE:
ONLY TOP QUALITY I&C TECHNICIANS ASSIGNED TO MST CREWS MST CREWS RECEIVE PRIORITY MANNING MST CREWS EXPERIENCE LEVELS ARE:
                                                                        ~7 YEARS AVERAGE I&C EXPERIENCE
~7 YEARS AVERAGE I&C EXPERIENCE
                                                                        ~4.7 YEARS AVERAGE MST EXPERIENCE 12
~4.7 YEARS AVERAGE MST EXPERIENCE 12 m
_m___-_-  _ . _ _ _ < - - - _ _ _ _ , - , - ----c-, -.ce-.--,_- . - - + -. - . - + . . . --.. .wv+-*- +-w v-w+=g--e we =e--e++=~-w++ ~~--"~-v---*--s--
----c-,
-.ce-.--,_-. - - + -. -. - +... --..
.wv+-*-
+-w v-w+=g--e we
=e--e++=~-w++
~~--"~-v---*--s--


l                                                                                         ENFORCEMENT CONFERENCE i
l ENFORCEMENT CONFERENCE i
FAILURE TO FOLLOW TEST PROCEDURE (CONT'D)
FAILURE TO FOLLOW TEST PROCEDURE (CONT'D)
CORRECTIVE ACTIONS O                         RE-PERFORMED MSTs CONDUCTED BY THE TECHNICIANS INVOLVED,
CORRECTIVE ACTIONS O
(
RE-PERFORMED MSTs CONDUCTED BY THE TECHNICIANS INVOLVED, 1
1 0                       AUGUST 20 - IMPOSED NEW MAINTENANCE PRE AND POST J0B BRIEFING REQUIREMENTS:
0 AUGUST 20 - IMPOSED NEW MAINTENANCE PRE AND POST J0B BRIEFING REQUIREMENTS:
IDENTIFICATION OF CRITICAL TASKS CONSEQUENCES OF IMPROPER PERFORMANCE REQUIRED INTERFACES l
IDENTIFICATION OF CRITICAL TASKS CONSEQUENCES OF IMPROPER PERFORMANCE REQUIRED INTERFACES SAFETY AND ALARA CONSIDERATIONS l
SAFETY AND ALARA CONSIDERATIONS O                         AUGUST 22 - WORK SUSPENDED PENDING SITE-WIDE I
O AUGUST 22 - WORK SUSPENDED PENDING SITE-WIDE I
BRIEFINGS:
BRIEFINGS:
WORK CONTROL BRIEFINGS TO REVIEW RECENT EVENTS PRE-JOB BRIEFINGS BY FIRST LINE SUPERVISORS REQUIRED i
WORK CONTROL BRIEFINGS TO REVIEW RECENT EVENTS PRE-JOB BRIEFINGS BY FIRST LINE SUPERVISORS REQUIRED i
0                         PLANT MANAGER HAD PERSONAL MEETINGS (THE                               '
0 PLANT MANAGER HAD PERSONAL MEETINGS (THE FOLLOWING WEEK) WITH ALL PLANT WORK GROUPS.
FOLLOWING WEEK) WITH ALL PLANT WORK GROUPS.
l l
l l
13 i
13 i
    ....,<en,-,                 n,-   ---.m,v.w ,,.,,-,.,.,.,_-..,,.,,-w,-,,,,w,,,_...               , , , , _ , , . , - , , ,-s.
....,<en,-,
n,-
---.m,v.w
,,.,,-,.,.,.,_-..,,.,,-w,-,,,,w,,,_...
,-s.
n


i 1
i 1
W 1
W ENFORCEMENT CONFERENCE 1
ENFORCEMENT CONFERENCE 8
8 FAILURE TO FOLLOW TEST PROCEDURE (CONT'D)
FAILURE TO FOLLOW TEST PROCEDURE (CONT'D)
CORRECTIVE ACTIONS-(CONT'D)
CORRECTIVE ACTIONS-(CONT'D)                                   :
l
~
~
l o
o
                                -0 AUGUST 127 - COMPLETED INVESTIGATION AND TERMINATED ~ EMPLOYMENT OF TECHNICIANS
-0 AUGUST 127 - COMPLETED INVESTIGATION AND TERMINATED ~ EMPLOYMENT OF TECHNICIANS O
                    .            O  FORMALIZED COMMUNICATIONS TRAINING IN PROGRESS-       :
FORMALIZED COMMUNICATIONS TRAINING IN PROGRESS-IMMEDIATE - MST-I&C' CREWS TRAINED REAL TIME TRAINING - DURING.4TH QTR. 1990 R
IMMEDIATE - MST-I&C' CREWS TRAINED REAL TIME TRAINING - DURING.4TH QTR. 1990 R
.0 STANDARDS OF EXCELLENCE ~ ADOPTED BY MAINTENANCE i
          "                      .0 STANDARDS OF EXCELLENCE ~ ADOPTED BY MAINTENANCE     '
i COMPLETED OCTOBER 13, 1990-t i
i i
                                      -  COMPLETED OCTOBER 13, 1990-                     !
t i<
1 14 q 1
1 14 q 1


o                 .      .
o k
k STANDARDS OF: EXCELLENCE.
STANDARDS OF: EXCELLENCE.
IN MAINTENANCE TO MEZT .J2 CHALLENGES AND RESPONSIBILITIES                           '
IN MAINTENANCE TO MEZT
0F THE NUCLEAR INDUSTRY WE, AS BRUNSWICK                         i
.J2 CHALLENGES AND RESPONSIBILITIES 0F THE NUCLEAR INDUSTRY WE, AS BRUNSWICK i
-                                                  NUCLEAR PROJECT MAINTENANCE, HEREBY ADOPT THE                         I FOLLOWING PROFESSIONAL STANDARDS:                 l WE WILL ENSURE THAT'THE SAFETY OF THE PUBLIC, PLANT PERSONNEL AND PLANT EQUIPMENT IS GIVEN HIGHEST PRIORITY IN ALL ASPECTS OF MAINTENANCE.
NUCLEAR PROJECT MAINTENANCE, HEREBY ADOPT THE I
FOLLOWING PROFESSIONAL STANDARDS:
l WE WILL ENSURE THAT'THE SAFETY OF THE PUBLIC, PLANT PERSONNEL AND PLANT EQUIPMENT IS GIVEN HIGHEST PRIORITY IN ALL ASPECTS OF MAINTENANCE.
PERFORM-QUALITY MAINTENANCE TO THE HIGHEST-PROFESSIONAL
PERFORM-QUALITY MAINTENANCE TO THE HIGHEST-PROFESSIONAL
                                                            ~ STANDARDS; INCLUDING COMPLIANCE TO ESTABLISHED             -
~ STANDARDS; INCLUDING COMPLIANCE TO ESTABLISHED
                                                                                                    - PROCEDURES.
- PROCEDURES.
                          '
USE 500NO MA'INTENANCE PRACTICES OURING ' ALL PHASEM 0F MAINTENANCE TO ENSURE OPTIMUM EGUIPMENT CONDITION.AND WORK AREA' CLEANLINESS.
* USE 500NO MA'INTENANCE PRACTICES OURING ' ALL PHASEM 0F MAINTENANCE TO ENSURE OPTIMUM EGUIPMENT CONDITION.AND WORK AREA' CLEANLINESS.
STRIVE TO ATTAIN TNE LOWEST POSSISLE RA0MATION EXPOSURE IN ALL PHASES OF MAINTENAN('d.
STRIVE TO ATTAIN TNE LOWEST POSSISLE RA0MATION EXPOSURE IN ALL PHASES OF MAINTENAN('d.             ,
DOC'IMENT' WORK PERFORMED 7 4. A CLEAR, C0:4CISE, ACCURATE, AND COMPLETE MANNER.
DOC'IMENT' WORK PERFORMED 7 4. A CLEAR, C0:4CISE, ACCURATE, AND COMPLETE MANNER.
: NOTIFY APPROP?IATE PERSONNEL IF UNSAFE, INADEQUATE,                 ]
: NOTIFY APPROP?IATE PERSONNEL IF UNSAFE, INADEQUATE,
p                                                                           OR'OEFELTIVE CONDITIONS'AREL06 SERVED.         '
]
L''                                                       CONTINUALLY IMP 8t0VE'' WORK' PERFORMANCE BY: ATTENDING           f O                                                                                                                   ~
p OR'OEFELTIVE CONDITIONS'AREL06 SERVED.
FORMAL TRAINING AN0' BY - LEARN!i1G Fft0M ' OUR OWN '       l ll         l                                                         EXPERIENCE,AND''THE' EXPERIENCE OF-OTHERS.
L''
EMPHAS!zt " TEAMWORK" AND' MAINTAIN GOOD WORKING-               I
CONTINUALLY IMP 8t0VE'' WORK' PERFORMANCE BY: ATTENDING O
        ^l,                                        RELATIONSHIPS'WITH10THER WORK: GROUPS:-GY TREATING FELLOW EMPLOYEES WITH RESPECT,-DIGNITY AND-COURTESY.
~
4                                             REPORT TO WORK PHYSICALLY FIT AND MENTALLY-ALERT.-
f FORMAL TRAINING AN0' BY - LEARN!i1G Fft0M ' OUR OWN '
      +1
l ll l
                                              $TRIVE.TO 00 RIGHT THINGS RIGHT THE FIRST TIME EVERYTIME.
EXPERIENCE,AND''THE' EXPERIENCE OF-OTHERS.
1                - AN0' BY 00ZNG SO, BE RECOGNIzt0 AS''AMOFS THE BEST IN OUR INDUSTRY.
EMPHAS!zt " TEAMWORK" AND' MAINTAIN GOOD WORKING-I RELATIONSHIPS'WITH10THER WORK: GROUPS:-GY TREATING FELLOW
g V.         ,
^l, EMPLOYEES WITH RESPECT,-DIGNITY AND-COURTESY.
        .J.
4 REPORT TO WORK PHYSICALLY FIT AND MENTALLY-ALERT.-
1 s,       ,!      , e       +     +---e -*=er- *ww-               " ' ' ' " ' ' *
+1
* h                                                                                                                                                                                                                         :
$TRIVE.TO 00 RIGHT THINGS RIGHT THE FIRST TIME EVERYTIME.
ENFORbEMENTCONFERENCE INADEQUATE PROCEDURES AND COMPLIANCE (324/90-29-02)                                                                                                                       r 0     ' ANNUNCIATOR PROCEDURES DURING MSTs L'
- AN0' BY 00ZNG SO, BE RECOGNIzt0 AS''AMOFS THE BEST IN OUR INDUSTRY.
COMMUNICATIONS                                                                                                                                               ,
1 g
L p.
V.
                                                  -0         OPERATOR AIDS EQUALIZE MSIVs.
.J.
                                                                                                                                                                                                                                ..1 HPCI OPERATION-1 e ;;
1 s,
n                                                   0           OPERATING PROCEDURES 1
, e
+
+---e
-*=er-
*ww-
^ ^ ^ ^ ^ ^ ^
 
h ENFORbEMENTCONFERENCE INADEQUATE PROCEDURES AND COMPLIANCE (324/90-29-02) r 0
' ANNUNCIATOR PROCEDURES DURING MSTs L'
COMMUNICATIONS L
:p.
- 0 OPERATOR AIDS EQUALIZE MSIVs.
..1 HPCI OPERATION-1 e ;;
n 0
OPERATING PROCEDURES 1
1 RCIC CONTROL SWITCH' DC VALVE THERMAL CYCLES
1 RCIC CONTROL SWITCH' DC VALVE THERMAL CYCLES
                                                                      ' CONDENSATE AND FEEDWATER (SULCV) e i:                       .
' CONDENSATE AND FEEDWATER (SULCV) e i:
                                                                                                                                                                                                                                  .I l'                                                                                                                                                                                                                           16' m
.I l'
v.-4                               %  ,    .-..4--..-c,         . , _ , , , . . . . -
16' m
                                                                                                    .,    . . - . . . - - . . . ~ - - -                           _----m._-_ ----- - - - - _ ---- - - - . -- - - - - - - -
v.-4
.-..4--..-c,
.. -... - -... ~ - - -
----m. -


I
I
- j.   -e -
- j.
-e -
ENFORCEMENT CONFERENCE INADEQUATE PROCEDURES AND COMPLIANCE (CONT'D)
ENFORCEMENT CONFERENCE INADEQUATE PROCEDURES AND COMPLIANCE (CONT'D)
CORRECI1YLACJ10RS 0         ALL RTGB.0PERATOR AIDS REVIEWED AND REVISED                         '
CORRECI1YLACJ10RS 0
AS NECESSARY FOR ACCURACY AND COMPLETENESS 0         A-THOROUGH-REVIEW 0F THESE. EVENTS DURING 4
ALL RTGB.0PERATOR AIDS REVIEWED AND REVISED AS NECESSARY FOR ACCURACY AND COMPLETENESS 0
NEXT LOR CYCLELHAS BEEN SCHEDULED ~                                 o V
A-THOROUGH-REVIEW 0F THESE. EVENTS DURING NEXT LOR CYCLELHAS BEEN SCHEDULED ~
0          REVISED RCIC PROCEDURE 0-         REMODELED! SIMULATOR TO 5 SECOND HOLD.FOR
o 4
                                            -RCIC TRIP"ANDLTHROTTLE VALVE CONTROL SWITCH-l n
V 0
0:         DC MOTOR OPERATED? VALVE DUTY CYCLE                                 :i "a                                             REQUIREMENTS UNDER REVIEW =                                         1 h                                                                                                                   l o
REVISED RCIC PROCEDURE 0-REMODELED! SIMULATOR TO 5 SECOND HOLD.FOR
4                            0         REM 0 DELED SIMULATOR SULCV RESPONSE                               ]
-RCIC TRIP"ANDLTHROTTLE VALVE CONTROL SWITCH-l n*
r                                                                                                          ,
0:
L nL                                 0-         SIMULATOR TRAINING 0N RCIC CONTROL SWITCH AND'SULCV IS: COMPLETE.
DC MOTOR OPERATED? VALVE DUTY CYCLE
c F                                                                                                       l I'
:i "a
17 L                                                                                                     :
REQUIREMENTS UNDER REVIEW =
1 h
l o
]
0 REM 0 DELED SIMULATOR SULCV RESPONSE 4r L
nL 0-SIMULATOR TRAINING 0N RCIC CONTROL SWITCH AND'SULCV IS: COMPLETE.
F l
c I'
17 L
i l i
i l i
~                                                                                                                   1
~
1


ENFORCEMENT CONFERENCE                 i FAILljRE TO DECLAtE UiljSUAL EVENT           a A k D 4AKE- >ROMPT k OTI ICATIO i (324/90-29-03)
ENFORCEMENT CONFERENCE i
CONCLUSIONS 0       STA DREW CORRECT CONCLUSION RELATIVE TO SRV POTENTIAL FAILURE.
FAILljRE TO DECLAtE UiljSUAL EVENT a
1 e         ,
A k D 4AKE- >ROMPT k OTI ICATIO i (324/90-29-03)
k L'                                               0       INDUSTRY WIDE TARGET ROCK'SRV ACTUATION
CONCLUSIONS 0
* PATTERN CAUSED UNCERTAINTY AND ' F0.TO AN-y                                            ERROR'IN JUDGEMENT.
STA DREW CORRECT CONCLUSION RELATIVE TO SRV POTENTIAL FAILURE.
3
1 e
                                                -0   . TRAINING-PROCESS WAS ADEQUATE AND CORRECT.
k L'
                                                    .                                                        i I
0 INDUSTRY WIDE TARGET ROCK'SRV ACTUATION PATTERN CAUSED UNCERTAINTY AND ' F0.TO AN-ERROR'IN JUDGEMENT.
3 y
- 0
. TRAINING-PROCESS WAS ADEQUATE AND CORRECT.
i I
l
l
            'f-p                                                 0       SEPTEMBER 27 SCRAM. DEMONSTRATED ABILITY TO L                   .                                    MAKE: CONSERVATIVE-CALL.
'f-p 0
I o
SEPTEMBER 27 SCRAM. DEMONSTRATED ABILITY TO L
J 18 l     s
MAKE: CONSERVATIVE-CALL.
    -.('
o J
18 l
s
-.('
l.
l.
g p     -a   g   --w-*-   y g     a ,
g p
3-aw   y   ,,w, ,-g,, -
-a g
                                                                      , , . ,    m ,
--w-*-
y g
a 3-aw y
,,w,
,-g,,
w-m,


    . ~ . _ .              _  . _ _ _ _ _ _ _ _ _ _ _ _ .          . - _  _. __ ._ . . ._ _ _ _ _ . _ .
. ~. _.
ENFORCEMENT CONFERENCE FAILURE TO DECLARE UNUSUAL EVENT (CONT'D1 CORRECTIVE ACTIONS J
ENFORCEMENT CONFERENCE FAILURE TO DECLARE UNUSUAL EVENT (CONT'D1 CORRECTIVE ACTIONS J
0         EVALUATED-SRV OPERATIONAi           1ARACTERISTICS AND                                 sc DEVELOPED' SIMPLE POLICY h           IDENTIFICATION AND o                                         DECLARATION l-a l-                             0         ON-GOING TRAINING i-k
0 EVALUATED-SRV OPERATIONAi 1ARACTERISTICS AND sc DEVELOPED' SIMPLE POLICY h IDENTIFICATION AND DECLARATION o
            'i '                                                                                                                   l
l-a l-0 ON-GOING TRAINING i-k
  ..        .I-l'         J.                                                                                                                       i j'                                                             .
'i '
l
.I-l' J.
i j'
i
i
      .[Il                                                                                                                        l L
.[I l
l L
4 I'
4 I'
:j .                                                                                                           19 L           .b l
19
                                                                                                  = ,         , ,- ,y +=+- = =
:j.
L
.b l
er
.,-r e
w--w=-
=,
,y
+=+- = =


4 . -::
4. -::.;
          ~.
~.
ENFORCEMENT CONFERENCE
ENFORCEMENT CONFERENCE
: FAILURE TO MAKL PRO 4P" nCl"IFICATION OF ES : ACTIJA"IOP S u                                                                      (324/90-29-04) i FOUR-EVENTS                                                                             :
: FAILURE TO MAKL PRO 4P" nCl"IFICATION OF ES : ACTIJA"IOP S (324/90-29-04) u i
FOUR-EVENTS
_}
_}
r.
r.
i j                                            0           MSIV-CLOSURE-(GROUP 1 ISOLATION) o                                                                                                                             .
ij 0
L                                                                                                                             !
MSIV-CLOSURE-(GROUP 1 ISOLATION) o L
10           RPS TRIP '(2' EVENTS)
10 RPS TRIP '(2' EVENTS)
            'l
'l
/ . ;:
/. ;:
: t.                                                                                                               .
t.
t
+
            +
0-RWCU. ISOLATION t
0-           RWCU. ISOLATION
.j(
              .j(
if I
if I
l   t
l t
                                                                                                                          'l
'l
                                                                                                                ; 20 I
; 20 I
:. .~                           . _.          -.      -  _          ..        . .
:..~


ENFORCEMENT CONFERENCE FAILUR! TO MAKE PROM)T NOTIFICATION                           <
ENFORCEMENT CONFERENCE FAILUR! TO MAKE PROM)T NOTIFICATION 0 : ESF ACTUATI0 tS (CONT'D) i CORRECTIVE ACTIONS 0
0 : ESF ACTUATI0 tS (CONT'D) i CORRECTIVE ACTIONS 0 EVENT REVIEW SCHEDULED FOR NEXT LOR                             i s
EVENT REVIEW SCHEDULED FOR NEXT LOR i
                                              ..                                                              t 0 ON-GOING TRAINING a
s t
                                                                          .                                li P
0 ON-GOING TRAINING a
                                                                                                            -i ll:
li P
V :' 1                                                                                                       .
-i ll:
y                                       .
V :' 1 y
(
(
i:
i:
          .c 21
.c 21
                                                                                                            'l
'l


ENFORCEMENT CONFERENCE J324/90-29-02. 03. 04)
ENFORCEMENT CONFERENCE J324/90-29-02. 03. 04)
Line 414: Line 536:


==SUMMARY==
==SUMMARY==
CONCLUSIONS 0       THOROUGH. EVENT REVIEW SCHEDULED FOR NEXT LOR CYCLE                                                                                                                                               l 0       PRE-JOB BRIEFS ARE STILL REQUIRED 0-       START /STOP TIMES OF MST LOGGED IN SF LOG
CONCLUSIONS 0
: 0.       COMMAND CONT.su AND COMMUNICATIONS PROJECT                                                                                                         i QUALITY TEAM
THOROUGH. EVENT REVIEW SCHEDULED FOR NEXT LOR CYCLE l
                                                                                                                  ~
0 PRE-JOB BRIEFS ARE STILL REQUIRED 0-START /STOP TIMES OF MST LOGGED IN SF LOG 0.
l                      0     -AIT REPORT COMMENTS 0       UNIT 2 SCRAM ON SEPTEMBER 27
COMMAND CONT.su AND COMMUNICATIONS PROJECT i
          ,            0        CONTINUED IMPROVEMENT IN OPERATOR
QUALITY TEAM
    .i --                       PERFORMANCE i
~
1                                                                                                                                                                               ,
0
i
-AIT REPORT COMMENTS l
        'f 22 i
0 UNIT 2 SCRAM ON SEPTEMBER 27 0
CONTINUED IMPROVEMENT IN OPERATOR
.i --
PERFORMANCE i
1
'f i
22 i


l l
ENFORCEMENT CONFERENCE ENGINEERING AND TRAINING I-CONCERNS ARE DESIGN CONSIDERATIONS OR ENr.NEERING INVOLVEMENT OF CONCERN?
ENFORCEMENT CONFERENCE                                               l ENGINEERING AND TRAINING I-CONCERNS ARE DESIGN CONSIDERATIONS OR ENr.NEERING INVOLVEMENT OF CONCERN?                                                                 .
~
'                                                        ~
I DOES' TRAINING INVOLVEMENTLIN RESPONSE TO PLANT EVENTS-NEEDiIMPROVEMENT?
              '                                                                                                          I DOES' TRAINING INVOLVEMENTLIN RESPONSE TO PLANT EVENTS-NEEDiIMPROVEMENT?
4 i
          .                                                                                                              4 i
F,;
F ,;
' ~~
  ' ~~
t i
t i
i I
i b's
b's                                                                                                                         )
)
o                                                                                                                          i o                                                                                                                     )
i o
l 23-
o 23-
  'y '
'y '
~       .,.                                                                                                          >
~
l y
y i
i


ENFORCEMENT CONFERENCE
ENFORCEMENT CONFERENCE
  " ^
" ^
ENGINEERING-AND TRAINING (CONT'D)
ENGINEERING-AND TRAINING (CONT'D)
ElifilnEERING                                                                                                                                                   .
ElifilnEERING 0
0            ENGINEERING AN ACTIVE MEMBER OF EACH SITE INCIDENT INVESTIGATION TEAM                                                                                                             :
ENGINEERING AN ACTIVE MEMBER OF EACH SITE INCIDENT INVESTIGATION TEAM
.r O.           FORMAL PROGRAM FOR RESOLUTION OF DESIGN-RELATEDLEQUIPMENT PROBLENS IS IN PLACE 1                                            (ENGINEERING WORK REQUESTS)-                                                                                                         t l
.r O.
OL-         1 TOP TEN LIST J                                                                                                                                                                                       ,
FORMAL PROGRAM FOR RESOLUTION OF DESIGN-RELATEDLEQUIPMENT PROBLENS IS IN PLACE (ENGINEERING WORK REQUESTS)-
L                                                                                                                                                                                       1
t 1
                        .          O             CONCEPTUAL. DESIGN REVIEWS-                                                                                                             ,
l OL-1 TOP TEN LIST J
j
L 1
[                                                                                                                                                                                       q!
O CONCEPTUAL. DESIGN REVIEWS-j
[: j.                                   '
[
1             .          :0             FORMAL PROGRAM FOR CORRECTIVE MAINTENANCE IS-                                                                                         O E
q
                                                'IN PLACE 1(WORK REQUESTS)
[: j.
      >                                                                                                                                                                                1
1
    ~
:0 FORMAL PROGRAM FOR CORRECTIVE MAINTENANCE IS-O E
'IN PLACE 1(WORK REQUESTS) 1
~
24
24
~                     ,
~
                                                                                      - , - - . . . . _ ~ _ . . _ . _ , . . _ _ . . _ . _ . . . _ . .           - - - - . , . - - - ,
-, - -.... _ ~ _.. _. _,.. _ _.. _. _... _..


1, ,.
1,,.
ENFORCEMENT CONFERENCE h                                           ERG 1HEERIBG_AND_IRAINING - (CONT ' D)-     L L
ENFORCEMENT CONFERENCE h
0     ENGINEERING INITIATIVES                         j 1                                         -
ERG 1HEERIBG_AND_IRAINING - (CONT ' D)-
INTEGRATED ACTION PLAN                     -
L L
L,                                             6   : SYSTEM ENGINEER UPGRADE b                                                                                           ,
0 ENGINEERING INITIATIVES j
l' r                                               6   INTERFACE IMPROVEMENT                 3
1 INTEGRATED ACTION PLAN L,
                                                                                          't j:                                             '6   CENTRAL DESIGN ORGANIZATION-DESIGN BASIS' RECONSTITUTION
6
.l       ;
: SYSTEM ENGINEER UPGRADE b
                                                                                        .j i                                                                             l r                       .0-     ENGINEERING CORRECTIVE ACTIONS o                                                                                         .
l' r
:          i                                                                               ;
6 INTERFACE IMPROVEMENT 3
          *                                                                        ~
't j:
RE-EVALUATING THERMAL SETPOINTS FOR 1                                   : SELECTED VALVES                 -        t d                                                                               ,
'6 CENTRAL DESIGN ORGANIZATION-DESIGN BASIS' RECONSTITUTION
                                                                                        ,1
.l
                                              -6   COMPLETE OCTOBER 19,,1990-           i m
.j i
l r
.0-ENGINEERING CORRECTIVE ACTIONS o
i
~
RE-EVALUATING THERMAL SETPOINTS FOR 1
: SELECTED VALVES t
d
,1
- 6 COMPLETE OCTOBER 19,,1990-i m
25
25
          -p q
,-p q
t (Il ,
t (Il,


L-
L-
                                .;    .4
.4
                                            .c                                                                                                                                                               j
.c j
)-
)-
L'                                                                                                             ENFORCEMENT CONFERENCE                                                                           ,
L' ENFORCEMENT CONFERENCE p"
p" ENGINEERING AND TRAINING-(CONT'D)
ENGINEERING AND TRAINING-(CONT'D)
TRAINING                                                                                                                                                         ,
TRAINING l
l p                                                                                                                                                                                                             ,
p L
L                                                                                                                                                                                                                 ,
E 0
E                                                                                   0                 PROCEDURES IN PLACE FOR PLANT MODIFICATION REVIEWS                                                                                               :!
PROCEDURES IN PLACE FOR PLANT MODIFICATION REVIEWS
u ua .',
' u u ',
  '1'                                                                                                 -
a.
SIMULATOR                                                                                       j u          I                                                                                          -
'1' SIMULATOR j
REAL TIME : TRAINING                                                                         .
REAL TIME : TRAINING I
L TRAINING CONTENT o
u L
TRAINING CONTENT o
I :.
I :.
L t
L t
4:
4:
t                                                                                                                                                                                                   '
t G
G                                                                                    0               REVIEW 0F DIRECT. REPLACEMENT MODIFICATIONS IN PLACE SINCE MARCH,1989 J.
0 REVIEW 0F DIRECT. REPLACEMENT MODIFICATIONS J.
1 i'
IN PLACE SINCE MARCH,1989 1
J                    ,                                                              O'               INCIDENT 1 REPORTS ARE REVIEWED                                                                       1, p
i' J
l;t           >
O' INCIDENT 1 REPORTS ARE REVIEWED 1
I M {)                                                                                   0               FULL SCOPE TRAINING PROGRAM UPGRADE'
p l;t I
                                                                                                                                                                                                              ~
M
{)
0 FULL SCOPE TRAINING PROGRAM UPGRADE'
~
INTEGRATED ACTION PLAN r
INTEGRATED ACTION PLAN r
26           i s
26 i
_              s      __ _ - _ -  _J      _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . .              _ . _ . . . _ _ . _ , . . . - , . . , . _ . . _ . _ , , .  . - . . _ . ,  . - . ,  ,
s s
J


                                                              ; ENFORCEMENT CONFERENCC L                                                                             .
; ENFORCEMENT CONFERENCC L
ENGINEERING AND' TRAINING (CONT'D)
ENGINEERING AND' TRAINING (CONT'D)
L.                                                                                                                                  .
L.
:                                                  0- TRAINING CORRECTIVE ACTIONS                                                   i
0-TRAINING CORRECTIVE ACTIONS i
[>
[>
i q
i q
O                                                     -
O IMMEDIATE AND SPECIFIC ITEMS FIXED-j 6-SIMULATOR FIDELITY AND TRAINING-4 3:
IMMEDIATE AND SPECIFIC ITEMS FIXED-                                     j 6-     SIMULATOR FIDELITY AND TRAINING-                               4 4
CONTENT i
3:                                                 CONTENT                                                         i
4
: r
: r o
      <                                                          o                RCIC TRIP AND' THROTTLE VALVE                 4
RCIC TRIP AND' THROTTLE VALVE 4
: o.             SULCV ay                                                                                                                               .i l4
o.
{i:                                    -
SULCV ay
REVIEW 0F. DIRECT REPLACEMENT                                           i MODIFICATIONS ISSUED BEFORE: MARCH, 1989                                 <
.i l4 {
1-
REVIEW 0F. DIRECT REPLACEMENT i
                  -:                                                                                                              I 6-   : COMPLETE MARCHL1991 ua I
i:
1_!. .                                     --
MODIFICATIONS ISSUED BEFORE: MARCH, 1989 1-I 6-
                                                          'NOW AN: ACTIVE MEMBER'0F EACH SITE                       -
: COMPLETE MARCHL1991 ua I
1 o
1_!..
INCIDENT INVESTIGATION TEAM t
'NOW AN: ACTIVE MEMBER'0F EACH SITE 1
4 t,
INCIDENT INVESTIGATION TEAM o
p                                             ,
t4 t,
[,                                                                                                                       27   ,
p
[                         ,
[,
  .,            'kl
27
[
'kl


ENFORCEMENT CONFERENCE ENGINEERING AND TRAINING (CONT'D)
ENFORCEMENT CONFERENCE ENGINEERING AND TRAINING (CONT'D)
CONCLUSIONS 1
CONCLUSIONS 1
i                     0-     SPECIFIC CORRECTIVE ACTIONS IMPLEMENTED y
i 0-SPECIFIC CORRECTIVE ACTIONS IMPLEMENTED y
0       UPGRADE ACTIONS ARE:
0 UPGRADE ACTIONS ARE:
KNOWN:
KNOWN:
WELL UNDERSTOOD
WELL UNDERSTOOD
                                                                          ~
~
BEING IMPLEMENTED
BEING IMPLEMENTED
              .t--                                         .
.t--
(
(
28
28
                .I
.I


4
4 ENFORCEMENT CONFERENCE
            .                                                        ENFORCEMENT CONFERENCE


==SUMMARY==
==SUMMARY==
 
L 0
L                         0               CONCURRENT EQUIPMENT AND OPERATIONAL QUESTIONS AND ISSUES:.
CONCURRENT EQUIPMENT AND OPERATIONAL QUESTIONS AND ISSUES:.
EXTENSIVELY EVALUATED IMMEDIATE CORRECTIVE ACTIONS TAKEN CONTINUING IMPROVEMENTS DEFINED AND SCHEDULED f                          0                 INITIATING EVENT - 5 WHYS                                                 .
EXTENSIVELY EVALUATED IMMEDIATE CORRECTIVE ACTIONS TAKEN CONTINUING IMPROVEMENTS DEFINED AND SCHEDULED 0
      .j
INITIATING EVENT - 5 WHYS f
        ,                                    1)   WHY DID THIS EVENT--0CCUR?
.j 1)
WHY DID THIS EVENT--0CCUR?
a ESTABLISHE
a ESTABLISHE


==D. PROCEDURE==
==D. PROCEDURE==
S NOT-FOLLOWED a-1                                         -
S NOT-FOLLOWED a-1 SURVEILLANCE TEST' RECORD FALSIFIED 1
SURVEILLANCE TEST' RECORD FALSIFIED 1
1o
1o                                                         ..
-2)
                                          -2)
WHY WERE PROCEDURES NOT FOLLOWEDI I
WHY WERE PROCEDURES NOT FOLLOWEDI I                                                     1' TECHNICIAN " NEGLIGENT" l
1' TECHNICIAN " NEGLIGENT" l
: 3) WHY WERE SURVEILLANCE TEST RECORDS FALSIFIED?                                                                         {
3)
TECHNICIANS KNEW PROCEDURE. NONCOMPLIANCE                                                                 ,
WHY WERE SURVEILLANCE TEST RECORDS FALSIFIED?
      +                                                       CONSEQUENCES                                                                                            ,
{
MISPi. ACED TRUST AND PERSONAL FRIENDSHIP l-       j                                                                                                                                                     29-     j i.
TECHNICIANS KNEW PROCEDURE. NONCOMPLIANCE CONSEQUENCES
          ;                                                                                                                                                            q w.. :
+
MISPi. ACED TRUST AND PERSONAL FRIENDSHIP l-j 29-j q
i.
w.. :


[   4. w .
[ 4. w x.
x.
ENFORCEMENT CONFERENCE L
L ENFORCEMENT CONFERENCE l
L
l L                                    


==SUMMARY==
==SUMMARY==
(CONT'D)
(CONT'D) 4)
: 4) WHY IS.THE EVENT'NOT THE RESULT OF A                     i PROGRAM 4ATIC PROBLEM?
WHY IS.THE EVENT'NOT THE RESULT OF A PROGRAM 4ATIC PROBLEM?
EVENT COULD NOT BE PREDICTED                         l PERSONNEL BEHAVIOR WAS NOT REPRESENTATIVE
EVENT COULD NOT BE PREDICTED PERSONNEL BEHAVIOR WAS NOT REPRESENTATIVE
[             -
[
EVENT WAS NOT GENERl'C f
EVENT WAS NOT GENERl'C f
: 5) WHY D0 WE' CONSIDER RESPONSE ADEQUAJE1
5)
                          -SELF IDENTIFIED NO PUBLIC OR NUCLEAR SAFETY IMPACT PROMPTLYREPORT5D CORRECTIVE ACTIONS (INCLUDING MEASURES T0       t
WHY D0 WE' CONSIDER RESPONSE ADEQUAJE1
  ,-                        PREVENT RECURRENCE) 4   ARE SELF-INITIATED-                         .
-SELF IDENTIFIED NO PUBLIC OR NUCLEAR SAFETY IMPACT PROMPTLYREPORT5D CORRECTIVE ACTIONS (INCLUDING MEASURES T0 t
6   ARE-COMPREHENSIVE                           ,
PREVENT RECURRENCE) 4 ARE SELF-INITIATED-6 ARE-COMPREHENSIVE 6
HAVE OR-WILL BE IMPLEMENTED IN A             i REASONABLE TIME NO PREVIOUS-INDEPENDENT VERIFICATION-RELATED     ,
HAVE OR-WILL BE IMPLEMENTED IN A i
                          . VIOLATION E
REASONABLE TIME NO PREVIOUS-INDEPENDENT VERIFICATION-RELATED
          ^
. VIOLATION E
^
3
3
                                                                        . ~
~


e
{
{
: n.       ' *; '
e n.
ACRONYMS AIT                           l AUGMENTED INSPECTION TEAM (NRC)
ACRONYMS AIT l AUGMENTED INSPECTION TEAM (NRC)
ANS                             AMERICAN NATIONAL STANDARD CO                             CONTROL CPERATOR .
ANS AMERICAN NATIONAL STANDARD CO CONTROL CPERATOR.
DC                             DIRECT CURRENT
DC DIRECT CURRENT
                          'HPCI                           HIGH PRESSURE COOLANT INJECTION                           !
'HPCI HIGH PRESSURE COOLANT INJECTION I&C INSTRUMENTATION AND CONTROL i
        ,                  I&C                             INSTRUMENTATION AND CONTROL                             i LOR                             LICENSED OPERATOR REQUALIFICATION MSIV-                         MAIN STEAM ISOLATION VALVE MST                           MAINTENANCE SURVEILLANCE TEST
LOR LICENSED OPERATOR REQUALIFICATION MSIV-MAIN STEAM ISOLATION VALVE MST MAINTENANCE SURVEILLANCE TEST e
,      e NRC-                         -NUCLEAR REGULATORY COMMISSION                         'l PCIS.                           PRIMARY CONTAINMENT ISOLATION SYSTEM                   .;
NRC-
                        ;QA                               QUALITY ASSURANCE                                       j.
-NUCLEAR REGULATORY COMMISSION
QC                             QUALITY CONTROL-l                   RCIC                           REACTOR CORE ISOLATION COOLING
'l PCIS.
    .I RPS.                           REACTOR PROTECTION' SYSTEM j       ,            RTGB'                         REACTOR' TURBINE, GAUGE BOARD                           :
PRIMARY CONTAINMENT ISOLATION SYSTEM
    .,-                    RWCU                           REACTOR WATER CLEAN-UP                   '
;QA QUALITY ASSURANCE j.
1                             ,                                                                            ;
QC QUALITY CONTROL-l RCIC REACTOR CORE ISOLATION COOLING
    ~i
.I RPS.
                        . SF                             SHIFT FOREMAN
REACTOR PROTECTION' SYSTEM j
,                        ' S RV '                       . SAFETY RELIEF VALVE
RTGB' REACTOR' TURBINE, GAUGE BOARD RWCU REACTOR WATER CLEAN-UP 1
' . [l .
~i
                        .STA-                             SHIFT' TECHNICAL ADVISOR SULCV                         START-UP LEVEL CONTROL VALVE i
. SF SHIFT FOREMAN
    'l                                                                                                             .
' S RV '
31 i :-
. SAFETY RELIEF VALVE
'. [l.
.STA-SHIFT' TECHNICAL ADVISOR SULCV START-UP LEVEL CONTROL VALVE i
'l 31 i :-
L.
L.
    . i(
. i(
_ .        _ .}}
.}}

Latest revision as of 09:01, 17 December 2024

Forwards Summary of 901016 Enforcement Conference Re Events Surrounding 900819 Unit 2 Reactor Scram
ML20058H437
Person / Time
Site: Brunswick  
Issue date: 11/01/1990
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Eury L
CAROLINA POWER & LIGHT CO.
References
NUDOCS 9011160060
Download: ML20058H437 (38)


Text

Y,J) 6 e,

NOV 011990 Docket Nos. 50-325, 50-324 License Nos. DPR-71, DPR-62 Carolina Power and Light Company ATTN:

Mr. Lynn W. Eury Executive Vice President Power Supply P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

MEETING

SUMMARY

- BRUNSWICK This refers to the Enforcement Conference held at our request-on October 16, 1990.

This meeting concerned activities authorized for your Brunswick facility.

The issues discussed at this conference related to events surrounding the August 19, 1990 Unit 2 reactor scram.

A list of attendees, a summary, and a copy of your handout are enclosed.

We ar* continuing our review i

of these issues to determine the appropriate enforcement,iction.

In accordance with Section 2.790 of the NRC's " Rules of Practice " Part 2 Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this matter, please contact us.

Sincerely, (Original signed by EMerschoff/for)

Luis A. Reyes, Director Division of Reector Projects

Enclosures:

1.

List of Attendees 2.

Enforcement Conference Summary 3.

Handout cc w/encls:

(Seepage 2) l 3

s-4 (g ^* * * *Ri?.

,Yn 9011160060 901101

4 o

'., ~....

NOV 011990 Carolina Power and Light Company 2

i i

cc w/encis:

R. B. Starkey, Jr.

Vice President Brunswick Nuclear Project Box.10429 Southport, NC 28461 J. L. Harness Plant General Manager Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 R. E.. Jones. General Counsel Carolina Power & Light Company

- P. 0.. Box'1551 Raleigh, NC 27602 Ms. Frankie Rabon' Board of Commissioners

. P. 0. Box 249 Bolivia, NC 28422

-Chrys Bagget.

State Clearinghouse Budget and Management--

j 116 West-Jones Street ~

Raleigh,.NC; 27603

- Dayne H. Brown, Director Division of Radiction Protection N. C. Dcpartment'of Environment, c

Health & Natural Resourcesi P'. 0.- Box 27687-

- Raleigh, NC.. 27611-7687 H. ' A. '.. Cbl e Special' Deputy Attorney General

- State of North Carolina

. P.' O. Box-629-Raleigh,,NC 127602:

a-

- Robert P. Gruber-Executive Director-

' Public Staff - NCVC P. 0. Box 29520

' Raleigh, NC. 27626-0520 e

1 J

i 1

Carolina Power and Light Company 3

NOV 01 m bec w/encls:

Document Control Desk DRP Section Chief NRC Resident inspector U.S. Nuclear Regulatory Commission Star Rte. 1. Box 208 Southport. NC 28461 y

R1:}CRP RII:D P Ril P

Ril DR MGhh n

R0'arr 1 DVerrelli s'choff ff/,( /90 10/3V90-10/y/90 10/jl/90

c i

w t

l-ENCLOSURE 1 LIST OF ATTENDEES Carolina Power and Light Company R. A. Watson, Senior VP for Nur. lear Operations K. Karr, 5)ecial Assistant to Senior VP for Nuclear Operations R. B. Star <ey, Jr., VP - Brunswick Nuclear Project J. W. Moyer, Technical Assistant to Plant General Manager K. B. Altman, Manager - Regulatory Compliance P. D. Morris, Senior Specialist, Nuclear Licensing

,+

Nuclear Regulatory Commission S. D. Ebneter, Regional Administrator, Region 11 (Rll)

J. L. Milhoan, Deputy Regional Administrator, Ril L. A. Reyes, Director, Division of Reactor Projects (DRP), RIl E

E. W.-Merschoff Deputy Director, DRP, Ri!

G. R. Jenkins, Director, Enforcement and Investigation Coordination Staff (EICS) Ril E

B. Uryc, Senior Enforcement Specialist EICS, RI!

C. A. -Julian, Chief, Engir.eering Branch, Division of Reactor Safety (DRS),RII--

D.'M. Verre111, Chief, Reactor Projects Branch 1. DRP, Ril i

G. A. Belisle, Chief Test Programs Section, DRS, RIl R. W. Borchardt, Regional Coordinator, Office of the Executive

-Director.of Operations R.- E. Carroll, Acting Chief, Reactor Projects Section 1A, DRP, R!l H. 0. Christensen, Senior Resident inspector - Grand Gulf, DRP, Ril R. L. Prevatte, Senior Resident Inspector - Brunswick, DRP, RIl W. Levis, Resident Inspector - Brunswick, DRP,~ R!l.

T. Lo, Project Ma"ager, Office of Nulear Reactor Projects o

M. M.:Glasman, Pr ject Engineer -DRP, Ril y

I

+

O l

l ENCLOSURE 2 j

i ENFORCEMENT CONFERENCE SUMMRY I

The Region II Director of Reactor Projects opened the meeting by stating the issues to be discussed stemmed from the August 19, 1990 Unit 2 reactor scram which resulted from an inadequately performed / controlled surveillance test.

l Specifically, these issues involved:

(1) the improprieties by Instrumentation l

& Control (ISC) technicians which included the inadequate performance of the related surveillance test, lack of required independent verification during the i

test, and the willful falsification of the test procedure to reflect independent verification was performed; (2) the failure of operators to properl acknowledge and respond to annunciators induced by the surveillance test; (3) y l

technicians; (4) per/ formal communications between operators and the I&Cthe failure the lack of pro J

o and (5) revealed hardware, training, and procedural deficiencies.

CP&L's Senior Vice President for Nuclear Operations expressed his concern over the subject event and indicated that the above issues had been addressed by short i

term corrective actions, with long term corrective actions being ccptured by the Brunswick Integrated Action Plan.

l The licensee then proceeded to address the issues of concern, providing related corrective actions, an overview of safety significance, and a sequence of l

events.

it was pointed out by the licensee that the scram was investigated j

promptly, the root cause was determined, the event was initially reported, immediate corrective actions were taken, the plant was always within its i

analyzed conditions, and no safety limits or radiological dose limits were l

exceeded.

They also stated that the willful procedural noncompliance was an i

isolated incident and not indicative of a programmatic problem or a breakdown

-l in management controls.

it was further indicated that in 12 years of operating t

history this was the first incident of deliberate falsification at Brunswick.

When questioned, tne licensee stated that the surveillance tests conducted by 1

the two I&C technicians were reperformed.

l f

Command, control, and communication issues in the control room and in the l

performance of maintenance / surveillance were then discussed.

The Regional

{

Administrator indicated that he was concerned with the apparent lack of a questioning attitude on the part of operations. Two annunciators which clearly 1

indicated that Channel A2 was in a trip condition and that testing was underway on Channel B2 should have alerted the operator to stop the testing.

In addition, when - the operator confronted the technician concerning the status j

of the balf-trip condition, communication between the individuals was imprecise i

and lacking formality, in response to this concern, the licensee indicated that training in the area of formalized communications was in progress; that i

new maintenance pre / post job briefing requirements were imposed; and on August 22, 1990, all work was suspended pending site - wide briefings to review I

this and other recent events.

Additionally, in order to ensure operators do not mistakenly disregard annunciator indications during future surveillance testing, the licensee stated that annunciator procedures were revised accordingly.

l

2 Relative to the lack of timely notifications, the licensee indicated that the 4

shift technical advisor initially drew the correct conclusion relative to declaration of an unusual event when the five safety relief valves (SRVs) failed to operate properly; however, the Operations Manager elected to wait for an engineering evaluation.

Stated corrective actions in response to these problems included evaluating operational characteristics of the SRVs; development of a simple policy for event declaration; and capturing this and the other notification problems by on-going training.

When questioned about the problems operators experienced with the startup level control valve (SULCV), the licensee indicated that the trim of the valve was changed in 1988 resulting in different flow characteristics for the valve.

H

- Since this change was accomplished as a direct replacemer.t, it was not reviewed by.the training organization, and therefore, the simulator was not upgraded to reflect the change.

Stated corrective actions for identified hardware, training, and procedural deficiencies included:

reviewing direct replacement modifications issued before March 1989; including the Training Department as a member-of the Site Incident investigation Team; re-evaluation of thermal setpoints for selected valves; upgrade of simulator to reflect true SULCV operation, as well as thermal overload characteristics of the reactor core j

i isolation cooling system trip and throttle valve; revision of operating procedures and operator aids as necessary; and implementation of a design basis reconstitution program, y

The Regional-Administrator closed the meeting and +"anked the licensee for

[

their presentation.

He then informed CPhl that th.y would be advised at a later date as to NRC's deliberations on these matters, l

l l

1 i

l I

l 4

1

t ENCLOSURE 3 BRUNSWICK NUCLEAR PROJECT 1

i i

l

'I AUGUST 19, 1990 REACTOR TRIP ENFORCEMENT CONFERENCE L

.l I

I l

i l'

L L

OCTOBER. 16, 1990 1

i

u-ENFORCEMENT CONFERENCE OCTOBER 16, 1990 AGEND.A h

OVERVIEW RUSS STARKEY Y

DESCRIPTION OF EVENTS BRUCE ALTMAN i

FAILURE TO FOLLOW TEST RICNARD WARDEN PROCEDURES (BRUCE ALTMAN)

L l

(324/90-29-01)

INADEQUATE PROCEDURES JOHN M0YER AND COMPLIANCE H

(324/90-29-02) i i

1 I

FAILURE TO DECLARE UNUSUAL EVENT JOHN M0YER AND MAKE PROMPT NOTIFICATION l

(324/90-29-03)

FAILURE TO MAKE PROMPT JOHN M0YER NOTIFICATION OF ESF ACTUATIONS (324/90-29-04)

ENGINEERING AND TRAINING BRUCE ALTMAN 1

SUM 4ARY RUSS STARKEY t

l

1 1

ENFORCEMENT CONFERENCE l

OVERVIEW DESCRIPTION OF EVENT (AUGUST 19.

1990)-

4 0

I&C TECHNICIANS FAILED TO FOLLOW MAINTENANCE SURVEILLANCE TEST (MST) PROCEDURE AND DELIBERATELY MISLED INVESTIGATION.

0 UNPLANNED REACTOR TRIP 4

0 EQUIPMENT, PERSONNEL, AND PROCEDURAL WEAKNESSES EVIDENCED 1

k i

4 2

I 1

ENFORCEMENT CONFERENCE l

0VERVIEW CONT'D I

i SAFETY SIGNIFICANCE l

0 N0 NUCLEAR SAFETY SIGNIFICANCE BRUNSWICK PLANT i

ALWAYS WITHIN ANALYZED CONDITION 6

ENVIRONMENT PUBLIC 0

NO RADIOLOGICAL DOSE LIMITS EXCEEDED l

l 0

WILLFUL PROCEDURE NONCOMPLIANCE IS ROI A l

PROGRAMMATIC PROBLEM.

0 NOT INDICATIVE OF A BREAKDOWN IN MANAGEMENT CONTROLS 3

~

ENFORCEMENT CONFERENCE OVERVIEW (CONT'D)

CAUSAL FACTORS AND ROOT CAUSE L

0 CAUSAL FACTORS IDENTIFIED 0

ROOT CAUSES DETERMINED AND UNDERST0OD IDENTIFICATION AND REPORTING 0

SELF IDENTIFIED L

0 INITIATING EVENT PROMPTLY REPORTED 0

IMMEDIATE CORRECTIVE ACTIONS TAKEN CORRECTIVE ACTIONS TO PRECLUDE RECURRENCE 0

PROMPT 0

COMPREHENSIVE 0

SELF INITIATED 0

SITE WIDE APPLICATION 0

HEIGHTEN AWARENESS OF PLANT AND PERSONAL CONSEQUENCES 4

ENFORCEMENT CONFERENCE OVERVIEW (CONT'D)

PAST PERFORMANCE O

ISOLATED OCCURRENCE AND NO PAST VIOLATION 0

ACKNOWLEDGED PRIOR PERSONNEL, EQUIPMENT, AND PROCEDURAL CONCERNS DILIGENTLY WORKING TO CORRECT MATERIAL CONDITION IMPROVING CONTINUALLY PERFORMANCE INDICATORS (UNTIL THIS EVENT) SHOWED CONTINUING PROGRESS PRIOR NOTICE OF SIMILAR EVENTS 0

NONE SPECIFIC TO THIS COMBINATION OF EVENTS e

5

l i

1 ENFORCEMENT CONFERENCE DESCRIPTION 0F EVENT AUGUST 19. 1990 21:37 INITIATED PERFORMANCE OF 2MST-PCIS24M 4

i 21:54 CHANNEL D TEST INITIATED WITHOUT RESETTING PREVIOUS CHANNEL C TEST TRIP i

GROUP 1 ISOLATION OCCURS - MAIN STEAM i

l ISOLATION VALVES CLOSE REACTOR SCRAMS - REACTOR RECIRC. PUMPS TRIP HPCI AND RCIC AUTO START i

i 21:55 SAFETY. RELIEF VALVES (SRV) AUT0 OPEN DUE TO HIGH PRESSURE (3.4-4 SEC DURATION)

REACTOR FEED PUMPS TRIP HPCI AND RCIC SECURED 21:56 SRVs MANUALLY OPENED TO CONTROL PRESSURE 22:00 HPCI MANUALLY STARTED FOR PRESSURE CONTROL 22:14 TORUS COOLING INITIATED

~22:15 NOTIFIED SENIOR NRC RESIDENT INSPECTOR OF EVENT

]

22:16 RCIC MANUALLY STARTED FOR LEVEL CONTROL i

22:26 GROUP 1 ISOLATION OCCURS-LOW CONDENSER VACUUM l

22:34 HPCI AND RCIC' SECURED 23:05/09 RCIC AND HPCI MANUALLY STARTED FOR PRESSURE CONTROL (HPCI STOP VALVE CYCLES) j i

23:17 REACTOR PROTECTION SYSTEM TRIP - LOW LEVEL 23:23 HPCI AND RCIC TRANSFERRED TO LEVEL CONTROL MSIVs OPENED l

(

i 23:27 HPCI AND RCIC SECURED 23:53 2B REACTOR FEED PUMP STARTED-SULCV PROBLEM ENCOUNTERED 6

[

1

)

ENFORCENENT CONFERENCE DESCRIPTION 0F EVENT (CONT'D) ll 2

AUGUST 20, 1990 i

~00:00 SCRAM INCIDENT INVESTIGATION TEAM MEETS ON-SITE 00:04 REACTOR PROTECTION SYSTEM TRIP-LOW LEVEL 00:05 HPCI MANUALLY STARTED FOR LEVEL CONTROL AND THEN SECURED (HPCI STOP VALVE CYCLES) 00:06 LEVEL CONTROL INITIATED BY CONTROLLING SPEED OF 28 REACTOR FEED PilMP 00:23 2B REACTOR FEED PUMP IRIPS DUE TO HIGH LEVEL 00:27 GROUP 3 ISOLATION (RWCU) DUE TO HI DIFFERENTIAL FLOW 00:31 SECURED CONDENSATE BOOSTER PUMPS DUE TO INCREASING LEVEL i

(

01:52 10CFR 50.72 FOUR HOUR RED PHONE REPORT MADE FOR SCRAM 4

02:00 RCIC TRIP AND THROTTLE VALVE TRIPS ON OVERLOAD WHILE ALIGNING SYSTEM TO STANDBY 02:00 SCRAM INCIDENT INVESTIGATION TEAM CONCLUDES SURVEILLANCE TEST PROCEDURE NOT FOLLOWED AND DETERMINES RECORDS FALSIFIED i

02:17 2A CONDENSATE B0OSTER PUMP STARTED-DISCHARGE VALVE TRIPS ON OVERLOAD 02:20 2B CONDENSATE B0OSTER PUMP STARTED FOR VESSEL LEVEL CONTROL AND SULCV PLACED IN AUTO END OF EVENT 7

y

-t y

wg----vr.r-.e,,---w---.---.-

v,,e,-e~--.-

+-*e--

-i..+v.,..w.,.

, -.-%---s-w

-=--.-w.--- -.

~,-.v-

t ENFORCEMENT CONFERENCE DESCRIPTION OF EVENT (CONT'D)

AUGUST 20. 1990 17:45 UNUSUAL EVENT DECLARED AND 7 RMINATED AUGUST 21, 1990 11:08 FOLLOWUP 10CFR50.72 REPORT COMPLETED FOR:

GROUP 1 ISOLATION-LOW VACUUM RPS TRIPS (2)-LOW LEVEL i

SEPTEMBER 7, 1990 11:05 FOLLOWUP 10CFR50.72 REPORT COMPLETED FOR GROUP 3 ISOLATION (RWCU) l^

I i

i l

i l

8 l

l

3 ENFORCEMENT CONFERENCE FAILURE TO FOLLOW TEST PROCEDURES (324/90-29-01) i l

IISI 0

MST ON PCIS 24M -LOGIC TRIP TEST F012 HIGH L

CONDENSER PRESSURE ERRORS l

0 MISSED PROCEDURE STEPS INDEPENDENT VERIFICATION i

RESETOFCHkNNELC i

0 MISCOMMUNICATION WITH CO-0 FALSIFIED SURVEILLANCE TEST RECORD 0

INITIAL DENIAL OF ERROR 1

1.

N 9

i l

l:

)

ENFORCEMENT CONFERENCE FAILURE TO FOLLOW TEST PROCEDURES (CONT'D)

N0 GENERIC IMPLICATIONS (ISOLATED OCCURRENCE) 0 HIGH MST PERFORMANCE VISIBILITY CDs, FOREMEN, MANAGERS, STAS, CJ-WORKERS, NRC, 0A 0

HIGH FREQUENCY OF MSTs a 200/ MONTH r

I 0

NRC INSPECTIONS AND OBSERVATIONS 4/ MONTH FORMAL 0

QA/QC AUDIT AND SURVEILLANCE t

ON-G0ING I

0 MAINTENANCE AUDITS WEEKLY i

i 10

.. -. -,., - -......... -. -....., _., ~... _...

ENFORCEMENT CONFERENCE FAILURE TO FOLLOW TEST PROCEDURE (CONT'D)

PERSONNEL 0

TWO MAINTENANCE TECHNICIANS SIGNIFICANCE OF UNDERLYING VIOLATION I

L O

ISOLATED OCCURRENCE 0

NO PREVIOUS VIOLATION INTENT OF INDIVIDUAL EMPLOYEE 4

0 OVER CONFIDENCE LED T0. GROSS NEGLIGENCE h

0 DID NOT DELIBERATELY INTEND TO CAUSE PLANT PROBLEMS 0

N0. ECONOMIC INCENTIVE INVOLVED 11 M

-__a-_

__m_mm__._.___.m__---m-______mm

._-___mm.=m___-_.-__.__----_.--m_m-..-_-*--._

_ ____z_

m--..

-a.____mm-_._.

___.__mu__._a__._______.-_-m.-___a.:.__-m_-

ENFORCEMENT CONFERENCE I

FAILURE TO FOLLOW TEST PROCEDURE (CONT'D) l l

INTENT OF LICENSEE (CP&L)

C PROVIDED STANDARDS AND PROCEDURES TO PREVENT SUCH ACTIONS i

0 POLICY REINFORCED VIA TRAINING, MANAGEMENT EXAMPLE, AND CONDUCT OF OPERATION 0

HAD N0 PRIOR KNCWLEDGE OF INTENT OF INDIVIDUAL 0

TECHNICIAN SELECTION STANDARDS ALL'MSTTECANICIANSAREI&CTECHNICAL t

LEVEL ONE (ANS QUALIFIED)

ONLY TOP QUALITY I&C TECHNICIANS ASSIGNED TO MST CREWS MST CREWS RECEIVE PRIORITY MANNING MST CREWS EXPERIENCE LEVELS ARE:

~7 YEARS AVERAGE I&C EXPERIENCE

~4.7 YEARS AVERAGE MST EXPERIENCE 12 m


c-,

-.ce-.--,_-. - - + -. -. - +... --..

.wv+-*-

+-w v-w+=g--e we

=e--e++=~-w++

~~--"~-v---*--s--

l ENFORCEMENT CONFERENCE i

FAILURE TO FOLLOW TEST PROCEDURE (CONT'D)

CORRECTIVE ACTIONS O

RE-PERFORMED MSTs CONDUCTED BY THE TECHNICIANS INVOLVED, 1

0 AUGUST 20 - IMPOSED NEW MAINTENANCE PRE AND POST J0B BRIEFING REQUIREMENTS:

IDENTIFICATION OF CRITICAL TASKS CONSEQUENCES OF IMPROPER PERFORMANCE REQUIRED INTERFACES SAFETY AND ALARA CONSIDERATIONS l

O AUGUST 22 - WORK SUSPENDED PENDING SITE-WIDE I

BRIEFINGS:

WORK CONTROL BRIEFINGS TO REVIEW RECENT EVENTS PRE-JOB BRIEFINGS BY FIRST LINE SUPERVISORS REQUIRED i

0 PLANT MANAGER HAD PERSONAL MEETINGS (THE FOLLOWING WEEK) WITH ALL PLANT WORK GROUPS.

l l

13 i

....,<en,-,

n,-

---.m,v.w

,,.,,-,.,.,.,_-..,,.,,-w,-,,,,w,,,_...

,-s.

n

i 1

W ENFORCEMENT CONFERENCE 1

8 FAILURE TO FOLLOW TEST PROCEDURE (CONT'D)

CORRECTIVE ACTIONS-(CONT'D)

~

o

-0 AUGUST 127 - COMPLETED INVESTIGATION AND TERMINATED ~ EMPLOYMENT OF TECHNICIANS O

FORMALIZED COMMUNICATIONS TRAINING IN PROGRESS-IMMEDIATE - MST-I&C' CREWS TRAINED REAL TIME TRAINING - DURING.4TH QTR. 1990 R

.0 STANDARDS OF EXCELLENCE ~ ADOPTED BY MAINTENANCE i

i COMPLETED OCTOBER 13, 1990-t i

1 14 q 1

o k

STANDARDS OF: EXCELLENCE.

IN MAINTENANCE TO MEZT

.J2 CHALLENGES AND RESPONSIBILITIES 0F THE NUCLEAR INDUSTRY WE, AS BRUNSWICK i

NUCLEAR PROJECT MAINTENANCE, HEREBY ADOPT THE I

FOLLOWING PROFESSIONAL STANDARDS:

l WE WILL ENSURE THAT'THE SAFETY OF THE PUBLIC, PLANT PERSONNEL AND PLANT EQUIPMENT IS GIVEN HIGHEST PRIORITY IN ALL ASPECTS OF MAINTENANCE.

PERFORM-QUALITY MAINTENANCE TO THE HIGHEST-PROFESSIONAL

~ STANDARDS; INCLUDING COMPLIANCE TO ESTABLISHED

- PROCEDURES.

USE 500NO MA'INTENANCE PRACTICES OURING ' ALL PHASEM 0F MAINTENANCE TO ENSURE OPTIMUM EGUIPMENT CONDITION.AND WORK AREA' CLEANLINESS.

STRIVE TO ATTAIN TNE LOWEST POSSISLE RA0MATION EXPOSURE IN ALL PHASES OF MAINTENAN('d.

DOC'IMENT' WORK PERFORMED 7 4. A CLEAR, C0:4CISE, ACCURATE, AND COMPLETE MANNER.

NOTIFY APPROP?IATE PERSONNEL IF UNSAFE, INADEQUATE,

]

p OR'OEFELTIVE CONDITIONS'AREL06 SERVED.

L

CONTINUALLY IMP 8t0VE WORK' PERFORMANCE BY: ATTENDING O

~

f FORMAL TRAINING AN0' BY - LEARN!i1G Fft0M ' OUR OWN '

l ll l

EXPERIENCE,ANDTHE' EXPERIENCE OF-OTHERS.

EMPHAS!zt " TEAMWORK" AND' MAINTAIN GOOD WORKING-I RELATIONSHIPS'WITH10THER WORK: GROUPS:-GY TREATING FELLOW

^l, EMPLOYEES WITH RESPECT,-DIGNITY AND-COURTESY.

4 REPORT TO WORK PHYSICALLY FIT AND MENTALLY-ALERT.-

+1

$TRIVE.TO 00 RIGHT THINGS RIGHT THE FIRST TIME EVERYTIME.

- AN0' BY 00ZNG SO, BE RECOGNIzt0 ASAMOFS THE BEST IN OUR INDUSTRY.

1 g

V.

.J.

1 s,

, e

+

+---e

-*=er-

  • ww-

^ ^ ^ ^ ^ ^ ^

h ENFORbEMENTCONFERENCE INADEQUATE PROCEDURES AND COMPLIANCE (324/90-29-02) r 0

' ANNUNCIATOR PROCEDURES DURING MSTs L'

COMMUNICATIONS L

p.

- 0 OPERATOR AIDS EQUALIZE MSIVs.

..1 HPCI OPERATION-1 e ;;

n 0

OPERATING PROCEDURES 1

1 RCIC CONTROL SWITCH' DC VALVE THERMAL CYCLES

' CONDENSATE AND FEEDWATER (SULCV) e i:

.I l'

16' m

v.-4

.-..4--..-c,

.. -... - -... ~ - - -


m. -

I

- j.

-e -

ENFORCEMENT CONFERENCE INADEQUATE PROCEDURES AND COMPLIANCE (CONT'D)

CORRECI1YLACJ10RS 0

ALL RTGB.0PERATOR AIDS REVIEWED AND REVISED AS NECESSARY FOR ACCURACY AND COMPLETENESS 0

A-THOROUGH-REVIEW 0F THESE. EVENTS DURING NEXT LOR CYCLELHAS BEEN SCHEDULED ~

o 4

V 0

REVISED RCIC PROCEDURE 0-REMODELED! SIMULATOR TO 5 SECOND HOLD.FOR

-RCIC TRIP"ANDLTHROTTLE VALVE CONTROL SWITCH-l n*

0:

DC MOTOR OPERATED? VALVE DUTY CYCLE

i "a

REQUIREMENTS UNDER REVIEW =

1 h

l o

]

0 REM 0 DELED SIMULATOR SULCV RESPONSE 4r L

nL 0-SIMULATOR TRAINING 0N RCIC CONTROL SWITCH AND'SULCV IS: COMPLETE.

F l

c I'

17 L

i l i

~

1

ENFORCEMENT CONFERENCE i

FAILljRE TO DECLAtE UiljSUAL EVENT a

A k D 4AKE- >ROMPT k OTI ICATIO i (324/90-29-03)

CONCLUSIONS 0

STA DREW CORRECT CONCLUSION RELATIVE TO SRV POTENTIAL FAILURE.

1 e

k L'

0 INDUSTRY WIDE TARGET ROCK'SRV ACTUATION PATTERN CAUSED UNCERTAINTY AND ' F0.TO AN-ERROR'IN JUDGEMENT.

3 y

- 0

. TRAINING-PROCESS WAS ADEQUATE AND CORRECT.

i I

l

'f-p 0

SEPTEMBER 27 SCRAM. DEMONSTRATED ABILITY TO L

MAKE: CONSERVATIVE-CALL.

o J

18 l

s

-.('

l.

g p

-a g

--w-*-

y g

a 3-aw y

,,w,

,-g,,

w-m,

. ~. _.

ENFORCEMENT CONFERENCE FAILURE TO DECLARE UNUSUAL EVENT (CONT'D1 CORRECTIVE ACTIONS J

0 EVALUATED-SRV OPERATIONAi 1ARACTERISTICS AND sc DEVELOPED' SIMPLE POLICY h IDENTIFICATION AND DECLARATION o

l-a l-0 ON-GOING TRAINING i-k

'i '

l

.I-l' J.

i j'

i

.[I l

l L

4 I'

19

j.

L

.b l

er

.,-r e

w--w=-

=,

,y

+=+- = =

4. -::.;

~.

ENFORCEMENT CONFERENCE

FAILURE TO MAKL PRO 4P" nCl"IFICATION OF ES : ACTIJA"IOP S (324/90-29-04) u i

FOUR-EVENTS

_}

r.

ij 0

MSIV-CLOSURE-(GROUP 1 ISOLATION) o L

10 RPS TRIP '(2' EVENTS)

'l

/. ;:

t.

+

0-RWCU. ISOLATION t

.j(

if I

l t

'l

20 I
..~

ENFORCEMENT CONFERENCE FAILUR! TO MAKE PROM)T NOTIFICATION 0 : ESF ACTUATI0 tS (CONT'D) i CORRECTIVE ACTIONS 0

EVENT REVIEW SCHEDULED FOR NEXT LOR i

s t

0 ON-GOING TRAINING a

li P

-i ll:

V :' 1 y

(

i:

.c 21

'l

ENFORCEMENT CONFERENCE J324/90-29-02. 03. 04)

L i

SUMMARY

CONCLUSIONS 0

THOROUGH. EVENT REVIEW SCHEDULED FOR NEXT LOR CYCLE l

0 PRE-JOB BRIEFS ARE STILL REQUIRED 0-START /STOP TIMES OF MST LOGGED IN SF LOG 0.

COMMAND CONT.su AND COMMUNICATIONS PROJECT i

QUALITY TEAM

~

0

-AIT REPORT COMMENTS l

0 UNIT 2 SCRAM ON SEPTEMBER 27 0

CONTINUED IMPROVEMENT IN OPERATOR

.i --

PERFORMANCE i

1

'f i

22 i

ENFORCEMENT CONFERENCE ENGINEERING AND TRAINING I-CONCERNS ARE DESIGN CONSIDERATIONS OR ENr.NEERING INVOLVEMENT OF CONCERN?

~

I DOES' TRAINING INVOLVEMENTLIN RESPONSE TO PLANT EVENTS-NEEDiIMPROVEMENT?

4 i

F,;

' ~~

t i

i b's

)

i o

o 23-

'y '

~

y i

ENFORCEMENT CONFERENCE

" ^

ENGINEERING-AND TRAINING (CONT'D)

ElifilnEERING 0

ENGINEERING AN ACTIVE MEMBER OF EACH SITE INCIDENT INVESTIGATION TEAM

.r O.

FORMAL PROGRAM FOR RESOLUTION OF DESIGN-RELATEDLEQUIPMENT PROBLENS IS IN PLACE (ENGINEERING WORK REQUESTS)-

t 1

l OL-1 TOP TEN LIST J

L 1

O CONCEPTUAL. DESIGN REVIEWS-j

[

q

[: j.

1

0 FORMAL PROGRAM FOR CORRECTIVE MAINTENANCE IS-O E

'IN PLACE 1(WORK REQUESTS) 1

~

24

~

-, - -.... _ ~ _.. _. _,.. _ _.. _. _... _..

1,,.

ENFORCEMENT CONFERENCE h

ERG 1HEERIBG_AND_IRAINING - (CONT ' D)-

L L

0 ENGINEERING INITIATIVES j

1 INTEGRATED ACTION PLAN L,

6

SYSTEM ENGINEER UPGRADE b

l' r

6 INTERFACE IMPROVEMENT 3

't j:

'6 CENTRAL DESIGN ORGANIZATION-DESIGN BASIS' RECONSTITUTION

.l

.j i

l r

.0-ENGINEERING CORRECTIVE ACTIONS o

i

~

RE-EVALUATING THERMAL SETPOINTS FOR 1

SELECTED VALVES t

d

,1

- 6 COMPLETE OCTOBER 19,,1990-i m

25

,-p q

t (Il,

L-

.4

.c j

)-

L' ENFORCEMENT CONFERENCE p"

ENGINEERING AND TRAINING-(CONT'D)

TRAINING l

p L

E 0

PROCEDURES IN PLACE FOR PLANT MODIFICATION REVIEWS

' u u ',

a.

'1' SIMULATOR j

REAL TIME : TRAINING I

u L

TRAINING CONTENT o

I :.

L t

4:

t G

0 REVIEW 0F DIRECT. REPLACEMENT MODIFICATIONS J.

IN PLACE SINCE MARCH,1989 1

i' J

O' INCIDENT 1 REPORTS ARE REVIEWED 1

p l;t I

M

{)

0 FULL SCOPE TRAINING PROGRAM UPGRADE'

~

INTEGRATED ACTION PLAN r

26 i

s s

J

ENFORCEMENT CONFERENCC L

ENGINEERING AND' TRAINING (CONT'D)

L.

0-TRAINING CORRECTIVE ACTIONS i

[>

i q

O IMMEDIATE AND SPECIFIC ITEMS FIXED-j 6-SIMULATOR FIDELITY AND TRAINING-4 3:

CONTENT i

4

r o

RCIC TRIP AND' THROTTLE VALVE 4

o.

SULCV ay

.i l4 {

REVIEW 0F. DIRECT REPLACEMENT i

i:

MODIFICATIONS ISSUED BEFORE: MARCH, 1989 1-I 6-

COMPLETE MARCHL1991 ua I

1_!..

'NOW AN: ACTIVE MEMBER'0F EACH SITE 1

INCIDENT INVESTIGATION TEAM o

t4 t,

p

[,

27

[

'kl

ENFORCEMENT CONFERENCE ENGINEERING AND TRAINING (CONT'D)

CONCLUSIONS 1

i 0-SPECIFIC CORRECTIVE ACTIONS IMPLEMENTED y

0 UPGRADE ACTIONS ARE:

KNOWN:

WELL UNDERSTOOD

~

BEING IMPLEMENTED

.t--

(

28

.I

4 ENFORCEMENT CONFERENCE

SUMMARY

L 0

CONCURRENT EQUIPMENT AND OPERATIONAL QUESTIONS AND ISSUES:.

EXTENSIVELY EVALUATED IMMEDIATE CORRECTIVE ACTIONS TAKEN CONTINUING IMPROVEMENTS DEFINED AND SCHEDULED 0

INITIATING EVENT - 5 WHYS f

.j 1)

WHY DID THIS EVENT--0CCUR?

a ESTABLISHE

D. PROCEDURE

S NOT-FOLLOWED a-1 SURVEILLANCE TEST' RECORD FALSIFIED 1

1o

-2)

WHY WERE PROCEDURES NOT FOLLOWEDI I

1' TECHNICIAN " NEGLIGENT" l

3)

WHY WERE SURVEILLANCE TEST RECORDS FALSIFIED?

{

TECHNICIANS KNEW PROCEDURE. NONCOMPLIANCE CONSEQUENCES

+

MISPi. ACED TRUST AND PERSONAL FRIENDSHIP l-j 29-j q

i.

w.. :

[ 4. w x.

ENFORCEMENT CONFERENCE L

L

SUMMARY

(CONT'D) 4)

WHY IS.THE EVENT'NOT THE RESULT OF A PROGRAM 4ATIC PROBLEM?

EVENT COULD NOT BE PREDICTED PERSONNEL BEHAVIOR WAS NOT REPRESENTATIVE

[

EVENT WAS NOT GENERl'C f

5)

WHY D0 WE' CONSIDER RESPONSE ADEQUAJE1

-SELF IDENTIFIED NO PUBLIC OR NUCLEAR SAFETY IMPACT PROMPTLYREPORT5D CORRECTIVE ACTIONS (INCLUDING MEASURES T0 t

PREVENT RECURRENCE) 4 ARE SELF-INITIATED-6 ARE-COMPREHENSIVE 6

HAVE OR-WILL BE IMPLEMENTED IN A i

REASONABLE TIME NO PREVIOUS-INDEPENDENT VERIFICATION-RELATED

. VIOLATION E

^

3

~

{

e n.

ACRONYMS AIT l AUGMENTED INSPECTION TEAM (NRC)

ANS AMERICAN NATIONAL STANDARD CO CONTROL CPERATOR.

DC DIRECT CURRENT

'HPCI HIGH PRESSURE COOLANT INJECTION I&C INSTRUMENTATION AND CONTROL i

LOR LICENSED OPERATOR REQUALIFICATION MSIV-MAIN STEAM ISOLATION VALVE MST MAINTENANCE SURVEILLANCE TEST e

NRC-

-NUCLEAR REGULATORY COMMISSION

'l PCIS.

PRIMARY CONTAINMENT ISOLATION SYSTEM

QA QUALITY ASSURANCE j.

QC QUALITY CONTROL-l RCIC REACTOR CORE ISOLATION COOLING

.I RPS.

REACTOR PROTECTION' SYSTEM j

RTGB' REACTOR' TURBINE, GAUGE BOARD RWCU REACTOR WATER CLEAN-UP 1

~i

. SF SHIFT FOREMAN

' S RV '

. SAFETY RELIEF VALVE

'. [l.

.STA-SHIFT' TECHNICAL ADVISOR SULCV START-UP LEVEL CONTROL VALVE i

'l 31 i :-

L.

. i(

.