ML20071C737: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:t
{{#Wiki_filter:t
                                                                                                                                                                                  \
\\
l OPERATING DATA REPORT, k
l k
DOCKET NO. 50-302 DATE     2/2/83 COMPLETED BY       D. Bogart TELEPHONE (904) 795-6486
OPERATING DATA REPORT, DOCKET NO.
_ OPERATING STATUS Crystal River Unit #3                                                    Notes
50-302 DATE 2/2/83 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486
_ OPERATING STATUS Notes
: 1. Unit Name:
: 1. Unit Name:
: 2. ReportagPened                1/1/83 - 1/31/83
Crystal River Unit #3 1/1/83 - 1/31/83
: 2. ReportagPened
: 3. I Ic===8 Thermal Power (MWt): _ 2544 890
: 3. I Ic===8 Thermal Power (MWt): _ 2544 890
: 4. Nameplate Rating (Grom MWe):
: 4. Nameplate Rating (Grom MWe):
l S. Deusa Elecencal Rating (Net MWe):
825 l
825 850
S. Deusa Elecencal Rating (Net MWe):
850
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
811
811
Line 33: Line 36:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasons:
Revised MDC ratines based on operating history.
Revised MDC ratines based on operating history.
: 9. Power Level To Wluch Restncted,1f Any (Net MWe):                         2475 MW thermal
2475 MW thermal
: 10. Reasons For Restrictions,1f Any:             P"an Pnuar hnfenra in hvnace.
: 9. Power Level To Wluch Restncted,1f Any (Net MWe):
This Month                         Yr.-to.Date         Cumulative
: 10. Reasons For Restrictions,1f Any:
: 11. Hours In Reporting Period                                                   744                         744             51624 744                          744          32951.2
P"an Pnuar hnfenra in hvnace.
: 12. Number Of Hours Reactor Was Critical 0                       0         1280.3
This Month Yr.-to.Date Cumulative 744 744 51624
: 13. Reactor Reserve Shutdown Hours                                                               _
: 11. Hours In Reporting Period 744 744 32951.2
32210.9 744                          744
: 12. Number Of Hours Reactor Was Critical 0
: 14. Hours Generator On.Line                                                                                                           0 0                       0
0 1280.3
: 15. Unit Reserve Shutdown Hours
: 13. Reactor Reserve Shutdown Hours 744 32210.9 744
: 16. Gross Thennal Energy Generated (MWH)                             1777945                            1777945          72302900                              -
: 14. Hours Generator On.Line 0
622985                             622985           24589602
0 0
: 17. Gross Electrical Energy Generated (MWH)                                                 ,_,
: 15. Unit Reserve Shutdown Hours 1777945 1777945 72302900
: 18. Net Electrical Energy Generated (MWH)                             594578                              594578          23339458 100%                           100%             62.4%
: 16. Gross Thennal Energy Generated (MWH) 622985 622985 24589602
: 19. Unit Semce Factor 100%                           100%             62.4%
: 17. Gross Electrical Energy Generated (MWH) 594578 594578 23339458
: 20. Unit Availability Factor 98.5%                              98.5%              57.4%
: 18. Net Electrical Energy Generated (MWH) 100%
100%
62.4%
: 19. Unit Semce Factor 100%
100%
62.4%
: 20. Unit Availability Factor
: 21. Unit Capacity Factor (Using MDC Net) -
: 21. Unit Capacity Factor (Using MDC Net) -
98.5%
98.5%
57.4%
96.9%
96.9%
54.8%
54.8%
'                                                                                      96.9%                              96.9%
: 22. Unit Capacity Factor (Using DER Net) 0%
: 22. Unit Capacity Factor (Using DER Net) 0%                           0%             25.6%
0%
25.6%
: 23. Unit Forced Outage Rate
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eacht:
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eacht:
                                                                                ~
nernal outane beninnine 3/19/83. scheduled to last 16 weeks.
nernal outane beninnine 3/19/83. scheduled to last 16 weeks.
1 t              25. If Shut Down At End Of Report Period. Estimated Date of Startup:                               N/A
~
: 26. Units In Test Status (Prior to Commercial Operation):                                               Forecast           Achieved 1
1 N/A
INITIAL CRITICALITY I/14/77 INITIAL ELECTRICITY l/30/77 COMMERCIAL OPERATION                                                                            3/13/77 8303000039 830215                                                                                                                                         (9/77)
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
PDR ADOCK 05000302           PDR R
t
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved 1
I/14/77 INITIAL CRITICALITY l/30/77 INITIAL ELECTRICITY 3/13/77 COMMERCIAL OPERATION 8303000039 830215 (9/77)
PDR ADOCK 05000302 R
PDR


po. .        ,.
po.
DOCKET NO.         50-302                       -
DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS                       UNIT NAME         FLCRP-3 DATE       2 /4 /8'l COMPLETED BY           MX ('ul va r REPORT MONTH     I/83                             TELEPHONE           (904) 795-6486 Cause & Corrective
50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 2 /4 /8'l COMPLETED BY MX ('ul va r REPORT MONTH I/83 TELEPHONE (904) 795-6486 Cause & Corrective
                                    .$ E                   3                                         Y       Licensee     E*,
.$ E 3
k*".                       Action to No.         D.ite       R       Eg                             s                               j5E         Event       :( ?
Y Licensee E*
5                                  jgg                      N0                              Prevent Recurrence H
k*".
                                    $E                                                                         Report #
Action to No.
fU 6
D.ite R
A                                       N/A           N/A       HC     HTEXCH       Reduced power to find a saltwater 83-01    830106        F        --
Eg s
leak in condenser waterbox C.               ,
j5E Event
H                                       N/A           N/A       CB     MOTORX       Reduced power due to what appeared to 83-02     830125         F         --
:( ?
be an increasing motor bearing oil level. Continued observation while at low power showed there was no problem. The unit returned to full i                                                                                                                                                 power.
fU H
N/A       HC     HTEXCH       Reduced power to clean waterboxes.
$E 5
83-03     830126         S         --                        B                                  N/A 3                               4 I                    2 Method:                           Exhibit G Instructions F: Forced       . Reason:                                                                                                                             for Preparati<m of Data I-Manual S: Scheduled           A-Equipment Failure (Explain) 2 Manual Scram.                   Entry Sheets for Licensee B Maintenance of Test                                                                                                              Event Report (LER) File (NUREG-C Refueling                                                                                       3 Automatic Scram.
jgg Report #
4-Other (Explain)                 01611                           -
N0 Prevent Recurrence 6
D Regulatory Restriction                                                                                                                                  I E-Operator Training & Ucense Examination 5
83-01 830106 F
F Administrative                                                                                                                   Exhibit I- Same Source G Operational Error (Explain) 19/77)                     Il Other (Explain)
A N/A N/A HC HTEXCH Reduced power to find a saltwater leak in condenser waterbox C.
H N/A N/A CB MOTORX Reduced power due to what appeared to 83-02 830125 F
be an increasing motor bearing oil level. Continued observation while at low power showed there was no problem. The unit returned to full i
power.
B N/A N/A HC HTEXCH Reduced power to clean waterboxes.
83-03 830126 S
I 2
3 4
Method:
Exhibit G Instructions F: Forced Reason:
S: Scheduled A-Equipment Failure (Explain)
I-Manual for Preparati<m of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee 3 Automatic Scram.
Event Report (LER) File (NUREG-C Refueling D Regulatory Restriction 4-Other (Explain) 01611 I
E-Operator Training & Ucense Examination 5
F Administrative Exhibit I-Same Source G Operational Error (Explain) 19/77)
Il Other (Explain)


AVERAGE DAILY UNIT POWER LEVEL 50-302 f                                                                   .                      , DOCKET NO.
AVERAGE DAILY UNIT POWER LEVEL f
UNIT     FLCRP-3       ,
, DOCKET NO.
DATE     2/2/83 D. Bogart COMPLETED BY TELEPHONE (4041 795-6486 January 1983 MONTH DAY       AVERAGE DAILY POWER LEVEL                           DAY       AVERAGE DAILY POWER LEVEL (MWe-Net)                                                   (MWe-Net) 811                                                         839 1                                                             17 824                                 gg                     820 2
50-302 UNIT FLCRP-3 DATE 2/2/83 COMPLETED BY D. Bogart TELEPHONE (4041 795-6486 MONTH January 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
831                                 g,                       g79 3
(MWe-Net) 811 1
                                  ._ 825                                 20                       829 4
17 839 820 824 gg 2
825                                 21 827 5
831 g,
772                                 22                       R94 6
g79 3
738                                 23                       825 7
4
781                                 y                        830 g
._ 825 20 829 825 827 5
9                         829                                 25                       636 829                                 26 686 10 828                                                         622
21 6
            ,,                                                            27 836                                 28                       676 12 824                                                         816 13                                                             39 14                                                             30 820                                 33 831 15 834 16 INSTRUCTIONS On this format, list the average daily unit power lesel in MWe Net fcr each day in the reporting month. Compute to the nearest whole megawatt.
772 22 R94 738 23 825 7
781 830 g
y 9
829 25 636 829 686 10 26 828 622 27 12 836 28 676 824 816 13 39 14 30 831 820 33 15 834 16 INSTRUCTIONS On this format, list the average daily unit power lesel in MWe Net fcr each day in the reporting month. Compute to the nearest whole megawatt.
(W77)
(W77)


        ~
~
de
de M)NTHLY OPERATIONAL  
    .                                          M)NTHLY OPERATIONAL  


==SUMMARY==
==SUMMARY==
STATEMENT r
STATEMENT r
E                                     .
E DOCKET NO.
DOCKET NO. 50-302 UNIT FLCRP-3 DATE 2/4/83 CCHPLETED BY   M.W. Culver TELEPHONE (904) 795-6486 MONTH     Januarv 1983
50-302 UNIT FLCRP-3 DATE 2/4/83 CCHPLETED BY M.W. Culver TELEPHONE (904) 795-6486 MONTH Januarv 1983


==SUMMARY==
==SUMMARY==
Line 105: Line 142:
i e
i e
l
l
                                                          - _ - - . . - - _ . __ __}}
.}}

Latest revision as of 06:55, 15 December 2024

Monthly Operating Rept for Jan 1983
ML20071C737
Person / Time
Site: Crystal River 
Issue date: 02/02/1983
From: Bogart D
FLORIDA POWER CORP.
To:
Shared Package
ML20071C732 List:
References
NUDOCS 8303080039
Download: ML20071C737 (4)


Text

t

\\

l k

OPERATING DATA REPORT, DOCKET NO.

50-302 DATE 2/2/83 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486

_ OPERATING STATUS Notes

1. Unit Name:

Crystal River Unit #3 1/1/83 - 1/31/83

2. ReportagPened
3. I Ic===8 Thermal Power (MWt): _ 2544 890
4. Nameplate Rating (Grom MWe):

825 l

S. Deusa Elecencal Rating (Net MWe):

850

6. Maximum Dependable Capacity (Gross MWe):

811

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasons:

Revised MDC ratines based on operating history.

2475 MW thermal

9. Power Level To Wluch Restncted,1f Any (Net MWe):
10. Reasons For Restrictions,1f Any:

P"an Pnuar hnfenra in hvnace.

This Month Yr.-to.Date Cumulative 744 744 51624

11. Hours In Reporting Period 744 744 32951.2
12. Number Of Hours Reactor Was Critical 0

0 1280.3

13. Reactor Reserve Shutdown Hours 744 32210.9 744
14. Hours Generator On.Line 0

0 0

15. Unit Reserve Shutdown Hours 1777945 1777945 72302900
16. Gross Thennal Energy Generated (MWH) 622985 622985 24589602
17. Gross Electrical Energy Generated (MWH) 594578 594578 23339458
18. Net Electrical Energy Generated (MWH) 100%

100%

62.4%

19. Unit Semce Factor 100%

100%

62.4%

20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) -

98.5%

98.5%

57.4%

96.9%

96.9%

54.8%

22. Unit Capacity Factor (Using DER Net) 0%

0%

25.6%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eacht:

nernal outane beninnine 3/19/83. scheduled to last 16 weeks.

~

1 N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

t

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved 1

I/14/77 INITIAL CRITICALITY l/30/77 INITIAL ELECTRICITY 3/13/77 COMMERCIAL OPERATION 8303000039 830215 (9/77)

PDR ADOCK 05000302 R

PDR

po.

DOCKET NO.

50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 2 /4 /8'l COMPLETED BY MX ('ul va r REPORT MONTH I/83 TELEPHONE (904) 795-6486 Cause & Corrective

.$ E 3

Y Licensee E*

k*".

Action to No.

D.ite R

Eg s

j5E Event

( ?

fU H

$E 5

jgg Report #

N0 Prevent Recurrence 6

83-01 830106 F

A N/A N/A HC HTEXCH Reduced power to find a saltwater leak in condenser waterbox C.

H N/A N/A CB MOTORX Reduced power due to what appeared to 83-02 830125 F

be an increasing motor bearing oil level. Continued observation while at low power showed there was no problem. The unit returned to full i

power.

B N/A N/A HC HTEXCH Reduced power to clean waterboxes.

83-03 830126 S

I 2

3 4

Method:

Exhibit G Instructions F: Forced Reason:

S: Scheduled A-Equipment Failure (Explain)

I-Manual for Preparati<m of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee 3 Automatic Scram.

Event Report (LER) File (NUREG-C Refueling D Regulatory Restriction 4-Other (Explain) 01611 I

E-Operator Training & Ucense Examination 5

F Administrative Exhibit I-Same Source G Operational Error (Explain) 19/77)

Il Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL f

, DOCKET NO.

50-302 UNIT FLCRP-3 DATE 2/2/83 COMPLETED BY D. Bogart TELEPHONE (4041 795-6486 MONTH January 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 811 1

17 839 820 824 gg 2

831 g,

g79 3

4

._ 825 20 829 825 827 5

21 6

772 22 R94 738 23 825 7

781 830 g

y 9

829 25 636 829 686 10 26 828 622 27 12 836 28 676 824 816 13 39 14 30 831 820 33 15 834 16 INSTRUCTIONS On this format, list the average daily unit power lesel in MWe Net fcr each day in the reporting month. Compute to the nearest whole megawatt.

(W77)

~

de M)NTHLY OPERATIONAL

SUMMARY

STATEMENT r

E DOCKET NO.

50-302 UNIT FLCRP-3 DATE 2/4/83 CCHPLETED BY M.W. Culver TELEPHONE (904) 795-6486 MONTH Januarv 1983

SUMMARY

STATEMENT: The onit experienced three power reductions this month.

i e

l

.