ML20071C737: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:t | {{#Wiki_filter:t | ||
\\ | |||
l OPERATING DATA REPORT, | l k | ||
DOCKET NO. 50-302 DATE | OPERATING DATA REPORT, DOCKET NO. | ||
_ OPERATING STATUS | 50-302 DATE 2/2/83 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486 | ||
_ OPERATING STATUS Notes | |||
: 1. Unit Name: | : 1. Unit Name: | ||
Crystal River Unit #3 1/1/83 - 1/31/83 | |||
: 2. ReportagPened | |||
: 3. I Ic===8 Thermal Power (MWt): _ 2544 890 | : 3. I Ic===8 Thermal Power (MWt): _ 2544 890 | ||
: 4. Nameplate Rating (Grom MWe): | : 4. Nameplate Rating (Grom MWe): | ||
l S. Deusa Elecencal Rating (Net MWe): | 825 l | ||
S. Deusa Elecencal Rating (Net MWe): | |||
850 | |||
: 6. Maximum Dependable Capacity (Gross MWe): | : 6. Maximum Dependable Capacity (Gross MWe): | ||
811 | 811 | ||
| Line 33: | Line 36: | ||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasons: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasons: | ||
Revised MDC ratines based on operating history. | Revised MDC ratines based on operating history. | ||
: 9. Power Level To Wluch Restncted,1f Any (Net MWe): | 2475 MW thermal | ||
: 10. Reasons For Restrictions,1f Any: | : 9. Power Level To Wluch Restncted,1f Any (Net MWe): | ||
This Month | : 10. Reasons For Restrictions,1f Any: | ||
: 11. Hours In Reporting Period | P"an Pnuar hnfenra in hvnace. | ||
: 12. Number Of Hours Reactor Was Critical 0 | This Month Yr.-to.Date Cumulative 744 744 51624 | ||
: 13. Reactor Reserve Shutdown Hours | : 11. Hours In Reporting Period 744 744 32951.2 | ||
32210.9 | : 12. Number Of Hours Reactor Was Critical 0 | ||
: 14. Hours Generator On.Line | 0 1280.3 | ||
: 15. Unit Reserve Shutdown Hours | : 13. Reactor Reserve Shutdown Hours 744 32210.9 744 | ||
: 16. Gross Thennal Energy Generated (MWH) | : 14. Hours Generator On.Line 0 | ||
622985 | 0 0 | ||
: 17. Gross Electrical Energy Generated (MWH) | : 15. Unit Reserve Shutdown Hours 1777945 1777945 72302900 | ||
: 18. Net Electrical Energy Generated (MWH) | : 16. Gross Thennal Energy Generated (MWH) 622985 622985 24589602 | ||
: 19. Unit Semce Factor 100% | : 17. Gross Electrical Energy Generated (MWH) 594578 594578 23339458 | ||
: 20. Unit Availability Factor | : 18. Net Electrical Energy Generated (MWH) 100% | ||
100% | |||
62.4% | |||
: 19. Unit Semce Factor 100% | |||
100% | |||
62.4% | |||
: 20. Unit Availability Factor | |||
: 21. Unit Capacity Factor (Using MDC Net) - | : 21. Unit Capacity Factor (Using MDC Net) - | ||
98.5% | |||
98.5% | |||
57.4% | |||
96.9% | |||
96.9% | |||
54.8% | 54.8% | ||
: 22. Unit Capacity Factor (Using DER Net) 0% | |||
: 22. Unit Capacity Factor (Using DER Net) 0% | 0% | ||
25.6% | |||
: 23. Unit Forced Outage Rate | : 23. Unit Forced Outage Rate | ||
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eacht: | : 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eacht: | ||
nernal outane beninnine 3/19/83. scheduled to last 16 weeks. | nernal outane beninnine 3/19/83. scheduled to last 16 weeks. | ||
1 | ~ | ||
: 26. Units In Test Status (Prior to Commercial Operation): | 1 N/A | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | |||
PDR ADOCK 05000302 | t | ||
: 26. Units In Test Status (Prior to Commercial Operation): | |||
Forecast Achieved 1 | |||
I/14/77 INITIAL CRITICALITY l/30/77 INITIAL ELECTRICITY 3/13/77 COMMERCIAL OPERATION 8303000039 830215 (9/77) | |||
PDR ADOCK 05000302 R | |||
PDR | |||
po | po. | ||
DOCKET NO. | DOCKET NO. | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS | 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 2 /4 /8'l COMPLETED BY MX ('ul va r REPORT MONTH I/83 TELEPHONE (904) 795-6486 Cause & Corrective | ||
.$ E 3 | |||
k*". | Y Licensee E* | ||
k*". | |||
Action to No. | |||
D.ite R | |||
A | Eg s | ||
leak in condenser waterbox C. | j5E Event | ||
H | :( ? | ||
be an increasing motor bearing oil level. Continued observation while at low power showed there was no problem. The unit returned to full i | fU H | ||
N/A | $E 5 | ||
83-03 | jgg Report # | ||
4-Other (Explain) | N0 Prevent Recurrence 6 | ||
83-01 830106 F | |||
F Administrative | A N/A N/A HC HTEXCH Reduced power to find a saltwater leak in condenser waterbox C. | ||
H N/A N/A CB MOTORX Reduced power due to what appeared to 83-02 830125 F | |||
be an increasing motor bearing oil level. Continued observation while at low power showed there was no problem. The unit returned to full i | |||
power. | |||
B N/A N/A HC HTEXCH Reduced power to clean waterboxes. | |||
83-03 830126 S | |||
I 2 | |||
3 4 | |||
Method: | |||
Exhibit G Instructions F: Forced Reason: | |||
S: Scheduled A-Equipment Failure (Explain) | |||
I-Manual for Preparati<m of Data B Maintenance of Test 2 Manual Scram. | |||
Entry Sheets for Licensee 3 Automatic Scram. | |||
Event Report (LER) File (NUREG-C Refueling D Regulatory Restriction 4-Other (Explain) 01611 I | |||
E-Operator Training & Ucense Examination 5 | |||
F Administrative Exhibit I-Same Source G Operational Error (Explain) 19/77) | |||
Il Other (Explain) | |||
AVERAGE DAILY UNIT POWER LEVEL | AVERAGE DAILY UNIT POWER LEVEL f | ||
UNIT | , DOCKET NO. | ||
DATE | 50-302 UNIT FLCRP-3 DATE 2/2/83 COMPLETED BY D. Bogart TELEPHONE (4041 795-6486 MONTH January 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | ||
831 | (MWe-Net) 811 1 | ||
17 839 820 824 gg 2 | |||
825 | 831 g, | ||
772 | g79 3 | ||
738 | 4 | ||
781 | ._ 825 20 829 825 827 5 | ||
9 | 21 6 | ||
772 22 R94 738 23 825 7 | |||
781 830 g | |||
y 9 | |||
829 25 636 829 686 10 26 828 622 27 12 836 28 676 824 816 13 39 14 30 831 820 33 15 834 16 INSTRUCTIONS On this format, list the average daily unit power lesel in MWe Net fcr each day in the reporting month. Compute to the nearest whole megawatt. | |||
(W77) | (W77) | ||
~ | |||
de | de M)NTHLY OPERATIONAL | ||
==SUMMARY== | ==SUMMARY== | ||
STATEMENT r | STATEMENT r | ||
E | E DOCKET NO. | ||
DOCKET NO. 50-302 UNIT FLCRP-3 DATE 2/4/83 CCHPLETED BY | 50-302 UNIT FLCRP-3 DATE 2/4/83 CCHPLETED BY M.W. Culver TELEPHONE (904) 795-6486 MONTH Januarv 1983 | ||
==SUMMARY== | ==SUMMARY== | ||
| Line 105: | Line 142: | ||
i e | i e | ||
l | l | ||
.}} | |||
Latest revision as of 06:55, 15 December 2024
| ML20071C737 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/02/1983 |
| From: | Bogart D FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20071C732 | List: |
| References | |
| NUDOCS 8303080039 | |
| Download: ML20071C737 (4) | |
Text
t
\\
l k
OPERATING DATA REPORT, DOCKET NO.
50-302 DATE 2/2/83 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486
_ OPERATING STATUS Notes
- 1. Unit Name:
Crystal River Unit #3 1/1/83 - 1/31/83
- 2. ReportagPened
- 3. I Ic===8 Thermal Power (MWt): _ 2544 890
- 4. Nameplate Rating (Grom MWe):
825 l
S. Deusa Elecencal Rating (Net MWe):
850
- 6. Maximum Dependable Capacity (Gross MWe):
811
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Give Reasons:
Revised MDC ratines based on operating history.
2475 MW thermal
- 9. Power Level To Wluch Restncted,1f Any (Net MWe):
- 10. Reasons For Restrictions,1f Any:
P"an Pnuar hnfenra in hvnace.
This Month Yr.-to.Date Cumulative 744 744 51624
- 11. Hours In Reporting Period 744 744 32951.2
- 12. Number Of Hours Reactor Was Critical 0
0 1280.3
- 13. Reactor Reserve Shutdown Hours 744 32210.9 744
- 14. Hours Generator On.Line 0
0 0
- 15. Unit Reserve Shutdown Hours 1777945 1777945 72302900
- 16. Gross Thennal Energy Generated (MWH) 622985 622985 24589602
- 17. Gross Electrical Energy Generated (MWH) 594578 594578 23339458
- 18. Net Electrical Energy Generated (MWH) 100%
100%
62.4%
- 19. Unit Semce Factor 100%
100%
62.4%
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) -
98.5%
98.5%
57.4%
96.9%
96.9%
54.8%
- 22. Unit Capacity Factor (Using DER Net) 0%
0%
25.6%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eacht:
nernal outane beninnine 3/19/83. scheduled to last 16 weeks.
~
1 N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
t
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved 1
I/14/77 INITIAL CRITICALITY l/30/77 INITIAL ELECTRICITY 3/13/77 COMMERCIAL OPERATION 8303000039 830215 (9/77)
PDR ADOCK 05000302 R
po.
DOCKET NO.
50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 2 /4 /8'l COMPLETED BY MX ('ul va r REPORT MONTH I/83 TELEPHONE (904) 795-6486 Cause & Corrective
.$ E 3
Y Licensee E*
k*".
Action to No.
D.ite R
Eg s
j5E Event
- ( ?
fU H
$E 5
jgg Report #
N0 Prevent Recurrence 6
83-01 830106 F
A N/A N/A HC HTEXCH Reduced power to find a saltwater leak in condenser waterbox C.
H N/A N/A CB MOTORX Reduced power due to what appeared to 83-02 830125 F
be an increasing motor bearing oil level. Continued observation while at low power showed there was no problem. The unit returned to full i
power.
B N/A N/A HC HTEXCH Reduced power to clean waterboxes.
83-03 830126 S
I 2
3 4
Method:
Exhibit G Instructions F: Forced Reason:
S: Scheduled A-Equipment Failure (Explain)
I-Manual for Preparati<m of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee 3 Automatic Scram.
Event Report (LER) File (NUREG-C Refueling D Regulatory Restriction 4-Other (Explain) 01611 I
E-Operator Training & Ucense Examination 5
F Administrative Exhibit I-Same Source G Operational Error (Explain) 19/77)
Il Other (Explain)
AVERAGE DAILY UNIT POWER LEVEL f
, DOCKET NO.
50-302 UNIT FLCRP-3 DATE 2/2/83 COMPLETED BY D. Bogart TELEPHONE (4041 795-6486 MONTH January 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 811 1
17 839 820 824 gg 2
831 g,
g79 3
4
._ 825 20 829 825 827 5
21 6
772 22 R94 738 23 825 7
781 830 g
y 9
829 25 636 829 686 10 26 828 622 27 12 836 28 676 824 816 13 39 14 30 831 820 33 15 834 16 INSTRUCTIONS On this format, list the average daily unit power lesel in MWe Net fcr each day in the reporting month. Compute to the nearest whole megawatt.
(W77)
~
de M)NTHLY OPERATIONAL
SUMMARY
STATEMENT r
E DOCKET NO.
50-302 UNIT FLCRP-3 DATE 2/4/83 CCHPLETED BY M.W. Culver TELEPHONE (904) 795-6486 MONTH Januarv 1983
SUMMARY
STATEMENT: The onit experienced three power reductions this month.
i e
l
.