ML20076B594: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. .
{{#Wiki_filter:.
t     ENERGY                         STEEL                       s s u r e n. r c o.
t ENERGY STEEL s s u r e n. r c o.
DETROIT - NASHVILLE GENERAL OFFICES 2685 LAPEER RD.
DETROIT - NASHVILLE GENERAL OFFICES 2685 LAPEER RD.
PONTIAC, MI 48057 313-373-4880 August 11, 1983 Mr. James G. Keppler Regional Administration United States Regulatory Commission 799 Roosevelt Rd.
PONTIAC, MI 48057 313-373-4880 August 11, 1983 Mr. James G.
Keppler Regional Administration United States Regulatory Commission 799 Roosevelt Rd.
Glyn Ellyn, IL 60137
Glyn Ellyn, IL 60137


Line 26: Line 27:
Report of Non-Conformance under Federal Regulation 10 -
Report of Non-Conformance under Federal Regulation 10 -
CFR 21.
CFR 21.
Re:   Our Purchase Order PD-830509 Our NCR No. 0027 Johnson Control's NCR No.:
Re:
Our Purchase Order PD-830509 Our NCR No. 0027 Johnson Control's NCR No.:
SR-888
SR-888


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
Pursuant to my conversation yesterday, August 10th, 1983, with your Mr. James Konklin (312-932-2500), we wish to file a report of Non-Conformance under Federal Regulation 10 CFR Part 21 and outlined as follows:
Pursuant to my conversation yesterday, August 10th, 1983, with your Mr. James Konklin (312-932-2500), we wish to file a report of Non-Conformance under Federal Regulation 10 CFR Part 21 and outlined as follows:
1.) Energy Steel & Supply Co. is the informant to the NRC under the signature of the writer.
1.)
2.)   The material in question of 8-pieces W 10 X 33 X 20-0 beams which are to be used for a critical Safety Related NF Support in a Containment Building. This is the only location that we supplied the beams in question to.
Energy Steel & Supply Co. is the informant to the NRC under the signature of the writer.
3.)   The material in question has been sold to Johnson Controls, Inc. through a contract with United Engineers & Constructors, Inc. at the Seabrook Power Station, Seabrook, New Hangshire.
2.)
l 4.)   The material in question as determined by Johnson Controls, Inc. is out of web tolerance (See enclosure).
The material in question of 8-pieces W 10 X 33 X 20-0 beams which are to be used for a critical Safety Related NF Support in a Containment Building.
5.)   We were informed of the defect by Johnson Controls, Inc. on June 2, 1983.       The NCR was officially submitted to us by Johnson Controls, Inc. under their NCR #SR-888 dated June 8, O
This is the only location that we supplied the beams in question to.
1983, and received by Energy Steel & Supply Co. on June 20, 1983.     (See enclosure).                                                               \
3.)
                                                                                                        \
The material in question has been sold to Johnson Controls, Inc. through a contract with United Engineers & Constructors, Inc. at the Seabrook Power Station, Seabrook, New Hangshire.
8308190413 830811 PDR ADOCK 05000443 S                   PDR                                                             [/ l    I l
l 4.)
The material in question as determined by Johnson Controls, Inc. is out of web tolerance (See enclosure).
5.)
We were informed of the defect by Johnson Controls, Inc. on June 2, 1983.
The NCR was officially submitted to us by Johnson Controls, Inc. under their NCR #SR-888 dated June 8, O
1983, and received by Energy Steel & Supply Co. on June 20,
\\
1983.
(See enclosure).
\\
[/ l 8308190413 830811 PDR ADOCK 05000443 l
S PDR I
CARBON STEEL HIGH STRENGTH LOW ALLOY ALLOY - STAINLESS - PLATE BARS SHAPES -INDUSTRIALg9 FLIES 46
CARBON STEEL HIGH STRENGTH LOW ALLOY ALLOY - STAINLESS - PLATE BARS SHAPES -INDUSTRIALg9 FLIES 46


t vu Mr. James G. Keppler United States Regulatory Commission i       -August 11, 1983
t vu Mr. James G.
        - Page 2 T
Keppler United States Regulatory Commission i
l         6.)   On Monday, August 10, 1983, a meeting was held in Seabrook at our request between Johncon Controls, Inc., United Engineers
-August 11, 1983
                & Constructors, Inc., and Energy Steel & Supply Co. in an ef-fort to examine and resolve this matter.
- Page 2 T
It was explained by Energy Steel & Supply Co. that the material being rojected was purchased from ITT Grinnell, Chicago, IL who in turn purchased the indterial from Inland Steel Co. , Chicago, IL.
l 6.)
Energy Steel & Supply Co. explained that it had notified ITT Grin-nell on June 3rd, 1983, of the rejection. ITT said they would take the problem up with U.S. Steel Supply Co. who in turn would notify Inland Steel Co.
On Monday, August 10, 1983, a meeting was held in Seabrook at our request between Johncon Controls, Inc., United Engineers
& Constructors, Inc., and Energy Steel & Supply Co. in an ef-fort to examine and resolve this matter.
It was explained by Energy Steel & Supply Co. that the material being rojected was purchased from ITT Grinnell, Chicago, IL who in turn purchased the indterial from Inland Steel Co., Chicago, IL.
Energy Steel & Supply Co. explained that it had notified ITT Grin-nell on June 3rd, 1983, of the rejection.
ITT said they would take the problem up with U.S.
Steel Supply Co. who in turn would notify Inland Steel Co.
In the time period from June 3, 1983, through August 3, 1983, Ener-gy Steel had made numerous calls to ITT Grinnell in an effort to resolve this rejection with virtually no response.
In the time period from June 3, 1983, through August 3, 1983, Ener-gy Steel had made numerous calls to ITT Grinnell in an effort to resolve this rejection with virtually no response.
Energy Steel & Supply Co. received a call on Friday, July 22nd, from Inland Steel Co. informing us that they felt their product was fully within the specified mill tolerances for that section. En-orgy Steel explained that we understood their position, however, in reviewing the specifications of ASTM A-6 Johnson Controls, Inc. in-sisted that this-material was non-conforming and out of tolerance and therefore was rejecting it.
Energy Steel & Supply Co. received a call on Friday, July 22nd, from Inland Steel Co. informing us that they felt their product was fully within the specified mill tolerances for that section.
En-orgy Steel explained that we understood their position, however, in reviewing the specifications of ASTM A-6 Johnson Controls, Inc. in-sisted that this-material was non-conforming and out of tolerance and therefore was rejecting it.
In our meeting at Seabrook, United Engineers & Constructors, Inc.
In our meeting at Seabrook, United Engineers & Constructors, Inc.
also took the position of Johnson Controls, Inc. and said the ma-terial was rejectable even though they personally did not inspact the material in question.
also took the position of Johnson Controls, Inc. and said the ma-terial was rejectable even though they personally did not inspact the material in question.
It was further. stated that although both United Engineers and Con-structors, Inc. and Johnson Controls, Inc. purchace and receive ma-               ,
It was further. stated that although both United Engineers and Con-structors, Inc. and Johnson Controls, Inc. purchace and receive ma-terial'to the same specifications that United Engi..eers & Const-ructors and Johnson Controls perform two different 2.eceiving in-spections.
terial'to the same specifications that United Engi..eers & Const-ructors and Johnson Controls perform two different 2.eceiving in-spections.
7.)
7.) Energy Steel & Supply Co. feels that it has respond (d re-sponsibly in every way in an effort to resolve this non-conformance.
Energy Steel & Supply Co. feels that it has respond (d re-sponsibly in every way in an effort to resolve this non-conformance.
It is clearly. stated however,,that.the material supplier (Energy Steel);is not responsible for dimensional conformance, but in fact that responsibility of the Material Manufacturer to assure con-formanca to the material' specifications.           (See enclosures.)
It is clearly. stated however,,that.the material supplier (Energy Steel);is not responsible for dimensional conformance, but in fact that responsibility of the Material Manufacturer to assure con-formanca to the material' specifications.
_ . -        . __ ,  -=
(See enclosures.)
-=


e Mr. James Kappler United States Regulatory Commission August 11, 1983 Page 3 8.) Energy Steel & Supply Co. is in agreement that Inland Steel Co. is correct in their determination based upon the fact that Energy Steel has personally inspected the non-conforming beams.
e Mr. James Kappler United States Regulatory Commission August 11, 1983 Page 3 8.)
It was suggested by Energy Steel to both ITT Grinnell and In-land Steel that Inland Steel attend the meeting scheduled for August 8, 1983. Inland Steel declined to attend and in ad-dition has refused to send a mill representative to the job site to determine in fact whether the beams in question are in conformance or non-conformance to the material specification.
Energy Steel & Supply Co. is in agreement that Inland Steel Co. is correct in their determination based upon the fact that Energy Steel has personally inspected the non-conforming beams.
Very truly yours, EN RGY STEEL & S   PLY CO.
It was suggested by Energy Steel to both ITT Grinnell and In-land Steel that Inland Steel attend the meeting scheduled for August 8, 1983.
Michael R.{Mitchell President
Inland Steel declined to attend and in ad-dition has refused to send a mill representative to the job site to determine in fact whether the beams in question are in conformance or non-conformance to the material specification.
Very truly yours, EN RGY STEEL & S PLY CO.
{Mitchell Michael R.
President


==Enclosures:==
==Enclosures:==
(A) Energy Steel letters dated: June 3, 1983 June 30, 1983 August 10, 1983 (B) Energy Steel Purchase Order PD-830509 830509-A (Amended)
(A)
(C) Energy Steel Inter-Office menos dated:
Energy Steel letters dated:
June 3, 1983 June 30, 1983 August 10, 1983 (B)
Energy Steel Purchase Order PD-830509 830509-A (Amended)
(C)
Energy Steel Inter-Office menos dated:
June 1,2,6,8, 1983; August 3& 9th, 1983.
June 1,2,6,8, 1983; August 3& 9th, 1983.
(D) ITT Grinnell letter dated August 9, 1983.
(D)
ITT Grinnell {{letter dated|date=August 9, 1983|text=letter dated August 9, 1983}}.
ITT Grinnell Certificate of Compliance for mat-erial supplied.
ITT Grinnell Certificate of Compliance for mat-erial supplied.
(E) Johnson Controls, Inc. NCR #SR-888 Dated June 8, 1983.
(E)
(F) ASME file letter NI-81-6 Dated July 13, 1981.
Johnson Controls, Inc. NCR #SR-888 Dated June 8, 1983.
(G) Inland Steel's response Dated August 3., 1983.
(F)
ASME file letter NI-81-6 Dated July 13, 1981.
(G)
Inland Steel's response Dated August 3.,
1983.


Mr. James Keppler United States Regulatory Commission August 11, 1983 Page 4
Mr. James Keppler United States Regulatory Commission August 11, 1983 Page 4
Line 77: Line 108:
==References:==
==References:==
3812, 3813, 3861 (B) (1), NCA-3867.1, 3867.2, 3868, 3868.3, 4134.7.
3812, 3813, 3861 (B) (1), NCA-3867.1, 3867.2, 3868, 3868.3, 4134.7.
cc: D. Mitchell M. Gawron R. Genung R. Gotwald Johnson Controls, Inc.
cc:
D. Mitchell M. Gawron R. Genung R.
Gotwald Johnson Controls, Inc.


                                                                                                                                                    .i X.
.i X.
                                                                                                                                                  -tr~
ENERGY SYEEL a s u e e t V.c o.
ENERGY                                                   SYEEL                             a s u e e t V .c o. Na{u             ,1.       -
Na{u
DETROIT. NASHVILLE           * 'cA.,'':
-tr~
GENERALOFFICES             .U Q 2685 LAPEER RD.                        . . .
,1.
PONTIAC, MI 48057 313-373-4880
DETROIT. NASHVILLE
                                                                                                                                                ~.:r @h,M    '
* ' A.,'':
                                                                                                                                                            , r. -
c GENERALOFFICES
ipf. -
.U Q
_ . .,p, a .t ,            ,
~. @h,M 2685 LAPEER RD.
June 3, 1983                                         $[   ;r yr ITT Grinnell                                                                                                                   . . y,-
PONTIAC, MI 48057
m.
', r. -
313-373-4880
:r ipf. -
_..,p, a.t,
June 3, 1983
$[
;r yr ITT Grinnell
.. y,-
4:Q m.
4425 South Western Ave.
4425 South Western Ave.
4:Q W-Chicago, IL 60609
W-Chicago, IL 60609
                                                                                                                                                      .l -
.l -
                                                                                                                                                      .! .'. 4
.!.'. 4
* Attn:   Mr. Herb Otto, Manager                                                                                                       4
.f t Attn:
                                                                                                                                                        .fr,qt .
Mr. Herb Otto, Manager 4 r,q.
                                                                                                                                                    ,K j;p ,
,Kj;p,
Re:   PD-830509A ordered 5/9/83                                                                                                 .[ . ..:. .
Re:
PD-830509A ordered 5/9/83
.[...:..
:I b$
:I b$


==Dear Mr. Otto:==
==Dear Mr. Otto:==
9: JiY
9: JiY
                                                                                                                                                - $ $M Of the 10-ocs W 10 G 33# X 20'-0 from Inland, 8-pcs have a main ' web di2nension of between .250 to .260. Specification dictates a thickness                                                         }.[,fg[i.
- $ $M
: dgf of .290. For this reason our customer is rejecting the material.                                                                 M'
}.[,fg[i.
                                                                                                                                                  ':]i-As ITT and Energy Stool are both suppliers, we are not responsible                                                             - ,'/jff p           for dimensional conformance. Therefore, please present this claim.                                                             /             l' ;
Of the 10-ocs W 10 G 33# X 20'-0 from Inland, 8-pcs have a main ' web
  .r.
: dgf di2nension of between.250 to.260.
    **          to Inland Steel and advise of the necessary steps to rectify or replace.                                                                                                                      @,!: [i,.
Specification dictates a thickness of.290.
f v.j t           3
For this reason our customer is rejecting the material.
  , s.                                                                                                                                               .,
M'
o Awaiting your response, I remain,                                                                                             !,5j t'
':]i-As ITT and Energy Stool are both suppliers, we are not responsible
                                                                                                                                                .h
-,'/jff p
                                                                                                                                                  * *t;%n ,
for dimensional conformance.
Very truly yours,                                         !
Therefore, please present this claim.
(!.y
/
                                                                                                                                                    ! ''O i
l' ;
  ~
to Inland Steel and advise of the necessary steps to rectify or
ENiiRGY STEEL & SUPPLY CO.                           .IIMk.
@,!: [i,.
i-4      -
f 3
46                                  l'{rr
replace.
                                                                                                                                                            !Ed '
v.j t
P
.r.
                                                                                                                                                                          .,t )
, s.
o Awaiting your response, I remain,
!,5j
.h t'
* *t;%n,
Very truly yours,
(!.y '
''O i ENiiRGY STEEL & SUPPLY CO.
.IIMk.
l'{rr.,t )
~
i-
!Ed '
4 46 P
T9fp'.
T9fp'.
Marg A. Gawron                       -
4.d Marg A. Gawron Q.A. Manager
4.d Q.A. Manager                             *
,_ y '
                                                                                                                                    ,_ y '     $.'[f
$.'[f
                                                                                                                                  - .' G -       -Q MAG /kc enclosures
-.' G -
                                                                                                                                                'ilg                 .;
-Q MAG /kc
                                                                                                                                                  ,;g;;;g
'ilg enclosures
                                                                                                                                                            ~
,;g;;;g
cc:  Michael R. Mitchell                                                                                                            :b.1;.. .
:b.1;...
President                                                                                                                    ,ua'.i t; .
~
~
                                                                                                                                                ,!dThv L                      '
cc:
                                                                                                                                  .g
Michael R. Mitchell
                                                                                                                                              -  ein  .a:
'.i t
                                                                                                                                                        . ) *; *
,ua ;.
: l.           5 ?? '
President
                                                                                                                                        ,d.       ,1,
,!dThv '
                                                                                                                                        .L ',   'h h'5,,,
~
                                                                                                                                        .          i ' M' CARDON STEEL - HIGH STRENGTH LOW ALLOY ALLOY STAINLESS PLATE BARS SHAPES -INDUSTRIAL SUPPLIES                                       . 'f J'r f4-3
Lein
_ _ _ - _ - - _ _ - - - _ _ _ _ _ - _ _ __ _                    _-                            .' 7 ''@
.a:
.g
. ) *;
* l.
5 ?? '
,d.
,1,
.L ',
'h h'5, i ' M' CARDON STEEL - HIGH STRENGTH LOW ALLOY ALLOY STAINLESS PLATE BARS SHAPES -INDUSTRIAL SUPPLIES
. f J'r f4-3
.' 7 ''@


      *~     ENERGY                         STEEL                     a   s u p p t r         c a.
* ~
DETROIT . NASHVILLE     ,,
ENERGY STEEL a
GENERAL OFFICES 2685 LAPEER RD.
s u p p t r c a.
DETROIT. NASHVILLE GENERAL OFFICES 2685 LAPEER RD.
PONTIAC,MI 48057 313 373-4880 June 30, 1983 ITT Grinnell Corp.
PONTIAC,MI 48057 313 373-4880 June 30, 1983 ITT Grinnell Corp.
Attn: Credit Department P.O. Box 98194 Chicago, IL 60693
Attn:
* Re:   Invoice   54936 54937 54938 Gentlemen:
Credit Department P.O. Box 98194 Chicago, IL 60693
* Re:
Invoice 54936 54937 54938 Gentlemen:
Enclosed please find our check for payment as follows:
Enclosed please find our check for payment as follows:
Invoice                         Remarks 54937                           Paid in Full 54938                           Paid in Full 54936
Invoice Remarks 54937 Paid in Full 54938 Paid in Full 54936
* Partial payment in the amount of for 2-pcs received.
* Partial payment in the amount of for 2-pcs received.
* Note: There are 8-pcs W 10 X 33 X 20-0 which have had an NCR issued a9ainst them as they have been rejected for being out of mill tolerance.
* Note:
There are 8-pcs W 10 X 33 X 20-0 which have had an NCR issued a9ainst them as they have been rejected for being out of mill tolerance.
A copy of our NCR No. 0027 is attached for your records.
A copy of our NCR No. 0027 is attached for your records.
We are awaiting your return shipping instructions and replacement material for the above 8-pcs. We will of course issue a final payment as soon as a disposition has been made on the.,above.
We are awaiting your return shipping instructions and replacement material for the above 8-pcs.
We will of course issue a final payment as soon as a disposition has been made on the.,above.
Very truly yours, ENERGY STEEL & SUPPLY CO.
Very truly yours, ENERGY STEEL & SUPPLY CO.
f4       . 29da4s Dene'   . Mitchell Vice President
f4. 29da4s Dene'
                                                            ~
. Mitchell Vice President DJM/kc
DJM/kc                                       .
~
CARBON STEEL HIGH STRENGTH LOW ALLOY ALLOY STAINLESS PLATE DARS SHAPES INDUSTRIAL SUPPLIES
CARBON STEEL HIGH STRENGTH LOW ALLOY ALLOY STAINLESS PLATE DARS SHAPES INDUSTRIAL SUPPLIES


m
m
* ENERGY                           STEEL                       s s u e e t r c o.
* ENERGY STEEL s s u e e t r c o.
DETROIT - NASHVILLE GENERAL OFFICES 2685 LAPEER RD.
DETROIT - NASHVILLE GENERAL OFFICES 2685 LAPEER RD.
PONTIAC, MI 48057 313-373-4880 August 10, 1983 Mr. Daniel Zienty Q.C. Manager ITT Grinnell Corp.
PONTIAC, MI 48057 313-373-4880 August 10, 1983 Mr. Daniel Zienty Q.C. Manager ITT Grinnell Corp.
425 S. Western Ave.
425 S. Western Ave.
Chicago, IL 60609 Re:   Our PO #PD-830509 Our NRC #0027 Johnson Controls' NCR-#SR-888
Chicago, IL 60609 Re:
Our PO #PD-830509 Our NRC #0027 Johnson Controls' NCR-#SR-888


==Dear Mr. Zienty:==
==Dear Mr. Zienty:==
Please be advised that Energy Steel & Supply Co. has filed with the Nuclear Regulatory Commission (NRC) today a report concerning our above order and our NCR #0027 under the I.*m41sions Federal Regulation 10 CFR Part 21 Upon conclusion of our meeting Monday between Johnson Controls, Inc.,
Please be advised that Energy Steel & Supply Co. has filed with the Nuclear Regulatory Commission (NRC) today a report concerning our above order and our NCR #0027 under the I.*m41sions Federal Regulation 10 CFR Part 21 Upon conclusion of our meeting Monday between Johnson Controls, Inc.,
and United Engineers & Constructors, Inc., it was determined by both parties that this material was to be used for a Critical Safety Related NF Support and that the web tolerances are out of mill tolerance on 8-pieces and unacceptable.
and United Engineers & Constructors, Inc., it was determined by both parties that this material was to be used for a Critical Safety Related NF Support and that the web tolerances are out of mill tolerance on 8-pieces and unacceptable.
We are still awaiting your response from Inland Steel.
We are still awaiting your response from Inland Steel.
Sincerely, ENERGY STEEL & SUPPLY CO.
Sincerely, ENERGY STEEL & SUPPLY CO.
k Michael R. Mitchell President MRM/kc cc:   D. Mitchell I
k Michael R. Mitchell President MRM/kc cc:
CARDON ST[ ti - HIGH STRENGTH LOW ALLOY ALLOY STAINLESS PLATE - BARS . SHAPES INDUSTRIAL SUPPLIES
D. Mitchell I
CARDON ST[ ti - HIGH STRENGTH LOW ALLOY ALLOY STAINLESS PLATE - BARS. SHAPES INDUSTRIAL SUPPLIES


  -                                                                                                                                                                              s ENERGYSTEEL                                                                       PURCHASE 0RDER 1
s ENERGYSTEEL PURCHASE 0RDER 1
r.
r.
It .
&SUPPLYCO.
                                                                  &SUPPLYCO.                                                         No. P Ib330509 i
No. P Ib330509 It.
  ; ,t                                                                                                                               AB0VE NUMBER MUST APPEAR 3, -
;,t AB0VE NUMBER MUST APPEAR 3, -
ON ALL DOCUMENTS AND COR-
ON ALL DOCUMENTS AND COR-RESPONDENCE CONCERNING j,'
* RESPONDENCE CONCERNING                 -
THIS ORDER.
j ,'
I' '
* THIS ORDER.
To:
I' '                     To:                                                                             '
No.I.o-am233 y
No.I.o-am233 y                                                                                                                                 -
tW-36 DETROIT NASHVILLE GENERAL OFFICES 955 MEDINAH DR.
        .      tW-36 DETROIT NASHVILLE GENERAL OFFICES
*i Ship To:
                                                                                  .                                                    955 MEDINAH DR.
llanlon Gregory Industries ROCHESTER, MI 48063 c
  *i-Ship To:                     llanlon Gregory Industries                                                           ROCHESTER, MI 48063 c                                           5501 Butler St.                                                                       313 375-0700 I .'                                         l'ittsburgh, PA.                   15201 TERMS:
5501 Butler St.
SHIPVIA: Motor Freight
313 375-0700 I.'
  .t i'
l'ittsburgh, PA.
      #          DATE OF               DATE REO D.           F.O.B.                         PREPAID             COLLECT     CERTIFICATION     QA REVIEW
15201 SHIPVIA: Motor Freight TERMS:
        .        ORDER                                                                               '
.t i' DATE OF DATE REO D.
REQ'D.
F.O.B.
{',               5/6/US                 5/11/83               Pitts., PA                       ,        d           O         YES                 M.A.G.
PREPAID COLLECT CERTIFICATION QA REVIEW ORDER REQ'D.
P-                                                                                                                                             m ,--     ._
{',
g                 S-pc                     W 10 x 30 x 20'-O                                                         ( 3,3 30;/ )       u--
5/6/US 5/11/83 Pitts., PA d
SA-36, Section III, Sub-section NF, Class                                 2,-               I 1977 Edition through Winter 1977 Addenda, NCA 3300, lvCFH50, Appendix B Iuld 10 CFR 21 apply.
O YES M.A.G.
k Tile RE'. UIREllHttrS !OTED ON Ti!E ATTACi!ED SPECIAL' PUR-,                                   .
P-m,--
                                                                                                                                                            "[pfh CilASE ORDER ret >UIREMElfrS FOfC1 ARE AN ItfrEGRAL PAlrrh h e
g S-pc W 10 x 30 x 20'-O
r                                                  OF TilIS PURCllASE ORDER AND !{1UST BE ADHERED TO.                                 ANY     !j EXCHFrIONS MUST BE APPROVED BY ENERGY STEEL & SUPPLY a
( 3,3 30;/ )
c:
u--
M k.;;.
I SA-36, Section III, Sub-section NF, Class 2,-
1977 Edition through Winter 1977 Addenda, NCA 3300, lvCFH50, Appendix B Iuld 10 CFR 21 apply.
k Tile RE'. UIREllHttrS !OTED ON Ti!E ATTACi!ED SPECIAL' PUR-,
"[pfh CilASE ORDER ret >UIREMElfrS FOfC1 ARE AN ItfrEGRAL PAlrrhh e
OF TilIS PURCllASE ORDER AND !{1UST BE ADHERED TO.
ANY
! j r
EXCHFrIONS MUST BE APPROVED BY ENERGY STEEL & SUPPLY a
M c:
k.;;.
y
y
  .., fl                                                                           Confirzaipp to Ucrry Rizzo
.., fl Confirzaipp to Ucrry Rizzo
: 7. -
: 7. -
I, eserun.mwr@
I, eserun.mwr@
DO NOT DUPLI
DO NOT DUPLI IE f
(
(
* IE  ,
Tsui umn.no t.nnnu. or u,cmo.n si i. sei.s oe u.. tu. c iO ENE ST L & SUPPLY Cg[/[/
f
\\
    ',        Tsui umn.no t.nnnu. or u,cmo.n si i. sei.s oe u.. tu. c                       iO         ENE   ST L & SUPPLY Cg[/[/                             ,
in.. unn.i.. ro,..w..neo, con. anet.on o, un in inou.iriai proc.uing ano iner.' '*
in.. unn.i .. ro, ..w. .neo, con. anet.on o, un in inou.iriai proc.uing ano iner.' '*                 \                                                        '
per MkhwlR. M W he11 Pronidont is not sets.ci to ine t.nn.isee oe uschigan slate s.i.s oe un tan.
per   MkhwlR. M W he11                             Pronidont
E AUTHORIZED SIGNATURE
        /      is not sets.ci to ine t.nn.isee oe uschigan slate s.i.s oe un tan.             E                           AUTHORIZED SIGNATURE VENDOR MUST RETURN ATTACHED ACKNOWLEDGEMENT AT ONCE. INVOICE IN DUPLICATE.
/
    ,.            Please enter our order for the following, subject to conditions and instructions named herein, IMPORTANT - This order is not valid until th3 attached acknowledgment has been signed and returned. This order expressly limits acceptance to the terms stated herein ard any addi-tional or dallerent terms stated herein and any addi'ional or different terms proposed by the seller are rejected unless expressly assented to in writing. THIS ORDER IS SUBJECT TO THE TERMS AND CONDITIONS ON THE REVERSE SIDE HEREOF. No other form of acceptance is binding on ENERGY STEEL & SUPPLY CO.
VENDOR MUST RETURN ATTACHED ACKNOWLEDGEMENT AT ONCE. INVOICE IN DUPLICATE.
g if '                                                                                                                                                           s.;
Please enter our order for the following, subject to conditions and instructions named herein, IMPORTANT - This order is not valid until th3 attached acknowledgment has been signed and returned. This order expressly limits acceptance to the terms stated herein ard any addi-tional or dallerent terms stated herein and any addi'ional or different terms proposed by the seller are rejected unless expressly assented to in writing. THIS ORDER IS SUBJECT TO THE TERMS AND CONDITIONS ON THE REVERSE SIDE HEREOF. No other form of acceptance is binding on ENERGY STEEL & SUPPLY CO.
o y,hi,                                                                                                                       '
gif '
W'       >
s.;,
y,hi, o
W'


ENERGYSTEEL                                                                                               PURCHASE ORDER
ENERGYSTEEL PURCHASE ORDER
                                                          &SUPPLYCO.                                                                                 N o , p. ~" '* '-"
&SUPPLYCO.
AB0VE NUMBER MUST APPEAR t.: :ii. .. . . .; . -                                                           ON ALL DOCUMENTS AND COR-                     ,,
N o, p. ~" '* '-"
                                                                    ~ ~ ~ ~ ~ ' ' '
AB0VE NUMBER MUST APPEAR t.: :ii......;. -
                                                                                                    .                                                RESPONDENCE CONCERNING THIS ORDER.
ON ALL DOCUMENTS AND COR-RESPONDENCE CONCERNING
To:                                                                                                                           NO.l-       ' - " " ' "
~ ~ ~ ~ ~ ' ' '
9             '
THIS ORDER.
QV-ut's                                                                             , o q7                      j f                          .=      \                       DETROIT NASHVILLE 1}\[  g            L-                     i GENERAL OFFICES 955 MEDINAH DR.
To:
l 1
NO.l-9 QV-ut's q7 j
Ship To:                                                                                                                                   ROCHtiSTER, MI 48063 li..nlost-Uregory In.iur,trius                                                                                           313-375-0700 S:'. e 1 Btitler St.
, o f1}\\[
i i '. t abu rs.;h , t u 152.1 SHIP g r 1'rcir#a TERMS:
\\
DATE OF                 DATE REO'D.             F.O.D.                                 PREPAID                   COLLECT               CERTIFICATION       OA REVIEW ORDER                                                                                                                                   REO'O.
DETROIT NASHVILLE
S/s/u:5             .',/11/03               L>it t u e , t%                                     y                         [-]           ms                         ; .'.G aec t .c.'w:nt to ouc V::4V35A change frm:                     5,- i . < ,       1: lo C 3H,' X 20'-U                                         ( n>O / 1 Chat.gc t.o:                 Jj),-p :s U 10 0 33v/ X 20'-u                                                       ( 66.ui!
.=
                                        ,\1l other terus                         .;d contlitions re:aain uncliangud 2       pt       2. f r$.2 -4                                                         _
L-GENERAL OFFICES i
9 1-        **    2. / /$b ' d                                                                                 ,
g 955 MEDINAH DR.
                                                                            .y        ,a
Ship To:
: 2. t H.i - c                                                         --
ROCHtiSTER, MI 48063 li..nlost-Uregory In.iur,trius 313-375-0700 S:'. e 1 Btitler St.
2        ee    2. / f-O-8                                                           %
i i '. t abu rs.;h, t u 152.1 SHIP g r 1'rcir#
: 2.          t    J / <Fd2 Y                                                           !
TERMS:
r-.= AT%               W     G)                  '
a DATE OF DATE REO'D.
                            .                                                                            nv*               ,
F.O.D.
neemsd
PREPAID COLLECT CERTIFICATION OA REVIEW ORDER REO'O.
                                                                                                                                                                      ;I A
S/s/u:5
ll '
.',/11/03 L>it t u e, t%
1 Confirning to Jcrry Hino                                                                           f                           j l'o ::.at Duplicato l
y
in.s u.ie,..iio senaessee or uicnigaa siate saies ce use Tan.t                       iO   ENERG           TEEL &
[-]
                                                                                                                        ,          PP,LY CO ,, -               f thes Maiee.al 6 10# eesale an&ot consurnpison or use in indutifial processm0 and merefore p ,, , ',
ms
;.'.G aec t.c.'w:nt to ouc V::4V35A change frm:
5,- i. <,
1: lo C 3H,' X 20'-U
( n>O / 1 Chat.gc t.o:
Jj),-p :s U 10 0 33v/ X 20'-u
( 66.ui!
,\\1l other terus
.;d contlitions re:aain uncliangud 2
pt
: 2. f r$.2 -4 9
: 2. / /$b ' d 1-
: 2. t H.i - c
,a
.y
: 2. / f-O-8 2
ee J / <Fd2 Y
! G) 2.
t r-.= AT%
W nv*
neemsd A
;I ll 1
Confirning to Jcrry Hino f
j l'o ::.at Duplicato l
in.s u.ie,..iio senaessee or uicnigaa siate saies ce use Tan.t iO ENERG TEEL &
PP,LY CO,, -
f thes Maiee.al 6 10# eesale an&ot consurnpison or use in indutifial processm0 and merefore p,,, ',
r b
r b
        .. -ne svinaci sa me tennessee oe u.cn.gaa state ssies ce use Tas.                              ''"'''' ''' ' '' ' AUTHORIZE D SIGN AT UR E ' ' ' ' ' ' ' " ' * * *
''"'''' ''' ' '' ' AUTHORIZE D SIGN AT UR E ' ' ' ' ' ' ' " ' * * * *
* I VENDOR MUST RETURN ATTACHED ACKNOWLEDGEMENT AT ONCE. INVOICE IN DUPLICATE.
.. -ne svinaci sa me tennessee oe u.cn.gaa state ssies ce use Tas.
kC thsP;attached ease enter out order for the following. subject to conditions and instru:tions named herein. IMPORTANT - This order is not valid until acknowledgment has been signed and returned.This order expressly limits acceptance to the terms stated herein and any addi-tionti or dif ferent terms stated herein and any additional or different terms proposed by the seller are rejected unicss expressly assented to in writing. THIS ORDER IS SUBJECT TO THE TERMS AND CONDITIONS ON THE REVERSE SIDE HEREOF. No other form of acceptance is binding on ENERGY STEEL & SUPPLY CO.
VENDOR MUST RETURN ATTACHED ACKNOWLEDGEMENT AT ONCE. INVOICE IN DUPLICATE.
kC P; ease enter out order for the following. subject to conditions and instru:tions named herein. IMPORTANT - This order is not valid until ths attached acknowledgment has been signed and returned.This order expressly limits acceptance to the terms stated herein and any addi-tionti or dif ferent terms stated herein and any additional or different terms proposed by the seller are rejected unicss expressly assented to in writing. THIS ORDER IS SUBJECT TO THE TERMS AND CONDITIONS ON THE REVERSE SIDE HEREOF. No other form of acceptance is binding on ENERGY STEEL & SUPPLY CO.


y N E R G Y .S T E E L                                 & s u e e t v       c o.             1 SPECIAL PURCHASE ORDER REQUIREMENTS                                       i MATERIAL FOR NUCLEAR APPLICATION               .
y N E R G Y.S T E E L s u e e t v c o.
l P.O. No.:   PD-830509
SPECIAL PURCHASE ORDER REQUIREMENTS MATERIAL FOR NUCLEAR APPLICATION P.O. No.:
_1 . Quality Program Specification       ,              3. Marking Recuirements           '
PD-830509
_1.
Quality Program Specification 3.
Marking Recuirements
[ 10CFR50
[ 10CFR50
                                                                      @ Marked per material spec-ification.                      .
@ Marked per material spec-ification.
[ ANSI N45.2                                                   All material die stamped with heat number.
[ ANSI N45.2 All material die stamped with heat number.
ASME Section III, Sub-Article NCA 3800,   1977 edition-through                   @ Low stress die stamps must Winter, 1977       addenda,                             be used.
ASME Section III, Sub-Article NCA 3800, 1977 edition-through
@ Low stress die stamps must Winter, 1977
: addenda, be used.
Die Stamp Not Permitted.
Die Stamp Not Permitted.
X   ASME Section III, Article NF, Class 2                                       "  Heats may not be comingled C Reporting requirements of                           '
X ASME Section III, Article NF, Class 2 Heats may not be comingled C Reporting requirements of
      ,          10CFR21.                                            ] To be packaged and shipped in ac'cordance with ANSI /
] To be packaged and shipped 10CFR21.
O Other                                                       ASME N45.2-1978 (Level D)
in ac'cordance with ANSI /
C Othor _                                                 [                       -
O Other ASME N45.2-1978 (Level D)
: 2. Mater.11 Certification Requirements                 4   Supplementary Requirements Material manufacturer certified                     [ Bend test per material test reports.
C Othor _
C Certificate of Compliance                                   Charpy Impact Tests per C Certifi: ate of Conformance
[
            @ Certification must accompany shipment. ( 3     copics of certification are required.)                             Heat treatment per
2.
* Attention:     M. Gawron Statement that material was produced in             [ No weld repair permitted.
Mater.11 Certification Requirements 4
Supplementary Requirements Material manufacturer certified
[ Bend test per material test reports.
C Certificate of Compliance Charpy Impact Tests per C Certifi: ate of Conformance
@ Certification must accompany shipment. ( 3 copics of certification are required.)
Heat treatment per
* Attention:
M. Gawron Statement that material was produced in
[ No weld repair permitted.
accordance with your Quality System -
accordance with your Quality System -
Program Rev. #     dated
Program Rev. #
[ Galvanized per audited by Energy Steel on Must appear on Certified Mill Test Report.-
dated audited by Energy Steel on
v   Statement that material was produced to ASME Section III, NCA-3800 must appear on Certified Mill Test Reports.
[ Galvanized per Must appear on Certified Mill Test Report.-
: 5. Shipping Requirements
v Statement that material was produced to ASME Section III, NCA-3800 must appear on Certified Mill Test Reports.
[ Mantifacturers Quality System Certificate                                                     e (bot) Number & Expiration Date must appear         lXl All shipments must be made     -
5.
on Certified Mill Test Repori;s.                         on FLAT BED TRUCKS. Load must be tarped.
Shipping Requirements
[ Suppliers Quality System Certificate (MS) Number & Expiration Date must appear on Certifi/cd Mill Te       Reports.
[ Mantifacturers Quality System Certificate (bot) Number & Expiration Date must appear lXl All shipments must be made e
APPROVED:           d                               CUSTOMER:     10-830233 Rev. 2   12-10-82   F106a kc
on Certified Mill Test Repori;s.
on FLAT BED TRUCKS. Load must be tarped.
[ Suppliers Quality System Certificate (MS) Number & Expiration Date must appear on Certifi/cd Mill Te Reports.
APPROVED:
d CUSTOMER:
10-830233 Rev. 2 12-10-82 F106a kc


ENERGY STEEL & SUPPLY CO.
ENERGY STEEL & SUPPLY CO.
INTRA-COMPANY MEMORANDLN TO:         Michael R. Mitchell                     DATE: June 1, 1983 FROM:       Margo A. Gawron
INTRA-COMPANY MEMORANDLN TO:
Michael R. Mitchell DATE: June 1, 1983 FROM:
Margo A. Gawron


==SUBJECT:==
==SUBJECT:==
Line 288: Line 417:
Leo Bourgoin called this date at 4:45pm to advise that PSC was rejecting 8 of the 10-pcs. of WF 10 @ 33# X 20-0."
Leo Bourgoin called this date at 4:45pm to advise that PSC was rejecting 8 of the 10-pcs. of WF 10 @ 33# X 20-0."
I verbally notified Dan Zienty of ITI (Q.C. Manager) and he will put in a claim at ITT.
I verbally notified Dan Zienty of ITI (Q.C. Manager) and he will put in a claim at ITT.
Informed Mr. Zienty, as Mr. Bourgoin had informed me, that the dimension of the web is from .250 to .260 -- thinner than the rest. The thick-ness of this material was to be .292 to meet specification for SA 6.
Informed Mr. Zienty, as Mr. Bourgoin had informed me, that the dimension of the web is from.250 to.260 -- thinner than the rest.
The thick-ness of this material was to be.292 to meet specification for SA 6.
mg l
mg l
FlO7   Rev. O 9-1-82   mg
FlO7 Rev. O 9-1-82 mg


ENERGY STEEL & SUPPLY CO.
ENERGY STEEL & SUPPLY CO.
INTRA-COMPANY MEMORANIXN TO:         Michael R. Mitchell                       DATE: 6-2-83 FROM:       Margo A. Gawron
INTRA-COMPANY MEMORANIXN TO:
Michael R. Mitchell DATE: 6-2-83 FROM:
Margo A. Gawron


==SUBJECT:==
==SUBJECT:==
Clajan to ITT for ID 830233 Spoke to Mr. Jeff Gardner, Sr..QA Engineer, Rhode Island, (401-831-7000 ext. 376). lie indicated that material must meet weight per foot and cross sectional area. We should check all thickness, throughout flange and see if weight and flange thickness would meet specification require-ments. Mill will mic flanges and web every foot to see if the sectional area comes to within 2.5% of entirety.
Clajan to ITT for ID 830233 Spoke to Mr. Jeff Gardner, Sr..QA Engineer, Rhode Island, (401-831-7000 ext. 376).
lie indicated that material must meet weight per foot and cross sectional area. We should check all thickness, throughout flange and see if weight and flange thickness would meet specification require-ments.
Mill will mic flanges and web every foot to see if the sectional area comes to within 2.5% of entirety.
Called Leo Bourgoin and he indicated that he has checked the flanges all the way down, flanges, web, length and width and cannot come to that 2.5%.
Called Leo Bourgoin and he indicated that he has checked the flanges all the way down, flanges, web, length and width and cannot come to that 2.5%.
Again reported to ITT that a claim should be begun and that we would appreciate discussing this matter with the mill as soon as possible as we will need replacement material. They will put in writing once they receive our written nonconformance.
Again reported to ITT that a claim should be begun and that we would appreciate discussing this matter with the mill as soon as possible as we will need replacement material.
mg FlO7   Rev. O 9-1-82   mg
They will put in writing once they receive our written nonconformance.
mg FlO7 Rev. O 9-1-82 mg


ENNRGY STEEL & SUPPLY CO.
ENNRGY STEEL & SUPPLY CO.
IwrRA-COMPANY MEMORANDUM TO:       Michael R. Mitchell                         DATE: June 6, 1983 FRON:     Margo A. Gawron
IwrRA-COMPANY MEMORANDUM TO:
Michael R. Mitchell DATE:
June 6, 1983 FRON:
Margo A. Gawron


==SUBJECT:==
==SUBJECT:==
10 @ 33# X 208-0 WF Johnson Controls PO#9763.011-31901 (Item 30)
10 @ 33# X 208-0 WF Johnson Controls PO#9763.011-31901 (Item 30)
Our PD-830509 Spoke to Mr. Otto of ITT and he transferred me to Dan Zienty. I in-formed Mr. Zienty that we were sending a letter to him today concerning the W 10 X 33. He.in turn will contact his vendor, US Steel Supply who will have to contact the mill -- Inland Steel.
Our PD-830509 Spoke to Mr. Otto of ITT and he transferred me to Dan Zienty.
I also called Mr. Bourgoin and he was not in. I left word to have him send us a written nonconformance for our file.
I in-formed Mr. Zienty that we were sending a letter to him today concerning the W 10 X 33.
mg l         .
He.in turn will contact his vendor, US Steel Supply who will have to contact the mill -- Inland Steel.
l l LG l
I also called Mr. Bourgoin and he was not in.
I left word to have him send us a written nonconformance for our file.
mg l
l l
LG l
F107 Rev. O 9-1-82 mg
F107 Rev. O 9-1-82 mg


ENERGY STEEL & SUPPLY CO.
ENERGY STEEL & SUPPLY CO.
INTRA-COMPANY MEMORANDLM TO:         Michael R. Mitchell                                                                               DATE:         6-8-83 FROM:       Margo A. Gawron
INTRA-COMPANY MEMORANDLM TO:
Michael R. Mitchell DATE:
6-8-83 FROM:
Margo A. Gawron


==SUBJECT:==
==SUBJECT:==
10 @ 33# X 20'-O WF Called Leo Bourgoin; need written (documented) non-conformance.                                                                 lie will write up and send out.
10 @ 33# X 20'-O WF Called Leo Bourgoin; need written (documented) non-conformance.
lie will write up and send out.
Material is awaiting inspection from mill and also holding ID-830101-A Flats 1/2 X 4 X 208-0.
Material is awaiting inspection from mill and also holding ID-830101-A Flats 1/2 X 4 X 208-0.
Might send all back at once.
Might send all back at once.
Line 327: Line 473:
ID-830233 / PD-830509-A, Report SR 888,OAS-801-SS Rev. 3, ASME III SA6, W77, D2ficiency: Site QA Receipt Inspection of material 10-pcs W 10 x 33 x 20'- 0" Gal-vanized to ASTM A 123. Material specification ASME SA 36, NF Class 2, Heat # 21862. Eight pieces have undersized web and*are unacceptable.
ID-830233 / PD-830509-A, Report SR 888,OAS-801-SS Rev. 3, ASME III SA6, W77, D2ficiency: Site QA Receipt Inspection of material 10-pcs W 10 x 33 x 20'- 0" Gal-vanized to ASTM A 123. Material specification ASME SA 36, NF Class 2, Heat # 21862. Eight pieces have undersized web and*are unacceptable.
(1977 Edition through Winter 1977 Addenda.)
(1977 Edition through Winter 1977 Addenda.)
/fl CM5W t
By:
By:
                                                            /fl CM5W Date:
M rgo Gawron Date:
t M rgo Gawron              6/22/83 Analysis of Problem:
6/22/83 Analysis of Problem:
Web thickness .292 minimum per SA 6 Table 17. Actual measurement ranged from .252/.270 using JCI Micrometer # 77. Two pieces were found to be
Web thickness.292 minimum per SA 6 Table 17. Actual measurement ranged from.252/.270 using JCI Micrometer # 77. Two pieces were found to be acceptable and 8-pcs are rejected and to be returned to vendor.
  ,                acceptable and 8-pcs are rejected and to be returned to vendor.
'A f^
                                                          'A   f^   W$p By:         rgo Gawron     Date: 6/22/83 Corrective Action Taken:
W$p By:
rgo Gawron Date:
6/22/83 Corrective Action Taken:
Vendor was transmitted a copy of this NCR and will advise us of their corrective action. (6/24/83-MAG)
Vendor was transmitted a copy of this NCR and will advise us of their corrective action. (6/24/83-MAG)
By:.                         Date:
By:.
A'
Date:
                                  /                 '
A
/
l/
l/
t Reviewed:   [/         [,             //                   Date:   2   h R: viewed:         uA! /k     /MY                           Date:   A $7b R: viewed:                                                   Date:
t Reviewed: [/
1 1: viewed:                                                   Date:
[,
APPROVED:                                                   Date:
//
F119 Rev 0 9-1-82 mg                                                                                 _
Date:
2 h
R: viewed:
uA! /k
/MY Date:
A $7b R: viewed:
Date:
1: viewed:
1 Date:
APPROVED:
Date:
F119 Rev 0 9-1-82 mg


ENERGY STEEL & SUPPLY CO.
ENERGY STEEL & SUPPLY CO.
INIRA-COMPANY MEMORANDUM TO:         Margo Gawron - QA                           DATE: August 3, 1983 FROM:       Michael R. Mitchell
INIRA-COMPANY MEMORANDUM TO:
Margo Gawron - QA DATE: August 3, 1983 FROM:
Michael R. Mitchell


==SUBJECT:==
==SUBJECT:==
Line 352: Line 515:
ITT Grinnell Corp.
ITT Grinnell Corp.
4425 S. Western Ave.
4425 S. Western Ave.
Chicago, IL 60609 Upon being notified of this rejection I notified Mr. Daniel Zienty of ITT. He said he would follow through on complaint. A copy of our NCR was forwarded to ITT upon receipt of NCR #SR-888 from Johnson Controls.
Chicago, IL 60609 Upon being notified of this rejection I notified Mr. Daniel Zienty of ITT.
He said he would follow through on complaint.
A copy of our NCR was forwarded to ITT upon receipt of NCR #SR-888 from Johnson Controls.
I was then informed by ITT that they purchased material from U.S. Steel Supply Co. who in turn had purchased material from Inland Steel Co.
I was then informed by ITT that they purchased material from U.S. Steel Supply Co. who in turn had purchased material from Inland Steel Co.
On Friday, July 22nd, I received a call from Mr. Brian Bozek, Staff Assistant, Structural Division from Inland Steel Co. (312-346-0300).
On Friday, July 22nd, I received a call from Mr. Brian Bozek, Staff Assistant, Structural Division from Inland Steel Co. (312-346-0300).
Mr. Bozek informed me that Inland wo' tic' not honor any claim for the reasons indicated as Inlands position was that the claim was rediculous.
Mr. Bozek informed me that Inland wo' tic' not honor any claim for the reasons indicated as Inlands position was that the claim was rediculous.
I proceeded to go through the ASTM Standards and ASME Specifications with Mr. Bozek to fully describe thq, tables, tolerances, etc. He then said he would check further into the matter and call me back on Monday morning, July 25, 1983. I also advised him that we had a preliminary meeting scheduled at Seabrook and that I would suggest participation from someone at Inland Steel.
I proceeded to go through the ASTM Standards and ASME Specifications with Mr. Bozek to fully describe thq, tables, tolerances, etc.
I finally talked to another individual at ITT and was told that Mr. Otto and Mr. Zienty were not in, but I should contact a Mr. Marty Majorsan,
He then said he would check further into the matter and call me back on Monday morning, July 25, 1983.
,          salesman at U.S. Steel Supply.     Mr. Majorsan said he was familiar with l           the problem but that I should contact a Mr. John Shad instead.     I asked l
I also advised him that we had a preliminary meeting scheduled at Seabrook and that I would suggest participation from someone at Inland Steel.
          - to be transferred and he said Mr. Shad was on the phone and that I should call back.-   I suggested Mr. Shad should call me back as that I had to have answers now.       No response.
I finally talked to another individual at ITT and was told that Mr. Otto and Mr. Zienty were not in, but I should contact a Mr. Marty Majorsan, salesman at U.S. Steel Supply.
F107 Rev. O 9-1-82 mg 11
Mr. Majorsan said he was familiar with l
the problem but that I should contact a Mr. John Shad instead.
I asked
- to be transferred and he said Mr. Shad was on the phone and that I l
should call back.-
I suggested Mr. Shad should call me back as that I had to have answers now.
No response. F107 Rev. O 9-1-82 mg 11


      ~
~
* e ENERGY STEEL & SUPPLY CO.
e ENERGY STEEL & SUPPLY CO.
InrRA-COMPANY MEMORANDUM TO:           Fhrgo Gawron - QA                           DATE: August 3, 1983 FROM:         Michael R. Mitchell
InrRA-COMPANY MEMORANDUM TO:
Fhrgo Gawron - QA DATE: August 3, 1983 FROM:
Michael R. Mitchell


==SUBJECT:==
==SUBJECT:==
Johnson Control - NCR #0027     (Continued...)
Johnson Control - NCR #0027 (Continued...)
I called ITT on July 27th and 28th for disposition on NCR. ITT would not return my calls. I advised Mr. Daigneault of Johnson Controls that I was doing everything within my ability to get a determination from ITT, but was unable to respond because they would not return my calls.
I called ITT on July 27th and 28th for disposition on NCR.
ITT would not return my calls.
I advised Mr. Daigneault of Johnson Controls that I was doing everything within my ability to get a determination from ITT, but was unable to respond because they would not return my calls.
Repeated calls were made to Mr. Herb Otto and Mr. Dan Zienty of ITT to determine status of rejection so that non-conformance could be resolved.
Repeated calls were made to Mr. Herb Otto and Mr. Dan Zienty of ITT to determine status of rejection so that non-conformance could be resolved.
They would not return my calls. I informed their secretary that I would notify the ASME and also advise the NCR under the provisions of 10 CFR 21 if there was no further response.
They would not return my calls.
I was contacted today by Mr. Zienty who said Inland Steel was mailing a response to U.S. Steel Supply who in turn would forward a copy'to ITT who in turn would forward a copy to Energy Steel & Supply Co. He also said Mr. Bozek denied over talking to me.
I informed their secretary that I would notify the ASME and also advise the NCR under the provisions of 10 CFR 21 if there was no further response.
I was contacted today by Mr. Zienty who said Inland Steel was mailing a response to U.S. Steel Supply who in turn would forward a copy'to ITT who in turn would forward a copy to Energy Steel & Supply Co.
He also said Mr. Bozek denied over talking to me.
I was advised that the contents of Inland's letter would be that they would not accept the rejection as the material was within dimensional,
I was advised that the contents of Inland's letter would be that they would not accept the rejection as the material was within dimensional,
              ,.hysical and chemical conformance to the section and that they would not se interested in participating in any meeting with United Engineers, Johnson Controls or Energy Steel & Supply.
,.hysical and chemical conformance to the section and that they would not se interested in participating in any meeting with United Engineers, Johnson Controls or Energy Steel & Supply.
This memo is to be pended until Tuesday, August 5th. If this NCR is not resolved we will then notify the ASME and the NRC under the pro-visions of 10 CFR Part 21               -
This memo is to be pended until Tuesday, August 5th.
Michael R. Mitchell President MRM/kc cc:   D. Mitchell l                 . File l             Ref: A6, Annex A1, Table A1.1, Para 13.3.3, ASME III, Sub-Section NF.
If this NCR is not resolved we will then notify the ASME and the NRC under the pro-visions of 10 CFR Part 21 Michael R. Mitchell President MRM/kc cc:
D. Mitchell l
. File l
Ref: A6, Annex A1, Table A1.1, Para 13.3.3, ASME III, Sub-Section NF.
i F107 Rev. O 9-1-82 mg
i F107 Rev. O 9-1-82 mg


ENERGY STEEL & SUPPLY CO.
ENERGY STEEL & SUPPLY CO.
INIRA-GNPANY MIDORANDLH                         q TO: Margo Gawron                                                 DATE: August 9, 1983 FROM: Michael R. Mitchell
INIRA-GNPANY MIDORANDLH q
TO: Margo Gawron DATE:
August 9, 1983 FROM: Michael R.
Mitchell


==SUBJECT:==
==SUBJECT:==
SITE VISIT TO SEABROOK POWER STATION, SEABROOK, NH.
SITE VISIT TO SEABROOK POWER STATION, SEABROOK, NH.
RE: Our P.O. - PD-830509 Our NCR # 0027 JCI's NCR # SR-888 On Monday, August 8, 1983 we met with United Engineers & Const-ructors, Inc.and Johnson Controls, Inc. in an effort to make a determination on the non-conforming material referenced in the above NCR's.
RE: Our P.O.
In attendance were:                   1) Mr. Arnie Heyn Assistant Supervisor-Field Purchasing
- PD-830509 Our NCR # 0027 JCI's NCR # SR-888 On Monday, August 8, 1983 we met with United Engineers & Const-ructors, Inc.and Johnson Controls, Inc. in an effort to make a determination on the non-conforming material referenced in the above NCR's.
In attendance were:
: 1) Mr. Arnie Heyn Assistant Supervisor-Field Purchasing
: 2) Mr. James Bertram Buyer-Field Purchasing
: 2) Mr. James Bertram Buyer-Field Purchasing
: 3) Mr. C.D. Hanson QC-Receiving
: 3) Mr.
C.D.
Hanson QC-Receiving
: 4) Mr. Carroll Kuhn Instrument and Controls Superintendant The above individuals represented UE&C.
: 4) Mr. Carroll Kuhn Instrument and Controls Superintendant The above individuals represented UE&C.
: 1) Mr. Steve Ostrowski Project Manager
: 1) Mr. Steve Ostrowski Project Manager
: 2) Mr. Tim Diagneault Buyer
: 2) Mr. Tim Diagneault Buyer
: 3) Mr. Leo Bergoin OC-Receiving Engineer The above                   individuals represented Johnson Control's, Inc.
: 3) Mr. Leo Bergoin OC-Receiving Engineer The above individuals represented Johnson Control's, Inc.
The meeting, lasted approximately one hour and in conclusion, Johnson Controls still insisted that the material was not within Mill tolerances, could not be down graded and therefore was non-conforming and rejected.
The meeting, lasted approximately one hour and in conclusion, Johnson Controls still insisted that the material was not within Mill tolerances, could not be down graded and therefore was non-conforming and rejected.
l (1)                                 l F107 Rev. O 9-1-82 mg
l l
(1)
F107 Rev. O 9-1-82 mg


Wo. explained our position of being a Material Supplier and were not-responsible for dimensional conformances and that Inland Steel Co. who was asked to send a representative to this meeting declined and proposed to do nothing to resolve this non-conformance.
Wo. explained our position of being a Material Supplier and were not-responsible for dimensional conformances and that Inland Steel Co. who was asked to send a representative to this meeting declined and proposed to do nothing to resolve this non-conformance.
Line 404: Line 592:
cc: DJM file t
cc: DJM file t
f 9
f 9
                  . e
e
                                            - (2)-
- (2)-
t
t


1FT Tf   1 a+---,                                                                   ITTGrinnellCorporation     -
1FT Tf 1 a+---,
442SSoith Western Botievant Dicago, Hlhois SM Telmhone (312)847-15%
ITTGrinnellCorporation 442SSoith Western Botievant Dicago, Hlhois SM Telmhone (312)847-15%
August 9, 1983 Energy Steel 2685 Lapeer Rd.
August 9, 1983 Energy Steel 2685 Lapeer Rd.
Pontiac, Mi. 48057 Attention: Mike Mitchell
Pontiac, Mi. 48057 Attention: Mike Mitchell


==Dear Mike:==
==Dear Mike:==
Attached is the letter you had requested from Inland Steel. The letter references Inland Steel's position per your NCR #SR888.
Attached is the letter you had requested from Inland Steel. The letter references Inland Steel's position per your NCR #SR888.
In light of Inland Steel's response, we ask that you evaluate the balance of the dimensions noted. Should you have any further questions or comments as to the acceptability of the subj ec t steel, please contact us immediately.
In light of Inland Steel's response, we ask that you evaluate the balance of the dimensions noted. Should you have any further questions or comments as to the acceptability of the subj ec t steel, please contact us immediately.
g Very truly yours.
Very truly yours.
y               ,  uk Zienty J Daniel J.
g uk y
Q.C. Mgr. - Chicago 1
J Daniel J.
Zienty Q.C. Mgr. - Chicago 1
Executin Offices / Providence. Rhode lsInwl
Executin Offices / Providence. Rhode lsInwl


        .>,. 61                                                                                                                             '
61 e-m(T i T 1 III GrinnellCorporation
e-m(T i T 1
,.e
              ,.e   , c-.     ,- ,
, c-.
III GrinnellCorporation
Pipe Hanger Division 4425 South Western Boulevard s-Chicago, Illinois 60609 Telephone (312) 8471500 l'enneh :
                                                                      .                                            Pipe Hanger Division 4425 South Western Boulevard s-Chicago, Illinois 60609 Telephone (312) 8471500 l'enneh :       Cliicnr.o, T111noin lescat i ren :     1/5551 1
Cliicnr.o, T111noin lescat i ren :
1/5551 1
('ENTil*!cA'"M tiP C(1!t!'t.1 ANCR 1
('ENTil*!cA'"M tiP C(1!t!'t.1 ANCR 1
l                         Ilanlon Oregory In,dustries                                                             Cunt,orcer l'urchane Order:
l Ilanlon Oregory In,dustries Cunt,orcer l'urchane Order:
5501 lbtler Street                                                                           P-D-830500A Pittsburgh, Pa. 15201 P-D-830507A 4
5501 lbtler Street P-D-830500A Pittsburgh, Pa. 15201 P-D-830507A P-D-830511 4
                                                                                                                  ,      P-D-830511           ,,
Material has been supplied to ASME nection III, NF subcection class 2, 1917 edition thru vinter of 1977 addenda, NCA 38005 Provicions of 10CFR21 and 10CFR50 ' appendix 1)ui) plies. Materini cttacped with low-ntress
Material has been supplied to ASME nection III, NF subcection class 2, 1917 edition thru vinter of 1977 addenda, NCA 38005 Provicions of 10CFR21 and 10CFR50 ' appendix 1)ui) plies. Materini cttacped with low-ntress
                                      . dies, packaging to ANSI N15.2 .     6 The material nupplied by 171' f rinnell, ::nplely fiale:. Divicion latve been supplied in accordance wit.h the Qualit.y ::yntem l'rce. ram accepted by AGME
. dies, packaging to ANSI N15.2.
]
6 The material nupplied by 171' f rinnell, ::nplely fiale:. Divicion latve been supplied in accordance wit.h the Qualit.y ::yntem l'rce. ram accepted by AGME
]
I-4 i
I-4 i
l Quality System Certi ficate (Materinja)
l Quality System
                                                                                                ~~~
-]
: g.        -]          .
gg g.
gg r                                        No,                                     ,
Certi ficate (Materinja)
ti . C . Man ar.e r-
~~~
,                                        QSC Is15 Is May 12,1983 Expiration Date May 5, 1984 ENERGY STEEL & SUPPLY C0.
No, ti. C. Man ar.e r-r QSC Is15 Is May 12,1983 Expiration Date May 5, 1984 ENERGY STEEL & SUPPLY C0.
t Q. S. Dept.
Q. S. Dept.
{     '
t
gy     h date
{
\                                                                                                             !!
gy h date
l-1 Pace 1       of_ 2
\\
                        -.m.                           . - - -                          ,.            e                 -,-                -    --y...        . - - - .
l-Pace 1 of_ 2 1
-.m.
e
--y...


    ,s. . . ..
,s.....
      .- J g   3(   3
J g 3( 3 ITIGiinnellCorporation
        .-    , c __ - ,
, c __ -,
ITIGiinnellCorporation
Pipe Hanger Division 4425 South Western Boulevard Chicago. Illinois 60G09 Telephone (312) 8471500 Certi fientt-of' Comvilinnen QUANTITY MATERIAL DESCRIt'T10H llMAT H0.
                                                            ,                  Pipe Hanger Division 4425 South Western Boulevard Chicago. Illinois 60G09 Telephone (312) 8471500 Certi fientt- of' Comvilinnen QUANTITY                 MATERIAL DESCRIt'T10H           llMAT   H0.               ,
Spc. #
Spc. #                 Channel 10 X 30# SA-36         2pe. G 76517-A '
Channel 10 X 30# SA-36 2pe. G 76517-A '
                                              @ 20'- 0"                       3pe. @ 76517-B -
@ 20'- 0" 3pe. @ 76517-B -
10pc./                 Ibam W 10 X 33# SA-36           2pc. @ 21862-A '
10pc./
                                              @ 20'- 0"                       2pe. @ 21862-E '
Ibam W 10 X 33# SA-36 2pc. @ 21862-A '
@ 20'- 0" 2pe. @ 21862-E '
2pe. @ 21662-C -
2pe. @ 21662-C -
2pc. @ 21862-D -
2pc. @ 21862-D -
2pc. @ 21862-F -
2pc. @ 21862-F -
2pe . '                 Ibam W 10 X 301/ SA-36         2pe. 0 671410-A /
2pe. '
                                              @ 20'- 0" a %
Ibam W 10 X 301/ SA-36 2pe. 0 671410-A /
* ep ENERGY SIEEL & SUPPLY CO.
@ 20'- 0" a %
ep ENERGY SIEEL & SUPPLY CO.
Q. S. Dipt.
Q. S. Dipt.
By-   4 date I'/I' d Page l or 2                     {
By-4 date I'/I' d Page l or 2
{


                                                                                                                                                                                                                                          ~~ 7M W
}V InianG diOel j. _.....
}V InianG diOel                     j . _ . .. ..       . . .'n       - - "; ~ ' e =;~~ * ' . "...:,.".                         . , .ou              *--''-" " "'T+1" We her:by certify t ut the heat l
...'n - - "; ~ ' e =;~~ * ' "...:,.". *--''-" " "'T+1"
I                                                                                           IlMC3144548 m.my. .                .        . = .                                                  ancrys!5 and/or test re u-                 sown
~~ 7M W lMC3144548
                                                                                                                                                                                          ' '' ' "'' ' # 5 ' "* !'"'d ** * 'h*                           Stt'i INLAeO STEEL COMPANY                                                                 28 " 21I t.L                   89527 Y                                                   records of the cornpany~
..,.ou l
                                                                                                                        ' ' ' * * " * * "            ~~~*'"~*-
We her:by certify t ut the heat I
QUALITY CONTHOL CENTER 2-103 3210 WATLING STREET                                                                 18/02             20       2/17,1983                   6921 % O01                                                       / v-                              -
I ancrys!5 and/or test re u-sown m.my..
                                                                                                ""'''''""'''"''E"                                                                               '~~                                       'N EAST CHICAGO, INDIANA 4G312                                                                                                                                                                           %
. =.
l0TO FAIP. FIELD e Hip TO 4571                                           [837#"d t N"P AGE                                1 CF .1 l
' '' ' "'' ' # 5 ' "* !'"'d ** * 'h*
U.'ilTED STATES STEEL SUPPLY DIV                                                                    UNITED STATES STEEL SUPPLY DIV                                                      ;-;;w.wmt+3M: tm;.wx->;u,&l
Stt'i INLAeO STEEL COMPANY 28 " 21I t.L 89527 Y records of the cornpany~
                                                                                                                                                                                          ,g STATE OF IND6ANA                                                               '
~ ~ ~ * ' " ~ * -
UI3ITED STATES STEEL CORP                                                                           U S STEEL CDP,p                                                                   9 COUNTY OF LAKE P O BOX 7310                                                                                        13535 S TORP.E? ICE 5"h*''ih'd ""d 5"           '" ' '' ' ' ' ** ' h 3 5                         '
QUALITY CONTHOL CENTER 2-103 3210 WATLING STREET 18/02 20 2/17,1983 6921 % O01
[d TH day of FEBRU ARY A.o.,1983 j C HIC A GO ILL rmcATion c #ewel 'M             60680 INL AND WIDE FLANGE SHAPES, A ST'i A 35-81A ASME SA 36, C .000/.260 P CHICAGO I_L L                            ,/                    60533            k]            L g    g 0M a                                                j
/ v-
                                                                                                                                                                                          $                                                                                  i h00/.040 L . 000/.050, BEND TESTED / 10000                                                                                                                                               j .*4 EL BA GARRETT                                       nou ,v % j g uy conssicu zxnRES: AUG. 18 T1985e
""'''''""'''"''E"
!                                                                                                                                                                                        % w m m m.-=e-                m .m.ms-n. % .-J l                                                                                                                                             l                                         TEST RESul.TS                                 .         .
'~~
N                    MATC PI AL. CESC m m CN                               CU A.*d T.         WE CHT                                               YIELD POItT TENSILE STRENGTH                                        ELONGATION BER LJ                                                                                                         l HEAT Nod.'"-            f* TESTI OR      RL/so.TN_ /               IRL /90             TN_ /                 TH.' s/ /Tm ~
[837#"d t N"P AGE
10 IN X 33.0 # X 40 FT                                                           5             6600 21862                                           50,200                           72,700                               8           30                   01 o
'N EAST CHICAGO, INDIANA 4G312 FAIP. FIELD 4571 1 CF.1 l0TO
TM .4   1
* Hip TO e
                                                                                                                                                                        '          =-
l
;-;;w.wmt+3M: tm;.wx->;u,&l U.'ilTED STATES STEEL SUPPLY DIV UNITED STATES STEEL SUPPLY DIV
,g STATE OF IND6ANA UI3ITED STATES STEEL CORP U S STEEL CDP,p 9 COUNTY OF LAKE
[d 5"h*''ih'd ""d 5" '" ' '' ' ' ' ** ' h 3 5 P O BOX 7310 13535 S TORP.E? ICE k]
TH day of FEBRU ARY A.o.,1983 j C HIC A GO ILL c #ewel 'M 60680 CHICAGO I_L L
,/
60533 g
g a
j L
0M i
rmcATion INL AND WIDE FLANGE SHAPES, A ST'i A 35-81A ASME SA 36, C.000/.260 P h00/.040 L. 000/.050, BEND TESTED / 10000 j.*4 EL BA GARRETT nou,v % j g uy conssicu zxnRES: AUG. 18 T1985e
% w m m m m.m.ms-n. %.-J l
l TEST RESul.TS
.-=e-YIELD POItT TENSILE STRENGTH ELONGATION BER l HEAT Nod. f* TEST OR N
MATC PI AL. CESC m m CN CU A.*d T.
WE CHT LJ I RL/so.TN_ /
IRL /90 TN_ /
TH.' s/ /Tm
~
10 IN X 33.0 # X 40 FT 5
6600 21862 50,200 72,700 8
30 01 o
TM.4 1
=-
l
l
                                                                                                                                                                                                                                                                .c
.c b
                                                                                                                                                                                                                      ..                                                    b O
O I
I
a...
                                                                                                                                                                                                                                        -.:                  a . ..
..n :.'-
,            .                                      .                                                                                                              .            . .n : .'-                       . . , . . . . -                          .        ,
gD.
gD.
a64-000             f                     ,
a64-000 f
~z a no.     .cs         .m         g .f i       see . s.           - co -     6-       u.       ~.       c, ..       c.           v-       .u.-
~z a no.
$1862.23                 .72   .021 LO31
.cs
            .: -         --          .                             y>              . . ,.s;.   .~..      -x            ,_.
.m g.f i see. s.
93-.                                                                                                                                                          ENERGY STEEL & SUPPLY Co.
- co -
                                  . . . .     - :i.n x&              -
6-u.
                                                                                    ~
~.
                                                                                      -m          .2d :d.. .        *. '.L.- ..                  .
c,..
c.
v-
.u.-
$1862.23
.72.021 LO31
- :i.n x&
-m
.2d :d...
*. '.L.-
ENERGY STEEL & SUPPLY Co.
y>
..,.s;.
. ~..
-x 93-.
~
9 S Dept.
9 S Dept.
            .h,~.
j..,. g ig
j..,. g
-fffQ
                      ,P., .:
.h~" "?]
                                ,.-,=,        .a..==,s
0_
                                                        % 3 % .== -
f
                                                                        .* . * ~
.h,~.
f..
,P.,
                                                                                    *J,K. .,: '
*J,K..,: '
                                                                                                  ** s.c
'J
                                                                                                    -
* f..
* Ks' '
* Ks' '
s
~*-* ~j '
                                                                                                                    *~~.--
I
                                                                                                                                    ~*-* ~j '  i' -     ' * - * =
% 3 %.== -
I 0_ f ig
.*. * ~
                                                                                                                                                                                                                            -fffQ .h~"                  "?]
** s.c
    'J
* ~ ~. - -
* l I
i' -
' * - * =
,=,
.a..==,s s
l I


Spootro gra p hic and Chemical                                                         Analyoto Motallurgiets 4845 5. MEDZlf AVE. . CHICAGO, ILL. 60632                                                 -
Spootro gra p hic and Chemical Analyoto Motallurgiets 4845 5. MEDZlf AVE.. CHICAGO, ILL. 60632 ARCA CODE 312 - 523 7003 AN ALYSis REPORT FOR:
ARCA CODE 312 - 523 7003 AN ALYSis REPORT FOR:                                                                                                                       .
7-17f$1;f11. Corp.
7-17f$1;f11. Corp.                                                           ,
nuncsaseenoen no.( PHC 24344 4425 8o.
nuncsaseenoen no.( PHC 24344 4425 8o.                                                                                                                   ,
Chicago,'JWestern Divo.
Chicago,'JWestern   :Ill. 60609       Divo.
:Ill. 60609
                                                                                                                                                                , -p
-p
* Attna Dan Eienty                                                              ,g                           o^TC
,g
_5/16/03)
_5/16/03)
                                                .                                                                                    Report Number: 5024-3 Sample Numbor                       HT. 21062
* Attna Dan Eienty o^TC Report Number: 5024-3
                                                                                                /
/
Tensile Strength                                                                       72,400 pol' Yield GTrength                                                                         44,200/
Sample Numbor HT. 21062 Tensile Strength 72,400 pol' Yield GTrength 44,200/
Elongation                                                                                     '
Elongation 27.5 4
27.5 4
.) WORK WA8 PERPORMED IN ACCORDANCE WITH CSSL O/A MANUAL DATED 6/80 (REVISED 4/81 WITU APPROVAL DATED 6/22/81) AND AS AUDITED DY ITT GRINNELL REPRESENTATIVE 2/11/03.
                                .) WORK WA8 PERPORMED IN ACCORDANCE WITH CSSL O/A MANUAL DATED 6/80 (REVISED 4/81 WITU APPROVAL DATED 6/22/81) AND AS AUDITED DY ITT GRINNELL REPRESENTATIVE 2/11/03.                                    ..
ENERGY STEEL & SUPPLY CO.
ENERGY STEEL & SUPPLY CO.
Q. S. Dept.
Q. S. Dept.
By       [date c ,c.
By
mc3. _,c;;.u.     ..To. ...c.
[date c
or S     O                       %
,c.
OUT CUFi f*its se V thdScaNge;ng;py,gg,.     ' '' ACT #
mc3.
                                                                                                                                        ' MNFICEf4CE. NO PART HEREOF MAY BE O
_,c;;.u...To.
...c.
or S
O OUT CUFi f*its se V thdScaNge;ng;py,gg,.
' '' ACT #
' MNFICEf4CE.
NO PART HEREOF MAY BE O


a FOR     smers , steel a supply co.                                                                     -
FOR smers, steel a supply co.
    ~ TT.*. Grinnell                                                                                   F+83o30or
a
                                                                                                                                                                                    ~
~ TT.*. Grinnell
sTo m n ITT GRINNELL ORDER FFC0808
~
                                                                                                                                                                                        ~
sTo m n F+83o30or CERTIFIED MATERIAL TEST REPORT ITT GRINNELL ORDER FFC0808
CERTIFIED MATERIAL TEST REPORT DATE M2" 16 1983 ITEM                                                         CHEMISTRY                                                         ED DESCR!PTl0N QUAN HEAT                                                    l                   YlELD UENSLE [Re     E BEND                                                                 TjG HRDNS NO.                         /         NO.s   C/ MN       Ps S ./                       [.                   PSI f PS! / %                        c/o / RW BN 2               L' 10 X 33#   2   21862A   ' 215 .72 .015     .026                   l                 'hh,200 72,h00         27.5
~
                                                                                                                                                                                                      )
DATE M2" 16 1983 ITEM HEAT CHEMISTRY l
2               W 10 X 33 'l   2   21862E     .22', 55 .005 .023                                         'ht,200 72,500         27 5 2               W 10 X 33#     2   21862C   .21?   7h .016 .026                                           LL,200 72,h00         27 5 2               W 10 X 33#     2   21862D   .20%   .T2 .01h     .02L                                       hh,200 72,L00         27 5                                                     l 2               V 10 X 33#     2   21862F   .21%   73 .015     .027                                       hh,200 72,h00         27 5 1
YlELD UENSLE [Re TjG HRDNS ED E
                                                                                                                                                                                              -3 1
DESCR!PTl0N QUAN BEND NO.
/
NO.s C/ MN Ps S./
[.
PSI f PS! /
c/o / RW BN 2
L' 10 X 33#
2 21862A
' 215
.72
.015
.026 l
'hh,200 72,h00 27.5
)
2 W 10 X 33 'l 2
21862E
.22',
55
.005.023
'ht,200 72,500 27 5 2
W 10 X 33#
2 21862C
.21?
7h
.016.026 LL,200 72,h00 27 5 2
W 10 X 33#
2 21862D
.20%
.T2.01h
.02L hh,200 72,L00 27 5 l
2 V 10 X 33#
2 21862F
.21%
73
.015
.027 hh,200 72,h00 27 5 1
-3 1
_7 l
_7 l
                                                                                                                                                                                            -    I
I
                                                                                                                                                                                                -i
-i
                                                                                                                                                                                      - - - .g l                                                                                                                                                                                             i
- - -.g l
                                                                                                                                                                                              -?
i
Material has been supp'.ied to ASME sectica III, NF subsecticn class 2,                 1977 edition thru vinter of 1977 addenda, NCA3300.       Provisions of 10CFR21 and 10CFR50 appendix E applies. Material stamped with low-stress dies, packaging to ANSI Nh5.2. Ccde case N2h2-) applies.
-?
I No. veld repair i CERTIFY THAT THE ABOVE RESULTS ARE TRUE AND g galg_gggm certificate (Materials )                                             CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. '
Material has been supp'.ied to ASME sectica III, NF subsecticn class 2, 1977 edition thru vinter of 1977 addenda, NCA3300.
Provisions of 10CFR21 and 10CFR50 appendix E applies. Material stamped with low-stress dies, packaging to ANSI Nh5.2. Ccde case N2h2-) applies.
I No. veld repair i CERTIFY THAT THE ABOVE RESULTS ARE TRUE AND g galg_gggm certificate (Materials )
CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. '
Expiration date May 5, 198h
Expiration date May 5, 198h
                                                                                                                ~            '
' ENERGY STEEL & SUPPLY C0.
                                                                ' ENERGY STEEL & SUPPLY C0.
7
                                                                                                          \ & t). 7  -7 Q. S. Dept.                                   r d.                                                            _
-7
l By   Y date N b b i //
~
* wensn w u as xsaexv                                 bu. a usu: n,ts c w h u uN LW W Vr t)W6 G                                   \
\\
          '                        Spootrographic                               a u ct C h o nt i c a l Analyotn
& t).
    .                                                                'Motallurgiota 4548 5. KEDZIE AVE. . CHICAGO, itL. 60632 AREA CODE 312               523-7088 AN ALYsts FIEPORT F0m
d.
* r           ;.    .;..                                                          '
Q. S. Dept.
                  . ITr.Grinnell Corp.
r By Y date N b b l
                      .                                                              .              euncnasc onoa''' -       PHC 24344                 J 4425 So..{ Western Blvd.                                                                                 --
i //
Chicago,',.Ill. 60609     .
 
(Attn: Dan'Elonty                                                 ,_, , , ,
wensn w u as xsaexv bu. a usu: n,ts c w h u uN LW W Vr t)W6 G
                                                                                                ,                    mc               60 Report Number: 5023-4 HT. 21862A #
\\
Sample Number Carbon                                                                   0.21% #
Spootrographic a u ct C h o nt i c a l Analyotn
Manganose                                                               0.72 Phosphorus                                                               0.015 /
'Motallurgiota 4548 5. KEDZIE AVE.. CHICAGO, itL. 60632 AREA CODE 312 523-7088 AN ALYsts FIEPORT F0m r
Sulfur                                                                   0.026 Silicon                                                                 0.03 Nickel                                                                   0.01 Chromium             ,
. ITr.Grinnell Corp.
I 0.06
euncnasc onoa''' -
                      , Molybdenum                                                               0.01                                                 ..
PHC 24344 4425 So..{ Western Blvd.
Copper -                                                                 0.04 i.
J Chicago,',.Ill. 60609 (Attn: Dan'Elonty mc 60 Report Number: 5023-4 Sample Number HT. 21862A Carbon 0.21%
Manganose 0.72 Phosphorus 0.015 /
Sulfur 0.026 Silicon 0.03 Nickel 0.01 Chromium I
0.06
, Molybdenum 0.01 Copper -
0.04 i.
JWORK NAS PERFORMED IN ACCORDANCE WITH CSSL Q/A MANUAL DATED 6/80 (REVISED 4/01 WITH APPROVAL DATED G/22/01) AND AS AUDITED DY ITT GRINNELL REPRESENTATIVE 2/11/83.
JWORK NAS PERFORMED IN ACCORDANCE WITH CSSL Q/A MANUAL DATED 6/80 (REVISED 4/01 WITH APPROVAL DATED G/22/01) AND AS AUDITED DY ITT GRINNELL REPRESENTATIVE 2/11/83.
{
{
I ENERGY STEEL & SUPPLY CO.
I ENERGY STEEL & SUPPLY CO.
Q. S. Dept.
Q. S. Dept.
j By /7/       da.te' f
j By /7/
                                                                                                                                    //
da.te' f
v'id f: u (suATony.inc.
//
v'i f: u (suATony.inc.
Cwicaco S E4Tho!SE.
Cwicaco S E4Tho!SE.
($ PtJr:MtSH:tO 0V     P g,..gjg,~p,,as.geegAno~ mm..T oun ,.nm w:m,u; c.o      *s)p.14r   *i;)
d
                                                                          ;cm.- g,m ynACT ANI *. a CTrticy cone thCPc:% ro e PART HERCOF_NAY.,0C.R5
($ PtJr:MtSH:tO 0V P
g,..gjg,~p,,as.geegAno~ mm..T oun,.nm w:m,u; *s)p.14r *i;) g,m ynACT ANI *. a CTrticy cone thCPc:%
c.o
;cm.-
ro PART HERCOF_NAY.,0C.R5 e


S p o o t r o g r e p la i o           and   Chemical           Analyetc Motsilurgicto 4848 5. KEDZIE AVE. . CHICAGO, ILL. 60632 AREA CODE 312 - 523-7000 AN ALTSIS REPCMT FOR:                                                                                     g
S p o o t r o g r e p la i o and Chemical Analyetc Motsilurgicto 4848 5. KEDZIE AVE.. CHICAGO, ILL. 60632 AREA CODE 312 - 523-7000 AN ALTSIS REPCMT FOR:
(''    r. .a ... ,. . . . .
g
: r..a...,.....
m
m
            .-  ITT. orinnell .. Corp.                                             euncnasc os.oca no. PEC 24344
('' ITT. orinnell.. Corp.
              . 4425.8o.inestern Blvd.
euncnasc os.oca no.
            . Chicagos'Ill. 60609
PEC 24344
( Attna. Dan''3ienty                                                                 o^Te Sf1Gf83)
. 4425.8o.inestern Blvd.
Roport Number: S023-5 j
. Chicagos'Ill. 60609 Sf1Gf83)
Samplo Number: HT. 21862D Carbon                                                       0.22%
( Attna. Dan''3ienty o^Te Roport Number: S023-5 j
Manganeso                                                     0.55 Phosphorue                                                 <0.005 /
Samplo Number: HT. 21862D Carbon 0.22%
Sulfur                                                       0.023 /
Manganeso 0.55 Phosphorue
Silicon             -
<0.005 /
                                                ,                            0.06 Nickel                                                       0.03 7
Sulfur 0.023 /
Chromium                     -
Silicon 0.06 Nickel 0.03 7
0.07 Molybdenum                 .
Chromium 0.07 Molybdenum 0.01 l
0.01 l               Copper                                                       0.11 l
Copper 0.11 l
WORK WAS PERFORMED Ili ACCORDANCE WITil CSSL Q/A MAMUAL DATED 6/80 (REVISED 4/01 WITH APPROVAL DATED 6/22/81) AND.AS AUDITED DY ITT GRINNELL REPRESENTATIVE 2/11/83.
WORK WAS PERFORMED Ili ACCORDANCE WITil CSSL Q/A MAMUAL DATED 6/80 (REVISED 4/01 WITH APPROVAL DATED 6/22/81) AND.AS AUDITED DY ITT GRINNELL REPRESENTATIVE 2/11/83.
i se 9
i se 9
ENERGY STEEL & SUPPLY C0. ~     .
ENERGY STEEL & SUPPLY C0. ~
Q. S. % pt.
Q. S. % pt.
By
/f[ date U
                                                                                            /f[ date         U             "
By c?
c?         pc;;         ~~
pc;;
a.narus ===.....=.=
~~
_    ---___r---  "-
a.narus===.....=.=
---___r---


,                  - -mv -- --
- -mv -- --
Spoetrocrophic                                 and           Chemical               Analycts
Spoetrocrophic and Chemical Analycts Motallurginto 4848 5. KEDZlE AVE. e CHICAGO, ILL. 60632 AREA CODE 312 - 523 7000 ANAMM RCPORT FORs
    .                                                      Motallurginto 4848 5. KEDZlE AVE. e CHICAGO, ILL. 60632 AREA CODE 312 - 523 7000 ANAMM RCPORT FORs                                                                                                                           *
-=
                . z.;  .v.  .      .
5' ITT Grinnoll' Corp.
y                                            -=
r uncorse.onnen eaa.
5' ITT Grinnoll' Corp.                                                                   r uncorse.onnen eaa.
. z.;
PHC 24344 44 25 Do. 'Wastern Blvd.                                                                                             - - - - - - - -
.v.
y PHC 24344 44 25 Do. 'Wastern Blvd.
Chicago, Ill. 60609
Chicago, Ill. 60609
( Attna Dan tienty                                                   . . . . . . . .
( Attna Dan tienty uru: (...513,/g3)
                                                                                              ,                    uru: ( ...513,/g3)
Report Number: 5023-6 Sample Number: HT._21862C Carbon 0.214 /
Report Number: 5023-6 Sample Number: HT._21862C#
l l
Carbon                                                                         0.214 /
Hanganese 0.74 Phosphorus 0.016 /
l l           Hanganese                                                                       0.74 Phosphorus                                                                     0.016 /
Sulfur 0.02G /
Sulfur                                                                         0.02G /
Silicon 0.03 Nickel 0.01 Chromium t.
Silicon                                                                         0.03 Nickel                                                                         0.01 Chromium                   t.
0.06 Holybdonum 0,01 i
0.06 Holybdonum               ,
Copper.
0,01 i                                                                                                                 ..
Copper.                       ,
0.03
0.03
                                        \
\\
l UORK WAS PERFORMED IN ACCORDANCE WITH CSSL O/A MAUUAL DATED 6/80 (REVISED 4/01 WITH APPROVAL DAIED 6/22/01) AND AG AUDITED DY ITT GRINNELL REPRESENTATIVE 2/11/83.
l UORK WAS PERFORMED IN ACCORDANCE WITH CSSL O/A MAUUAL DATED 6/80 (REVISED 4/01 WITH APPROVAL DAIED 6/22/01) AND AG AUDITED DY ITT GRINNELL REPRESENTATIVE 2/11/83.
1 ENERGY STEEL & 3UPPLY C0.
1 ENERGY STEEL & 3UPPLY C0.
Q. S. Dcpt.
Q. S. Dcpt.
ByMM date T'M'O '
ByMM date T'M'O
                                                                                                                  ,?
,?
                                                                                                                                        /
/
cwicaco secerno conv[
cwicaco secerno conv[
av. isc.
av. isc.
                                                                                                                    *. . ./.!./! /5
* /.!./ /5
              'f
'f 8Yt*d5n7:4.ns Ae...w f1 / * ***' *
                              'E      I 8Yt*d5n7:4.ns Ae...w f1 / * ***' *
* iat cony ogneg,
* iat cony ogneg,     ,ao Pani Hcntor MAy at g
,ao Pani Hcntor MAy at g
                      .=&-__-___---_-_-                      _ - - - - -
'E I
.=&-__-___---_-_-


Spootrographic                                     and C h o rn i c a l                 Analycto
Spootrographic and C h o rn i c a l Analycto Motallurgiato l
        .                                                                      Motallurgiato l                                       ,                  4840 5. REDZIE AVE.                 CHICAGO, ILL. 60632 AREA CODE 312 - 523 7000 ANA4.V&lS ftEPCMT FQMa
4840 5. REDZIE AVE.
(      r. . .                          .
CHICAGO, ILL. 60632 AREA CODE 312 - 523 7000 ANA4.V&lS ftEPCMT FQMa
                                                                                            --=-
--=-
y                             ,                          ,
y
            . I r r r,r i n,i...nell corp.
(
: uncoacc onoca no.(         PHC 24344 4425.'So. : Western Divd.                                                                                             '                          '
: r...
            . Chicago,:Ill.'60609
. I r r r,r i n,i...nell corp.
            . Atta: Dan'Eienty                                                                                                 cArc     51       03
: uncoacc onoca no.(
            %                                                                          _-. .        J                                      t Report Number: 5023-7 Saraple Numbers . HT. 21062D Carbon                                                                                 0.20% '
PHC 24344 4425.'So. : Western Divd.
Manganese                                                                             0.72 Phosphorus                                                                             0.014 /
Chicago,:Ill.'60609
Sulfur                                                                                 0.024 !
. Atta: Dan'Eienty cArc 51 03 J
Silicon                                                                               0.04 Nickol                                                                                 0.01 Chromium                                 !                                            0.06 Molybdenum                             r-                                             0.01                                                 -
t Report Number: 5023-7 Saraple Numbers. HT. 21062D Carbon 0.20% '
Copper *     '                                                                        0.03
Manganese 0.72 Phosphorus 0.014 /
                                                          /
Sulfur 0.024 Silicon 0.04 Nickol 0.01 Chromium 0.06 Molybdenum r-0.01 Copper
L
* 0.03
              / WORK WAS PERFORMED IU ACCORDANCE UITH CSSL 0/A MANUAL DATED 6/00 (REVISED 4/01 WIT 11 APPROVAL DATED G/22/01) AMD AS AUDITED BY ITT GRINNELL REPRESENTATIVE 2/11/83.                                                                     ,
/L
E   ENERGY      Q.S.Dapt STEEL. & SUP pir-n -
/ WORK WAS PERFORMED IU ACCORDANCE UITH CSSL 0/A MANUAL DATED 6/00 (REVISED 4/01 WIT 11 APPROVAL DATED G/22/01) AMD AS AUDITED BY ITT GRINNELL REPRESENTATIVE 2/11/83.
9, jf} bh _date _                  _
ENERGY STEEL. & SUP E
                                                                                                                ;-        i r o     */
Q.S.Dapt pir-n -
CHicAco SP *c)10.SchtCh
9, jf} bh _date _
                                                                                                                                    '          Lahd & TONY.!N
i r o
* j ,! n.
*/
                                                                                                                                        /,+ff,.f/r
CHicAco SP c)10.SchtCh Lahd & TONY.!N
                                                                                                                                            ,~ i p                        IT fCUT O   pn             #
* j,! /,+ff,.f/r
                                                                .g hli;gry 'g A .I.,h,   . ""            *#      '%
: n.,~ i IT fCUT O pn
* N F. NO PARI HERCOP MAY BC [lC-
.g hli;gry 'g A.I.,h, p
N F.
NO PARI HERCOP MAY BC [lC-


                                                                                                        -uy w S p o o t r o g r a p la i c and Chemical                               Analyetc M o t o l l!' ~ g l o t o 484a s. KEDZIE AVE.
-uy w S p o o t r o g r a p la i c and Chemical Analyetc M o t o l l!' ~ g l o t o 484a s. KEDZIE AVE.
* CillCAGO, ILL. 60632                                                 .
* CillCAGO, ILL. 60632 ADEA CODE 312 - 523 7000 AN ALYSIS REPCMT FCMI f,ITT Grinnell~ Corp.
ADEA CODE 312 - 523 7000 AN ALYSIS REPCMT FCMI
h
                    's.
's.
* h
eunceinsc onocie no.
* f,ITT       Grinnell~ Corp.
PilC 24344
            *,'                                                                             eunceinsc onocie no.
'4425 So, Wostern Blvd.
              '4425 So, Wostern Blvd.                                                                                         PilC 24344
* Chicago,.Ill. 60609 516!83)
* Chicago,.Ill. 60609
* Attn Dan 31onty
* Attn           Dan 31onty                                 _ _ ,j                               o^Tc 516!83)
_ _,j o^Tc Report 11 umber: 5023-8 Sanple Numbert HT. 21862F' Carbon 0.21% V Han<3anese 0.73 Phosphorus
Report 11 umber: 5023-8 Sanple Numbert HT. 21862F' Carbon                                                               0.21% V Han<3anese                                                           0.73 Phosphorus                                                           0. 0lf Sulfur                                                               0.027' 1
: 0. 0lf Sulfur 0.027' Silicon 0.03 Nickel 0.01 Chromium 0.06 l
Silicon                                                             0.03 Nickel                                                               0.01 Chromium                                                             0.06 l
Molybdenum O.01 Copper 0.03 I
Molybdenum                   '
O.01 Copper                                                                 0.03 I
WORK WAS PERFORMBD IN ACCORDANCE WITl! CSSL Q/A MANDAL DATED 6/80 (REVISED 4/81 UIT!! APPROVAL DATED 6/22/81) MD AS AUDITED BY ITT GRINNELL REPRESENTATIVE 2/11/83.
WORK WAS PERFORMBD IN ACCORDANCE WITl! CSSL Q/A MANDAL DATED 6/80 (REVISED 4/81 UIT!! APPROVAL DATED 6/22/81) MD AS AUDITED BY ITT GRINNELL REPRESENTATIVE 2/11/83.
ENERGY STEEL & SUPPLY C0.
ENERGY STEEL & SUPPLY C0.
Q. S. Dept.
Q. S. Dept.
By/             date fM               .
By/
6   ,
date fM 6
Cuic Aco Grccinogtre' s t. AnoH A TortY. lNC.
Cuic Aco Grccinogtre' s t. AnoH A TortY. lNC.
j ,'*f       .f a,          .'. . .: i..': :. *,3
j,'*f
      ~ . ooneooana nerae on ovMunnso ,                       _ . .
.f
PMODUCSD FQ4 Ptte84.em4 9@ wfTt CUT ogygg pgggo,,u, y,p p' ,         _,    eWl PAC f AN0 ON .?arcy ggg                 p             p
.'...: i..': :. *,3 a,
~. ooneooana nerae on ovMunnso,
PMODUCSD FQ4 Ptte84.em4 9@ wfTt CUT ogygg pgggo,,u, '
y,p p,
eWl PAC f AN0 ON.?arcy ggg p
p


      .                                                                                                    JOHNSON CONTROLS INC.                                                       h Q AS -1601 - SS                                       l
JOHNSON CONTROLS INC.
                                                                                                                                                                                                                                                                                        \
h Q AS -1601 - SS 2 0 1Bg3
2 0 1Bg3                       . INSPECTION SURVEILLANCE REPORT                                                                                                     ATT ACHMENT 4.3.1-1 PROJECT                                         UNIT                                   CONTRACT.                                 REPORT NO.                       SR EBS                             l DATE TREND CODE
. INSPECTION SURVEILLANCE REPORT ATT ACHMENT 4.3.1-PROJECT UNIT CONTRACT.
: h. 2 rc,el.                                       fl                                   02 t.2-0001                                                                         07054-33                                   6/5/63                                 .
REPORT NO.
REFERENCE DOCUMENT O OAS-5
SR EBS l
              . q/.!-[ ;; . SE F. tv. 3                                                                                                                         ASME CLASS 13.3                                                                                    ,
DATE
t        ,/.f.:'E II : 5!.6, U77                                                                                                                       O SAFETY RELATED                                           0 NON SAFETY RELATED TYPE OF INSPECTION                                                                                                                                                               ,
: h. 2 rc,el.
O RECElvlNG                             O oOCuMENTS                                     O PARTS / MATERIALS                                               WOR KMANSHIP                                       TEST                     O SYSTEM DESCRIPTIO*. OF INSPECTION._ ~ ' ;t '! IE r0!I;'n of rrsterisls Itt: s'50 F.O. i d is0ll-Ji-'d1 (20 2Oct
fl 02 t.2-0001 07054-33 6/5/63 TREND CODE REFERENCE DOCUMENT ASME CLASS 13.3 O OAS-5
                ..i        .        -. ,    en'      ,-~            ..i 4 qs. r .= T.-? r'r , f /.~.6. ET CL . 2 HT t. 21 L 62.
. q/.!-[ ;;. SE F. tv. 3
                                                                        .                                                                                                                      Eic5! Piec es .sr e m.c e. 1:c
,/.f.:'E II : 5!.6, U77 O SAFETY RELATED 0 NON SAFETY RELATED t
                .- . ..              -.,....u.               ;
TYPE OF INSPECTION O RECElvlNG O oOCuMENTS O PARTS / MATERIALS WOR KMANSHIP TEST O SYSTEM DESCRIPTIO*. OF INSPECTION._ ~ ' ;t '!
* H e'       s.-<a       . 2 42 '-ir.i ra.'                 T.er     SA6       Table           17.     actual           necsbren eut rant.es e..                 .- *> ! ne . . , < -               w s e .< - ,. -- a. e n L77.
IE r0!I;'n of rrsterisls Itt: s'50 F.O.
i d is0ll-Ji-'d1 (20 2Oct
..i 4 qs. r.= T.-? r'r, f /.~.6.
ET CL. 2 HT t. 21 L 62.
Eic5! Piec es.sr e m.c e.
1:c en'
..i
,-~
-.,....u.
* H e' s.-<a. 2 42 '-ir.i ra.' T.er SA6 Table 17. actual necsbren eut rant.es e..
.- *> ! ne.., < -
w s e.< -,. -- a. e n L77.
S Vb SATISF ACTORY FINDING O UNSATISF'ACTORY (RECOMMENDED DISPOSITION) T'eturn ur.r.ccentchle n.2tt. rial to ver. dor.
S Vb SATISF ACTORY FINDING O UNSATISF'ACTORY (RECOMMENDED DISPOSITION) T'eturn ur.r.ccentchle n.2tt. rial to ver. dor.
                    . , .    . . . .; . , ..        4 . - c e Rt rre vithir tolerance
4. - c e Rt rre vithir tolerance
              ,                                                                                                                                                              ,*-      *d                           -- et s.                 /
*d
INSPECTO,RfAt3DI-TOR                                   /
/
DISPOSITION:                                                                                                                                                       .
-- et s.
                                                  -                                                                                          - .                            .a k a.            .                                                  .
/
                                                                                                                                                        ..                  -.-..,r.,.,                                               , ,,          . . ;. .
INSPECTO,RfAt3DI-TOR DISPOSITION:
                                                                                      . ~.          ..-                          ..-                ' , - ' ...os.4.. -:rs.A.f.a.s r*      .a        ..                    .                            ..s.
.a k a.
                                                                .V. . y;. : :, ,c;; .
-.-..,r.,.,
                                                                                                                                                                                                                                                            . , -*.s . .;;'
s.4.
P.RO. JECT MCR.. CONST.. SUPT.. ENG., ETC.'. .. .. -- .c: + .D AT. ,E ..,,QiG L6.d u.w
: s. f..s
                                                                                                  ~-                                      $    "-
-. :r
                                                                                                                                                    '.. D' .A:.OA M AN               AG E. R./OA           E NG.IN E E R ' ~.          . , D..A,T,E -b.v;                   -a
. ~.
                                                                                                        .1         e .. . e u. r                                       ~
.V.. y;. : :,,c;;.
s n             .-        s                                                  tr a't t.s
..s.
                                                                                      ~~''                    ' ' " #''I                             ' ' ' ' "%            #'          '''        *                                                    '
', - '...o r
DISPOSITION COMPLETED ' " ' . . '; ': ?s ,-. ;'.y.,' '.V .h :-y. m- r. .,i
.a
:            e.                                                                        : -     u....r.. p ..i y 1 .. . as                           ..
- A. a
                                                                                                                                                                                                                                              .','..'u.'..
., - s..;;'
            ...                                                                        ;..,, ~.               ..-.-s,..
P.RO. JECT MCR.. CONST.. SUPT.. ENG., ETC.'..... --.c: +.D AT.,E..,,QiG L6.d '.. D' OA M AN AG E. R./OA E NG.IN E E R '., D..A,T,E -b.v; a't t.s
                                                                                  - - . . . . . .  .          a .. .              .
~-
: c. -     ,            ....    ,
-a
.1 e... e u. r u.w
.A:.
~
s n s
~.
tr
' ' " #''I
.. '; ': ?s,-. ;',' '.V
~ ~ ' '
DISPOSITION COMPLETED ' " '
.y.
.h :-y. m-r..,i : -
u....r.. p..i y 1... as
.','..'u.'..
e.
;..,, ~.
..-.-s,..
a...
: c. -
t
t
                                                                                                                                                      ...f.c.                                                                         . . ,              ,    ..        ,
...f.c.
                                                                                                                                                          ?..                                  -
... < p=,.....,' ;.. y.. '...,; -
                                                                                                                                                        .yn : , : .. . < p=,. . . . . ,' ;.. y . . ' . .. ,; -
?..
a.
a.
                                                                                                      % %.                          . . .r . ..                                                                                             .s.                                 '
.s.
                                                                              ,=
r...
.yn :, :
,=
. ',i.
i
i
                                                                                                                                                                                . ',i .
~~,, SUPT./OA EtJGINEER DATE REINSPECTION RESULTS:
                          .                                                                                                                                ~~, , SUPT./OA EtJGINEER                                                                 DATE REINSPECTION RESULTS:
l k
                                                                                                                                                                                                                                    ~
~
l k                                                                                                                                                                                                                                                   -            -
INSPECTOR! AUDITOR DATE L
INSPECTOR! AUDITOR                                                             DATE L
DATE QA f/AN AGER L (ANI CONCUR R E NCE DATE IP/AUDITO R
DATE                                                       QA f/AN AGER                                                                 DATE L (ANI CONCUR R E NCE IP/AUDITO R                                                       .                                            .        . / :. . .. . .
. / :......


7                                           s   .
7 s
                        .r.                                                                                                               ,
.r.
: g.               -(
g.
-(
i''
i''
I The Arnerican Soci t of Mechanical Engineers                                                 '
. The Arnerican Soci t of Mechanical Engineers I
Un.ted Eng necico Center
Un.ted Eng necico Center
* 345 E. 47th St. Ne; York, N.Y.
* 345 E. 47th St. Ne; York, N.Y.
: t.                     .                                        10017
t.
10017
* 212 G44 7722 + TWX.710 5815267 July 13, 1981
* 212 G44 7722 + TWX.710 5815267 July 13, 1981


==Subject:==
==Subject:==
Section III, Division 1
Section III, Division 1
                                                                                                                                                  \
\\
NCA-3800
NCA-3800
{
{
Line 768: Line 1,100:
==Reference:==
==Reference:==
Your letter of December 29, 1980 ASME File # NI 81-6 Centlemen:
Your letter of December 29, 1980 ASME File # NI 81-6 Centlemen:
Our understanding of the question in your inquiry, and our' reply are as follovs:                                       '
Our understanding of the question in your inquiry, and our' reply are as follovs:
Ques tion :
Ques tion :
Supplier, or the Certificate lloider to assure that product dimen
Supplier, or the Certificate lloider to assure that product dime
                        ,in accordance with the material specifications?
,in accordance with the material specifications?
                      .\   ..
.\\..
l         Jtepiv : The Code requires that                                                                     .
l Jtepiv : The Code requires that its the material specifications, the Material Manufacturer assure conforraance i
i its the material specifications, the Material Manufacturer assure conforraance                                       .
reference NCA-3867.1, 3867.2 and 3868.
l4134.7 requiru r ha t                                reference NCA-3867.1, 3867.2 and 3868. NCA-
l4134.7 requiru r ha t
                      ;confoms to the Code. the Certificate Holder assure all purchased material
;confoms to the Code. the Certificate Holder assure all purchased material NCA-
                    ;al confonnance but                             The Material Supplier is not responsible for dimension-
;al confonnance but The Material Supplier is not responsible for dimension-
                    ;of natcrial, reference NCA-3861(b)(1),is responsibic for establishing and maintain p.
;of natcrial, reference NCA-3861(b)(1),is responsibic for establishing and maintain p.
Yours truly,
Yours truly,
                ,              ,                  ,M             . d-ohn Hillman sissistant Secretary
,M d-ohn Hillman sissistant Secretary
: 2) 644 80I.9
: 2) 644 80I.9 f,%
                    ..l f,%                                                                                                 RESEARCH DEVELOPMENT L                                                                                                   and ENGlhEERING DIVISION
l RESEARCH DEVELOPMENT
                  ;1c ,
..L and ENGlhEERING DIVISION
                                                                                                                        . JUL 141981 s..
;1c,
k                                                                                                         RECEIVED y,        A5ME proc)dures proviJc for reconsidstation of this intarpretation when or il additional Informatio ses.lable which the ini uirer bolieves r.ilr}ht affoct the interprutation. Furthor, porsons aggrieved b laterplotbli(in thJy 3ppeal to tho Cognizant ASME cornmittee or sedcomtnittee As statedin th f I*,,desica code     documents. ASMt; doos not"appros o ""ecertify,""rato."
. JUL 141981 s..
or actuiti.
k RECEIVED A5ME proc)dures proviJc for reconsidstation of this intarpretation when or il additional Informatio ses.lable which the ini uirer bolieves r.ilr}ht affoct the interprutation. Furthor, porsons aggrieved b y,
orewordof tbs or 'endorso"
laterplotbli(in thJy 3ppeal to tho Cognizant ASME cornmittee or sedcomtnittee As statedin th f I*,, code documents. ASMt; doos not"appros o "" certify,""rato." or 'endorso" e orewordof tbs desica or actuiti.


4 NCA 3740-NCA-3813                                                                     SECrlON III - SUBSECrlON NCA accordance with the applicable requirements of this                                                                       NCA-3762 Documentation of Quality Assurance i           Section.                                                                                                                                   Program The NA Certificate lloider shall be responsible for             ,
4 NCA 3740-NCA-3813 SECrlON III - SUBSECrlON NCA accordance with the applicable requirements of this NCA-3762 Documentation of Quality Assurance i
documenting his Quality Assurance Program (NCA-8121).
Section.
NCA 3763 Filing of Quality Assurance Manual NCA 3760 RESPONSIBILITY FOR QUALITY                                                                                           The NA Certificate IIolder shall file with his ASSURANCE Authorized Inspection Agency (NCA-5121) copies of NCA-3761 Scope of Responsibilitics                                                                                       the Quality Assurance Manual. The NA Certificate lloider shall keep a copy on file available to the (a) The NA Certificate lloider shall be responsible Inspector (NCA-5122) and Inspection Specialist for surveying, quahfying, and auditmg suppliers of subcontracted services (NCA-3125) including nonde-                                                                       (NCA-5124).
Program The NA Certificate lloider shall be responsible for documenting his Quality Assurance Program (NCA-8121).
structive examination contractors, Material Suppliers, and Material Manufacturers. Material Suppliers or Material Manufacturers' holding a Quality System                                                                         NCA-3770 DATA REPORT Certificate (Materials) need not be surveyed nor                                                                             The NA Certificate IIolder shall certify compliance
NCA 3763 Filing of Quality Assurance Manual NCA 3760 RESPONSIBILITY FOR QUALITY The NA Certificate IIolder shall file with his ASSURANCE Authorized Inspection Agency (NCA-5121) copies of NCA-3761 Scope of Responsibilitics the Quality Assurance Manual. The NA Certificate lloider shall keep a copy on file available to the (a) The NA Certificate lloider shall be responsible Inspector (NCA-5122) and Inspection Specialist for surveying, quahfying, and auditmg suppliers of (NCA-5124).
    ;            audited for work or material covered by the scope of                                                                     with this Section by signing the appropriate Data their Certificate. Subcontractors holding an appropri-                                                                   Report Forms and apply the appropriate stamping                         l ate N, NPT, or NA Certifict: need not be surveyed                                                                         (NCA-8000) nor audited by the NA Ce rtificate lioider for work within the scope of the subcontractor's Certificate.
subcontracted services (NCA-3125) including nonde-structive examination contractors, Material Suppliers, and Material Manufacturers. Material Suppliers or NCA-3770 DATA REPORT Material Manufacturers' holding a Quality System Certificate (Materials) need not be surveyed nor The NA Certificate IIolder shall certify compliance audited for work or material covered by the scope of with this Section by signing the appropriate Data their Certificate. Subcontractors holding an appropri-Report Forms and apply the appropriate stamping l
(b) An NA Certificate lloider may subcontract                                                                     NCA 3800 METALLIC MATERIAL furnace brazing operations involving uniform heating to an organization not holding a Certificate of Autho-MANUFACTURER'S AND rization provided:                                                                                                                       MATERIAL SUPPLIER'S QUALITY SYSTEM PROGRAM (1) the work performed .is with.m the scope of actisities of the NA Certificate llolder's Certificate of                                                                 NCA 3810 DEFINITIONS (2 t i   A Certificate IIolder's Quality Assur-                                                                 NCA-3811 Material ance Program shall provide for the subcontracting of                                                                         The term material as used in this Section refers only furnace brazing operations, including Authorized                                                                         to material as defined in NCA-1220. The term stock Inspection and these provisions shall be acceptable to                                                                   material as used in this Section refers to material the Authorized Inspection Agency;                                                                                         which is,or_may_be s              used for conversion to an SA, SB, (3) the NA Certificate IIolder's Quality Assur-                                                                 or SFA Specification or allowab!c ASTM Specification ance Program provides for surveillance by the NA                                                                         b7ilie~ Material Manufacturer or Certificate IIolder.
ate N, NPT, or NA Certifict: need not be surveyed (NCA-8000) nor audited by the NA Ce rtificate lioider for work within the scope of the subcontractor's Certificate.
Certificate IIolder at his subcontractor *s facility dur-ing the brazing operation; (4) the NA Certificate lloider shall be responsi-                                                                 NCA 3812 Material Manufacturer ble for surveying and accepting the Quality System                                                                           As used in this Section, the Material Manufacturer Programs of the subcontractor; is an organization which certifies7 that the material, as (J) the NA Certificate lloider shall assure that                                                                 defined in NCA-1220, is in compliance with require-the subcontractor uses written procedures and brazing                                                                     ments of the basic material specification. In addition,
(b) An NA Certificate lloider may subcontract NCA 3800 METALLIC MATERIAL furnace brazing operations involving uniform heating MANUFACTURER'S AND to an organization not holding a Certificate of Autho-MATERIAL SUPPLIER'S rization provided:
      ,          operators that have been qualified as required by the                                                                     the Material Manufacturer performs or supervises and
(1) the work performed.is with.m the scope of QUALITY SYSTEM PROGRAM actisities of the NA Certificate llolder's Certificate of NCA 3810 DEFINITIONS NCA-3811 Material (2 t i A Certificate IIolder's Quality Assur-ance Program shall provide for the subcontracting of The term material as used in this Section refers only furnace brazing operations, including Authorized to material as defined in NCA-1220. The term stock Inspection and these provisions shall be acceptable to material as used in this Section refers to material the Authorized Inspection Agency; which is,or_may_be used for conversion to an SA, SB, s
  ]               Code; directly controls one or more of the operations which 7                         (6) the NA Certificate IIolder shall be responsi-                                                                 affect the material properties required by the material ble for controlling the quality and for assuring that all                                                                 specification and verifies the satisfactory completion of materials and parts which are submitted to the inspector for acceptance, including those brazed by subcontractors, conform to all APPlicable requirements                                                                         - specmeat a   r ms secnon rnay penna cenain specac requirements to be completed later, and any such incomplete items of this Section.                                                                                                          are to be noted.
(3) the NA Certificate IIolder's Quality Assur-or SFA Specification or allowab!c ASTM Specification ance Program provides for surveillance by the NA b7ilie~ Material Manufacturer or Certificate IIolder.
Certificate IIolder at his subcontractor *s facility dur-ing the brazing operation; (4) the NA Certificate lloider shall be responsi-NCA 3812 Material Manufacturer ble for surveying and accepting the Quality System As used in this Section, the Material Manufacturer Programs of the subcontractor; is an organization which certifies that the material, as 7
(J) the NA Certificate lloider shall assure that defined in NCA-1220, is in compliance with require-the subcontractor uses written procedures and brazing ments of the basic material specification. In addition, operators that have been qualified as required by the the Material Manufacturer performs or supervises and
]
Code; directly controls one or more of the operations which 7
(6) the NA Certificate IIolder shall be responsi-affect the material properties required by the material ble for controlling the quality and for assuring that all specification and verifies the satisfactory completion of materials and parts which are submitted to the inspector for acceptance, including those brazed by subcontractors, conform to all APP cable requirements
- specmeat a li r ms secnon rnay penna cenain specac of this Section.
requirements to be completed later, and any such incomplete items are to be noted.
A
A


r                                                                                                                                         p
r p
              ,  .                          NCA-3000 - RESPONSIDILITIES AND DUTIES                           NCA 3812-NCA 3853
NCA-3000 - RESPONSIDILITIES AND DUTIES NCA 3812-NCA 3853
                                                                                                                                          ]-
]
all the requirements of the material specification           application to the Society is given in Forms N-70A,                 ,
all the requirements of the material specification application to the Society is given in Forms N-70A, performed prior to that certification.
performed prior to that certification.                       N-70B, and N-70C.8                                                 {
N-70B, and N-70C.8
c NCA 3813 Material Supplier                                                                                                     .
{c NCA 3813 Material Supplier NCA-3850 GENERAL REQUIREMENTS As used in this Section, the Matenal Supplier is an organization which supplies material produced and NCA-3851 Material Manufacturer certified by Material Manufacturers but does not The Material Manufacturer (NCA-3812) shall es-perform any operations which affect the matenal W
As used in this Section, the Matenal Supplier is an       NCA-3850 GENERAL REQUIREMENTS organization which supplies material produced and             NCA-3851 Material Manufacturer certified by Material Manufacturers but does not perform any operations which affect the matenal The Material Manufacturer (NCA-3812) shall es-properties required by the material specificat,on, i W          a          S                f k            dd the quality during manufacture or dering other work except when agreed upon by the Certificate Holder which he proposes to perform.
a S
f k dd properties required by the material specificat,on, i
the quality during manufacture or dering other work except when agreed upon by the Certificate Holder which he proposes to perform.
who uses the material in Code construction or when so authorized in a Quality System Certificate (Materials).
who uses the material in Code construction or when so authorized in a Quality System Certificate (Materials).
The Material Supplier may perform and certify the             NCA-3852 Material Supplier results of tests, examinations, repairs, or treatments (a) The Material Supph.er who does not perform required by the material specification or by .this any tests, examinations, or treatments required by this       -
The Material Supplier may perform and certify the NCA-3852 Material Supplier results of tests, examinations, repairs, or treatments (a) The Material Supph.er who does not perform required by the material specification or by.this any tests, examinations, or treatments required by this Section which were not performed by the Material Section shall establish a Matenal Identification and Manufacturer as provided in NCA-3852(b).
Section which were not performed by the Material                                                           ,
Section shall establish a Matenal Identification and Manufacturer as provided in NCA-3852(b).
Verification Program for storage and handling of material. Material Identification and Verification as used in this Section is defined in NCA-4124.
Verification Program for storage and handling of material. Material Identification and Verification as used in this Section is defined in NCA-4124.
NCA 3820 QUALITY SYSTEM CERTIFICATE                               (b) The Material Supplier who performs any tests, (MATERIALS)                                   examinations, or treatments required by the matcrial (a) A Material Manufacturer shall hold a Quality         specification or by this Section or who subcontracts System Certificate (Materials) issued by the Society           these activities shall meet the requirements in this verifying the adequacy of the Material Manufacturer's       Subarticle for both the Material Manufacturer and the              ,
NCA 3820 QUALITY SYSTEM CERTIFICATE (b) The Material Supplier who performs any tests, (MATERIALS) examinations, or treatments required by the matcrial (a) A Material Manufacturer shall hold a Quality specification or by this Section or who subcontracts System Certificate (Materials) issued by the Society these activities shall meet the requirements in this Subarticle for both the Material Manufacturer and the verifying the adequacy of the Material Manufacturer's Quahty System Program. Alternatively, the Material Material Supplier for the activities performed.
Quahty System Program. Alternatively, the Material           Material Supplier for the activities performed.                     ,
Manufacturer shall have his Quality System Program surveyed, qualified, and audited by the Material NCA-3853 Evaluation of the Program i
Manufacturer shall have his Quality System Program surveyed, qualified, and audited by the Material             NCA-3853 Evaluation of the Program                                   i Supplier, or by the Certificate Ifolder for the items (NCA-3461, NCA-3561, NCA-3661, or NCA-3761).                     (a) The Society, when requested by the Material (b) A Material Supplier shall hold a Quality System       Manufacturer on Forms N 70A, N-70B, and N-70C Certificate (Materials) issued by the Society verifying       will arrange for an evaluation of the applicant's the adequacy of the Material Supplier's Identification       Quality System Program. The Program will be evalu-                     ;
Supplier, or by the Certificate Ifolder for the items (NCA-3461, NCA-3561, NCA-3661, or NCA-3761).
and Verification Program. Alternatively, the Material         ated on the basis of its compliance with the applicable Supplier shall have his Identification and Verification       material requirements of this Section. The Certificate                 .
(a) The Society, when requested by the Material (b) A Material Supplier shall hold a Quality System Manufacturer on Forms N 70A, N-70B, and N-70C Certificate (Materials) issued by the Society verifying will arrange for an evaluation of the applicant's the adequacy of the Material Supplier's Identification Quality System Program. The Program will be evalu-and Verification Program. Alternatively, the Material ated on the basis of its compliance with the applicable Supplier shall have his Identification and Verification material requirements of this Section. The Certificate Program surveyed, qualified, and audited by the which is issued will describe and specify the scope and Certificate lloider for the items (NCA-3461, NCA-limits of work for which the applicant is qualified and 3561, NCA 3661, or NCA-3761). # e'?
Program surveyed, qualified, and audited by the               which is issued will describe and specify the scope and                 .
e <-
Certificate lloider for the items (NCA-3461, NCA-             limits of work for which the applicant is qualified and 3561, NCA 3661, or NCA-3761). # e'? e <-               t .,,:,will be subjected to a planned audit program by the                 1 (c) Except as provided in NCA-3867.4(e) and                 Society.                                                         y NCA-3867.4(f), any party performing and certifying                 (b) The Society when requested by the Material               4 to an operation, process, or to the results of tests,         Supplier on Forms N-70A, N-70B, and N-70C will examinations, repairs, or treatments required by the           arrange for an evaluation of the applicant's Iden-                 8 material specification or by this Section shall have a         tification and Verification Program. The Program will               ,
t
Quality System Program which shall cover the opera-           be evaluated on the basis of its compliance with the tions, processes, or services performed. This Quality         applicable material requirements of this Section. The System Program shall be surveyed, qualified, and               Certificate which is issued will describe and specify the audited by the Material Manufacturer, Material Sup.           material which the applicant is qualified to su, ' and               {
.,,:, ill be subjected to a planned audit program by the 1
plier, or Certificate Holder who directly receives the         will be subject to a planned audit program by the                     i certification of work performed (NCA-3861) except             Society.                                                           ;
w (c) Except as provided in NCA-3867.4(e) and Society.
when the party holds a Quality System Certificate /               (c) When the Material Supplier requests that the (Materials) which covers those operations.
y NCA-3867.4(f), any party performing and certifying (b) The Society when requested by the Material 4
(d) The information to be supplied by the Material         . copies may be obtained from ASME Nuclear Certification,345 Manufacturer or Material Supplier when making                 East 47th St., New York, NY 10017.                                   ,
to an operation, process, or to the results of tests, Supplier on Forms N-70A, N-70B, and N-70C will examinations, repairs, or treatments required by the arrange for an evaluation of the applicant's Iden-8 material specification or by this Section shall have a tification and Verification Program. The Program will Quality System Program which shall cover the opera-be evaluated on the basis of its compliance with the tions, processes, or services performed. This Quality applicable material requirements of this Section. The System Program shall be surveyed, qualified, and Certificate which is issued will describe and specify the audited by the Material Manufacturer, Material Sup.
material which the applicant is qualified to su, ' and
{
plier, or Certificate Holder who directly receives the will be subject to a planned audit program by the i
certification of work performed (NCA-3861) except Society.
when the party holds a Quality System Certificate /
(c) When the Material Supplier requests that the (Materials) which covers those operations.
(d) The information to be supplied by the Material
. copies may be obtained from ASME Nuclear Certification,345 Manufacturer or Material Supplier when making East 47th St., New York, NY 10017.
i 31 b
i 31 b


r io- s w uc an                or.
r an w u or. -
eu.   -                                                              -
io-s c
m-              c w m e0eas                                     ,,.c-p 312 346 0300
eu.
m c w m e0eas
,,.c-312 346 0300 p
: s. -
: s. -
t q                                                               .
t q
n'' et- h6
n'' et-6 h InlandSteel
                                                                    . -r\
. -r\\
                                                                        '''pt                                                         l h InlandSteel August 3, 1963 Mr. John Schade
h
        +c                       U. S. Steel Supply P. O. Box 7310 Chicago, Illinois         60680 I
'''pt August 3, 1963 Mr. John Schade
+c U. S. Steel Supply P. O. Box 7310 Chicago, Illinois 60680 I


==Dear Sir:==
==Dear Sir:==
This letter is in reference to a recent shipment of Vide Flange Shapes and the discussion between you and our Product Consultant, J. O'Keefe.
This letter is in reference to a recent shipment of Vide Flange Shapes and the discussion between you and our Product Consultant, J. O'Keefe.
      "                        Ihe subject shipment is identified as follows:
Ihe subject shipment is identified as follows:
Your Order: EC3144548 Our Orders Y 89527 Inland Wide Flange Shapes A36-81a W 10 x 33.0# x 40' It is our understanding that eight pieces out of ten pieces shipped were checked at a job site and web thickness measured between 0.252" and 0.270". As explained by our Mr. O'Keefe, the web thickness of 0.290" identified with this size is only a theoretical value which can vary within reasonable limits. Although the dimensions of a section are variable, we do produce to a foot weight as designated for that section.
Your Order: EC3144548 Our Orders Y 89527 Inland Wide Flange Shapes A36-81a W 10 x 33.0# x 40' It is our understanding that eight pieces out of ten pieces shipped were checked at a job site and web thickness measured between 0.252" and 0.270".
In this case that you are presenting, the other dimensions of the cross section are equally important in evaluating conformance. The inspector should of          nake such application.          measurements before asking a judgment on the suitability
As explained by our Mr. O'Keefe, the web thickness of 0.290" identified with this size is only a theoretical value which can vary within reasonable limits. Although the dimensions of a section are variable, we do produce to a foot weight as designated for that section.
In this case that you are presenting, the other dimensions of the cross section are equally important in evaluating conformance.
The inspector should nake such measurements before asking a judgment on the suitability of application.
[,
[,
In the event that additional information is required on this subject, do not hesitate to contact this office.
In the event that additional information is required on this subject, do not hesitate to contact this office.
Sincerely.           -
Sincerely.
              <              Michael. J. Bajor-                                                                             '
Michael. J. Bajor-j Cen. Supvg. Metallurgist l
j                     Cen. Supvg. Metallurgist l
L, s-
L, s-               -Technical Service
-Technical Service s
:
MJB pl q,,
* s MJB pl q,,
p*
p*
_.}}
_.}}

Latest revision as of 03:03, 15 December 2024

Part 21 Rept Re Matl Sold to Johnson Controls Determined to Be Out of Web Tolerance.Beams Used for Critical safety-related Nf Support in Containment Bldg.Supporting Documentation Encl
ML20076B594
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 08/11/1983
From: Matthew Mitchell
ENERGY STEEL & SUPPLY CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-83 NCR-0027, NCR-27, NUDOCS 8308190415
Download: ML20076B594 (35)


Text

.

t ENERGY STEEL s s u r e n. r c o.

DETROIT - NASHVILLE GENERAL OFFICES 2685 LAPEER RD.

PONTIAC, MI 48057 313-373-4880 August 11, 1983 Mr. James G.

Keppler Regional Administration United States Regulatory Commission 799 Roosevelt Rd.

Glyn Ellyn, IL 60137

Subject:

Report of Non-Conformance under Federal Regulation 10 -

CFR 21.

Re:

Our Purchase Order PD-830509 Our NCR No. 0027 Johnson Control's NCR No.:

SR-888

Dear Mr. Keppler:

Pursuant to my conversation yesterday, August 10th, 1983, with your Mr. James Konklin (312-932-2500), we wish to file a report of Non-Conformance under Federal Regulation 10 CFR Part 21 and outlined as follows:

1.)

Energy Steel & Supply Co. is the informant to the NRC under the signature of the writer.

2.)

The material in question of 8-pieces W 10 X 33 X 20-0 beams which are to be used for a critical Safety Related NF Support in a Containment Building.

This is the only location that we supplied the beams in question to.

3.)

The material in question has been sold to Johnson Controls, Inc. through a contract with United Engineers & Constructors, Inc. at the Seabrook Power Station, Seabrook, New Hangshire.

l 4.)

The material in question as determined by Johnson Controls, Inc. is out of web tolerance (See enclosure).

5.)

We were informed of the defect by Johnson Controls, Inc. on June 2, 1983.

The NCR was officially submitted to us by Johnson Controls, Inc. under their NCR #SR-888 dated June 8, O

1983, and received by Energy Steel & Supply Co. on June 20,

\\

1983.

(See enclosure).

\\

[/ l 8308190413 830811 PDR ADOCK 05000443 l

S PDR I

CARBON STEEL HIGH STRENGTH LOW ALLOY ALLOY - STAINLESS - PLATE BARS SHAPES -INDUSTRIALg9 FLIES 46

t vu Mr. James G.

Keppler United States Regulatory Commission i

-August 11, 1983

- Page 2 T

l 6.)

On Monday, August 10, 1983, a meeting was held in Seabrook at our request between Johncon Controls, Inc., United Engineers

& Constructors, Inc., and Energy Steel & Supply Co. in an ef-fort to examine and resolve this matter.

It was explained by Energy Steel & Supply Co. that the material being rojected was purchased from ITT Grinnell, Chicago, IL who in turn purchased the indterial from Inland Steel Co., Chicago, IL.

Energy Steel & Supply Co. explained that it had notified ITT Grin-nell on June 3rd, 1983, of the rejection.

ITT said they would take the problem up with U.S.

Steel Supply Co. who in turn would notify Inland Steel Co.

In the time period from June 3, 1983, through August 3, 1983, Ener-gy Steel had made numerous calls to ITT Grinnell in an effort to resolve this rejection with virtually no response.

Energy Steel & Supply Co. received a call on Friday, July 22nd, from Inland Steel Co. informing us that they felt their product was fully within the specified mill tolerances for that section.

En-orgy Steel explained that we understood their position, however, in reviewing the specifications of ASTM A-6 Johnson Controls, Inc. in-sisted that this-material was non-conforming and out of tolerance and therefore was rejecting it.

In our meeting at Seabrook, United Engineers & Constructors, Inc.

also took the position of Johnson Controls, Inc. and said the ma-terial was rejectable even though they personally did not inspact the material in question.

It was further. stated that although both United Engineers and Con-structors, Inc. and Johnson Controls, Inc. purchace and receive ma-terial'to the same specifications that United Engi..eers & Const-ructors and Johnson Controls perform two different 2.eceiving in-spections.

7.)

Energy Steel & Supply Co. feels that it has respond (d re-sponsibly in every way in an effort to resolve this non-conformance.

It is clearly. stated however,,that.the material supplier (Energy Steel);is not responsible for dimensional conformance, but in fact that responsibility of the Material Manufacturer to assure con-formanca to the material' specifications.

(See enclosures.)

-=

e Mr. James Kappler United States Regulatory Commission August 11, 1983 Page 3 8.)

Energy Steel & Supply Co. is in agreement that Inland Steel Co. is correct in their determination based upon the fact that Energy Steel has personally inspected the non-conforming beams.

It was suggested by Energy Steel to both ITT Grinnell and In-land Steel that Inland Steel attend the meeting scheduled for August 8, 1983.

Inland Steel declined to attend and in ad-dition has refused to send a mill representative to the job site to determine in fact whether the beams in question are in conformance or non-conformance to the material specification.

Very truly yours, EN RGY STEEL & S PLY CO.

{Mitchell Michael R.

President

Enclosures:

(A)

Energy Steel letters dated:

June 3, 1983 June 30, 1983 August 10, 1983 (B)

Energy Steel Purchase Order PD-830509 830509-A (Amended)

(C)

Energy Steel Inter-Office menos dated:

June 1,2,6,8, 1983; August 3& 9th, 1983.

(D)

ITT Grinnell letter dated August 9, 1983.

ITT Grinnell Certificate of Compliance for mat-erial supplied.

(E)

Johnson Controls, Inc. NCR #SR-888 Dated June 8, 1983.

(F)

ASME file letter NI-81-6 Dated July 13, 1981.

(G)

Inland Steel's response Dated August 3.,

1983.

Mr. James Keppler United States Regulatory Commission August 11, 1983 Page 4

References:

3812, 3813, 3861 (B) (1), NCA-3867.1, 3867.2, 3868, 3868.3, 4134.7.

cc:

D. Mitchell M. Gawron R. Genung R.

Gotwald Johnson Controls, Inc.

.i X.

ENERGY SYEEL a s u e e t V.c o.

Na{u

-tr~

,1.

DETROIT. NASHVILLE

  • ' A.,:

c GENERALOFFICES

.U Q

~. @h,M 2685 LAPEER RD.

PONTIAC, MI 48057

', r. -

313-373-4880

r ipf. -

_..,p, a.t,

June 3, 1983

$[

r yr ITT Grinnell

.. y,-

4:Q m.

4425 South Western Ave.

W-Chicago, IL 60609

.l -

.!.'. 4

.f t Attn:

Mr. Herb Otto, Manager 4 r,q.

,Kj;p,

Re:

PD-830509A ordered 5/9/83

.[...:..

I b$

Dear Mr. Otto:

9: JiY

- $ $M

}.[,fg[i.

Of the 10-ocs W 10 G 33# X 20'-0 from Inland, 8-pcs have a main ' web

dgf di2nension of between.250 to.260.

Specification dictates a thickness of.290.

For this reason our customer is rejecting the material.

M'

':]i-As ITT and Energy Stool are both suppliers, we are not responsible

-,'/jff p

for dimensional conformance.

Therefore, please present this claim.

/

l' ;

to Inland Steel and advise of the necessary steps to rectify or

@,!: [i,.

f 3

replace.

v.j t

.r.

, s.

o Awaiting your response, I remain,

!,5j

.h t'

  • *t;%n,

Very truly yours,

(!.y '

O i ENiiRGY STEEL & SUPPLY CO.

.IIMk.

l'{rr.,t )

~

i-

!Ed '

4 46 P

T9fp'.

4.d Marg A. Gawron Q.A. Manager

,_ y '

$.'[f

-.' G -

-Q MAG /kc

'ilg enclosures

,;g;;;g

b.1;...

~

cc:

Michael R. Mitchell

'.i t

,ua ;.

President

,!dThv '

~

Lein

.a:

.g

. ) *;

  • l.

5 ?? '

,d.

,1,

.L ',

'h h'5, i ' M' CARDON STEEL - HIGH STRENGTH LOW ALLOY ALLOY STAINLESS PLATE BARS SHAPES -INDUSTRIAL SUPPLIES

. f J'r f4-3

.' 7 @

  • ~

ENERGY STEEL a

s u p p t r c a.

DETROIT. NASHVILLE GENERAL OFFICES 2685 LAPEER RD.

PONTIAC,MI 48057 313 373-4880 June 30, 1983 ITT Grinnell Corp.

Attn:

Credit Department P.O. Box 98194 Chicago, IL 60693

  • Re:

Invoice 54936 54937 54938 Gentlemen:

Enclosed please find our check for payment as follows:

Invoice Remarks 54937 Paid in Full 54938 Paid in Full 54936

  • Partial payment in the amount of for 2-pcs received.
  • Note:

There are 8-pcs W 10 X 33 X 20-0 which have had an NCR issued a9ainst them as they have been rejected for being out of mill tolerance.

A copy of our NCR No. 0027 is attached for your records.

We are awaiting your return shipping instructions and replacement material for the above 8-pcs.

We will of course issue a final payment as soon as a disposition has been made on the.,above.

Very truly yours, ENERGY STEEL & SUPPLY CO.

f4. 29da4s Dene'

. Mitchell Vice President DJM/kc

~

CARBON STEEL HIGH STRENGTH LOW ALLOY ALLOY STAINLESS PLATE DARS SHAPES INDUSTRIAL SUPPLIES

m

  • ENERGY STEEL s s u e e t r c o.

DETROIT - NASHVILLE GENERAL OFFICES 2685 LAPEER RD.

PONTIAC, MI 48057 313-373-4880 August 10, 1983 Mr. Daniel Zienty Q.C. Manager ITT Grinnell Corp.

425 S. Western Ave.

Chicago, IL 60609 Re:

Our PO #PD-830509 Our NRC #0027 Johnson Controls' NCR-#SR-888

Dear Mr. Zienty:

Please be advised that Energy Steel & Supply Co. has filed with the Nuclear Regulatory Commission (NRC) today a report concerning our above order and our NCR #0027 under the I.*m41sions Federal Regulation 10 CFR Part 21 Upon conclusion of our meeting Monday between Johnson Controls, Inc.,

and United Engineers & Constructors, Inc., it was determined by both parties that this material was to be used for a Critical Safety Related NF Support and that the web tolerances are out of mill tolerance on 8-pieces and unacceptable.

We are still awaiting your response from Inland Steel.

Sincerely, ENERGY STEEL & SUPPLY CO.

k Michael R. Mitchell President MRM/kc cc:

D. Mitchell I

CARDON ST[ ti - HIGH STRENGTH LOW ALLOY ALLOY STAINLESS PLATE - BARS. SHAPES INDUSTRIAL SUPPLIES

s ENERGYSTEEL PURCHASE 0RDER 1

r.

&SUPPLYCO.

No. P Ib330509 It.

,t AB0VE NUMBER MUST APPEAR 3, -

ON ALL DOCUMENTS AND COR-RESPONDENCE CONCERNING j,'

THIS ORDER.

I' '

To:

No.I.o-am233 y

tW-36 DETROIT NASHVILLE GENERAL OFFICES 955 MEDINAH DR.

  • i Ship To:

llanlon Gregory Industries ROCHESTER, MI 48063 c

5501 Butler St.

313 375-0700 I.'

l'ittsburgh, PA.

15201 SHIPVIA: Motor Freight TERMS:

.t i' DATE OF DATE REO D.

F.O.B.

PREPAID COLLECT CERTIFICATION QA REVIEW ORDER REQ'D.

{',

5/6/US 5/11/83 Pitts., PA d

O YES M.A.G.

P-m,--

g S-pc W 10 x 30 x 20'-O

( 3,3 30;/ )

u--

I SA-36,Section III, Sub-section NF, Class 2,-

1977 Edition through Winter 1977 Addenda, NCA 3300, lvCFH50, Appendix B Iuld 10 CFR 21 apply.

k Tile RE'. UIREllHttrS !OTED ON Ti!E ATTACi!ED SPECIAL' PUR-,

"[pfh CilASE ORDER ret >UIREMElfrS FOfC1 ARE AN ItfrEGRAL PAlrrhh e

OF TilIS PURCllASE ORDER AND !{1UST BE ADHERED TO.

ANY

! j r

EXCHFrIONS MUST BE APPROVED BY ENERGY STEEL & SUPPLY a

M c:

k.;;.

y

.., fl Confirzaipp to Ucrry Rizzo

7. -

I, eserun.mwr@

DO NOT DUPLI IE f

(

Tsui umn.no t.nnnu. or u,cmo.n si i. sei.s oe u.. tu. c iO ENE ST L & SUPPLY Cg[/[/

\\

in.. unn.i.. ro,..w..neo, con. anet.on o, un in inou.iriai proc.uing ano iner.' '*

per MkhwlR. M W he11 Pronidont is not sets.ci to ine t.nn.isee oe uschigan slate s.i.s oe un tan.

E AUTHORIZED SIGNATURE

/

VENDOR MUST RETURN ATTACHED ACKNOWLEDGEMENT AT ONCE. INVOICE IN DUPLICATE.

Please enter our order for the following, subject to conditions and instructions named herein, IMPORTANT - This order is not valid until th3 attached acknowledgment has been signed and returned. This order expressly limits acceptance to the terms stated herein ard any addi-tional or dallerent terms stated herein and any addi'ional or different terms proposed by the seller are rejected unless expressly assented to in writing. THIS ORDER IS SUBJECT TO THE TERMS AND CONDITIONS ON THE REVERSE SIDE HEREOF. No other form of acceptance is binding on ENERGY STEEL & SUPPLY CO.

gif '

s.;,

y,hi, o

W'

ENERGYSTEEL PURCHASE ORDER

&SUPPLYCO.

N o, p. ~" '* '-"

AB0VE NUMBER MUST APPEAR t.: :ii......;. -

ON ALL DOCUMENTS AND COR-RESPONDENCE CONCERNING

~ ~ ~ ~ ~ ' ' '

THIS ORDER.

To:

NO.l-9 QV-ut's q7 j

, o f1}\\[

\\

DETROIT NASHVILLE

.=

L-GENERAL OFFICES i

g 955 MEDINAH DR.

Ship To:

ROCHtiSTER, MI 48063 li..nlost-Uregory In.iur,trius 313-375-0700 S:'. e 1 Btitler St.

i i '. t abu rs.;h, t u 152.1 SHIP g r 1'rcir#

TERMS:

a DATE OF DATE REO'D.

F.O.D.

PREPAID COLLECT CERTIFICATION OA REVIEW ORDER REO'O.

S/s/u:5

.',/11/03 L>it t u e, t%

y

[-]

ms

.'.G aec t.c.'w
nt to ouc V::4V35A change frm:

5,- i. <,

1: lo C 3H,' X 20'-U

( n>O / 1 Chat.gc t.o:

Jj),-p :s U 10 0 33v/ X 20'-u

( 66.ui!

,\\1l other terus

.;d contlitions re:aain uncliangud 2

pt

2. f r$.2 -4 9
2. / /$b ' d 1-
2. t H.i - c

,a

.y

2. / f-O-8 2

ee J / <Fd2 Y

! G) 2.

t r-.= AT%

W nv*

neemsd A

I ll 1

Confirning to Jcrry Hino f

j l'o ::.at Duplicato l

in.s u.ie,..iio senaessee or uicnigaa siate saies ce use Tan.t iO ENERG TEEL &

PP,LY CO,, -

f thes Maiee.al 6 10# eesale an&ot consurnpison or use in indutifial processm0 and merefore p,,, ',

r b

"' ' ' AUTHORIZE D SIGN AT UR E ' ' ' ' ' ' ' " ' * * * *

.. -ne svinaci sa me tennessee oe u.cn.gaa state ssies ce use Tas.

VENDOR MUST RETURN ATTACHED ACKNOWLEDGEMENT AT ONCE. INVOICE IN DUPLICATE.

kC P; ease enter out order for the following. subject to conditions and instru:tions named herein. IMPORTANT - This order is not valid until ths attached acknowledgment has been signed and returned.This order expressly limits acceptance to the terms stated herein and any addi-tionti or dif ferent terms stated herein and any additional or different terms proposed by the seller are rejected unicss expressly assented to in writing. THIS ORDER IS SUBJECT TO THE TERMS AND CONDITIONS ON THE REVERSE SIDE HEREOF. No other form of acceptance is binding on ENERGY STEEL & SUPPLY CO.

y N E R G Y.S T E E L s u e e t v c o.

SPECIAL PURCHASE ORDER REQUIREMENTS MATERIAL FOR NUCLEAR APPLICATION P.O. No.:

PD-830509

_1.

Quality Program Specification 3.

Marking Recuirements

[ 10CFR50

@ Marked per material spec-ification.

[ ANSI N45.2 All material die stamped with heat number.

ASME Section III, Sub-Article NCA 3800, 1977 edition-through

@ Low stress die stamps must Winter, 1977

addenda, be used.

Die Stamp Not Permitted.

X ASME Section III, Article NF, Class 2 Heats may not be comingled C Reporting requirements of

] To be packaged and shipped 10CFR21.

in ac'cordance with ANSI /

O Other ASME N45.2-1978 (Level D)

C Othor _

[

2.

Mater.11 Certification Requirements 4

Supplementary Requirements Material manufacturer certified

[ Bend test per material test reports.

C Certificate of Compliance Charpy Impact Tests per C Certifi: ate of Conformance

@ Certification must accompany shipment. ( 3 copics of certification are required.)

Heat treatment per

  • Attention:

M. Gawron Statement that material was produced in

[ No weld repair permitted.

accordance with your Quality System -

Program Rev. #

dated audited by Energy Steel on

[ Galvanized per Must appear on Certified Mill Test Report.-

v Statement that material was produced to ASME Section III, NCA-3800 must appear on Certified Mill Test Reports.

5.

Shipping Requirements

[ Mantifacturers Quality System Certificate (bot) Number & Expiration Date must appear lXl All shipments must be made e

on Certified Mill Test Repori;s.

on FLAT BED TRUCKS. Load must be tarped.

[ Suppliers Quality System Certificate (MS) Number & Expiration Date must appear on Certifi/cd Mill Te Reports.

APPROVED:

d CUSTOMER:

10-830233 Rev. 2 12-10-82 F106a kc

ENERGY STEEL & SUPPLY CO.

INTRA-COMPANY MEMORANDLN TO:

Michael R. Mitchell DATE: June 1, 1983 FROM:

Margo A. Gawron

SUBJECT:

ID 830233 10 @ 33 X 20'-O WP 10-pcs.

Leo Bourgoin called this date at 4:45pm to advise that PSC was rejecting 8 of the 10-pcs. of WF 10 @ 33# X 20-0."

I verbally notified Dan Zienty of ITI (Q.C. Manager) and he will put in a claim at ITT.

Informed Mr. Zienty, as Mr. Bourgoin had informed me, that the dimension of the web is from.250 to.260 -- thinner than the rest.

The thick-ness of this material was to be.292 to meet specification for SA 6.

mg l

FlO7 Rev. O 9-1-82 mg

ENERGY STEEL & SUPPLY CO.

INTRA-COMPANY MEMORANIXN TO:

Michael R. Mitchell DATE: 6-2-83 FROM:

Margo A. Gawron

SUBJECT:

Clajan to ITT for ID 830233 Spoke to Mr. Jeff Gardner, Sr..QA Engineer, Rhode Island, (401-831-7000 ext. 376).

lie indicated that material must meet weight per foot and cross sectional area. We should check all thickness, throughout flange and see if weight and flange thickness would meet specification require-ments.

Mill will mic flanges and web every foot to see if the sectional area comes to within 2.5% of entirety.

Called Leo Bourgoin and he indicated that he has checked the flanges all the way down, flanges, web, length and width and cannot come to that 2.5%.

Again reported to ITT that a claim should be begun and that we would appreciate discussing this matter with the mill as soon as possible as we will need replacement material.

They will put in writing once they receive our written nonconformance.

mg FlO7 Rev. O 9-1-82 mg

ENNRGY STEEL & SUPPLY CO.

IwrRA-COMPANY MEMORANDUM TO:

Michael R. Mitchell DATE:

June 6, 1983 FRON:

Margo A. Gawron

SUBJECT:

10 @ 33# X 208-0 WF Johnson Controls PO#9763.011-31901 (Item 30)

Our PD-830509 Spoke to Mr. Otto of ITT and he transferred me to Dan Zienty.

I in-formed Mr. Zienty that we were sending a letter to him today concerning the W 10 X 33.

He.in turn will contact his vendor, US Steel Supply who will have to contact the mill -- Inland Steel.

I also called Mr. Bourgoin and he was not in.

I left word to have him send us a written nonconformance for our file.

mg l

l l

LG l

F107 Rev. O 9-1-82 mg

ENERGY STEEL & SUPPLY CO.

INTRA-COMPANY MEMORANDLM TO:

Michael R. Mitchell DATE:

6-8-83 FROM:

Margo A. Gawron

SUBJECT:

10 @ 33# X 20'-O WF Called Leo Bourgoin; need written (documented) non-conformance.

lie will write up and send out.

Material is awaiting inspection from mill and also holding ID-830101-A Flats 1/2 X 4 X 208-0.

Might send all back at once.

mg F107 Rev. O 9-1-82 mg

ENERGY STEEL & SUPPLY CO.

NONCONFORMANCE/ CORRECTIVE ACTION REPORT

REFERENCE:

ID-830233 / PD-830509-A, Report SR 888,OAS-801-SS Rev. 3, ASME III SA6, W77, D2ficiency: Site QA Receipt Inspection of material 10-pcs W 10 x 33 x 20'- 0" Gal-vanized to ASTM A 123. Material specification ASME SA 36, NF Class 2, Heat # 21862. Eight pieces have undersized web and*are unacceptable.

(1977 Edition through Winter 1977 Addenda.)

/fl CM5W t

By:

M rgo Gawron Date:

6/22/83 Analysis of Problem:

Web thickness.292 minimum per SA 6 Table 17. Actual measurement ranged from.252/.270 using JCI Micrometer # 77. Two pieces were found to be acceptable and 8-pcs are rejected and to be returned to vendor.

'A f^

W$p By:

rgo Gawron Date:

6/22/83 Corrective Action Taken:

Vendor was transmitted a copy of this NCR and will advise us of their corrective action. (6/24/83-MAG)

By:.

Date:

A

/

l/

t Reviewed: [/

[,

//

Date:

2 h

R: viewed:

uA! /k

/MY Date:

A $7b R: viewed:

Date:

1: viewed:

1 Date:

APPROVED:

Date:

F119 Rev 0 9-1-82 mg

ENERGY STEEL & SUPPLY CO.

INIRA-COMPANY MEMORANDUM TO:

Margo Gawron - QA DATE: August 3, 1983 FROM:

Michael R. Mitchell

SUBJECT:

Johnson Control (NCR #0027)

In response to my final conversation today with Mr. Dan Zienty con-corning the above NCR, I wish to issue as a matter of record the fol-lowing statement.

The material in question was purchased from:

ITT Grinnell Corp.

4425 S. Western Ave.

Chicago, IL 60609 Upon being notified of this rejection I notified Mr. Daniel Zienty of ITT.

He said he would follow through on complaint.

A copy of our NCR was forwarded to ITT upon receipt of NCR #SR-888 from Johnson Controls.

I was then informed by ITT that they purchased material from U.S. Steel Supply Co. who in turn had purchased material from Inland Steel Co.

On Friday, July 22nd, I received a call from Mr. Brian Bozek, Staff Assistant, Structural Division from Inland Steel Co. (312-346-0300).

Mr. Bozek informed me that Inland wo' tic' not honor any claim for the reasons indicated as Inlands position was that the claim was rediculous.

I proceeded to go through the ASTM Standards and ASME Specifications with Mr. Bozek to fully describe thq, tables, tolerances, etc.

He then said he would check further into the matter and call me back on Monday morning, July 25, 1983.

I also advised him that we had a preliminary meeting scheduled at Seabrook and that I would suggest participation from someone at Inland Steel.

I finally talked to another individual at ITT and was told that Mr. Otto and Mr. Zienty were not in, but I should contact a Mr. Marty Majorsan, salesman at U.S. Steel Supply.

Mr. Majorsan said he was familiar with l

the problem but that I should contact a Mr. John Shad instead.

I asked

- to be transferred and he said Mr. Shad was on the phone and that I l

should call back.-

I suggested Mr. Shad should call me back as that I had to have answers now.

No response. F107 Rev. O 9-1-82 mg 11

~

e ENERGY STEEL & SUPPLY CO.

InrRA-COMPANY MEMORANDUM TO:

Fhrgo Gawron - QA DATE: August 3, 1983 FROM:

Michael R. Mitchell

SUBJECT:

Johnson Control - NCR #0027 (Continued...)

I called ITT on July 27th and 28th for disposition on NCR.

ITT would not return my calls.

I advised Mr. Daigneault of Johnson Controls that I was doing everything within my ability to get a determination from ITT, but was unable to respond because they would not return my calls.

Repeated calls were made to Mr. Herb Otto and Mr. Dan Zienty of ITT to determine status of rejection so that non-conformance could be resolved.

They would not return my calls.

I informed their secretary that I would notify the ASME and also advise the NCR under the provisions of 10 CFR 21 if there was no further response.

I was contacted today by Mr. Zienty who said Inland Steel was mailing a response to U.S. Steel Supply who in turn would forward a copy'to ITT who in turn would forward a copy to Energy Steel & Supply Co.

He also said Mr. Bozek denied over talking to me.

I was advised that the contents of Inland's letter would be that they would not accept the rejection as the material was within dimensional,

,.hysical and chemical conformance to the section and that they would not se interested in participating in any meeting with United Engineers, Johnson Controls or Energy Steel & Supply.

This memo is to be pended until Tuesday, August 5th.

If this NCR is not resolved we will then notify the ASME and the NRC under the pro-visions of 10 CFR Part 21 Michael R. Mitchell President MRM/kc cc:

D. Mitchell l

. File l

Ref: A6, Annex A1, Table A1.1, Para 13.3.3, ASME III, Sub-Section NF.

i F107 Rev. O 9-1-82 mg

ENERGY STEEL & SUPPLY CO.

INIRA-GNPANY MIDORANDLH q

TO: Margo Gawron DATE:

August 9, 1983 FROM: Michael R.

Mitchell

SUBJECT:

SITE VISIT TO SEABROOK POWER STATION, SEABROOK, NH.

RE: Our P.O.

- PD-830509 Our NCR # 0027 JCI's NCR # SR-888 On Monday, August 8, 1983 we met with United Engineers & Const-ructors, Inc.and Johnson Controls, Inc. in an effort to make a determination on the non-conforming material referenced in the above NCR's.

In attendance were:

1) Mr. Arnie Heyn Assistant Supervisor-Field Purchasing
2) Mr. James Bertram Buyer-Field Purchasing
3) Mr.

C.D.

Hanson QC-Receiving

4) Mr. Carroll Kuhn Instrument and Controls Superintendant The above individuals represented UE&C.
1) Mr. Steve Ostrowski Project Manager
2) Mr. Tim Diagneault Buyer
3) Mr. Leo Bergoin OC-Receiving Engineer The above individuals represented Johnson Control's, Inc.

The meeting, lasted approximately one hour and in conclusion, Johnson Controls still insisted that the material was not within Mill tolerances, could not be down graded and therefore was non-conforming and rejected.

l l

(1)

F107 Rev. O 9-1-82 mg

Wo. explained our position of being a Material Supplier and were not-responsible for dimensional conformances and that Inland Steel Co. who was asked to send a representative to this meeting declined and proposed to do nothing to resolve this non-conformance.

I further explained that if we could not agree on a resolution to correct this problem I would have no alternative, but to file a Non-Conformance Report with the NRC under the provisions of 10 CFR Part 21.

It was agreed that since we could not get either ITT Grinnell or Inland Steel Co. to respond that we were compelled.to file with the NRC.

After the meeting I personally inspected the 8-pcs of W 10 x 33 beams and now agree with Inland Steel's initial comment that this claim was ridiclous.

It is my strongest belief that if this material is in fact non-conforming and being rejected for the reason stated, that 80%

of all the steel on site and installed in place would be rejected and have to be removed and replaced.

I have advised ITT Grinnell today of our intension to file a Non-Conformance Report with the NRC.

cc: DJM file t

f 9

e

- (2)-

t

1FT Tf 1 a+---,

ITTGrinnellCorporation 442SSoith Western Botievant Dicago, Hlhois SM Telmhone (312)847-15%

August 9, 1983 Energy Steel 2685 Lapeer Rd.

Pontiac, Mi. 48057 Attention: Mike Mitchell

Dear Mike:

Attached is the letter you had requested from Inland Steel. The letter references Inland Steel's position per your NCR #SR888.

In light of Inland Steel's response, we ask that you evaluate the balance of the dimensions noted. Should you have any further questions or comments as to the acceptability of the subj ec t steel, please contact us immediately.

Very truly yours.

g uk y

J Daniel J.

Zienty Q.C. Mgr. - Chicago 1

Executin Offices / Providence. Rhode lsInwl

61 e-m(T i T 1 III GrinnellCorporation

,.e

, c-.

Pipe Hanger Division 4425 South Western Boulevard s-Chicago, Illinois 60609 Telephone (312) 8471500 l'enneh :

Cliicnr.o, T111noin lescat i ren :

1/5551 1

('ENTil*!cA'"M tiP C(1!t!'t.1 ANCR 1

l Ilanlon Oregory In,dustries Cunt,orcer l'urchane Order:

5501 lbtler Street P-D-830500A Pittsburgh, Pa. 15201 P-D-830507A P-D-830511 4

Material has been supplied to ASME nection III, NF subcection class 2, 1917 edition thru vinter of 1977 addenda, NCA 38005 Provicions of 10CFR21 and 10CFR50 ' appendix 1)ui) plies. Materini cttacped with low-ntress

. dies, packaging to ANSI N15.2.

6Property "ANSI code" (as page type) with input value "ANSI N15.2.</br></br>6" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process. The material nupplied by 171' f rinnell, ::nplely fiale:. Divicion latve been supplied in accordance wit.h the Qualit.y ::yntem l'rce. ram accepted by AGME

]

I-4 i

l Quality System

-]

gg g.

Certi ficate (Materinja)

~~~

No, ti. C. Man ar.e r-r QSC Is15 Is May 12,1983 Expiration Date May 5, 1984 ENERGY STEEL & SUPPLY C0.

Q. S. Dept.

t

{

gy h date

\\

l-Pace 1 of_ 2 1

-.m.

e

--y...

,s.....

J g 3( 3 ITIGiinnellCorporation

, c __ -,

Pipe Hanger Division 4425 South Western Boulevard Chicago. Illinois 60G09 Telephone (312) 8471500 Certi fientt-of' Comvilinnen QUANTITY MATERIAL DESCRIt'T10H llMAT H0.

Spc. #

Channel 10 X 30# SA-36 2pe. G 76517-A '

@ 20'- 0" 3pe. @ 76517-B -

10pc./

Ibam W 10 X 33# SA-36 2pc. @ 21862-A '

@ 20'- 0" 2pe. @ 21862-E '

2pe. @ 21662-C -

2pc. @ 21862-D -

2pc. @ 21862-F -

2pe. '

Ibam W 10 X 301/ SA-36 2pe. 0 671410-A /

@ 20'- 0" a %

ep ENERGY SIEEL & SUPPLY CO.

Q. S. Dipt.

By-4 date I'/I' d Page l or 2

{

}V InianG diOel j. _.....

...'n - - "; ~ ' e =;~~ * ' "...:,.". *---" " "'T+1"

~~ 7M W lMC3144548

..,.ou l

We her:by certify t ut the heat I

I ancrys!5 and/or test re u-sown m.my..

. =.

' ' " ' # 5 ' "* !'"'d ** * 'h*

Stt'i INLAeO STEEL COMPANY 28 " 21I t.L 89527 Y records of the cornpany~

~ ~ ~ * ' " ~ * -

QUALITY CONTHOL CENTER 2-103 3210 WATLING STREET 18/02 20 2/17,1983 6921 % O01

/ v-

"""""E"

'~~

[837#"d t N"P AGE

'N EAST CHICAGO, INDIANA 4G312 FAIP. FIELD 4571 1 CF.1 l0TO

  • Hip TO e

l

-;;w.wmt+3M
tm;.wx->;u,&l U.'ilTED STATES STEEL SUPPLY DIV UNITED STATES STEEL SUPPLY DIV

,g STATE OF IND6ANA UI3ITED STATES STEEL CORP U S STEEL CDP,p 9 COUNTY OF LAKE

[d 5"h*ih'd ""d 5" '" ' ' ' ' ** ' h 3 5 P O BOX 7310 13535 S TORP.E? ICE k]

TH day of FEBRU ARY A.o.,1983 j C HIC A GO ILL c #ewel 'M 60680 CHICAGO I_L L

,/

60533 g

g a

j L

0M i

rmcATion INL AND WIDE FLANGE SHAPES, A ST'i A 35-81A ASME SA 36, C.000/.260 P h00/.040 L. 000/.050, BEND TESTED / 10000 j.*4 EL BA GARRETT nou,v % j g uy conssicu zxnRES: AUG. 18 T1985e

% w m m m m.m.ms-n. %.-J l

l TEST RESul.TS

.-=e-YIELD POItT TENSILE STRENGTH ELONGATION BER l HEAT Nod. f* TEST OR N

MATC PI AL. CESC m m CN CU A.*d T.

WE CHT LJ I RL/so.TN_ /

IRL /90 TN_ /

TH.' s/ /Tm

~

10 IN X 33.0 # X 40 FT 5

6600 21862 50,200 72,700 8

30 01 o

TM.4 1

=-

l

.c b

O I

a...

..n :.'-

gD.

a64-000 f

~z a no.

.cs

.m g.f i see. s.

- co -

6-u.

~.

c,..

c.

v-

.u.-

$1862.23

.72.021 LO31

- :i.n x&

-m

.2d :d...

  • . '.L.-

ENERGY STEEL & SUPPLY Co.

y>

..,.s;.

. ~..

-x 93-.

~

9 S Dept.

j..,. g ig

-fffQ

.h~" "?]

0_

f

.h,~.

,P.,

  • J,K..,: '

'J

  • f..
  • Ks' '

~*-* ~j '

I

% 3 %.== -

.*. * ~

    • s.c
  • ~ ~. - -

i' -

' * - * =

,=,

.a..==,s s

l I

Spootro gra p hic and Chemical Analyoto Motallurgiets 4845 5. MEDZlf AVE.. CHICAGO, ILL. 60632 ARCA CODE 312 - 523 7003 AN ALYSis REPORT FOR:

7-17f$1;f11. Corp.

nuncsaseenoen no.( PHC 24344 4425 8o.

Chicago,'JWestern Divo.

Ill. 60609

-p

,g

_5/16/03)

  • Attna Dan Eienty o^TC Report Number: 5024-3

/

Sample Numbor HT. 21062 Tensile Strength 72,400 pol' Yield GTrength 44,200/

Elongation 27.5 4

.) WORK WA8 PERPORMED IN ACCORDANCE WITH CSSL O/A MANUAL DATED 6/80 (REVISED 4/81 WITU APPROVAL DATED 6/22/81) AND AS AUDITED DY ITT GRINNELL REPRESENTATIVE 2/11/03.

ENERGY STEEL & SUPPLY CO.

Q. S. Dept.

By

[date c

,c.

mc3.

_,c;;.u...To.

...c.

or S

O OUT CUFi f*its se V thdScaNge;ng;py,gg,.

' ACT #

' MNFICEf4CE.

NO PART HEREOF MAY BE O

FOR smers, steel a supply co.

a

~ TT.*. Grinnell

~

sTo m n F+83o30or CERTIFIED MATERIAL TEST REPORT ITT GRINNELL ORDER FFC0808

~

DATE M2" 16 1983 ITEM HEAT CHEMISTRY l

YlELD UENSLE [Re TjG HRDNS ED E

DESCR!PTl0N QUAN BEND NO.

/

NO.s C/ MN Ps S./

[.

PSI f PS! /

c/o / RW BN 2

L' 10 X 33#

2 21862A

' 215

.72

.015

.026 l

'hh,200 72,h00 27.5

)

2 W 10 X 33 'l 2

21862E

.22',

55

.005.023

'ht,200 72,500 27 5 2

W 10 X 33#

2 21862C

.21?

7h

.016.026 LL,200 72,h00 27 5 2

W 10 X 33#

2 21862D

.20%

.T2.01h

.02L hh,200 72,L00 27 5 l

2 V 10 X 33#

2 21862F

.21%

73

.015

.027 hh,200 72,h00 27 5 1

-3 1

_7 l

I

-i

- - -.g l

i

-?

Material has been supp'.ied to ASME sectica III, NF subsecticn class 2, 1977 edition thru vinter of 1977 addenda, NCA3300.

Provisions of 10CFR21 and 10CFR50 appendix E applies. Material stamped with low-stress dies, packaging to ANSI Nh5.2. Ccde case N2h2-) applies.

I No. veld repair i CERTIFY THAT THE ABOVE RESULTS ARE TRUE AND g galg_gggm certificate (Materials )

CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. '

Expiration date May 5, 198h

' ENERGY STEEL & SUPPLY C0.

7

-7

~

\\

& t).

d.

Q. S. Dept.

r By Y date N b b l

i //

wensn w u as xsaexv bu. a usu: n,ts c w h u uN LW W Vr t)W6 G

\\

Spootrographic a u ct C h o nt i c a l Analyotn

'Motallurgiota 4548 5. KEDZIE AVE.. CHICAGO, itL. 60632 AREA CODE 312 523-7088 AN ALYsts FIEPORT F0m r

. ITr.Grinnell Corp.

euncnasc onoa -

PHC 24344 4425 So..{ Western Blvd.

J Chicago,',.Ill. 60609 (Attn: Dan'Elonty mc 60 Report Number: 5023-4 Sample Number HT. 21862A Carbon 0.21%

Manganose 0.72 Phosphorus 0.015 /

Sulfur 0.026 Silicon 0.03 Nickel 0.01 Chromium I

0.06

, Molybdenum 0.01 Copper -

0.04 i.

JWORK NAS PERFORMED IN ACCORDANCE WITH CSSL Q/A MANUAL DATED 6/80 (REVISED 4/01 WITH APPROVAL DATED G/22/01) AND AS AUDITED DY ITT GRINNELL REPRESENTATIVE 2/11/83.

{

I ENERGY STEEL & SUPPLY CO.

Q. S. Dept.

j By /7/

da.te' f

//

v'i f: u (suATony.inc.

Cwicaco S E4Tho!SE.

d

($ PtJr:MtSH:tO 0V P

g,..gjg,~p,,as.geegAno~ mm..T oun,.nm w:m,u; *s)p.14r *i;) g,m ynACT ANI *. a CTrticy cone thCPc:%

c.o

cm.-

ro PART HERCOF_NAY.,0C.R5 e

S p o o t r o g r e p la i o and Chemical Analyetc Motsilurgicto 4848 5. KEDZIE AVE.. CHICAGO, ILL. 60632 AREA CODE 312 - 523-7000 AN ALTSIS REPCMT FOR:

g

r..a...,.....

m

( ITT. orinnell.. Corp.

euncnasc os.oca no.

PEC 24344

. 4425.8o.inestern Blvd.

. Chicagos'Ill. 60609 Sf1Gf83)

( Attna. Dan3ienty o^Te Roport Number: S023-5 j

Samplo Number: HT. 21862D Carbon 0.22%

Manganeso 0.55 Phosphorue

<0.005 /

Sulfur 0.023 /

Silicon 0.06 Nickel 0.03 7

Chromium 0.07 Molybdenum 0.01 l

Copper 0.11 l

WORK WAS PERFORMED Ili ACCORDANCE WITil CSSL Q/A MAMUAL DATED 6/80 (REVISED 4/01 WITH APPROVAL DATED 6/22/81) AND.AS AUDITED DY ITT GRINNELL REPRESENTATIVE 2/11/83.

i se 9

ENERGY STEEL & SUPPLY C0. ~

Q. S. % pt.

/f[ date U

By c?

pc;;

~~

a.narus===.....=.=

---___r---

- -mv -- --

Spoetrocrophic and Chemical Analycts Motallurginto 4848 5. KEDZlE AVE. e CHICAGO, ILL. 60632 AREA CODE 312 - 523 7000 ANAMM RCPORT FORs

-=

5' ITT Grinnoll' Corp.

r uncorse.onnen eaa.

. z.;

.v.

y PHC 24344 44 25 Do. 'Wastern Blvd.

Chicago, Ill. 60609

( Attna Dan tienty uru: (...513,/g3)

Report Number: 5023-6 Sample Number: HT._21862C Carbon 0.214 /

l l

Hanganese 0.74 Phosphorus 0.016 /

Sulfur 0.02G /

Silicon 0.03 Nickel 0.01 Chromium t.

0.06 Holybdonum 0,01 i

Copper.

0.03

\\

l UORK WAS PERFORMED IN ACCORDANCE WITH CSSL O/A MAUUAL DATED 6/80 (REVISED 4/01 WITH APPROVAL DAIED 6/22/01) AND AG AUDITED DY ITT GRINNELL REPRESENTATIVE 2/11/83.

1 ENERGY STEEL & 3UPPLY C0.

Q. S. Dcpt.

ByMM date T'M'O

,?

/

cwicaco secerno conv[

av. isc.

  • /.!./ /5

'f 8Yt*d5n7:4.ns Ae...w f1 / * ***' *

  • iat cony ogneg,

,ao Pani Hcntor MAy at g

'E I

.=&-__-___---_-_-

Spootrographic and C h o rn i c a l Analycto Motallurgiato l

4840 5. REDZIE AVE.

CHICAGO, ILL. 60632 AREA CODE 312 - 523 7000 ANA4.V&lS ftEPCMT FQMa

--=-

y

(

r...

. I r r r,r i n,i...nell corp.

uncoacc onoca no.(

PHC 24344 4425.'So. : Western Divd.

Chicago,:Ill.'60609

. Atta: Dan'Eienty cArc 51 03 J

t Report Number: 5023-7 Saraple Numbers. HT. 21062D Carbon 0.20% '

Manganese 0.72 Phosphorus 0.014 /

Sulfur 0.024 Silicon 0.04 Nickol 0.01 Chromium 0.06 Molybdenum r-0.01 Copper

  • 0.03

/L

/ WORK WAS PERFORMED IU ACCORDANCE UITH CSSL 0/A MANUAL DATED 6/00 (REVISED 4/01 WIT 11 APPROVAL DATED G/22/01) AMD AS AUDITED BY ITT GRINNELL REPRESENTATIVE 2/11/83.

ENERGY STEEL. & SUP E

Q.S.Dapt pir-n -

9, jf} bh _date _

i r o

  • /

CHicAco SP c)10.SchtCh Lahd & TONY.!N

  • j,! /,+ff,.f/r
n.,~ i IT fCUT O pn

.g hli;gry 'g A.I.,h, p

N F.

NO PARI HERCOP MAY BC [lC-

-uy w S p o o t r o g r a p la i c and Chemical Analyetc M o t o l l!' ~ g l o t o 484a s. KEDZIE AVE.

  • CillCAGO, ILL. 60632 ADEA CODE 312 - 523 7000 AN ALYSIS REPCMT FCMI f,ITT Grinnell~ Corp.

h

's.

eunceinsc onocie no.

PilC 24344

'4425 So, Wostern Blvd.

  • Chicago,.Ill. 60609 516!83)
  • Attn Dan 31onty

_ _,j o^Tc Report 11 umber: 5023-8 Sanple Numbert HT. 21862F' Carbon 0.21% V Han<3anese 0.73 Phosphorus

0. 0lf Sulfur 0.027' Silicon 0.03 Nickel 0.01 Chromium 0.06 l

Molybdenum O.01 Copper 0.03 I

WORK WAS PERFORMBD IN ACCORDANCE WITl! CSSL Q/A MANDAL DATED 6/80 (REVISED 4/81 UIT!! APPROVAL DATED 6/22/81) MD AS AUDITED BY ITT GRINNELL REPRESENTATIVE 2/11/83.

ENERGY STEEL & SUPPLY C0.

Q. S. Dept.

By/

date fM 6

Cuic Aco Grccinogtre' s t. AnoH A TortY. lNC.

j,'*f

.f

.'...: i..': :. *,3 a,

~. ooneooana nerae on ovMunnso,

PMODUCSD FQ4 Ptte84.em4 9@ wfTt CUT ogygg pgggo,,u, '

y,p p,

eWl PAC f AN0 ON.?arcy ggg p

p

JOHNSON CONTROLS INC.

h Q AS -1601 - SS 2 0 1Bg3

. INSPECTION SURVEILLANCE REPORT ATT ACHMENT 4.3.1-PROJECT UNIT CONTRACT.

REPORT NO.

SR EBS l

DATE

h. 2 rc,el.

fl 02 t.2-0001 07054-33 6/5/63 TREND CODE REFERENCE DOCUMENT ASME CLASS 13.3 O OAS-5

. q/.!-[ ;;. SE F. tv. 3

,/.f.:'E II : 5!.6, U77 O SAFETY RELATED 0 NON SAFETY RELATED t

TYPE OF INSPECTION O RECElvlNG O oOCuMENTS O PARTS / MATERIALS WOR KMANSHIP TEST O SYSTEM DESCRIPTIO*. OF INSPECTION._ ~ ' ;t '!

IE r0!I;'n of rrsterisls Itt: s'50 F.O.

i d is0ll-Ji-'d1 (20 2Oct

..i 4 qs. r.= T.-? r'r, f /.~.6.

ET CL. 2 HT t. 21 L 62.

Eic5! Piec es.sr e m.c e.

1:c en'

..i

,-~

-.,....u.

  • H e' s.-<a. 2 42 '-ir.i ra.' T.er SA6 Table 17. actual necsbren eut rant.es e..

.- *> ! ne.., < -

w s e.< -,. -- a. e n L77.

S Vb SATISF ACTORY FINDING O UNSATISF'ACTORY (RECOMMENDED DISPOSITION) T'eturn ur.r.ccentchle n.2tt. rial to ver. dor.

4. - c e Rt rre vithir tolerance

  • d

/

-- et s.

/

INSPECTO,RfAt3DI-TOR DISPOSITION:

.a k a.

-.-..,r.,.,

s.4.

s. f..s

-. :r

. ~.

.V.. y;. : :,,c;;.

..s.

', - '...o r

.a

- A. a

., - s..;;'

P.RO. JECT MCR.. CONST.. SUPT.. ENG., ETC.'..... --.c: +.D AT.,E..,,QiG L6.d '.. D' OA M AN AG E. R./OA E NG.IN E E R '., D..A,T,E -b.v; a't t.s

~-

-a

.1 e... e u. r u.w

.A:.

~

s n s

~.

tr

' ' " #I

.. '; ': ?s,-. ;',' '.V

~ ~ ' '

DISPOSITION COMPLETED ' " '

.y.

.h :-y. m-r..,i : -

u....r.. p..i y 1... as

.','..'u.'..

e.

..,, ~.

..-.-s,..

a...

c. -

t

...f.c.

... < p=,.....,' ;.. y.. '...,; -

?..

a.

.s.

r...

.yn :, :

,=

. ',i.

i

~~,, SUPT./OA EtJGINEER DATE REINSPECTION RESULTS:

l k

~

INSPECTOR! AUDITOR DATE L

DATE QA f/AN AGER L (ANI CONCUR R E NCE DATE IP/AUDITO R

. / :......

7 s

.r.

g.

-(

i

. The Arnerican Soci t of Mechanical Engineers I

Un.ted Eng necico Center

  • 345 E. 47th St. Ne; York, N.Y.

t.

10017

  • 212 G44 7722 + TWX.710 5815267 July 13, 1981

Subject:

Section III, Division 1

\\

NCA-3800

{

j

Reference:

Your letter of December 29, 1980 ASME File # NI 81-6 Centlemen:

Our understanding of the question in your inquiry, and our' reply are as follovs:

Ques tion :

Supplier, or the Certificate lloider to assure that product dime

,in accordance with the material specifications?

.\\..

l Jtepiv : The Code requires that its the material specifications, the Material Manufacturer assure conforraance i

reference NCA-3867.1, 3867.2 and 3868.

l4134.7 requiru r ha t

confoms to the Code. the Certificate Holder assure all purchased material NCA-
al confonnance but The Material Supplier is not responsible for dimension-
of natcrial, reference NCA-3861(b)(1),is responsibic for establishing and maintain p.

Yours truly,

,M d-ohn Hillman sissistant Secretary

2) 644 80I.9 f,%

l RESEARCH DEVELOPMENT

..L and ENGlhEERING DIVISION

1c,

. JUL 141981 s..

k RECEIVED A5ME proc)dures proviJc for reconsidstation of this intarpretation when or il additional Informatio ses.lable which the ini uirer bolieves r.ilr}ht affoct the interprutation. Furthor, porsons aggrieved b y,

laterplotbli(in thJy 3ppeal to tho Cognizant ASME cornmittee or sedcomtnittee As statedin th f I*,, code documents. ASMt; doos not"appros o "" certify,""rato." or 'endorso" e orewordof tbs desica or actuiti.

4 NCA 3740-NCA-3813 SECrlON III - SUBSECrlON NCA accordance with the applicable requirements of this NCA-3762 Documentation of Quality Assurance i

Section.

Program The NA Certificate lloider shall be responsible for documenting his Quality Assurance Program (NCA-8121).

NCA 3763 Filing of Quality Assurance Manual NCA 3760 RESPONSIBILITY FOR QUALITY The NA Certificate IIolder shall file with his ASSURANCE Authorized Inspection Agency (NCA-5121) copies of NCA-3761 Scope of Responsibilitics the Quality Assurance Manual. The NA Certificate lloider shall keep a copy on file available to the (a) The NA Certificate lloider shall be responsible Inspector (NCA-5122) and Inspection Specialist for surveying, quahfying, and auditmg suppliers of (NCA-5124).

subcontracted services (NCA-3125) including nonde-structive examination contractors, Material Suppliers, and Material Manufacturers. Material Suppliers or NCA-3770 DATA REPORT Material Manufacturers' holding a Quality System Certificate (Materials) need not be surveyed nor The NA Certificate IIolder shall certify compliance audited for work or material covered by the scope of with this Section by signing the appropriate Data their Certificate. Subcontractors holding an appropri-Report Forms and apply the appropriate stamping l

ate N, NPT, or NA Certifict: need not be surveyed (NCA-8000) nor audited by the NA Ce rtificate lioider for work within the scope of the subcontractor's Certificate.

(b) An NA Certificate lloider may subcontract NCA 3800 METALLIC MATERIAL furnace brazing operations involving uniform heating MANUFACTURER'S AND to an organization not holding a Certificate of Autho-MATERIAL SUPPLIER'S rization provided:

(1) the work performed.is with.m the scope of QUALITY SYSTEM PROGRAM actisities of the NA Certificate llolder's Certificate of NCA 3810 DEFINITIONS NCA-3811 Material (2 t i A Certificate IIolder's Quality Assur-ance Program shall provide for the subcontracting of The term material as used in this Section refers only furnace brazing operations, including Authorized to material as defined in NCA-1220. The term stock Inspection and these provisions shall be acceptable to material as used in this Section refers to material the Authorized Inspection Agency; which is,or_may_be used for conversion to an SA, SB, s

(3) the NA Certificate IIolder's Quality Assur-or SFA Specification or allowab!c ASTM Specification ance Program provides for surveillance by the NA b7ilie~ Material Manufacturer or Certificate IIolder.

Certificate IIolder at his subcontractor *s facility dur-ing the brazing operation; (4) the NA Certificate lloider shall be responsi-NCA 3812 Material Manufacturer ble for surveying and accepting the Quality System As used in this Section, the Material Manufacturer Programs of the subcontractor; is an organization which certifies that the material, as 7

(J) the NA Certificate lloider shall assure that defined in NCA-1220, is in compliance with require-the subcontractor uses written procedures and brazing ments of the basic material specification. In addition, operators that have been qualified as required by the the Material Manufacturer performs or supervises and

]

Code; directly controls one or more of the operations which 7

(6) the NA Certificate IIolder shall be responsi-affect the material properties required by the material ble for controlling the quality and for assuring that all specification and verifies the satisfactory completion of materials and parts which are submitted to the inspector for acceptance, including those brazed by subcontractors, conform to all APP cable requirements

- specmeat a li r ms secnon rnay penna cenain specac of this Section.

requirements to be completed later, and any such incomplete items are to be noted.

A

r p

NCA-3000 - RESPONSIDILITIES AND DUTIES NCA 3812-NCA 3853

]

all the requirements of the material specification application to the Society is given in Forms N-70A, performed prior to that certification.

N-70B, and N-70C.8

{c NCA 3813 Material Supplier NCA-3850 GENERAL REQUIREMENTS As used in this Section, the Matenal Supplier is an organization which supplies material produced and NCA-3851 Material Manufacturer certified by Material Manufacturers but does not The Material Manufacturer (NCA-3812) shall es-perform any operations which affect the matenal W

a S

f k dd properties required by the material specificat,on, i

the quality during manufacture or dering other work except when agreed upon by the Certificate Holder which he proposes to perform.

who uses the material in Code construction or when so authorized in a Quality System Certificate (Materials).

The Material Supplier may perform and certify the NCA-3852 Material Supplier results of tests, examinations, repairs, or treatments (a) The Material Supph.er who does not perform required by the material specification or by.this any tests, examinations, or treatments required by this Section which were not performed by the Material Section shall establish a Matenal Identification and Manufacturer as provided in NCA-3852(b).

Verification Program for storage and handling of material. Material Identification and Verification as used in this Section is defined in NCA-4124.

NCA 3820 QUALITY SYSTEM CERTIFICATE (b) The Material Supplier who performs any tests, (MATERIALS) examinations, or treatments required by the matcrial (a) A Material Manufacturer shall hold a Quality specification or by this Section or who subcontracts System Certificate (Materials) issued by the Society these activities shall meet the requirements in this Subarticle for both the Material Manufacturer and the verifying the adequacy of the Material Manufacturer's Quahty System Program. Alternatively, the Material Material Supplier for the activities performed.

Manufacturer shall have his Quality System Program surveyed, qualified, and audited by the Material NCA-3853 Evaluation of the Program i

Supplier, or by the Certificate Ifolder for the items (NCA-3461, NCA-3561, NCA-3661, or NCA-3761).

(a) The Society, when requested by the Material (b) A Material Supplier shall hold a Quality System Manufacturer on Forms N 70A, N-70B, and N-70C Certificate (Materials) issued by the Society verifying will arrange for an evaluation of the applicant's the adequacy of the Material Supplier's Identification Quality System Program. The Program will be evalu-and Verification Program. Alternatively, the Material ated on the basis of its compliance with the applicable Supplier shall have his Identification and Verification material requirements of this Section. The Certificate Program surveyed, qualified, and audited by the which is issued will describe and specify the scope and Certificate lloider for the items (NCA-3461, NCA-limits of work for which the applicant is qualified and 3561, NCA 3661, or NCA-3761). # e'?

e <-

t

.,,:, ill be subjected to a planned audit program by the 1

w (c) Except as provided in NCA-3867.4(e) and Society.

y NCA-3867.4(f), any party performing and certifying (b) The Society when requested by the Material 4

to an operation, process, or to the results of tests, Supplier on Forms N-70A, N-70B, and N-70C will examinations, repairs, or treatments required by the arrange for an evaluation of the applicant's Iden-8 material specification or by this Section shall have a tification and Verification Program. The Program will Quality System Program which shall cover the opera-be evaluated on the basis of its compliance with the tions, processes, or services performed. This Quality applicable material requirements of this Section. The System Program shall be surveyed, qualified, and Certificate which is issued will describe and specify the audited by the Material Manufacturer, Material Sup.

material which the applicant is qualified to su, ' and

{

plier, or Certificate Holder who directly receives the will be subject to a planned audit program by the i

certification of work performed (NCA-3861) except Society.

when the party holds a Quality System Certificate /

(c) When the Material Supplier requests that the (Materials) which covers those operations.

(d) The information to be supplied by the Material

. copies may be obtained from ASME Nuclear Certification,345 Manufacturer or Material Supplier when making East 47th St., New York, NY 10017.

i 31 b

r an w u or. -

io-s c

eu.

m c w m e0eas

,,.c-312 346 0300 p

s. -

t q

n et-6 h InlandSteel

. -r\\

h

pt August 3, 1963 Mr. John Schade

+c U. S. Steel Supply P. O. Box 7310 Chicago, Illinois 60680 I

Dear Sir:

This letter is in reference to a recent shipment of Vide Flange Shapes and the discussion between you and our Product Consultant, J. O'Keefe.

Ihe subject shipment is identified as follows:

Your Order: EC3144548 Our Orders Y 89527 Inland Wide Flange Shapes A36-81a W 10 x 33.0# x 40' It is our understanding that eight pieces out of ten pieces shipped were checked at a job site and web thickness measured between 0.252" and 0.270".

As explained by our Mr. O'Keefe, the web thickness of 0.290" identified with this size is only a theoretical value which can vary within reasonable limits. Although the dimensions of a section are variable, we do produce to a foot weight as designated for that section.

In this case that you are presenting, the other dimensions of the cross section are equally important in evaluating conformance.

The inspector should nake such measurements before asking a judgment on the suitability of application.

[,

In the event that additional information is required on this subject, do not hesitate to contact this office.

Sincerely.

Michael. J. Bajor-j Cen. Supvg. Metallurgist l

L, s-

-Technical Service s

MJB pl q,,

p*

_.