s OPERATING DATA REPOkT DOCKET NO. 50-301 | s OPERATING DATA REPOkT DOCKET NO. 50-301 2 | ||
DATE: | |||
01/23/96 20 h | |||
01 0' | COMPLETED BY: | ||
OO ON | M. | ||
TOO | B. | ||
g y | Koudelka 3P O CO ON TELEPHONE: | ||
22 0' | 414 755-6480 N | ||
: 5. DESIGN ELECTRICAL RATING (NET MWE) : | OPERATING STATUS o. | ||
01 0' | |||
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 | |||
. NOTES OO ON 2. | |||
NA | REPORTING PERIOD: March - 1995 TOO 3. | ||
LICENSED THERMAL POWER (MWT): | |||
1518.5 g y 22 0' | |||
: 4. NAMEPLATE RATING (GROSS MWE). | |||
523.8 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE) : | |||
497.0 6. | |||
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : | |||
509.0. | |||
7. | |||
MAXIMUM DEPENDABLE CAPACITY (NET MWE) : | |||
485.0 8. | |||
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: | |||
NA 9. | |||
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA | |||
: 10. REASONS FOR RESTRICTIONS, (IF ANY) : | : 10. REASONS FOR RESTRICTIONS, (IF ANY) : | ||
NA THIS MONTH | NA THIS MONTH YEAR TO DATE CUMULATIVE i | ||
: 11. HOURS IN REPORTING PERIOD | : 11. HOURS IN REPORTING PERIOD 744.0 2,160.0 198,673.0 | ||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL 683.4 2,014.4 174,066.0 | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS | : 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9 | ||
: 14. HOURS GENERATOR ON LINE | : 14. HOURS GENERATOR ON LINE 607.0 1,933.3 171,628.0 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS | : 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2 | ||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) | : 16. GROSS THERMAL ENERGY GENERATED (MWH) 909449.0 2895326.0 246877251.0 | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED | : 17. GROSS ELECTRICAL ENERGY GENERATED 305910.0 976380.0 83927490.0 | ||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) | : 18. NET ELECTRICAL ENERGY GENERATED (MWH) 290627.0 931075.0 B0011590.0 | ||
: 19. UNIT SERVICE FACTOR | : 19. UNIT SERVICE FACTOR 81.6% | ||
: 20. UNIT AVAILABILITY FACTOR | 89.5% | ||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) | 86.4% | ||
: 22. UNIT CAPACITY FACTOR (USING DER NET) | : 20. UNIT AVAILABILITY FACTOR 81.6% | ||
: 23. UNIT FORCED OUTAGE RATE | 89.5% | ||
86.5% | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 80.5% | |||
88.9% | |||
82.5% | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 78.6% | |||
86.7% | |||
81.0% | |||
: 23. UNIT FORCED OUTAGE RATE 2.3% | |||
0.7% | |||
1.0% | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): | : 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): | ||
Refueling, 09/30/95, 38 days | Refueling, 09/30/95, 38 days | ||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 | NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 | ||
.}} | |||
Latest revision as of 07:32, 13 December 2024
| ML20097D979 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/31/1995 |
| From: | Koudelka M WISCONSIN ELECTRIC POWER CO. |
| To: | |
| Shared Package | |
| ML20097D578 | List: |
| References | |
| NUDOCS 9602130258 | |
| Download: ML20097D979 (1) | |
Text
- _ _ _ _ _ - - _ _ _ _ _ _ _. _ _.
s OPERATING DATA REPOkT DOCKET NO. 50-301 2
DATE:
01/23/96 20 h
COMPLETED BY:
M.
B.
Koudelka 3P O CO ON TELEPHONE:
414 755-6480 N
OPERATING STATUS o.
01 0'
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2
. NOTES OO ON 2.
REPORTING PERIOD: March - 1995 TOO 3.
LICENSED THERMAL POWER (MWT):
1518.5 g y 22 0'
- 4. NAMEPLATE RATING (GROSS MWE).
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE) :
497.0 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
509.0.
7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE) :
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
NA THIS MONTH YEAR TO DATE CUMULATIVE i
- 11. HOURS IN REPORTING PERIOD 744.0 2,160.0 198,673.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 683.4 2,014.4 174,066.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 14. HOURS GENERATOR ON LINE 607.0 1,933.3 171,628.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 909449.0 2895326.0 246877251.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 305910.0 976380.0 83927490.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 290627.0 931075.0 B0011590.0
- 19. UNIT SERVICE FACTOR 81.6%
89.5%
86.4%
- 20. UNIT AVAILABILITY FACTOR 81.6%
89.5%
86.5%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 80.5%
88.9%
82.5%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 78.6%
86.7%
81.0%
- 23. UNIT FORCED OUTAGE RATE 2.3%
0.7%
1.0%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, 09/30/95, 38 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
.