ML20113G510: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20113G510 | | number = ML20113G510 | ||
| issue date = 04/09/1984 | | issue date = 04/09/1984 | ||
| title = Requests Response to Encl Oc Ames | | title = Requests Response to Encl Oc Ames Re Restart of TMI-1 | ||
| author name = Exon J | | author name = Exon J | ||
| author affiliation = SENATE | | author affiliation = SENATE | ||
| Line 12: | Line 12: | ||
| case reference number = FOIA-84-341 | | case reference number = FOIA-84-341 | ||
| document report number = NUDOCS 8501240380 | | document report number = NUDOCS 8501240380 | ||
| title reference date = 04-02-1984 | |||
| package number = ML20113F513 | | package number = ML20113F513 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | ||
| Line 18: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:e s- | {{#Wiki_filter:e s-g-$. JAMQ5 EXCN A tuto r,CRv1 Cts cowwmts: | ||
mcasArKA | |||
**"? : %'in"L*"= | |||
su ss= ATE M ART sustosus wAsmsNotor, p.c. assis | |||
~ | |||
aar PsoER AL sueLoswG Lan cskm. N EBR AS K A 40988 | ,yggg7 aar PsoER AL sueLoswG Lan cskm. N EBR AS K A 40988 WASHINGTON. D.C. 20510 | ||
- 8805 FEDER AL SulLDING | |||
$ M AM A, N E W R A S K A 40181 379 F20ER AL BulLDING M92TM PLATTE, N E BR AS KA $9 01 April 9, 1984 Congressional Liaison Nuclear Regulatory Commission 1717 H Street, N.W. | |||
Washington, D.C. 20505 | Washington, D.C. | ||
20505 | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
I am enclosing a letter from: | I am enclosing a letter from: | ||
Mr. O. C. Ames 4906 Davenport St. | Mr. | ||
Omaha, NE | O. | ||
I would appreciate any information which will enable me to respond to my constituent's inquiry. | C. Ames 4906 Davenport St. | ||
Senator J. James Exon ATTN: Eileen Novotny United States Senate Washington, DC 20510 Cordially, J | Omaha, NE 68132 whose problem appears to f all within your jurisdiction. | ||
J | i I would appreciate any information which will enable me to respond to my constituent's inquiry. | ||
Please return the enclosed correspondence with your report to: | |||
8501240380 840629 PDR FOIA | Senator J. | ||
James Exon ATTN: Eileen Novotny United States Senate Washington, DC 20510 Cordially, J | |||
J a | |||
Ex. | |||
. it States Senator Enclosure 8501240380 840629 PDR FOIA WEISS 84-341 PDR l | |||
* o, e | |||
O. C. AMES 4e06 DAVEh70RT oKARA NEL O /..';, - f, | O. C. AMES 4e06 DAVEh70RT oKARA NEL O /..';, - f, | ||
$,$ &: j ~ | |||
April 2, 1984 The Honorable J. James Eron | April 2, 1984 The Honorable J. James Eron Senate Office Building Washington D. C. | ||
Senate Office Building Washington | 2oS15 TAy does Three rile Island Unit fl still stand idle ? Why does the ERC continue to refuse a re-start 7 This plant was not involved in the accident at TEI-2 and it is time to get it back into power production. | ||
There can be no question of competency. f ter all GPU has been going through, they certainly would not risk anything less than completely qualified operators. | There can be no question of competency. | ||
f ter all GPU has been going through, they certainly would not risk anything less than completely qualified operators. | |||
But the NRO has kept T2I-1 shut down for the past five years, which has caused financial problems to both the company and the stock holders. | But the NRO has kept T2I-1 shut down for the past five years, which has caused financial problems to both the company and the stock holders. | ||
I am a 77 year old retires and only one of many senior sitizens who have invested a large portion of their life savings in GPU common stock for retirement income. We ha ve suffered up to a 55% capital loss in aceket value and f or these past five years we ha va had no dividends. | I am a 77 year old retires and only one of many senior sitizens who have invested a large portion of their life savings in GPU common stock for retirement income. We ha ve suffered up to a 55% capital loss in aceket value and f or these past five years we ha va had no dividends. | ||
Our first need is f or the NRO to ellow a re-start at TEI-1. Te certainly hope it will not be another five years before we get some retern on our investments. | Our first need is f or the NRO to ellow a re-start at TEI-1. Te certainly hope it will not be another five years before we get some retern on our investments. | ||
Ilease help. Please do what you can to get TZI-l back on the line. | Ilease help. Please do what you can to get TZI-l back on the line. | ||
~ | |||
\\ | |||
isny thanks | isny thanks O. C. Ames | ||
O. C. Ames | ~ | ||
l | |||
l}} | .}} | ||
Latest revision as of 00:10, 13 December 2024
| ML20113G510 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/09/1984 |
| From: | Exon J SENATE |
| To: | NRC |
| Shared Package | |
| ML20113F513 | List: |
| References | |
| FOIA-84-341 NUDOCS 8501240380 | |
| Download: ML20113G510 (2) | |
Text
e s-g-$. JAMQ5 EXCN A tuto r,CRv1 Cts cowwmts:
mcasArKA
- "? : %'in"L*"=
su ss= ATE M ART sustosus wAsmsNotor, p.c. assis
~
,yggg7 aar PsoER AL sueLoswG Lan cskm. N EBR AS K A 40988 WASHINGTON. D.C. 20510
- 8805 FEDER AL SulLDING
$ M AM A, N E W R A S K A 40181 379 F20ER AL BulLDING M92TM PLATTE, N E BR AS KA $9 01 April 9, 1984 Congressional Liaison Nuclear Regulatory Commission 1717 H Street, N.W.
Washington, D.C.
20505
Dear Sir or Madam:
I am enclosing a letter from:
Mr.
O.
C. Ames 4906 Davenport St.
Omaha, NE 68132 whose problem appears to f all within your jurisdiction.
i I would appreciate any information which will enable me to respond to my constituent's inquiry.
Please return the enclosed correspondence with your report to:
Senator J.
James Exon ATTN: Eileen Novotny United States Senate Washington, DC 20510 Cordially, J
J a
Ex.
. it States Senator Enclosure 8501240380 840629 PDR FOIA WEISS84-341 PDR l
- o, e
O. C. AMES 4e06 DAVEh70RT oKARA NEL O /..';, - f,
$,$ &: j ~
April 2, 1984 The Honorable J. James Eron Senate Office Building Washington D. C.
2oS15 TAy does Three rile Island Unit fl still stand idle ? Why does the ERC continue to refuse a re-start 7 This plant was not involved in the accident at TEI-2 and it is time to get it back into power production.
There can be no question of competency.
f ter all GPU has been going through, they certainly would not risk anything less than completely qualified operators.
But the NRO has kept T2I-1 shut down for the past five years, which has caused financial problems to both the company and the stock holders.
I am a 77 year old retires and only one of many senior sitizens who have invested a large portion of their life savings in GPU common stock for retirement income. We ha ve suffered up to a 55% capital loss in aceket value and f or these past five years we ha va had no dividends.
Our first need is f or the NRO to ellow a re-start at TEI-1. Te certainly hope it will not be another five years before we get some retern on our investments.
Ilease help. Please do what you can to get TZI-l back on the line.
~
\\
isny thanks O. C. Ames
~
l
.