ENS 40161: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
| event date = 09/16/2003 00:30 EDT | | event date = 09/16/2003 00:30 EDT | ||
| last update date = 11/11/2003 | | last update date = 11/11/2003 | ||
| title = Reactor Coolant System Pressure Increase Caused | | title = Reactor Coolant System Pressure Increase Caused a Valid Signal | ||
| event text = At 1150 hours on 9/15/03 during Reactor Coolant System (RCS) pressure increase to approximately 700 psig, the Core Flood (CF) Tank 1 outlet motor-operated valve (CF1B) opened when the breaker for the valve was closed. Because RCS pressure was not high enough to actuate the pressure switch setpoint of 770 psig to open this valve, it was believed this was an invalid signal, and therefore the valve opening was not reportable under the criteria of 10 CFR50.72 | | event text = At 1150 hours on 9/15/03 during Reactor Coolant System (RCS) pressure increase to approximately 700 psig, the Core Flood (CF) Tank 1 outlet motor-operated valve (CF1B) opened when the breaker for the valve was closed. Because RCS pressure was not high enough to actuate the pressure switch setpoint of 770 psig to open this valve, it was believed this was an invalid signal, and therefore the valve opening was not reportable under the criteria of 10 CFR50.72 | ||
After further review, at 0030 hours on 9/16/03 it was determined the sensed pressure was within the setpoint range of the switch, making this a valid signal to open the valve. The CF Tank pressure at the time (approximately 600 psig) was less than the RCS pressure of approximately 700 psig, therefore no discharge into the RCS occurred, and this event is not reportable per 10 CFR50.72(b)(2)(iv). | After further review, at 0030 hours on 9/16/03 it was determined the sensed pressure was within the setpoint range of the switch, making this a valid signal to open the valve. The CF Tank pressure at the time (approximately 600 psig) was less than the RCS pressure of approximately 700 psig, therefore no discharge into the RCS occurred, and this event is not reportable per 10 CFR50.72(b)(2)(iv). |
Latest revision as of 21:24, 1 March 2018
Where | |
---|---|
Davis Besse Ohio (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+3.77 h0.157 days <br />0.0224 weeks <br />0.00516 months <br />) | |
Opened: | Lewis 08:16 Sep 16, 2003 |
NRC Officer: | John Mackinnon |
Last Updated: | Nov 11, 2003 |
40161 - NRC Website
| |