ENS 40162
From kanterella
Jump to navigation
Jump to search
ENS Event | |
|---|---|
13:18 Sep 16, 2003 | |
| Title | Offsite Notification to Osha at Seabrook Regarding a Fatality |
| Event Description | A contract employee, apparently suffered a heart attack, while in processing for Refueling Outage 09. The employee was treated by the site EMTs and transported to the hospital. It was subsequently reported that the employee passed away. Notification that the employee expired was at 11:03 EST.
The licensee notified OSHA as required for a heart attack fatality. The NRC Resident Inspector was notified. |
| Where | |
|---|---|
| Seabrook New Hampshire (NRC Region 1) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
| Time - Person (Reporting Time:+-0.72 h-0.03 days <br />-0.00429 weeks <br />-9.86256e-4 months <br />) | |
| Opened: | Dana Merrill 12:35 Sep 16, 2003 |
| NRC Officer: | Rich Laura |
| Last Updated: | Sep 16, 2003 |
| 40162 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40162\u003C/a\u003E - \u003Ca href=\"/Seabrook\" title=\"Seabrook\"\u003ESeabrook\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EOffsite Notification to Osha at Seabrook Regarding a Fatality\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40162 - Seabrook\n","link":"","lat":42.89886111111111,"lon":-70.85284722222222,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_40162&oldid=428973"