ENS 40406: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/22/2003 08:27 CST
| event date = 12/22/2003 08:27 CST
| last update date = 12/22/2003
| last update date = 12/22/2003
| title = Reactor Trip Due To Main Turbine Trip
| title = Reactor Trip Due to Main Turbine Trip
| event text = At 0827 on 12/22/2003, Comanche Peak Unit Two (2) tripped due to a turbine trip > 50%.  The turbine trip was caused by ingestion of a small metallic cover plate into the main generator exciter housing, as witnessed by maintenance personnel.  A small fire ensued, which self-extinguished in five (5) minutes.  An Aux Feedwater auto start (ESF actuation) occurred due to normal post-trip steam generator shrink.  The turbine-driven and both motor-driven aux feedwater pumps started as designed.
| event text = At 0827 on 12/22/2003, Comanche Peak Unit Two (2) tripped due to a turbine trip > 50%.  The turbine trip was caused by ingestion of a small metallic cover plate into the main generator exciter housing, as witnessed by maintenance personnel.  A small fire ensued, which self-extinguished in five (5) minutes.  An Aux Feedwater auto start (ESF actuation) occurred due to normal post-trip steam generator shrink.  The turbine-driven and both motor-driven aux feedwater pumps started as designed.
All control rods inserted into the core upon trip.  The local electrical grid is stable.  The number one (1) steam generator atmospheric relief valve cycled as designed upon the secondary pressure transient.
All control rods inserted into the core upon trip.  The local electrical grid is stable.  The number one (1) steam generator atmospheric relief valve cycled as designed upon the secondary pressure transient.

Latest revision as of 22:24, 1 March 2018

ENS 40406 +/-
Where
Comanche Peak Luminant icon.png
Texas (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-2.8 h-0.117 days <br />-0.0167 weeks <br />-0.00384 months <br />)
Opened: Richard Brabec
11:39 Dec 22, 2003
NRC Officer: Jeff Rotton
Last Updated: Dec 22, 2003
40406 - NRC Website
Loading map...