TENNESSEE VALLEY AUTHORITY CH ATTANOOG A, TENNESSEE 37401 400 Chestnut Street Tower II 35 APR I    #;Yeh28,1985 M
TENNESSEE VALLEY AUTHORITY CH ATTANOOG A, TENNESSEE 37401 400 Chestnut Street Tower II
BLRD-5043 8/82-23 BLRD-50439/82-20 U.S. Nuclear Regulatory Cmmission Regton II ATTN: Dr. J. Nelsen Orace , Regiomi Adninistrator 101 Marietta Street , NW Suite 2900 Atlanta, Georgta 30323
#;Yeh28,1985 I
35 APR M
BLRD-5043 8/82-23 BLRD-50439/82-20 U.S. Nuclear Regulatory Cmmission Regton II ATTN:
Dr. J. Nelsen Orace, Regiomi Adninistrator 101 Marietta Street, NW Suite 2900 Atlanta, Georgta 30323


==Dear Dr. Grace:==
==Dear Dr. Grace:==
 
BELLEFmTE NUCLEAR PLANT WITS 1 AND 2 - DEFICIENCIES FOUND BY OIE BULLETIN 79-118 INSPECTION PIOGRAM - BLRD-50438/82-23, BLRD-50439/82-20 THIRD INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector Don Quick on March 1, 1982 in accordance with 10 TR 50.55(e) as NCR BLN GB 8202. This was followed by our interim reporta dated March 30, 1982 and Atgust 5, 1933 Encimod is our third interim report. We expect to sutnit our next report on unit 1 on cr about March 28, 1986.
BELLEFmTE NUCLEAR PLANT WITS 1 AND 2 - DEFICIENCIES FOUND BY OIE BULLETIN 79-118 INSPECTION PIOGRAM - BLRD-50438/82-23, BLRD-50439/82-20 THIRD INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector Don Quick on March 1,             1982 in accordance with 10 TR 50.55(e) as NCR BLN GB 8202. This was followed by our interim reporta dated March 30, 1982 and Atgust 5, 1933 Encimod is our third interim report. We expect to sutnit our next report on unit 1 on cr about March 28, 1986.
If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.
If you have any questions , please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours,
Very truly yours ,
TENNSSSEE VALLEY AUrHORITY
TENNSSSEE VALLEY AUrHORITY
                                                                          ///{Y               k,/
///{Y k,/
J. W . Hufham , Mam ger Licensing and Regulations Enclos ure oc: Mr. James Taylor, Director (Enclosure)
J. W. Hufham, Mam ger Licensing and Regulations Enclos ure oc:
Office of Inspection and Enforcement U.S. Nuclear Regulatory Ccumission Washt ngton , D.C . 20555 Records Center Inatitute of Nuclear Power Operations                   ,
Mr. James Taylor, Director (Enclosure)
1100 Circie 75 Parkway, Sulte 1500 Atlanta, Georsta 30339 S Dif fCK0 030320       05000430 PDR fc)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Ccumission Washt ngton, D.C. 20555 Records Center Inatitute of Nuclear Power Operations 1100 Circie 75 Parkway, Sulte 1500 Atlanta, Georsta 30339 Dif fCK0 030320 05000430 S
                                                                                                      -  iI 1
PDR fc) 1 iI
                            - - - - - -            ^ " ' *" ' o ~ " " " " * '* " "1
^ " ' *" ' o ~ " " " " * '* " "1


ENCI.0S URE BELLEFGTE NUCLEAR PLANr UNITS 1 AND 2 DEFICIENCIES FOUND BY OIE BILLETIN 79-14 MSPECTIm PlumAM 10 7R 50.55(e)
ENCI.0S URE BELLEFGTE NUCLEAR PLANr UNITS 1 AND 2 DEFICIENCIES FOUND BY OIE BILLETIN 79-14 MSPECTIm PlumAM 10 7R 50.55(e)
BLRD-50-438/82-23, BLRD-50-439/82-20 E                                          NG BLN GB 8202 THIRD INERIM IEPORT Description of Deficiency U.S. Nuclear Regulatory Ccamission, OIE hlletin 79-14,' addresses the concern that installed piping systens including the supports were not in confonnance with design documents. The bulletin requires that steps be taken to ensure the seismic analysis accurately reflects the as-constructed configuration. Spot inspections of as-constructed piping systems against aralysis isometries have identified discrepancies that warrant resolution.
BLRD-50-438/82-23, BLRD-50-439/82-20 NG BLN GB 8202 E
THIRD INERIM IEPORT Description of Deficiency U.S. Nuclear Regulatory Ccamission, OIE hlletin 79-14,' addresses the concern that installed piping systens including the supports were not in confonnance with design documents. The bulletin requires that steps be taken to ensure the seismic analysis accurately reflects the as-constructed configuration. Spot inspections of as-constructed piping systems against aralysis isometries have identified discrepancies that warrant resolution.
Interim Prcutress TVA is continuing to implement the 79-14 program plan outlined in our first report on this deficiency. WA anticipates that the inspection program will continue until the time period inmediately beforeo fuel load. At that time, we will present our report on the results of the inspection program and our disposition of IE Bulletin 79-14 We currently project sutnittal of the unit I report on a about March 28, 1936.
Interim Prcutress TVA is continuing to implement the 79-14 program plan outlined in our first report on this deficiency. WA anticipates that the inspection program will continue until the time period inmediately beforeo fuel load. At that time, we will present our report on the results of the inspection program and our disposition of IE Bulletin 79-14 We currently project sutnittal of the unit I report on a about March 28, 1936.
i l
i l
I
I
                  %w}}
%w}}

Latest revision as of 22:31, 12 December 2024

Third Interim Rept Re Nonconformance of Installed Piping Sys W/Design Documents Per IE Bulletin 79-14.Initially Reported on 820301.Insps Continuing.Next Rept for Unit 1 Will Be Submitted by 860328
ML20116F897
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 03/28/1985
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-14, NUDOCS 8505010290
Download: ML20116F897 (2)


Text

--___

1*

TENNESSEE VALLEY AUTHORITY CH ATTANOOG A, TENNESSEE 37401 400 Chestnut Street Tower II

  1. Yeh28,1985 I

35 APR M

BLRD-5043 8/82-23 BLRD-50439/82-20 U.S. Nuclear Regulatory Cmmission Regton II ATTN:

Dr. J. Nelsen Orace, Regiomi Adninistrator 101 Marietta Street, NW Suite 2900 Atlanta, Georgta 30323

Dear Dr. Grace:

BELLEFmTE NUCLEAR PLANT WITS 1 AND 2 - DEFICIENCIES FOUND BY OIE BULLETIN 79-118 INSPECTION PIOGRAM - BLRD-50438/82-23, BLRD-50439/82-20 THIRD INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector Don Quick on March 1, 1982 in accordance with 10 TR 50.55(e) as NCR BLN GB 8202. This was followed by our interim reporta dated March 30, 1982 and Atgust 5, 1933 Encimod is our third interim report. We expect to sutnit our next report on unit 1 on cr about March 28, 1986.

If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours,

TENNSSSEE VALLEY AUrHORITY

///{Y k,/

J. W. Hufham, Mam ger Licensing and Regulations Enclos ure oc:

Mr. James Taylor, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Ccumission Washt ngton, D.C. 20555 Records Center Inatitute of Nuclear Power Operations 1100 Circie 75 Parkway, Sulte 1500 Atlanta, Georsta 30339 Dif fCK0 030320 05000430 S

PDR fc) 1 iI

^ " ' *" ' o ~ " " " " * '* " "1

ENCI.0S URE BELLEFGTE NUCLEAR PLANr UNITS 1 AND 2 DEFICIENCIES FOUND BY OIE BILLETIN 79-14 MSPECTIm PlumAM 10 7R 50.55(e)

BLRD-50-438/82-23, BLRD-50-439/82-20 NG BLN GB 8202 E

THIRD INERIM IEPORT Description of Deficiency U.S. Nuclear Regulatory Ccamission, OIE hlletin 79-14,' addresses the concern that installed piping systens including the supports were not in confonnance with design documents. The bulletin requires that steps be taken to ensure the seismic analysis accurately reflects the as-constructed configuration. Spot inspections of as-constructed piping systems against aralysis isometries have identified discrepancies that warrant resolution.

Interim Prcutress TVA is continuing to implement the 79-14 program plan outlined in our first report on this deficiency. WA anticipates that the inspection program will continue until the time period inmediately beforeo fuel load. At that time, we will present our report on the results of the inspection program and our disposition of IE Bulletin 79-14 We currently project sutnittal of the unit I report on a about March 28, 1936.

i l

I

%w