ENS 43128: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 01/27/2007 20:40 EST | | event date = 01/27/2007 20:40 EST | ||
| last update date = 01/28/2007 | | last update date = 01/28/2007 | ||
| title = Automatic Reactor Trip Due | | title = Automatic Reactor Trip Due to Loss of Load Transient Caused by Ehc Problem | ||
| event text = On January 27, 2007 at approximately 2040 hours an automatic reactor trip occurred. The cause of the trip was Over Temperature Delta T (2/4). All systems functioned as designed. All control rods inserted on the trip. Decay heat removal is via condenser steam dump and Auxiliary Feedwater. | | event text = On January 27, 2007 at approximately 2040 hours an automatic reactor trip occurred. The cause of the trip was Over Temperature Delta T (2/4). All systems functioned as designed. All control rods inserted on the trip. Decay heat removal is via condenser steam dump and Auxiliary Feedwater. | ||
The initial cause of the trip appears to be from a loss of load due to a turbine electro-hydraulic system issue. This is still under investigation. | The initial cause of the trip appears to be from a loss of load due to a turbine electro-hydraulic system issue. This is still under investigation. |
Latest revision as of 22:17, 1 March 2018
Where | |
---|---|
Ginna ![]() New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-1.63 h-0.0679 days <br />-0.0097 weeks <br />-0.00223 months <br />) | |
Opened: | Kevin Mclaughlin 00:02 Jan 28, 2007 |
NRC Officer: | Steve Sandin |
Last Updated: | Jan 28, 2007 |
43128 - NRC Website
| |