ENS 43169: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 02/15/2007 16:54 EST
| event date = 02/15/2007 16:54 EST
| last update date = 02/15/2007
| last update date = 02/15/2007
| title = Unit 1 And Unit 2 Reactor Trip
| title = Unit 1 and Unit 2 Reactor Trip
| event text = At 1654 EST on 2-15-07, Oconee Units 1 & 2 tripped from 100% power.  The cause of the trips is under investigation.  Unit 1 experienced a partial loss of 4160 volt power [Non-Safety Related] which resulted in a loss of Main Feedwater.  Emergency Feedwater started on Unit 1.  Unit 2 remained on Main Feedwater.  Reactor Coolant Pump power was not affected by the trip on either Unit.  Post trip equipment response on Unit 2 was normal. On Unit 1, a second HPI pump auto-started due to a non-safety low seal flow signal [one normally running for normal RCS makeup].
| event text = At 1654 EST on 2-15-07, Oconee Units 1 & 2 tripped from 100% power.  The cause of the trips is under investigation.  Unit 1 experienced a partial loss of 4160 volt power [Non-Safety Related] which resulted in a loss of Main Feedwater.  Emergency Feedwater started on Unit 1.  Unit 2 remained on Main Feedwater.  Reactor Coolant Pump power was not affected by the trip on either Unit.  Post trip equipment response on Unit 2 was normal. On Unit 1, a second HPI pump auto-started due to a non-safety low seal flow signal [one normally running for normal RCS makeup].
Units 1 & 2 have been stabilized in Mode 3.  Restoration of 4160 volt loads on Unit 1 is in progress.
Units 1 & 2 have been stabilized in Mode 3.  Restoration of 4160 volt loads on Unit 1 is in progress.

Latest revision as of 22:17, 1 March 2018

ENS 43169 +/-
Where
Oconee Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-2.9 h-0.121 days <br />-0.0173 weeks <br />-0.00397 months <br />)
Opened: Rob Meixell
19:00 Feb 15, 2007
NRC Officer: Jeff Rotton
Last Updated: Feb 15, 2007
43169 - NRC Website