ENS 44719: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/14/2008 17:14 CST
| event date = 12/14/2008 17:14 CST
| last update date = 12/14/2008
| last update date = 12/14/2008
| title = Manual Reactor Trip Due To Electrical Fault On An Operating Condensate Pump
| title = Manual Reactor Trip Due to Electrical Fault on an Operating Condensate Pump
| event text = Callaway Plant was at 98% power with two condensate pumps in service.  At 1714 on 12-14-08, the reactor was manually tripped due to a motor ground fault on the 'B' condensate pump. The 'C' condensate pump was not available for service [See EN #44714]. This left only one condensate pump available so the reactor was manually tripped.  The plant is in mode 3 and stable.  Reactor trip procedures have been implemented and exited and normal operating procedures are in progress at this time.  All safety systems actuated as designed. All control rods inserted during the trip. Offsite power is available and powering safety loads. There is no primary to secondary leakage. Decay heat is being removed via steam dumps to the condenser with makeup provided by Auxiliary Feedwater to the steam generators. The standby diesel generators and safety systems are available. The NRC Senior Resident Inspector has been notified.
| event text = Callaway Plant was at 98% power with two condensate pumps in service.  At 1714 on 12-14-08, the reactor was manually tripped due to a motor ground fault on the 'B' condensate pump. The 'C' condensate pump was not available for service [See EN #44714]. This left only one condensate pump available so the reactor was manually tripped.  The plant is in mode 3 and stable.  Reactor trip procedures have been implemented and exited and normal operating procedures are in progress at this time.  All safety systems actuated as designed. All control rods inserted during the trip. Offsite power is available and powering safety loads. There is no primary to secondary leakage. Decay heat is being removed via steam dumps to the condenser with makeup provided by Auxiliary Feedwater to the steam generators. The standby diesel generators and safety systems are available. The NRC Senior Resident Inspector has been notified.
| URL = http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2008/20081215en.html#en44719
| URL = http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2008/20081215en.html#en44719

Latest revision as of 21:13, 1 March 2018

ENS 44719 +/-
Where
Callaway Ameren icon.png
Missouri (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-2.6 h-0.108 days <br />-0.0155 weeks <br />-0.00356 months <br />)
Opened: Fred Bianco
20:38 Dec 14, 2008
NRC Officer: Howie Crouch
Last Updated: Dec 14, 2008
44719 - NRC Website
Loading map...