Line 16: Line 16:
| event date = 04/16/2009 18:28 CDT
| event date = 04/16/2009 18:28 CDT
| last update date = 04/16/2009
| last update date = 04/16/2009
| title = Reactor Shutdown Required By Technical Specifications
| title = Reactor Shutdown Required by Technical Specifications
| event text = At 1828 [CDT] on 4/16/09, it was discovered that the procedure for calibrating Low Steam Line Pressure Safety Injection Lead/Lag units may not ensure that the Tech Spec setpoint requirements were met.  Calibration methodology used a ratio of lead over lag time constants to determine acceptance criteria.  KPS [Kewaunee Power Station] Tech Specs Table 3.5-1 item 4 requires that the lead and lag time constants have individual ESF initiation instrument setting limits.  When the error was discovered, data was reviewed from the most recent calibrations of the pressure channels.  While the ratios met acceptance criteria per the calibration procedure, the individual lag time constants did not meet acceptance criteria per Tech Specs.  Per TS Table 3.5-3 item 1c, all channels of the Low Steam Pressure/Line Safety Injection signal were declared inoperable.  Per KPS Tech Spec 3.5.c., the plant must be placed in Hot Shutdown, as soon as practicable.   
| event text = At 1828 [CDT] on 4/16/09, it was discovered that the procedure for calibrating Low Steam Line Pressure Safety Injection Lead/Lag units may not ensure that the Tech Spec setpoint requirements were met.  Calibration methodology used a ratio of lead over lag time constants to determine acceptance criteria.  KPS [Kewaunee Power Station] Tech Specs Table 3.5-1 item 4 requires that the lead and lag time constants have individual ESF initiation instrument setting limits.  When the error was discovered, data was reviewed from the most recent calibrations of the pressure channels.  While the ratios met acceptance criteria per the calibration procedure, the individual lag time constants did not meet acceptance criteria per Tech Specs.  Per TS Table 3.5-3 item 1c, all channels of the Low Steam Pressure/Line Safety Injection signal were declared inoperable.  Per KPS Tech Spec 3.5.c., the plant must be placed in Hot Shutdown, as soon as practicable.   
Negative reactivity insertion began at 2004 [CDT] on 4/16/09.  Therefore, this is reportable under 10 CFR 50.72(b)(2)(i) 'Initiation of a shutdown required by Tech Specs.'  Since both trains of Steam Line Low Pressure SI channels are affected this is also reportable under 10 CFR 50.72(b)(3)(ii)(B) 'any event or condition that results in the nuclear plant being in an unanalyzed condition that significantly degrades plant safety' and 10 CFR 50.72(b)(3)(v)(D) 'any event or condition that at the time of discovery could have prevented the fulfillment of the safety function of structures or systems that are needed to mitigate the consequences of an accident.'
Negative reactivity insertion began at 2004 [CDT] on 4/16/09.  Therefore, this is reportable under 10 CFR 50.72(b)(2)(i) 'Initiation of a shutdown required by Tech Specs.'  Since both trains of Steam Line Low Pressure SI channels are affected this is also reportable under 10 CFR 50.72(b)(3)(ii)(B) 'any event or condition that results in the nuclear plant being in an unanalyzed condition that significantly degrades plant safety' and 10 CFR 50.72(b)(3)(v)(D) 'any event or condition that at the time of discovery could have prevented the fulfillment of the safety function of structures or systems that are needed to mitigate the consequences of an accident.'

Latest revision as of 22:12, 1 March 2018

ENS 44994 +/-
Where
Kewaunee Dominion icon.png
Wisconsin (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown

10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition

10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
Time - Person (Reporting Time:+-0.92 h-0.0383 days <br />-0.00548 weeks <br />-0.00126 months <br />)
Opened: Brad Gauger
22:33 Apr 16, 2009
NRC Officer: Mark Abramovitz
Last Updated: Apr 16, 2009
44994 - NRC Website