ENS 45467: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
| event date = 10/26/2009 10:50 CDT
| event date = 10/26/2009 10:50 CDT
| last update date = 11/18/2009
| last update date = 11/18/2009
| title = Pressurizer And Feedwater Storage Tank Level Indications Do Not Meet Appendix R Requirements
| title = Pressurizer and Feedwater Storage Tank Level Indications Do Not Meet Appendix R Requirements
| event text = During a review in preparation for converting from 10 CFR 50 Appendix R to NFPA 805, it was discovered that all of the cables for pressurizer and emergency feedwater storage tank level indications did not meet Appendix R cable requirements. A fire in Corridor 4, Corridor 26, or in Room 6 could result in a failure of level indication for these critical components. Corridors 4 and 26 were adequately addressed by existing fire watches. A fire watch was established for Room 6 upon discovery of this condition. Pressurizer level and emergency feedwater storage tank level indicators currently meet their requirements, with the established fire watches.
| event text = During a review in preparation for converting from 10 CFR 50 Appendix R to NFPA 805, it was discovered that all of the cables for pressurizer and emergency feedwater storage tank level indications did not meet Appendix R cable requirements. A fire in Corridor 4, Corridor 26, or in Room 6 could result in a failure of level indication for these critical components. Corridors 4 and 26 were adequately addressed by existing fire watches. A fire watch was established for Room 6 upon discovery of this condition. Pressurizer level and emergency feedwater storage tank level indicators currently meet their requirements, with the established fire watches.
The licensee notified the NRC Resident Inspector.
The licensee notified the NRC Resident Inspector.

Latest revision as of 22:10, 1 March 2018

ENS 45467 +/- *RETRACTED*
Where
Ft Calhoun Omaha Public Power District icon.png
Nebraska (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
Time - Person (Reporting Time:+-3.05 h-0.127 days <br />-0.0182 weeks <br />-0.00418 months <br />)
Opened: Erick Matzke
12:47 Oct 26, 2009
NRC Officer: Karl Diederich
Last Updated: Nov 18, 2009
45467 - NRC Website
Loading map...