ENS 48976: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 04/26/2013 13:54 EDT
| event date = 04/26/2013 13:54 EDT
| last update date = 04/26/2013
| last update date = 04/26/2013
| title = Diaphragms May Not Be Qualified For Specific Radiation Design Conditions
| title = Diaphragms May Not Be Qualified for Specific Radiation Design Conditions
| event text = The following report was received from ITT Engineered Valves, LLC via facsimile:
| event text = The following report was received from ITT Engineered Valves, LLC via facsimile:
It is my duty as the Responsible Officer of ITT Engineered Valves, LLC (ITT) to inform the Nuclear Regulatory Commission of a defect with certain items of our nuclear diaphragm valve product line which may be considered Basic Components. The components are ITT's Nuclear M1 diaphragms, sizes 3 inch and 4 inch that may have been sold to certain customers for specific design conditions. The defect does not affect all 3 inch and 4 inch M1 diaphragms that have been sold. It only applies to those that were sold for a particular service condition of Code Case N31 (250?F and 220 psi with 40 year radiation exposure of 1E8 Rad).
It is my duty as the Responsible Officer of ITT Engineered Valves, LLC (ITT) to inform the Nuclear Regulatory Commission of a defect with certain items of our nuclear diaphragm valve product line which may be considered Basic Components. The components are ITT's Nuclear M1 diaphragms, sizes 3 inch and 4 inch that may have been sold to certain customers for specific design conditions. The defect does not affect all 3 inch and 4 inch M1 diaphragms that have been sold. It only applies to those that were sold for a particular service condition of Code Case N31 (250?F and 220 psi with 40 year radiation exposure of 1E8 Rad).

Latest revision as of 22:01, 1 March 2018

ENS 48976 +/-
Where
Itt Engineered Valves, Llc
Lancaster, Pennsylvania (NRC Region 1)
Organization: Itt Engineered Valves, Llc
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+-0.48 h-0.02 days <br />-0.00286 weeks <br />-6.57504e-4 months <br />)
Opened: Stephen Dononhue
17:25 Apr 26, 2013
NRC Officer: Bill Huffman
Last Updated: Apr 26, 2013
48976 - NRC Website