ENS 49637: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/16/2013 14:54 CST
| event date = 12/16/2013 14:54 CST
| last update date = 12/17/2013
| last update date = 12/17/2013
| title = Loss Of Containment Smoke Detection Capability
| title = Loss of Containment Smoke Detection Capability
| event text = At 1454 CST on December 16, 2013, the Unit 1 pyro panel (smoke detection panel) was declared non-functional due to an unexpected failure.  Viable compensatory measures have been established for all affected areas except the Unit 1 Containment Building.  Since a fire in Containment is an entry condition for the site's Emergency Plan, this is considered a loss of emergency assessment capability and is being reported per 10CFR50.72(b)(3)(xiii).  Containment temperatures are being monitored while the pyro panel is out of service, however, this is not considered a satisfactory compensatory measure for maintaining effective assessment capability.
| event text = At 1454 CST on December 16, 2013, the Unit 1 pyro panel (smoke detection panel) was declared non-functional due to an unexpected failure.  Viable compensatory measures have been established for all affected areas except the Unit 1 Containment Building.  Since a fire in Containment is an entry condition for the site's Emergency Plan, this is considered a loss of emergency assessment capability and is being reported per 10CFR50.72(b)(3)(xiii).  Containment temperatures are being monitored while the pyro panel is out of service, however, this is not considered a satisfactory compensatory measure for maintaining effective assessment capability.
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.

Latest revision as of 21:52, 1 March 2018

ENS 49637 +/-
Where
Farley Southern Nuclear icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+0.72 h0.03 days <br />0.00429 weeks <br />9.86256e-4 months <br />)
Opened: Darrin Gard
21:37 Dec 16, 2013
NRC Officer: Daniel Mills
Last Updated: Dec 17, 2013
49637 - NRC Website
Loading map...