ENS 49979: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 04/01/2014 00:26 EDT
| event date = 04/01/2014 00:26 EDT
| last update date = 04/01/2014
| last update date = 04/01/2014
| title = Automatic Reactor Trip Due To Electrical Issue
| title = Automatic Reactor Trip Due to Electrical Issue
| event text = At 0026 on 04/01/2014, following the turbine shutdown and removal of the main generator from service in preparation for refueling outage 16, Seabrook had a reactor trip and all control rods were fully inserted. The trip was caused by an electrical issue that caused 345 KV bus 6 to deenergize and power was lost to the Unit Auxiliary Transformers (UATs). The in-house busses transferred to the Reserve Auxiliary Transformer (RAT) supplies and the momentary loss of power to in-house Bus 1 caused 2 reactor coolant pumps to trip, generating a 2 loop loss of flow reactor trip signal. The exact cause of the initiating electrical issue is being investigated.
| event text = At 0026 on 04/01/2014, following the turbine shutdown and removal of the main generator from service in preparation for refueling outage 16, Seabrook had a reactor trip and all control rods were fully inserted. The trip was caused by an electrical issue that caused 345 KV bus 6 to deenergize and power was lost to the Unit Auxiliary Transformers (UATs). The in-house busses transferred to the Reserve Auxiliary Transformer (RAT) supplies and the momentary loss of power to in-house Bus 1 caused 2 reactor coolant pumps to trip, generating a 2 loop loss of flow reactor trip signal. The exact cause of the initiating electrical issue is being investigated.
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.

Latest revision as of 21:51, 1 March 2018

ENS 49979 +/-
Where
Seabrook NextEra Energy icon.png
New Hampshire (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+-1.7 h-0.0708 days <br />-0.0101 weeks <br />-0.00233 months <br />)
Opened: Paul Dunden
02:44 Apr 1, 2014
NRC Officer: Charles Teal
Last Updated: Apr 1, 2014
49979 - NRC Website
Loading map...