ENS 49979: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 04/01/2014 00:26 EDT | | event date = 04/01/2014 00:26 EDT | ||
| last update date = 04/01/2014 | | last update date = 04/01/2014 | ||
| title = Automatic Reactor Trip Due | | title = Automatic Reactor Trip Due to Electrical Issue | ||
| event text = At 0026 on 04/01/2014, following the turbine shutdown and removal of the main generator from service in preparation for refueling outage 16, Seabrook had a reactor trip and all control rods were fully inserted. The trip was caused by an electrical issue that caused 345 KV bus 6 to deenergize and power was lost to the Unit Auxiliary Transformers (UATs). The in-house busses transferred to the Reserve Auxiliary Transformer (RAT) supplies and the momentary loss of power to in-house Bus 1 caused 2 reactor coolant pumps to trip, generating a 2 loop loss of flow reactor trip signal. The exact cause of the initiating electrical issue is being investigated. | | event text = At 0026 on 04/01/2014, following the turbine shutdown and removal of the main generator from service in preparation for refueling outage 16, Seabrook had a reactor trip and all control rods were fully inserted. The trip was caused by an electrical issue that caused 345 KV bus 6 to deenergize and power was lost to the Unit Auxiliary Transformers (UATs). The in-house busses transferred to the Reserve Auxiliary Transformer (RAT) supplies and the momentary loss of power to in-house Bus 1 caused 2 reactor coolant pumps to trip, generating a 2 loop loss of flow reactor trip signal. The exact cause of the initiating electrical issue is being investigated. | ||
The NRC Resident Inspector has been notified. | The NRC Resident Inspector has been notified. |
Latest revision as of 21:51, 1 March 2018
Where | |
---|---|
Seabrook ![]() New Hampshire (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-1.7 h-0.0708 days <br />-0.0101 weeks <br />-0.00233 months <br />) | |
Opened: | Paul Dunden 02:44 Apr 1, 2014 |
NRC Officer: | Charles Teal |
Last Updated: | Apr 1, 2014 |
49979 - NRC Website
| |