ENS 50798: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 08/25/2014 08:00 EST
| event date = 08/25/2014 08:00 EST
| last update date = 02/09/2015
| last update date = 02/09/2015
| title = Breakdown In The Quality Assurance Program For Vogtle 3&4 Construction Project
| title = Breakdown in the Quality Assurance Program for Vogtle 3&4 Construction Project
| event text = This is a 10 CFR 50.55  initial notification for a significant breakdown in the Quality Assurance (QA) Program of Chicago Bridge & Iron (CB&I), an agent for the Licensee of the Vogtle 3&4 Construction Project.  
| event text = This is a 10 CFR 50.55  initial notification for a significant breakdown in the Quality Assurance (QA) Program of Chicago Bridge & Iron (CB&I), an agent for the Licensee of the Vogtle 3&4 Construction Project.  
In August 2014, deviations were found in sub-modules CA03-06, -08, and -09, which initiated the discovery and evaluation processes for both Part 21 and 10 CFR 50.55 . The conditions were determined to be not reportable by CB&I under 10 CFR 21, but an evaluation of the root cause analysis results concluded that a significant QA program breakdown had occurred that could have produced a defect. No defect has been identified.
In August 2014, deviations were found in sub-modules CA03-06, -08, and -09, which initiated the discovery and evaluation processes for both Part 21 and 10 CFR 50.55 . The conditions were determined to be not reportable by CB&I under 10 CFR 21, but an evaluation of the root cause analysis results concluded that a significant QA program breakdown had occurred that could have produced a defect. No defect has been identified.

Latest revision as of 20:48, 1 March 2018

ENS 50798 +/-
Where
Vogtle Southern Nuclear icon.png
Georgia (NRC Region 2)
Reporting
10 CFR 50.55(e)
Time - Person (Reporting Time:+4029.6 h167.9 days <br />23.986 weeks <br />5.52 months <br />)
Opened: Frederick Willis
11:36 Feb 9, 2015
NRC Officer: Jeff Herrera
Last Updated: Feb 9, 2015
50798 - NRC Website
Loading map...