ENS Event | |
|---|---|
13:00 Sep 24, 2013 | |
| Title | Deficiency Identified in Quality Assurance Program |
| Event Description | This is a 10 CFR 50.55(e) initial notification for a significant breakdown in the Quality Assurance (QA) Program of Chicago Bridge & Iron (CB&I) Lake Charles facility, a sub-supplier of CB&I. CB&I Lake Charles supplies safety-related structural sub-modules for the Vogtle 3 & 4 construction project.
In September 2013, CB&I Lake Charles issued a root cause analysis report for deviations associated with sub-modules being supplied to domestic AP1000 construction projects. An evaluation of the root cause analysis results concluded that a significant QA program breakdown had occurred that could have produced a defect. No defect has been identified. This initial notification is being made in accordance with 10 CFR 50.55(e)(4)(iii) and 10 CFR 50.55(e)(5)(i). The licensee will notify the NRC Resident Inspector. Reference similar Summer Event (EN#49582). |
| Where | |
|---|---|
| Vogtle Georgia (NRC Region 2) | |
| Reporting | |
| 10 CFR 50.55(e) | |
| Time - Person (Reporting Time:+1655.87 h68.995 days <br />9.856 weeks <br />2.268 months <br />) | |
| Opened: | Howard Mahan 13:52 Dec 2, 2013 |
| NRC Officer: | Vince Klco |
| Last Updated: | Dec 2, 2013 |
| 49595 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 49595\u003C/a\u003E - \u003Ca href=\"/Vogtle\" title=\"Vogtle\"\u003EVogtle\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EDeficiency Identified in Quality Assurance Program\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 49595 - Vogtle\n","link":"","lat":33.13062222222222,"lon":-81.77135277777778,"icon":"/w/images/1/14/Southern_Nuclear_icon.png"}],"imageoverlays":null} | |
Unit 3 | |
|---|---|
| Reactor critical | Not Critical |
| Scram | No |
| Before | Under Construction (0 %) |
| After | Under Construction (0 %) |
Unit 4 | |
|---|---|
| Reactor critical | Not Critical |
| Scram | No |
| Before | Under Construction (0 %) |
| After | Under Construction (0 %) |
WEEKMONTHYEARENS 553282021-06-24T04:00:00024 June 2021 04:00:00
[Table view]10 CFR 50.55(e) 10 Cfr 50.55(E) Report Regarding Electrical Construction and Measuring and Test Equipment Control ENS 507982014-08-25T13:00:00025 August 2014 13:00:00 10 CFR 50.55(e) Breakdown in the Quality Assurance Program for Vogtle 3&4 Construction Project ENS 504412014-03-13T12:00:00013 March 2014 12:00:00 10 CFR 50.55(e) Welding Program Deviations During Construction ENS 495952013-09-24T13:00:00024 September 2013 13:00:00 10 CFR 50.55(e) Deficiency Identified in Quality Assurance Program ENS 489062012-12-06T12:00:0006 December 2012 12:00:00 10 CFR 50.55(e) Failure to Comply with Conditions of Construction Permit 2021-06-24T04:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_49595&oldid=422648"