March 31, 1997 Florida Power Corporation Crystal River Energy Complex Mr. Roy A. Anderson (SA2A)
March 31, 1997 Florida Power Corporation Crystal River Energy Complex Mr. Roy A. Anderson (SA2A)
Sr. VP. Nuclear Operations ATTN: Mgr., Nuclear Licensing 15760 West Power Line Street Crystal River. FL 34428-5708
Sr. VP. Nuclear Operations ATTN:
Mgr., Nuclear Licensing 15760 West Power Line Street Crystal River. FL 34428-5708


==SUBJECT:==
==SUBJECT:==
Line 24: Line 25:


==SUMMARY==
==SUMMARY==
:      MANUAL CHAPTER 0350 RESTART PANEL CRYSTAL RIVER - DOCKET NO. 50-302
MANUAL CHAPTER 0350 RESTART PANEL CRYSTAL RIVER - DOCKET NO. 50-302


==Dear Mr. Anderson:==
==Dear Mr. Anderson:==
i This refers to the meeting held March 21, 1997. in your Training Center.                                                   ,
i This refers to the meeting held March 21, 1997. in your Training Center.
Enclosed is a list of attendees, your briefing slides, your list of planned                                               !
Enclosed is a list of attendees, your briefing slides, your list of planned license amendments end technical specification changes, and a copy of your Restart Detail Schecule.
license amendments end technical specification changes, and a copy of your                                                 ;
The purpose of the meeting was to discuss related items on the NRC Manual Chapter 0350 restart matrix related to the resolution of technical and engineering issues and to reach a better understanding of your major milestones for recovery.
Restart Detail Schecule.
The discussions included the following topics:
The purpose of the meeting was to discuss related items on the NRC Manual Chapter 0350 restart matrix related to the resolution of technical and engineering issues and to reach a better understanding of your major milestones for recovery. The discussions included the following topics:
Restart Status. Performance Indicators. Resolution of Design Issues. System Readiness Review Resolution of Emergent Issues. MCAP II Update and Closure of i
Restart Status. Performance Indicators. Resolution of Design Issues. System                                               ,
MC 0350 Items.
Readiness Review Resolution of Emergent Issues. MCAP II Update and Closure of                                             i MC 0350 Items.                                                                                                               I In accordance with Section 2.790 of NRC's " Rules of Practice. "Part 2.
In accordance with Section 2.790 of NRC's " Rules of Practice. "Part 2.
Title 10 Code of Federal Regulations, a co)y of tr ; letter and its enclosures will be placed in the NRC Public Document loom.
Title 10 Code of Federal Regulations, a co)y of tr ; letter and its enclosures will be placed in the NRC Public Document loom.
Should you have any questions concerning this letter, please contact us.                                                     ,
Should you have any questions concerning this letter, please contact us.
Sincerely.                                         l l
Sincerely.
Orig signed by Johns P. Jaudon                         j Johns P. Jaudon. Director Division of Reactor Safety Docket No. 50-302 License Nos. DPR-72
Orig signed by Johns P. Jaudon j
Johns P. Jaudon. Director Division of Reactor Safety Docket No. 50-302 License Nos. DPR-72


==Enclosures:==
==Enclosures:==
: 1. List of Attendees                                                                           \
1.
: 2. FPC Briefing Slides
List of Attendees
: 3. License Amendments and Tech Spec Changes                                                       I g.RestartDetailSchedule 0FFICIAL COPY DO            O2
\\
                                                                                                            @-@W N               4 P                   PDR
2.
                                                                                                                          @ '/5~ !
FPC Briefing Slides 3.
License Amendments and Tech Spec Changes I
g.RestartDetailSchedule 0FFICIAL COPY
@-@W N
4 DO O2 P
PDR
@ '/5~ !
J
J


j FPC                                   2 cc w/encls:     -
j FPC 2
John P. Cowan. Vice President                         !
cc w/encls:
Nuclear Production (SA2C)                             i FPC. Crystal River Energy Complex                     !
John P. Cowan. Vice President Nuclear Production (SA2C) i FPC. Crystal River Energy Complex 15760 West Power Line Street Crystal River, FL 34428-6708 B. J. Hickle. Director i
15760 West Power Line Street Crystal River, FL 34428-6708 B. J. Hickle. Director                                 i Nuclear Plant Operations (NA2C)                       ;
Nuclear Plant Operations (NA2C)
FPC. Crystal River Energy Complex                     l 15760 West Power Line Street                           t Crystal River, FL 34428-6708                           !
FPC. Crystal River Energy Complex l
David F. Kunsemiller, Director (SA2A)                 :
15760 West Power Line Street t
Nuclear Operations Site Support                       i FPC. Crystal River Energy Complex                     i 15760 West Power Line Street                           ;
Crystal River, FL 34428-6708 David F. Kunsemiller, Director (SA2A)
Crystal River, FL 34428-6708                           j R. Alexander Glenn Corporate Counsel                   !
Nuclear Operations Site Support i
FPC - MAC - ASA i
FPC. Crystal River Energy Complex i
P. O. Box 14042                                       l
15760 West Power Line Street Crystal River, FL 34428-6708 j
      'St. Petersburg, FL 33733-4042                         i l
R. Alexander Glenn Corporate Counsel FPC - MAC - ASA i
Attorney General                                       !
P. O. Box 14042 l
,      Department of Legal Affairs                           ;
l
l      The Capitol                                           ;
'St. Petersburg, FL 33733-4042 i
Tallahassee, FL 32304-l l     Bill Passetti                                         l Office of Radiation Control                           '
Attorney General Department of Legal Affairs l
Dept. of Health & Rehab. Sa v.                         i 1317 Winewood Boulevard.                               l Tallahassee, FL 32399-0700 l
The Capitol Tallahassee, FL 32304-l l
Joe Myers Director                                     l Division of Emergency Preparedness                     '
Bill Passetti l
Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 1
Office of Radiation Control Dept. of Health & Rehab. Sa v.
Chairman                                               l Board of County Commissioners                           '
i 1317 Winewood Boulevard.
Citrus County 110 N. Apopka Avenue Inverness. FL 34450-4245 Robert B. Borsum Framatome Technologies 1700.Rockville Pike. Suite 525 Rockville. MD 20852-1631
l Tallahassee, FL 32399-0700 l
Joe Myers Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 1
Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness. FL 34450-4245 Robert B. Borsum Framatome Technologies 1700.Rockville Pike. Suite 525 Rockville. MD 20852-1631


FPC                                                     3 Distribution w/encls:
FPC 3
L. Raghavan, NRR B. Crowley, RII G. Hopper. RII PllBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road l     Crystal River FL 34428 1
Distribution w/encls:
I l
L. Raghavan, NRR B. Crowley, RII G. Hopper. RII PllBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road l
i Orrirr             A             n                                                       l SIGNATURE NAM       Mell i       Kland 5 DATF ' 03 /     / 97   03_/   / 97   03 /   / 97   03 / / 97 03 / / 97 03 /   / 97 COPY?   ' [ES)       NO   [YES)     NO     YES     NO   YES   NO YE5   NO YES     NO l OrrICIAL htLOKD CUPf       DtLUMthi NAML: P;\MiSUMJ21.LR I
Crystal River FL 34428 i
Orrirr A
n SIGNATURE NAM Mell i Kland 5 DATF '
03 /
/ 97 03_/
/ 97 03 /
/ 97 03 /
/ 97 03 /
/ 97 03 /
/ 97 COPY? ' [ES)
NO
[YES)
NO YES NO YES NO YE5 NO YES NO OrrICIAL htLOKD CUPf DtLUMthi NAML: P;\\MiSUMJ21.LR I


_ . _ - _ _.. _ . - . _ . _ _ .._.. _ . - .._. _ _ .._ __ _ _ _ _ _ _ _= _ .-..._ _ __. _ .y l
_. _ - _ _.. _. -. _. _ _.._.. _. -.._. _ _.._ __ _ _ _ _ _ _ _= _.-..._ _ __. _.y l
l                                                                                             !
l t
t LIST OF ATTENDEES                               !
LIST OF ATTENDEES Florida Power Corocration 1
Florida Power Corocration 1
R. Anderson. Senior Vice President. Nuclear Operations J. Baumstark. Director. Quality Programs i
R. Anderson. Senior Vice President. Nuclear Operations                           ;
J. Cowan. Vice President Nuclear Production l
J. Baumstark. Director. Quality Programs                                         i J. Cowan. Vice President Nuclear Production F. Frando. Nuclear Regulation S)ecialist                                         l B. Gutherman. Manager. Nuclear _icensing                                         :
F. Frando. Nuclear Regulation S)ecialist B. Gutherman. Manager. Nuclear _icensing M. Hendrix. Senior Public Relations Coordinator' B. Hickle. Director. Nuclear Plant Operations i
M. Hendrix. Senior Public Relations Coordinator' B. Hickle. Director. Nuclear Plant Operations i
J. Holden. Director Engineering O. Kunsemiller. Director. Site Support W. Lancaster. Public Relations and Marketing Manager R. Maughan. Department Support Administrator J. Maseda. Manager. Nuclear. Engineering Programs J. McGee. Senior Counsel
J. Holden. Director Engineering                                                 '
{
O. Kunsemiller. Director. Site Support                                           ,
D. Miskiewicz, Senior Nuclear Safety Analysis
W. Lancaster. Public Relations and Marketing Manager                             :
)
R. Maughan. Department Support Administrator                                     '
M. Myers. Manager. Investor Relations M. Pombior. Training J. Ranalli. Engineering Restart Manager W. Rossfeld Manager. Regulatory Assurance F. Sullivan. Manger. Nuclear Operations Engineering J. Terry. Manager, Nuclear Engineering Programs R. Widell. Director. Nuclear Operations Training f.PS,C t
J. Maseda. Manager. Nuclear. Engineering Programs J. McGee. Senior Counsel                                                         {
.i J. Breman. Engineer EIl R. Finnin. FTI Resident MPR A. Zarechnak. System Readness Manager BCP Technical Services Inc G. Nott Seminole Electric K. Bachor. Manager of Engineering J. Twitchell. Director of Operations 4
D. Miskiewicz, Senior Nuclear Safety Analysis                                   )
M. Myers. Manager. Investor Relations                                             l M. Pombior. Training J. Ranalli. Engineering Restart Manager W. Rossfeld Manager. Regulatory Assurance F. Sullivan. Manger. Nuclear Operations Engineering J. Terry. Manager, Nuclear Engineering Programs R. Widell. Director. Nuclear Operations Training f.PS,C                                                                           t
                                                                                            .i J. Breman. Engineer                                                               !
EIl R. Finnin. FTI Resident MPR A. Zarechnak. System Readness Manager BCP Technical Services Inc G. Nott Seminole Electric K. Bachor. Manager of Engineering J. Twitchell. Director of Operations 4
NUS Information Services Inc.
NUS Information Services Inc.
!            R. Colthorpe i
R. Colthorpe i
l                                                                   Enclosure 1 L
l L


l i
i i
i 1
1 i
i 2
2
                                                                              )
)
Nuclear Reaulatory Commission                                             !
Nuclear Reaulatory Commission S. Cahill. Senior Resident Inspector. Crystal River l
S. Cahill. Senior Resident Inspector. Crystal River                         l C. Christensen, Chief. Engineering Branch T. Cooper. Resident Inspector Crystal River F. Hebdon. Director 11-3. Office Of Nuclear Reactor Regulations (NRR)
C. Christensen, Chief. Engineering Branch T. Cooper. Resident Inspector Crystal River F. Hebdon. Director 11-3. Office Of Nuclear Reactor Regulations (NRR)
J. Jaudon. Director. Division of Reactor Safety K. Landis, Chief. Branch 3. Division of Reactor Projects L. Raghavan. Project Manager. Project Directorate 11-1. NRR L. Reyes, Regional Administrator l   R. Schin, Reactor Inspector. Engineering Branch Public l   J. Brendel. Analyst SILCAP G. Burbank W. Enyard. Business Manager. IBEW System Council U-8 O. Fields                                                                 i Z. Schreiber. Analyst. SILCAP Members of the News Media i
J. Jaudon. Director. Division of Reactor Safety K. Landis, Chief. Branch 3. Division of Reactor Projects L. Raghavan. Project Manager. Project Directorate 11-1. NRR L. Reyes, Regional Administrator l
R. Schin, Reactor Inspector. Engineering Branch Public l
J. Brendel. Analyst SILCAP G. Burbank W. Enyard. Business Manager. IBEW System Council U-8 O. Fields Z. Schreiber. Analyst. SILCAP Members of the News Media i
i l
i l
1 l
1 l
Line 106: Line 126:
l l
l l
r i
r i
Enclosure 1 l
t
t                                                                             !
1


I FPC - CR3                                                                                                                                                     !
I FPC - CR3 FLORIDA POWER CORPORATION
FLORIDA POWER CORPORATION
~
                                                                                                                                                                  ~
CRYSTAL RIVER UNIT 3
CRYSTAL RIVER UNIT 3 NRC RESTART PANEL MEETING 1
(
NRC RESTART PANEL MEETING 1
MARCH 21,1997 1
MARCH 21,1997 1
l                                                             nive ,
l nive,
i s                       -ny ,r-f                                                                     ,
j i
                                            ----en e em c.E=ms>
s
O hio po Enclosure 2
-n y,r-f
----en e em c.E=ms>
Ohio po


i FPC - CR3 AGENDA rgj.it                   .,                          __ _      . , _ . . _        ,
i FPC - CR3 rgj.it AGENDA I
Opening Remarks                                                 Anderson
Opening Remarks Anderson j
            - Restart Status                                                   Cowan l           - Performance Indicators                                           Hickle                                                 ;
Restart Status Cowan l
            - Resolution a Design Issues                                       Holden
Performance Indicators Hickle Resolution a Design Issues Holden System Readiness Review Terry t
                                                                                                  .                                  t l
l Resolution of Emergent Issues Baumstark MCAP II Update Baumstark Closure of MC 0350 Items Kunsemiller Concluding Statements Anderson
            - System Readiness Review                                         Terry
            - Resolution of Emergent Issues                                   Baumstark
            - MCAP II Update                                                   Baumstark Closure of MC 0350 Items                                         Kunsemiller                                           :
Concluding Statements                                           Anderson


FPC - CR3 i
l l
FPC - CR3 l
i r{4 r
Confirmatory Action Letter I
Confirmatory Action Letter I
r{4 l
i l
                                    - Design issues identified in FPC letter dated 10/28/96 i
[
l                                   -
l t
Design issues identified in FPC letter dated 10/28/96 i
i l
Extent of Condition Reviews i
Extent of Condition Reviews i
1
l 1
                                    - Resolution of Safety and Licensing Issues Regional Administrator Concurrence for Mode 2 3
Resolution of Safety and Licensing Issues Regional Administrator Concurrence for Mode 2 l
t 3


i                                                                                                                       !
i I
I i                                                                                                                       l
i l
}                                                                                                                     -
}
I FPC - CR3                                                                                                     l Three-Phase Approach
l I
;                                                                                                                      i i
FPC - CR3 Three-Phase Approach i
Readiness for Restart l                    -
f i
Startup and Power Ascension
i t
                      -  Long Term Improvement Plan l
i t
Readiness for Restart t
i Startup and Power Ascension l
Long Term Improvement Plan i
l i
f i
l l
l l
l l
l                                                                                                                    4 i
4 i
i
i


FPC - CR3 t
FPC - CR3 l
Elements of Each Phase r...{$)
t r...{$)
t System Readiness i
Elements of Each Phase t
j System Readiness i
Organizational Readiness l
Organizational Readiness l
Operational Readiness i
Operational Readiness i
t Regulatory Readiness t
t Regulatory Readiness j
                  - Communications Plan
t Communications Plan i
:                                                  5 4
5 4


1                                                                                                                                     :
1 i
i              FPC - CR3                                                                                                             l t
FPC - CR3 l
Readiness for Restart 1
t Readiness for Restart 1
i i
i i
{
{
i
i Reflected in Current Schedule of Activities l
                            - Reflected in Current Schedule of Activities i
i i
i Prepares Plant for Mode 2
Prepares Plant for Mode 2 l
                            - Satisfactory Progress on MCAP Items l
Satisfactory Progress on MCAP Items l
1 i
l 1
i i
l I
6 i
 
FPC - CR3 Startup and Power Ascension i
l Deliberate and Controlled Process 1
I t
Hold Points for Status Review i
i l
i l
I 6
Completion of Required Testing l'
i
Limited Corrective Maintenance 4
 
FPC - CR3 Startup and Power Ascension l                                                -        Deliberate and Controlled Process
                                                -        Hold Points for Status Review i
l                                                -        Completion of Required Testing
                                                -        Limited Corrective Maintenance 4
7 l
7 l
4
l 4


FPC - CR3 Long Term Improvement Plan Incorporate MCAP Principles into Business Plans Complete Remaining Open MCAP II Items Long Term Business Planning 8
FPC - CR3 l
Long Term Improvement Plan i
l l
l l
Incorporate MCAP Principles into Business Plans l
Complete Remaining Open MCAP II Items l
f i
Long Term Business Planning j
i i
i I
i i
8 l
t


                                                                                                                                                        - - . . .._ - - - ._-.  - . ~ .
-. ~.
t 3
t 3
i a
i a
FPC - CR3                                                                                                                                                                   !
FPC - CR3 x$f Restart Schedule 1
x$f                                                                               Restart Schedule                                                                         !
u 3rd Otr 96 m 4th Otr 96 a 1st Otr 97 m2nd Otr 97 m 3rd Otr 97 m 4th Otr 97 alst Otr 98 a 2nd Otr 98 m Design And Licensing Basis Review Review Design Basis m
u 3rd Otr 96 m 4th Otr 96 a 1st Otr 97 m2nd Otr 97 m 3rd Otr 97 m 4th Otr 97 alst Otr 98 a 2nd Otr 98 m                                   !
m System Readiness WalkdoEs
Design And Licensing Basis Review m            Review Design Basis             m System Readiness WalkdoEs
* Plant Modifications l
* Plant Modifications 2                 Engineering                        &                                                      l
Engineering l
                                                                                          ,m         Construction                    m                                                   l 2               Testing                      m                                                5 n                                               .
2 l
Regulatory Requirements                                                                 i
Construction m
'                                                                                                                                                                                          i 2          NRC Reviews                   &
,m Testing 5
                                                                                      ]
m 2
TECH SPEC Changes / Approval NRC Restart Autholzation                                                     !
n Regulatory Requirements i
j                                                                                                                                      +                                                 i ProceduresAndTraining j
i NRC Reviews 2]
j
TECH SPEC Changes / Approval NRC Restart Autholzation j
                                                                                          .          J, OP/APIOP Trainingm         e                                                       i
+
                                                                                          .                          MAR TrainLng                                                         }
i I
* I Startup                                                 l, Sytem Uneups
ProceduresAndTraining j
                                                                                          .                                ,      r                                                       :
J, OP/APIOP Trainingm j
Heatup & Testing
e i
                                                                                          -                                        Reac5r Startup                                           j Power Escalatikn 4
MAR TrainLng
,                                                                                                                                                                              9           !
}
I Startup l,
Sytem Uneups r
Heatup & Testing Reac5r Startup j
Power Escalatikn l
4 9
i i
i i
i                                                                                                                                                                                         !
i


                                                    - _ - - - - - __ _ . - - _ _ - - _ _ _ _ _ _ _ _ _ _ - ~
- - _ _. - - _ _ - - _ _ _ _ _ _ _ _ _ _ - ~
1 1
1 1
4 r
4 r
Line 218: Line 267:
a 1
a 1
1 t
1 t
i N
i No
                              *M o
*MW Cl$
W Cl$
u C.-
:                                u C.-
C l
C l
i f
i f
Line 229: Line 277:
]
]
d 1
d 1
j                                               _
j i
i 1
1 l
J
 
e t
i i
i i
1 1
Crystal ~ River Unit #3 Restart Plan 3--
l J
i__uv ee-
 
_i r
e
.i_ e e *=~~e 1 _1 a-L
                                                                                                                                                                                                                                                                                                  , t i
-e->geee-1gemq jea wI_ tan -tlan
i Crystal ~ River Unit #3 Restart Plan
-t j a a.-L J
          .i_ e          :
~ L' ewer Loop MANS A msgy y usgy c
3--       i__uv               %                                                    . _ - -                            :              ee-                                                -
: c r
_i           r                             ,
4........>
                                                                                          -t j a a.-L                                                                J                          e *=~~e                                         1 _1     a-                     L
insteN R.S. Penettetten MAR 2
  -e->geee-1gemq jea                                 wI_ tan -tlan A msgy              y usgy                                                                                              ~ L' ewer Loop MANS                                                                                                                     !
DGI ETW fntev ection 4
c              : c             r                                                                                                     4........>                                                                                                                     ,
MAR & Work Png Prep-EFW Cowitating Venturi MAR C -
insteN R.S. Penettetten MAR                                                                                                                                                                                             .
Reactor Startup j
2                                                                                                                                                                       -
^
DGI ETW fntev ection                                                                                                                             -                                                                                                                ;
^
4 MAR & Work Png Prep-               EFW Cowitating Venturi MAR           C-
y Genem M j
  ^                 ^
- MAR & Work Pkg. Preparation --
Reactor Startup          j y Genem M                                                                                                                                                                                             >                    j
      - MAR & Work Pkg. Preparation --                                                          -
Power Escalatic i i
Power Escalatic i i
I
I
_ EFP Defeat Switch MAR _                                                                                                                                                                                   ,
_ EFP Defeat Switch MAR _
4.H.P.I.C.a.vitat.ing               .. .. V.e.nturi           . . . .                  M.AR
4.H.P.I.C.a.vitat.ing V.e.nturi M.AR EFV-12 Conduit 1
* EFV-12 Conduit                                                                                                                                                                                                                                                                     1
i EFV-12 MOV MAR 1
:                                                                                                                                                                                                                                                                                      i EFV-12 MOV MAR 1
_EFV-12 Vehre MA_R ESCP-1 Uperado t
_EFV-12 Vehre MA_R                                                                                                                                                                                                                                                       ,
i EFIC Corn, Module MAR i
ESCP-1 Uperado                         _
_ ASV-204 MAR _
i EFIC Corn, Module MAR             _                                                                                                                                                                                                        i
E.S. Puenp PTL MAR D.R Sporn ym MAR D.H. Syern VW MAR l
_ ASV-204 MAR _                                         E.S. Puenp PTL MAR                   D.R Sporn ym MAR                                                                                   D.H. Syern VW MAR                                                                         l
*B A Side L
                                                                                                            -                    *B
MUV-27 Auto Cleeure MAR
_                                                                      A Side                                                         L
~
                                                                                                            ~
i
                                                                                                                                                                                                                          * * *
* i MUV-27 Auto Cleeure MAR
[
[
MUV-103 Seet Leakep MAR
MUV-103 Seet Leakep MAR
[
[
i
_EFP-2 Flow indestien MAR i
_EFP-2 Flow indestien MAR i
t
i t
_ MWP Cyelene Separator MAR l
_ MWP Cyelene Separator MAR l
Review Deelen Besie                       7 Systern Reednees Walkdowne                                                                                                                                                                                                       NRC Restert Autheriretion NRC Rowlews                                                                                                                                                                   _
Review Deelen Besie 7
TECH SPEC Changes / Approval                                                                                                                                                   _
Systern Reednees Walkdowne NRC Restert Autheriretion
j i
(
t
NRC Rowlews TECH SPEC Changes / Approval j
                                                                                                                                                                                                                                                                                                    )
i t
)
l
l
[
[
Line 282: Line 331:


FPC - CR3 l
FPC - CR3 l
h             Performance Indicators u Organizational Readiness m System Readiness
h Performance Indicators u Organizational Readiness r
:          m Operations Readiness m Regulatory Readiness i
I m System Readiness m Operations Readiness 1
m Communications Readiness l
l m Regulatory Readiness i
l
i m Communications Readiness l
:                                                  11 l
l 11 l
l
l l


I[;l               i     :. ;:i:.! ;I! i!!j i[                           i!
I[;l i
                                                                                  !!I i. l   '
;:i:.! ;I! i!!j i[
2   _
i!
_                                                                                          1
!!I i. l 2
_                s s
1 s
s                                                e r e                                                 c
e s
,                on                                                   n
s c
_                t  i                                     e          e r
r e
ad                                       r           r c a                                     u s          u d e i
on ne t
c o           e nR                                           s l
i e
I   l                                   C      r o     R e a                                                 r c n no                                 e r
r ad r
mr e u s     o s
r c
r i
a u
uI  t    c     u
u i
_                at                                  s         e     c ma ri z                           l o   t r
e s
a P r s r
c d
o e
nR l
s C
r R
I l
o a
r e
s mr o
c n
e no r
e u
sr at uI c
i t
u s
e ma o
t r
c y
s e
r z
r P
l r
r o
ri a
on C
d o
P t
t s
s s
f a
e e
e r
g uRf u
"B H r
i i
e r
e r
y r
s i
o
c P O t
_                f on r a e g r C
s I
e uRf t
I I
s de e i o
n e
s r
n r
P u "B H i
d o
t s
e tr P
s           c i
d P
t      "
ni t
PO                                  I s I I      n e e Pr  d n
a AI n
o r P d t
a a
ni t t
t f
a AI         n   a   a
e l
_                                                                  e     l s Cl f                o e         e p O" "A RMS
s Cl p
.                                                                        i                      _
"A i
V
o e
  -          3 R
e RMS O"
C N
V 3R N
_          C P
C C
F    '       -
PF i'


I
I FPC - CR3
                                                                                                                                                                ~
~
FPC - CR3 Organizational Readiness Restart Issue Closure FE*"                                                                                                                                       ___.___
Organizational Readiness FE*"
i
Restart Issue Closure i
            ,m 2 0 0                                                                         ___                            _ _ _
,m 2 0 0 Actual s
s                           -
v c
v           Actual m                                                   _
m e
e 150                                                                                                                                                     i
150 i
                                                                                                          -            Workof f c
Workof f i
g i
c f
f I
g I
O 1 1W
1 1W O
            +
+
1 0
1 0
u 50                                                                                                                                                    '
50 u
!            e I
e
            =O g
=O I
E a  0      .
E
                                                                                                                      .\
.\\
i
a 0
                  &n   Feb Mr Af r                           Mry         Jun     Jd Aug SEp                       Q:t         Nw Dec                               .
g
&n Feb Mr A r Mry Jun Jd Aug SEp Q:t Nw Dec f
i i
1997 13 1
1997 13 1


FPC - CR3 l                               Organizational ~ Readiness                                                     .
l i
s
FPC - CR3 l
zW                   MCAP II Restart Item Closure 4
Organizational ~ Readiness s
1 Goal is to Demonstrate Progress
zW MCAP II Restart Item Closure j
:                20 e                                                        + Actual E 200<
4 1
1 j                                                       _.g_.Workof f (Rev.1) o.
Goal is to Demonstrate Progress 20 I
O                                                                                               !
+ Actual e
o 10
E 200<
;            u e
i j
I                b
_.g_.Workof f (Rev.1) 1 o.
:s Z                                                                                           l 0     .                      ,                .                    -        -  .
O 10 o
Jri Rb     Mr   Apr My   Jn           JJ     Ag           Sp             Of Nu   Dr i
u l
1997 14
e I
b
:s Z
l 0
Jri Rb Mr Apr My Jn JJ Ag Sp Of Nu Dr i
1997 i
l 14


i                                                                                                                                                                                                 4 i
i 4
FPC - CR3                                                                                                                                                                       I Organizational Readiness
i FPC - CR3 I
Organizational Readiness
~
~
Ekd                                       SelfIdentified Precursors 1
Ekd SelfIdentified Precursors l
!                                    100 90
i 1
!                                      80 i
100 l
70                                                                                                                                                         ;
90 80 i
                                  #    60           .  -    -        -      -        -                        -      -                -        -              -                . .
i 70 60 l
l                                c e 50 O@
c 50 e
: u.                                                                                                       . _ _ .      _ . _ _ _
O@
: n. T         4 Total 20
u.
                                                                                                                                                    - Goal >60%
4
i                                       10
: n. T Total i
!                                            0                           -      ,
20 Goal >60%
JEri   Feb Mr         Apr   lWiy     Jun                     Jd     Aug           Sep           Cht             Nw             Dac 1997 l                                           -.      -      . - _ _ . . - _ . -              -.                                          _
i 10 0
is
t JEri Feb Mr Apr lWiy Jun Jd Aug Sep Cht Nw Dac l
!                                                                                                                                                                                                  i
1997 i
i l
is i
i


i                                                                                                                                                                                   l FPC - CR3                                                                                                                                                               j i                                                  Total Number of Open Precursors rM                                                              . . . . . _        .    . . _ _
i l
1200 M PCs Opened j
FPC - CR3 j
1000                                                                                                              tC3 PCs Closed 4
rM Total Number of Open Precursors i
)                                                                                                                                                          C 3 Restart 977
I 1200 l
                                                                                                                                                            -e-Total 800 734 7
M PCs Opened j
W 77 p@p_                       path Mh%
tC3 PCs Closed l
600   i                                                                             _
1000 4
l C 3 Restart
)
977
-e-Total l
800 734 I
7W 77 p@p_
path Mh%
j 600 i
. _ _,. _ _Feb Dec Jan l
l
.{
Grade "A" 4
5 5
l
l
                                                  $                                                            Dec      Jan      . _ _ , . _ _Feb
'l ii i
                                                  'l   ii     .                        Grade "A"             4        5                          5 l                                              .{  3 1
i i
I Grade "B"             8       29         ~ ~49-i
Grade "C" 168 228 I
* i    "
Grade "B" 8
i                        Grade "C"            168      228                        338 3   t       <                                                    _      __        _ . . _ _ _ _
29
Grade "D"             6       92                         203 l
~ ~49-3 1
h     i       r                       Old System --         491       430                         382 l
338 3
l                                        200
t Grade "D" 6
[i g
92 203 l
                                                        ,2 gg                677    ~~tIA~                        9F i           Y
h i
,                                                      h 130
r Old System --
                                                          ~
~~tIA~
l                                                      h          $2 l                                                 l 6       I
9F 491 430 382 l
                                                                \
[
l L,     c Dec   Jan     Feb     Mar Apr         May     Jun         Jul     Aug     Sep                   Od           Nov       Dec
g gg 677 l
                                                                                                                                                                              .6
,2 l
200 i
Y l
i h 130 l
h
~
$2 l
l 6
I
\\
L, l
c Dec Jan Feb Mar Apr May Jun Jul Aug Sep Od Nov Dec
.6


I     FPC - CR3                                                                                                                                                                                     !
b I
Organizational Readiness Fk                                   "A" and "B" Precursor Recurrence i
FPC - CR3 Organizational Readiness i
10                                                                                                                                                           i 8                                                                                                                                                           ,
Fk "A" and "B" Precursor Recurrence i
t Hypothetical Data u
1 10 i
6
8 Hypothetical Data t
;                I        e                                                                                                                        for Illustration Only l .O                                                                                                                                                                                 ,
u I e 6
E
for Illustration Only l.O E
;                          o           4 z
4 o
2 l                                       0       :            :        :                    :                      :                :      :        :      :      :                  :      ,
z 2
:                                          c      .o           '                        u           >,              c               =5       a         a.     ~
i l
o     >              o
0 c
                                          ,m        e           5                       a           m               a                 ,        a         e             o               e a             2                   <            2                 7                           <      m       O     z                 o 1997 17 l
.o u
c
=5 a
a.
~
o o
e 5
a m
a a
e o
e
,m a
2 2
7 m
O z
o 1997
\\
l 17 1
M
M


e FPC - CR3                                                                                                                                                                                                                                                                         _
e FPC - CR3 Or8anizational Readiness
a, Or8anizational Readiness 5y8 7                                                                                                            Violation History
<a, 5y8 Violation History 7
                ..                                m.             .# a u . a a.._                                                                       >
m.
_            m                                         .        ..                        m ,,.                 ,
.# a u. a a.._
                                                                          ~
m m,,.
                                                                            ,t            ,
~
a      , ![ [       -
, ![ [
                                                                                                                                                                                                                                                                'j 100 90
'j
                      ~
,t a
o                             80 i-o-                           70
100 90
                      *#                                  ::            =                                       =                                 =   =     =       =               =                     =             =       =                   =
~o 80 i-o-
                      '8 m                           60                                                                                                                                                                                                                             ,
70
: 5. 8                           50                                                                                                                                                                                                                             ;
=
C *ii                         40 So                             30 e         Actual o      3                                                                                                                                                                             -            Goal >67%
=
20                                                                                                                                                     -                                                                        ;
=
                      .,o                                                                                                                                                                                   - - _ - .                            -
=
a m                             10                                                                                                                                                                                                   -
=
tr                                                                                                                                                                                                                                                             !
=
De e                                                                         :    :
=
l         1                                             Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec                                                                                                                                                                             '
=
j        a
=
;j         4                                                                                                                                                       1997 g         c tj       ;);
=
* h         ;)       ~~
=
n         ij                                                                                                                                                                                                                                                                 18       :
'8 m 60
3        12 i
: 5. 8 50 l
C *ii 40 So e
Actual 30 3
Goal >67%
o 20
.,o a
m 10 r
tr De e
l l
1 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec j
a
;j 4
1997 i
g tj
;);
c h
;)
~~
n ij 18 3
12
\\
i


FPC - CR3 Performance Indicators Sh                     System Readiness                                   l l
r FPC - CR3 Performance Indicators Sh System Readiness l
:              - Corrective Maintenance
i
                - Temporary Modifications l               - Systems Accepted by Operations
- Corrective Maintenance
                - Requests for Engineering Assistance
- Temporary Modifications l
                - Restart Modifications               '
- Systems Accepted by Operations i
i j
- Requests for Engineering Assistance j
i
- Restart Modifications i'
j i
i l
i l
l 19
l l
19


i i
i i
FPC - CR3
FPC - CR3 System Readiness h)
.                                                                              System Readiness h)                                                 Corrective Maintenance                                                                                                       i f
Corrective Maintenance i
1000                                                                                                                                               -
f 1000 l
                                                                                                                                                                                        ~
900 i~
                                        . 900                                                                                             i~   -                ctual 4                                       -
ctual
* 800                                                                                                                                                         i t                                       *                                                                                                        -            kVorkoff                                  '
~
:s                                                                                                       -
4 800 i
cr 700 e
kVorkoff t
0:                                                                                                       -
:s cr 700 Goal <200 e
i            Goal <200
i 0:
  ,                                          600                                                                                                             -.            -
600
                                        ,E O
,E f
4 N
ON O
O                                                                                                                                                            ,
4 i
                                        '                                                                                                                                                              i E
E
                                        -Q   M           m a          =
-Q M
A A m
A A
A m
A A
A
A A
                                                                                    =
A A
A
A A
                                                                                                  =              =
m a
A
=
                                                                                                                          =
m m
A
=
                                                                                                                                              =
=
A
=
                                                                                                                                                                =
=
A
=
                                                                                                                                                                                =
=
A m
=
a i
m a i
;                                            100 Z           0                     -  -  -                              -          +                 -                  .
100 f
l                                                                                                 :                                                                            :
Z l
l                                                      Jan             Rb Mr Apr Nily         Jun             Jd     Aug               Sep                 Cbt             Nw           [bc       ,
0
l 1997 i
+
20   i l
l Jan Rb Mr Apr Nily Jun Jd Aug Sep Cbt Nw
l
[bc l
1997 i
20 i
l l


j FPC - CR3 System Readiness rEh                                           Temporary Modifications                                                     ,
1 FPC - CR3 j
10 9
System Readiness rEh Temporary Modifications l
6      8-     *
10 i
;                                            E     7     \          .
9 6
S                                    -
8-
s,h E.
*\\
gS a6    A       A A A     A                       .
E 7
A A A     ,  ,
s,h 6 S
                                            ..e       _      __                _
E.
0 '5 4
i gSa A
                                                        + Actual                                                       -
A A
3                                                                                o jE 2
A A
:s
A A
                                                        .Workoff z       1   --e Goal Prior to Heat Up<5 0                                                                     -  -  -
A j
Jn   Rb       Mr Ar   Nby   Jm                       JJ Ag       Sep Q1 Nu     Dr 1997
..e 0 '5 4
                                                                                      - - - - - , ~ - - -   - -  _ ~           ,__
+ Actual 3
o jE.Workoff 2
:s i
z 1
--e Goal Prior to Heat Up<5 l
0 Jn Rb Mr Ar Nby Jm JJ Ag Sep Q1 Nu Dr 1997 i
- - - - -, ~ - - -
_ ~
i


                                                          !!!i;     !l!l!Iil!!!!j!li,                         !I
!i(! lr
      !i(! lr              $I,>l,lil>
$I,>l,lil>
-                                                                                              : 3 D
!!!i;
c        2 2
!l!l!Iil!!!!j!li,
l f
!I c
f   _.
22
w a     o   _                                      -  N u   k     _
: 3 D f
-                                          t c
w f
r o                                              t
a o
-                                                                                                  t s                   A     W_                                            _C n                               _
l N
i o                     4     -"                                              p t                                                                             e S
u k
a                                                                                 _
r t
r                                                                           g
c o
_                      e                                                 -
tt W_
u s
_C s
s p                                                                         A     _
A n
eO n                                                                               i t
o 4
_                i     y                                                                         J7 9
p i
db                                                                                   9 _
e t
-                  a e                                                                         ; u1 n e c                                                                             J Rna                                                                                y   .
S a
                                                                                                ,W i
r g
-                  mt e p I
e u
t     e             _                                                              r s c                         -=                                                   p yc                                                                             A
s p
-                SA                           .'                                              -
A seO i
r M
n t
m t
i y
e                                                                          b s                                                                         Fe i'
J7 9
y S                                                                             i i
db 9
m m"
a n
0               0   0                   0   0 J
e e
0 2       0               6   4                   2 1       1 s
; u1 c
S>o V*cw:H e                                         s O*     ES=Xne %O 'eQE:z           -
J Rn a
3 R
y mt i
C C
,W e
P
p I
-            F
t e
r s
c
- =
p yc A
SA r
m M
e t
b s
i '
e F
y S
im m"
i J
0 0
0 0
0 0
2 0
6 4
2 1
1 S>o V*cw:H s
e O*
ES=Xn %O 'eQE:z s
e 3
RC C
PF lll l
llIl!l,lt:'l
;::l


FPC - CR3 System Readiness FEh                             Requests for Engineering Assistance                 . . . . . . .
j t
600                                                                                                             -    . -            - _ -
i FPC - CR3 System Readiness FEh Requests for Engineering Assistance 600
                                                                                                                              + Total Open 500'                                                                                               --m- W o r k o f f t
+ Total Open 500'
                                                                                                                              + Goal <200 i
--m-W o r k o f f t
j 400                                                                                                   + Re c eiv e d                                     i uJ cr                                                                                                     +Clo s e d yy                                                                                                               .-.              _ _ _ _
+ Goal <200 l
u e                                                                                                                                                          '
j 400
                      .O
+ Re c eiv e d i
                      ! 200a       i               A       i     i                       i           i       i   i   i               1               --          ai
uJ i
;                    z A
cr
l                               0                   .                                                                                                          .
+Clo s e d i
!                                Jan               Feb Wr         Apr                   Wy           Jun       Jul Aug Sep         Oct           Nov               Dec
yy j
                    !                                                                                        1997 i
ue L
23 t
.O s
! 200a i A
i i
i i
i i
i 1
ai z
j A
l 0
Jan Feb Wr Apr Wy Jun Jul Aug Sep Oct Nov Dec 1997 t
i 23 f
t f


FPC - CR3                                                                                                                             -
FPC - CR3 Fn---
System Readiness                                                                             ;
System Readiness Restart Modifications l
Restart Modifications Fn---                                                                  _
t l
l t
t i
l t
40 t
i 40 t
35 Actual Workof f t
35                                                                         ;        Actual t       30             *                                                          -        Workof f m,                 , , ,                                                          -
30 m,
                      ,c                                                                                   - - _ - _ _ _ _ _ _ _
25 t
t eO     25                                                                                                                      ,
,c eO a: a 5
a: a5                                                    .
20
                      +       20 o .9 u .t eu
+o.9 u.t eu 15
                      -Q O 15 E5 E   10 z            5
-Q O
,                                  O.
E E 10 5z 5
Jan Feb   Wr Apr Wy                     Jun           Jul Aug Sep Oct Nov Dec
O.
;                                                                                1997 24
i l
Jan Feb Wr Apr Wy Jun Jul Aug Sep Oct Nov Dec 1997 24


c                                                                                                                             l 4
c l
FPC - CR3 Performance Indicators k                                   Operations Readiness 4                                                                                                                             i i
4 FPC - CR3 Performance Indicators k
l                                                                                                                             .
Operations Readiness i
            - Control Board Deficiencies
4 i
            - Operator Work Arounds
l
            - Operating Procedure Changes l
- Control Board Deficiencies
r
- Operator Work Arounds
            - Emergency Operating Procedure Changes
- Operating Procedure Changes l
            - Abnormal Procedure Changes
- Emergency Operating Procedure Changes r
;                                                                                                                              i 25 i
- Abnormal Procedure Changes j
l i
25 i
l


  . . _ . . . . _ . - _ . . _ .  ~ . . . - . - - . - - .       - - - - - . - . - . - - - . - . - - - - - - -                                - -  -
~... -. - -. - -.
I j                     FPC - CR3                                                                                                                                                                                 -
I j
Operations Readiness Control Board Deficiencies I
FPC - CR3 Operations Readiness FEIk Control Board Deficiencies 1
I i
l l
l l
l l
FEIk      .
i l
25 ts u
25 ts u
m                                                                                                                                                                           .
m Actual l
l 0                   20
0 20 m
* Actual m                                                                                                                 '                                                            -
_e G o a l < 10 oe 15 w
_e                                                                                                                               G o a l < 10 oe w           .-
o C
15 C
C l
o                                                                                                    _              _ _            __ _ _.
l O e 0'
l                                                   C l                                    O             e                                                                                                                                                             .
l l
0' l
.5 10 c
                                    .5O e c
l O e w o I
10  .
e 54
I w
.o E
e o                  54                                                                                                                                                     :
i o
                                    .o                                                                                                                                                                             !
o t
E                                                                                                                                                                            i o                   o                                                                             .  .      ,                      .
;g l
t
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec l
                                    ;g l
1997 i
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec l                                                                                                                                       1997 i
2b i
2b i


      ;        l ;r li                 !          l,f j!r           '        ,I,l       . ll!
l ;r li l,f j!r
          ,      hg                                                                                             .
,I,l ll!
                $                          O3 37OM*
hg O3 37OM*
0
Mmaa 0
                                                                @          Mmaa O*! C9
O*! C9 Cm km Cgg@
                '                                      Cm       km Cgg@
N h
_                N
k r
_          k                                                                             h r
W s,{,
            .          o    8                                                                  s,{,
o 8
Wr o                                                                       em A~
ro em A~
t a   s8 rd i       .
s8 t
en pu Oor6 =         -
a rd i
fA o
en pu Oo
r       :
=
e      :        i   i   s     s         8         n       l i b     m                                                                       E m
r6 fA o
r e
i i
s s
8 n
l i
b m
E m
u N
u N
o -                                    -
o g
g     g  $  4     g     k3       h         [           Q               k
g 4
                                                            "@O (
g k3 h
                                                    .      ;lll                 - l i
[
t
Q k
"@O
(
;lll l
it


i f
i f
f 4     i g
f 4
Outstanding Procedure                                                     !
i g
Comments y=o$$$b$$$$$b
Outstanding Procedure Comments y=o$$$b$$$$$b
: g.     .-
: g..-
I k-     I   -
I k-I -
ee fD
ee fD cD
: g. u-M cD
: g. u M
                                                                                                        "'*.       l e+ N            f g.
l
gag-j           ,    -                                                                          i TQ                !
.N f
j a5-     g     -                                                         Nm m pc               ,
e+
l g                                                                        ee o a 1
gag-j g.
sk       l
i TQNm a5-g -
* tD 4   @.
j l
C    2 C
m pc g
m-                                                               M CD e
ee o
m   M           -
a 1 sk tD l
h
* 4 C
                                ~
2
I" Z-I-                       '. a A
>. m -
N) wE o
M e
a) i
C CD m
M h
~ I "
'. a wE Z-I -
A o
a) i N)
[
[
t                                                             01 *      ;
t 01 i
                                                                          -                                        i i
i S$
S$
l l
l l                                                                                                                   l
l t
!                                                                                                                  t


                                                                                                                                                  ~
FPC - CR3
FPC - CR3 Operations Readiness W                 Emergency Operating Procedures E
~
i
i Operations Readiness W
                                                                                                                                                !  i 20 I *
Emergency Operating Procedures E
                                                                                                                  -    Actual 18
i i
                                                                                                                  -    Wo rkof f 1            t.O 16                                                                                             -
20 l
i e                                                                                                      Goal <0
I Actual 18 l
                . 14 -
Wo rkof f l
                      -  *            *            -          -    -              -                              i
t.
                                                                                                                                                    }
16 1
e 12 t
O i
              .a                                                                                                                                   ;
Goal <0 e 14 -
o 10
i e 12
              +'                                                                                                                                   !
}
W   O W
t
w t
.a
l              3 V                                                                                     '
+' 10 o
e                                                                                                                                   !
W O
o   4                                                                                                                               i O
W t
w o    2 0..   -
w l
3 V
I e
o 4
i O
wo 2
0..
i i
i i
i i
i i
                                                                                                                      =
=
                                                                                                                                  =
=
Jan Feb       Mr               Apr         IWay Jun           Jul                   Aug Sep   Cbt         Nw       Dec I
Jan Feb Mr Apr IWay Jun Jul Aug Sep Cbt Nw Dec I
1997 29
1997 29


l                                                                                                                                                                                                                                                                                               .
l h
l l
l l
R l                                         FPC - CR3                                                                                                                                                                                                                                             -    !
R l
!                                                                                                                                                  Operations Readiness kh                                                                                                     Abnormal Procedures I
FPC - CR3 Operations Readiness kh Abnormal Procedures I
l       !
l 160 l
:                                                                    160                                                                                                                                                              ~                                           ~
~
i                                                                                 a       ;                                                c                                                                                                       *
~
                                                                                                                                                                                                                                                    '              ctual i                                                                     140                                                                                                                                                                                                                             i i
i a
:::          Workof f                               l 2   120 s                                                                                                                                                                             -
c ctual i
i     Goal <15 v                                                                                                                                                                                                                                   l 8 .100 2e                                                                                                                                                                                                                                 !
140 i
n.
i Workof f l
mE* 80
2 120 Goal <15 s
                                                                .E E v o 60 co                                                                                                                                                                                                                                 ;
i v
2                                                                                                                                                                                                                                   ;
l 8.100 l
2m      40 i                                                               O l                                                                       20       , ,      A                                                 A       A                             A                               A     A       A       A                 A                     ..
2e
f i
: n.
i                                                                          0                 -                                                  ,    -                                                            .      .                -
* 80 mE
;                                                                              Jan     Feb                                     Mar                 Apr                     IVby                         Jun           Jul     Aug   Sep                 Oct             Nav   Dec             .
.E E v o 60 co 2
3 i
2 40 m
1997 i
i O
t 6
l 20
30 l
(
A A
A A
A A
A A
A f
i i
0 Jan Feb Mar Apr IVby Jun Jul Aug Sep Oct Nav Dec l
I 1997 3
i l
i t
6 30 l
l


t FPC - CR3 l
t FPC - CR3 l
Performance Indicators                                                                                                       !
Performance Indicators rh Regulatory Readiness i
rh                                                 .
- License Amendments and Tech Spec Submittals i
Regulatory Readiness i
- Other NRC Restart Submittals i
                            - License Amendments and Tech Spec Submittals
- Submittal Quality (under development)
                            - Other NRC Restart Submittals
- Total Commitments j
                            - Submittal Quality (under development)
l i
                            - Total Commitments i
i i
I 31
I 31


FPC - CPO License Amendments and Tech Spec Submittals 25                                                                                                                                                                                                                                             ~
r i
                                .                                                                                                                                                                              ]                                                     Submittals to "Ri   20 4                                                                                                                                                                                                                             be made
FPC - CPO License Amendments and Tech Spec Submittals f
                              .t_
25
m E
~
15
i
                                                                                                                                                                                                                                    -                                  Goal =0 a
]
M                                                                                                                                                                     ~ - - ~~~~~~'~
Submittals to "Ri 20 4 be made
o  10
.t_
                              "      5 E
E Goal =0 m
s Z
15 r
0::                                                                                 =                 =       =             =       =       _                                    =                                             = =   =     ::
i a
Jan                                                                     Feb                         Mar   Apr May                 Jun     Jul                   Aug                                                         Sep Oct Nw [bc 1997 32 i
M o
10
~ - - ~~~~~~'~
i 5
Es Z
0::
=
=
=
=
=
=
=
=
=
j Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nw
[bc 1997 32 i


i                                                                                                                                                                                                                           -  '
i FPC - CR3 t
FPC - CR3 Other NRC Restart Submittais t
Other NRC Restart Submittais t
25 t
l 25 l
e               ^
t e
c               S u b mittals to e     20                                                                                             be mad e e                                                                                                                                                                       i' i                                                   *
c S u b mittals to j
                                                    .                                                                                      =               G o a l= 0 3m        15 M
^
.                                                    w i
e 20 be mad e e
o        10 m
i i
e
=
                                                    .Q                                                                                                                                                                       !
G o a l= 0 3
E o        5 z                                                                                                v I
15 m
0 ::               = =   =             =               =     =                     =                 =               =                 ,,,      ::
M w
Jan         Feb   Mar Apr May                         Jun Jul                 Aug Sep Oct Nov Dec 1997 33 i
i o
l
10 me i
.Q E
5 oz v
I 0 ::
=
=
=
=
=
=
=
=
=
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 33 i
I l
I


                                                                                                                                            ~
i
i FPC - CR3                                                                                                                                 -
~
Regulatory Readiness y_t z
FPC - CR3 f
Total Commitments                   . . .
Regulatory Readiness y_t Total Commitments z
4 l
i 4
200 180
l 200 l
* Actual
l' 180 Actual
                =                                                                                   -
=
c 160                                                                                                                         '
c 160
e E  140
+Wo r kof f e
                                                                                                  +Wo r kof f i              'E   120 i               E   100 O
E 140
O     80 8   60 e
'E 120 i
l              .D   40 1               E t               :::  20 l             z l                     0                 -
i E
Jan Feb   IVbr Apr           IVby       Jun   Jul       Aug         Sep     Oct         Itv     Dx:
100 O
1997 34
i 80 l
O 8
60 I
e l
.D 40 1
E t
20 l
z l
0 Jan Feb IVbr Apr IVby Jun Jul Aug Sep Oct Itv Dx:
i 1997 34


i                                                                                                                                                                    :
i i
i i
FPC - CR3                                                                                                                                       !
i FPC - CR3 Performance Indicators EY Communications Readiness l
.                                                                  :                                    Performance Indicators EY                                                         Communications Readiness                                         i l
i l
!                                                                                                                                                                    l l                                                                                                                                                                _    ;
l I
I I
I i
i
- Organizational Communications Effectiveness
                                                                                            - Organizational Communications Effectiveness i
{
l 1
i l
i l
l t
1 i
35       j i
l l
I
t 35 j
i I


FPC - CR3 Communications Readiness Organizational Communications Effectiveness Ftkt                                                                                                                                                      . . . . .
FPC - CR3 Communications Readiness Ftkt Organizational Communications Effectiveness I
l I:,pathetical Data for Illustration Only Goal is an improving Trend 100 t
l i
80                                                                                                                                                                               gOps
I:,pathetical Data for Illustration Only Goal is an improving Trend 100 i
                                          -              60 E Maint E                                                                                                                                                                                               O C h e m/ Ra d e
i t
0              40                                                                                                                                                                               D Eng e                                                                                                                                                                                                                                          .
80 gOps E Maint 60 E
a                                                                                                                                                                                                gSupport 20                                                                                                                                                                                             _ _ _ . _ . _ _
O C h e m/ Ra d e0 40 D Eng
0                                               -                                              -                    -            -                      -                      -
,ea gSupport i
Jan               Feb                                       Mar                             Apr lWy                 Jun       Jul       Aug           Sep                     Oct                   Nov Dec 1997 i
20 j
__        _ . _ _                ____ _ _ __.....___                                                                      _ . _ _ _ _ _ _ . _ _ _                                                                                          t 36
0 Jan Feb Mar Apr lWy Jun Jul Aug Sep Oct Nov Dec 1997 i'
t 36
[


FPC - CR3 t
FPC - CR3 l
l                                       CR-3 STARTUP TEAM l                       SOLUTION SET PRESEXTATION b     N4                                               SOLUTION SET                                     -
t i
l A*4b           U                                                 FLOW PATH                                         S
l l
>                        o          b;g+p          ;;ra 3
CR-3 STARTUP TEAM i
                                                                    =                                                   r"^r g
l SOLUTION SET PRESEXTATION
[
b N4 SOLUTION SET l
A*4b b;g+p U
FLOW PATH S
[
l 3
;;ra
=
r"^r g o
_'5~- r ~ ~~
_'5~- r ~ ~~
                            -                = Git,                   moos
= Git, moos N
                                                                          '        + setocA + N          +        smots      : Lose -+       C
smots
                                    %                                                        LOOP A M ES L,,,,,,,,,,,,ry S
+
4                                                                                              L EFP-2 @
: Lose -+ C
0 4fDAPO                                                                                                    _
+
37   i 4                                                                                                                                                         ;
setocA +
A M ES LOOP L,,,,,,,,,,,,ry L EFP-2 S
4 04fDAPO t
37 i
4 e
l
l


  --------_-__,_--w_--,     -m   w,m     - -
--------_-__,_--w_--,
_ m g_m_ yx m a a m,m_,yg   ,ap ,p y   -p4gg_m__,_ y,, - -    _
-m w,m m g_m_ yx m a a m,m_,yg
l                                                                                                             =
,ap
uJ i                                       b E
,p y
                                                                        !                                !=
-p4gg_m__,_
i i                                        O                                          m{g Z
y,,
E
l
                                                                    <                                        0 l                                                           e                     EB-J 1
=
uJ i
b E
i
=
m{g i
O Z
E 0
l e
EB-J 1


                                                                                                                                                                                    ~
~
l
l l
.i                                                                                                                                                                                     ;
.i FPC - CR3 l
FPC - CR3 l
l OTSG Steam Supply ASV-204 ASV-5 r
OTSG Steam Supply ASV-204                     ASV-5 r
y 5:a-x Steam Driven EFP-2 EFV-12 ST
y     _
-vu s
5:a-                   x Steam Driven EFP-2 EFV-12 ST
,s Non-Saiety FWP-7 yo
                                                                                                                                            -vu s ,s Non-Saiety FWP-7                         y o
~~
                                                                                                                          ~~
-c%c%--
                                                                                                                                -c%c%--
l Motor Driven EFP-1 l
l             .                                                                                            Motor Driven                                                             ,
9 i
EFP-1                                                             9 i


FPC - CR3 l
h FPC - CR3 l
SOLUTION SET FLOW PATH                                                                     r             ,
SOLUTION SET FLOW PATH r
t l
t l
LIMITING SINGLE FAILURES
LIMITING SINGLE FAILURES
: LOBA         :
: LOBA
Loss of "A" Battery l                                                   INITIAL CONDITIONS r       ,  r       ,        ,          ,
[
MODE                                                '" L
Loss of "A" Battery l
                                                                    +   SBLOCA   +     &          +   FAlLURES
INITIAL
: LOBB         :
[
LOOP                                                       Loss of "B" Battery E.
CONDITIONS r
: EFP-2         :
r MODE
S S
'" L
40
+
SBLOCA
+
+
: LOBB FAlLURES LOOP Loss of "B" Battery E.
i i
S
: EFP-2 S
40 i
l
?
I
 
i rec-cn3 SOLUTION SET FLOW PATHS I
l Address Each Single Failure Scenario Separately i
Identify Design Basis Success Path j
Identify Defense In Depth t
Identify Challenges Identify Needs
- Modifications
- Procedures
- Licensing Actions
- Training 41 f


rec-cn3
l t
                        $        SOLUTION SET FLOW PATHS l                                Address Each Single Failure Scenario Separately i                                                                                                                              ;
FPC - CR3 i
.                                Identify Design Basis Success Path                                                            ,
i
Identify Defense In Depth Identify Challenges                                                                          '
Identify Needs                                                                                ;
                                  - Modifications
                                  - Procedures
                                  - Licensing Actions
                                  - Training 41
* l t
FPC - CR3                                                                                                                                                                                                     -
i i
[
[
i                                                                                                                                                                                                                                   F v
i F
j M.
v j
                                                        "                                  ;r                                                                     I L
M.
MUP-1A or MUP-1B                                         1 PUMP                                                                                                                                                                             ;
I
m       6 A L INSUFFICIENT
;r MUP-1A or MUP-1B PUMP L
,                                                                            r             ,
1 m
OPERATIONAL l
6 A L INSUFFICIENT OPERATIONAL r
H       '
H EFP-1 4
EFP-1           4                                   EDG                 ->            UMITATION
EDG
                                                                                                                                                                                                ~~~~~'
~~~~~'
;l CAPACITV                                                                                 l
l UMITATION
;                                                                                                                                                        .. .............                                  I               S
;l CAPACITV l
!                                                                                                                                                        *    - CONTROL COMPLEX COOLING (-1.0 hr)
I S
* Ih
- CONTROL COMPLEX I h COOLING (-1.0 hr) l o P
                                                                                                                                                          ,'                                                l o MITIGATION                                                                                                                                                   ,
MITIGATION 3
P 3
T DEPNN STRATEGY TM DEPEE. NCY..J l o LOBB.,
                                                                                                                                                          '    -              T DEPNN STRATEGY                                                               TM DEPEE.              .  .NCY. .J l o                     .
- 500 PSIG 1 HPI PUMP I a (Operator Cooldown)
LOBB .,                                                                                                 '
C l
                                                                                                                                                                - 500 PSIG 1 HPI PUMP                                                                                     *
l g r 8
                                                                                                                                                          ,          (Operator Cooldown)
EFW FLOW I
* I a
                                                        &                                                                                l               . . . . . . . . . . . . . . .                    g r             C EFW FLOW                                                                                       ,
I 8
o v
o v
* I n                     ,
I n I
                                                                                                                                          +
C i
I                C      '
+
n                                                                                                                                         ,      +          u           ;
+
r EFW FRAMATOME              <      ,
n u
t FLOW
FRAMATOME r
                                                                -    +   EFP-2           -+ CROSSTIE EFW TRAINS                                                     +                     EFW       p   ADMIN   + AND +         l,
t EFW 2
                                            '              2          w                                                                                                          ANALYSIS            '      ;    -      E        -
w ANALYSIS E
i S
l
S r                ,                                    FWP-7                       DEFENSE IN DEPTH
+ EFP-2 -+
:    FWP-7                                             :  DIESEL SUCCESS PATH                                   '                2 MOD CHALLENGES                                                                                                                                                                             v DEFENSE IN DEPTH 42 i
CROSSTIE EFW TRAINS
+
EFW p
ADMIN
+ AND +
FLOW i
[
S S
l FWP-7 DEFENSE IN DEPTH l
r FWP-7 DIESEL SUCCESS PATH MOD 2
CHALLENGES v
DEFENSE IN DEPTH 42 i


                                                                                                                              . . . - _ . . - ~ . . . - . . _ _ - - --
... - _.. - ~... -.. _ _ - - --
t t
1 t
FPC - CR3                                                                                                                                                                 t l
FPC - CR3 t
l F __.    .    . . _ .
t F
r          ,
t l
t t
t l
1 HPl
r 1 HPl MUP-1B or MUP-1C l
MUP-1B or MUP-1C l                                 PUMP         m                               ,
PUMP m
i
i t
                                                                                                                                                                      $        t i
i U
!                          r               ,
r MITIGATION STRATEGY i
U MITIGATION                                                                                                                                       ;
C r
STRATEGY                                                                                                                                       i' LOBA + 1 HPI PUMP                     r            '            r                          ,            r          ,                  ' '
r r
C
LOBA +
'.                                                                                  FRAMATOME
1 HPI PUMP FRAMATOME EFP-2
.l                                 g             :    EFP-2                :
.l g
EFW                       ,,
EFW ADMIN
ADMIN        -+         AND       +
-+ AND +
EFW FLOW                 '            "
C EFW FLOW ANALYSIS 4
ANALYSIS                           <          >
EFW E
C 4   ,                                                                                                                                    ;
FLOW i:
EFW                                                                                                                               E       .
f S
FLOW                                                                                                                                       :
i FWP-7 DEFENSE IN DEPTH l
i S
W FWP-7 DIESEL MD i
i
i SUCCESS PATH v
                                                    <          ,              FWP-7             DEFENSE IN DEPTH W         FWP-7     ->          DIESEL                                                                                         !
CHALLENGES DEFENSE IN DEPTH 1
MD     >
i f
i i
43 i
SUCCESS PATH                                                                                                                                 v CHALLENGES DEFENSE IN DEPTH i                                                                                                                                                                           !
1 9
43   f, i
[
1 9                                                                                                                                                                           [


t
t FPC - CR3
                                                                                                                                                                                    ~
~
FPC - CR3                                                                                                                                                                            [
[
t i
t i
{
{
m I
m J
2 HPI           .            HPI FLOW PUMPS                             ANALYSIS                                                                                                                       6 S               i U
I f
MITIGATION STRATEGY FRAMATOME TIME                                                           ,
2 HPI HPI FLOW PUMPS ANALYSIS 6
EFP-2 -+ 2 HPI PUMPS
I S
* ANALYSIS C
i U
EFW FLOW                                                                                                                                                         ,
MITIGATION STRATEGY FRAMATOME TIME C
OPERATIONAL LOAD                    EFP-1 TRIP r    ,    b
l EFP-2 -+ 2 HPI PUMPS ANALYSIS EFW FLOW EFP-1 TRIP b
                                    *
f r
* LIMITATION                                MANAGEMENT
OPERATIONAL LOAD
                                                                                                                                +       DEFEAT --* AND   -> ADMIN ->                 i f ,
+
                                                      <                                      ,      <                        ,        SWITCH     -        '    ;
DEFEAT AND -> ADMIN ->
EFW   -
i f
                                                                                                    -- es nEANAM                       b MOD E              t FLOW                       - BWST DEPLETION                                       MOD (PTL)
LIMITATION MANAGEMENT SWITCH E
                                                      - 500 Psig                                                                                                     S (Operator Cooldown)
t EFW b MOD l
-- es nEANAM FLOW
- BWST DEPLETION MOD (PTL)
- 500 Psig S
(Operator Cooldown)
S DEFENSE IN DEPTH
S DEFENSE IN DEPTH
                                    -+     FWP-7     ---->        DIESEL                                                                                                             j SUCCESS PATH MOD                     ,
-+ FWP-7 DIESEL j
CHALLENGES                                                                                                                                                               i DEFENSE IN DEPTH                                                                                                                                         v 44
SUCCESS PATH MOD j
CHALLENGES i
DEFENSE IN DEPTH v
44 I


l.
l e
l e
: l.                                                                                                                                                                                                                                                I i
I i
i j
i I
I FPC - CR3 s
j FPC - CR3 FG-
,t s
h.
h.
7 i
i l
i l
FG-      ,
l LIMITING SINGLE j
i l                                           LIMITING SINGLE FAILURES                                                                                                                                                          ^
^
                                                                                                                                        -                                                                                    O                   ;
FAILURES O
l U
l U
LOBA                                                                       :
ADMIN LOBA
ADMIN                                                                =
=
Loss of "A" Battery LOBB                                                                                         : SAFETY C
Loss of "A" Battery l
Loss of "B" Battery ASSESSMENT                                                          C
C LOBB SAFETY ASSESSMENT C
Loss of "B" Battery
{
{
: EOPIAP/OPISP REVISIONS EFP-2                                                                                       : TRAINING S
j EOPIAP/OPISP REVISIONS EFP-2 TRAINING S
                                                                                                                                                        ; FSARI EDBD /ITS REVISIONS                                                 <                      >
FSARI EDBD /ITS REVISIONS t
t
t 45
                  .                                                                                                                                                                                                                                t 45


FPC - CR3 i                                                                                 _ _ _ _ . . _ . _
l FPC - CR3 j
l i
r i
STARTUP
l STARTUP i
;                                            TEAM       EOPs i
TEAM EOPs i
1 l
1 l
l                                   PLANT                       MFTIREVIEW    & FPC MODIFICATION i
MFTI & FPC l
i SYSTEM READINESS REVIEWS 46
PLANT REVIEW MODIFICATION i
i SYSTEM READINESS REVIEWS i
i 46 i


i FPC - CR3                                                                     l CYCIJ 11 RESTART                               CYCII 12             :
i FPC - CR3 l
i
CYCIJ 11 RESTART CYCII 12 i
;          New Isolation Criteria                 i       HPI Cavitating Venturis             i Crosstie EFP-2 / ASV-204                       Diesel EFW Pump     i 150 KW EDG Upgrade                       l                 or
New Isolation Criteria i
;          Load Management                               Increase EDG l
HPI Cavitating Venturis i
Crosstie EFP-2 / ASV-204 Diesel EFW Pump l
i 150 KW EDG Upgrade l
or Load Management Increase EDG l
Capacity i
Capacity i
i EFW Cavitating Venturis FWP-7 DieselPowered l
i EFW Cavitating Venturis FWP-7 DieselPowered EFIC Improvements l
EFIC Improvements l                                                                           47
l 47


i l
l i
i                                                 . i l
i i
I FPC - CR3                                   -
l I
l
FPC - CR3 l
            >        System Readiness Review i             i                                   ;
System Readiness Review i
i                                                   ;
i i
I                                           .
I
[
[
l
l t
!                                                  t i
i Plan
                - Plan
[
[
                - Status l
Status l
:                - Performance Measures i
Performance Measures I
48 i                                                   !
i r
48 i
t
t


                                                                                                                ?
?
1 FPC - CR3                                                                                           i g                                     System Readiness Review i
l 1
              . _ _                                      _ _________________                                  i i
FPC - CR3 i
Conduct reviews to assure that safety related                             ,
g System Readiness Review r
systems are in compliance with the beensing
i i
!.                                    and design basis of the facility                                         ,
i Conduct reviews to assure that safety related systems are in compliance with the beensing j
and design basis of the facility i
l l
l l
l l
l l
Line 1,015: Line 1,359:
49 i
49 i


FPC - CR3 System Readiumess Review Plan
l FPC - CR3 System Readiumess Review Plan Assess each of the 105 systems for a " Graded Approach" i
                                                            -                        Assess each of the 105 systems for a " Graded Approach" review
review Perform assessment of each system Evaluate results l
                                                            -                        Perform assessment of each system
Track restart requirements l
                                                            -                        Evaluate results
Operations acceptance of systems Performance monitoring i
                                                            -                        Track restart requirements l
I i
Operations acceptance of systems
i i
                                                              -                      Performance monitoring I
l 50 i
ii i
i i
l' 50 i
l
 
FPC - CR3 j
rg_
Classification Methodology i
Multiple Fission Product Barrier Approach
- 10CFR50, Appendix A,II Analytical Process
- PSA Model
- Maintenance Rule Risk Significance j
- Safety Significance Engineering Judgment and Assessment Performance t
l
- Past " change process" oprortunities
- Previous system assessments l
51


FPC - CR3 Classification Methodology rg_                                                                                                                                                      .
FPC - CR3 rOR Level 1 Systems Level 2 Systems i
i
l
                        - Multiple Fission Product Barrier Approach
^C Electrical Distribution System Emergency Feedwater System a
                          - 10CFR50, Appendix A,II
DC Electrical Distribution System i
                        - Analytical Process
EmergencyFeedwater a
                          - PSA Model                                                                                                                          :
Air aandling subsystems l
                          - Maintenance Rule Risk Significance                                                                                                ,
Initiation and Control a
j                         - Safety Significance Engineering Judgment and Assessment Performance                                                                                      ;
Nuclear Services Closed Cycle Cooling System Reactor Coolant System a
t l                         - Past " change process" oprortunities
Raw Water System Emergency Diesel Generators u
                          - Previous system assessments 51
Decay Heat Closed Cycle Cooling System F
and EDG Support Systems a
Control Rod Drive System j
u Main Steam System i
Decay Heat System a
Waste Disposal System l
Makeup & Purification System a
Radiation Monitoring System
^" nun i t r System Core Flood System i
a Building spray System l
a Feedwater System Engineered Safeguards System l
4 l
m Chemical Addition System l
l m
Spent Fuel System j
u NuclearInstrumentation System I
a Reactor Protection System a
Containment Access 52 l


FPC - CR3 Level 1 Systems                          Level 2 Systems rOR    _ . _ - -    _                                                                      _
l FPC - CR3 j
" ' ' ' " ~ " " " " ' " " " " " " ' ' " " " " ' ' ' '
l'f Nuclear Closed Cycle Cooling Sytem (SW) l I
i l
i l
                                                                                    " ^C Electrical Distribution System Emergency Feedwater System                                                                    ,
i I
a DC Electrical Distribution System
i l
;                                              -        EmergencyFeedwater          a Air aandling subsystems Initiation and Control      a Nuclear Services Closed Cycle Cooling System
I 53 I
                                              -        Reactor Coolant System a Raw Water System
i
                                              -        Emergency Diesel Generators  u Decay Heat Closed Cycle Cooling System and EDG Support Systems      a Control Rod Drive System u Main Steam System
:                                              -        Decay Heat System            a Waste Disposal System l                                              -        Makeup & Purification System a Radiation Monitoring System
                                                                                    " ^" nun i t r System
                                              -        Core Flood System i                                                                                    a Building spray System
                                              -        Engineered Safeguards System a Feedwater System l
l m Chemical Addition System l                                                                                    m Spent Fuel System u NuclearInstrumentation System a Reactor Protection System a Containment Access                                        52 l
 
FPC - CR3
                        "'''"~""""'""""""''""""''''
l'f    . .
Nuclear Closed Cycle Cooling Sytem (SW) l i
l i
I                                                                 i I                                                           53 i


w f
w f
SYSTEM READINESS REVIEW MATRIX NUCLEAR CLOSED CYCLE COOLING SYSTEM (SW)
SYSTEM READINESS REVIEW MATRIX NUCLEAR CLOSED CYCLE COOLING SYSTEM (SW)
M.JOR                 TOPICS N BASIS                                                     ExtMsIM;DOCTMENTS                   OPERATIO*S           tealvrEMAMT       st1tv.
M.JOR TOPICS N BASIS ExtMsIM;DOCTMENTS OPERATIO*S tealvrEMAMT st1tv.
T 6   7           8J  9                                 12     33   to     35         16         17   18     19     2e 21 22           23 24 25   26   27   28   29 3e t        2                              3                      4 5                              le                          II
T t
                                                                            !                                 l                    ' !                                                                           ! ! !                                                l               j !
2 3
i                                   !    !                              .                          ! ',                    i                                    2 1     i         1 L          .
4 5
                                                                                                                                                                                                                                              '                l I        l      3 I : ' l l i                                    l i j i                                                                !
6 7
l ii j {               l                 i l l     ;   j           l l i.
8 J 9
g      - , - . . . .                                                                                                                I                                                                                               -      . ,
le II 12 33 to 35 16 17 18 19 2e 21 22 23 24 25 26 27 28 29 3e
i             e 4
! ! L !
1 X Mennem .._.J. . of mipecs for elevel 2 SRR
l I l l j
                                          ** .c                       h saled &cen SRT.OPIidentific4 igenses LM.2SW. ADD
i l
2 1 i 1
i 3
I : '
l l l i j { l i l l
; j i. l l i
l i j i I
i i
e g
4 1
X Mennem.._.J.. of mipecs for elevel 2 SRR
**.c h saled &cen SRT.OPIidentific4 igenses LM.2SW. ADD


                                                                                                                                                                        ~
~
FPC - CR3                                                                                                                                               !
FPC - CR3 System Selection Review t
System Selection Review
All Maintenance Rule Risk Significant Systems are Level 1 or 2 Systems i
                                                                            - All Maintenance Rule Risk Significant Systems are Level 1 or 2 Systems i
l Level 1 and 2 Systems Contribute to 100% of Core Damage Frequency j
l
i i
                                                                            - Level 1 and 2 Systems Contribute to 100% of Core i                                                                              Damage Frequency i
Level 1 Systems Contribute to 87% of Core Damage Frequency i
                                                                            - Level 1 Systems Contribute to 87% of Core Damage
!                                                                              Frequency i
t I
t I
l                                                                                                                                                                         !
l 54 s
54 s                                                                               ;


t FPC - CR3 System Readiness Review Phase 1 Fkh                                                                                                                                                                                            _ . . . _ _
r FPC - CR3 t
l
System Readiness Review l
                                    , February ,
Fkh Phase 1 l
M arch       ,
, February M arch A p ril M.,
A p ril           ,
June July A ugust Septem bes; October
M .,                        ,
[
June   ,
i i
July       ,
e a
A ugust ,    Septem bes; October           ,
a e
i         i             e                     a                               a                       e                 i           i               e                   i Le well System Reviews j
i i
I l
e i
l                                                  La sel 2 System Reviews l
Le well System Reviews j
I h
l l
La sel 2 System Reviews l
Level 3 System Reviews i
Level 3 System Reviews i
l                                               GROUP 1 Systems Level 3 System Reviews GROUP 2 Systems                                                         l l
l GROUP 1 Systems Level 3 System Reviews GROUP 2 Systems l
Level 3 System Reviews
l Level 3 System Reviews GROUP 3 Systems GROUP 1 Systems-Potential to impact EDGIEFW Dependency G ROUP 2 Systems - Potentini for discovery oIDB er LB issue t
                                                                                                                                                                  .            GROUP 3 Systems
GROUP 3 Systems. Remaining Systems I
!                                                                              GROUP 1 Systems- Potential to impact EDGIEFW Dependency G ROUP 2 Systems - Potentini for discovery oIDB er LB issue
55
.'                                                                              GROUP 3 Systems. Remaining Systems t
I 55


                                                                                                              ~
FPC - CR3
~
i FEY I
System Readiness Review Attribute Check Status Level 1 Systems l
l l
G i
0 0
t 3ID i
.E l
g aro l
.c i
O 2E i
-n W 0mds 5*
-A W M
k i
A.
0;; - -
V6EN V$Eh V8Ek V@EN V8Ek V8Ek WEN WEN VYEk WEk WEk l
27 2 14 2 21 2GB 37 3M 321 32 44 4 11 4 18 l
l 56 l
i
[
 
i I
i l
FPC - CR3 i
FPC - CR3 i
System Readiness Review Attribute Check Status Level 1 Systems FEY                .
System Readiness Review l
l G
l 4%L 79 Summary i
* 0              0 3ID
              .E g aro
,              .c O                                                                                                i i                2E
              $ **                                              -n W 0mds 5*                                                -A W M
i 0;; - -      _      _
                                              - A.                  .
V6EN  V$Eh V8Ek  V@EN    V8Ek      V8Ek WEN    WEN    VYEk    WEk              WEk l                    27    2 14 2 21    2GB    37        3M  321    32      44    4 11            4 18 l
56
 
!                                                                                                                                                                                                                                            -    i I
i l,
FPC - CR3                                                                                                                                                                                                                            !
i                          -
System Readiness Review l                 4%L 79 Summary i
iii 1
iii 1
I i
I i
I r
I r
I l                                                                                                                                                                                                                                                  !
i i
I l
I l
                                                                                                                                                                                                                                                    \
(                                                                                                                                                                                                                                                  !
l                                                                                                                                                                                                                                                  )
I                                                                                                                                                                                                                                                  !
i l
!                                                                                                                                                                                                                                                  l t
i i
i i
I l
I l
i l
(
i 57 i
\\
l
)
I i
l l
t i
i I
l i
l i
57 j
i h
l I
l I


                                                                                                                  - s FPC - CR3
s FPC - CR3
                          %,4                 Resolution of Emergent Issues t
%,4 Resolution of Emergent Issues r
Changes to Restart Process t
t Changes to Restart Process t
                                            - NOD Consolidation Formalize Plan / Guidance Redefine Criteria / Establish Screen Out 58
- NOD Consolidation Formalize Plan / Guidance Redefine Criteria / Establish Screen Out t
l l
)
l l
58 l
1 l


I r
FPC - CR3
FPC - CR3
                                                                                                                                        ~
~
  %        1 Restart Criteria
Restart Criteria 1
: 1. Required to address an operability issue i
1.
: 2. Required to restore acceptable design margin or conformance with design basis i
Required to address an operability issue i
: 3. Required to meet restart licensing commitments or to resolve USQs needed to restore conformance with the licensing basis
2.
: 4. Required to address an organizational, programmatic, or process deficiency that could prevent maintenance of adequate design margins or conformance                                                   '
Required to restore acceptable design margin or conformance with design basis i
with the design or licensing basis t
i 3.
!            5. Required to address significant equipment materiel condition deficiencies singly or in aggregate, or repetitive failures that could affect safety system availability, impact plant reliability, or reduce the ability of operators to operate the plant safely 59
Required to meet restart licensing commitments or to resolve USQs needed to f
restore conformance with the licensing basis 4.
Required to address an organizational, programmatic, or process deficiency that could prevent maintenance of adequate design margins or conformance with the design or licensing basis t
5.
Required to address significant equipment materiel condition deficiencies singly or in aggregate, or repetitive failures that could affect safety system availability, impact plant reliability, or reduce the ability of operators to operate the plant safely 59 f


L 6
L 6
l                   FPC - CR3                                                                                                                                                                       - !
l FPC - CR3 f
f   .
Restart Criteria (con.)
Restart Criteria (con.)
4 Issues not meeting criteria 1-5 will not be required for restart and will be classified as follows:
l 4
: 6. a.                           Item can be scheduled for a subsequent outage l                                           b.                 Item can be readily worked on line, does not affect safe and reliable operation, does not represent a significant challenge to Maintenance Rule Goals or LCO Allowed Outage Time, and does not impair i
Issues not meeting criteria 1-5 will not be required for restart and will be classified as follows:
operations necessary to perform surveillance or monitoring
6.
: c.                 Item is classified as minor maintenance, cosmetic maintenance, or housekeeping, and does not affect plant operation
a.
: d.                 Item is an administrative issue 60
Item can be scheduled for a subsequent outage l
l b.
Item can be readily worked on line, does not affect safe and reliable operation, does not represent a significant challenge to Maintenance l
Rule Goals or LCO Allowed Outage Time, and does not impair operations necessary to perform surveillance or monitoring i
c.
Item is classified as minor maintenance, cosmetic maintenance, or housekeeping, and does not affect plant operation j
d.
Item is an administrative issue 60


                                                                                                                                      +
+
i FPC - CR3 Role of Restart Accountability Team l
i FPC - CR3 Role of Restart Accountability Team l
i
l i
!              -  Decision makers at the right level
Decision makers at the right level r'
:                                                                                                                                        r'
)
)
              -  Accountable to Plant Manager                                                                                           ,
Accountable to Plant Manager Oversight by Restart Panel 1
              -  Oversight by Restart Panel                                                 .
f 61 I
61
...m.
______...m._    _ _ _ _ . -_______m.____-_                    __ ___        e e*w* * -e-*.-.
m.
e e*w*
-e-*.-.


i                                                                                                                                                                                                                         ~
I i
4 FPC - CR3 Role of Restart Panel Ig    o I
~
'                                                                                                                                                                                                                                  l
l FPC - CR3 4
                                        -        Approve changes to process i
Ig Role of Restart Panel o
I l
Approve changes to process j
i i
i i
i i
Link with NRC / CAL / 0350 process 1
i
i
                                        -        Link with NRC / CAL / 0350 process 1
'i Consolidate recommendations for restart i
i
I i
'i                                                                                                                                                                                                                                 ,
;                                        -        Consolidate recommendations for restart I
i l
^
^
1 l
l 1
i                                                                                                                                                                                                                                  I 62                       [
l i
I 62
[
i
i


4 t
t 4
i FPC - CR3                                                                                                                 -
i FPC - CR3 F{*
Implementation of Process F{*
Implementation of Process 4
4 i                                                                                                                                                   :
i l'
l' l
l Rescrub previous open issues
Rescrub previous open issues
\\
\
Consolidation ofNRC / FPC issues i
Consolidation ofNRC / FPC issues i
l l
l l
!                                                                                                                                                    l f
l f
l i
l i
l l
l l
Line 1,204: Line 1,607:
l l
l l
l 1
l 1
63   l l
63 l
I                                                                                                                                                   I
l 1
!                                                                                                                                                  i 1
I I
i 1


                                                                                              ~
~
FPC - CR3 MCAP II L pdate
FPC - CR3 l
          - Rescrub for restart April revision as committed
MCAP II L pdate l
            - "As of" 4 April                                                                   !
Rescrub for restart I
            - Completion dates reflect restart resource loadmg Completion criteria necessary to support " satisfactory progress" requirement of CAL s
April revision as committed j
- "As of" 4 April
- Completion dates reflect restart resource loadmg Completion criteria necessary to support " satisfactory progress" requirement of CAL s


                                                                                      -_.._____._ __ _ _ _ _ __ .___ _ _. _ ___.-_.....___ _.__.. _ _ _ ._ .._ q
-_.._____._ __ _ _ _ _ __.___ _ _. _ ___.-_.....___ _.__.. _ _ _._.._ q FPC - CR3 i
.                    FPC - CR3                                                                                                                             -
r%%
i Corrective Action Program Update r%%      ..
Corrective Action Program Update
l 1                                                                                                                                                               ;
[
l 1
[
i l
i l
i
i Revision to process (CP-111)
                                        -  Revision to process (CP-111)
- Involvement of supervisor / line manager (Precursor Card ownership) i
                                            - Involvement of supervisor / line manager i                                              (Precursor Card ownership)
- Timeliness of response (identify, cause determination, corrective action implementation)
:                                            - Timeliness of response (identify, cause determination, corrective action implementation)
I
                                            - Extent of condition review (A & B precursors)                                                                     l
- Extent of condition review (A & B precursors)
                                            - Effectiveness review (A & B precursors)
- Effectiveness review (A & B precursors) j
                                            - CARB involvement (extend / downgrade) 65
- CARB involvement (extend / downgrade) i 65


                                                                                    ~
l
                                                                                    ~
~
FPC - CR3 Challenges to Process t
FPC - CR3
                  - Influx of PCs from extent of condition reviews
~
                  - Backlog
Challenges to Process I
                  - Monitoring sensitivity i
t I
66
Influx of PCs from extent of condition l
I reviews Backlog Monitoring sensitivity i
66 1


FPC - CR3 Closure of MC 0350 Action Items Regulatory Readiness Plan
\\
                                                          - Closure Packages and Schedule
FPC - CR3 1
                                                          - NRC Assessment Team Coordination 67
Closure of MC 0350 Action Items Regulatory Readiness Plan L
Closure Packages and Schedule NRC Assessment Team Coordination I
l 67
{


r i
FPC - CR3 Regulatory Readiness Strategy l
FPC - CR3 Regulatory Readiness Strategy l
            - Develop closure sequence for all restart issues Maintain closure schedule in one master schedule
l l
            - Use schedule to inform organization oflicensing needs l
i Develop closure sequence for all restart issues l
            - Measure licensmg performance by adherence to schedule
Maintain closure schedule in one master schedule I
            - Provide closure management by projecting NRC review needs and maintaining status ofissues 1                                                                                                                                                                                                                                         68 i
Use schedule to inform organization oflicensing needs i
l l
Measure licensmg performance by adherence to schedule Provide closure management by projecting NRC review needs and maintaining status ofissues 1
68 l
i i
t
t


i
i 1
                                                                                                                                                                        . 1 I
I FPC - CR3 l
FPC - CR3                                                                                                                                                             ;
l License Amendments - resolve USQs and Unanalyzed Condition-s l
l
Tech Spec changes - support plant modifications and j
                                -                        License Amendments - resolve USQs and Unanalyzed Condition-s Tech Spec changes - support plant modifications and safe operation l
i safe operation l
                                -                        License submittals - correct Licensing Bases 1                                                                                                                                                                           :
License submittals - correct Licensing Bases 1
l
Commitment and Issue Closure Packages j
                                -                        Commitment and Issue Closure Packages l
l l
NRC Inspections NRC Readiness Assessments l
NRC Inspections NRC Readiness Assessments l
l 1
l 1
l l                                                                                                                                                                     69
i l
l 69 l


4 FPC - CR3                                                                                                                                                   -
l
g i
)
l                                                                                                                         Closure Packages and Schedule o
I 4
l i
FPC - CR3
Documentation assembled as issue or commitment is completed
)
                                                              - Regulatory Assurance review packages (QA oversight)
i i
                                                              - Closure packages are available to NRC Inspection Teams
l g
                                                              - Integrated Schedule drives timing 1
Closure Packages and Schedule j
                                                              - Regulatory Assurance will coordinate interface i
o l
70
l l
l l
i j
Documentation assembled as issue or commitment is completed i
Regulatory Assurance review packages (QA oversight)
Closure packages are available to NRC Inspection Teams j
Integrated Schedule drives timing Regulatory Assurance will coordinate interface 1
i 70


FPC - CR3                                                                                         -
FPC - CR3 l
F{@}
NRC Assessment Team Coordination i
NRC Assessment Team Coordination i
F{@}              .. .
i 1
!                                                                                                      i
FPC Briefings support issue closure Restart Panel meetings show progress toward restart MCAP efforts show progress on organizational and programmatic changes j
:                                                                                                      1
FPC self-assessments demonstrate organizational l
                        - FPC Briefings support issue closure
l l
                        - Restart Panel meetings show progress toward restart
readiness i
                        - MCAP efforts show progress on organizational and j
NRC assessment teams confirm organizational, operational, and system readiness l
programmatic changes l
i l
                        - FPC self-assessments demonstrate organizational l                         readiness i
[
                        - NRC assessment teams confirm organizational, operational, and system readiness i
l                                                                                                      [
r I
r I
71   I i
k 71 I
i


1 l
1 l
i F
l F
        .__ - m - u Restart Authorization Plan RESTART AUTIIORIZATION PL AN w
Restart Authorization Plan i
2 MCAP II Root Causes
f
                      - Organizational                                                                                                             _    Root Cause     4 Effectiveness                                                                                                                 identification
.__ - m - u w
                      - Corrective Action Program                             +
l RESTART AUTIIORIZATION PL AN l
                      - Self Assessment                                                                                                                     Corrective
I 2
                      - Performance Monitoring A ction     +
MCAP II Root Causes
and Trending                                                                                                                     Program                                 i
[
                      - Root Cause Analysis
- Organizational Root Cause 4
                      - Q A Follow-up                                                                                                                                                               i b*U                                   '
Effectiveness identification
                      - Maintain Design a Licensing Basis
- Corrective Action r
                                                                                                                                                    -      A ssessm ent   h                         j
Program
                      - Operations Resources                                                                         Closure       h*O 0350
+
                      -Change Management                                                                 +         pg         +   gg;         ;
- Self Assessment Corrective
g       ,
- Performance Monitoring A ction
Licensee      m     NRC
+
* M anagem ent   - -
and Trending Program i
Concurrence Restart issues               +                                                     '
- Root Cause Analysis l
f                            EITectiveness List                                                                           .
- Q A Follow-up i
4      Self                     Staff Operat onal p e,
b*U
                                                                            ?                               5       Training       \ ssessment - U         E ffectiveness
- Maintain Design a A ssessm ent h
* Regulatory Readiness               +                                                                                   -        Regulatory   y Com pliance System Readiness               4 Plant Physical y Readiness I
j Licensing Basis
i l                                                                                                                                                                                             72 t
- Operations Resources Closure h*O 0350
-Change Management
+
pg
+
gg; Licensee NRC g
m M anagem ent Concurrence f
EITectiveness
[
Restart issues
+
List 4
Self Staff Operat onal
?
5 Training
\\ ssessment
- U E ffectiveness
* p e, Regulatory Readiness
+
Regulatory y
[
Com pliance j
System Readiness 4
f Plant Physical y Readiness L
I i
l 72
[
I t


FPC - CR3                                                                                                         -
FPC - CR3 License Amendments and Tech Spec Submittals I
License Amendments and Tech Spec Submittals 25 ui                                                              ;                  5ubmittals to W   20 d                                                                           be made
i 25 5ubmittals to ui W
            .li!
20 d be made
!            E
.li!
            .o 15
E Goal =0
                                                                            -                  Goal =0
.o 15 a
:            a
;l M
;l           M l             o 10 u
l o
W 5                                                                                             -
10 l
E                                                                                                  I 3
u W
Z                                                                                                               i 0::   =   =   =     =           =   ,                =                     =   = =     ::
L E
Jan Feb Nbr Apr   May         Jun Jul             Atg Sep Oct                       bbv   [bc 1997 ll 73         .
I 5
I 3
l Z
i 0::
=
=
=
=
=
=
=
=
=
Jan Feb Nbr Apr May Jun Jul Atg Sep Oct bbv
[bc 1997 ll 73 l
t


                                                                                                                                                                                                                              . I I
I I
i FPC - CR3                                                                                                                                                                                                               j r
i FPC - CR3 j
i S&   -
r i
Other NRC Restart Submittals                                                                                                   ___                                                        i i         ..
S&
                                                                                                                                                    -?                       w l                                   25 e    *                                                                                                                  *
Other NRC Restart Submittals i
                                                                                                                                                                '          S u b mittals to                                     :
i t
e   20                                                                                                                                       be made                                             !-
-?
1
w l
:                              m                                                                                                                                                                                                 ;
25 I
                                                                                                                                                                -          Goal =0                                               .
S u b mittals to e
3s    15 4
e e
0   10 u                                                                                                                                                                                                 ,
20 be made 1
e i                             .O                                                                                                                                                                                                   j
m Goal =0 3
:                              E a   5 z                                                                                                                                           v I
15 s
0 ...
4
Jan   Feb Mar Apr May Jun                                                                                       Jul Aug Sep Oct Nov Dec i
%0 10 u
1997
e i
* f 74
.O j
E l
5 a
z j
v I
0..
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec i
i 1997 I
f j
74


I                                                                                                                                                                                                     . :
I t
t 1
1 FPC - CR3 t
FPC - CR3                                                                                                                                                                           ,
License Amendments and Tech Spec Changes 1
t License Amendments and Tech Spec Changes 1                                                                                                                                                                                                       :
25.
!                                                            25 .
I l
I         _ _ _    _ . _ - .            _ _ _ _ _ .
1 Pla n n e d N RC 2
:                                                                          ;      Pla n n e d N RC                                                                     .
20 A p p r o v als a>O ua 15 i
2    20                   A p p r o v als a
i a
O u
i t
a 15 i                                                         a
+
                                                      +
O 10 me
O m 10 e
.O l
                                                      .O l                                                         E s   5 i
E s
i z                                                               -
5 i
w l
z w
l                                                             0 -      .        .              .-
i l
Jan Feb Mar Apr May Jun                                                   Jul Aug Sep Oct Nov Dec 1997 75
l 0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 75


f i
f t
FPC - CR3                                                                                                                   -
i FPC - CR3 rEh. _ _ Other NRC Restart Submittals i
rEh. _ _ Other NRC Restart Submittals                                                                                                 i 25 Pla n n ed is s u 20         Clo s u r e                                                                                                 ,
25 Pla n n ed is s u v
e                                                                                                                         '
20 Clo s u r e e
i             d) s
r i
,              m, 3
d) s m,
15 O                                                                                                                         .
15 3
15 10
O 15 10 i
              .c                                                   .
.c l
l             E s   5
l E
!            z 0 , ,
i s
Jan Feb Mar Apr May Jun                       Jul Aug Sep Oct Nov Dec 1997 76
5 z
0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 76 I
i


  ,I(ii   ;,.      1!       ;i   'Ig,           h[fI i   n ,
,I(ii 1!
I!!fi!!l' 7
;i
                                            .                              7 t
'Ig, h[fI i
s n
n I!!fi!!l' 7
e t
7 s
m e
tn e
me t
a t
a t
S
S g.
: g.      .
n i
i n
d_
d_u.
u.
.-                      l c
lcn o
-                        n o
C
C r
- r
  -.      ,iI
,iI n
                          ;:      n    4 1     4       43
4 1
4 t
43


l License Amendments and Tech Spec Changes                       -
l License Amendments and Tech Spec Changes Issue Submittal Submittal NRC Date Approval Date SB LOCA TSCRN 3.7.5 EFW 5/28/97 10/30/97 TSCRN 3.7.7 SW TSCRN 3.7.9 RW i
Issue               Submittal Submittal NRC Date         Approval Date SB LOCA           TSCRN 3.7.5 EFW                         5/28/97     10/30/97 TSCRN 3.7.7 SW                                                         '
Ne'n TS Control Complex Cooling i
TSCRN 3.7.9 RW                                                         i Ne'n TS Control Complex Cooling i
TSCRN 3.5.2 ECCS TSCRN 3.7.8 DC TSCRN 3.7.10 DH Seawater TSCRN 3.8.1, 3.8.3 FWP-7 Diesel USQ i
TSCRN 3.5.2 ECCS TSCRN 3.7.8 DC TSCRN 3.7.10 DH Seawater                                               '
SW/RW Pull to Lock USQ EFP-1/DHP-1A Trip Block Defeat USO TS Bases 3.8.2 500 kV Substation 6/6/97 9/5/97 License Amendment DH-45-Fi 6/16/97 9/15/97 i
TSCRN 3.8.1, 3.8.3 FWP-7 Diesel USQ                                                       i SW/RW Pull to Lock USQ EFP-1/DHP-1A Trip Block Defeat USO TS Bases 3.8.2 500 kV Substation         6/6/97     9/5/97 License Amendment DH-45-Fi               6/16/97   9/15/97             i Appendix R issues Exemption Request                         10/96A     10/20/97 System Readiness License Amendment                         6/13/97 I
Appendix R issues Exemption Request 10/96A 10/20/97 System Readiness License Amendment 6/13/97 9/12/97 Reviews LTOPS JCO submittal / exemption request 4/4/97 5/1/97 TSCRN,(if required) 7/16/97 10/15/97 EOP/AP Strategy License Amens
Reviews                                                                9/12/97 LTOPS             JCO submittal / exemption request       4/4/97     5/1/97 TSCRN,(if required)                     7/16/97     10/15/97 EOP/AP Strategy     License Amens   '
:nt 7/14/97 10/13/97 Regarding Operator Actions ILRT TSCRN App. J. Option B 4/7/97 6/2/97 1
:nt                   7/14/97     10/13/97 Regarding Operator Actions ILRT               TSCRN App. J. Option B 1                                                                    4/7/97     6/2/97
RWP Cyclone USQ submittal 6/16/97 10/13/97 Separator Fouling CCHE Tech Spec CCHE TSCRN (SRs) 7/25/97 10/25/97 Review License Amendment, (if needed) 7/28/97 9/29/97 Implementation of License Conditions  
;          RWP Cyclone       USQ submittal
!                                                                    6/16/97     10/13/97 Separator Fouling CCHE Tech Spec CCHE TSCRN (SRs)                       7/25/97     10/25/97 Review             License Amendment, (if needed)         7/28/97     9/29/97 Implementation of License Conditions Enclosure 3


i l
i l
Potential USQs   HPl Pump Recirc                             6/27/97         9/26/97 MUV-31 controllogic change                 6/27/97         9/26/97 EDG Protective Trips                       6/27/97       9/26/97 HPI Analysis (with/without HPl venturis)   6/27/97       9/26/97 HPl Nozzle Cyles                           7/18/97       9/25/97 Letdown Line Rupture (manual action)       4/25/97       6/27/97 AHFL-1/2                                   5/16/97       8/15/97 OTSG Tech Spec   TSCRN 3/28/97       6/30/97 RG 1.97 Issue   b PAM, EDG kW Meters (Other new             4/30/97       8/17/97 Type A's)-TSCRN Non-Restart License Amendments and Tech Spec Changes RCP Flywheel     TSCRN                                       8/11/97       1/29/98 Tendon           TSCRN                                       12/19/97     3/20/98 Surveillance 4
Potential USQs HPl Pump Recirc 6/27/97 9/26/97 MUV-31 controllogic change 6/27/97 9/26/97 EDG Protective Trips 6/27/97 9/26/97 HPI Analysis (with/without HPl venturis) 6/27/97 9/26/97 HPl Nozzle Cyles 7/18/97 9/25/97 Letdown Line Rupture (manual action) 4/25/97 6/27/97 AHFL-1/2 5/16/97 8/15/97 OTSG Tech Spec TSCRN 3/28/97 6/30/97 RG 1.97 Issue b PAM, EDG kW Meters (Other new 4/30/97 8/17/97 Type A's)-TSCRN Non-Restart License Amendments and Tech Spec Changes RCP Flywheel TSCRN 8/11/97 1/29/98 Tendon TSCRN 12/19/97 3/20/98 Surveillance 4
i
i


1 l
1 l
Other NRC Restart Submittals                         -
Other NRC Restart Submittals i
i Issue                 Submittal                           Submittal Issue Date       Closure Date   I 1
Issue Submittal Submittal Issue Date Closure Date 1
SB LOCA               LPI Mission Time (DHP) letter       6/20/97   10/13/97 Boron Precipitation letter         8/29/97   10/13/97 l
SB LOCA LPI Mission Time (DHP) letter 6/20/97 10/13/97 Boron Precipitation letter 8/29/97 10/13/97 Appendix R lssues Assessment Summary 4/21/97 11/3/97 ADV 30-day Response 4/11/97 4/11/97 LTOPS Revised response on GL 88-11 8/25/97 11/14/97 j
Appendix R lssues Assessment Summary                       4/21/97   11/3/97 ADV 30-day Response                 4/11/97   4/11/97       l LTOPS                 Revised response on GL 88-11         8/25/97   11/14/97     j System Readiness SRR Procedure                                                       l 3/28/97   10/10/97       i Reviews               SRRP Summary                       6/23/97   10/10/97 EOP/AP Operator       EOP commitment date change         3/31/97   11/10/97 Actions GL 96-01             Summary Report                     7/18/97   11/18/97 FSAR Rev. 23         Letter to NRC re: USQs             3/31/97   9/15/97 USQs                 Letter following FSAR review       7/7/97   9/15/97 GL 96-06             Letter to NRC SW Fitting             5/12/97   6/26/97 Summary Report                       6/26/97   6/26/97 TS Bases             Summary of TS Bases changes         4/14/97   4/14/97 Submittal Tendon               Special report to NRC               7/25/97   10/24/97       i Surveillance                                                                         i T
System Readiness SRR Procedure 3/28/97 10/10/97 Reviews SRRP Summary 6/23/97 10/10/97 EOP/AP Operator EOP commitment date change 3/31/97 11/10/97 Actions GL 96-01 Summary Report 7/18/97 11/18/97 FSAR Rev. 23 Letter to NRC re: USQs 3/31/97 9/15/97 USQs Letter following FSAR review 7/7/97 9/15/97 GL 96-06 Letter to NRC SW Fitting 5/12/97 6/26/97 Summary Report 6/26/97 6/26/97 TS Bases Summary of TS Bases changes 4/14/97 4/14/97 Submittal Tendon Special report to NRC 7/25/97 10/24/97 i
Maintenance Rule     Walkdown Summary Report             7/15/97   7/15/97         l Structural Baseline Integrated Safety     Summary Report (?)                 10/24/97   10/24/97 Assessment of Current Outage
Surveillance i
!              Modifications l
Maintenance Rule Walkdown Summary Report 7/15/97 7/15/97 T
l CCHE Tech Spec       NRC Letter withdrawing TSCRN       3/18/97A 5/26/97 FSAR Rev. 24         Rev. 24                             11/21/97 11/21/97 I
Structural Baseline Integrated Safety Summary Report (?)
i
10/24/97 10/24/97 Assessment of Current Outage Modifications l
l CCHE Tech Spec NRC Letter withdrawing TSCRN 3/18/97A 5/26/97 FSAR Rev. 24 Rev. 24 11/21/97 11/21/97 i


i .
i GL 95-03, Circ.
GL 95-03, Circ.
Letter of resolution (?)
Letter of resolution (?)                 6/2/97           6/23/97
6/2/97 6/23/97 Cracking of SG
;              Cracking of SG                                                                       ~
~
Tubes l
Tubes l
GL 95-07, Letter of resolution (?)                   6/9/97           6/11/97 Pressure LockingfThermal Binding Request Restart       Letter request                           11/30/97           12/15/97 Approval MCAP-Il               Rev. 2                                   4/30/97           12/15/97 Non-Restart Submittals ISI interval         Letter to extend second interval         3/13/97A           3/13/97A Extension ASME Section XI       interval closure report submittal         11/10/97           11/19/97 IPEEE                 IPEEE letter                             3/31/97           5/5/97       i FSAR Rev. 25           Rev. 25                                   x/98             x/98
GL 95-07, Letter of resolution (?)
{
6/9/97 6/11/97 Pressure LockingfThermal Binding Request Restart Letter request 11/30/97 12/15/97 Approval MCAP-Il Rev. 2 4/30/97 12/15/97 Non-Restart Submittals ISI interval Letter to extend second interval 3/13/97A 3/13/97A Extension ASME Section XI interval closure report submittal 11/10/97 11/19/97 IPEEE IPEEE letter 3/31/97 5/5/97 i
Security Plan         Biometrics Submittal                     4/11/97           9/1/97 Upgrade               Rev. 6-14 Correction                     4/21/97           9/1/97 Upgrade #1 Submittal                     5/15/97           9/1/97 Upgrade #2 Submittal                     7/7/97             9/1/97 Severe Accident       Deferral Letter                           6/30/97           6/30/97 Management A-46 Seismic         First submittal                           3/31/97           7/20/97 Second submittal                         7/20/97           7/20/97       !
FSAR Rev. 25 Rev. 25 x/98 x/98 Security Plan Biometrics Submittal 4/11/97 9/1/97 Upgrade Rev. 6-14 Correction 4/21/97 9/1/97 Upgrade #1 Submittal 5/15/97 9/1/97 Upgrade #2 Submittal 7/7/97 9/1/97 Severe Accident Deferral Letter 6/30/97 6/30/97 Management A-46 Seismic First submittal 3/31/97 7/20/97 Second submittal 7/20/97 7/20/97 OTSG Tech Spec Mode 4 Report (?)
OTSG Tech Spec       Mode 4 Report (?)                         10/30/97           10/30/97 90-day post-outage report (?)             3/24/98           3/24/98 1
10/30/97 10/30/97 90-day post-outage report (?)
3/24/98 3/24/98


i FPC - CR3 fjy                         License Amendments and Tech Spec Changes t       . . _ . .                                                                        _.           . . . . - _
i FPC - CR3 fjy License Amendments and Tech Spec Changes t
                                                                                                                                                                                      ._. . . .               ._.X                            ._ .                     ..a ._ ..             _ : , . A a ; .. .                  . :
._.X
_ :,. A a ;...
f a
l t
I
.s.
.._....A - --
m..
....)
i 25 --
-- 25 i
i 1
r 5
20 --
0 Submittals to be made
- - 20 19 t
e Tu t
-+-Work off curve j
15 --
15
-- 15 o
o m
13 o
i n.
4 o
o 10 --
- 10 E
oz i
\\
l 5--
5
--5 l
I I
l
l
                                                                                                                                                                                    .s.                        .._.. . .A - --                  .-                            m..    .-          .  - ,        _ _ . _        ....)
?
25 --                                                                                                                                                                                                                                  -- 25 i
t Goal = 0 O-l 0
1 20 --                                                                  0                                                                                                                                                                  - 20 19 Submittals to be made                                                    -
0 0 -0 i
e Tu t                                                                                                                                                      -+-Work off curve j        15 --                                                                                                                  15                                                                                                              -- 15 o
1/31/97 3/31/97 5/31/97 7/31/97 9/30/97 11/30/97 l
o m                                                                                                                                      13 o                                                                                                                                                                                                                                                                                              i n.
4                        o o        10 --
E
                                                                                                                                                                                                                                                                                              - 10                                          -
o
\
z                                                                                                                                                                                                                                                                                                i
                  ,                                    5--                                                                                                                                        5                                                                                        --5                                              l I
l t
O-                                                                                                                                                                                                                                          Goal = 0 l               0   0 0 -0                 ,                            i
!                                                        1/31/97                                                 3/31/97                                                   5/31/97               7/31/97                           9/30/97               11/30/97                                                                       -


'l FPC - CR3                                                                                                                                                                         '
'l FPC - CR3
((%                                           Other NRC Restart Submittals
((%
_ . _ _ . _ .              t 25 --
Other NRC Restart Submittals t
                                                                                                                                      -- 25                                               i 23 l
I 25 --
-- 25 i
23 i
i l
20 --
20 --
                                                                                                                                '                                                        t
t
                                                                                                                                    --20 19                             MSubmittals to be made
--20 19 MSubmittals to be made l
.                                                                                                                                                                                        f i
f i
3                                                                     -+-Work off curve                                                                     !
3
E                                                                                                                                                           !
-+-Work off curve E
g       15 --                             15
l g
                              .o                                                                                                    -- 15                                                 t 3                                                14 v)             e
15 --
                                              ~
15
o t                                                                                                                                                         !'
-- 15 t
                            .o       10 --
.o 14 3v) e
E                                                                                                   -- 10 3                                                           9 2                                                                                                                                                           '
~
\
o t
5--                                                               5
.o 10 --
                                                                                                                                      -5                                                 !
E
3 2
-- 10 3
o_                                                                                                     Goal
9 2
* 0                                   :
\\
!                                                                                                                                    _o 1/31/97     3/31/97         5/31/97         7/31/97             9/30/97   11/30/97 l
5--
r
5
:                                                                                                                                                                                        I l
- -5 I
3
(
2 l
o_
Goal
* 0
_o 1/31/97 3/31/97 5/31/97 7/31/97 9/30/97 11/30/97 l
r I
l
?
i
i


                                                                                                                                                                                . I 1 l*C - Cl O                                                                                                                                                               ~
I 1 l*C - Cl O
        .Y                         License Amendments and Tech Spec Approvals 25 --
~
                                                                                                                                                      -- 25                     i i
.Y License Amendments and Tech Spec Approvals I
25 --
-- 25 i
i
'l
'l
^
^
4 20 --                                                                                                         2 1 MScheduled NRC Approvals                                                                 -- 20 m
20 --
3>                                      -+--NRC Approval curve o                 15 --                                                                                         16
2 1 I
: a.                                                                                                                               -- 15
4
: o.                                                                                                                                                           .
-- 20 MScheduled NRC Approvals m3
ee i                                                                                                                                                                                i O
-+--NRC Approval curve
f-
>o 15 --
                    's a                                                                                                         11
16 a.
                    .o                 10 --                                                                                                                                     i E
-- 15 o.
                                                                                                                                                      -- 10                       i z                                                                                                                                                             i-6 5--
1 i
                                                                                                                                                      --5                         !
ee O
4 l
i f
l
's 11 a.o 10 --
                                                                                                                                                                                  )
i E
1                                           -
-- 10 i
i z
6 5--
--5 4
l l
)
1 h
0-
0-
                                                                                                                                                      -0                         :
- 0 1/31/97 3/31/97 5/31/97 7/31/97 9/30/97 11/30/97 I
1/31/97               3/31/97                       5/31/97         7/31/97   9/30/97     11/30/97 i
f i


FPC - CIO                                                                                                                                                                                               .
FPC - CIO
                        .y\ ,
.y\\,
Other NRC Restart Submittals i
Other NRC Restart Submittals i
25 - -
25 - -
                                                                                                                                                                                                        -- 25 i
-- 25 i
2:
2:
i i
i 20 --
20 --                 M Scheduled issue Closure
M Scheduled issue Closure i
                                                                                                                                                                                                        - - 20                   l
- - 20 l
                                                                      -+-NRC lssue Closure Curve
-+-NRC lssue Closure Curve g
                              $                                                                                                                                                            16 g                15 --
15 --
                              .E!                                                                                                                                                                       -- 15 o
16
5                                                                                                                                                                                               l
.E!
                              .o
-- 15 o
[               10 --                                                                                                                                                                           .
5 l
z                                                                                                                                            10                         -- 10                   I 8
.o
5--                                                                                             ~
[
                                                                                                                                                                                                      --S                     i i
10 --
3 l
I 10
e
-- 10 I
                .                              0-                                                                                                                                                             .
z 8
                                                                                                                                                                                                        .0 1/31/97                                               3/31/97                     5/31/97     7/31/97     9/30/97                     11/30/97 i
5--
~
--S i
i 3
l e
0-
. 0 1/31/97 3/31/97 5/31/97 7/31/97 9/30/97 11/30/97 i


_- -  , - . - . _ ~ .           - - - . - - . . . - _ - . . - - . _ .                                    - -.            . - . - . ~ . - . - - . - ~ . - . _ . . . -
, -. -. _ ~.
;        3           :
. -. -. ~. -. - -. - ~. -. _... -
CBC2- Run Oste: 20 Mar,7                                                                                                                                                           I Peas             I ProjectVlew                                                                                   Legend I
3 I
!          project: RESTAgy                                                                                   Time Now           : 10Mer97 07:             20 l
CBC2-Run Oste: 20 Mar,7 Peas I
a.s i.is, o ..     c: j Forecest End: 29Wav99 15:                     30         c,s u s.: o ..     see Version: Of Restert Detell Schedule                                                               Reeutred End: 310ec98 23:                     )0 me i
ProjectVlew Legend I
Targets:                                                       Showing Forecast Dates                                                                       , ,,,, ,,,,,,,,
project: RESTAgy Time Now
19??                                                                                 1998 Jon IFeb lWer lApr IWev lJun lJul lAug lSep (Oct lNow IDef                           Jan lFeb lWer l l             SIGNIFICANT JOB: SB LOCA                                                                                                                                                       1
: 10Mer97 07: 20 a.s i.is, o..
!                                            1. Smell Break LOCA                                                                                                                             j l                     OlWor 9 7 0 7 : 0 0 ===                                                                 '04Dec97 15:00                                                                 j
c:
,                                            A. EFW/EDC (R 2,             4, 6. D-5. 6. 12 14)
j Forecest End: 29Wav99 15: 30 c,s u s.: o..
!                      OIWor   97 07:00                                                                         04Dec97 15:00 Westing With NRR 18Wer97 07:00110Wer9 7 15:00 l                                             1   'A'   Diesel 6 EFP-2 Dependenew (D-5               R l                     Olwer   97 07:00 ---                                                                     04Dec97 15:00 Revise TS 3.7.5 EFW linct potentle! USO OlWer 9 7 0 7 : 0 0 ===                                                       '290ct97 15:00 l                                                                 NRC review /spproval TS 3.7.5 EFW i
see i
16 Wen 97 15:00i                                   il70ct97 15:00 Submit proposed License Amendment to NRC l-                                         16 Wen 97 15:001 i                                               Revise TS 3.7.7 SW j                         llWor97 06:00 -                                                             il0Nov97 15:00
Version: Of Restert Detell Schedule Reeutred End: 310ec98 23: )0 Targets:
,                                                                NRC review /sporevel TS 3.7.7 SW
Showing Forecast Dates me 19??
!                                        12Wawi7 15:00>                                     il30ct97 15:00 l
1998 Jon IFeb lWer lApr IWev lJun lJul lAug lSep (Oct lNow IDef Jan lFeb lWer l l
Submit proposed License Amendment to NRC 12Wew97 15:00I j                                               Revise TS 3.7.9 RW l                         IlWar97 07:00 -                                                             il0Nov97 15:00 l                                                               NRC review /sporoval TS 3.7.9 RW i
SIGNIFICANT JOB: SB LOCA 1
12Mov     17 15:00i                                 il30ct97 15:00 Submit proposed License Amendment to NRC 12 Wow 97 15:001 New TS For Control Complex Cooling 17 der 97 07:00!                                                             il4Nov97 15:00 NRC review /opprovst new TS Control Compi 16 Wen 97 15:00i                                   il70ct97 15:00 Submit proposed License Amendment to NRC
: 1. Smell Break LOCA j
: t.                                       16 Wow 97 15:001 l
l OlWor 9 7 0 7 : 0 0===
l                                                   Revise TS 3.5.2 (ECCSI I                             2 4Wer97 00:00       >
'04Dec97 15:00 j
m20Nov97 15:00 l                                                                   NRC review /spproval TS 3.5.2 (ECCSI l
A.
22 Wow 97 15:00i                                       '230ct97 15:00 Submit proposed License Amendment to NRC 22Wew97 15:001
EFW/EDC (R 2, 4, 6. D-5. 6.
!                                                    Revise TS 3.7.8 (DC) l                               31 War 97 00:00                                                             :27Nov97 15:00 l
12 14)
NRC review /epproval TS 3.7.0 (DC) 29Wew97 15:00i                                         '300ct97 15:00 Submit proposed License Amendment to NRC 290ev97 15:00i Revise TS 3.7.10 (DH Seewster) 07Apr97 00:00                                                                 :040ec97 15:00 l                                                                     NRC review /spproval TS 3.7.10               (DH Seewe
OIWor 97 07:00 04Dec97 15:00 Westing With NRR 18Wer97 07:00110Wer9 7 15:00 l
,                                              05Jun97 15:00-                                         iD6Nov97 15:00
1
!                                                                      Submit proposed License Amendment to NRC
'A' Diesel 6 EFP-2 Dependenew (D-5 R
:                                              0' Jun97 15:006 4
l Olwer 97 07:00 ---
.                                                2. Revise EDC Specs For Upreted Capacity I                       llWer97 07:00 -                                                               il4Nov97 11:00 Revise TS 3.8.l and 'S 3.8.3 Ilwer97 07:00 -                                                               il4Nov97 11:00 Jon IFeb lWer JApr l Wow lJun (Jul lAug lSep 10ct INov lDec                         Jon lFeb lWer ]
04Dec97 15:00 Revise TS 3.7.5 EFW linct potentle! USO OlWer 9 7 0 7 : 0 0===
l                               1997                                                                                 1998 l
'290ct97 15:00 l
Enclosure 4
NRC review /spproval TS 3.7.5 EFW i
16 Wen 97 15:00i il70ct97 15:00 Submit proposed License Amendment to NRC l-16 Wen 97 15:001 i
Revise TS 3.7.7 SW j
llWor97 06:00 -
il0Nov97 15:00 NRC review /sporevel TS 3.7.7 SW 12Wawi7 15:00>
il30ct97 15:00 l
Submit proposed License Amendment to NRC 12Wew97 15:00I j
Revise TS 3.7.9 RW l
IlWar97 07:00 -
il0Nov97 15:00 l
NRC review /sporoval TS 3.7.9 RW i
12Mov 17 15:00i il30ct97 15:00 Submit proposed License Amendment to NRC 12 Wow 97 15:001 New TS For Control Complex Cooling 17 der 97 07:00!
il4Nov97 15:00 NRC review /opprovst new TS Control Compi 16 Wen 97 15:00i il70ct97 15:00 Submit proposed License Amendment to NRC t.
16 Wow 97 15:001 l
l Revise TS 3.5.2 (ECCSI I
2 4Wer97 00:00 m20Nov97 15:00 l
NRC review /spproval TS 3.5.2 (ECCSI l
22 Wow 97 15:00i
'230ct97 15:00 Submit proposed License Amendment to NRC 22Wew97 15:001 Revise TS 3.7.8 (DC) l 31 War 97 00:00
:27Nov97 15:00 l
NRC review /epproval TS 3.7.0 (DC) 29Wew97 15:00i
'300ct97 15:00 Submit proposed License Amendment to NRC 290ev97 15:00i Revise TS 3.7.10 (DH Seewster) 07Apr97 00:00
:040ec97 15:00 l
NRC review /spproval TS 3.7.10 (DH Seewe 05Jun97 15:00-iD6Nov97 15:00 Submit proposed License Amendment to NRC 0' Jun97 15:006 4
: 2. Revise EDC Specs For Upreted Capacity I
llWer97 07:00 -
il4Nov97 11:00 Revise TS 3.8.l and 'S 3.8.3 Ilwer97 07:00 -
il4Nov97 11:00 Jon IFeb lWer JApr l Wow lJun (Jul lAug lSep 10ct INov lDec Jon lFeb lWer ]
l 1997 1998 l  


CBC2 kun Date: 2CMar$7                                                                     Page     2 projectVlew                                                       L'8'"d Project: RESTART                                                         Time how       16Mer97 07: :D   a gi e , o,,,, cm Forecest End:. 29Wew98 15:  ;0 c,,,,,,, ,,,,' eg, version: Di Restart Detail Schedule                                       Required End: 3tDec98 23:   30 Tcreets:                                   Showing Forecast Dates 1997                                                               1999 Jon lFeb lWer lApr lWeg lJun lJul laug lSep 10ct lNov lDec         Jan lFeb l Mar l SIGNIFICANT JOB: SB LOCA NRC review /sporoved TS 3.8 I end TS 3.8.
CBC2 kun Date: 2CMar$7 Page 2
16 Mag 97 11:00i                               il70ct97 11:00 Submit proposed License Amendment to NRC 16 Mew 97 11: 00 i Revise Bases for TS 3.8.1 and 3.0.2 3l Mar 97 07:00-                                   iO30ct97 15:00 NRC review / approval Bases 3.8.2 OoJun97     15:00i               '05Sep97 15:00 Submit proposed License Amendment to NRC 06Jun97 15:001 C. LPI Mission Time and Boron Precipitet Iluer97 07:00 u _ J05 Mew 97 15:00 Subratt Letter on DHP Low Flow Test Resul 31 Mar 97 f7:C0 C JIBApr97 15:00 Submit Letter on Boron Precipitet lon DISep97 07:00 005Sep97 15:00 D. Lic Amend on DH-45-FI Lic Cond (R51 3tMer97 15:C   0i                                     il30ct97 15:00 NRC rev'lew/epproval Lie Am on DH-45-FI 16Jun97   15:00i               il5Sep97 15:00 Submit proposed License Amendment to NRC 16Jun97 15:00i SIGNIFICANT JOB: APPENDIX R ISSUES
projectVlew L'8'"d Project: RESTART Time how
: 2. Appendia   R Issues (D-II. 221
. 29Wew98 15: ;0 16Mer97 07: :D a gi e,
                                                                          >03Nov97 15:00 0-22 Ampeelty llusr57 07:00 =                                   '08Sep97 15:00 P epare submittel for App. R essessment IIMer97 07:00 p         121Apr97 15:00 Submitted to NRC                                                                             '
o,,,,
21Apr97 15:00I
cm Forecest End:
                                                                                                                                  )
c,,,,,,,
NRC Inspection (Fire Protect!       :n Function 23Sep97 07:00i         '03Nov97 15:00 NRC review /epproval App R Exemptions (Th IBuer97 07:00                                             >200ct97 15:00 Submitted to NRC                                                                                   l IEuer97 07:00l                                                                                                       l SIGNIFICANT JOB: SYSTEM READINESS REVIEWS
eg, version: Di Restart Detail Schedule Required End: 3tDec98 23: 30 Tcreets:
: 31. System Readiness Reviews (D-13, 231 Ilusr97 07:00 or                                       il00ct97 15:00 ADV 30-dow Response IBWar97 07:00 t       il6Apr97 15:00 Submit response IBuer97 07:00         il6Apr97 15:00 Submit SRR Procedure 2iApr97 LO:00i License Amendments /FSAR Update 30Mer97 00:00i                                       i100ct97 15:00 NRC review / approval System Readiness Rev 3Jun97 15:00i                   il25ep97 15:00 Submit proposed License Amendment to NRC 13Jun97 15:00i t                                                Submit SRR Summerv 23Jun97 15:00I l               Jan lFeo l War (Apr lWev lJun lJul lAug lSep lOct lNov lDec         Jon lFeb l War l l               1997                                                               1998
Showing Forecast Dates 1997 1999 Jon lFeb lWer lApr lWeg lJun lJul laug lSep 10ct lNov lDec Jan lFeb l Mar l SIGNIFICANT JOB: SB LOCA NRC review /sporoved TS 3.8 I end TS 3.8.
16 Mag 97 11:00i il70ct97 11:00 Submit proposed License Amendment to NRC 16 Mew 97 11: 00 i Revise Bases for TS 3.8.1 and 3.0.2 3l Mar 97 07:00-iO30ct97 15:00 NRC review / approval Bases 3.8.2 OoJun97 15:00i
'05Sep97 15:00 Submit proposed License Amendment to NRC 06Jun97 15:001 C. LPI Mission Time and Boron Precipitet Iluer97 07:00 u_ J05 Mew 97 15:00 Subratt Letter on DHP Low Flow Test Resul 31 Mar 97 f7:C0 C JIBApr97 15:00 Submit Letter on Boron Precipitet lon DISep97 07:00 005Sep97 15:00 D. Lic Amend on DH-45-FI Lic Cond (R51 3tMer97 15:C 0i il30ct97 15:00 NRC rev'lew/epproval Lie Am on DH-45-FI 16Jun97 15:00i il5Sep97 15:00 Submit proposed License Amendment to NRC 16Jun97 15:00i SIGNIFICANT JOB: APPENDIX R ISSUES
: 2. Appendia R Issues (D-II. 221
>03Nov97 15:00 0-22 Ampeelty llusr57 07:00 =
'08Sep97 15:00 P epare submittel for App. R essessment IIMer97 07:00 p 121Apr97 15:00 Submitted to NRC 21Apr97 15:00I
)
NRC Inspection (Fire Protect! :n Function 23Sep97 07:00i
'03Nov97 15:00 NRC review /epproval App R Exemptions (Th IBuer97 07:00
>200ct97 15:00 Submitted to NRC IEuer97 07:00l SIGNIFICANT JOB: SYSTEM READINESS REVIEWS
: 31. System Readiness Reviews (D-13, 231 Ilusr97 07:00 or il00ct97 15:00 ADV 30-dow Response IBWar97 07:00 t il6Apr97 15:00 Submit response IBuer97 07:00 il6Apr97 15:00 Submit SRR Procedure 2iApr97 LO:00i License Amendments /FSAR Update 30Mer97 00:00i i100ct97 15:00 NRC review / approval System Readiness Rev 3Jun97 15:00i il25ep97 15:00 Submit proposed License Amendment to NRC 13Jun97 15:00i Submit SRR Summerv t
23Jun97 15:00I l
Jan lFeo l War (Apr lWev lJun lJul lAug lSep lOct lNov lDec Jon lFeb l War l l
1997 1998


C802 Run Dete: 202:r97                                                                       Page   3 ProjectView                                                         Legend Project: RESTART                                                           Time Now       10Mee97 07: )0 a,g i , is , o,,,,, , a Forecast End:. 29 Wow 98 15: ;0 version: 01 Restert Detell Schedule                                         Required End: 310ec98 23: :D   cy  , ,,,,,,,,,
C802 Run Dete: 202:r97 Page 3
                                                                                                                            , ,,,,;, a Tcreets:                                     Showing Forecast Dates l997                                                               1998 Jon IFeblWer IApr l Wow lJun lJul lAug lSep [Oct lNov lDec         Jan lFeb lWer l SIGNIFICANT JOB: SYSTEu READINESS REVIEWS NRC Inspection regarding Systu m Readines 22Sep97 07:00123Sep97 15:00 SIGNIFICANT JOB: LT(!PS
ProjectView Legend Project: RESTART Time Now
: 4. LTCPS (Low Temperat"         Overpressure P 24Feb 17 07:00                                                     il2Nov97 15:00 Respond to NRC letter dated 2/4/97 24Feb 17 07:00                       '29 Maw 97 15:00 NRC review /approvst LTOPS JC0 and Exempt 04Apr97 05:00i         i0lusw97 15:00 Submit package to NRC 04Apr97 05:00l IF TSCR, perform rollowing actions DIMav97 07:00i                                     il2Nov97 15:00 NRC review / approval LTOPS TS change, ir 16Jul97 15:00i                   il50ct97 15:00 Submit proposed License Amendment to NRC 16Jul97 15:00i Provide revised response to CL 88-11 OlJu197 07:00>                 '22Sep97 15:00 NRC review / approval CL 88-11 revis ed res 25Aug97 15:00i       '22Sep97 15:00 Submit response to NRC 25Aug97 15:00i SIGNIFIC ANT JOB: EOP/AP STRATEGY REGARDING OPERATOR ACTIO
. 29 Wow 98 15: ;0 10Mee97 07: )0 a,g i, is,
: 5. EOP/AP Strategw Regarding Operator Ac 18 der 97 00:00i                                             i10Nov97 15:00 Submit Letter to NRC.
o,,,,,,
31Mer97 07:(0i Submittai clartr w ing EOP Lic Basis 28Apr97 15:00i                                     il0Nov97 15:00 NRC review /approvat SER ECP/AP Operator
a Forecast End:
                                      -14Jul97   15:00i               il30ct97 15:00 Submit proposed License Amendment to NRC 14Jul97 15:00i NRC Insp regarding E0P/AP Stra .egy re: 0 16Sep97 07:00 ll 7Sep97 15:00 SIGNIFICANT JOB: GL 96-01
cy,,,,,,,,,;,
a version: 01 Restert Detell Schedule Required End: 310ec98 23: :D Tcreets:
Showing Forecast Dates l997 1998 Jon IFeblWer IApr l Wow lJun lJul lAug lSep [Oct lNov lDec Jan lFeb lWer l SIGNIFICANT JOB: SYSTEu READINESS REVIEWS NRC Inspection regarding Systu m Readines 22Sep97 07:00123Sep97 15:00 SIGNIFICANT JOB: LT(!PS 4.
LTCPS (Low Temperat" Overpressure P 24Feb 17 07:00 il2Nov97 15:00 Respond to NRC letter dated 2/4/97 24Feb 17 07:00
'29 Maw 97 15:00 NRC review /approvst LTOPS JC0 and Exempt 04Apr97 05:00i i0lusw97 15:00 Submit package to NRC 04Apr97 05:00l IF TSCR, perform rollowing actions DIMav97 07:00i il2Nov97 15:00 NRC review / approval LTOPS TS change, ir 16Jul97 15:00i il50ct97 15:00 Submit proposed License Amendment to NRC 16Jul97 15:00i Provide revised response to CL 88-11 OlJu197 07:00>
'22Sep97 15:00 NRC review / approval CL 88-11 revis ed res 25Aug97 15:00i
'22Sep97 15:00 Submit response to NRC 25Aug97 15:00i SIGNIFIC ANT JOB: EOP/AP STRATEGY REGARDING OPERATOR ACTIO
: 5. EOP/AP Strategw Regarding Operator Ac 18 der 97 00:00i i10Nov97 15:00 Submit Letter to NRC.
31Mer97 07:(0i Submittai clartr ing EOP Lic Basis w
28Apr97 15:00i il0Nov97 15:00 NRC review /approvat SER ECP/AP Operator
-14Jul97 15:00i il30ct97 15:00 Submit proposed License Amendment to NRC 14Jul97 15:00i NRC Insp regarding E0P/AP Stra.egy re: 0 16Sep97 07:00 ll 7Sep97 15:00 SIGNIFICANT JOB: GL 96-01
: 6. CL96-01 (R-1)
: 6. CL96-01 (R-1)
IIMar97 07:00 =                         '27Jun97 15:00 Summary Report to NRC 10Jun97 07:00 CJ i9Jun97 15:00 1
IIMar97 07:00 =
'27Jun97 15:00 Summary Report to NRC 10Jun97 07:00 CJ i9Jun97 15:00 1
NRC Corrective Action Inspection (CL 96-26Jun9 7 07:00127Jun97 15:00 SIGNIFIC ANT JOB: ILRT
NRC Corrective Action Inspection (CL 96-26Jun9 7 07:00127Jun97 15:00 SIGNIFIC ANT JOB: ILRT
: 7. ILRT (R-10) 28Fet 97 07:00 ---                               i0lAug97 15:00 TSCRN ror Appendix J. Option B 2BFet 97 07:00 ---                               i0lAug97 15:00 NRC review / approval TS change App J. Opt 07Apr97 15: 00 >           '02Jun97 15:00 Submit clartrication or request 07Apr97 15:001 Jan lFeb lWer lApr l Wow lJu n lJul lAug lSep l0ct lNov lDec       Jan lFeb l Wor l
: 7. ILRT (R-10) 28Fet 97 07:00 ---
,                  1997                                                               1998
i0lAug97 15:00 TSCRN ror Appendix J. Option B 2BFet 97 07:00 ---
i0lAug97 15:00 NRC review / approval TS change App J. Opt 07Apr97 15: 00 >
'02Jun97 15:00 Submit clartrication or request 07Apr97 15:001 Jan lFeb lWer lApr l Wow lJu lJul lAug lSep l0ct lNov lDec Jan lFeb l Wor l n
1997 1998


      . _ . ~ . _ _ _ _ . _ _ . _ . _                                 ..  ...______._.___.._._-..__.______-__.__m_
. _. ~. _ _ _ _. _ _. _. _
1 l                                                                                                                                                                                                 >
...______._.___.._._-..__.______-__.__m_
CBC2 Run Dates 202sr97                                                                                                                 Page   4 ProjectVlew                                                                   ''8'"'
1 l
i                      Project: RESTART                                                                                         Time Now                     10Wer97 07: 30 4
CBC2 Run Dates 202sr97 Page 4
asu nv k .. c2 Forecast End: 29 Wow 98 15:             30         e      asu l                       Version: Di Restert Dete11 Schedule                                                     .
ProjectVlew
Required End: 310ec98 23:               30 c,sueel
''8'"'
                                                                                                                                                                              ,m,,,,,ovy. ,  .
Project: RESTART Time Now 10Wer97 07:
Tergets:                                                            Showing Forecast Dates                                                                              '
30 asu nv k..
1997                                                                                 1998 Jon IFeb [Wer lApe lWew lJun l Ju l lAug lSep 10ct lNov lDec                         Jan lFeb lWer l                                           ,
c2 i
SIGNIFIC ANT JOB: RWP CYCLONE SEPARATOR FOULING B. RwP Cwelone Seperrter Fouling (0 20)
4 Forecast End: 29 Wow 98 15: 30 l
OIApr97 07:(     0-                                                         >10Nov97 15:00 USQ Submittel, if necessary DIApr97 07:00i                                                             il0Nov97 15:00                                                     .
Version: Di Restert Dete11 Schedule Required End: 310ec98 23: 30 c,sueel ovy.
I NRC review /sporoval SER on RwP Cvelone S                                                           >
e asu Tergets:
16Jun97 15:00i                                       il30ct97 15:00 Submit proposed License Amendment to NRC 16Jun97 15:00i SIGNIFICANT JOB: A-46 SEISMIC
Showing Forecast Dates
: 9. A-46 Seismic 05 Mar 9 7 0 7 : 0 0 ==                                 '20Jun97 15:00 l
,m,,,,,
Phase I Response                                                                                                                 !
1997 1998 Jon IFeb [Wer lApe lWew lJun l Ju l lAug lSep 10ct lNov lDec Jan lFeb lWer l SIGNIFIC ANT JOB: RWP CYCLONE SEPARATOR FOULING B. RwP Cwelone Seperrter Fouling (0 20)
05uer97 07:00 EU 331 Mar 97 15:00 Phase II Response 30Wew97 07:00                     20Jun97 15:00 NRC Inspection regarding A*46 Seismic                                                                   ,
OIApr97 07:( 0-
03Jun97 07:00104Jun9 7 15:00                                                                                                     t SIGNIFICANT JOB: FSnR REV, 23 USGS
>10Nov97 15:00 USQ Submittel, if necessary DIApr97 07:00i il0Nov97 15:00 I
: 10. FSAR Rev. 23 US0s 15Apr97 00:00t                                               il5Sep97 15:00
NRC review /sporoval SER on RwP Cvelone S 16Jun97 15:00i il30ct97 15:00 Submit proposed License Amendment to NRC 16Jun97 15:00i SIGNIFICANT JOB: A-46 SEISMIC
* l Letter to NRC regarding FSAR Rev. 23 USQ 15Apr97 00:00i l
: 9. A-46 Seismic 05 Mar 9 7 0 7 : 0 0==
Letter to NRC rollowing review or FSAR R 07Jul97 15:001                                                                                                           ,
'20Jun97 15:00 l
SIGNIFIC ANT JOB: CL 96 06
Phase I Response 05uer97 07:00 EU 331 Mar 97 15:00 Phase II Response 30Wew97 07:00 20Jun97 15:00 NRC Inspection regarding A*46 Seismic 03Jun97 07:00104Jun9 7 15:00 t
: 11. CL 96-06 10-B1 IlWar97 07:00 =                                             '07Jul97 15:00 l                                                                 Letter to NRC (120 dew response to GL 96 IBWar97 0'?:00 SW Fittings on CR0s 09Apr97 07:00i                               130Jun97 15:00 l                                                                                   Submit letter to NRC regarding SW rlttin l-                                                           19Waw97 15:00i Summary Report to NRC OlJul97 07:00 007Jul97 15:00 NRC Inspection regarding CL 96-06 09Jul97 07:00 I t0Jul97 15:00 SIGNIFIC ANT JOB: TS BASES SUBWITTAL
SIGNIFICANT JOB: FSnR REV, 23 USGS
: 13. TS Bases Submittel IBWar97 07:00                 il4Apr97 15:00 Summary Report to NRC IBWer97 07:001 Submit summary or TS bases changes IBWer97 07:00;               il4Apr97 15:00 SIGNIFIC ANT JOB: TE DON SURVEILLANCE 14 Tendon Surveillence 07Apr97 07:00i                                                       >240ct97 15:00 i
: 10. FSAR Rev. 23 US0s 15Apr97 00:00t il5Sep97 15:00 l
i                                                                                                           NRC review /spproval speciel tendon suri                 e i                                                                           25Ju197 15:00i                               '240ct97 15:00 Submit special report to NRC.
Letter to NRC regarding FSAR Rev. 23 USQ 15Apr97 00:00i l
l                                                                           25Jul97 15:00i SIGNIFIC ANT. JOB: MAINT. RULE STRUCTURAL BASELINE WALKDOWN
Letter to NRC rollowing review or FSAR R 07Jul97 15:001 SIGNIFIC ANT JOB: CL 96 06
: 15. Weintenance Rule Structural Baseline 02Jun97 07:00i                         illJul97 15:00 Jon lFeb l Wor lAer l Wow lJun lJul lAug ISep l0ct (Nov lDec                         Jan lFeb lWer l 1997                                                                                 1998
: 11. CL 96-06 10-B1 IlWar97 07:00 =
'07Jul97 15:00 l
Letter to NRC (120 dew response to GL 96 IBWar97 0'?:00 SW Fittings on CR0s 09Apr97 07:00i 130Jun97 15:00 l
Submit letter to NRC regarding SW rlttin l-19Waw97 15:00i Summary Report to NRC OlJul97 07:00 007Jul97 15:00 NRC Inspection regarding CL 96-06 09Jul97 07:00 I t0Jul97 15:00 SIGNIFIC ANT JOB: TS BASES SUBWITTAL
: 13. TS Bases Submittel IBWar97 07:00 il4Apr97 15:00 Summary Report to NRC IBWer97 07:001 Submit summary or TS bases changes IBWer97 07:00; il4Apr97 15:00 SIGNIFIC ANT JOB: TE DON SURVEILLANCE 14 Tendon Surveillence 07Apr97 07:00i
>240ct97 15:00 i
i NRC review /spproval speciel tendon suri e i
25Ju197 15:00i
'240ct97 15:00 Submit special report to NRC.
l 25Jul97 15:00i SIGNIFIC ANT. JOB: MAINT. RULE STRUCTURAL BASELINE WALKDOWN
: 15. Weintenance Rule Structural Baseline 02Jun97 07:00i illJul97 15:00 Jon lFeb l Wor lAer l Wow lJun lJul lAug ISep l0ct (Nov lDec Jan lFeb lWer l 1997 1998


    &      I l
I l
CBC2 Run D:te: 20 gr9;                                                                       Page     5 Legend Project: RESTART ProJectView Time Now     . 18 Mar 97 07: 30 a g io n, o.,,. . c3 Forecast End: 29 Wow 98 15:   30 c,,,,,,,,,,,,     is, Vseslan: 01 Restert Detall Schedule                                           Required End: 310ec98 23:   10 ,,,,,, ,,,,,,,,  .
CBC2 Run D:te: 20 gr9; Page 5
Tcreets:                                     Showing Forecest Dates 1997                                                                 1998 Jon lFeb l War lApr lWew lJun IJul lAug lSep 10ct lNov lDec         Jan lFeb lWer l                                 ,,
ProJectView Legend Project: RESTART Time Now
SIGNIFICANT JOB: MAINT. RULE STRUCTURAL BASELINE WALKDOWN NRC Inspection regarding Weintenance Rui 02Jun97 07:00103Jun 9 7 15:00 l                                                       Summary Report to NRC 07Jul97 07:00 OllJu!97 15:00 SIGNIFICANT JOB: ASME SECTION XI
. 18 Mar 97 07: 30 a g io n, o.,,..
: 16. ASME Section XI 1R-ill 18Wer97 07:00                                                   il9Nov97 07:00 Letter to NRC regarding extension IBWer97 07:00i Submit Reller Request 97-001 II 2' Wer97 07:00i         '29Apr97 15:00 NRC review /epproval of Reller Request 97 2   Mar 97 07:00 CJ0lApr97 23:00 Submit Reller Request to NRC.
c3 Forecast End: 29 Wow 98 15: 30 c,,,,,,,,,,,,
2   Mar 97 07:00 i Submit Limited Exam Reller Request 00Aug97 07:00i               il40ct97 07:00 NRC review /epproval Limited       Exam Reller 020ct97 15:00 C3140ct97 07:00 Submit Reller Request to NRC       .
is, Vseslan: 01 Restert Detall Schedule Required End: 310ec98 23: 10 Tcreets:
020ct97 15:001 Submit closecut report or :urrent ISI in 140ct9 7 0 7 : 00 t___J 10Nov9 7 15:00 NRC Inspection (ASME 5ection XI, ISI) llNov97 07:00 ll2Nov97 15:00
Showing Forecest Dates 1997 1998 Jon lFeb l War lApr lWew lJun IJul lAug lSep 10ct lNov lDec Jan lFeb lWer l SIGNIFICANT JOB: MAINT. RULE STRUCTURAL BASELINE WALKDOWN NRC Inspection regarding Weintenance Rui 02Jun97 07:00103Jun 9 7 15:00 l
      ~~~ SIGNIFICANT JOB: INTEG. SAFETY ASS. OF CUR. DUTAGE MODS.
Summary Report to NRC 07Jul97 07:00 OllJu!97 15:00 SIGNIFICANT JOB: ASME SECTION XI
,                                    17. Integrated Sorety Assessment of Curr l                   2 6Wer97 07:Orli                       i0lAug97 15:00 Meeting with NRR regarding the Integrate 2 6 Mar 97 07:0Li l26uer97 15:00 Summary Report to NRC 30Jun97 07:00 0 04Jul97 15:00 Discussion with NRC regarding the Integr 07Jul97 07:00i     i0lAug97 15:00 SIGNIFIC ANT JOB: IN PLACE FILTER TESTING FOR AHFL-l/2
: 16. ASME Section XI 1R-ill 18Wer97 07:00 il9Nov97 07:00 Letter to NRC regarding extension IBWer97 07:00i Submit Reller Request 97-001 II 2' Wer97 07:00i
: 18. In-place Filter Testing for AHFL-l/2 17Jer97 14:00 m           iD6 Mew 97 08:00 Revise FSAR 15Apr9709:00       06 Mew 97 08:00
'29Apr97 15:00 NRC review /epproval of Reller Request 97 2 Mar 97 07:00 CJ0lApr97 23:00 Submit Reller Request to NRC.
(       SIGNIFICANT JOB: CC E TECH SPEC
2 Mar 97 07:00 i Submit Limited Exam Reller Request 00Aug97 07:00i il40ct97 07:00 NRC review /epproval Limited Exam Reller 020ct97 15:00 C3140ct97 07:00 Submit Reller Request to NRC 020ct97 15:001 Submit closecut report or
: 19. Control Complex Habitabl!!tw Envelop 17Jer97 14:00 m               i26Mov97 15:00 NRC review /spproval CCHE TS 17Jer97 14:00                 '26Mov97 15:00 l                                   4RC Inspection of current condition l               17Jer97 14:00 J20uer97 15:00 Letter withdrawing TSCRN 18Wer97 06:00 il8uer97 07:00 NRC Inspection Fo!!owing CREvS TS submit 23Ma 997 07:00 026Mov97 15:00
:urrent ISI in 140ct9 7 0 7 : 00 t___J 10Nov9 7 15:00 NRC Inspection (ASME 5ection XI, ISI) llNov97 07:00 ll2Nov97 15:00
:CHE TSCRN (SRsl 17Jer97 14:00 1         >23Apr97 23:00 I
~~~ SIGNIFICANT JOB: INTEG. SAFETY ASS. OF CUR. DUTAGE MODS.
!                    Jon lFeb lWer lApr l Wow lJun lJul lAus lSep l0ct lNov lDec           Jon IFeb l Mar l 1997                                                                 1998
: 17. Integrated Sorety Assessment of Curr l
2 6Wer97 07:Orli i0lAug97 15:00 Meeting with NRR regarding the Integrate 2 6 Mar 97 07:0Li l26uer97 15:00 Summary Report to NRC 30Jun97 07:00 0 04Jul97 15:00 Discussion with NRC regarding the Integr 07Jul97 07:00i i0lAug97 15:00 SIGNIFIC ANT JOB: IN PLACE FILTER TESTING FOR AHFL-l/2
: 18. In-place Filter Testing for AHFL-l/2 17Jer97 14:00 m iD6 Mew 97 08:00 Revise FSAR 15Apr9709:00 06 Mew 97 08:00
(
SIGNIFICANT JOB: CC E TECH SPEC
: 19. Control Complex Habitabl!!tw Envelop 17Jer97 14:00 m i26Mov97 15:00 NRC review /spproval CCHE TS 17Jer97 14:00
'26Mov97 15:00 l
4RC Inspection of current condition l
17Jer97 14:00 J20uer97 15:00 Letter withdrawing TSCRN 18Wer97 06:00 il8uer97 07:00 NRC Inspection Fo!!owing CREvS TS submit 23Ma 997 07:00 026Mov97 15:00
:CHE TSCRN (SRsl 17Jer97 14:00 1
>23Apr97 23:00 I
Jon lFeb lWer lApr l Wow lJun lJul lAus lSep l0ct lNov lDec Jon IFeb l Mar l 1997 1998


    .      ..      - . - _ - - - - - - - - - - .                              - .      .-.        _ - - - - - - ~                     .            _ _ _ _ _ - -
_ - - - - - - ~
i CBC2 Run Oste 20MJr97                                                                                             Pegs   6 ProjectView                                                                     Legend Project: RESTART                                                                           Time Now           : 18Wer97 07: 10   4.s i , o ,. .           e
i CBC2 Run Oste 20MJr97 Pegs 6
!                                                                                                  Forecast End: 29Wev98 85:         )0   e,i g i,, , g,,, ,        ,,,
ProjectView Legend Project: RESTART Time Now
I vsesion: 08 Restert Detell Schedule                         '
: 18Wer97 07: 10 4.s i, o,..
Required End: 310ec98 23: )0                                     ,,
e Forecast End: 29Wev98 85: )0 e,i g i,,, g,,,,
I vsesion: 08 Restert Detell Schedule Required End: 310ec98 23: )0
[
[
Tergete:                                           Showing Forecast Dates                                                         ,,,,,, ,,,,,,,,
Tergete:
l                        #997                                                                                 1998 l                         Jon lFeb lWer lApr l Wow lJun IJul lAug lSep 10ct lNov lDec                         Jos lFeb lWer l                                         5
Showing Forecast Dates l
(             SIGNIFICANT JOB: RESTART COWWITWENTS                                                                                                                       .
#997 1998 l
l                                        ,20. Restert Commitments l                     18Wer97 07:00e                                     il9Aug97 15:00 kPAPIssues 18 Wor 97 07:00i                               '28Ju!97 15:00                                                                                   l SSWOPI Issues 18Wer97 07:00i                                     il8Aug97 15:00 l                                         IDRP Issues
Jon lFeb lWer lApr l Wow lJun IJul lAug lSep 10ct lNov lDec Jos lFeb lWer l 5
;                      18Wer97 07:00                                       il9Aug97 15:00 SIGNIFICANT JOB: RADIOLOGICAL EMERG, PLANNING (RESTARTI l                                                                                                                                                                       '
(
'                                      21. Radiological Emergency Planning ilWer9 7 07 : 00 ==               il9 Wow 97 15:00
SIGNIFICANT JOB: RESTART COWWITWENTS l
: l.                                     Ensure FEMA soproval of CR-3 restert
,20. Restert Commitments l
!                  IlWor97 07:00 -                   il9 Wow 97 15:00 i
18Wer97 07:00e il9Aug97 15:00 kPAPIssues 18 Wor 97 07:00i
(           SIGNIFICANT JOB: OPEN ITEWS LIST                                                                                                                           -
'28Ju!97 15:00 l
j
SSWOPI Issues 18Wer97 07:00i il8Aug97 15:00 l
: 22. OIL (D-4, 7,         17, 21, M-2, OP-6, 8, O llWor97 07:00 mL_                                               '060ct97 15:00 l
IDRP Issues 18Wer97 07:00 il9Aug97 15:00 l
NRC review /eparovel Open Items List llWo r 9 7 0,7 : 0 0 -                                         >060ct97         15:00
SIGNIFICANT JOB: RADIOLOGICAL EMERG, PLANNING (RESTARTI l
!            SIGNIFICANT JOB: OTHER USQ'S DB ISSUES. OR UNANAL. COND.
: 21. Radiological Emergency Planning ilWer9 7 07 : 00==
il9 Wow 97 15:00 l.
Ensure FEMA soproval of CR-3 restert IlWor97 07:00 -
il9 Wow 97 15:00 i
(
SIGNIFICANT JOB: OPEN ITEWS LIST j
: 22. OIL (D-4, 7, 17, 21, M-2, OP-6, 8, O llWor97 07:00 mL_
'060ct97 15:00 l
NRC review /eparovel Open Items List llWo r 9 7 0,7 : 0 0 -
>060ct97 15:00 SIGNIFICANT JOB: OTHER USQ'S DB ISSUES. OR UNANAL. COND.
23, Other US0s, DB Issues, or unenotyred
23, Other US0s, DB Issues, or unenotyred
[                 11Wa r 9 7 0 7 : 00 ==                                           il30ct97 15:00 Flu (Commitment to Closecuti or Amend L1 15Apr97   0?:00i                                       il30ct97 15:00 Potentist USQ - HPI Pump Rectre 02Jun97 07:00i                                       '310ct97 15:00 Potentiel USO - WUV-31 02Jun97 07:00i                                       1310ct97 15:00 Potentiel USO - EDG Protective Trips
[
                                    '02 un97 07:00i                                       '310ct97 15:00 Potentlet USQ - HPI Anslusts tw/wo HPI v                                                                       '
11Wa r 9 7 0 7 : 00==
l                                    02Jun97 07:00i                                       i310ct97 15:00 Potential USO - FWP-7 Diesel 02Jun97 07:00i                                       '310ct97 15:00 Potentist USQ - HPI Norrie Cycles 02Jun97 07:00i                                       i310ct97 15:00 Potentist USO         SW/RW Pu!! to Lock                                                                         l' l                                     02Jun97 07:00i                                       '310ct97 15:00 Potentist USO - L/D Line Rupture 02)un97 07:00 i                                       '310ct97 15:00 Potentle! USQ - EFP-1/DHP lA Trip Block 02Jun97 07:00i                                       '310ct97 15:00 Potentist USO - AHFL-1/2 02Jun97 07:00i                                       '310ct97 15:00 SIGNIFIC ANT JOB: RE"IEW OPERATOR WORKAROUNDS
il30ct97 15:00 Flu (Commitment to Closecuti or Amend L1 15Apr97 0?:00i il30ct97 15:00 Potentist USQ - HPI Pump Rectre 02Jun97 07:00i
: 24. Review operster workarounds (W-2) (F 02Jun97 07:00i                               iD80ct97 15:00 e
'310ct97 15:00 Potentiel USO - WUV-31 02Jun97 07:00i 1310ct97 15:00 Potentiel USO - EDG Protective Trips
;                                                                                  NRC Inspection of operator uorkerounds 070ct97 07:001080ct97 15:00 SIGNIFICANT JOB: REVIEW IMPLEMENTATION OF LICENSE CONDITI
'02 un97 07:00i
: 25. Review implementation or license con 18Wer97 07:00                                                     '270ct97 15:00 i
'310ct97 15:00 Potentlet USQ - HPI Anslusts tw/wo HPI v l
NRC inspect and closecut packages regard 29Apr97 07:00i             '09Jun97 15:00                                                                                                   i Jon lFeb l Wor IApr jWew lJun lJul lAug lSep l0ct lNov lDec                           Jan (Feb l Mar I 1997                                                                                 1998
02Jun97 07:00i i310ct97 15:00 Potential USO - FWP-7 Diesel 02Jun97 07:00i
_ .-.        m                                       , , .                            ,_ ,
'310ct97 15:00 Potentist USQ - HPI Norrie Cycles 02Jun97 07:00i i310ct97 15:00 Potentist USO SW/RW Pu!! to Lock l
l 02Jun97 07:00i
'310ct97 15:00 Potentist USO - L/D Line Rupture 02)un97 07:00 i
'310ct97 15:00 Potentle! USQ - EFP-1/DHP lA Trip Block 02Jun97 07:00i
'310ct97 15:00 Potentist USO - AHFL-1/2 02Jun97 07:00i
'310ct97 15:00 SIGNIFIC ANT JOB: RE"IEW OPERATOR WORKAROUNDS
: 24. Review operster workarounds (W-2) (F 02Jun97 07:00i iD80ct97 15:00 e
NRC Inspection of operator uorkerounds 070ct97 07:001080ct97 15:00 SIGNIFICANT JOB: REVIEW IMPLEMENTATION OF LICENSE CONDITI
: 25. Review implementation or license con 18Wer97 07:00
'270ct97 15:00 i
NRC inspect and closecut packages regard 29Apr97 07:00i
'09Jun97 15:00 i
Jon lFeb l Wor IApr jWew lJun lJul lAug lSep l0ct lNov lDec Jan (Feb l Mar I 1997 1998 m


                                                                        -_.-.-.            . - _ _ _ ~ ~ ~ - _                           . . . . ~ . . . . . .~
. - _ _ _ ~ ~ ~ - _
CBC2 Run Date: 202sr97                                                                                     Page     7 l
.... ~......~
ProjectVlew                                                        ''''"d Project: RESTART                                                                     Time Noe           : 18Wer97 07: 30 a.gi.ia, 6 ,..             c=3 Fo eeest End: 29 Wow 98 15: )0                                 aus Version: 01 Restert Detail Schedule                                                 Required End: 310ec98 23:       10 e,ta s..: o.ca.
CBC2 Run Date: 202sr97 Page 7
Targets:                                                Showing Forecast Dates                                                                       e 1997                                                                           1998 l                                                                                                                                                                          )
l ProjectVlew
Jon lFeb lWor lApr l Wow lJun lJul lAug ISep l0ct lNov lDec                   Jan lFeb lWer l                                                     l SIGNIFICANT JOB: REVIEW IMPLEMENTATION OF LICENSE CONDITI                                                                                                         [
''''"d Project: RESTART Time Noe
: 18Wer97 07: 30 a.gi.ia, 6,..
c=3 Fo eeest End: 29 Wow 98 15: )0 e,ta s..: o.ca.
aus Version: 01 Restert Detail Schedule Required End: 310ec98 23: 10 Targets:
Showing Forecast Dates e
l 1997 1998
)
Jon lFeb lWor lApr l Wow lJun lJul lAug ISep l0ct lNov lDec Jan lFeb lWer l l
SIGNIFICANT JOB: REVIEW IMPLEMENTATION OF LICENSE CONDITI
[
t Perpare drert License Amendment, ir need
t Perpare drert License Amendment, ir need
(                             29Apr97 07:00m               i O9Jun97 15:00 i'
(
NRC review /epprovst Lie Am on !! cense           to 2BJul97 15:00i             '295ep97 15:00 Submit proposed License Amendment to NRC 2BJu!97 15:001                                                                                                         l' l
29Apr97 07:00m O9Jun97 15:00 i
,          SIGNIFICANT JOB: FSnR REY. 24
i NRC review /epprovst Lie Am on !! cense to 2BJul97 15:00i
: 26. FSAR Rev. 24 ID-24, 25. W-31                                                                                             i 05Apr97 07:00; j         SIGNIFICANT JOB: OTHER CENERIC ISSUES
'295ep97 15:00 Submit proposed License Amendment to NRC l
: 27. Other Generic Letters IElevated by N llWor97 07:00 -                           illJun97 15:00 y
2BJu!97 15:001 l
l                                         C_ 95-03. Cire. Crocking or SC Tubes llWor97 07:00 =                             '23Jun97 15:00 NRC review CL 95-03 letter 02Jun97 15:00 C:2323Jun97 15:00                                                                                                       i Submit resolution or issue to NRC                                                                                   I 02Jun97 15:00I                                                                                                                         i l
SIGNIFICANT JOB: FSnR REY. 24
NRC Inspection                                                                                                     4 D3Jun97 07:00 E::323Jun97 15:00 CL 95-07, Pressure Lacking / Thermal Bind!
: 26. FSAR Rev. 24 ID-24, 25. W-31 i
18 der 97 07:00-                       illJun97 15:00                                                                                                 i l
05Apr97 07:00; j
SIGNIFICANT JOB: OTHER CENERIC ISSUES
: 27. Other Generic Letters IElevated by N llWor97 07:00 -
illJun97 15:00 y
l C_ 95-03. Cire. Crocking or SC Tubes llWor97 07:00 =
'23Jun97 15:00 NRC review CL 95-03 letter 02Jun97 15:00 C:2323Jun97 15:00 i
Submit resolution or issue to NRC I
02Jun97 15:00I i
l NRC Inspection 4
D3Jun97 07:00 E::323Jun97 15:00 CL 95-07, Pressure Lacking / Thermal Bind!
18 der 97 07:00-illJun97 15:00 i
NRC review CL 95 07 letter 09Jun97 15:00 3 IlJun97 15:00 Submit resolution or issue to NRC 09Jun97 15:00 1 NRC Inspection 10Jun97 07:00 tilJun97 15:00 SIGNIFICANT JOB: 50 54tFl. LETTER
NRC review CL 95 07 letter 09Jun97 15:00 3 IlJun97 15:00 Submit resolution or issue to NRC 09Jun97 15:00 1 NRC Inspection 10Jun97 07:00 tilJun97 15:00 SIGNIFICANT JOB: 50 54tFl. LETTER
: 28. 50.54trl Letter IR-BI IElevated by N llWar97 07:00 en               128Apr97 15:00 Submit SRR Procedure liusr97 07:00 M 21Apr97 15:00 NRC review 50.54tri letter IBWar97 07:00                 #28Apr97 15:00 Provide SRR Procedure to NRC 2tApr97 15:00i Submit Additionel Letter 26Wiw97 07:00 030Wew97 15:00 SIGNIFIC ANT JOB: S3FOO II. OTSC Tech Spec IIWer97 07:00 -                                   >21Ju!97 15:00 NRC review /spproval OTSC Lic Am 24Wer97 15:0Ci                           >23Jun97 15:00 Submit proposed License Amendment to NRC 24Wer97 15:0C4 Wode 4 Report IlWar97 07:00 I[3 24Wer97 15:00 90-day Post-Outage Report
: 28. 50.54trl Letter IR-BI IElevated by N llWar97 07:00 en 128Apr97 15:00 Submit SRR Procedure liusr97 07:00 M 21Apr97 15:00 NRC review 50.54tri letter IBWar97 07:00
,                  llMer97 07:00 E                       0 06)un 9 7 15:00 NRC Inspection or SC Tunes OlJun97 00:001 l
#28Apr97 15:00 Provide SRR Procedure to NRC 2tApr97 15:00i Submit Additionel Letter 26Wiw97 07:00 030Wew97 15:00 SIGNIFIC ANT JOB: S3FOO II. OTSC Tech Spec IIWer97 07:00 -
Jon (Feb lWer lApr lWew lJun lJul lAug ISep 10ct lNov l0ec                     Jon lFeb l Wor l 3997                                                                           1998
>21Ju!97 15:00 NRC review /spproval OTSC Lic Am 24Wer97 15:0Ci
    ~ _ _ - , - - - -       ,      , _ , -          - .  ...m.        ,. _,                                                                                -. -- . . . .
>23Jun97 15:00 Submit proposed License Amendment to NRC 24Wer97 15:0C4 Wode 4 Report IlWar97 07:00 I[3 24Wer97 15:00 90-day Post-Outage Report llMer97 07:00 E 0 06)un 9 7 15:00 NRC Inspection or SC Tunes OlJun97 00:001 l
Jon (Feb lWer lApr lWew lJun lJul lAug ISep 10ct lNov l0ec Jon lFeb l Wor l 3997 1998
~ _ _ -, - - - -
...m.


    . - - . + ~ . . - , . ,                       , ,. . . - . , . _ -              - . . . . ~~....._....- _- _ _-.                                         - _.--~ -..- _ -.
. - -. + ~.. -,.,
l
-.... ~~....._....- _- _ _-.
s                 ,
- _.--~ -..- _ -.
i l                                                                                                                                                                                                             1 l.
l s
GBC2 Run Date: 20 Mar 97                                                                                                                 Pege 6 ProjectVlem                                                                                           Lesead                   .
i l
s            Project: RESTART                                                                                           Time Now             : 10Wer97 07:     30             a.. ,is, o., ,   e               !
1 l.
l Forecast End: 29Wew99 15:             10             c,sueet o ca*   ese             I Version: Of Restert Detell Schedule                                                                         Required End: 310ec98 23: )0                                           ,,,            j i           Tsegets:                                                       Showing Forecast Dates                                                                             ,, ,,, ,y ,,,, ,
GBC2 Run Date: 20 Mar 97 Pege 6
1997                                                                                         1998 Jon lFeb lWer lApr l Wow lJun lJul laug ISep l0ct lNov lDec                                   Jan lFeb lWer l                                                               j SIGNIFICANT JOB: REG, GUIDE I.97 ISSUES (RESTART)                                                                                                                                           5 t
ProjectVlem Lesead s
: 33. Reg. Guide 1.97 Issues (Restertl                                                                                                                             ;
Project: RESTART Time Now
10Wer97 07:00 -                                     'l4Ju!97 15:00                                                                                                                 '
: 10Wer97 07: 30 a..
SIGNIFIC ANT JOB: CR-3 RESTART APPROVAL REQUEST l                                             CR 3 Restert Approval Request 10Mir97 07:00 50 24Wer97 15:00 Letter reauest for restart 10Mir97 07:00 5324 Wor 97 15:00                                                                                                                                                   :
,is, o.,,
SIGNIFIC ANT JOB: MC 0350 ACTIONS                                                                                                                                                           ,
e l
III. WC 0350 ACTIONS                                                                                                                                         I 2' Wer97 00:00i Restert Penel Weetings
Forecast End: 29Wew99 15: 10 I
c,sueet o ca*
ese Version: Of Restert Detell Schedule Required End: 310ec98 23: )0 j
i Tsegets:
Showing Forecast Dates
,,,,,,y,,,,,
1997 1998 Jon lFeb lWer lApr l Wow lJun lJul laug ISep l0ct lNov lDec Jan lFeb lWer l j
SIGNIFICANT JOB: REG, GUIDE I.97 ISSUES (RESTART) 5 t
: 33. Reg. Guide 1.97 Issues (Restertl 10Wer97 07:00 -
'l4Ju!97 15:00 SIGNIFIC ANT JOB: CR-3 RESTART APPROVAL REQUEST l
CR 3 Restert Approval Request 10Mir97 07:00 50 24Wer97 15:00 Letter reauest for restart 10Mir97 07:00 5324 Wor 97 15:00 SIGNIFIC ANT JOB: MC 0350 ACTIONS III. WC 0350 ACTIONS I
2' Wer97 00:00i Restert Penel Weetings
(
(
2 Wor 97 00:00'                                                                             '2tDec97 00:00                                                                   ;
2 Wor 97 00:00'
Assessment or Root Cause Ide                       ittrication 30Sep%/ 07:001                                                                                                                 ;
'2tDec97 00:00 Assessment or Root Cause Ide ittrication 30Sep%/ 07:001 i
i
Assessment or Licensee Menegement Errect 21Jun97 00:00'
,                                                                            Assessment or Licensee Menegement Errect                                                                                           '
'21Nov97 00:00 l
l                                                21Jun97 00:00'                                                       '21Nov97 00:00                                                                           '
Assessment or Plant and Corp ) rete Starr 30Sep97 07:00I Assessment or Physical Reedl iess OF Plan
Assessment or Plant and Corp )                     rete Starr 30Sep97 07:00I                                                                                                                 ,
[
Assessment or Physical Reedl iess OF Plan 30Sep97 07:00I                                                                                                                 [.
30Sep97 07:00I Assessment or Comp!!ance wit i Regulatory 30Sep97 07:001 r
Assessment or Comp!!ance wit i Regulatory 30Sep97 07:001                                                                                                                   :
l Coordination with Interested Agencies en l
r l                                                                                                       Coordination with Interested Agencies en                                                               '
30Sep97 07:00' i
l                                                                              30Sep97 07:00'                                                                                                                   i j                 SIGNIFICANT JOB: OTHER (NON-RESTART) LICENSING ACTIONS                                                                                                                                     '!
j SIGNIFICANT JOB: OTHER (NON-RESTART) LICENSING ACTIONS IV. NON-RESTART ISSUES 18Feb9 ' 07:00
IV. NON-RESTART ISSUES 18Feb9 ' 07:00
[
[
l SIGNIFIC ANT JOB: IS:: INTERVAL EXTENSION                                                                                                                                                     :
SIGNIFIC ANT JOB: IS:: INTERVAL EXTENSION l
: l. ISI   Interval Extension                                                                                                                                           i 05Feb97         17:00         14Wer97 17:00                                                                                                                                                   i Submit letter to NRC 140er97 07:00 Il4Wer97 07:00 l
: l. ISI Interval Extension i
Identary Reller Requests needed for 3rd                                                           l t
05Feb97 17:00 14Wer97 17:00 i
140ct97 07:00'                             '24Dec97 11:00                                                                   i l                                                                                                                         NRC review /epprovi l Reller Requests for                                           !
Submit letter to NRC 140er97 07:00 Il4Wer97 07:00 l
;                                                                                                OB0ec97 15:00 C320Dec97 07:00                                                                                 l*
Identary Reller Requests needed for 3rd l
Submit Reller Regi             est to NRC.
140ct97 07:00'
l                                                                                               080ec97 15:00i                                                                                                 >
'24Dec97 11:00 i
l                                                                                                            Identify IST Reller Reques Ls needed for 140ct97 07:00>                             124Dec97 11:00                                                                     ,
t l
1 l                                                                                                                         NRC review /epprova l IST Reller Requests                                           j I
NRC review /epprovi l Reller Requests for OB0ec97 15:00 C320Dec97 07:00 l
DBDec97 15:00 C3 20Dec97 07:00                                                                                 )
Submit Reller Regi est to NRC.
Submit.Reller Regi             est to NRC.
l 080ec97 15:00i l
                                              ,                                                  OB0ec97 15:00l SIGNIFICANT JOB:
Identify IST Reller Reques Ls needed for 140ct97 07:00>
I REf.CUIDEI.97 ISSUES (NON-RESTART)
124Dec97 11:00 1
: 3. Tset. DH Flow Tech Spec, TSCRN 209                                                                                                                         4 l                             18Wer97 07:00i                                       iDIAug97 09:00                                                                                                             '
l NRC review /epprova l IST Reller Requests j
i i                                              Submit proposed Tset/DH Flow License Am IBder97 07:00i
I DBDec97 15:00 C3 20Dec97 07:00
~
)
F d                                                                     NRC review Tset, DH Flow TS submittel 09Way17 09:00'                         04Jul97 09:00 Submit supplement 09Wev'i7 09:00 l l
Submit.Reller Regi est to NRC.
Jan lFeblWer IAer lWew lJun IJul lAug (Sep l0ct lNov lDec                                     Jon lFebIWar I 1997                                                                                         1990                                                                           j L                                                                                                                                   . . . _ . . _ _ _ _ _            _ _ _ _ _ _                _ _ _ _ . __!
OB0ec97 15:00l REf.CUIDEI.97 ISSUES (NON-RESTART)
SIGNIFICANT JOB:
I
: 3. Tset. DH Flow Tech Spec, TSCRN 209 4
l 18Wer97 07:00i iDIAug97 09:00 i
i Submit proposed Tset/DH Flow License Am
~
IBder97 07:00i F
d NRC review Tset, DH Flow TS submittel 09Way17 09:00' 04Jul97 09:00 Submit supplement 09Wev'i7 09:00 l l
Jan lFeblWer IAer lWew lJun IJul lAug (Sep l0ct lNov lDec Jon lFebIWar I 1997 1990 j
L


(~                         ~-w               .
(~
    --                                          .~
~-w
                                .                                                                                                                    i
.~
!
i i
* i i
i 1
1 i
CEC 2 Run D2te: 202:r97 Pegs 9
CEC 2 Run D2te: 202:r97                                                                         Pegs   9                                     ;
i I
I                                                             Projectvle.                                                         Legead l       Project: RESTART                                                               Time Now       30Mer97 07: 30 4.     . s , o ,,. .     cm I.
Projectvle.
Forecast End:. 29Wew98 15:  30                          ese  !
Legead l
Varelon: Of Restert Detall Schedule                                           Required End: 310ec98 23:   30 c,ns
Project: RESTART Time Now
                                                                                                                      , , , , , , ., ,n, , c.;,
. 29Wew98 15: 30 30Mer97 07: 30 4.
Targete:                                         Showing Forecast Dates                                                                     ,
. s, o,,..
1997                                                                   1998 Jon lFeb lWer lApr lWew lJun lJul lAug ISep 10ct lNov lDec             Jon lFeb l War l SIGNIFICANT JOB: IPEEE SUBWITTAL 4 IPEEE Submittet ilWar97 07:00 -                 105Mov97 15:00 Submit IPEEE letter to NRC                                                                         j
cm I.
,                              05Wew97 15:001                                                                                                         r i                                                                                                                                                     i l         SIGNIFIC ANT JOB: CRITICALITY WONITOR                                                                                                       '
Forecast End:
;                                          5. Criticellty Wonitor l                     OlApr97 07:( 0i                                   >0BSep97 15:00 Submit Esemption for criticality monitor Ol Apr97 07:10 i                                   iDBSep97 15:00 NRC review /sporoval semption on Critical                                                   1 i
ese c,ns. n c.;,
l 09Jun97 15:00-                   >0BSep97 15:00                                                               1 Submit proposed Exemption to NRC.
Varelon: Of Restert Detall Schedule Required End: 310ec98 23: 30 Targete:
09Jun97 15:004 i         SIGNIFICANT JOB: FSnR REV. 25
Showing Forecast Dates 1997 1998 Jon lFeb lWer lApr lWew lJun lJul lAug ISep 10ct lNov lDec Jon lFeb l War l SIGNIFICANT JOB: IPEEE SUBWITTAL 4 IPEEE Submittet ilWar97 07:00 -
!                                                                                          6. FSAR Rev. 25
105Mov97 15:00 Submit IPEEE letter to NRC j
!                                                                            22Dec97 07:00i SIGNIFIC ANT JOB: SECURITY PLAN UPGRADE 4
05Wew97 15:001 r
l                                         7 Security Program Plan Upgrade                                                                             l 1.0Wer97 07:00                                       =0lSep97 15:00
i i
                                                                                                                                                      )
l SIGNIFIC ANT JOB: CRITICALITY WONITOR
l                                       NRC Security and Sereguards Inspection l                 18wer97 07:00 CC302Apr97 15:00 Security Upgrade (Vehicle gate, new turn 11 Mar 97 07:00                 i08Mov97 15:00 NRC review Security Upgrade #1 submitte!
: 5. Criticellty Wonitor l
09Wou97 07:00 [:3 22 Wow 97 15:00 Docket (p) changes 09Wew97 07:00 O l5Wav97 15:00 NRC Inspection 22Wa   w97 15:001 See Upgrade (Lights, IDF East, search CC 09Waw97 07:00>                 il4Jul97 15:00
OlApr97 07:( 0i
,                                                          NRC review Security Upgrade #2 submittel l                                          20Jun97 07:00>     il4Ju!97 15:00 Docket (p) changes OlJul97 07:00 007Ju!97 15:00                                                                             i l
>0BSep97 15:00 Submit Esemption for criticality monitor Ol Apr97 07:10 i iDBSep97 15:00 NRC review /sporoval semption on Critical 1
l
09Jun97 15:00-
!                                          Biometrics Exemption                                                                                       ;
>0BSep97 15:00 1
31Mer97 00:00>                                 il5Aug97 15:00                                                                   l l                                           NRC review Biometries Exemption submitte                                                                   !
i l
1 31Wer97 07:C0t                 >23 Mew 97 15:00                                                                                 l Docket proposed (p) changes 3tMer97 07:00 E311 Apr97 15:00 Submit rinal 1p1 changes for Blometrics 26Wew97 07:00i                   sl5Aug97 15:00 SIGNIFIC ANT JOB: SE"ERE ACCIDENT WANAGEMENT                                                                                                 I 1 0. Severe Accident Wenegement 13h er97 07:00 =                         '30Jun97 00:00                                                                             l NRC review Severe Accident Wenegement le f                 18Wer97 07:00i                           '30Jun97 00:00                                                                             i Dererre! letter to NRC 30Jun97 00:00I l         SIGNIFICANT JOB: NEu TS ON CHILLED WATER New TS on Chilled Water 24Wer97 07:00r                                                 al3Nov97 15:00 Jon (Feb l War lApr l Wow JJun lJul lAug ISep l0ct lNov 10ec           Jan IFeb IWar l 1997                                                                   1998
Submit proposed Exemption to NRC.
09Jun97 15:004 i
SIGNIFICANT JOB: FSnR REV. 25
: 6. FSAR Rev. 25 22Dec97 07:00i SIGNIFIC ANT JOB: SECURITY PLAN UPGRADE 4
l 7 Security Program Plan Upgrade l
1.0Wer97 07:00
=0lSep97 15:00
)
l NRC Security and Sereguards Inspection l
18wer97 07:00 CC302Apr97 15:00 Security Upgrade (Vehicle gate, new turn 11 Mar 97 07:00 i08Mov97 15:00 NRC review Security Upgrade #1 submitte!
09Wou97 07:00 [:3 22 Wow 97 15:00 Docket (p) changes 09Wew97 07:00 O l5Wav97 15:00 NRC Inspection 22Wa w97 15:001 See Upgrade (Lights, IDF East, search CC 09Waw97 07:00>
il4Jul97 15:00 NRC review Security Upgrade #2 submittel 20Jun97 07:00>
il4Ju!97 15:00 l
Docket (p) changes OlJul97 07:00 007Ju!97 15:00 i
l Biometrics Exemption 31Mer97 00:00>
il5Aug97 15:00 l
l NRC review Biometries Exemption submitte 1
31Wer97 07:C0t
>23 Mew 97 15:00 Docket proposed (p) changes 3tMer97 07:00 E311 Apr97 15:00 Submit rinal 1p1 changes for Blometrics 26Wew97 07:00i sl5Aug97 15:00 SIGNIFIC ANT JOB: SE"ERE ACCIDENT WANAGEMENT 1 0. Severe Accident Wenegement 13h er97 07:00 =
'30Jun97 00:00 l
NRC review Severe Accident Wenegement le f
18Wer97 07:00i
'30Jun97 00:00 i
Dererre! letter to NRC 30Jun97 00:00I l
SIGNIFICANT JOB: NEu TS ON CHILLED WATER New TS on Chilled Water 24Wer97 07:00r al3Nov97 15:00 Jon (Feb l War lApr l Wow JJun lJul lAug ISep l0ct lNov 10ec Jan IFeb IWar l 1997 1998


l 4     ,
l 4
CBC2 Run Orte: 20 Mar 97                                                                   Page 10 ProjectView                                                             L'8'"d Project: RESTART                                                         Time Now       IBWer97 07: 10 .. i . i g , o,,,, a Forecast End:. 29Wav98 15:  10  e, ig i ,, , o,,, * ,,,
CBC2 Run Orte: 20 Mar 97 Page 10 ProjectView L'8'"d Project: RESTART Time Now
version: 01 Restert Detall Schedule                                       Required End: 310ec98 23:   10 Torgets:                                 Showing Forecast Dates 1997                                                               1998 Jon lFebl Wor IApr lWew lJun lJul lAug ISep 10ct lNov lDec         Jan IFeblWer l SIGNIFICANT JOB: NEw TS ON CHILLED WATER NRC review / approval New TS on Chilled we 29h aw97 15:00i                             '160ct97 00:00 Submit proposed License Amendment to NRC 29 Mew 97 15:00i SIGNIFICANT JOB: RCP FLYWHEEL INSPECTION
. 29Wav98 15: 10 IBWer97 07: 10
: 12. RCP Flywheel Inspection 08Apr97 07: 00 :                                                 :24Dec97 15:00 NRC review /speroval TS RCP Flywheel Insp llJun97 15:00i                               il2Nov97 15:00 Submit proposed License Amendment to NRC llJun97 15:00i NRC Inspection regard ng RCP Flywheel In 13Nov97 07:00             240ec97 15:00 SIGNIFICANT JOB: TENDON SURVEILLANCE TSCRN 14a. Tendon Surveillance TSCRN 010c t 9 7 0 7 : 0 0 r--
.. i. i g, o,,,,
NRC review /sporovel TS Lendon survellten 190ec97 15:00i                 '2nMer98 15:00 Submit proposed License Amendment to NRC 190ec97 15:00i SIGNIFIC ANT JOB: CHANGE THE ISI VALIDATION COMMITMENT Change the ISI Valldetton Commitment                                                                   l JIMer97 07:00i                   108Ju!97 15:00 NRC review /spproval ISI Valldetton Commi 30 Mew 97 15:00 CJilJun97 07:00 Submit ISI Validation Commitment to NRC.
a Forecast End:
e, ig i,,,
o,,,
* version: 01 Restert Detall Schedule Required End: 310ec98 23: 10 Torgets:
Showing Forecast Dates 1997 1998 Jon lFebl Wor IApr lWew lJun lJul lAug ISep 10ct lNov lDec Jan IFeblWer l SIGNIFICANT JOB: NEw TS ON CHILLED WATER NRC review / approval New TS on Chilled we 29h aw97 15:00i
'160ct97 00:00 Submit proposed License Amendment to NRC 29 Mew 97 15:00i SIGNIFICANT JOB: RCP FLYWHEEL INSPECTION
: 12. RCP Flywheel Inspection 08Apr97 07: 00 :
:24Dec97 15:00 NRC review /speroval TS RCP Flywheel Insp llJun97 15:00i il2Nov97 15:00 Submit proposed License Amendment to NRC llJun97 15:00i NRC Inspection regard ng RCP Flywheel In 13Nov97 07:00 240ec97 15:00 SIGNIFICANT JOB: TENDON SURVEILLANCE TSCRN 14a. Tendon Surveillance TSCRN 010c t 9 7 0 7 : 0 0 r--
NRC review /sporovel TS Lendon survellten 190ec97 15:00i
'2nMer98 15:00 Submit proposed License Amendment to NRC 190ec97 15:00i SIGNIFIC ANT JOB: CHANGE THE ISI VALIDATION COMMITMENT Change the ISI Valldetton Commitment JIMer97 07:00i 108Ju!97 15:00 NRC review /spproval ISI Valldetton Commi 30 Mew 97 15:00 CJilJun97 07:00 Submit ISI Validation Commitment to NRC.
30 Maw 97 15:00i SIGNIFICANT JOB: ret.IEF REQUEST FROM REG, OF IwE/IwL Reller request from requirements of IwE/
30 Maw 97 15:00i SIGNIFICANT JOB: ret.IEF REQUEST FROM REG, OF IwE/IwL Reller request from requirements of IwE/
OI Apc97 07:(0 i                   illJul97 15:00 NRC review /opproval Relief Request from 02Jun97 15:00 C314Jun97 07:00 Submit Reller Request to NRC, 02)un97 15:001 l
OI Apc97 07:(0 i illJul97 15:00 NRC review /opproval Relief Request from 02Jun97 15:00 C314Jun97 07:00 Submit Reller Request to NRC, 02)un97 15:001 l
l Jon lFeb l Mar lApr l Wow lJun lJul lAue (Sep l0ct lNov lDec       Jon IFeblWer I 1997                                                                 1990}}
l Jon lFeb l Mar lApr l Wow lJun lJul lAue (Sep l0ct lNov lDec Jon IFeblWer I 1997 1990}}

Latest revision as of 21:02, 11 December 2024

Summarizes 970321 Meeting W/Util to Discuss Related Items on NRC Mc 0350 Restart Matrix Re Resolution of Technical & Engineering Issues & to Reach Better Understanding of Major Milestones for Recovery
ML20137U897
Person / Time
Site: Crystal River 
Issue date: 03/31/1997
From: Jaudon J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Richard Anderson
FLORIDA POWER CORP.
References
NUDOCS 9704170142
Download: ML20137U897 (105)


Text

_

March 31, 1997 Florida Power Corporation Crystal River Energy Complex Mr. Roy A. Anderson (SA2A)

Sr. VP. Nuclear Operations ATTN:

Mgr., Nuclear Licensing 15760 West Power Line Street Crystal River. FL 34428-5708

SUBJECT:

MEETING

SUMMARY

MANUAL CHAPTER 0350 RESTART PANEL CRYSTAL RIVER - DOCKET NO. 50-302

Dear Mr. Anderson:

i This refers to the meeting held March 21, 1997. in your Training Center.

Enclosed is a list of attendees, your briefing slides, your list of planned license amendments end technical specification changes, and a copy of your Restart Detail Schecule.

The purpose of the meeting was to discuss related items on the NRC Manual Chapter 0350 restart matrix related to the resolution of technical and engineering issues and to reach a better understanding of your major milestones for recovery.

The discussions included the following topics:

Restart Status. Performance Indicators. Resolution of Design Issues. System Readiness Review Resolution of Emergent Issues. MCAP II Update and Closure of i

MC 0350 Items.

In accordance with Section 2.790 of NRC's " Rules of Practice. "Part 2.

Title 10 Code of Federal Regulations, a co)y of tr ; letter and its enclosures will be placed in the NRC Public Document loom.

Should you have any questions concerning this letter, please contact us.

Sincerely.

Orig signed by Johns P. Jaudon j

Johns P. Jaudon. Director Division of Reactor Safety Docket No. 50-302 License Nos. DPR-72

Enclosures:

1.

List of Attendees

\\

2.

FPC Briefing Slides 3.

License Amendments and Tech Spec Changes I

g.RestartDetailSchedule 0FFICIAL COPY

@-@W N

4 DO O2 P

PDR

@ '/5~ !

J

j FPC 2

cc w/encls:

John P. Cowan. Vice President Nuclear Production (SA2C) i FPC. Crystal River Energy Complex 15760 West Power Line Street Crystal River, FL 34428-6708 B. J. Hickle. Director i

Nuclear Plant Operations (NA2C)

FPC. Crystal River Energy Complex l

15760 West Power Line Street t

Crystal River, FL 34428-6708 David F. Kunsemiller, Director (SA2A)

Nuclear Operations Site Support i

FPC. Crystal River Energy Complex i

15760 West Power Line Street Crystal River, FL 34428-6708 j

R. Alexander Glenn Corporate Counsel FPC - MAC - ASA i

P. O. Box 14042 l

l

'St. Petersburg, FL 33733-4042 i

Attorney General Department of Legal Affairs l

The Capitol Tallahassee, FL 32304-l l

Bill Passetti l

Office of Radiation Control Dept. of Health & Rehab. Sa v.

i 1317 Winewood Boulevard.

l Tallahassee, FL 32399-0700 l

Joe Myers Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 1

Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness. FL 34450-4245 Robert B. Borsum Framatome Technologies 1700.Rockville Pike. Suite 525 Rockville. MD 20852-1631

FPC 3

Distribution w/encls:

L. Raghavan, NRR B. Crowley, RII G. Hopper. RII PllBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road l

Crystal River FL 34428 i

Orrirr A

n SIGNATURE NAM Mell i Kland 5 DATF '

03 /

/ 97 03_/

/ 97 03 /

/ 97 03 /

/ 97 03 /

/ 97 03 /

/ 97 COPY? ' [ES)

NO

[YES)

NO YES NO YES NO YE5 NO YES NO OrrICIAL htLOKD CUPf DtLUMthi NAML: P;\\MiSUMJ21.LR I

_. _ - _ _.. _. -. _. _ _.._.. _. -.._. _ _.._ __ _ _ _ _ _ _ _= _.-..._ _ __. _.y l

l t

LIST OF ATTENDEES Florida Power Corocration 1

R. Anderson. Senior Vice President. Nuclear Operations J. Baumstark. Director. Quality Programs i

J. Cowan. Vice President Nuclear Production l

F. Frando. Nuclear Regulation S)ecialist B. Gutherman. Manager. Nuclear _icensing M. Hendrix. Senior Public Relations Coordinator' B. Hickle. Director. Nuclear Plant Operations i

J. Holden. Director Engineering O. Kunsemiller. Director. Site Support W. Lancaster. Public Relations and Marketing Manager R. Maughan. Department Support Administrator J. Maseda. Manager. Nuclear. Engineering Programs J. McGee. Senior Counsel

{

D. Miskiewicz, Senior Nuclear Safety Analysis

)

M. Myers. Manager. Investor Relations M. Pombior. Training J. Ranalli. Engineering Restart Manager W. Rossfeld Manager. Regulatory Assurance F. Sullivan. Manger. Nuclear Operations Engineering J. Terry. Manager, Nuclear Engineering Programs R. Widell. Director. Nuclear Operations Training f.PS,C t

.i J. Breman. Engineer EIl R. Finnin. FTI Resident MPR A. Zarechnak. System Readness Manager BCP Technical Services Inc G. Nott Seminole Electric K. Bachor. Manager of Engineering J. Twitchell. Director of Operations 4

NUS Information Services Inc.

R. Colthorpe i

l L

i i

1 i

2

)

Nuclear Reaulatory Commission S. Cahill. Senior Resident Inspector. Crystal River l

C. Christensen, Chief. Engineering Branch T. Cooper. Resident Inspector Crystal River F. Hebdon. Director 11-3. Office Of Nuclear Reactor Regulations (NRR)

J. Jaudon. Director. Division of Reactor Safety K. Landis, Chief. Branch 3. Division of Reactor Projects L. Raghavan. Project Manager. Project Directorate 11-1. NRR L. Reyes, Regional Administrator l

R. Schin, Reactor Inspector. Engineering Branch Public l

J. Brendel. Analyst SILCAP G. Burbank W. Enyard. Business Manager. IBEW System Council U-8 O. Fields Z. Schreiber. Analyst. SILCAP Members of the News Media i

i l

1 l

l l

l l

l l

r i

t

I FPC - CR3 FLORIDA POWER CORPORATION

~

CRYSTAL RIVER UNIT 3

(

NRC RESTART PANEL MEETING 1

MARCH 21,1997 1

l nive,

j i

s

-n y,r-f


en e em c.E=ms>

Ohio po

i FPC - CR3 rgj.it AGENDA I

Opening Remarks Anderson j

Restart Status Cowan l

Performance Indicators Hickle Resolution a Design Issues Holden System Readiness Review Terry t

l Resolution of Emergent Issues Baumstark MCAP II Update Baumstark Closure of MC 0350 Items Kunsemiller Concluding Statements Anderson

l l

FPC - CR3 l

i r{4 r

Confirmatory Action Letter I

i l

[

l t

Design issues identified in FPC letter dated 10/28/96 i

i l

Extent of Condition Reviews i

l 1

Resolution of Safety and Licensing Issues Regional Administrator Concurrence for Mode 2 l

t 3

i I

i l

}

l I

FPC - CR3 Three-Phase Approach i

f i

i t

i t

Readiness for Restart t

i Startup and Power Ascension l

Long Term Improvement Plan i

l i

f i

l l

l l

4 i

i

FPC - CR3 l

t r...{$)

Elements of Each Phase t

j System Readiness i

Organizational Readiness l

Operational Readiness i

t Regulatory Readiness j

t Communications Plan i

5 4

1 i

FPC - CR3 l

t Readiness for Restart 1

i i

{

i Reflected in Current Schedule of Activities l

i i

Prepares Plant for Mode 2 l

Satisfactory Progress on MCAP Items l

l 1

i i

l I

6 i

FPC - CR3 Startup and Power Ascension i

l Deliberate and Controlled Process 1

I t

Hold Points for Status Review i

i l

Completion of Required Testing l'

Limited Corrective Maintenance 4

7 l

l 4

FPC - CR3 l

Long Term Improvement Plan i

l l

l l

Incorporate MCAP Principles into Business Plans l

Complete Remaining Open MCAP II Items l

f i

Long Term Business Planning j

i i

i I

i i

8 l

t

-. ~.

t 3

i a

FPC - CR3 x$f Restart Schedule 1

u 3rd Otr 96 m 4th Otr 96 a 1st Otr 97 m2nd Otr 97 m 3rd Otr 97 m 4th Otr 97 alst Otr 98 a 2nd Otr 98 m Design And Licensing Basis Review Review Design Basis m

m System Readiness WalkdoEs

  • Plant Modifications l

Engineering l

2 l

Construction m

,m Testing 5

m 2

n Regulatory Requirements i

i NRC Reviews 2]

TECH SPEC Changes / Approval NRC Restart Autholzation j

+

i I

ProceduresAndTraining j

J, OP/APIOP Trainingm j

e i

MAR TrainLng

}

I Startup l,

Sytem Uneups r

Heatup & Testing Reac5r Startup j

Power Escalatikn l

4 9

i i

i

- - _ _. - - _ _ - - _ _ _ _ _ _ _ _ _ _ - ~

1 1

4 r

C 3

q i

i l

d h

l 5

a 1

1 t

i No

  • MW Cl$

u C.-

C l

i f

i i

l i

U s

]

d 1

j i

i 1

1 l

J

e t

i i

Crystal ~ River Unit #3 Restart Plan 3--

i__uv ee-

_i r

.i_ e e *=~~e 1 _1 a-L

-e->geee-1gemq jea wI_ tan -tlan

-t j a a.-L J

~ L' ewer Loop MANS A msgy y usgy c

c r

4........>

insteN R.S. Penettetten MAR 2

DGI ETW fntev ection 4

MAR & Work Png Prep-EFW Cowitating Venturi MAR C -

Reactor Startup j

^

^

y Genem M j

- MAR & Work Pkg. Preparation --

Power Escalatic i i

I

_ EFP Defeat Switch MAR _

4.H.P.I.C.a.vitat.ing V.e.nturi M.AR EFV-12 Conduit 1

i EFV-12 MOV MAR 1

_EFV-12 Vehre MA_R ESCP-1 Uperado t

i EFIC Corn, Module MAR i

_ ASV-204 MAR _

E.S. Puenp PTL MAR D.R Sporn ym MAR D.H. Syern VW MAR l

  • B A Side L

MUV-27 Auto Cleeure MAR

~

i

[

MUV-103 Seet Leakep MAR

[

_EFP-2 Flow indestien MAR i

i t

_ MWP Cyelene Separator MAR l

Review Deelen Besie 7

Systern Reednees Walkdowne NRC Restert Autheriretion

(

NRC Rowlews TECH SPEC Changes / Approval j

i t

)

l

[

i

FPC - CR3 l

h Performance Indicators u Organizational Readiness r

I m System Readiness m Operations Readiness 1

l m Regulatory Readiness i

i m Communications Readiness l

l 11 l

l l

I[;l i

i
.! ;I! i!!j i[

i!

!!I i. l 2

1 s

e s

s c

r e

on ne t

i e

r ad r

r c

a u

u i

e s

c d

o e

nR l

s C

r R

I l

o a

r e

s mr o

c n

e no r

e u

sr at uI c

i t

u s

e ma o

t r

c y

s e

r z

r P

l r

r o

ri a

on C

d o

P t

t s

s s

f a

e e

e r

g uRf u

"B H r

i i

e r

s i

c P O t

s I

I I

n e

n r

d o

e tr P

d P

ni t

a AI n

a a

t f

e l

s Cl p

"A i

o e

e RMS O"

V 3R N

C C

PF i'

I FPC - CR3

~

Organizational Readiness FE*"

Restart Issue Closure i

,m 2 0 0 Actual s

v c

m e

150 i

Workof f i

c f

g I

1 1W O

+

1 0

50 u

e

=O I

E

.\\

a 0

g

&n Feb Mr A r Mry Jun Jd Aug SEp Q:t Nw Dec f

i i

1997 13 1

l i

FPC - CR3 l

Organizational ~ Readiness s

zW MCAP II Restart Item Closure j

4 1

Goal is to Demonstrate Progress 20 I

+ Actual e

E 200<

i j

_.g_.Workof f (Rev.1) 1 o.

O 10 o

u l

e I

b

s Z

l 0

Jri Rb Mr Apr My Jn JJ Ag Sp Of Nu Dr i

1997 i

l 14

i 4

i FPC - CR3 I

Organizational Readiness

~

Ekd SelfIdentified Precursors l

i 1

100 l

90 80 i

i 70 60 l

c 50 e

O@

u.

4

n. T Total i

20 Goal >60%

i 10 0

t JEri Feb Mr Apr lWiy Jun Jd Aug Sep Cht Nw Dac l

1997 i

i l

is i

i

i l

FPC - CR3 j

rM Total Number of Open Precursors i

I 1200 l

M PCs Opened j

tC3 PCs Closed l

1000 4

l C 3 Restart

)

977

-e-Total l

800 734 I

7W 77 p@p_

path Mh%

j 600 i

. _ _,. _ _Feb Dec Jan l

l

.{

Grade "A" 4

5 5

l

'l ii i

i i

Grade "C" 168 228 I

Grade "B" 8

29

~ ~49-3 1

338 3

t Grade "D" 6

92 203 l

h i

r Old System --

~~tIA~

9F 491 430 382 l

[

g gg 677 l

,2 l

200 i

Y l

i h 130 l

h

~

$2 l

l 6

I

\\

L, l

c Dec Jan Feb Mar Apr May Jun Jul Aug Sep Od Nov Dec

.6

b I

FPC - CR3 Organizational Readiness i

Fk "A" and "B" Precursor Recurrence i

1 10 i

8 Hypothetical Data t

u I e 6

for Illustration Only l.O E

4 o

z 2

i l

0 c

.o u

c

=5 a

a.

~

o o

e 5

a m

a a

e o

e

,m a

2 2

7 m

O z

o 1997

\\

l 17 1

M

e FPC - CR3 Or8anizational Readiness

<a, 5y8 Violation History 7

m.

.# a u. a a.._

m m,,.

~

, ![ [

'j

,t a

100 90

~o 80 i-o-

70

=

=

=

=

=

=

=

=

=

=

=

'8 m 60

5. 8 50 l

C *ii 40 So e

Actual 30 3

Goal >67%

o 20

.,o a

m 10 r

tr De e

l l

1 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec j

a

j 4

1997 i

g tj

);

c h

)

~~

n ij 18 3

12

\\

i

r FPC - CR3 Performance Indicators Sh System Readiness l

i

- Corrective Maintenance

- Temporary Modifications l

- Systems Accepted by Operations i

- Requests for Engineering Assistance j

i

- Restart Modifications i'

j i

i l

l l

19

i i

FPC - CR3 System Readiness h)

Corrective Maintenance i

f 1000 l

900 i~

ctual

~

4 800 i

kVorkoff t

s cr 700 Goal <200 e

i 0:

600

,E f

ON O

4 i

E

-Q M

A A

A A

A A

A A

A A

m a

=

m m

=

=

=

=

=

=

=

m a i

100 f

Z l

0

+

l Jan Rb Mr Apr Nily Jun Jd Aug Sep Cbt Nw

[bc l

1997 i

20 i

l l

1 FPC - CR3 j

System Readiness rEh Temporary Modifications l

10 i

9 6

8-

  • \\

E 7

s,h 6 S

E.

i gSa A

A A

A A

A A

A j

..e 0 '5 4

+ Actual 3

o jE.Workoff 2

s i

z 1

--e Goal Prior to Heat Up<5 l

0 Jn Rb Mr Ar Nby Jm JJ Ag Sep Q1 Nu Dr 1997 i

- - - - -, ~ - - -

_ ~

i

!i(! lr

$I,>l,lil>

!!!i;

!l!l!Iil!!!!j!li,

!I c

22

3 D f

w f

a o

l N

u k

r t

c o

tt W_

_C s

A n

o 4

p i

e t

S a

r g

e u

s p

A seO i

n t

i y

J7 9

db 9

a n

e e

u1 c

J Rn a

y mt i

,W e

p I

t e

r s

c

- =

p yc A

SA r

m M

e t

b s

i '

e F

y S

im m"

i J

0 0

0 0

0 0

2 0

6 4

2 1

1 S>o V*cw:H s

e O*

ES=Xn %O 'eQE:z s

e 3

RC C

PF lll l

llIl!l,lt:'l

l

j t

i FPC - CR3 System Readiness FEh Requests for Engineering Assistance 600

+ Total Open 500'

--m-W o r k o f f t

+ Goal <200 l

j 400

+ Re c eiv e d i

uJ i

cr

+Clo s e d i

yy j

ue L

.O s

! 200a i A

i i

i i

i i

i 1

ai z

j A

l 0

Jan Feb Wr Apr Wy Jun Jul Aug Sep Oct Nov Dec 1997 t

i 23 f

t f

FPC - CR3 Fn---

System Readiness Restart Modifications l

t l

t i

40 t

35 Actual Workof f t

30 m,

25 t

,c eO a: a 5

20

+o.9 u.t eu 15

-Q O

E E 10 5z 5

O.

i l

Jan Feb Wr Apr Wy Jun Jul Aug Sep Oct Nov Dec 1997 24

c l

4 FPC - CR3 Performance Indicators k

Operations Readiness i

4 i

l

- Control Board Deficiencies

- Operator Work Arounds

- Operating Procedure Changes l

- Emergency Operating Procedure Changes r

- Abnormal Procedure Changes j

l i

25 i

l

~... -. - -. - -.

I j

FPC - CR3 Operations Readiness FEIk Control Board Deficiencies 1

I i

l l

l l

25 ts u

m Actual l

0 20 m

_e G o a l < 10 oe 15 w

o C

C l

l O e 0'

l l

.5 10 c

l O e w o I

e 54

.o E

i o

o t

g l

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec l

1997 i

2b i

l ;r li l,f j!r

,I,l ll!

hg O3 37OM*

Mmaa 0

O*! C9 Cm km Cgg@

N h

k r

W s,{,

o 8

ro em A~

s8 t

a rd i

en pu Oo

=

r6 fA o

r e

i i

s s

8 n

l i

b m

E m

u N

o g

g 4

g k3 h

[

Q k

"@O

(

lll l

it

i f

f 4

i g

Outstanding Procedure Comments y=o$$$b$$$$$b

g..-

I k-I -

ee fD cD

g. u M

l

.N f

e+

gag-j g.

i TQNm a5-g -

j l

m pc g

ee o

a 1 sk tD l

  • 4 C

2

>. m -

M e

C CD m

M h

~ I "

'. a wE Z-I -

A o

a) i N)

[

t 01 i

i S$

l l

l t

FPC - CR3

~

i Operations Readiness W

Emergency Operating Procedures E

i i

20 l

I Actual 18 l

Wo rkof f l

t.

16 1

O i

Goal <0 e 14 -

i e 12

}

t

.a

+' 10 o

W O

W t

w l

3 V

I e

o 4

i O

wo 2

0..

i i

i i

=

=

Jan Feb Mr Apr IWay Jun Jul Aug Sep Cbt Nw Dec I

1997 29

l h

l l

R l

FPC - CR3 Operations Readiness kh Abnormal Procedures I

l 160 l

~

~

i a

c ctual i

140 i

i Workof f l

2 120 Goal <15 s

i v

l 8.100 l

2e

n.
  • 80 mE

.E E v o 60 co 2

2 40 m

i O

l 20

(

A A

A A

A A

A A

A f

i i

0 Jan Feb Mar Apr IVby Jun Jul Aug Sep Oct Nav Dec l

I 1997 3

i l

i t

6 30 l

l

t FPC - CR3 l

Performance Indicators rh Regulatory Readiness i

- License Amendments and Tech Spec Submittals i

- Other NRC Restart Submittals i

- Submittal Quality (under development)

- Total Commitments j

l i

i i

I 31

r i

FPC - CPO License Amendments and Tech Spec Submittals f

25

~

i

]

Submittals to "Ri 20 4 be made

.t_

E Goal =0 m

15 r

i a

M o

10

~ - - ~~~~~~'~

i 5

Es Z

0::

=

=

=

=

=

=

=

=

=

j Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nw

[bc 1997 32 i

i FPC - CR3 t

Other NRC Restart Submittais t

l 25 l

t e

c S u b mittals to j

^

e 20 be mad e e

i i

=

G o a l= 0 3

15 m

M w

i o

10 me i

.Q E

5 oz v

I 0 ::

=

=

=

=

=

=

=

=

=

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 33 i

I l

I

i

~

FPC - CR3 f

Regulatory Readiness y_t Total Commitments z

i 4

l 200 l

l' 180 Actual

=

c 160

+Wo r kof f e

E 140

'E 120 i

i E

100 O

i 80 l

O 8

60 I

e l

.D 40 1

E t

20 l

z l

0 Jan Feb IVbr Apr IVby Jun Jul Aug Sep Oct Itv Dx:

i 1997 34

i i

i FPC - CR3 Performance Indicators EY Communications Readiness l

i l

l I

I i

- Organizational Communications Effectiveness

{

i l

1 i

l l

t 35 j

i I

FPC - CR3 Communications Readiness Ftkt Organizational Communications Effectiveness I

l i

I:,pathetical Data for Illustration Only Goal is an improving Trend 100 i

i t

80 gOps E Maint 60 E

O C h e m/ Ra d e0 40 D Eng

,ea gSupport i

20 j

0 Jan Feb Mar Apr lWy Jun Jul Aug Sep Oct Nov Dec 1997 i'

t 36

[

FPC - CR3 l

t i

l l

CR-3 STARTUP TEAM i

l SOLUTION SET PRESEXTATION

[

b N4 SOLUTION SET l

A*4b b;g+p U

FLOW PATH S

[

l 3

ra

=

r"^r g o

_'5~- r ~ ~~

= Git, moos N

smots

+

Lose -+ C

+

setocA +

A M ES LOOP L,,,,,,,,,,,,ry L EFP-2 S

4 04fDAPO t

37 i

4 e

l


_-__,_--w_--,

-m w,m m g_m_ yx m a a m,m_,yg

,ap

,p y

-p4gg_m__,_

y,,

l

=

uJ i

b E

i

=

m{g i

O Z

E 0

l e

EB-J 1

~

l l

.i FPC - CR3 l

l OTSG Steam Supply ASV-204 ASV-5 r

y 5:a-x Steam Driven EFP-2 EFV-12 ST

-vu s

,s Non-Saiety FWP-7 yo

~~

-c%c%--

l Motor Driven EFP-1 l

9 i

h FPC - CR3 l

SOLUTION SET FLOW PATH r

t l

LIMITING SINGLE FAILURES

LOBA

[

Loss of "A" Battery l

INITIAL

[

CONDITIONS r

r MODE

'" L

+

SBLOCA

+

+

LOBB FAlLURES LOOP Loss of "B" Battery E.

i i

S

EFP-2 S

40 i

l

?

I

i rec-cn3 SOLUTION SET FLOW PATHS I

l Address Each Single Failure Scenario Separately i

Identify Design Basis Success Path j

Identify Defense In Depth t

Identify Challenges Identify Needs

- Modifications

- Procedures

- Licensing Actions

- Training 41 f

l t

FPC - CR3 i

i

[

i F

v j

M.

I

r MUP-1A or MUP-1B PUMP L

1 m

6 A L INSUFFICIENT OPERATIONAL r

H EFP-1 4

EDG

~~~~~'

l UMITATION

l CAPACITV l

I S

- CONTROL COMPLEX I h COOLING (-1.0 hr) l o P

MITIGATION 3

T DEPNN STRATEGY TM DEPEE. NCY..J l o LOBB.,

- 500 PSIG 1 HPI PUMP I a (Operator Cooldown)

C l

l g r 8

EFW FLOW I

o v

I n I

C i

+

+

n u

FRAMATOME r

t EFW 2

w ANALYSIS E

l

+ EFP-2 -+

CROSSTIE EFW TRAINS

+

EFW p

ADMIN

+ AND +

FLOW i

[

S S

l FWP-7 DEFENSE IN DEPTH l

r FWP-7 DIESEL SUCCESS PATH MOD 2

CHALLENGES v

DEFENSE IN DEPTH 42 i

... - _.. - ~... -.. _ _ - - --

1 t

FPC - CR3 t

t F

t l

t l

r 1 HPl MUP-1B or MUP-1C l

PUMP m

i t

i U

r MITIGATION STRATEGY i

C r

r r

LOBA +

1 HPI PUMP FRAMATOME EFP-2

.l g

EFW ADMIN

-+ AND +

C EFW FLOW ANALYSIS 4

EFW E

FLOW i:

f S

i FWP-7 DEFENSE IN DEPTH l

W FWP-7 DIESEL MD i

i SUCCESS PATH v

CHALLENGES DEFENSE IN DEPTH 1

i f

43 i

1 9

[

t FPC - CR3

~

[

t i

{

m J

I f

2 HPI HPI FLOW PUMPS ANALYSIS 6

I S

i U

MITIGATION STRATEGY FRAMATOME TIME C

l EFP-2 -+ 2 HPI PUMPS ANALYSIS EFW FLOW EFP-1 TRIP b

f r

OPERATIONAL LOAD

+

DEFEAT AND -> ADMIN ->

i f

LIMITATION MANAGEMENT SWITCH E

t EFW b MOD l

-- es nEANAM FLOW

- BWST DEPLETION MOD (PTL)

- 500 Psig S

(Operator Cooldown)

S DEFENSE IN DEPTH

-+ FWP-7 DIESEL j

SUCCESS PATH MOD j

CHALLENGES i

DEFENSE IN DEPTH v

44 I

l.

l e

I i

i I

j FPC - CR3 FG-

,t s

h.

7 i

i l

l LIMITING SINGLE j

^

FAILURES O

l U

ADMIN LOBA

=

Loss of "A" Battery l

C LOBB SAFETY ASSESSMENT C

Loss of "B" Battery

{

j EOPIAP/OPISP REVISIONS EFP-2 TRAINING S

FSARI EDBD /ITS REVISIONS t

t 45

l FPC - CR3 j

r i

l STARTUP i

TEAM EOPs i

1 l

MFTI & FPC l

PLANT REVIEW MODIFICATION i

i SYSTEM READINESS REVIEWS i

i 46 i

i FPC - CR3 l

CYCIJ 11 RESTART CYCII 12 i

New Isolation Criteria i

HPI Cavitating Venturis i

Crosstie EFP-2 / ASV-204 Diesel EFW Pump l

i 150 KW EDG Upgrade l

or Load Management Increase EDG l

Capacity i

i EFW Cavitating Venturis FWP-7 DieselPowered EFIC Improvements l

l 47

l i

i i

l I

FPC - CR3 l

System Readiness Review i

i i

I

[

l t

i Plan

[

Status l

Performance Measures I

i r

48 i

t

?

l 1

FPC - CR3 i

g System Readiness Review r

i i

i Conduct reviews to assure that safety related systems are in compliance with the beensing j

and design basis of the facility i

l l

l l

i 2

49 i

l FPC - CR3 System Readiumess Review Plan Assess each of the 105 systems for a " Graded Approach" i

review Perform assessment of each system Evaluate results l

Track restart requirements l

Operations acceptance of systems Performance monitoring i

I i

i i

l 50 i

i i

l

FPC - CR3 j

rg_

Classification Methodology i

Multiple Fission Product Barrier Approach

- 10CFR50, Appendix A,II Analytical Process

- PSA Model

- Maintenance Rule Risk Significance j

- Safety Significance Engineering Judgment and Assessment Performance t

l

- Past " change process" oprortunities

- Previous system assessments l

51

FPC - CR3 rOR Level 1 Systems Level 2 Systems i

l

^C Electrical Distribution System Emergency Feedwater System a

DC Electrical Distribution System i

EmergencyFeedwater a

Air aandling subsystems l

Initiation and Control a

Nuclear Services Closed Cycle Cooling System Reactor Coolant System a

Raw Water System Emergency Diesel Generators u

Decay Heat Closed Cycle Cooling System F

and EDG Support Systems a

Control Rod Drive System j

u Main Steam System i

Decay Heat System a

Waste Disposal System l

Makeup & Purification System a

Radiation Monitoring System

^" nun i t r System Core Flood System i

a Building spray System l

a Feedwater System Engineered Safeguards System l

4 l

m Chemical Addition System l

l m

Spent Fuel System j

u NuclearInstrumentation System I

a Reactor Protection System a

Containment Access 52 l

l FPC - CR3 j

" ' ' ' " ~ " " " " ' " " " " " " ' ' " " " " ' ' ' '

l'f Nuclear Closed Cycle Cooling Sytem (SW) l I

i l

i I

i l

I 53 I

i

w f

SYSTEM READINESS REVIEW MATRIX NUCLEAR CLOSED CYCLE COOLING SYSTEM (SW)

M.JOR TOPICS N BASIS ExtMsIM;DOCTMENTS OPERATIO*S tealvrEMAMT st1tv.

T t

2 3

4 5

6 7

8 J 9

le II 12 33 to 35 16 17 18 19 2e 21 22 23 24 25 26 27 28 29 3e

! ! L !

l I l l j

i l

2 1 i 1

i 3

I : '

l l l i j { l i l l

j i. l l i

l i j i I

i i

e g

4 1

X Mennem.._.J.. of mipecs for elevel 2 SRR

    • .c h saled &cen SRT.OPIidentific4 igenses LM.2SW. ADD

~

FPC - CR3 System Selection Review t

All Maintenance Rule Risk Significant Systems are Level 1 or 2 Systems i

l Level 1 and 2 Systems Contribute to 100% of Core Damage Frequency j

i i

Level 1 Systems Contribute to 87% of Core Damage Frequency i

t I

l 54 s

r FPC - CR3 t

System Readiness Review l

Fkh Phase 1 l

, February M arch A p ril M.,

June July A ugust Septem bes; October

[

i i

e a

a e

i i

e i

Le well System Reviews j

I h

l l

La sel 2 System Reviews l

Level 3 System Reviews i

l GROUP 1 Systems Level 3 System Reviews GROUP 2 Systems l

l Level 3 System Reviews GROUP 3 Systems GROUP 1 Systems-Potential to impact EDGIEFW Dependency G ROUP 2 Systems - Potentini for discovery oIDB er LB issue t

GROUP 3 Systems. Remaining Systems I

55

FPC - CR3

~

i FEY I

System Readiness Review Attribute Check Status Level 1 Systems l

l l

G i

0 0

t 3ID i

.E l

g aro l

.c i

O 2E i

-n W 0mds 5*

-A W M

k i

A.

0;; - -

V6EN V$Eh V8Ek V@EN V8Ek V8Ek WEN WEN VYEk WEk WEk l

27 2 14 2 21 2GB 37 3M 321 32 44 4 11 4 18 l

l 56 l

i

[

i I

i l

FPC - CR3 i

System Readiness Review l

l 4%L 79 Summary i

iii 1

I i

I r

I l

i i

I l

(

\\

l

)

I i

l l

t i

i I

l i

l i

57 j

i h

l I

s FPC - CR3

%,4 Resolution of Emergent Issues r

t Changes to Restart Process t

- NOD Consolidation Formalize Plan / Guidance Redefine Criteria / Establish Screen Out t

l l

)

l l

58 l

1 l

I r

FPC - CR3

~

Restart Criteria 1

1.

Required to address an operability issue i

2.

Required to restore acceptable design margin or conformance with design basis i

i 3.

Required to meet restart licensing commitments or to resolve USQs needed to f

restore conformance with the licensing basis 4.

Required to address an organizational, programmatic, or process deficiency that could prevent maintenance of adequate design margins or conformance with the design or licensing basis t

5.

Required to address significant equipment materiel condition deficiencies singly or in aggregate, or repetitive failures that could affect safety system availability, impact plant reliability, or reduce the ability of operators to operate the plant safely 59 f

L 6

l FPC - CR3 f

Restart Criteria (con.)

l 4

Issues not meeting criteria 1-5 will not be required for restart and will be classified as follows:

6.

a.

Item can be scheduled for a subsequent outage l

l b.

Item can be readily worked on line, does not affect safe and reliable operation, does not represent a significant challenge to Maintenance l

Rule Goals or LCO Allowed Outage Time, and does not impair operations necessary to perform surveillance or monitoring i

c.

Item is classified as minor maintenance, cosmetic maintenance, or housekeeping, and does not affect plant operation j

d.

Item is an administrative issue 60

+

i FPC - CR3 Role of Restart Accountability Team l

l i

Decision makers at the right level r'

)

Accountable to Plant Manager Oversight by Restart Panel 1

f 61 I

...m.

m.

e e*w*

-e-*.-.

I i

~

l FPC - CR3 4

Ig Role of Restart Panel o

I l

Approve changes to process j

i i

i i

Link with NRC / CAL / 0350 process 1

i

'i Consolidate recommendations for restart i

I i

^

l 1

l i

I 62

[

i

t 4

i FPC - CR3 F{*

Implementation of Process 4

i l'

l Rescrub previous open issues

\\

Consolidation ofNRC / FPC issues i

l l

l f

l i

l l

l l

l l

l 1

63 l

l 1

I I

i 1

~

FPC - CR3 l

MCAP II L pdate l

Rescrub for restart I

April revision as committed j

- "As of" 4 April

- Completion dates reflect restart resource loadmg Completion criteria necessary to support " satisfactory progress" requirement of CAL s

-_.._____._ __ _ _ _ _ __.___ _ _. _ ___.-_.....___ _.__.. _ _ _._.._ q FPC - CR3 i

r%%

Corrective Action Program Update

[

l 1

[

i l

i Revision to process (CP-111)

- Involvement of supervisor / line manager (Precursor Card ownership) i

- Timeliness of response (identify, cause determination, corrective action implementation)

I

- Extent of condition review (A & B precursors)

- Effectiveness review (A & B precursors) j

- CARB involvement (extend / downgrade) i 65

l

~

FPC - CR3

~

Challenges to Process I

t I

Influx of PCs from extent of condition l

I reviews Backlog Monitoring sensitivity i

66 1

\\

FPC - CR3 1

Closure of MC 0350 Action Items Regulatory Readiness Plan L

Closure Packages and Schedule NRC Assessment Team Coordination I

l 67

{

r i

FPC - CR3 Regulatory Readiness Strategy l

l l

i Develop closure sequence for all restart issues l

Maintain closure schedule in one master schedule I

Use schedule to inform organization oflicensing needs i

l l

Measure licensmg performance by adherence to schedule Provide closure management by projecting NRC review needs and maintaining status ofissues 1

68 l

i i

t

i 1

I FPC - CR3 l

l License Amendments - resolve USQs and Unanalyzed Condition-s l

Tech Spec changes - support plant modifications and j

i safe operation l

License submittals - correct Licensing Bases 1

Commitment and Issue Closure Packages j

l l

NRC Inspections NRC Readiness Assessments l

l 1

i l

l 69 l

l

)

I 4

FPC - CR3

)

i i

l g

Closure Packages and Schedule j

o l

l l

l l

i j

Documentation assembled as issue or commitment is completed i

Regulatory Assurance review packages (QA oversight)

Closure packages are available to NRC Inspection Teams j

Integrated Schedule drives timing Regulatory Assurance will coordinate interface 1

i 70

FPC - CR3 l

F{@}

NRC Assessment Team Coordination i

i 1

FPC Briefings support issue closure Restart Panel meetings show progress toward restart MCAP efforts show progress on organizational and programmatic changes j

FPC self-assessments demonstrate organizational l

l l

readiness i

NRC assessment teams confirm organizational, operational, and system readiness l

i l

[

r I

k 71 I

i

1 l

l F

Restart Authorization Plan i

f

.__ - m - u w

l RESTART AUTIIORIZATION PL AN l

I 2

MCAP II Root Causes

[

- Organizational Root Cause 4

Effectiveness identification

- Corrective Action r

Program

+

- Self Assessment Corrective

- Performance Monitoring A ction

+

and Trending Program i

- Root Cause Analysis l

- Q A Follow-up i

b*U

- Maintain Design a A ssessm ent h

j Licensing Basis

- Operations Resources Closure h*O 0350

-Change Management

+

pg

+

gg; Licensee NRC g

m M anagem ent Concurrence f

EITectiveness

[

Restart issues

+

List 4

Self Staff Operat onal

?

5 Training

\\ ssessment

- U E ffectiveness

  • p e, Regulatory Readiness

+

Regulatory y

[

Com pliance j

System Readiness 4

f Plant Physical y Readiness L

I i

l 72

[

I t

FPC - CR3 License Amendments and Tech Spec Submittals I

i 25 5ubmittals to ui W

20 d be made

.li!

E Goal =0

.o 15 a

l M

l o

10 l

u W

L E

I 5

I 3

l Z

i 0::

=

=

=

=

=

=

=

=

=

Jan Feb Nbr Apr May Jun Jul Atg Sep Oct bbv

[bc 1997 ll 73 l

t

I I

i FPC - CR3 j

r i

S&

Other NRC Restart Submittals i

i t

-?

w l

25 I

S u b mittals to e

e e

20 be made 1

m Goal =0 3

15 s

4

%0 10 u

e i

.O j

E l

5 a

z j

v I

0..

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec i

i 1997 I

f j

74

I t

1 FPC - CR3 t

License Amendments and Tech Spec Changes 1

25.

I l

1 Pla n n e d N RC 2

20 A p p r o v als a>O ua 15 i

i a

i t

+

O 10 me

.O l

E s

5 i

z w

i l

l 0

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 75

f t

i FPC - CR3 rEh. _ _ Other NRC Restart Submittals i

25 Pla n n ed is s u v

20 Clo s u r e e

r i

d) s m,

15 3

O 15 10 i

.c l

l E

i s

5 z

0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1997 76 I

i

,I(ii 1!

i

'Ig, h[fI i

n I!!fi!!l' 7

7 s

tn e

me t

a t

S g.

n i

d_

u.

lcn o

C

- r

,iI n

4 1

4 t

43

l License Amendments and Tech Spec Changes Issue Submittal Submittal NRC Date Approval Date SB LOCA TSCRN 3.7.5 EFW 5/28/97 10/30/97 TSCRN 3.7.7 SW TSCRN 3.7.9 RW i

Ne'n TS Control Complex Cooling i

TSCRN 3.5.2 ECCS TSCRN 3.7.8 DC TSCRN 3.7.10 DH Seawater TSCRN 3.8.1, 3.8.3 FWP-7 Diesel USQ i

SW/RW Pull to Lock USQ EFP-1/DHP-1A Trip Block Defeat USO TS Bases 3.8.2 500 kV Substation 6/6/97 9/5/97 License Amendment DH-45-Fi 6/16/97 9/15/97 i

Appendix R issues Exemption Request 10/96A 10/20/97 System Readiness License Amendment 6/13/97 9/12/97 Reviews LTOPS JCO submittal / exemption request 4/4/97 5/1/97 TSCRN,(if required) 7/16/97 10/15/97 EOP/AP Strategy License Amens

nt 7/14/97 10/13/97 Regarding Operator Actions ILRT TSCRN App. J. Option B 4/7/97 6/2/97 1

RWP Cyclone USQ submittal 6/16/97 10/13/97 Separator Fouling CCHE Tech Spec CCHE TSCRN (SRs) 7/25/97 10/25/97 Review License Amendment, (if needed) 7/28/97 9/29/97 Implementation of License Conditions

i l

Potential USQs HPl Pump Recirc 6/27/97 9/26/97 MUV-31 controllogic change 6/27/97 9/26/97 EDG Protective Trips 6/27/97 9/26/97 HPI Analysis (with/without HPl venturis) 6/27/97 9/26/97 HPl Nozzle Cyles 7/18/97 9/25/97 Letdown Line Rupture (manual action) 4/25/97 6/27/97 AHFL-1/2 5/16/97 8/15/97 OTSG Tech Spec TSCRN 3/28/97 6/30/97 RG 1.97 Issue b PAM, EDG kW Meters (Other new 4/30/97 8/17/97 Type A's)-TSCRN Non-Restart License Amendments and Tech Spec Changes RCP Flywheel TSCRN 8/11/97 1/29/98 Tendon TSCRN 12/19/97 3/20/98 Surveillance 4

i

1 l

Other NRC Restart Submittals i

Issue Submittal Submittal Issue Date Closure Date 1

SB LOCA LPI Mission Time (DHP) letter 6/20/97 10/13/97 Boron Precipitation letter 8/29/97 10/13/97 Appendix R lssues Assessment Summary 4/21/97 11/3/97 ADV 30-day Response 4/11/97 4/11/97 LTOPS Revised response on GL 88-11 8/25/97 11/14/97 j

System Readiness SRR Procedure 3/28/97 10/10/97 Reviews SRRP Summary 6/23/97 10/10/97 EOP/AP Operator EOP commitment date change 3/31/97 11/10/97 Actions GL 96-01 Summary Report 7/18/97 11/18/97 FSAR Rev. 23 Letter to NRC re: USQs 3/31/97 9/15/97 USQs Letter following FSAR review 7/7/97 9/15/97 GL 96-06 Letter to NRC SW Fitting 5/12/97 6/26/97 Summary Report 6/26/97 6/26/97 TS Bases Summary of TS Bases changes 4/14/97 4/14/97 Submittal Tendon Special report to NRC 7/25/97 10/24/97 i

Surveillance i

Maintenance Rule Walkdown Summary Report 7/15/97 7/15/97 T

Structural Baseline Integrated Safety Summary Report (?)

10/24/97 10/24/97 Assessment of Current Outage Modifications l

l CCHE Tech Spec NRC Letter withdrawing TSCRN 3/18/97A 5/26/97 FSAR Rev. 24 Rev. 24 11/21/97 11/21/97 i

i GL 95-03, Circ.

Letter of resolution (?)

6/2/97 6/23/97 Cracking of SG

~

Tubes l

GL 95-07, Letter of resolution (?)

6/9/97 6/11/97 Pressure LockingfThermal Binding Request Restart Letter request 11/30/97 12/15/97 Approval MCAP-Il Rev. 2 4/30/97 12/15/97 Non-Restart Submittals ISI interval Letter to extend second interval 3/13/97A 3/13/97A Extension ASME Section XI interval closure report submittal 11/10/97 11/19/97 IPEEE IPEEE letter 3/31/97 5/5/97 i

FSAR Rev. 25 Rev. 25 x/98 x/98 Security Plan Biometrics Submittal 4/11/97 9/1/97 Upgrade Rev. 6-14 Correction 4/21/97 9/1/97 Upgrade #1 Submittal 5/15/97 9/1/97 Upgrade #2 Submittal 7/7/97 9/1/97 Severe Accident Deferral Letter 6/30/97 6/30/97 Management A-46 Seismic First submittal 3/31/97 7/20/97 Second submittal 7/20/97 7/20/97 OTSG Tech Spec Mode 4 Report (?)

10/30/97 10/30/97 90-day post-outage report (?)

3/24/98 3/24/98

i FPC - CR3 fjy License Amendments and Tech Spec Changes t

._.X

_ :,. A a ;...

f a

l t

I

.s.

.._....A - --

m..

....)

i 25 --

-- 25 i

i 1

r 5

20 --

0 Submittals to be made

- - 20 19 t

e Tu t

-+-Work off curve j

15 --

15

-- 15 o

o m

13 o

i n.

4 o

o 10 --

- 10 E

oz i

\\

l 5--

5

--5 l

I I

l

?

t Goal = 0 O-l 0

0 0 -0 i

1/31/97 3/31/97 5/31/97 7/31/97 9/30/97 11/30/97 l

'l FPC - CR3

((%

Other NRC Restart Submittals t

I 25 --

-- 25 i

23 i

i l

20 --

t

--20 19 MSubmittals to be made l

f i

3

-+-Work off curve E

l g

15 --

15

-- 15 t

.o 14 3v) e

~

o t

.o 10 --

E

-- 10 3

9 2

\\

5--

5

- -5 I

3

(

2 l

o_

Goal

  • 0

_o 1/31/97 3/31/97 5/31/97 7/31/97 9/30/97 11/30/97 l

r I

l

?

i

I 1 l*C - Cl O

~

.Y License Amendments and Tech Spec Approvals I

25 --

-- 25 i

i

'l

^

20 --

2 1 I

4

-- 20 MScheduled NRC Approvals m3

-+--NRC Approval curve

>o 15 --

16 a.

-- 15 o.

1 i

ee O

i f

's 11 a.o 10 --

i E

-- 10 i

i z

6 5--

--5 4

l l

)

1 h

0-

- 0 1/31/97 3/31/97 5/31/97 7/31/97 9/30/97 11/30/97 I

f i

FPC - CIO

.y\\,

Other NRC Restart Submittals i

25 - -

-- 25 i

2:

i 20 --

M Scheduled issue Closure i

- - 20 l

-+-NRC lssue Closure Curve g

15 --

16

.E!

-- 15 o

5 l

.o

[

10 --

I 10

-- 10 I

z 8

5--

~

--S i

i 3

l e

0-

. 0 1/31/97 3/31/97 5/31/97 7/31/97 9/30/97 11/30/97 i

, -. -. _ ~.

. -. -. ~. -. - -. - ~. -. _... -

3 I

CBC2-Run Oste: 20 Mar,7 Peas I

ProjectVlew Legend I

project: RESTAgy Time Now

10Mer97 07: 20 a.s i.is, o..

c:

j Forecest End: 29Wav99 15: 30 c,s u s.: o..

see i

Version: Of Restert Detell Schedule Reeutred End: 310ec98 23: )0 Targets:

Showing Forecast Dates me 19??

1998 Jon IFeb lWer lApr IWev lJun lJul lAug lSep (Oct lNow IDef Jan lFeb lWer l l

SIGNIFICANT JOB: SB LOCA 1

1. Smell Break LOCA j

l OlWor 9 7 0 7 : 0 0===

'04Dec97 15:00 j

A.

EFW/EDC (R 2, 4, 6. D-5. 6.

12 14)

OIWor 97 07:00 04Dec97 15:00 Westing With NRR 18Wer97 07:00110Wer9 7 15:00 l

1

'A' Diesel 6 EFP-2 Dependenew (D-5 R

l Olwer 97 07:00 ---

04Dec97 15:00 Revise TS 3.7.5 EFW linct potentle! USO OlWer 9 7 0 7 : 0 0===

'290ct97 15:00 l

NRC review /spproval TS 3.7.5 EFW i

16 Wen 97 15:00i il70ct97 15:00 Submit proposed License Amendment to NRC l-16 Wen 97 15:001 i

Revise TS 3.7.7 SW j

llWor97 06:00 -

il0Nov97 15:00 NRC review /sporevel TS 3.7.7 SW 12Wawi7 15:00>

il30ct97 15:00 l

Submit proposed License Amendment to NRC 12Wew97 15:00I j

Revise TS 3.7.9 RW l

IlWar97 07:00 -

il0Nov97 15:00 l

NRC review /sporoval TS 3.7.9 RW i

12Mov 17 15:00i il30ct97 15:00 Submit proposed License Amendment to NRC 12 Wow 97 15:001 New TS For Control Complex Cooling 17 der 97 07:00!

il4Nov97 15:00 NRC review /opprovst new TS Control Compi 16 Wen 97 15:00i il70ct97 15:00 Submit proposed License Amendment to NRC t.

16 Wow 97 15:001 l

l Revise TS 3.5.2 (ECCSI I

2 4Wer97 00:00 m20Nov97 15:00 l

NRC review /spproval TS 3.5.2 (ECCSI l

22 Wow 97 15:00i

'230ct97 15:00 Submit proposed License Amendment to NRC 22Wew97 15:001 Revise TS 3.7.8 (DC) l 31 War 97 00:00

27Nov97 15:00 l

NRC review /epproval TS 3.7.0 (DC) 29Wew97 15:00i

'300ct97 15:00 Submit proposed License Amendment to NRC 290ev97 15:00i Revise TS 3.7.10 (DH Seewster) 07Apr97 00:00

040ec97 15:00 l

NRC review /spproval TS 3.7.10 (DH Seewe 05Jun97 15:00-iD6Nov97 15:00 Submit proposed License Amendment to NRC 0' Jun97 15:006 4

2. Revise EDC Specs For Upreted Capacity I

llWer97 07:00 -

il4Nov97 11:00 Revise TS 3.8.l and 'S 3.8.3 Ilwer97 07:00 -

il4Nov97 11:00 Jon IFeb lWer JApr l Wow lJun (Jul lAug lSep 10ct INov lDec Jon lFeb lWer ]

l 1997 1998 l

CBC2 kun Date: 2CMar$7 Page 2

projectVlew L'8'"d Project: RESTART Time how

. 29Wew98 15: ;0 16Mer97 07: :D a gi e,

o,,,,

cm Forecest End:

c,,,,,,,

eg, version: Di Restart Detail Schedule Required End: 3tDec98 23: 30 Tcreets:

Showing Forecast Dates 1997 1999 Jon lFeb lWer lApr lWeg lJun lJul laug lSep 10ct lNov lDec Jan lFeb l Mar l SIGNIFICANT JOB: SB LOCA NRC review /sporoved TS 3.8 I end TS 3.8.

16 Mag 97 11:00i il70ct97 11:00 Submit proposed License Amendment to NRC 16 Mew 97 11: 00 i Revise Bases for TS 3.8.1 and 3.0.2 3l Mar 97 07:00-iO30ct97 15:00 NRC review / approval Bases 3.8.2 OoJun97 15:00i

'05Sep97 15:00 Submit proposed License Amendment to NRC 06Jun97 15:001 C. LPI Mission Time and Boron Precipitet Iluer97 07:00 u_ J05 Mew 97 15:00 Subratt Letter on DHP Low Flow Test Resul 31 Mar 97 f7:C0 C JIBApr97 15:00 Submit Letter on Boron Precipitet lon DISep97 07:00 005Sep97 15:00 D. Lic Amend on DH-45-FI Lic Cond (R51 3tMer97 15:C 0i il30ct97 15:00 NRC rev'lew/epproval Lie Am on DH-45-FI 16Jun97 15:00i il5Sep97 15:00 Submit proposed License Amendment to NRC 16Jun97 15:00i SIGNIFICANT JOB: APPENDIX R ISSUES

2. Appendia R Issues (D-II. 221

>03Nov97 15:00 0-22 Ampeelty llusr57 07:00 =

'08Sep97 15:00 P epare submittel for App. R essessment IIMer97 07:00 p 121Apr97 15:00 Submitted to NRC 21Apr97 15:00I

)

NRC Inspection (Fire Protect! :n Function 23Sep97 07:00i

'03Nov97 15:00 NRC review /epproval App R Exemptions (Th IBuer97 07:00

>200ct97 15:00 Submitted to NRC IEuer97 07:00l SIGNIFICANT JOB: SYSTEM READINESS REVIEWS

31. System Readiness Reviews (D-13, 231 Ilusr97 07:00 or il00ct97 15:00 ADV 30-dow Response IBWar97 07:00 t il6Apr97 15:00 Submit response IBuer97 07:00 il6Apr97 15:00 Submit SRR Procedure 2iApr97 LO:00i License Amendments /FSAR Update 30Mer97 00:00i i100ct97 15:00 NRC review / approval System Readiness Rev 3Jun97 15:00i il25ep97 15:00 Submit proposed License Amendment to NRC 13Jun97 15:00i Submit SRR Summerv t

23Jun97 15:00I l

Jan lFeo l War (Apr lWev lJun lJul lAug lSep lOct lNov lDec Jon lFeb l War l l

1997 1998

C802 Run Dete: 202:r97 Page 3

ProjectView Legend Project: RESTART Time Now

. 29 Wow 98 15: ;0 10Mee97 07: )0 a,g i, is,

o,,,,,,

a Forecast End:

cy,,,,,,,,,;,

a version: 01 Restert Detell Schedule Required End: 310ec98 23: :D Tcreets:

Showing Forecast Dates l997 1998 Jon IFeblWer IApr l Wow lJun lJul lAug lSep [Oct lNov lDec Jan lFeb lWer l SIGNIFICANT JOB: SYSTEu READINESS REVIEWS NRC Inspection regarding Systu m Readines 22Sep97 07:00123Sep97 15:00 SIGNIFICANT JOB: LT(!PS 4.

LTCPS (Low Temperat" Overpressure P 24Feb 17 07:00 il2Nov97 15:00 Respond to NRC letter dated 2/4/97 24Feb 17 07:00

'29 Maw 97 15:00 NRC review /approvst LTOPS JC0 and Exempt 04Apr97 05:00i i0lusw97 15:00 Submit package to NRC 04Apr97 05:00l IF TSCR, perform rollowing actions DIMav97 07:00i il2Nov97 15:00 NRC review / approval LTOPS TS change, ir 16Jul97 15:00i il50ct97 15:00 Submit proposed License Amendment to NRC 16Jul97 15:00i Provide revised response to CL 88-11 OlJu197 07:00>

'22Sep97 15:00 NRC review / approval CL 88-11 revis ed res 25Aug97 15:00i

'22Sep97 15:00 Submit response to NRC 25Aug97 15:00i SIGNIFIC ANT JOB: EOP/AP STRATEGY REGARDING OPERATOR ACTIO

5. EOP/AP Strategw Regarding Operator Ac 18 der 97 00:00i i10Nov97 15:00 Submit Letter to NRC.

31Mer97 07:(0i Submittai clartr ing EOP Lic Basis w

28Apr97 15:00i il0Nov97 15:00 NRC review /approvat SER ECP/AP Operator

-14Jul97 15:00i il30ct97 15:00 Submit proposed License Amendment to NRC 14Jul97 15:00i NRC Insp regarding E0P/AP Stra.egy re: 0 16Sep97 07:00 ll 7Sep97 15:00 SIGNIFICANT JOB: GL 96-01

6. CL96-01 (R-1)

IIMar97 07:00 =

'27Jun97 15:00 Summary Report to NRC 10Jun97 07:00 CJ i9Jun97 15:00 1

NRC Corrective Action Inspection (CL 96-26Jun9 7 07:00127Jun97 15:00 SIGNIFIC ANT JOB: ILRT

7. ILRT (R-10) 28Fet 97 07:00 ---

i0lAug97 15:00 TSCRN ror Appendix J. Option B 2BFet 97 07:00 ---

i0lAug97 15:00 NRC review / approval TS change App J. Opt 07Apr97 15: 00 >

'02Jun97 15:00 Submit clartrication or request 07Apr97 15:001 Jan lFeb lWer lApr l Wow lJu lJul lAug lSep l0ct lNov lDec Jan lFeb l Wor l n

1997 1998

. _. ~. _ _ _ _. _ _. _. _

...______._.___.._._-..__.______-__.__m_

1 l

CBC2 Run Dates 202sr97 Page 4

ProjectVlew

8'"'

Project: RESTART Time Now 10Wer97 07:

30 asu nv k..

c2 i

4 Forecast End: 29 Wow 98 15: 30 l

Version: Di Restert Dete11 Schedule Required End: 310ec98 23: 30 c,sueel ovy.

e asu Tergets:

Showing Forecast Dates

,m,,,,,

1997 1998 Jon IFeb [Wer lApe lWew lJun l Ju l lAug lSep 10ct lNov lDec Jan lFeb lWer l SIGNIFIC ANT JOB: RWP CYCLONE SEPARATOR FOULING B. RwP Cwelone Seperrter Fouling (0 20)

OIApr97 07:( 0-

>10Nov97 15:00 USQ Submittel, if necessary DIApr97 07:00i il0Nov97 15:00 I

NRC review /sporoval SER on RwP Cvelone S 16Jun97 15:00i il30ct97 15:00 Submit proposed License Amendment to NRC 16Jun97 15:00i SIGNIFICANT JOB: A-46 SEISMIC

9. A-46 Seismic 05 Mar 9 7 0 7 : 0 0==

'20Jun97 15:00 l

Phase I Response 05uer97 07:00 EU 331 Mar 97 15:00 Phase II Response 30Wew97 07:00 20Jun97 15:00 NRC Inspection regarding A*46 Seismic 03Jun97 07:00104Jun9 7 15:00 t

SIGNIFICANT JOB: FSnR REV, 23 USGS

10. FSAR Rev. 23 US0s 15Apr97 00:00t il5Sep97 15:00 l

Letter to NRC regarding FSAR Rev. 23 USQ 15Apr97 00:00i l

Letter to NRC rollowing review or FSAR R 07Jul97 15:001 SIGNIFIC ANT JOB: CL 96 06

11. CL 96-06 10-B1 IlWar97 07:00 =

'07Jul97 15:00 l

Letter to NRC (120 dew response to GL 96 IBWar97 0'?:00 SW Fittings on CR0s 09Apr97 07:00i 130Jun97 15:00 l

Submit letter to NRC regarding SW rlttin l-19Waw97 15:00i Summary Report to NRC OlJul97 07:00 007Jul97 15:00 NRC Inspection regarding CL 96-06 09Jul97 07:00 I t0Jul97 15:00 SIGNIFIC ANT JOB: TS BASES SUBWITTAL

13. TS Bases Submittel IBWar97 07:00 il4Apr97 15:00 Summary Report to NRC IBWer97 07:001 Submit summary or TS bases changes IBWer97 07:00; il4Apr97 15:00 SIGNIFIC ANT JOB: TE DON SURVEILLANCE 14 Tendon Surveillence 07Apr97 07:00i

>240ct97 15:00 i

i NRC review /spproval speciel tendon suri e i

25Ju197 15:00i

'240ct97 15:00 Submit special report to NRC.

l 25Jul97 15:00i SIGNIFIC ANT. JOB: MAINT. RULE STRUCTURAL BASELINE WALKDOWN

15. Weintenance Rule Structural Baseline 02Jun97 07:00i illJul97 15:00 Jon lFeb l Wor lAer l Wow lJun lJul lAug ISep l0ct (Nov lDec Jan lFeb lWer l 1997 1998

I l

CBC2 Run D:te: 20 gr9; Page 5

ProJectView Legend Project: RESTART Time Now

. 18 Mar 97 07: 30 a g io n, o.,,..

c3 Forecast End: 29 Wow 98 15: 30 c,,,,,,,,,,,,

is, Vseslan: 01 Restert Detall Schedule Required End: 310ec98 23: 10 Tcreets:

Showing Forecest Dates 1997 1998 Jon lFeb l War lApr lWew lJun IJul lAug lSep 10ct lNov lDec Jan lFeb lWer l SIGNIFICANT JOB: MAINT. RULE STRUCTURAL BASELINE WALKDOWN NRC Inspection regarding Weintenance Rui 02Jun97 07:00103Jun 9 7 15:00 l

Summary Report to NRC 07Jul97 07:00 OllJu!97 15:00 SIGNIFICANT JOB: ASME SECTION XI

16. ASME Section XI 1R-ill 18Wer97 07:00 il9Nov97 07:00 Letter to NRC regarding extension IBWer97 07:00i Submit Reller Request 97-001 II 2' Wer97 07:00i

'29Apr97 15:00 NRC review /epproval of Reller Request 97 2 Mar 97 07:00 CJ0lApr97 23:00 Submit Reller Request to NRC.

2 Mar 97 07:00 i Submit Limited Exam Reller Request 00Aug97 07:00i il40ct97 07:00 NRC review /epproval Limited Exam Reller 020ct97 15:00 C3140ct97 07:00 Submit Reller Request to NRC 020ct97 15:001 Submit closecut report or

urrent ISI in 140ct9 7 0 7 : 00 t___J 10Nov9 7 15:00 NRC Inspection (ASME 5ection XI, ISI) llNov97 07:00 ll2Nov97 15:00

~~~ SIGNIFICANT JOB: INTEG. SAFETY ASS. OF CUR. DUTAGE MODS.

17. Integrated Sorety Assessment of Curr l

2 6Wer97 07:Orli i0lAug97 15:00 Meeting with NRR regarding the Integrate 2 6 Mar 97 07:0Li l26uer97 15:00 Summary Report to NRC 30Jun97 07:00 0 04Jul97 15:00 Discussion with NRC regarding the Integr 07Jul97 07:00i i0lAug97 15:00 SIGNIFIC ANT JOB: IN PLACE FILTER TESTING FOR AHFL-l/2

18. In-place Filter Testing for AHFL-l/2 17Jer97 14:00 m iD6 Mew 97 08:00 Revise FSAR 15Apr9709:00 06 Mew 97 08:00

(

SIGNIFICANT JOB: CC E TECH SPEC

19. Control Complex Habitabl!!tw Envelop 17Jer97 14:00 m i26Mov97 15:00 NRC review /spproval CCHE TS 17Jer97 14:00

'26Mov97 15:00 l

4RC Inspection of current condition l

17Jer97 14:00 J20uer97 15:00 Letter withdrawing TSCRN 18Wer97 06:00 il8uer97 07:00 NRC Inspection Fo!!owing CREvS TS submit 23Ma 997 07:00 026Mov97 15:00

CHE TSCRN (SRsl 17Jer97 14:00 1

>23Apr97 23:00 I

Jon lFeb lWer lApr l Wow lJun lJul lAus lSep l0ct lNov lDec Jon IFeb l Mar l 1997 1998

_ - - - - - - ~

i CBC2 Run Oste 20MJr97 Pegs 6

ProjectView Legend Project: RESTART Time Now

18Wer97 07: 10 4.s i, o,..

e Forecast End: 29Wev98 85: )0 e,i g i,,, g,,,,

I vsesion: 08 Restert Detell Schedule Required End: 310ec98 23: )0

[

Tergete:

Showing Forecast Dates l

  1. 997 1998 l

Jon lFeb lWer lApr l Wow lJun IJul lAug lSep 10ct lNov lDec Jos lFeb lWer l 5

(

SIGNIFICANT JOB: RESTART COWWITWENTS l

,20. Restert Commitments l

18Wer97 07:00e il9Aug97 15:00 kPAPIssues 18 Wor 97 07:00i

'28Ju!97 15:00 l

SSWOPI Issues 18Wer97 07:00i il8Aug97 15:00 l

IDRP Issues 18Wer97 07:00 il9Aug97 15:00 l

SIGNIFICANT JOB: RADIOLOGICAL EMERG, PLANNING (RESTARTI l

21. Radiological Emergency Planning ilWer9 7 07 : 00==

il9 Wow 97 15:00 l.

Ensure FEMA soproval of CR-3 restert IlWor97 07:00 -

il9 Wow 97 15:00 i

(

SIGNIFICANT JOB: OPEN ITEWS LIST j

22. OIL (D-4, 7, 17, 21, M-2, OP-6, 8, O llWor97 07:00 mL_

'060ct97 15:00 l

NRC review /eparovel Open Items List llWo r 9 7 0,7 : 0 0 -

>060ct97 15:00 SIGNIFICANT JOB: OTHER USQ'S DB ISSUES. OR UNANAL. COND.

23, Other US0s, DB Issues, or unenotyred

[

11Wa r 9 7 0 7 : 00==

il30ct97 15:00 Flu (Commitment to Closecuti or Amend L1 15Apr97 0?:00i il30ct97 15:00 Potentist USQ - HPI Pump Rectre 02Jun97 07:00i

'310ct97 15:00 Potentiel USO - WUV-31 02Jun97 07:00i 1310ct97 15:00 Potentiel USO - EDG Protective Trips

'02 un97 07:00i

'310ct97 15:00 Potentlet USQ - HPI Anslusts tw/wo HPI v l

02Jun97 07:00i i310ct97 15:00 Potential USO - FWP-7 Diesel 02Jun97 07:00i

'310ct97 15:00 Potentist USQ - HPI Norrie Cycles 02Jun97 07:00i i310ct97 15:00 Potentist USO SW/RW Pu!! to Lock l

l 02Jun97 07:00i

'310ct97 15:00 Potentist USO - L/D Line Rupture 02)un97 07:00 i

'310ct97 15:00 Potentle! USQ - EFP-1/DHP lA Trip Block 02Jun97 07:00i

'310ct97 15:00 Potentist USO - AHFL-1/2 02Jun97 07:00i

'310ct97 15:00 SIGNIFIC ANT JOB: RE"IEW OPERATOR WORKAROUNDS

24. Review operster workarounds (W-2) (F 02Jun97 07:00i iD80ct97 15:00 e

NRC Inspection of operator uorkerounds 070ct97 07:001080ct97 15:00 SIGNIFICANT JOB: REVIEW IMPLEMENTATION OF LICENSE CONDITI

25. Review implementation or license con 18Wer97 07:00

'270ct97 15:00 i

NRC inspect and closecut packages regard 29Apr97 07:00i

'09Jun97 15:00 i

Jon lFeb l Wor IApr jWew lJun lJul lAug lSep l0ct lNov lDec Jan (Feb l Mar I 1997 1998 m

. - _ _ _ ~ ~ ~ - _

.... ~......~

CBC2 Run Date: 202sr97 Page 7

l ProjectVlew

'"d Project: RESTART Time Noe

18Wer97 07: 30 a.gi.ia, 6,..

c=3 Fo eeest End: 29 Wow 98 15: )0 e,ta s..: o.ca.

aus Version: 01 Restert Detail Schedule Required End: 310ec98 23: 10 Targets:

Showing Forecast Dates e

l 1997 1998

)

Jon lFeb lWor lApr l Wow lJun lJul lAug ISep l0ct lNov lDec Jan lFeb lWer l l

SIGNIFICANT JOB: REVIEW IMPLEMENTATION OF LICENSE CONDITI

[

t Perpare drert License Amendment, ir need

(

29Apr97 07:00m O9Jun97 15:00 i

i NRC review /epprovst Lie Am on !! cense to 2BJul97 15:00i

'295ep97 15:00 Submit proposed License Amendment to NRC l

2BJu!97 15:001 l

SIGNIFICANT JOB: FSnR REY. 24

26. FSAR Rev. 24 ID-24, 25. W-31 i

05Apr97 07:00; j

SIGNIFICANT JOB: OTHER CENERIC ISSUES

27. Other Generic Letters IElevated by N llWor97 07:00 -

illJun97 15:00 y

l C_ 95-03. Cire. Crocking or SC Tubes llWor97 07:00 =

'23Jun97 15:00 NRC review CL 95-03 letter 02Jun97 15:00 C:2323Jun97 15:00 i

Submit resolution or issue to NRC I

02Jun97 15:00I i

l NRC Inspection 4

D3Jun97 07:00 E::323Jun97 15:00 CL 95-07, Pressure Lacking / Thermal Bind!

18 der 97 07:00-illJun97 15:00 i

NRC review CL 95 07 letter 09Jun97 15:00 3 IlJun97 15:00 Submit resolution or issue to NRC 09Jun97 15:00 1 NRC Inspection 10Jun97 07:00 tilJun97 15:00 SIGNIFICANT JOB: 50 54tFl. LETTER

28. 50.54trl Letter IR-BI IElevated by N llWar97 07:00 en 128Apr97 15:00 Submit SRR Procedure liusr97 07:00 M 21Apr97 15:00 NRC review 50.54tri letter IBWar97 07:00
  1. 28Apr97 15:00 Provide SRR Procedure to NRC 2tApr97 15:00i Submit Additionel Letter 26Wiw97 07:00 030Wew97 15:00 SIGNIFIC ANT JOB: S3FOO II. OTSC Tech Spec IIWer97 07:00 -

>21Ju!97 15:00 NRC review /spproval OTSC Lic Am 24Wer97 15:0Ci

>23Jun97 15:00 Submit proposed License Amendment to NRC 24Wer97 15:0C4 Wode 4 Report IlWar97 07:00 I[3 24Wer97 15:00 90-day Post-Outage Report llMer97 07:00 E 0 06)un 9 7 15:00 NRC Inspection or SC Tunes OlJun97 00:001 l

Jon (Feb lWer lApr lWew lJun lJul lAug ISep 10ct lNov l0ec Jon lFeb l Wor l 3997 1998

~ _ _ -, - - - -

...m.

. - -. + ~.. -,.,

-.... ~~....._....- _- _ _-.

- _.--~ -..- _ -.

l s

i l

1 l.

GBC2 Run Date: 20 Mar 97 Pege 6

ProjectVlem Lesead s

Project: RESTART Time Now

10Wer97 07: 30 a..

,is, o.,,

e l

Forecast End: 29Wew99 15: 10 I

c,sueet o ca*

ese Version: Of Restert Detell Schedule Required End: 310ec98 23: )0 j

i Tsegets:

Showing Forecast Dates

,,,,,,y,,,,,

1997 1998 Jon lFeb lWer lApr l Wow lJun lJul laug ISep l0ct lNov lDec Jan lFeb lWer l j

SIGNIFICANT JOB: REG, GUIDE I.97 ISSUES (RESTART) 5 t

33. Reg. Guide 1.97 Issues (Restertl 10Wer97 07:00 -

'l4Ju!97 15:00 SIGNIFIC ANT JOB: CR-3 RESTART APPROVAL REQUEST l

CR 3 Restert Approval Request 10Mir97 07:00 50 24Wer97 15:00 Letter reauest for restart 10Mir97 07:00 5324 Wor 97 15:00 SIGNIFIC ANT JOB: MC 0350 ACTIONS III. WC 0350 ACTIONS I

2' Wer97 00:00i Restert Penel Weetings

(

2 Wor 97 00:00'

'2tDec97 00:00 Assessment or Root Cause Ide ittrication 30Sep%/ 07:001 i

Assessment or Licensee Menegement Errect 21Jun97 00:00'

'21Nov97 00:00 l

Assessment or Plant and Corp ) rete Starr 30Sep97 07:00I Assessment or Physical Reedl iess OF Plan

[

30Sep97 07:00I Assessment or Comp!!ance wit i Regulatory 30Sep97 07:001 r

l Coordination with Interested Agencies en l

30Sep97 07:00' i

j SIGNIFICANT JOB: OTHER (NON-RESTART) LICENSING ACTIONS IV. NON-RESTART ISSUES 18Feb9 ' 07:00

[

SIGNIFIC ANT JOB: IS:: INTERVAL EXTENSION l

l. ISI Interval Extension i

05Feb97 17:00 14Wer97 17:00 i

Submit letter to NRC 140er97 07:00 Il4Wer97 07:00 l

Identary Reller Requests needed for 3rd l

140ct97 07:00'

'24Dec97 11:00 i

t l

NRC review /epprovi l Reller Requests for OB0ec97 15:00 C320Dec97 07:00 l

Submit Reller Regi est to NRC.

l 080ec97 15:00i l

Identify IST Reller Reques Ls needed for 140ct97 07:00>

124Dec97 11:00 1

l NRC review /epprova l IST Reller Requests j

I DBDec97 15:00 C3 20Dec97 07:00

)

Submit.Reller Regi est to NRC.

OB0ec97 15:00l REf.CUIDEI.97 ISSUES (NON-RESTART)

SIGNIFICANT JOB:

I

3. Tset. DH Flow Tech Spec, TSCRN 209 4

l 18Wer97 07:00i iDIAug97 09:00 i

i Submit proposed Tset/DH Flow License Am

~

IBder97 07:00i F

d NRC review Tset, DH Flow TS submittel 09Way17 09:00' 04Jul97 09:00 Submit supplement 09Wev'i7 09:00 l l

Jan lFeblWer IAer lWew lJun IJul lAug (Sep l0ct lNov lDec Jon lFebIWar I 1997 1990 j

L

(~

~-w

.~

i i

i 1

CEC 2 Run D2te: 202:r97 Pegs 9

i I

Projectvle.

Legead l

Project: RESTART Time Now

. 29Wew98 15: 30 30Mer97 07: 30 4.

. s, o,,..

cm I.

Forecast End:

ese c,ns. n c.;,

Varelon: Of Restert Detall Schedule Required End: 310ec98 23: 30 Targete:

Showing Forecast Dates 1997 1998 Jon lFeb lWer lApr lWew lJun lJul lAug ISep 10ct lNov lDec Jon lFeb l War l SIGNIFICANT JOB: IPEEE SUBWITTAL 4 IPEEE Submittet ilWar97 07:00 -

105Mov97 15:00 Submit IPEEE letter to NRC j

05Wew97 15:001 r

i i

l SIGNIFIC ANT JOB: CRITICALITY WONITOR

5. Criticellty Wonitor l

OlApr97 07:( 0i

>0BSep97 15:00 Submit Esemption for criticality monitor Ol Apr97 07:10 i iDBSep97 15:00 NRC review /sporoval semption on Critical 1

09Jun97 15:00-

>0BSep97 15:00 1

i l

Submit proposed Exemption to NRC.

09Jun97 15:004 i

SIGNIFICANT JOB: FSnR REV. 25

6. FSAR Rev. 25 22Dec97 07:00i SIGNIFIC ANT JOB: SECURITY PLAN UPGRADE 4

l 7 Security Program Plan Upgrade l

1.0Wer97 07:00

=0lSep97 15:00

)

l NRC Security and Sereguards Inspection l

18wer97 07:00 CC302Apr97 15:00 Security Upgrade (Vehicle gate, new turn 11 Mar 97 07:00 i08Mov97 15:00 NRC review Security Upgrade #1 submitte!

09Wou97 07:00 [:3 22 Wow 97 15:00 Docket (p) changes 09Wew97 07:00 O l5Wav97 15:00 NRC Inspection 22Wa w97 15:001 See Upgrade (Lights, IDF East, search CC 09Waw97 07:00>

il4Jul97 15:00 NRC review Security Upgrade #2 submittel 20Jun97 07:00>

il4Ju!97 15:00 l

Docket (p) changes OlJul97 07:00 007Ju!97 15:00 i

l Biometrics Exemption 31Mer97 00:00>

il5Aug97 15:00 l

l NRC review Biometries Exemption submitte 1

31Wer97 07:C0t

>23 Mew 97 15:00 Docket proposed (p) changes 3tMer97 07:00 E311 Apr97 15:00 Submit rinal 1p1 changes for Blometrics 26Wew97 07:00i sl5Aug97 15:00 SIGNIFIC ANT JOB: SE"ERE ACCIDENT WANAGEMENT 1 0. Severe Accident Wenegement 13h er97 07:00 =

'30Jun97 00:00 l

NRC review Severe Accident Wenegement le f

18Wer97 07:00i

'30Jun97 00:00 i

Dererre! letter to NRC 30Jun97 00:00I l

SIGNIFICANT JOB: NEu TS ON CHILLED WATER New TS on Chilled Water 24Wer97 07:00r al3Nov97 15:00 Jon (Feb l War lApr l Wow JJun lJul lAug ISep l0ct lNov 10ec Jan IFeb IWar l 1997 1998

l 4

CBC2 Run Orte: 20 Mar 97 Page 10 ProjectView L'8'"d Project: RESTART Time Now

. 29Wav98 15: 10 IBWer97 07: 10

.. i. i g, o,,,,

a Forecast End:

e, ig i,,,

o,,,

  • version: 01 Restert Detall Schedule Required End: 310ec98 23: 10 Torgets:

Showing Forecast Dates 1997 1998 Jon lFebl Wor IApr lWew lJun lJul lAug ISep 10ct lNov lDec Jan IFeblWer l SIGNIFICANT JOB: NEw TS ON CHILLED WATER NRC review / approval New TS on Chilled we 29h aw97 15:00i

'160ct97 00:00 Submit proposed License Amendment to NRC 29 Mew 97 15:00i SIGNIFICANT JOB: RCP FLYWHEEL INSPECTION

12. RCP Flywheel Inspection 08Apr97 07: 00 :
24Dec97 15:00 NRC review /speroval TS RCP Flywheel Insp llJun97 15:00i il2Nov97 15:00 Submit proposed License Amendment to NRC llJun97 15:00i NRC Inspection regard ng RCP Flywheel In 13Nov97 07:00 240ec97 15:00 SIGNIFICANT JOB: TENDON SURVEILLANCE TSCRN 14a. Tendon Surveillance TSCRN 010c t 9 7 0 7 : 0 0 r--

NRC review /sporovel TS Lendon survellten 190ec97 15:00i

'2nMer98 15:00 Submit proposed License Amendment to NRC 190ec97 15:00i SIGNIFIC ANT JOB: CHANGE THE ISI VALIDATION COMMITMENT Change the ISI Valldetton Commitment JIMer97 07:00i 108Ju!97 15:00 NRC review /spproval ISI Valldetton Commi 30 Mew 97 15:00 CJilJun97 07:00 Submit ISI Validation Commitment to NRC.

30 Maw 97 15:00i SIGNIFICANT JOB: ret.IEF REQUEST FROM REG, OF IwE/IwL Reller request from requirements of IwE/

OI Apc97 07:(0 i illJul97 15:00 NRC review /opproval Relief Request from 02Jun97 15:00 C314Jun97 07:00 Submit Reller Request to NRC, 02)un97 15:001 l