ML20151B106: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:<
{{#Wiki_filter:<
  .     .
.
'~.: .
.
              -
/
                                                                                                                                      /
'~.:
                                                                                                                                      '
-
  .
.
                                                                                                                  J
J
    .
'
                                                          07 JUL 1988
.
            Docket No. 50-317
.
                        50-318
07 JUL 1988
            Baltimore Gas and Electric Company
Docket No. 50-317
            ATTN: Mr. J. A. Tiernan
50-318
                    Vice President
Baltimore Gas and Electric Company
                    Nuclear Energy
ATTN:
            P. O. Box 1475
Mr. J. A. Tiernan
            Baltimore, Maryland 21203
Vice President
            Gentlemen:
Nuclear Energy
            Subject:   Inspection Nos. 50-317/88-13 and 50-318/88-13
P. O. Box 1475
            This refers to the routine safety inspection of Containment Integrated Leak
Baltimore, Maryland 21203
            Rate Testing conducted by Mr. Joseph A. Golla of this of fice on May 26-27, 1988
Gentlemen:
            at Calvert Cliffs Nuclear Power Plant, Units 1 and 2 of activities authorized
Subject:
            by NRC License Nos. DPR-53 and DPR-69 and to the discussions of our findings
Inspection Nos. 50-317/88-13 and 50-318/88-13
            held by Mr. Golla with Mr. J. Lemons at the conclusion of the inspection.
This refers to the routine safety inspection of Containment Integrated Leak
            Areas examined during this inspection are described in the NRC Region I
Rate Testing conducted by Mr. Joseph A. Golla of this of fice on May 26-27, 1988
            Inspection Report which is enclosed with this letter. Within these areas, the
at Calvert Cliffs Nuclear Power Plant, Units 1 and 2 of activities authorized
            inspection consisted of selective examinations of procedures and representative
by NRC License Nos. DPR-53 and DPR-69 and to the discussions of our findings
            records, interviews with personnel, and observations by the inspector.
held by Mr. Golla with Mr. J. Lemons at the conclusion of the inspection.
            Within the scope of this inspection, no violations were observed.
Areas examined during this inspection are described in the NRC Region I
            No reply to this letter is required. Your cooperation with us in this matter
Inspection Report which is enclosed with this letter. Within these areas, the
            is appreciated.
inspection consisted of selective examinations of procedures and representative
                                                        Sincerely,
records, interviews with personnel, and observations by the inspector.
                                                          r.. t d.cl SlFP3"T8'
Within the scope of this inspection, no violations were observed.
                                                          ,;c ;,q a g P , Durg '
No reply to this letter is required. Your cooperation with us in this matter
                                                        Jacque P. Durr, Chief,                                                               l
is appreciated.
                                                        Engineering Branch,                                                                 j
Sincerely,
                                                        Division of Reactor Safety                                                           I
r.. t d.cl SlFP3"T8'
            Enclosure:   Combined NRC Region I Inspection Report Nos. 50-317/88-13 and
,;c ;,q a g P , Durg '
                          50-318/88-13.
Jacque P. Durr, Chief,
                                        OFFICIAL RECORD COPY           IR CC 88-13 - 0001.0.0                                       [ g
l
                                                                      06/28/88                                                       (
Engineering Branch,
      8807200243 G80707
j
          DR ADOCK 0500       7                                                                                                         /
Division of Reactor Safety
                                                                                              _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _      w
I
Enclosure:
Combined NRC Region I Inspection Report Nos. 50-317/88-13 and
50-318/88-13.
OFFICIAL RECORD COPY
IR CC 88-13 - 0001.0.0
[ g
06/28/88
(
8807200243 G80707
/
DR
ADOCK 0500
7
w


).
).
  ..     .
..
  .' ' .
.
  s-
.' '
    '
.
            : Baltimore Gas and Electric Company'       :
s-
            cc w/ enc 1:
: Baltimore Gas and Electric Company'
            M. Bowman, General Supervisor, Technical Services Engineering
:
            T. Magette, Administrator, Nuclear Evaluations
'
            V. Bradley, Director, Security Services (Safeguards Only)
cc w/ enc 1:
            ~H. D. Coss, Vice President, General Services (Safeguards Only)
M. Bowman, General Supervisor, Technical Services Engineering
              L. P..Gibbs, General Supervisor, Calvert Cliffs Security Operations
T. Magette, Administrator, Nuclear Evaluations
                (SafeguardsOnly)
V. Bradley, Director, Security Services (Safeguards Only)
              Pubite Document Room (PDR)
~H. D. Coss, Vice President, General Services (Safeguards Only)
              Local Public Document Room (LPOR)
L. P..Gibbs, General Supervisor, Calvert Cliffs Security Operations
            Nuclear Safety Information Center (NSIC)
(SafeguardsOnly)
            NRC Resident Inspector.
Pubite Document Room (PDR)
              State of Maryland (2)
Local Public Document Room (LPOR)
            .bcc w/ enc 1:
Nuclear Safety Information Center (NSIC)
              Region I Docket Room (with concurrence )
NRC Resident Inspector.
            Management Assistant, ORHA (w/o enc 1)
State of Maryland (2)
              L. Trip ,'DRP
.bcc w/ enc 1:
            0. Limroth, DRP                                                           j
Region I Docket Room (with concurrence )
              S. McNeil, LPM, NRR
Management Assistant, ORHA (w/o enc 1)
              R. Bores, DRSS
L. Trip ,'DRP
                                                                                        i
0. Limroth, DRP
                                                                                        i
j
              RI:DRS           R   RS         RI:DRS
S. McNeil, LPM, NRR
              o la/sh/rw     Eapen           Durr
R. Bores, DRSS
            C.   .
i
              6 7/88           6/1 //88       6/,29/88
i
                                        0FFICIAL RECORD COPY   IR CC 88-13 - 0002.0.0
RI:DRS
                                                                06/23/88
R
                                                                                        1
RS
RI:DRS
o la/sh/rw
Eapen
Durr
C.
.
6 7/88
6/1 //88
6/,29/88
0FFICIAL RECORD COPY
IR CC 88-13 - 0002.0.0
06/23/88
1
}}
}}

Latest revision as of 07:14, 11 December 2024

Forwards Insp Repts 50-317/88-13 & 50-318/88-13 on 880526-27.No Violations Noted
ML20151B106
Person / Time
Site: Calvert Cliffs  
Issue date: 07/07/1988
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20151B107 List:
References
NUDOCS 8807200243
Download: ML20151B106 (2)


See also: IR 05000317/1988013

Text

<

.

.

/

'~.:

-

.

J

'

.

.

07 JUL 1988

Docket No. 50-317

50-318

Baltimore Gas and Electric Company

ATTN:

Mr. J. A. Tiernan

Vice President

Nuclear Energy

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Inspection Nos. 50-317/88-13 and 50-318/88-13

This refers to the routine safety inspection of Containment Integrated Leak

Rate Testing conducted by Mr. Joseph A. Golla of this of fice on May 26-27, 1988

at Calvert Cliffs Nuclear Power Plant, Units 1 and 2 of activities authorized

by NRC License Nos. DPR-53 and DPR-69 and to the discussions of our findings

held by Mr. Golla with Mr. J. Lemons at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

r.. t d.cl SlFP3"T8'

,;c ;,q a g P , Durg '

Jacque P. Durr, Chief,

l

Engineering Branch,

j

Division of Reactor Safety

I

Enclosure:

Combined NRC Region I Inspection Report Nos. 50-317/88-13 and

50-318/88-13.

OFFICIAL RECORD COPY

IR CC 88-13 - 0001.0.0

[ g

06/28/88

(

8807200243 G80707

/

DR

ADOCK 0500

7

w

).

..

.

.' '

.

s-

Baltimore Gas and Electric Company'

'

cc w/ enc 1:

M. Bowman, General Supervisor, Technical Services Engineering

T. Magette, Administrator, Nuclear Evaluations

V. Bradley, Director, Security Services (Safeguards Only)

~H. D. Coss, Vice President, General Services (Safeguards Only)

L. P..Gibbs, General Supervisor, Calvert Cliffs Security Operations

(SafeguardsOnly)

Pubite Document Room (PDR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector.

State of Maryland (2)

.bcc w/ enc 1:

Region I Docket Room (with concurrence )

Management Assistant, ORHA (w/o enc 1)

L. Trip ,'DRP

0. Limroth, DRP

j

S. McNeil, LPM, NRR

R. Bores, DRSS

i

i

RI:DRS

R

RS

RI:DRS

o la/sh/rw

Eapen

Durr

C.

.

6 7/88

6/1 //88

6/,29/88

0FFICIAL RECORD COPY

IR CC 88-13 - 0002.0.0

06/23/88

1