J | |||
' | |||
. | |||
. | |||
07 JUL 1988 | |||
Docket No. 50-317 | |||
50-318 | |||
Baltimore Gas and Electric Company | |||
ATTN: | |||
Mr. J. A. Tiernan | |||
Vice President | |||
Nuclear Energy | |||
P. O. Box 1475 | |||
Baltimore, Maryland 21203 | |||
Gentlemen: | |||
Subject: | |||
Inspection Nos. 50-317/88-13 and 50-318/88-13 | |||
This refers to the routine safety inspection of Containment Integrated Leak | |||
Rate Testing conducted by Mr. Joseph A. Golla of this of fice on May 26-27, 1988 | |||
at Calvert Cliffs Nuclear Power Plant, Units 1 and 2 of activities authorized | |||
by NRC License Nos. DPR-53 and DPR-69 and to the discussions of our findings | |||
held by Mr. Golla with Mr. J. Lemons at the conclusion of the inspection. | |||
Areas examined during this inspection are described in the NRC Region I | |||
Inspection Report which is enclosed with this letter. Within these areas, the | |||
inspection consisted of selective examinations of procedures and representative | |||
records, interviews with personnel, and observations by the inspector. | |||
Within the scope of this inspection, no violations were observed. | |||
No reply to this letter is required. Your cooperation with us in this matter | |||
is appreciated. | |||
Sincerely, | |||
r.. t d.cl SlFP3"T8' | |||
,;c ;,q a g P , Durg ' | |||
Jacque P. Durr, Chief, | |||
l | |||
Engineering Branch, | |||
j | |||
Division of Reactor Safety | |||
I | |||
Enclosure: | |||
Combined NRC Region I Inspection Report Nos. 50-317/88-13 and | |||
50-318/88-13. | |||
OFFICIAL RECORD COPY | |||
IR CC 88-13 - 0001.0.0 | |||
[ g | |||
06/28/88 | |||
( | |||
8807200243 G80707 | |||
/ | |||
DR | |||
ADOCK 0500 | |||
7 | |||
w | |||
). | ). | ||
.. | |||
. | |||
.' ' | |||
. | |||
s- | |||
: Baltimore Gas and Electric Company' | |||
: | |||
' | |||
cc w/ enc 1: | |||
M. Bowman, General Supervisor, Technical Services Engineering | |||
T. Magette, Administrator, Nuclear Evaluations | |||
V. Bradley, Director, Security Services (Safeguards Only) | |||
~H. D. Coss, Vice President, General Services (Safeguards Only) | |||
L. P..Gibbs, General Supervisor, Calvert Cliffs Security Operations | |||
(SafeguardsOnly) | |||
Pubite Document Room (PDR) | |||
Local Public Document Room (LPOR) | |||
Nuclear Safety Information Center (NSIC) | |||
NRC Resident Inspector. | |||
State of Maryland (2) | |||
.bcc w/ enc 1: | |||
Region I Docket Room (with concurrence ) | |||
Management Assistant, ORHA (w/o enc 1) | |||
L. Trip ,'DRP | |||
0. Limroth, DRP | |||
j | |||
S. McNeil, LPM, NRR | |||
R. Bores, DRSS | |||
i | |||
i | |||
RI:DRS | |||
R | |||
RS | |||
RI:DRS | |||
o la/sh/rw | |||
Eapen | |||
Durr | |||
C. | |||
. | |||
6 7/88 | |||
6/1 //88 | |||
6/,29/88 | |||
0FFICIAL RECORD COPY | |||
IR CC 88-13 - 0002.0.0 | |||
06/23/88 | |||
1 | |||
}} | }} | ||
Latest revision as of 07:14, 11 December 2024
| ML20151B106 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 07/07/1988 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Tiernan J BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML20151B107 | List: |
| References | |
| NUDOCS 8807200243 | |
| Download: ML20151B106 (2) | |
See also: IR 05000317/1988013
Text
<
.
.
/
'~.:
-
.
J
'
.
.
07 JUL 1988
Docket No. 50-317
50-318
Baltimore Gas and Electric Company
ATTN:
Mr. J. A. Tiernan
Vice President
Nuclear Energy
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Inspection Nos. 50-317/88-13 and 50-318/88-13
This refers to the routine safety inspection of Containment Integrated Leak
Rate Testing conducted by Mr. Joseph A. Golla of this of fice on May 26-27, 1988
at Calvert Cliffs Nuclear Power Plant, Units 1 and 2 of activities authorized
by NRC License Nos. DPR-53 and DPR-69 and to the discussions of our findings
held by Mr. Golla with Mr. J. Lemons at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
r.. t d.cl SlFP3"T8'
,;c ;,q a g P , Durg '
Jacque P. Durr, Chief,
l
Engineering Branch,
j
Division of Reactor Safety
I
Enclosure:
Combined NRC Region I Inspection Report Nos. 50-317/88-13 and
50-318/88-13.
OFFICIAL RECORD COPY
IR CC 88-13 - 0001.0.0
[ g
06/28/88
(
8807200243 G80707
/
DR
ADOCK 0500
7
w
).
..
.
.' '
.
s-
- Baltimore Gas and Electric Company'
'
cc w/ enc 1:
M. Bowman, General Supervisor, Technical Services Engineering
T. Magette, Administrator, Nuclear Evaluations
V. Bradley, Director, Security Services (Safeguards Only)
~H. D. Coss, Vice President, General Services (Safeguards Only)
L. P..Gibbs, General Supervisor, Calvert Cliffs Security Operations
(SafeguardsOnly)
Pubite Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector.
State of Maryland (2)
.bcc w/ enc 1:
Region I Docket Room (with concurrence )
Management Assistant, ORHA (w/o enc 1)
L. Trip ,'DRP
0. Limroth, DRP
j
S. McNeil, LPM, NRR
R. Bores, DRSS
i
i
RI:DRS
R
RS
RI:DRS
o la/sh/rw
Eapen
Durr
C.
.
6 7/88
6/1 //88
6/,29/88
0FFICIAL RECORD COPY
IR CC 88-13 - 0002.0.0
06/23/88