}                                                                            i GENERIC ISSUE MANAGEMENT CONTROL SYSTEM        l I
l                                      SECOND QUARTER FY-88 UPDATE I                                                                            l l
i 4
1 0FFICE OF NUCLEAR REGULATORY RESEARCH MAY 1988                      -
i i
1 i
i h
I i
i i
i l9 i        8806070165 890506 PDR  GTECI GNIOO6 L                      PDR ~-
i                                                                      ,
I
(-
                                          .                                  j
 
1
  %/
                                                      - ii -
TABLE OF CONTENTS (a) Generic Issue Management Control System (1) Description (2) Abbreviations (b)) Table 1      -
Generic Safety Issues Scheduled for Resolution, Issues Resolved, and Issues Integrated (c) Table 1A -          Summary of Generic Safety Issues Scheduled for Resolution, Issues Resolved, and Issues Integrated (d) Table 2      -
Number of Generic Safety Issues Resolved and Scheduled for Resolution (Through 2nd Quarter FY-88)
(e) Table 3      -
Generic Safety Issues Resolved by Fiscal Year C)      (f) Table 4      -
Generic Safety Issues Scheduled for Resolution                                                          j (by Fiscal Year)                                                                                      *
(g) Table 4A -          Generic Safety issues Scheduled for Resolution (by Priority)
(h) Table 5      -
Number of Generic Issues Prioritized from FY-83 through the Second Quarter of FY-88 (i) Table 6      -
Generic Issues Prioritized as of 2nd Quarter FY-88 (j) Table 7      -
Generic Issues.to be Prioritized (k) Table 8      -
Generic Issues to be Reprioritized (1) Table 9      -
Regulatory Impact Issues Scheduled for Resolution (m) Table 10 -          Licensing Issues Scheduled for Resolution (n) Work Scope & Schedules for each Approved Generic Issue l
l O                                                                                                                                        :
l l
 
                                            - iii -
GENERIC ISSUE MANAGEMENT CONTROL SYSTEM DESCRIPTION The Generic Issue Management Control System (GIMCS) provides appropriate infor-mation necessary to manage the resolution.of safety-related as well as non-safety related generic issues. For the purpose of this management control system, resolved is defined as the point where the staff's final resolution product is issued. For safety-related issues, this gene ally occurs when the resolution has been incorporated into one or more of the following documents:
(a) Commission Policy Statement /0rders (b) NRC Regulations                                                      <
(c) Standard Review Plan (SRP)                                            l (d) Regulatory Guide                                                      j (e) Generic Letter                                                        1 1
GIMCS is part of an integrated system of reports and procedures that is        I designed to manage generic safety issues through the stages of prioritization  !
and resolution (development of new criteria, review and approval, public        I comments, and incorporation into the SRP, as appropriate). NUREG-0933 provides an evaluation for a recommended priority listing based on the potential safety
[3 significance and cost of implementation for each issue. The procedure and      j
\'j  criteria for adding new generic issues to the system are outlined in RES Office !
Letter No. 1 dated December 3, 1987. (Prior to the NRC reorganization of April 12, 1987, NRR Office Letter No. 40 was used for identifying new issues.)        l GIMCS provides the proposed schedules for managing and controlling the resolution of the issues on the prioritized listing. These include: (1) issues that are ranked HIGH priority; (2) issues that are ranked MEDIUM-priority; (3) issues for which possible resolutions have been identified for evaluation; (4) issues for which technical resolutions are available (as documented by memorandum, analysis, NUREG, etc.); and (5) other issues designated to receive resources for resolution. Issues ranked as either "LOW"  )
i or "0 ROP" are not allocated resources for resolution and, therefore, are not tracked in GIMCS.
Some prioritized generic issues may not have resources allocated for resolution; these issues are listed in GIMCS as inactive issues. Generally, these will be MEDIUM priority issues that have no safety deficiency demanding high priority attention, but have potential for safety improvements or reduction in uncertainty of analysis that may be substantial and worthwhile.
Efforts for the resolution of these issues will be planned over the next several years, but on a basis that will not interfere with work on the resolution of HIGH priority generic issues or other high priority work. Thus, some (MEDIUM priority) generic issues may be inactive until such time as resources become available to resolve them. The detailed schedule for resolving generic issues is monitored by GIMCS.
(v)
 
                                                        - iv -
Management and control indicators used in GIMCS are defined as follows:
: 1. Item No.            - Generic Issue Number
: 2. Issue Type          - Generic Safety (with priority High, Medium, or Nearly Resolved), licensing, or Regulatory Impact.
: 3. Action Level        Active      - T/A funds appropriated for resolution, and/or Task Manager actively pursuing resolution.
Inactive - No T/A funds appropriated for resolution, Task Manager assigned to more important work, or no Task Manager assigned.
: 4. Office /Div/Br      - First-listed has lead responsibility for resolving issue; others listed have input to resolution.
: 5. Task Manager        - Name of assigned individual rer.ponsible for resolution
: 6. TAC Number          - TAC number assigned to the issue.
: 7. Title                - Generic Issue Title
: 8. Work Authorization  - Who or what authorized work to be done on the issue.
: 9. Contract Title      - Contract Title (if contract issued).
: 10. Contractor Name/flN - Contractor Name and FIN. (If contract is not yet issued, indicate whether the contract is included in the flN plan.)
: 11. Work Scope          - Describes briefly the work necessary to techni-cally' resolve and complete the generic issue.
: 12. Affected Documents  - Identifies documents into which the technical resolution will be incorporated.
: 13. Status              - Describes current status of work,
: 14. Problem / Resolution - Identifies problem areas and describes what actions are necessary to resolve them.
: 15. Technical Resolution - Identifies detailed schedule of milestone dates that are required for completing the issue through the issuance of SRP revisions or other changes that document requirements.
Milestones    - Selected significant milestones.      The "original" scheduled dates remains unchanged. Changes in scheduled dates are listed under "Current."
Actual completion dates are listed under "Actual."
 
                                    -v-LEGEND AIF    - Atomic Industrial Forum                              ;
ANPRM  - Advanced Notice of Proposed Rulemaking BNL    - Brookhaven National Laboratory                        j DTP    - Branch Technical Position                            ;
JTR    - Draft Technical Resolution                            l EPRI  - Electric Powe'r Research Institute                    j FRN    - Federal Register Notice FTR    - Final Technical Resolution GL    - Generic Letter GSI    - Generic Safety Issue                                  '
H      - HIGH-Priority GSI IEB    - Inspection & Enforcement Bulletin INEL  - Idaho Nuclear Engineering Laboratory LI    - Licensing Issue M      - ME010M-Priority GSI NR    - Nearly-Resolved GSI ORNL  - Oak Ridge National Laboratory PNL    - Pacific Northwest Laboratories PRA    - Probabilistic Risk Assessment RAI    - Request for Additional Information R.G.  - Regulatory Guide RI    - Regulatory Impact 5      - Subsumed in Another (Issue No.)
S0W    - Statement of Work SRP    - Standard Review Plan                                  ,
STS    - Standard Technical Specification                      ;
T/A    - Technical Assistance                                  l TAP    - Task Action Plan                                      i TBD    - To Be Determined                                      I TI    - Temporary Instruction                              .i TS    - Technical Specification                                !
USI    - Unresolved Safety Issue I
i V
 
TABLE 1 GENERIC SAFETY ISSUES SCHEDULED FOR RESOLUTION, ISSUES RESOLVED AND ISSUES It:1EGRATED FY-83 IHROUG*l FY-88 (2ND QUARTER)
FY-83                                                    FY-84                                                  FY-85 ISSUE    GIs          New      GIs                          GIs          New            GIs                    GIs                New          GIs TYPE    Start +      Issues - Resolved = End                Start +      Issues - Resolved = End                Start +            Issues - Resolved = End USI        16          0            2      14                14          0                  2      12          12                0            0                12 HIGH      24          2              0      26                26          1                  1      26          22*              41              6                57 MEDIUM    31          2              0      33                33          4                  3      34          28*                1            10                19 NR        20          3              4      19                19          5                  9        15          15              11              7                19 TOTAL:    91          7              6      92                92        10                15        87          77              53              23              107 1
i                    FY-86                                                                                          FY-87 ISSUE    Gls          New        GIs                              ISSUE      GIs            New              GIs              GIs TYPE      Start +      Issues - Resolved = End                    TYPE      Start + Issues - Resolved - Integrated                                  =      End USI      12              0        1          11                  USI        11                0              2                  0                        9 HIGH    57            (16)*      3          38                  HIGH-      38                4,              3                  7                      32 MEDIUM  19              7        2          24                  MEDIUM      24                1              4                  5                      16 NR      19              (3)*      3          13                  NR          13                0                1                  1                      11 TOTAL:  107            (12)*      9          86                  TOTAL:      86                5              10                13                      68
* Extensive revisions to Human factors issues resulted in priority changes.
;                                                                              T1-1                                      As of 2nd Quarter FY-88 i
_ _ _ _ _ _                  _ _ . _            .__ _ _ - -        - - _ - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ -____\
 
TABLE I (Continued)
GENERIC SAFETY ISSUES SCHEDULED FOR RESOLUTION, ISSUES RESOLVED AND ISSUES INTEGRATED FY-83 THROUGH IY-88 FY-88 ISSUE    GIs        New        GIs      GIs TYPE      Start + Issues - Resolved - Integrated = End USI        9          0          0            0        9 HIGH      32          1          2            3      28 MEDIUM    16          1          1            3      13 NR        11          0          1            0      10 l  TOTAL:    68          2          4            6      60 i
I T1-2                      As of 2rni Quarter FY-88 O      -                  -
O  _
O
 
Y d
~
x./
Table 1A
 
==SUMMARY==
OF GENERIC SAFETY ISSUES SCHEDULED FOR RESOLUTION, j                                    ISSUES RESOLVED, AND ISSUES INTEGRATED 1                                                Cumulative Totals j                                        FY-83 Through FY-88 (2nd Quarter) i j
ISSUE        GIs        New                    GIs                                          GIs      ,
TYPE        Start + Issues      Sub-Total      Resolved                                      Integrated = Remainder USI          16            0        16            7                                              0          9 HIGH          24          29*        53          15                                              10          28 MEDIUM        31        ~ 10        41          20                                              8          13 NR            20          16*        36          25                                              1          10 TOTAL:        91          55      146            67                                              19          60 4
(
;
* Extensive revisions to Human Factors issues resulted in priority changes                                                                                              1
* GIs Integrated i
!              FY-87:      Issues 48, 49, and A-30 into Issue 128 Total (13) Issue 65 into Issue 23 Issues 68; 122.1.a; 122.1.b; 122.1.c; and 125.Il 1 h into Issue 124 I                            Issues I.B.1.1(6) and I.B.1.1(7) into Issue 75 1                            Issue B-6 into Issue 119.1 Issue 67.7 into 135 l      1st Qtr FY-88:        Issue 77 into A-17 i              TotaT--(6)    Issues I.D.5(5), II.B.5(1), II.B 5(2), II.B.5(3), and II.F.5 were integrated into the 1
Research Activities Program and were reclassified as Licensing Issues.
a I
T1-3                                                        As of 2nd Quarter. FY-88
 
, . _. _ _ _ _ _                  _ _ . s . _                -
i i
i
]                                                                          TABLE 2                                                            [
NUMBER OF GENERIC SAFETY ISSUES RESOLVED j                                                              AND SCHEDULED FOR RESOLUTION                                                    -
!                                                              (Through 2nd Quarter FY-88) a l'
RESOLVED                                          SCHEDULED FOR RESOLUTION j                  ISSUE                                                                                                        Cumulative PRIORITY FY-83    FY-84    FY-85    FY-86        FY-87 FY-88    FY-88        FY-89 FY-90  FY TBD        Total      -
USI        2          2        0      1            2    0          5            3  1      0      0          16
* i HIGH      0          1        6      3            3    2          8            9  6      3      2          43 MEDIUM    0          3        10      2            4    1          3            4  3        1    2-          33 i
NR        4          9        7      3            1    1          2            4  2      0      2'        35 i                ' Total:    6        15        23      9          10    4        18          20  12      4      6        127 i'
4 I        -
                                                                    ~
i                                                              s i
: w.                            ~
j                                                                                                              '
i g
                                                                                              - ~ _ -,
i
}'
}
l                                                                            T2-1                        As of 2nd Quarter FY  !                                                                                                                                  ,
i                                                                                                                                -
 
em
                                                                                                                                                                                      )
TABLE 3 GENERIC SAFETY ISSUES RESOLVED BY FISCAL YEAR
                              ^ A                              Issue                                                                                                                        Resolution      Date Approved    Date Number                                                            Title                            Priority                      Product    for Resolution-  Resolved FY-83                                                              ,
A-11      ,
Reactor Vessel Materials                  USI                        GL 82-26        01/79            10/82 Toughness A-16                                                    Steam Effects on BWR Core Spray NR                                  MPA D-12        NRR-0P FY83      03/29/83 Distribution
                                                                                                                                                                                                                                                      ~
]                                                                                                                                                                                                                                                          5 A-39                                                    Jetermination of Safety '                USI                        SRP Revision    01/79            10/82 Relief Valve (SRV) Pool                                                                                    _
Dynamic Loads and Temperature                                      '
;.                          N                                                                                        Li.mits for BWR Cbntainment                                                x _
B-53                                                    Load Break Switch                        NR -                      SRP Revision " NRR-0P FY83        07/28/83 II.E.5.1                                                (B&W) Design Evaluation NR 7
No Req.        NRR-0P FY83      03/21/83                \+
'.                                                              IV.C.1                                                  Extend Lessons Learned From              NR                        No Req. '      NRR-OP FY83      04/15/83 TMI to Other NRC Programs l
FY-84 12                                                      BWR Jet' Pueo Integrity                  Medium                    No Req.        NRR-0P FY83      09/25/84 20                                                      Effects of Electromagnetic                NR                        NUREG/          NRR-0P FY83      11/15/83
:                                                                                                                      Pulse on Nuclear Plant Systems                                      CR-3069 5
40                                                      Safety Concerns Associated                NR                        MPA B      07/18/83          12/27/83 With Breaks in the BWR Scram System                                                          ;
                                                                                                                                                                                              ;                                                s j
45                                                      Inoperability of Instruments              NR                        SRP Revision    09/08/83          03/23/84 Due to Extreme Cold Weather                                                                    ,_,
x j
N
;                                                                                              _                                                                            13-1                              As of 2nd Quarter Ff.r33
                                                                                                                                                                                    ~7
_ _ _ _ _ _ _ _ . . _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _            __.. . . _ _ _ _ _ _ __ _ . _ ____ _ _ _ _ .                    _ _ . _    _ _ _ _ _ . _ _ . _ _ . _ _ _ _ _ -                              -              .e i
 
Table 3 (Continued)
GENERIC SAFETY ISSUES RESOLV20 BY FISCAL YEAR Issue                                                        Resolution    Date Approved    Date Nueber                Title                      Priority      Product    for Resolution  Resolved FY-84 (cont'd) 50            Reactor Vessel Level              NR        MPA-F26        07/28/83          09/06/84 Instrumentation in BWRs 69            Make-Up Nozzle Cracking in        NR        "PA-            12/06/83        09/27/84 B&W Plants A-1            Water Hammer                      USI        SRP Revision    01/79            03/IS/84 A-12          Steam Ge:wrator and Reactor        USI        SRP Revision    01/79            10/83 Coolant Pump Supports B-10          Behavior of BWR Mark III          High      SRP Revision    NRR-OP FY83      09/10/84 Containments B-26          Structural Integrity of            Medium    No Req.        NRR-0P FY83      09/27/84 Containment Penetrations B-60          Loose Parts Monitoring            NR        GL              NRR-0P FY83      09/25/84 Systems (LPMS)
I.A.1.4        Long-Term Upgrading of            NR          New Rule      NRR-OP FY83      01/01/84 Operating Personnel II.A.1        Siting Policy Reformulation        Medium      No Req.        NRR-OP FY83      09/20/84 II.E.S.2      (B&W) Reactor Transient            NR          NUREG-0667    NRR-0P FY83      09/28/84 Response Task Force III.D.2.5      Offsite Dose Calculation Manual NR            NtlREG/        NRR-0P FY83      01/17/84 CR-3332 T3-2                      As of 2nd Quarter FY-88 O
O                                                  O
 
t  >
Table 3 (Continued)
GENERIC SAFETY ISSUES RESOLVED BY FISCAL YEAR Issue                                                  Resolution    Date Approved    Date Number            Title                    Priority      Prodrict    for Resolution  Resolved FY-85 22        Inadvertent Boron Dilution        NR        GL 85-05      11/05/82          10/15/84 Events A-41      Long Term Seismic Program        Medium    No Req.        NRR-0P FY83      10/10/84 B-19      Thermal-Hydraulic 5tabiiity      NR        GL            01/03/85          05/21/85 B-54      Ice Condenser Containments        Medium    NUREG/        NRR-0P FY83      10/22/84 CR-4001
) B-58      Passive Mechanical failures      Medium    No Req.        NRR-0P FY83      07/09/85 i
                                                                                                        ~
C-11      Assessment of Failure and        Medium    No Req.        NRR-OP FY83      07/09/85 l            Reliability of Pumps and j            Valves I
, I.A.2.2    Training and Qualifications      High      Policy        NRR-0P FY83      06/24/85 i            of Operating Personnel                      Statement
.                                                        No Req.
j I.A.2.6(4) Operator Workshops                Medium    No Reg.        NRR-OP FY83      09/25/85
! I.A.2.7    Accreditation of Training        Medium    Policy        NRR-OP FY83      06/24/85 i            Institutions                                Statement i                                                        No Reg.
i I.A.3.4    Licensing of Additional          Medium    Policy        NRR-OP FY83      02/12/85 Operations Personnel                        Statement j                                                        No Req.
j                                                                                                          .
; I.G.*      Scope of Test Program            Medium    No Req.        NRR-0P FY83      10/05/84 i
i I                                                                                                          '
i                                                T3-3                      As of 2nd Quarter FY-88 i
i 2
 
l Table 3 (Continued)
GENERIC SAFETY ISSUES RESOLVED BY FISCAL YEAR Issue                                                        Resolution    Date Approved      Date Number                Title                      Priority      Product    for Resolution    Resolved FY-85 (cont'd)
II.B.6        Risk Reduction for Operating      High      No Req.        NRR-OP FY83        09/25/85 Reactors at Sites With High Population Densities II.B.8        Rulemaking Proceedings on          High          -              -                  -
Degraded Core Accidents (a) Hydrogen Rule                              Rule          NRR-OP FY83        07/19/85 (b) Severe Accidents                          Policy        NRR-OP FY83        08/12/85 Statement II.C.1        Interim Reliability Evaluation    riigh      No Req.      NRR-0P FY83        07/09/85 Program II.C.2        Continuation of Interim            High        No Req.      NRR-0P FY83        09/25/85 Reliability Evaluation Program II.E.2.2      Research on Small Break LOCAs      Medium      No Req.      NRR-0P FY83        07/25/85 and Anomalous Transients III.A.I.3(2)  Maintain Supplies of Thyroid-      NR          Policy        NRR-OP FY83        08/15/85 Blocking Agent For Public                      Statement III.A.3.4      Nuclear Data Link                  Medium      No Req.      NRR-0P FY83        06/26/85 III.D.2.3(1)  Develop Procedures to Dis-        NR          ESRP          NRR-OP FY83        08/23/85 criminate Between Sites / Plants              Revision III.D.2.3(2)  Discriminate Between Sites        NR          ESRP          NRR-OP FY83        08/28/85 and Plants that Require                        Revision Consideration of Liquid Pathway Interdiction Techniques III.D.2.3(3)  Establish Feasible Method of      NR          ESRP          NRR-OP FY83        08/28/85 Pathway Interdiction                          Revision T3-4                        As of 2nd Quarter FY-88 O                                                      O                                                  O
 
C                                                      O                                              O Table 3 (Continued)
GENERIC SAFETY ISSUES RESOLVED BY FISCAL YEAR Issue                                                        Resolution    Date Approved      Date Number                Title                      Priority      Product    for Resolution    Resolved FY-85 (cont'd)
III.D.2.3(4)    Prepare a Summary Assessment      NR        ESRP          NRR-0P FY83        08/28/85 Revision 1
]          IV.E.5        Assess Currently Operating        liigh    No Req.        NRR-0P FY83        09/25/85 Plants                                                                      ,
FY-86 i
3              Setpoint Drift in                  NR        Reg Guide      NRR-DP FY83        05/19/86
:                          Instrumentation                            Rev. No Req.
I i          14            PWR Pipe Cracks                    NR        .lo Req.      NRR-0P FY83        10/04/85 36              Loss of Service Water              NR        SRP Revision  02/15/84          05/13/86 j                                                                      No Req.
j        61              SRV Discharge Line Break          Medium    No Reg.        11/30/83          08/08/86 t
Inside the Wetwell Airspace i                        of BWR Mark I and Mark II j                        Containments
!        A-43            Containment Emergency            USI        SRP            01/79              10/85 i
Sump Performance                            Revision t
!        I.C.9          Long-Term Plan for Upgrading      Medium    No Req.        NRR-0P FY83        06/07/85 4                        of Procedures i
III.D.3.1      Radiation Protection Plans        liigh      No Req.        NRR-0P FY83        05/19/86 j        HF1.2          Engineering Expertise on          fligh      No Req.        10/01/84          10/28/85 4
Shift
)
HF1.3          Guidance on Limits and            fligh      No Req.        10/01/84          06/26/86 l
Conditions of Shift Work
;                                                              T3-5                    As of 2nd Quarter FY-88 l
i,                                                                      .                                          .
 
l l                                          Table 3 (Continued) l GENERIC SAFETY ISSUES RESOLVED BY FISCAL YEAR l  Issue                                                    Resolution    Date Approved      Date Number            Title                    Priority      Product    for Resolution    Resolved FY-87 l  91        Main Crankshaft failures in      NR          NUREG-1216    07/85              09/87 l            Transamerica Delaval Diesel                  (No Reg.)
Generators A-46      Seismic Qualification of          U S '.      GL87-02      02/81              02/87 Equipment in Operating Plants                (Req.)
l  A-49      Pressurized Thermal Shock        USI        Rule / Reg. 12/81              02/87
)                                                          Guide 1_154 (Req.)
l 1.A.2.6(1) long-Term Upgrading of            High        Reg. Guide    10/82              05/87 Training and Qualifications -                1.8 (Req.)
Revise Reg. Guide 1.8 I.A.3.3    Requirement for Operator          High        No Req.      12/82              01/87 Fitness I.A.4.2(1) Research on Training              High        Reg. Guide    10/84              05/87 Simulators                                    1.149, Rev.1 (Req.)
I . B .1.1 Organization and Management        -            -              -                -
Long-Term Improvements I.B.1.1(1) Prepare Draft Criteria            Medium      No Reg.      12/82              01/87 I.B.I.1(2) Prepare Comission Paper          Medium      No Req.      12/82              01/87 I.B.1.1(3) Issue Requirements for the        Medium      No Req.      12/82              01/87 Upgrading of Management and Technical Resources T3-6                    As of 2nd Quarter FY-88 O                                                    O                                              O
 
h
,                                                                  Table 3 (Continued)
GENERIC SAFETY ISSUES RESOLVED BY FISCAL YEAR l                  Issue                                                              Resolution  Date Approved    Date Number                  Title                          Priority    Product  Jor Resolution  Resolved i
I.B.I.1(4)      Review Responses to Determine          Medium    No Reg. 12/82            01/87 i                                  Acceptability fl.,$$
l                86              Long Range Plan for Dealing            NR        NUREG-0313, 10/84            01/88
:                                with Stress Corrosion Cracking                    Rev. 2, l                                  in BWR Piping                                      GL 88-01 l                                                                                    (Req.)
93              Steam Binding of Auxiliary              High      GL 88-03    10/84            02/88 feedwater Pumps                                    (No Req.)
i                  I.D.4          Control Room Design Standard            Medium    No Req. NRR-0P FY83      03/88        i 1
j                II.E.4.3        (Containment) Integrity Check          High-      NUREG-1273  NRR-0P FY83      03/88 i                                                                                    (No Req.)
:l I
i 4
\                                                                                                                          .
l l
l
}
j                                                                            T3-7                  As of 2nd Quarter FY-88 l
 
    . . _ _ - . =_          -. . . - - ..                .      ._                            - .        .
TABLE 4 l
60 GSIs SCHEDULED FOR RESOLUTION (BY FISCAL YEAR) i PRIORITY              FY-88                  FY-89          FY-90                  FY-91    T80    TOTAL USI                  A-3                    A-17          A-45                    -      ~-
9 A-4                  A-40                                                          -
A-5                  A-47 A-44 A-48 1
HIGH                    99                    43            23                    87      121      28 105                    94            29                    113      I . F.1 122.2                  115            101                    HFS.2 I.A.4.2(4)            125.II.7      128 II.C.4                130            II.H.2 i                                        HF1.1                134            HFS.1
* i HF4.1                8-56 HF8                  C-8 q                                                                HF4.4 i
!, ~
l                  MEDIUM                  79                    70            51                    135      -106      13 t
A-29                    82          B-61                              B-17 8-5                  B-55          II.E.6.1 I. D. 3 j                  NR                      66                  103              75                      -
84      10
:                                          124                  B-64            83                                102
!                                                                I.D.5(3)
:                                                                II.J.4.1                                                          i i
t l                  TOTAt:                  18                    20              12                          4    6    60 T4-1                    As of 2nd Quarter FY-88 i
i                                                                      .
 
Table 4A GENERIC SAFETY ISSUES SCHEDULED FOR RESOLUTION Date          Resolution    Current Issue                                        Lead Office /              Approved for      Date at end  Resolution Number                      Title          Division / Branch  Priority  Resolution        of FY-87          Date A-3,4,5 Steam Generator Tube Integrity      NRR/ DEST /EMTB      USI    01/79              12/87        06/88 A-17    Systems Interaction                RES/DE/EIB            USI    0I/79              04/89        09/89 A-40    Seismic Design Criteria            RES/DE/EIB            USI    01/79              04/89        06/89 A-44    Station Blackout                    RES/DRPS/RPSI        USI    01/79              03/88        05/88 A-45    Shutdown Decay Heat Removal        RES/DRPS/RPSI        USI    02/81              12/89        04/90 Requirements A-47    Safety Implications of Control      RES/DE/EIB            USI    02/81              04/89        04/89 Systems A-48    Hydrogen Control Measures and      RES/DRAA/SAIB        USI    02/81              01/88        06/88 Effects of Hydrogen Burns on Safety Equipment 23      Reactor Coolant Pump Seal          RES/DE/EIB            H      NRR-0P FY83      04/90        04/90 Failures 29      Bolting Degradation or Failures    RES/DE/EIB            H      NRR-OP FY83        10/89        03/90 in Nuclear Power Plants 43      R'e liability of Air Systems        RES/DRPS/RPSI        H      12/87            NONE          04/89 87      Failure of HPCI Steam Line          RES/DRPS/RPSI        H      09/26/85          12/90          12/90 Without Isolation T4-2                      As of 2nd Quarter FY-88 O                                                      O                                                      O
 
O                                                                                                                O                                                      O Table 4A (Continued)
GENERIC SAFETY ISSUES SCilEDULED FOR RESOLUTION Date          Resolution    Current Issue                                                                                                  Lead Office /                Approved for      Date at end  Resolution Number                                                                                Title        Division / Branch    Priority  Resolution        of FY-87          Date 94        Additional Low-Temperature                                                                  RES/DRPS/RPSI          H      07/23/85          12/88        12/88 Overpressure Protection For Light Water Reactors 99        RCS/RHR Suction Line Interlocks                                                            RES/DRPS/RPSI          H      08/13/85          04/88        08/88 on PWRs 101      BWR Water Level Redundancy                                                                  RES/DE/EIB            H      05/06/85          03/90        03/90 105      Interfacing Systems LOCA at BWRs RES/DE/EIB                                                                        H      06/11/85          12/88        08/88 113      Dynamic Qualification Testing of RES/DE/EIB                                                                        H      07/02/87          09/91        09/91 Large Bore Hydraulic Snubbers 115      Enhancement of the Reliability                                                              RES/DRPS/RPSI          H      07/07/86          05/89          05/89 of Westinghouse Solid State Protection System 121      Hydrogen Control for large,                                                                RES/DRA/RDB            H      09/20/85          02/88          06/88 Dry PWR Containments 122.2    Initiating Feed-and-Bleed                                                                  N'RR/ DEST /SRXB      H      01/86              12/87        06/88 125.II.7 Reevaluate Provision to Auto-                                                                RES/DRPS/RPSI          H      09/10/86          08/89          08/89 matica11y Isolate Feedwater from Steam Generator During a Line Break 14-3                      As of 2nd Quarter FY-88
_ _ - _ _ _ _ _ _ _ _ _ - _ _ - _ - _ _ _ _ _ - - - _ _ - _ _ _ _ _ _ _ _                                  -_____-____-._--_________-_-______-_._________~______  __ .__
 
Table 4A (Continued)
GENERIC SAFETY ISSUES SCHEDULED FOR RESOLUTION Date          Resolution    Current Issue                                      Lead Office /              Approved for      Date at end    Resolution Numbe.-                  Title            Division / Branch  Priority  Resolution        of FY-87          Date 128    Electrical Power Reliability      RES/DE/EIB          H      11/28/86          12/89          12/89 130    Essential Service Water Pump      RES/DRPS/RPSI        H      03/10/87          06/89          06/89 Failures at Multiplant Sites 134    Rule on Degree and Experience      RES/DRA/RDB          H      01/23/86          09/89          08/89 Requirements for Senior Operators B-56    Diesel Reliability                RE5/UNPS/RPSI        H      NRR-0P FY83      12/88          04/89 C-8    Main Steam Line Isolation Valve    RES/DRPS/RPSI        H      NRR-OP FY83      02/89          04/89 Leakage Control Systems I.A.4.2 Review Simulators for Confor-      NRR/DLPQ/LOLB        H      NRR-OP FY83      10/87          06/88 (4)    mance I.F.1  Expand QA List                    RES/DRA/ARGIB        H      NRR-0P FY83      12/86          TBD II.C.4  Reliability Engineering            RES/DRPS/RHFB        H      NRR-OP FY83      06/88          09/88 II.H.2  Obtain Technical Data on the      R'ES/0RAA/AEB        H      NRR-0P FY83      03/91          12/89 Conditions Inside the TMI-2 Containment Structure HF1.1  Shift Staffing                    RES/DRPS/RHFB        H      10/01/84          06/88        06/88 HF4.1  Inspection Procedure for          NRR/DLPQ/LHFB        H      10/01/84          09/87        07/88 Upgraded Emergency Operating Procedures T4-4                      As of 2nd Quarter FY-88 O                                                      O                                                    O
 
O                                                                                                    O                                                                                                                    '
Table 4A (Continued)
GENERIC SAFETY ISSUES SCHF0"Liu FOR RESOLUTION Date            Resolut;on              Current i      Issue                                                                          Lead Office /                                                Approved for      Date at end              Resolution Number                                              Title                    Divison/ Branch                                  Priority    Resolution        of FY-87                      Date HF4.4  Guidelines For Upgrading Other                                        RES/0RPS/RilFB                                      H        10/01/84          06/89                    06/89 Procedures liFS.1  Local Control Stations                                                RES/DRPS/RHFB                                      H        10/01/84          12/90                    09/90 HF5.2  Review Criteria for Human                                              RES/DRPS/RHFB                                      H        10/01/84          12/90                    05/91 Factors Aspects of Advanced Controls and Instrumentation HF8    Maintenance and Surveillance                                          NRR/DLPQ/LPEB                                      H        03/06/85          01/88                    05/88 Program 51      Proposed Requirements for                                              RES/DE/EIB                                          M        06/03/83          05/88                    07/90 Improving Reliability of Open Cycle Service Water Systems 70      PORV and Block Valve Reliability RES/DE/EIB                                                                                M        05/14/84          12/87                    10/88 79      Unanalyzed Reactor Vessel                                              RES/DE/EIB                                          M        07/25/83          12/86                    08/88 Thermal Stress During Natural C.onvection Cooldown 82      Beyond Design Bases Accidents in RES/DRPS/RPSI                                                                            M        12/07/83          08/87                    05/89 Spent Fuel Pools 106    Piping and Use of Highly                                              RES/DRPS/RPSI                                        M        11/03/87          NONE                      TBD                              ,
Combustible Gases in Vital                                                                                                                                                                                        1 Areas 14-5                                  As of 2nd Quarter FY-88
 
Table 4A (Continued)
GENERIC SAFETY ISSUES SCHEDULEL FOR RESOLUTION Date                    Resolution                                  Current Issue                                        Lead Office /              Approved for                Date at end                                  Resolution Nud,er                      Title          Division / Branch  Priority  Resolution                  of FY-87                                        Date 135      Steam Generator and Steam Line    RES/DE/EIB          M      05/27/86                    11/90                                        11/90 Overfill l                                                                                                        08/89                                        06/88 l A-29      Nuclear Power Plant Design for    F.ES/DRPS/RPSI      M      NRR-OP FY83 the Reduction of Vulnerability to Industrial Sabotage B-5        Ductility of Two Way Slabs and    RES/DE/EIB          H      NRR-9P FY83                  08/88                                        04/88 Shells and Buckling Behavior of Steel Containments B-17      Criteria for Safety-Related        RES/DRPS/RHFB        M      03/22/82                    06/90                                        TDB Operator Actions B-55      Improve Reliability of Target      RES/DE/EIB          11      tiFR-OP                      03/89                                        03/89 Rock Safety Relief Valves B-61      Allowable ECCS Equipment Outage    RES/DRAA/PRAB        M      NRR-0P                      10/88                                        04/90 Per.iods I.D.3    Safety System Status Monitoring    RES/DE/MEB                  4RR-0P FYB3                  05/89                                        02/89 II.E.6.1 Test Adequacy Study                RES/DE/ElB            H      NRR-OP FYB3                05/90                                        10/83 66        Steam Generator Requirements      NRR/ DEST /EMTB      NR      11/16/83                    12/86                                        06/88 75        Generic Irplications of ATWS      RES/DRA/ARGIB        NR      10/19/83                    01/90                                        01/90 Events at the Salem Nuclear Plant 14-6                      As of 2nd Quarter FY-88 9                                                        9                            -
e    _
:                                                                      F                                                        O
;                                                                  Table 4A (Continued)
GENERIC SAFETY ISSUES SCHEDULED FOR RESOLUTION l
;                                                                                              Date            Resolut;on    Current Issue                                                                            Approved for Lead Office /                                  Date at end  Resolution Number                        Title          Division / Branch      Priority    Resolution        of FY-87        Date l
83          Control Room Habitability              RC.5/DRAA/SAIB      NR      08/83            04/90          04/90 l        84          CE PORVs                                RES/DRPS/RPSI        !!R      02/27/85            TBD          TBD 1
i        102        Human Error in Events Involving        NRR/DLPQ/LPEB        NR      02/13/35          10/87          TBD j                    Wrong Unit or Wrong Train I
!          103        Design For Probable Maximum            RES/DE/EIB            NR      99/04/85          09/87          04/89
!                    Precipitatfor                                                                                                      -'
l l          124        Auxiliary Feedwater System            NRR/ DEST /SPLB        NR      02/86            02/88          08/P8
{                    Reliability j        B-64        Decommissioning of Nuclear            RES/DE/MEB            ;<R      NRR-OP FY84      01/89          04/89
!                    Reactors
;          I,0.5(3) On-Line Reactor Surveillance            RES/DE/MEB            NR      NRR-0P FY33      06/89          12/88 Systems i                                                                                                                .
!          II.J.4.1 Revise Deficiency Report              AE00/DSP/R0AB          NR      NRR-0P FY83      09/P8          11/88 Requirements Total: 60 i
1 i
i l
i                                                                      T4-7                        As of 2nd Quarter FY-88 t                                                                -
 
O                                                                                                                                                                                      O TABLE 5 NUMBER OF CENERIC ISSUES PRIORITIZED IN FY-83 THROUGH THE SECOND QUARTER OF FY-88 Issue Type                                                              FY-83  FY-84    FY-85                  FY-86  FY-87                FY-88  Total Issues Identified                                                        56    19                  54          45*    6                    2    182 To Be Prioritized                                                                                                                                                                                            '
Issues Identified                                                        19        2                      0      1      1                    1    23 To Be Reprioritized
                                                                                                                                                          ~~
Total:                                                                    75    21                  54          46      7                    3    205 New Issues (Entered into GIMCS)
  .                      High                                                                        2          1              41            6      4                    1    55 Medium                                                                      2      4                          1    1      1                    1    10 Nearly Resolved                                                            3        5                      6      1      0                    0    15 Subtctal:                                                                  7    10                  48            8      5                    2. 80 Resolved                                                                    4        0                        1    0      0                    1    6 tw                                                                          1        4                      0      2      1                    0    8 Drop                                                                        1        4                      4      6    13                    4    30 Regulatory Impact /LI                                                      0        0                      4      6      0                    2    10 Subsumed                                                                    8        2                        3    6      0                    0    19 Total Issues                                                              21    20                  60          28    19                    9  153 Prioritized Remaining Issues To Be                                                    54          1              -6          18    -12                    -6    49 Prioritized or Reprioritized
                      - *Extensive revisions to Human factors issues resulted in priority changes.
2
                                                                                                                                                                                                                                    .j T5-1                                      As of 2nd Quarter FY-88
 
        \                                                                                                                        )
J                                                          '
J TABLE 6 GENERIC ISSUES PRIORITIZED AS OF SECOND QUARTER FY-88 Action Item /                                                      Identification      Date              Current Issue No. Title                                                Date                Prioritized      Priority FY-83
: 31.          Natural Circulation Cooldown                          09/82              07/83            S(I.C.1)
: 32.          Flow Blockage in Essential Equipment Caused          09/82              05/83            S(51) by Corbicula
: 33.          Correcting Atmospheric Dump Valve Opening Upon        09/82              08/82            S(A-47)
Loss of Integrated Control System Power
: 39.          Potential for Unacccptable Interaction Between        09/82              07/82            S(25) the CRD System and Non-Essential Control Air System
: 40.          Safety Concerns Associated with Pipe Breaks in        09/82              07/83            NR the BWR Scram System i    41.          BWR Scram Discharge Volume Systems                    09/82              07/83            RESOLVED
: 42.          Combination Primary / Secondary System LOCA          09/82              04/83            5(18)
: 45.          Inoperability of Instrumentation Due to Extreme      09/82              09/83            NR Cold Weather 1    46.          loss of 125 Volt DC Bus                              09/82              02/83            S(76)
: 47.          Loss of Off-Site Power                                09/82              04/83            RESOLVED
: 50.          Reactor Vessel Level Instrumentation in BWRs          09/82              07/83            NR 3    51.          Proposed Requiraments for Improving the 4                  Reliability of Open Cycle Service Water Systems      09/82                06/83            MEDIUM
: 52.          SSW Flow Blockage by Blue Mussels                    09/82                05/83            S(51)
: 56.          Abnorma' Transient Operating Guidelines as            09/82                02/63            S(A-45/I.D.1)
Applied to a Steam Generator Overfill Event i    58.          Inadvertent Centainment Flooding                      09/82                08/83            DROP
: 64.          Identification of Protection System Instrument        10/82                02/83            RESOLVED Sensing Lines
  ;  65.          Probability of Core-Melt Due to Component Cool-      02/83                07/83            HIGd ing Water System Failures
: 77.          Flooding of Safety Equipment Compartments by          06/83                09/83            HIGH Back-Flow Through Floor Drains
: 79.          Unanalyzed Reactor Vessel Thermal Stress During      06/83                07/83-          MEDIUM Natural Convection Cooldown 4    D-1          Advisability of a Seismic Scram                      09/82                06/83            LOW IV.E.2        Plan for Early Resolution of Safely Issues            09/82                06/83            RESOLVED T6-1                      As of 2nd Quarter IY-88 1
 
TABLE 6 (Continued)
GENERIC ISSUES PRIORITIZED AS OF SECOND QUARTER FY-88 Action Item /                                                      Identification    Date            Current Issue No. Title                                                Date              Prioritized    Priority FY-84 34            RCS Leak                                            09/82            02/RA          DROP
: 35.          Degradation of Internal Appurtenances in LWRs        09/82            02/84          LOW
: 36.          Loss of Service Water                                09/82            02/84          NR
: 43.          Contamination of Instrument Air Lines                09/82            11/83          DROP
: 44.          Failure of Saltwater Cooling System                  09/82            10/83          5(43)
: 48.          LCO for Class IE Vital Instrument Buses in          09/82            10/83          NR Operating Reactors
: 49.          Intericcks and LOCs for Redundant Class IE          09/82            07/84          MEDIUM Tie Breakers
: 53.          Consequences of a Postulated Blow Blockage in        09/82            09/84          DROP Incident in a BWR
: 60.          Lamellar Tearing of Reactor Systems Structural      10/82            11/83          S(A-12)
Supports
: 61.          SRV Line Break Inside the BWR Wetwell Airspace      10/82            11/83          MEDIUM of Mark I and II Containments
: 66.          Steam Generator Requirements                        06/83            11/83          NR
: 68.          Postulated Loss of Auxiliary feedwater System        06/83            04/84          HIGH Resulting from Turbine-Driven Auxiliary Feedwater Pump Steam Supply Line Rupture.
: 69.          Make up Nozzle Cracking in B&W Plants                06/83            12/83          NR
: 70.          PORV and Block Valve Reliability                    06/83            05/84          MEDIUM
: 75.          Generic Implications of ATVS Events at the Salem 06/83                10/83          NR Nuclear Plants
: 80.            Pipe Break Effects on Control Rod Drive Hydrau- 06/83                  01/84          LOW lic Lines in the Drywells of BWR Mark I and II
: 82.            Beyond Design Basis Accidents in Spent Fuel          08/83            12/83          MEDIUM Pools
: 90.            Technical Specifications for Anticipatory Trips      02/84            08/84          LOW
: 92.          Fuel Crumbling During LOCA                          04/83            07/84          LOW B-65          Iodine Spiking                                      09/82            06/84          DROP T6-2                      As of 2nd Quarter TY-88 O                                                        O                                                    O
 
O                                                          J~                                                        J -
TABLE 6 (Continued)
GENERIC ISSUES PRIORITIZED AS Of SECOND QUARTER FY-88 Action Item /                                                        Identification    Date            Current Issue No.      Title                                                Date              Prioritized    Priority FY-85
: 37.          Steam Generator Overfill and Combined Primary          09/82            05/85            S(USI A-47) and Secondary Blowdown 54            Valve Operator-Related Events Occurring                09/82            06/85            5(II.E.6.1)
During 1978, 1979, and 1980
: 55.          Failure of IE Safety-Related Switchgear Circuit        09/82            03/85            DROP Breakers
: 59.          Technical Specification Requirements for Plant        10/82            02/85            RI Shutdown
: 67.          Steam Generator Staff Actiens                          06/83            03/85          MEDIUM
: 81.          Potential Safety Probims Associated With Locked 11/83                  10/84          DROP Doors and Barriers in Nuclear Power Plants
: 83.          Control Room Habitability                              11/83            06/84          NR
: 84.          CE PORVs                                              11/83            02/85          NR
: 85.          Reliability of Vacuum Breakers Connected              11/83            Otis            DROP to Steam Discharge Lines Inside BWR Containments
: 86.          NRC Pipe Cracking Review Group Study                    12/83            10/84          NR
: 87.          Failure of HPCI Steam Line Without Isolation          01/84            09/85          HIGH
: 91.          Transamerica Delaval Emergency Diesel                  03/84            07/85-          NR Generator Main Crankshaft failure
: 93.          Steas Binding of Auxiliary Feedwater Pumps            07/84            10/84          HIGH
: 94.          Additional Low-Temperature-Overpressure                08/84            07/85          HIGH Protection For Light Water Reactors
: 98.          CRD Accumulator Check Valve Leakage                    09/84            02/85          DROP
: 99.          RCS/RHR Suction Line Interlocks on PWRs                09/84            08/85          IIIGH 101.          BWR Water Level Redundancy                            09/84            05/85          HIGH 102.          Human Error in Events Involving Wrong Unit or          09/84            02/85          $(HF-02)
Wrong Train 103.          Design For Probable Maximum Precipitation              10/84            09/85          NR 105.          Interfacing System LOCA at BVRs                        10/84            06/85          HIGH 108.          BWR Suppression Pool Temperature Limits                12/84            02/85          RI(LOW) 119.          Piping Review Committee Recommendations                07/85            09/85          RI(NR) 121.          Hydrogen Control for La- Dry Containments              08/85            09/85          HIGH 16-3                      As of 2nd Quarter FY-88
 
TA8LE 6 (Continued)
GENERIC ISSUES PRIORITIZED AS OF SECOND QUARTER FY-88 Action Item /                                                      Identification    Date          Current Issue No. Title                                                Date              Prioritized    Priority FY-85(cont'd)
B-19          Thermal-Hydraulic Stability                          02/83            01/85          NR B-50          Post Operating Basis Earthquake Inspection          02/83            04/85          RI(LOW)
B-59          N-1 Loop Operation in BWRs and PL'Rs                02/83            06/85          RESOLVED HF-01        Human Factor Program Plan (HFPP with 24              08/83            10/84          HIGH subtasks)
HF-02        Maintenance and Surveillance Program Plan            04/84            03/85          HIGH (MSPP vith ten subtasks)
FY-86 T. ~          Vibration Qualification of Equipment                03/83            06/86          DROP
: 30.          Potential Generator Missiles - Generator Rotor      09/82            10/85          DROP Retaining Rings
: 74.          Reactor Coolant Activity Limits for Operating        06/83            05/86          GROP Reactors
: 97.          PWR Reactor Cavity Uncontrolled Exposure            09/84            10/85          S(III.D.3.1) 111.          Stress Corrosion Cracking of Presure Boundary        01/85            11/85          LI Ferritic Steels in Selected Environments 112.          Westinghouse RPS Surveillance frequencies and        01/85            10/85          RI(R)
Out-of-Service Times 114          Seismic-Induced Relay Chatter                        03/85            06/86          S(USI A-46) 115          Reliability of Westinghouse Solid State              04/85            07/86          HIGH Protection System 122.1.a      Common Mode Failure of Isolation Valves in          08/85            01/86          HIGH Closed Position 122.1.b      Recovery of Auxiliary Feedaater                      08/85            01/86          MEDIUM 122.1.c      Interruption of Auxiliary Feedwater Flow            08/85            01/86          HIGH 122.2        Initiating Feed-and-Bleed                            08/85            01/86          HIGH 122.3        Physical Security System Constraints                08/85            01/86          LOW 124          Auxiliary Feedwater System Reliability              12/85            02/86          NR 125.I.2.a    PORV Reliability - Test Program                      11/85            06/86          S(70) 125.I.2.b    PORV Reliability - Surveillance                      11/85            06/86          S(70) 125.I.2.c    Auto Block Valve Closure                            11/85            06/86          DROP T6-4                      As of 2nd Quarter FY-88 O                                                        O                                                        O
 
s                                                                            ,.
Q TABLE 6 (Continued)
GEVERIC ISSUES PRIORITIZED AS OF SECOND QUARTER FY-88 Action Item /                                                                          Identification    Date          Current Issue No.                    Title                                                    Date              Prioritized    Priority      ,
FY-86 (cont'd) 125.I.2.d                    Equipment Qualification for feed-and-Bleed                11/85            06/86          S(USI A-45)
Environment 125.II.3                    Review Steam / Feed Line Break Mitigation                11/85            08/86    ,
DROP Systems for Single Failure 125.11.4                    OTSG Dryout and Reflood Effects                          11/85            09/86          DROP
  ~
125.11.7                    Reevaluate Provisions to Automatically                    11/85            09/86          HIGH Isolate Feedwater from Steam Generator During Line Break 125.II.9                    Enhance Feed-and-Bleed Capability                        11/85            08/86          S(USI A-45) 125.11.14                    Remote Operation of Equipment Which Must                  11/85            08/86          LOW Now be Operated Locally 133                          Update Policy Stateament on Nuclear Plant                07/86            07/86          LI Staff Working Hours 134                          Rule on Degree and Experience Requirement                07/86            07/86          HIGH C-4                          Statistical Methods for ECCS Analysis                    02/83            06/86          RI(R)
C-5                          Decay Heat Update                                        02/83            06/86          RI(R)
C-6                          LOCA Heat Sources                                        02/83            06/86          RI(R)
FY-87 113                          Dynamic Oualification Testing of Large Bore              03/85            07/87          HIGH Hydraulic Snubbers 125.I.1                      .Tvailability of the STA                                  11/85            07/87          DROP 125.I.4                      Plant-Specific Simulator                                  11/85            02/8/          DROP 125.I.7.b                    Realistic Hand-On Training                                11/85            03/87          DROP 125.I.8                      Procedures and Staffing for Reporting                    11/85            06/87          DROP to NRC Emergency Response Center 125.II.1.a                  Two-Train AFW Reliability                                11/85            10/86          DROP 125.II.1.b                  Review Existing AFW Systems for Single failure            11/85            10/86          HIGH 125.II.1.c                  NUREG-0737 Reliability Improvements                      11/85            10/86          DROP I6-5                  As of 2nd Quarter FY-88
 
TABLE 6 (Continued)
GENERIC ISSUES PRIORITIZED AS OF SECOND QUARTER FY-88 Action Item /                                                      Identification  Date            Current Issue No. Title                                                Date            Prioritized    Priority FY-87 (cont'd) 125.II.1.d  AFW Steam and Feedwater Rupture Control              11/85            10/86          DROP System /ICS Interactions in B&W Plants 125.II.2    Adequacy of Existing Maintenance Requirerents        11/85            06/87          DROP for Safety-Related Systems 125.II.5    Thermal-Hydraulic Effects of Loss and                11/85            06/87          DROP Restoration of feedwater on Primary System Components 125.II.6    Reexamine PRA Estimates of Core Damage Risk from Loss of All Feedwater                          11/85            03/87          DROP 125.II.8    Reassess Criteria for Feed-and-Bleed Initiation      11/85            03/87          DROP 125.II.10    Hierarchy of Impromptu Operator Actions              11/85            02/87          DROP 125.II.12    Adequacy of Training Regarding PORV Operation        11/85            03/87          DROP 127          Testing and Maintenance of Manual valves in          05/86            06/87          LOW Safety-Related Systems 128          Electrical Power Reliability                        05/86            11/86          HIGH 130          Essential Service Water Pump failures at Multi-      06/86            03/87          HIGH plant Sites 135          Steam Generator and Steam Line Overfill              05/86            06/87          MEDIUM FY-88
*43          Reliability of Air Systems                          04/87            12/87          HIGH
'55          Failure of Class IE Safety-Related Switchgear        09/85            02/88          DROP Circuit Breakers to Close on Demand P8          Earthquakes and Emergency Planning                  01/84            10/87          RESOLVED 106        Piping and Use of Highly Combustible Gases          10/84            11/87          MEDIUM in Vital Areas 125.I 6    Valve Torque Limit and Bypass Switch Settings        11/85            12/87          DROP 125.I.7A    Recover Failed Equipment                            11/85            12/87          DROP 125.II.13    Operator Job Aids                                    11/85            03/88          DROP 126          Reliability of PWR Main Steam Safety Valves          03/86            03/88          LI 136          Storage and Use of Large Quantities of              09/86            03/68          LI Cryogenic Combustibles on Site T6-6                    As of 2nd Quarter FY-88 O                                                      O                                              .
O
 
O                                                                                          TABLE 7 O
GENERIC ISSUES TO BE PRIORITIZED AS OF SECOND QUARTER FY-88 Action Item /                                                                                                                Identification      Current Issue No.                                            Title                                                                      Date            Schedule 38                                                  Potential Recirculation System failure as a Consequence of                09/82            09/88 Injection of Containment Paint Flakes or Other Fine Debris 57                                                  Effects of Fire Protection System Actuation on Safety-Related              09/82            05/88 Equipment 62                                                  Reactor Systems Bolting Applications                                        10/82          07/88 63                                                  Use of Equipment Not Classified as Essential to Safety in                  10/82          05/89 BWR Transient Analysis 71                                                  Failure of Resin Demineralizer Systems and Their Effects on                06/83            09/89 Nuclear Power Plant Safety 72                                                  Control Rod Drive Guide Tube Support Pin Failures                          06/83            11/88 73                                                  Detached Thermal Sleeves                                                  06/83            06/88 76                                                  Instrumentation and Control Power Interactions                            06/83            12/88 78                                                  Monitoring of Fatigue Transient Limits for Reactor Coolant                06/83            08/88 System 89                                                  5 tiff Pipe Clamps                                                        02/84            08/88 95                                                  Loss of Effective Volume for Containment Recirculation                    08/84            10/88 Spray
                    %                                                    RHR Suction Valve Testing                                                  0C/84            07/88 100                                                  OTSG Level                                                                09/84            05/88 104                                                  Reduction'of Boron Dilution Requirements                                  10/84            11/89 107                                                  Generic Implications of Main Transformer failures                          11/84            12/88 109                                                  Reactor Vessel Closure Failure                                            12/84            03/89 110                                                  Equipment Protection Devices on Engineered Safety Features                12/84            02/89 116                                                  Accicent.Managenent                                                        04/85            07/89 117                                                  Allowable Outages Times for Diverse Simultaneous Equipment Outages        05/85            03/89 118                                                  Tendon Anchorage Failure                                                  07/85            11/88 120                                                  On-Line Testability of Protection Systems                                  08/85            10/88 123                                                  Deficiencies in the Regulations Governing DBA and Single Failure          11/85            07/88 Criterion Suggested by the Davis-8 esse Incident of June 9, 1985 125.I.3                                              SPDS Availability                                                          11/85            05/88 125.I.5                                              Safety Systems Tested in All Conditions Required by Design Basis          11/85            05/88 Analysis T7-1                As of 2nd Quarter FY-88
 
TABLE 7 (Continued)
GENERIC ISSUES TO BE PRIORITIZED AS OF SECOND QUARTER FY-88 Action Item /                                                                    Identification    Current Issue No. Title                                                                    Date          Schedule 125.II.11    Recovery of Main Feedwater as Alternative to AFW                        11/85        05/88 129          Valve Interlocks to Prevent Vessel Drainage During Shutdown Cooling      05/86        06/88 131          Potential Seismic Interaction Involving the Movable In-Core              07/86        05/88 Flux Mapping System in Westinghouse Plants 132          RHR Pumps Inside Containment                                            07/86        05/88 137          Refueling Cavity Seal Failure                                            10/86        07/88 138          Deinerting Upon Discovery of RCS Leakage                                10/86        07/88 139          Thinning of Carbon Steel Piping in LVRs                                  12/86        05/88 140          Fission Product Removal by Containment sprays or Pools                  03/87        06/88 141          LBLOCA With Consequential SGTR                                          04/87        05/88 142          Leakage Through Electrical Isolators                                    06/87        08/88 143          Availability of Chilled Water Systems                                    10/87        02/89 144          Scram Without a Turbine / Generator Trip                                03/88        09/88 TOTAL:    36 T7-2                  As of 2nd Quarter FY-88 O                                                  O                                                  O
 
O                                                          C                                                      O TABLE 8 GENERIC ISSUES TO BE REPRIORITIZED AS OF SECOND QUARTER FY-88 Action Item /                                                                  Previous      Identification    Current Issue No.          Title                                                                          Date Priority                        Schedule 2                Failure of Protective Services on Essential Equipment                          05/83 24 MEDIUM                      10/88 Automatic Emergency Core Cooling System Switch to                NR            03/83        08/88 Recirculation
*81                Potential Safety Problems Associated with Locked Doors and                    12/86 DROP                        06/88 8arriers in Nuclear Power Plants A-19                Digital Computer Protection System                                LI            02/83 B-22                                                                                                              04/89 LWR Fuel                                                        LI            02/83 B-29                                                                                                              04/89 Effectiveness of Ultimate Heat Sinks                              LI            02/83        03/89 B-31                Dam Failure Model                                                R1            02/83        08/88 8-32                Ice Effects on Safety-Related Water Supplies                    LI            02/83
*C-9                                                                                                            12/88 RHR Peat Exchanger Tube Failures                                  DROP          07/84        06/88 C-14                Storm Surge Models for Coastal Sites                              RI            02/83        05/88 D-2                Emergency Core Cooling System Capability for future Plants        5 (A-45)      06/83        05/88 III.D.I.1(2)      Review Information on Provisions for Leak Detection              1            12/82        05/88 III.C.I.1(3)      Develop Proposed System Acceptance Criteria                      I            12/82        05/88 TOTAL: 13 Previous priority evaluation published in NUREG-0933 18-1                  As of 2nd Quarter FY-88
 
__._._.m__ ._.      . _ _ - . _ _ _ _ _ _ . . _____ ___ _ .                        ._        __ __          _ _ . - . . _ _ _ _ __    _  __ _ _ _ _ _ _ _  _      __ . . _ . . _
i j                                                                                            TABLE 9 l                                                                    REGULATORY IMPACT ISSUES SCHEDULED FOR RESOLUTION I
i Date              Resolution      Current
;              Issue                                                            Lead Office /                        Approved for              Date at end    Resolution I              Number                                          Title        Division / Branch          P.-iority    Resolution                of FY-87        Date i                                                                                                                                                                                            !
!                                                                                                                                                                                            i
)              119.1  Piping Rupture Requireents                                    NRR/ DEST /EMIB        RI        09/10/85                      05/88        05/88                      !
{                    and Decoupling of Seismic                                                                                                                                              '
i                    and LOCA Loads 1
l              119.2  Pipe Damping Valees                                          RES/DE/SEB              RI        09/10/85                      11/87        06/88 i
!              119.3  Decoupling OBE from SSE                                      RES/DE/SEB              RI        09/10/85                        TBD        TBD
* l 4
119.4  BWR Piping Materials                              ,
RES/DE/MEB              RI        09/10/85                      12/87        05/88 l'            119.5  Leak Detection Requirements                                                          RI        09/10/85 RES/DE/MEB                                                      01/88        06/88                      :
                                                                                                                                                                                            ;5 i                                                                                                                                                                                            >
1                                                                                                                                                                                              .
l              TOTAL: S I                                                                                                                                                                                          -
,                                                                                                                                                                                            t 1
I T9-1                                      As of.2nd Quarter FY-88' i
 
TABLE 10 LICENSING ISSUES SCHEDULED FOR RESOLUTION Lead Office /          Current Issue                                                                                                    Division /              Resolution Number                Title                                                                              Branch                  Date
'(I                              67.5.1                Reassessment of Radiological Consequences                                          RES/DRPS/RPSI          03/89
.i                                67.5.2                Reevaluation of SGTR Design Basis                                                  RES/DRPS/RPSI          03/89 i
;                                133                  Update Policy Statement on Nuclear Power Plant Staff                              NRR/DLPQ/LHFB          04/88                            ,
Working Hours i
!                                I.D.5(5)              Disturbance Analysis Systems                                                      RES/DRPS/RHFB          06/89 1
II.B.5(1)            Behavior of Severely Damaged fuel                                                  RES/DRAA/AEB            06/94                            .
1 II.B.5(2)            Behavior of Core-Melt                                                              RES/DRAA/PRA8          06/94 i
!                                II.B.5(3)            Effect of Hydrogen Burning and Explosions on                                      RES/DRAA/AEB            09/91 i
Containment Structure II.F.5                Classification of Instrumentation, Control, and                                    RES/DE                  TBD
.                                                      Electrical Equipment I                                                                                                                                                                                                    -
j                                TOTAL: 8                                                                                                                                                          l' I
I
  !                                                                                                                                                                                                ;i r
h I
i 1
  )                                                                                                                                                                                                :
i i                                                                                                      T10-1                As of 2nd Quarter FY-88 I
1
 
                '    ,L                                                                    ' 1I                                      i m
g                                                                                                                                .
s    ,
      ~      ,
      -          5
.                8
                  /
1 1
                  /
5 0
E                  _  1    5 4      0 3 5 7 9 2 5              8  2 5 6 8          0 3 6 9 2 4 T            E_
G                        1  1  1    1  1 2 2 2 3 3 3 3 4 4 4 4 5 5 5 7
A            A_
D            P_
N U
R
_                                          G
_                                          N                G I                N L                I
_                                        O                P O                I m                                    _
C                P
_                                  _                  S                      N                R
_                  M                      O                W                    N
_                  E                      I                B                    O
                                    .                  T                      T                                    I S                      C                N                    T    N Y                      E                I                    A  I
                                    .                  S                      V                                    T    A M      .        S                                N                G                    N R E      .        T        R                      O                M          S      E  T T      _        N        E                      C                I            R      M S      _        A        T                                        K            W Y      _        L        A                      L U G S                P                                                C            L      R N W                  A A S                A                    T  O L
_        R        E Q R L                R            R      S R U O              C            O      NW O      .        E        C                    - T  O                        F      I R      _        W O
I                      A P              N                        R T      _
V                  MN                  O N          N      L O S N        _        P        R                  E      L            I    O      O      E E  O      _                  E                  L  G  E            S    I      I      V T U C        _        R        S                  A N U                O T          T      E  I    N S          _        A                            S  I  F            R A          C S  T  E_            E        E L N O R                R    L      E S        U    I I  N      _        L        L                  T  U  T            O O          T
              -              E  L_            C        C                                                        R R          T s          F M                  U        Y A D N                C S          OW      E G A
      -                  O                    N E                I      R P    T  N    T E  T _                    C                  S S P                S            F      A O      I G      _ S                                    T  S S              S X A    I _      E N            N      S S        N  E T          N W R P E N        . R    I        E      I    I  Y  E  R N E U R O E O        W    I D A    T _ U                  P                                                    R      R        C S S S    T  V T    I            T    H      U S W G              R NM          _  L E            O      A A    I  E S                  S    T E
.-                      I          . I    R                B B L              S                I S K B M IR WP S C                  L    -
E      _ A U              F  S U      _  F    L        O  T I
N N B W AI N S L    T            HW          E  O N V S                                                                  T            R  L  I  L M      T
_        I    S      N GI G A            M  E            I    E S P R S
I
_ A L A M Y F    [  T E
M S S L I  I  A R D Y E  I  T W NI P MR EE ET V M O U I A
_  E          T  I E E E E F H C R N          A C      _ S RO SY L RI D I D R                O  T  C L I        G N
L U V N OI          I    X C I      _                                                                    P O          L        A O R          P                                          A  I        I    M              I  S  M    L S B U R R          E S    L      B        L A WF        . E A    T E      _ M N              A O    T    T  V N E S A                A E          P NI F N E S N      _ U O R            I  E G G L        O S E E      _    P    I    I  L  R S S A        I  S S T        E    T  A M              E L M G      .              A I        D S          E  L E V B E T        E              V  T  E A B                    F    T      L  E A      T T    A        R R    F    F      A V B A              N I    O    - N G          B S
                                    . N D F                O O O K C                  H        A C          W OI N IN O Y
                                    . A A O E              T          C  I  X  N            L P G O                  I    R S
                                    . L    R        H A    T N OL L PR G M I            P H N IL T S                  P
                                    ._ OO EG TY            R N O                      O T
C      R        G E E      I  B MI D S O              E F D L U S O R N
_  C D        I  G N M T                E E R            G O N I A SN U R O                I
_              L N    E S A D            Z D        S N
__                                . R G        I  I  G S U N C Y                                              L R F C
                                    . O N B V                  E L A      I L
L D O R R R V  A    E  B O  R  I P E H
A T    I    A O M S A              R A N R O                                          N F C T        I  R  A S V V E N O                  P G L A U M  T  R K  N  G  R
_                                  . A    L L P E A E R N A Y N T
N I I  / A A        I    E
                                    . E O E M            T E E O E N E O E O A                        E  D S E M S              T
                                    . R B R T    D C R U E N
.                                                      I S R R P G U B C C L F S A R B H D                                      I
_.                            R_
E B __
M ._
U.
N..
m E.
U.
1 2
S_                              5 5 S.
I        3 9 3          1  6  7    7  0 5 9 2 3 4              6 7 3 4 1  2 3 5 9 0 0 0 0
_    2 2 4          5 6 6 6        7  7  7  3  8  3    8    8  9 9 9        1  1    1    1
 
O 8
8
/
1 1
/
5 G
E              _  9  1  4 6 O 2        3 5      7  9    1  3 5      8  0 2 4        7    0 3 5          8  1 T        E_      5 6 6 6        T  7  7  7    7  7    8  8  8    8  9 9 9 9 0 0 0 0                        1 A        G_
A                                                                                      1  1      1    1  1 D        P_
N U
C
_                                                  K
_                                                  A
_                                                  E
_                                                  R
_                                                  B                                                        -
_                                                  E                                                      .
_                                                  N                                                      ~
_                                                  I
_  S                                              L
_    A                                                          S
_  E                                              N            R
_  R                                              I            U
_  A                                                      S O                                                _
S M                                      G      E H
_    L R    E                                    S      T        S M      _    A  E  T                                            I    G R E      _  T    B S                                      M      S N O T        _  I    B  Y                                    O            I    T S      _ V U S                                            R      T    K A Y      _        N                                        F      N    R    R S      _ N S                                                      A O      E
_  I        T                      S            R      L    W    P L      _        C O                        T            E      P        O O      _  S    I  R                      N            T      I    F        S R      _  E    L  P                      E            A      T    F    R  E            E S N T      _  S U A
M            W      L A O U                    G
_        A  E                      N            D      U    T    I  S        S A E  O      _ G      R  T                      I            E      M S N S                T  T U C        _        D A                        A            E                E  I        N O S          _  E    Y  T                      T            F      T    T    S            A B                S S  T      _    L  H S                        N                    A N          L        L  A              T I  N  E_      B                                O        Y E              A R      L        P S                N O
E      _  I    E D                        C        T  T      S    L    O  I                            E F  M  L_      T    R  I                                I  A      E    P    F  F        R O                M O  E  T . S O      L                      R        L  L      R            R        E  T              E G      _  *t  B C                        W        I  O      U R        .
E        W                  R X  A  I _    B        S                      P        B S        L    A O V              O  Y              I E  N      _ M      E                                    A  I      I    E    E  O        P  T              U D A NM T _    O G W                            Y        I          A    L    R                I              Q
_ C R                                R        L  Y      F    C        E  Y    R  L              E I          _        A  4                      D        F  L            U E      N  T    A  I              R E      _  Y i 0                                      R  L  Y P      N C      I  I    E  B U      _  L                            S                A  T  M        N L R        L  A              L S      _  H    F  Y                  T  E        MC      I  U N      E      G C R                    A S      _ G O        T  S              N G D        E  I  L  P O      I  M  E    U  E V
I      _  I        I  T              E  R  E    T  T  I            R A    T    N N                O
_  H G      L N        E      M A    E S A B R              T    E  E  N        L    A        M C                N  I  E      S      E  L  L    Y  M A    E    N    P  T  I    N U      I        E I      _. F    I  B M        S      R      B S O        I  T    r. X  S        I  V R            R d      _  O    T  A  E          S  I  R    -      T  L A M        E      E              E t    _        S  I  R S M      L  U O D R U            E  W    E        D B S        T    T        T N      _  E    E  L  I  E  O A Q F        N    E  A  R        T    D N U N N              I        A E      _  S    T  E  U U R      I  E      A    T          E A N A          T    O A      R        E G      _ U          R Q    L  F  R  R  L    -  A O R C          T    A            I  L    C    T  H
_                E  A      E      O D W        T  E  I    S        R  R    T  P          U
_  E    F  F R    V  E  T  N R    E    D      WV            E O O C                N O Y
_  H    I  O          B A O      T  E    E      O R      Y    E  T  T    A R G K A
_  T    L      E G O M        I  N  F    E  V P    E    C    R  A A R        E    I    C C
_        A  T  R  N          T  O        F  O      S    I    G  R  R    E  W S A          E
_  D U N U          I  G G C C G                R  L        L    E  E  E    T  O    E L D
_  N Q      E  T  P  N N E          N  Y  P A L  O D  N  N N P D B
_  A        M P M      I  I  T  N I      R      C A P            E  E    I                  N
_        C ( U A        L P E E T            A      I  I        N G G            R CI N W
_  G    I  C R D P        I  D G A        I  L R    T    E O                M A            O O
_  N M N                U P        O  I    L A    T  N    T        MM        E E      M    I  D
_  I    A A E E O              K  R  T    I  V C    E    A E A A            T  L S        T  T
_  P N H P P C R A D                    I    X  E  E  S D      L  E E S C            I    A U
_  I    Y  N I    I  E  W  E  Y  N U      E  L S P        U  T  T    Y U E          T  H
_  P D E P P D B L H                    I    A R    E E U        R  S S S N S S S R_
E                                                                                5 B_
M_                                                                              D U_                                                                              N N _.
7                        A O
E _                                                    I                        4 U_                  1  2 3 4 5            2        I S_                                                                                    7  9 0 4 5 S_      6    3  5 9 9 9 9          9  1  2    4  S  8  0    3    4  5 3      1  2 4          4  4 I _    0    1  1  1  1  1  1  1  2 2 2 2 2 3                3    3  3    - -      -    - -      -
1    1
_  1    1  1  1  1  1  1  1  1            1  1  1    1    1  1  A A A A A A
 
    - - _ - - . ~ - _ ,                    --      _ - . . -  .~                ._ ..- . . - - . . -                  - _  . .        - ....  . --    . . .        ~  .  = ~ . -
g*'                                                                            '.;
                                                                                                                                                                #                                    i
  !                                                                                                                                                                                                A 4
RUN DATE: 05/11/88 s
INDFM OF ISSUES GENERIC ISSUE MANAGEMENT CONTROL SYSTEM 1
l                            ISSUE NUMRER                                                                      T I TLE
                          ..--...--------                                                                                                                      .PAGE A-47                  SAFETY IMPLICATION OF CONTROL SYSTEMS                                                                                    '
'                                                                                                                                                                    114                            .
J                          t.-48                HYDROGEN CONTROL MEASURES AND EFFECTS OF HYDROGEN BURNS                                                            117 B-5                  BUCKLING BEHAVIOR OF 07tFt' CONTAINMENTS                                                                                              w 120                    _
B-17                  CRITERIA FOR SAFETY-RELATED OPERATOR ACTIONS                                                                      123 6-55                  IMPROVE RELIABILITY OF TARGET, ROCK SAFETY-RELIEF VALVES                                            '                                      "'
125 B-56                  DIESFL GENERr.!ssR RELIABILITY                                                                                    128
[,                        8-61                  ALLOWABLE ECCS EQUIPMENT OUTAGE PERIODS                                                                            131 8-6(                  DECOMMISSIONING'0F REACTORS                                                                                        134 1
C-8                  MAIN STEAM LINE LEAKAGE CONTROL                                                                                    136 HF 1.1                SHIFT STAFFING                                                                                '
141 HF 4.1 INSPECTION PROCEDURE FOR UPGRADED EMERGENCY OPERATING PROCEDURES (EOPS '                                          143 HF 4.4              GUIDELINES FOR UPGRADING OTHER PROCFDURES
                                                                                                                                      ~
145 HF 5.1                LOCAL CONTROL STATIONS                                                                                              147 l                        HF 5.2                REV. CRIT. FOR HUMAN FACTORS ASPECTS OF ADV CONTROLS AND INSTRUMENT.                                                149 HF S                  MAINTENANCE AND SURVEILLANCE PROGRAM i                                                                                                                                                                  152              %
;                        I.A.4.214)            REVIEW SIMULATORS FOR CONFORMANCE TO CRITERIA                                                                      154
)                        I.D.3                SAFETY SYSTEM STATUS MO ITORING                                                                                    156~
L                        I.D.4                CONTROL ROOM DESIGN STANDARD                                                                                      159 I.D.5(3)              ON-LINE REACTOR SURVEILLANCE SYSTEMS                                                                              160
{
I D.5(5)              DISTURBANCE ANALYSIS SYSTEMS                                                                                    - 162 I.F.1                EXPAND OA LIST                                                                                                    163 11.8.5(1)            BEHAVIOR OF SEVERELY DAMAGED FUEL                                                                                  165                    -
?
II.B.5(2)            BEHAVIOR OF CORE-MELT                                                                                      ~ 167 9
                                                                                                                                                                                                  -i l
8 i                                            .
m  = - _ _ _ _ _ +    _m___--~_____-__mv---r--            v        v- 1                                e e-
 
i RUN DATE: 05/11/88 INDEX OF ISSUES GENERIC ISSUE *iANAGEMENT CONTROL SYSTEM ISSUE NUMBER                                                              T I T LE                PAGE II.B.5(3)        EFFECT OF HYDR 6 GEN COMBUSTION ON CONTAINMENT SIRUCTURES                              168 II.C.4            RELIABILITY ENGINEERING                                                                171 II E.4.3          CONTAINMENT DESIGN-INTEGRIYY CHECK                                                    173 II.E.6.1          IN-SITU TESTING OF VALVES                                                              175 II.F.5            CLASSIFICATION OF INSTRUMENTATION CONTROL AND ELECTRICAL EQUIPMENT                    181 II.H.2            9BTAIN DATA ON CONDITIONS INSIDE TMI-2 CONTAINMENT                                    183 II J.4.1          REVISE DEFICIENCY REPORTING REQUIREMENTS                                              185 4
9
                                                                                              * ~
N V
m k
O O                                  O
 
                                                                                                                                                                    ~
                                                                                                                                                                          %                                                              7%
;                r                                                                                                                                                          \
                                                                                                                                                                                                                                            )        .~
j
                                                                                                                                                                                                                                      ' \j RUN DATE: b5/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                      PAGE:      1 i          ISSUE NUMBER: 23                                                                                    TITLE. REACTOR CO3LANT PUMP SEAL FAILURES IDENTIFICATION DATE: 12/80C                                                                        PRIORITIZATION DATE- 04/83C                                                      TYPE: GSI                  PRIORITY: H TASK MANAGER: J. JACKSON                                                                            OFFICE / DIVISION / BRANCH- RES /DE /EIB                                        nCr!DN LEVEL: ACTIVE        STATUS:
TAC NUMBERS:                                                                                                                                                                                                    RESOLUTION DATE: 04/90 WORK AUTHORIZATION: NRR FY-84 OPERATING PLAN. (APPENDIX G) i                      FIN                                                  CONTRACTOR                                                                                    CONTRACT TITLE
                                                                                                                                                                                                                                              \
* A3751                                                  BNL                              REACTOR COOLANT PUMP (RCP) SEAL INTEGRITY A3771                                                  BNL                              ASSESS EFFECT OF MECH. MAINT, RCP SEAL A3806                                                  NONE                            EVAL. ADEQ. OF RCP SEAL INSTR. & RESP. TO RCP A6322                                                  NONE                            RCP SHAFT SEAL BEHAVIOR DURING ST. BLACKOUT B2953                                                              JL                  REACTOR COOL. PUMP SEAL FAIL. VAL. IMP. ANALYSIS B3049                                                  ..JNE                            LEAK RATE ANALYSIS OF WESTINGHOUSE RCP D1760                                                  SCIENTECH                        REG. ANAL. FOR GI-23. RCP SEAL FAILURES W0RK                  SCOPE THE TAP FOR THIS ISSUE HAS BEEN REVISED TO INCOR-                                                                                                          SHOULD TAKE. IF ANY. TO REDUCE RCP SEAL FAILURE TO AN PORATE WORK NECESSARY TO COMPLETE GSI 65. REVIEW                                                                                                                    ACCEPTABLE LEVEL COMMENSURATE WITH THE POTENTIAL SAFETY PWR RCP SEAL FAILURES CAUSED BY MECHANICAL FAILURES                                                                                                                CONSEQUENCES OF SEAL FAILURE. THE PROGRAM CONSISTS OF AND LOSS OF SEAL COOLING TO ASCERTAIN IF INCREASED NRC                                                                                                              THE FOLLOWING MAJOR TASKS:
REQUIREMENTS ARE NECESSARY TO MINIMIZE SEAL FAILURES.                                                                                                                TASK 1 - DETERMINE ACTUAL SEAL FAILURE MECHANISMS.
EVALUATE THE EFFECTS OF SYSTEN DESIGN. MATERIALS.                                                                                                                    TASK 2 - EVALUATE RCP SEAL COOLING FOR ALL MODES OF OPERA-OPERATION. TESTING. AND MAINTENANCE ON SEAL FAILURE                                                                                                                            TION FOR WHICH SEAL COOLING IS REO'D USING THF MECHANISMS.          REVIEW THE REtIAB. OF SEAL COOLING SYSTEMS                                                                                                                RELIABILITY OF T' ICAL RCP SEAL COOLING SYSTEM AND IDENTIFY METHODS TO MINIMIZE THE EFFECTS OF LOSS OF                                                                                                                        DESIGNS.
SEAL COOLING.            PERFORM A RISK ASSESSMENT OF SEAL FAILURE                                                                                                  TASK 3 - REVIEW MECHANICAL AND MAINTENANCE-INDUCED FROM MAINTENANCE AND MECHANICAL EFFECTS.                                                                                                                                        FAILURE MECHANISMS.
THIS PROGRAM WILL DETERMINE WHAT STEPS THE NRC a
STATUS WORK IS CURRENTLY IN PROGRESS ON TASKS 1.2 & 3.                                                                                                            OF LOSS OF SEAL COOLING. ' INPUT IS BEING PROVIDED THROUGH
,          RSB PROVIDED INPUT TO TASK 1 (ASSEMBLE BACKGROUND                                                                                                                  CONTRACTS WITH AECL AND ETEC.      THE AECL WORK IS COMPLFTE AND INFORMATION ON SEAL FAILURES) WHICH INCL: AN LER                                                                                                                    NUREG/CR-4077. "REACTOR COOLANT PUMP SHAFT SEAL BEHAVIOR 4          SEARCH. A REVIEW OF INDUSTRY EXPERENCE, AND A BWR                                                                                                                  DURING STATION BLACKOUT" HAS BEEN ISSUED.        THE ETEC WORK HA3 3
SCREENING REVIEW.                                      BNL HAS COMPLETED ADDITIONAL WORK ON                                                                        BEEN COMPLETED AND NUREG/CR-4294 "LEAK RATE ANALYSIS OF THE 1          THIS TASK UNDER FIN A-3771 PUBLISHED AS NUREG/CR-4400.                                                                                                              WESTING. REACTOR COOLANT PUMP" HAS BEEN ISSUED. ADDITIONAL EIB IS WORKING ON TASK 2.1 EVALUATING THE EFFECTS                                                                                                          CONCERNS REGARDING SEALS DISCOVERED THROUGH RESEARCH AT AtCL AS OF FY88 OUARTER 2 e
?
4
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                              PAGE:    2 ISSUE NUMBER: 23                                                                            TITLE- REACTOR COOLANT PUMP SEAL FAILURES S T A TUS WAS INVESTIGATED THROUGH A FOLLOW -ON CONTRACT AT AECL                                                                            PUMP SEAL RELATED INSTRUM AND OPERATOR RESPONSE." HAS THIS WORK WAS PUBLISHED IN NUREG/CR-4821 "REACTOR COOLANT                                                                          6EEN ISSUED            IN ADDITIbN. BNL IS WORKING ON A DRAFT PUMP SHAFT SEAL STABILITY DURING STATION BLACKOUT."                                                                                TECHNICAL FINDINGS DOCUMENT WHICH WILL INCORPORATE THE EIB. UNDER CONTRACT FIN A-3751 WITH BNL, IS                                                                          RESULTS OF ALL THE VARIOUS STUDIES AND OTHER PERTINENT WORhlNG ON TASK 2.2 EVALUATING THE RELIABILITY OF                                                                                  RESULTS TO BE PUBLISHED IN A SINGLE NUREG DOCUMENT.
COOLING WATER SYSTEMS.                                      THE BNL WORA ON SUBTAS' 2 2 HAL                                              EIB. UNDER CONT:;AC T F IN B-2953 IS WORKING ON A BEEN COMPLETED AND NUREG/CR-4643. "LVALUATION UF CORE                                                                              VALUE-IMPACT ANALYSIS 9F PROPOSED RESOLUTIONS TO GSI-23 DAMAGE SEQUENCES INITIATED BY L0bs OF REACTOR COOLANT                                                                              WHICH THE STAFF DRAFTED IN 06/86 WITH THE AID OF THE RCP PUMP SEAL COOLING" HAS BEEN ISSUED.                                                                                                SEAL SUPPORT CONTRACTORS.                  AFTLR RECEIVING AND REVIEWING EIB. L'NDER COMINACT FIN A- 3771 WITH BNL. HAS                                                                        A DRAFT OF THE FINAL REPORT FROM THIS STUDY. THE STAFF COMPLETED TASK 3.1 EVALUATING THE EFFECT OF MECHANICAL                                                                            HAS DETERMINED ADDITIONAL WORK WILL BE REQUIRED.
AND MAINTENANCE-INDUCED RCP SEAL FAILURES ON RISK.                                                                                  ISCIENTECH WAS CONTRACTED TO COMPLETE THIS TASK UNDER NUREG/CR-4400 "THE IMPACT OF MECHANICAL AND                                                                                        FIN NO        D1760 BY 05/88).
MAINTENANCE-INDUCED FAILURES OF MAIN REACTOR COOLANT                                                                                      THE STAFF HAS RECEIVED THE WESTINGHOUSE REPORT PUMD SEALS ON PLANT SAFETY" HAS PEEN ISSUED.                                                                                      WITH THE RESULTS OF THE FRENCH RCP SEAL TEST AND THE EIB. UNDER CONTRACT FIN A-3806 WITH BNL HAS                                                                          FESPONSE TO THE STAFF CONCERNS REGARDING WCAP-10541 ON COMPLETED TASK 2.3 AND 3.2 EVALUATING- THE ADEQUACY OF                                                                            ISP SEAL PERFORMANCE DURING STATION BLACKOUT.
CURRENT RCP SEAL AND SEAL COOLING SYSTEM INSTRUMENTATION                                                                          ADDITIONAL CONCERNS REGARDING ALL TYPES OF RCP SEALS TO DETECT RCP SEAL DEGRADATION AND FAILURES. THE                                                                                  WERE RAISED AS A RESULT OF THE AECL TEST PROGRAM. THE ADECUACY OF CURRENT AUTOMATIC ACTIONS AND MANUAL                                                                                  TEST PROGRAM AT AECL IS BEING EXTENDED TO FURTHER OPERATOR RESPONSES TO PREYENT RCP SEAL LOCAS OR OTHER                                                                              INVESTIGATE THESE CCNCERNS.                    THE REVISED MILESTONES UNACCEPTABLE EVENTS AND TO PROPOSE POSSIBLE                                                                                        INCORPORATE THE RESULTS OF THE FRENCH TEST. WESTINGHOUSE INSTRUMENTATION CHANGES. AUTOMATIC ACTIONS OR MANt'AL                                                                              REPORT. AND THE AECL WORK TO THE EXTENT POSSIBLE AT THIS OPERATOR RESPONSES WHICH COULD IMPROVE THE CURRENT RCP                                                                            TIME.
SEAL SAFETY PROCEDURES.                                        NUREG/CK-4544 "REACTOR COOLANT AFFECTED DOCUMENTS                                                                                              PROBLEM / RESOLUTION ISSUE NUREG-                                                                                                                                            *** NONE ***
REVIEW AND ISSUE SRP SECTION 9.2.2 (TBD)
REVISE AND ISSUE SRP SECTION 9.3.4 (TBD)
ISSUE NEW REGULATORY GUIDE AND SRP SECTION (TBDI 041GINAL                    CURRENT                    ACTUAL MI LESTONES                                                            DATE                      DATE                      DATE T P kbSbEbFbRbbMMENT                                                                                b4hh3                          -
bh/h3 AS OF FY88 QUARTER 2 O                                                                                                                  O                                                                              O
 
c q                                                                      (J~3                                        -
(J RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                        PAGE:        3 ISSUE NUMBER: 23                                TITLE: REACTOR COOLANT FUMP SFAL FAILURES ORIGINAL        CURRENT              ACTUAL MILEST0NES                                              DATE          DATE                  DATE TAP APPROVED BY DSI DIR                                                    10/83              --
10/83 ISSUED REQUEST FOR PROPOSAL TO BNL FOR                                    11/83              --
11/83 COMPONENT COOLING WATER PRA TRANSFER RESOLUTION REPONSIBILITY FROM DSI ?9                              06/84              --
06/84 DE TRANSFER RESOLUTION RESPONSIBILTY FROM DE TO                              05/85              --
05/85 DST /GIB COMPLETE DOCUMEN. OF BACKGROUND PAST                                      05/85              --
10/84
[                SEAL FAILURES. INCLUDING LER SEARCH.REV t                OF INDUST. EXP.& REV.0F BWR SCR.l TASK 1)
EVAL. RCP SEAL COOLING. INCL. DETERM. EFFECT                                12/84              --
05/86 OF LOSS COOLING, EVAL RELIAB. OF COOLING SYS.
AND REV. RCP SEAL COOLING INSTR. (TASK 21 EVALUATE MECHANICAL AND MAINTENANCE-INDUCED                                01/85              --
09/86 j                FAILURE MECHANISMS (TASK 3l COMPLETE FEASABILITY STUDY TO IDENTIFr                                    03/85        05/88                      --
MOST EFFECTIVE FIX. SCIENTECH REG, ANAL FOR GI-23 (TASK 4)
DTR PACKAGE COMPLETE                                                      07/85        4%i15                      --
DIVISION DEPUTY DIRECTOR REVIEW COMPLETED                                  ^G/f;        48/88                      --
CONCURRENCE BY OTHER OFFICES                                              09/85        10/88                      --
DTR SENT TO CRGR F?O!                                                      10/85        10/88                      --
ACPS 70/L44 GA GTR COMPLETE                                                11/85        11/88                      --
cMr.7 KiviLW OF DTR COMPLETE                                                11/85        12/88                      --
FRN OF ISSUANCE OF PROPOSED RESOLUTION                                    12/85        03/89                      --
FOR PUBLIC COMMENT AS OF FY88 QUARTER 2
 
a RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                PAGE.          4 ISSUE NUMBER: 23                                            TITLE: REACTOR COOLANT PUMP SEAL FAILURES ORIGINAL        CURRENT        ACTUAL M ILESTON ES                                              DATE        DATE            DATE CCMDLETE DE REVIEW OF PUBLIC COMMENT 5 AND                                          04/86        08/89                --
PREPARE FTR PACKAGE DIVISION DEPUTY DIRECT 9R REVIEW OF FTR                                              05/86        09/89                --
COMPLETED CONCURRENCE BY OTHER OFFICES                                                          11/89        11/89                --
CRGR REVIEW OF FTR COMPLETED (53)                                                    06/86        01/90                --
FRN OF ISSUANCE OF FTR                                                              07/86        04/90                --
i.
i 1
f 4
AS OF FY88 OUARTER 2 O                    - - - - _ _
O                                                        O
 
_)                                                                b                                            -              U            i l
l RUN DATE: 05/11/88              j GENERIC ISSUE MANAGEMENT C04 TROL SYS TEM                            PAGE:. 5 ISSUE NUMBER:. 29                          TITLE: BOLTING DEGRADATION OR FAILURE IN NUCLEAR POWER PLANTS IDENTIFICATION DATE: 10/81C                  PRIORITIZATION DATE: 08/82C                          TYPE: GSI                PRIORITY: H TASK MANAGER: R. JOHNSON                      OF F ICE /DIVISI0'N/ BRANCH : RES /DE /EIB          ACTION LEVEL: ACTIVE      STATUS-TAC NUMBERS:
RESOLUTION DATE 03/90 WORK AUTHORIZATION: NRR FY-84 OPERATING PLAN (APPENDIX Gl FIN          CONTRACTOR                                              CONTRACT TITLE A3359          BNL                    BOLTING APPLICATIONS REQUIREMENTS l              A3782          BNL                    BOLTING APPLICATIONS REOUIREMENTS B2593          PNL                    BOLTING DEGRADATION VALUE IMPACT ANALYSIS W0RK        SC0PE THIS ISSUE INCLUDES ALL SAFETY RELATEC BOLTING. WITH THE                                "DEGRADATION OF THREADED FASTENERS IN THE REACTOR EMPHASIS ON REACTOR COOLANT PRESSURE BOUNDARY BOLTING                                  COOLANT PRESSURE BOUNDARY OF PWR PLANTS.-
DEGRADATION OR FAILURE.            TASKS INCLUDE:                                3. DRAFT STAFF RECOMMENDATION FOR PROPOSED CRITERIA /
: 1. DEVELOPMENT OF THE TECHNICAL BASES FOR BOLTING                                      GUIDELINES TO BE INCGRPORATED INTO THE SRP.
APPLICATION REQUIREMENTS.                                                    4. DEVELOP A PROPOSED IMPLEMENTATION PLAN FOR
: 2. REVIEW LICENSEE RESPONSES TO IEB 82-02                                            MANAGEMENT CONSIDERATION.
STA T US EPWI Pe0VIDED A COPY OF THE REVISED DRAFT FINAL REPORT.                      INITIATIVES WERE ONGOING. NRR MANAGEMENT HAD DECIDED TO "DEGRADATION AnG TAILURE OF BOLTING IN NUCLEAR POWER                              LIMIT THE SCOPE OF THIS ISSUE TO ONLY PRIMARY PRESSURE PLANTS." AFTER REVIEW. IT 9AS DECIDED THAT THE REPORT IN                          BOUNDARY BOLTING.      CAREFUL RE-REVIEW OF THE ORIGINAL 1985 CONJUNCTION WITH OTHER RESULTS of IM988%TR Y INITIATIVES (SEE                    REGULATORY ANALYSIS. IN CONJUNCTION WITH PREPARING THE DRAFT PP 29-1 THROUGH 29-3) PROVIDES THE-TECHNICAL CASTS FOR THE                        CRGR PACKAGE. REVEALED THAT. CONSISTENT WITH THE NRR INTENT.
RESOLUTION OF THIS GI UTILIZING THE RECENTLY COMPLET.Lu                          ONLY PRIMARY PRESSURE BOUNDARY BOLTING HAD BEEN ADRESSED BY INDUSTRY DEVELOPED TECHNICAL BASIS DOCUMENTS AND A DRAFT                          FML FnR NRR. IN ORDER TO EXPAND THE SCOPE OF SAFETY RELATED REGULATORY ANALYSIS. PREPARED BY PACIFIC NORTHWEST                                BOLTING TO CE ADDRESSED BY THE GI 29 RESOLUTION TO MAKE LABORATORY FOR THE PREVIOUS TASK MANAGER IN 1985. ASSEMBLING                      MAXIMUM USE OF THE INDUSTRY DEVELOPED TECHNICAL BASES OF A DRAFT CRGR PACKAGE WAS BEGUN.            BECAUSE THE FINAL                  DOCUMENTS. THE ORIGINAL REGULATORY ANALYSIS MUST BE REVISED INDUSTRY INITIATIVES HAVE ADDRESSED ALL SAFETY RELATED                            EIB HAS REQUESTED ASSISTANCE FROM PRAB. RES FOR THIS EFFORT.
BOLTING. THE RESOLUTION OF GI 29 WILL ADDRETS AS LARGE A                          EIB HAS CONCLUDED THAT THIS IS THE MOST EXPEDITIOUS WAY TO SCOPE OF SAFETY RELATED BOLTING AS CAN BE JUSTIr IED ON THE                      EFFECT THE NEEDED REVISIONS. PRAB IS UNDERTAKING THE BASIS OF THE REGULATORY ANALYSIS. THIS WILL ENABLE GI 6; .                        REQUIRED REVISIUNS ON A HIGH PRIORITY BASIS: HOWEVER. BASED REACTOR SYSTEMS BOLTING APPLICATION" TO BE SUBSUMED INT' GI                    ON THE PRAB ESTIMATE FOR COMPLETION OF THIS EFFORT. A
: 29.                                                                              SCHEDULE SLIP OF 5 MONTHS WAS PROJECTED TO OCCUR AND IN THE 1984-1985 TIME FRAME WHEN THE BROAD:R INDUSTRY                      MILESTONES WERE REVISED ACCORDINGLY IN THE PREVIOUS UPDATE.
AS OF-FY88 OUARTER 2
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                      PAGE:    6 YSSUE NUMBER: 29                                                    TITLE: BOLTING DEGRADATION OR FAILURE IN NUCLEAR POWER PLANTS AFFECTED DOCUMENTS                                                                                PROBLEM / RESOLUTION SRP REVISION.                                                                                      NONE ORIGINAL                                  CURRENT          ACTUAL M I LEST 0NE S                                        DATE                                    DATE              DATE khhbkbbhTRkbhTbbhL                                                      bh/8h                                        -
bh/hh RECLIVE DRAFT I4UREG/CR REPORT                                          07/83                                        --
07/83 FROM CONTRACTOR STAFF REVIEW OF DRAFT NUREG/CR                                          07/83                                        --
03/84 REPORT DRAFT STAFF POSITION (REVISED                                            07/84                                        --
08/84 SRP SECTION)
PREPARE draft VALUE/ IMPACT                                              08/83                                        --
05/85 STATEMENT EVALUATE PROPOSED RESOLUTION                                            03/89                                        --
09/87 0F USI A-45 AND EPRI/AIF
 
==SUMMARY==
 
PAPER PREPARE DTR CRGR PACKAGE FOR REVIEW                                      09/83                                          --
11/87 BY OTHER OFFICES DIVISION DEPUTY DIRECTOR REVIEW COMPLETED                                12/83                                  05/88                --
REVISE REGULATORY ANALYSIS                                              04/88                                  04/88                --
REVIEW PACKAGE TO CRGR (29)                                              01/84                                    07/88              --
ACRS REVIEW COMPLETED                                                    04/88                                    04/88              --
CRGR REVIEW COMPLETED                                                    01/84                                    09/88              --
EDO APPROVAL                                                            03/84                                    10/88              --
FRN OF ISSUANCE OF PROPOSED RESOLUTION                                  03/84                                    12/88                --
FOR PUBLIC COMMENT AS OF FY88 OUaG'ER 2 O                                                                                  O                                                                                        O
 
l...                                                                                                                                                                                                              <                                          '
i t
!                                                                                                                                                                                                            RUN DATEi 05/11/84_                          !
!                                                                                                                                                                                                                                                          I i                                                                                                                GENERIC ISSUE MANAGFMENT CONTROL SYSTEM                                                          PAGE:          7                        .
i l                                                      ISSUE NUMBER- 49                                TITLE: BOLTING DEGRADATION OR FAILURE IN NUCLEAR POWER PLANTS'                                                                                      I i
ORIGINAL                                    CURRENT            ACTUAL                              l MILEST0NES                                                      DATE                                      DATE                DATE                            ~!
COMPLETE DE REVIEW OF PUBLIC COMMENTS AND                                          12/88                                    05/89                      --
PREPARE FTR PACKAGE DIVISION DEPUTY DIRECTOR REVIEW OF FTR                                            01/89                                    06/89                      --                          '
COMPLETED                                                                                                                                                                            ,
CONCURRENCE BY OTHER OFFICES & FTR PACKAGE                                        12/88                                    08/89                      __
TO CRGR (53) r CRGR REVIEW OF FTR COMPLETED                                                      05/89                                      10/89                      -.
EDO APPROVAL OF FTR                                                              06/89                                      11/89                      --
FRN OF ISSUANCE OF FTR                                                            03/89                                    03/90                      --
f t
                                                                                                                                                                                                                                  ,                        i I
i
                                                                                                                                                                                                                                                          .I AS OF FY88 OUARTER 2' i
i 3
I
  - - - - _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -                        ___                                  - _ ~. :- - . _ - - - _ . _ - - _ _ _ _ - -  - _ _ _ - - - _ _ _ . _ _ _                __          --                    - ____
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                            PAGE-          3 ISSUE NUMBER-                        43                                              TITLE: RELIABILITY OF AIR SYSTEMS IDENTIFICATION DATE: 09/82C                                                          PRIORITIZATION DATE 12/87C                                                                    TYPE. GSI                                PRIORITY: H TASK MANAGER: G. BURDICK                                                              OFFICE / DIVISION / BRANCH RES /DRPS/RPSI                                                    ACTION LEVEL: ACTIVE                    STATUS; TAC NUMBERS:                                                                                                                                                                                                                RESOLUTION DATE 04/89 WORK AUTHORIZATION. NRR FY-84 OPERATING PLAN ( APPENDIX G)
FIN                              CONTRACTOR                                                                                            CONTRACT TITLE A396F                                BNL                              AIR SYSTEMS RELIABILITY W 0R K                  SC0PE ASSESS THE RISK SIGNIFICANCE Of AIR SYSTEMS PROBLEMS.                                                                                        PROBLEMS AND DEVELOP A REGULATORY GUIDE FOR IMPLEMENTATION DEVISE A COST-EFFECTIVE APROACH FOR ALLEVIATING THOSE                                                                                                      OF THE APPROACH
                                                                                                                                        $TA T US PRELIMINARY RESOLUTION APPROACH PRESENTED                                                                  BALLY TO                          PLANTS SHOW VERY LITTLE CONTRIBUTION TO RISK FROM AIR SYSTEM NRR.            PROG. ASSUMPTION TO CONTRACTOR 12/22/87                                                            1ASK                                  FAULTS.              THE TECH ASSISTANCE PROGRAM IS CN SCHEDULE WITH MAAAGER/ CONTRACTOR MEETING HELD 12/29/87. DRAFT 187                                                                                                      COMPLETION OF THE RISK ESTIMATE TASK BY 4/30/88. DECISION REVIEWED 1/6/87.                                                                                                                                          ON PUBLIC MEETING WITH INDUSTRY PENDING OUTCOME OF RISK AN APPROACH TO RESOLUTION WAS AGAIN DISCUSSED WITH                                                                                            CONTRIBUTION ESTIMATE.
AEOD AND NRR ON 2/24/88. RESULTS FROM NUREG-1150 REFERENCE AFFECTED DOCUMENTS                                                                                                                        PROBLEM / RESOLUTION NRC INFORMATION NOTICE NO. 87-28                                                SUPPLEMENT J.                                                                                      *** N ONE ***
ORIGINAL                      CURRENT                  ACTUAL MI LEST ONF S                                                                                          DATE                        DATE                      DATE INITIAL RESOLUTION APPROACH DEFINED                                                                                                --                          --
12/87 AS OF FY88 OUARTER 2 O                                                                                                                                      O                                                                                          O
 
f
(                                                      -                                  J RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                      PAGE:                9 ISSUE NUMBER: 43                                        TITLE: RELIABILITY OF AIR SYSTEMS ORIGINAL                  CURRENT            ACTUAL MILEST0NES                                            DATE                    DATE                DATE TECHNICAL ASSISTANCE PROG. START                                                01/88                      --
02/88 TASK ACTION PLAN APPROVED                                                      01/88                        --
02/88 RISK ASSESSMENT COMPLETE                                                        04/88                  04/88                      --
RECOMMENDATIONS OR FINAL TAP                                                    05/88                  05/88                      --
TO NRR TECHNICAL ASSISTANCE, V/I STATEMENT COMPLETE                                    08/88                  08/88                      --
DRAFT REG. GUIDE COMPLETE                                                        09/88                  09/88                      --
REG. GUIDE REVIEW BY DIVISIONS COMPLETE                                          10/88                    10/88                    --
(RES/NRR/AEOD)
RESOLUTION OF COMMENTS COMPLETE / SUBMITTED TO                                  11/88                  11/88                      --
CRGR (29)                                                                                                                                                                      "
NRR/CRGR CONCURRENCE                                                            11/88                  11/88                    --
TO ACRS SUBCOMMITTEE AND OGC                                                    11/88                  11/88                    --
COMMENT RESOLUTION CL:MPLETE                                                    12/88                  12/88                    --
CONCURRENCE BY NRR LEAD DIVISIONS                                                12/88                  12/88                    --
GUIDE ISSUED FOR USE.AND COMMENT                                                12/88                  12/88                    --
PUBLIC COMMENTS REVIEWED                                                        03/89                    03/89                    --
NRR CONCURRENCE                                                                04/89                    04/89                    --
FINAL REG. GUIDE ISSUED                                                        04/89                    04/89                  --
i l
[
l l
                                                                                                                                                                  'AS OF FY88 OUARTER 2 l
_ -_..  . ..[ .. . . . . .          .
 
RUN DATE: 03/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                        PAGE:    10 ISSUE NUMBER: 51                                          TITLE- IMPROVING THE RELIABILITY OF OPEN CYCLE SERVICE WATER SYSTEMS IDENTIFICATION DATE: 09/82C                                PRIORITIZATION DATE: 06/83C                                                            TYPE: GSI                PRIORITY: M TASK MANAGER: J. JACKSON                                  OFFICE / DIVISION / BRANCH: RES /DE /EIB                                              ACTION LEVEL: ACTIVE      STATUS:
TAC NUM3ERS:                                                                                                                                                                RESOLUTION DATE- 07/90 WORK AUTHORIZATION: MEMO TO R.J. MATTSON FROM H.R. DENTON DATED JUNE 3.                                                                    1983.
NRR FY-84 OPERATING PLAN. (APPENDIX G).
FIN                  CONTRACTOR                                                                                      CONTRACT TITLE 82977                    PNL                      IMPROVING RELIABILITY OF OPEN-CYCLE WATER Sv5TEMS W0P K                    SC0PE
        $HEbkhkkLkbWbRKbbbPkksPRbVkbkbhkkHkhkP                                                                                    kNb bbNhRbt MkhHbbS kNb b hhbPbbk THk bkk bF kHbbk FOR ISSUE 51 (MEMORANDUM FROM R. MATTSON ' . . T. SPEIS.                                                                          METHODS WHICH WILL ASSURE THE CONTINUED RELIABILITY ET AL.. DATED 01/11/84).                    IN
 
==SUMMARY==
. THE SCOPE OF THIS                                                        OF OPEN CYCLE SERVICE WATER SYSTEMS AGAINST VARIOUS TASK WILL BE TO EVALUATE THE ADEQUACY OF SURVEILLANCE                                                                            FORMS OF FOULING.
ST A T US THE TAP WAS REVISED AND ISSUED ON 10/3/84                                                                                MATERIALS TO OPEN CYCLE WATER SYSTEMS IN NUCLEAR POWER THE S0W WAS REVISED ON 5/9/85 TO INCORPORATE                                                                                      PLANTS.
RES PROJECT TASK V INTO NRR*S TECHNICAL                                                                                                TASKS 1 & 2 (OF 41 0F THE S0W WERE COMPLETED. WITH THE ASSISTANCE PROJECT.                THE TAP WAS REVISED TO BE                                                                    PUBLICATION OF NUREG/CR-4626 (VOLS 1 & 2) IN 9/86 AND CONSISTENT WITH THE S0W AND TO ASSURE THAT IT                                                                                    3/87 RESPECTIVELY. COORDINATION OF THIS PROJECT WITH INCORPORATED MILESTONES NECESSARY TO PROCESS CRGR                                                                                RES IS DOCUMENTED IN A MEMORANDUM FROM R. MATTSON TO F .
SRP PACKAGES THROUGH ISSUANCE AND USE.                                THE FIRST 4                                                ARSENAULT. DATED 01/23/84.
TASKS ASSOCIATED WITH THIS ISSUE ARE TIED TO RES                                                                                        DSRO REQUESTED MODIFICATION OF THE CONTRACT ON PROJECT B2463 AND ARE COMPLETE.                      BASED UPON THE                                                              12/22/86 TO INCLUDE PREPARATION OF A GUIDANCE DOCUMENT RESULTS OF THIS RESEARCH WHICH DEALS WITH BI0 FOULING.                                                                            (INTO TASK 4) AND PREPARATION OF THE PRA/VALUE IMPACT EIB WILL ADAPT WHERE POSSIBLE METHODS FOR                                                                                        ASSESSMENT AS A NEW TASK 5. THE RESULTING 189 IDATED SURVEILLANCE AND CONTROL OF BI0 FOULING TO FOULING                                                                                1/26/871. ALONG WITH THE FY-87 FUNDING. WAS APPROVED BY MUD. SILT AND CORROSION PRODUCTS.                                                                                              IN MARCH 1987.
A MODIFIED PNL PROPOSAL DATED 10/85 WAS                                                                                        TASK 4 (TECHNICAL FUNDINGS REPORT) AND TASK 5 APPROVED BY DSRO ON 5/15/86. THE CONTRACTOR WILL                                                                                  (REGULATORY ANALYSIS REPORT) ARE IN PROGRESS AND SHOULD DETERMINE THE APPLICABILITY OF BI0 FOULING SURVEILLANCE                                                                          BE SUBMITTED DURING THE THIRD OUARTER OF FY-88.
AND CONTROL METHODS CONTAINED IN NRC-FURNISHED AS OF FY88 QUARTER 2 O                                                                                                              O                                                                O
 
s                                                                                                                                                    A J                                                        -
L) i RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                        PAGE:          II 4
ISSUE NUMBER: 51                                      TITLE: IMPROVING THE RELIABILITY OF OPEN CYCLE SERVICE WATER SYSTEMS AFFECTED DOCUMENTS                                                                    PROBLEM / RESOLUTION MORE EXTENSIVE USE OF CHLORINATION THAN ORIGINALLY PLANNED.        THEREFORE AN ENVIRONMENTAL IMPACT ASSE S? a''iN T (EIA) WILL BE NECESSARY. A RFP TO PNL FOR THIS STf7Y HAS BEEN MADE          THIS WORK WILL DELAY THE SCHEDULE BY APPROXIMATELY 4 MONTHS.
4
!                                                                                                  ORIGINAL                  CURRENT                  ACTUAL
'                                              MILEST0NES                                                DATE                  DATE                      DATE
    .                        TAP APPROVED BY DSI DIRECTOR                                            01/84                        --
01/84 REVISED TAP APPROVED AND ISSUED                                          10/84                        --
10/84 PROPOSALS SOLICITED                                                      07/84                        --
10/84 l                            PNL RESPONSE TO RFP AND S0W                                              12/84                        --
12/84 I
REVISE S0W TO INCORPORATE RES TASK V                                      05/85                        --
05/85 PROPOSAL EVALUATED AND ACCEPTED                                          02/85                        --
08/85 CONTRACT SCHEDULE                                                        03/85                        --
10/85 DRAFT TECHNICAL FINDINGS REPORT FROM                                      07/86                  04/88                          --
CONTRACTOR STAFF REVIEW OF DRAFT TECHNICAL FINDINGS                                  08/86                  05/85                          --
REPORT STAFF REVIEW OF FINAL NUREG/CR TECHNICAL                                  09/86                  06/88                          --
FINDINGS REPORT ENVIRONMENTAL IMPACT ASSESSMENT (EIA).                                    06/88                  06/88                          --
WORK COMPLETED DRAFT REGULATORY ANALYSIS REPORT FROM                                    10/87                  10/88                          --
CONTRACTOR' AS OF FY88 QUARTER 2
 
RUO DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                    PAGE:          12 ISSUE NUMBER: S1                                      TITLE: IMPROVING THE RELIABILITY OF OPEN CYCLE SERVICE WATER SYSTEMS ORIGINAL        CURRENT          ACTUAL M ILEST 0N E S                                              DATE          DATE            DATE DTR PACKAG. COMPLETED                                                            11/87        10/88                --
DIVISION DEPUTY DIRECTOR PEVIEW OF DTR                                          12/87        11/88                --
COMPLETED CONCURRENCE BY OTHER OFFICES                                                    12/87        01/89                  --
DTR FACKAGE TO CRGR (291                                                        12/87        0I/89                  --
ACRS REVIEW OF DTR COMPLETED                                                    12/87        03/89                  --
CRGR REVIEW OF DTR COMPLETED                                                    01/88        03/89                  --
FRN OF ISSUANCE OF PROPOSED RESOLUTION                                          OS/88        06/89                  --
FOR PUBLIC COMMENT COMPLETE DE REVIEW OF PUBLIC CCMMENTS                                          07/88          11/89                --
AND PREPARE FTR PACKAGE DIVISION DEPUTY DIRECTOR REVIEW OF FTR                                          08/88          12/89                _-
COMPLETED CONCURRENCE BY OTHER OFFICES                                                    08/88        02/90                  --
CRGR REVIEW OF FTR COMPLETED (53)                                              09/88        04/90                  --
FRN OF ISSUANCE OF SRP                                                          07/88        07/90                  --
AS OF FY88 OUARTER 2 O                                                                          O                                                              O
 
                                                %                                                                                                              r3 a
                                                                    )                                                                                          (w)                                                      -                                                        (mw)
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL S(STEM                                                        PAGE:                  13 ISSUE NUMBER: F6                                                                  TITLE: STEAM GENERATOR REQUIREMENTS IDENTIFICATION DATE: 01/83C                                                      PRIORIIIZATION DATE. 11/83C                                              TYPE: GSI                              PRIORITY:
TASK MANAGER: E. MURPHY                                                          OFFICE / DIVISION / BRANCH- NRR / DEST /EMTB                              ACTION LEVEL: INACTIVE                STATUS: NR TAC NUMBERS: MS3338                                                                                                                                                                              RESOLUTICN DATE- 06/88 WORK AUTHORIZATION: MEMO TO D. EISENHUT FROM H. DENION DATED 11/16/83.
FIN                                        CONTRACTOR                                                          CONIRACT TITLE
                                            -----                                            ----------        ------------------ .-------------------------~~-----------------------
W0R K    SC0PE CONSIDER PROPOSED GENERIC REQUIREMENTS STEMMING                                                                              GENERATOR TUBE INTEGRTTY, FROM USI*S A-3 A-4 AND A-5 REGARDING STEAM STA TUS AS AFPROVED BY THE COMMISSION, ORIGINALLY PROPOSED                                                                          LICENSEES TO IMPLEMENT THE STAFF"S RECOMMENDATIONS; AND (2)
GENERIC REQUIREMENTS WERE ISSUED AS RECOMMENDATIONS TO ALL                                                                              REVISE TH7 SRP AND STS CONSISTENT WITH THE STAFF PWR LICENSEES AND APPLICANTS IN GL 85-02.                                                      THE STAFF"S                              RECOMMENDATIONS IN GL 85-02.
ASSESSMENT OF LICENSEE RESPONSES TO GL 85-02 WAS PROVIDED TO                                                                                  THIS GSI HAS BEEN CONDUCTED IN PARALLEL WITH THE THE COMMISSSION IN SECY-86-77 DATED 03/24/86. TWO                                                                                      STAFF'S PROGRAM FOR RESOLVING USI*S A-3, A-4 AND A-5. A ADDITIONAL TASKS ARE UNDER CONSIDERATION AS A RESULT OF THE                                                                            DRAFT REPORT DOCUMENTING THE-STAFF'S PROPOSED RESOLUTION OF ABOVE ASSESSMENT.                                            THESE TASKS ARE CURPENTLY INACTIVE WITH                                  THE USI'S WAS ISSUED FOR PUBLIC COMMENT IN APRIL 1984.
NO SCHEDULED COMPLETION DATES:                                              (1) PROVIDE PLAN T-SPECIF IC                              FINAL PUBLICATION OF NUREG-0844 WILL CONSTITUTE TECHNICAL ASSESSMENTS TO EACH LICENSEE IDENTIFYING AREAS WHERE                                                                                    RESOLUTION OF THE USI*S. DELA(S IN RESOLUTION OF USI'S A-3, LICENSEE PROGRAMS APPEAR TO FALL SHORT OF STAFF                                                                                        4, 5 HAVE AFFECTED CLOSE OUT OF THIS ISSUE.                            NO RECOMMENDATIONS IN GL 85-02 AND TO CONTINUE TO ENCOURAGE                                                                                REQUIREMENTS WILL RESULT FROM THE RESOLUTION OF THIS ISSUE.
AFFECTED DOCUMENTS                                                                                  PROBLEM / RESOLUTION i                                          GL 85-02, "STAFF RECOMMENDED ACTIONS                                                                                        NONE STEMMING FROM NRC INTEGRATED PROGRAM FOR THE RESOLUTION OF UNRESOLVED SAFETY ISSUE REGARDING STEAM GENERATOR
;                              TUBE INTEGRITY."
AS OF FY88 QUARTER 2-
  . _ _ _ _ . _ _ _ _ _ _ _ _ _            ._________._______.____._________________________m                            ___    _  _ _ _ _ _ _ - _ _ _ _          ___                                              __    _ _ .      __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _
 
RUN DATE: 05/11/80 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                    PAGE:          14 ISSUE NUMBER: 66                                TITLE: STEAM GENERATOk' REQUIRCMENTS ORIGINAL        C'tRRENT        ACTUAL MI LES T ON ES                                            DATE        DATE            DATE ACRS REVIEW COMPLETE (231                                                    10/83            --
10/83 CRGR REVIEW COMPLETE                                                        01/83            --
10/83 COMMISSION PAPER ON PROPOSED USI                                            01/84            --
01/84 RESOLUTION AND ISSUANCE OF GENERIC LETTER ISECY-84-131 REVISED COMMISSION PAPE R ON ISSUANCE                                      07/84            --
09/84 OF GENERIC LETTER (SECY-84-13Al COMMISSION MEETING                                                          02/84            --
09/84 ISSUE SECY-84-138                                                          11/84            --
11/84 ISSUE SECY-85-62                                                            02/85            --
02/85 ISSUE GL 85-02                                                              03/84            --
04/85 ISSUE REPORT TO COMMISSION REGARDING                                        02/86            --
03/86 RESPONSES TO GL 85-02 CLOSE CUT ISSUE                                                              06/88        06/88                --
AS OF Fv88 OUARTER 2 9                                                                      9      .
9
 
i
(                                                                                                                                                                                                                  3 v/
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                                                            PAGE:                                                                        15 ISSUE NUMBER:                67.5.1                                            TITLE: REASSESSMENT OF SGTR DESIGN BASIS
.                                                                                                                                                                                                                                                                                                                                                                                                    t IDENTIFICATION DATE: 06/83C                                                    PRIORITIZATION DATE: 03/85C                                                                                                                                            TYPE: LI                                              PRIORITY:
TASK MANAGER: J. HOPENFELD                                                      OFFICE / DIVISION / BRANCH: RES /DRPS/RPSI                                                                                                                            ACTION LEVEL: ACTIVE                                    STATUS: 5 i  TAC NUMBERS: NONE                                                                                                                                                                                                                                                                                              RESOLUTION DATE: 03/89 4
WORK AUTHORIZATIUN: MEMO TO R. BERNER0 FROM H. DENTON DATED 3/25/85 FIN                        CONTRACTOR                                                                                                                                                                            CONTRACT TITLE A6879                          INEL                                  RISK ASSOCIATED WITH A SPECTRUM OF SGTR ACCIDENTS B0832                        ORNL                                    STEAM GENERATOR TUBE RUPTURE 1
1
)                                                                                                                                                                                                                      WORK      SCOPE COMPLETE THE EXPERIMENTS ON IODINE PARTITION                                                                                                                                                                          REQUIREMENTS IN LIGHT OF RECENT DATA USING BEST ESTIMATE j  COEFFICIENTS: EVALUATE THE VALIDITY OF SRP IODINE SPIKE                                                                                                                                                                        MODELS.            IDENTIFY MODIFICATIONS TO THE SRP, STA TUS i            THE ORNL EXPERIMENTS TO DETERMINE THE IODINE PARTITION                                                                                                                                                                EVALUATE THE RISK ASSOCIATED WITH SGTR ACCIDENTS WAS
;  COEFFICIENT ARE NEARLY COMPLETE.                                              THE INEL CONTRACT TG                                                                                                                              ISSUED 2/10/88 AND T/A WORK IS NOW UNDER WAY.
1 1
1                                            AFFECTED DOCUMENTS                                                                                                                                                                                                      PROBLEM / RESOLUTION-THAN ANTICIPATED PARTLY DUE TO TEMPORARY UNAVAILABITY OF
.                                                                                                                                                                                                                                  INEL PERSONNEL TO RESPOND TO THE S0W.                                          THE CONTRACT WAS i-ISSUED ON 3/10/88. THIS SHOULD HAVE NO EFFECT ON SCHEDULED DELIVERABLES.
i                                                                                                                                                                                                                                            OR:GINAL                    CURRENT                                  ACTUAL MILESi0NES                                                                                                                                                                  DATE DATE                                    DA1E i                                PREPARE DRAFT TAP                                                                                                                                                                                          06/87                          --
06/87 i
l
$                                                                                                                                                                                                                                                                                                                        AS OF FY88 OUARTER 2' 1
 
RU1 DATF. OS/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                  PAGE:          16 ISSUE NUMBER:  67.S.1                                      TITLE- REASSESSMENT OF SGTR DESIGN BASIS ORICINAL        CURRENT          ACTUAL M ILEST0N E S                                              DATE        DATE              DATE FEVISE DRAFT TAP TO INCLUDE                                                        10/87              --
12/87 PROBASILISTIC ASSESSMENT OF SGTR MANAGEMENT APPROVAL OF REVISED                                                    11/87              --
12/87 TAP COMPLETE WORK PLAN AND CONTRACT PROPOSAL                                          11/87              --
12/87 ISSUE CONTRACT TO INEL                                                            01/88              --
03/88 DRAFT REPORT FROM INEL AND ORNL TO RES                                            06/88        06/88                  --
FINAL REPORT FROM INEL AND                                                        08/88        08/88                  --
ORNL TO RES DRAFT REGULATORY ANALYSIS PREPARED                                                09/88        09/88                  --
CRGR PACKAGE ISSUED FOR COMMENT                                                    10/88        10/88                  --
ORGR PACKAGE REVISED. SENT TO RES                                                  12/88        12/88                  --
DIRECTOR FOR APPROVAL CRGR AND ACRS MEETINGS (29,S3)                                                    02/89        02/89                  --
ISSUE CLOSEOUT MEMO                                                                03/89        03/89                  --
AS OF FY88 OUARTER 2 9                                        -
9                                                          9
 
                                !            >;                              I          *l            l    ,            :*                                    ,  h , 4 ? i 9                                                                                                                            2 8                                  .                    _                _
                                        /                                  .                    _              _                                                  R 3                                  _                    _              .                                                  E 0                                  _                    _              .                                                  T
_                    _              _                                                  R
  ,                                                                        _                    _              _                                                  A E                                                                                                                            U
    .                                  T Q
A                                  .                    _              ._
8                          D                                  .                    _              _                                                  8          ,
8                                                              _                    _              _                                                  8
            /                          N                                  .                    _              _                                                  Y 1                  . 5 O                                      .                    _              .                                                  F              .
1  7          Y          I                                  _                    _              _                    .
            /  1          T      :    T                                  _                    _              _                    _                            F 5              I    S U                                      _                    _              _              L      _                            O R U L                                                                                -                    _7          7      7    7 0
C T O
_ S
_ I
_              _              AE_8 UT                8      8 8        S A S                                      _    S                                                    _          /      / /        A E E I
R    T    E                                  _    A
                                                                                                                .              TA_/
CD_6 A
2 1
2 2 1
T G            P S R                          _              . B                              _                                            1 A A                                            _              .                    .        N_                          _0                                          _
D P                                            _              . N              .                                    _                                          _
  -                                                        _              . G              _        O I  __
N                                              .              . I                  _              _
U                                              .              . S                  _        T_
R                    E                        _ '            _ E                  _        U_
V I
_              _D                    _        L_
O_
T                        _              _ S                  _        S_
C                        .              _A                    _        E_                          .
A                        _              _                              R_
                                                                                                          /                    T      .
_              _D                    .        M_                  N      _
_ E                            E.                          _
EE_
L                        .              _ R                  _              .              RT          -      -      - -
E                        .              _ E                  _        L_                  RA_
V                        .              _D                    -        B_
E                        .              _ I                  _        O_
R                    UD_
C I    L                        .              _    S              .              _                    _
L                              _              _    N              _        P_                          _
N                        _              _    O              _              _
O                        _              _    C              _              _
E    I                        _              _                    .              _
P    T                        _              _ E                  .              _
M          Y C                            _              _ B                  -                _
E          T    A                        _              _                    _              _    1 T                                          _              _D                    _                                    .
S                                          _              _ L                  -              _5            L      .                                            -
Y                                      E_                  _ U                  -                              A    -
S    S I
S L .
T .
_ O
_H                  _
_              _7
_6              NE.8 IT
                                                                                                                                        .7
_/ /
7 8
7 8 8
                                                                                                                                                          / /
7 L                I                    I _                  . SS                                  _
O    A          S T __
                                                                            .        T
                                                                                                                ._ E GA_6 ID_0              0      1    1 R    B          P                                                              _                              R                1      1    1                  -
T                R                    T .            E__EN    RE              _              _E    S        O      _
N O
C N
G
                                  /
S P
C.
A.
R
                                                            .          P_TI _ UD                  _
I S          R              5    T .            0_PC _
UC S_
T    E          D              8    N_                  _                                    -
N    D          /              /    O_              C_RA E                                5                          _                U_
M    R C S                      2    C __            S_                    T .
E    T      5 E                /          .              _                    .
G    G 8                                                  .
A N
S /
3 R
3 D
K.
A..
T -
A    F      0 H                E          .                                    -              ._                    _
M    O            C            T          .        R ._                      -              _                    _
N            A          .              _                S_                  _                    _                      L E    N      E A                D          _        0_                        .                                    _                      A U    O      T    R                        _
W_                        .              _.                    _                      S S    I      A B                N          _              _                    _              _                    _                      O S    T      D /                O          _              _                    _              _                    _                      P I    A            N            T          _              _                      _              _*                    _                      O U Nb                      N          .              _                    _              _*                    _                P R C    L O          I            E          .              _                    .              -
* _                  A P I    A      I    S            D          .              _                    .              _                      _            R  T R    V T          I                        .              _                    _              .                                    T        T E    E A V                          .
_              _                    _              - D              S _.              G D C N    E Z          I            H            -              _    R                .                                    _            S  E    A E    R      I    D                        .              _    E                .                  E            E_                    S R G          T    /            M          .              _    H                _              -                    _          EF    I    T I    E            O            .              _    TE              _              _ N              N_              DO V N E R C                      R          _              _    EB              _              _                0    _          U      E O L O          I            F            _              _ HU                  _ 1                I                            LT    R C T      I    F                          _ E            . WT              _ .            _                                CN I
T P O R F                0 R
_ N
_ O
                                                                            . EE
_ 5 S.M T
N-T ._
NE F D IM O N E            _N            _ NL                  _ 7            -                S_                S        A N                          _ IP                  _ 6      E_R M
E_
_          OS L R                          _ MI                  _        U_                                      TE A N E
B
_ RT                _ I      C_E OT L'
_P PSS OV LA
_ EL                _G
                                                                            . TU                  _              -                    _A AA R P R_                    _ EM                  _ F      D_                      I_T            T      P R    O_
T _
_D
_ D
_ O D_E    _
M_T  _          TI C P K A R C                  O C_
_              . ON                . T      E_D T                            _F A FT                O 3 D                T      A                    . TA
_ R C_
_                        R AS T RI N W
8 L
                              / E 6 F O
M R_
T _
N_E      N
_ SL
                                                                              . IL
_ A
_ P E.E F
F .
                                                                                                                                        ._ D DL E E
_E          I    M T 2
0 N E
P E
M OO C.N
                                                                              . SI
                                                                              . YF
_ LR
_ S
_ A A.B    _
_R
_A EB E E SA G IB A P L
5 E O                      :
_ AE                  _D              _                    _P VO N M T    H E N                                    _ NV                  _  E            _O                    _E ER A O 7 A                N O                                _ AO                  . V            -                    _RP RP M C 6 D                O    I                            _                    . L            _ T J N T                                    _ NR                  . O            .
N                  A                          _ AO                  . S            _
                        -    O                  Z                          _        T            . E            _*
R      I    R      :    I                          _ TA                  _ R            _*
E T          E S R                                      _ CR                -              _*
B A G R O                              .              . UE                  - G            _
M C A                      H            .              _ DN                  . N U I N
N B E
T    N.E I        N            _ NE                  . I
                                                                                                    . E F A M U                  F . O                  _ OG                                _
I    M U A                      . N            _C                    . B            _
l                      E      T            N                                  _ M                  .              _
U N K                      K                          _ A                    .              .
S E S C R                                              _        E            _              .
S D A A O                                              _        T            .              _
I      I    T      T      W                            _ S                  .              _
                                                                            +
    ;f , j        t!                  ;a{!!'            1,'      a!,  !        :j<i4        ;l1        ;.          11    I!3            .ii'
 
2 R
E T
R A
8 8
/
1 U
Q 8
8 Y
F 9
1  8
/  1 F
5        L                                                  O 0        AE      8 S
U'    k      - - -          -  -      - -
A TA / - - -                  -  -      - -
E E      CD 3 T  G    A A A D P N
U R
T N
EE          8    8    8    8  8      9    9 RT          8    8    8    8  8      8    8 RA        - / / / / /                  / /
UD          6    8    9 0 2          2 3 C            0 0 0          1  1      0 0 M
E T
S    L Y    A S  S  NE      8  8    8    8    8  8,    9 9 I  IT          8    8    8    8  8      8    8 L S  GA / / / / / /                        / /
O A  ID          6    8    9 0 2          2 3 R  B  R    b 0        0 0      1  1      0 0 T    O N N O G C  I S
T E N D E
E M
G A
N A
R T
G S
F O
9 M
E N U O S I S T I A U                        D        S C L                        E        E I A                        R        R R V    S                  A    T E E                        P N O            )
N E    E          S S E        E  T      3 E R                E E R          M        5 G      N          R  R P        M  T G N        9 E    0          O O S C          E      2 L                T  T    I      S      (
T    T                    S R I                L L Y          O    ,
S T    Sk E          E    L F    DL G N N N A              EA      N Ek        I    I    N D SV          I  O A E IO          T    M Lb M M                    U VR E E h      O O Y S EP                E    M I          R R R S RP                M k      F F      O    I  AA        T Mb                  T              S U k,    T    T A E ER            R O R  R    R L G GO C E O O U A AF A S N P P G K K                        O b      E E E          C CR D L b R R R A AO PN CPT A
2        k T        L T              C      E b F A            F    R RE R U 5        h A N A G GR G S h R        I    R    R  RI    R S 7        k      D F D C CD C                  I 6
R E
B 9
M U
N E
U S
S I
: 1
 
          \/                                                                                  v                                                  -              U RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                        PAGE:    19 ISSUE NUMBER: 70                                      TITLE: PORV AND BLOCK VALVE RELIABILITY IDENTIFICATION DATE: 06/83C                          PRIORITIZATION DATE: 05/84C                                    TYPE: GSI                PRIORTTY: M TASK MANAGER: R. KIRKWOOD                            OFFICE / DIVISION / BRANCH: RES /DE /EIB                        ACTION LEVEL: ACTIVE      STATUS:
TAC NUMBERS:                                                                                                                                    RESOLUTION DATE: 10/88 WORK AUTHORIZATION: MEMO TO R. MATTSON FROM H. DENTON DATED 5/14/84 FIN                  CONTRACTOR                                                      CONTRACT TITLE h80h                bhl                    [S hkhkbhbhRkbK kkbbChkbhhRbhkkPRbVkhPbkVfbbhhbh 80828                  ORNL                  OP. EXPER. REV. OF PORV* S & BLOCK VALVES F AILURES IN NUC. POWER PLANTS W0RK          SC0PE IDENTIFY FUNDAMENTAL SAFETY REQUIREMENTS OF THE                                            FOR INCREASED PLANT AVAILABILITY AND THE PRA RESULTS PORV*S AND BLOCK VALVES.              PRA*S WILL DE USED TO DETERMINE                            WILL BE USED TO IDENTIFY THE AMOUNT OF MONEY THAT COULD CORE-MELT FREQUENCIES AND RISK CONTRIBUTED BY                                                    BE JUSTIFIED FOR PORV/ BLOCK VALVE IMPROVEMENTS.
MALFUNCTION OF PORV AND BLOCK VALVES ASSOCIATED WITH                                              POTENTIAL IMPROVEMENTS WILL BE IDENTIFIED IN THE AREAS OF VARIOUS ACCIDENTS AND PLANT PROTECTION FEATURES                                                  DESIGN. EQUIPMENT QUALIFICATIONS. QA AND QC, MAINTENANCE INCLUDING SGTR EVENTS. LTOP. PORV-LOCA. RCS VENTS AND                                            PROGRAMS. TECHNICAL SPECIFICATIONS AND TESTING BTP RSB 5-1.        BASED ON THE RESULTS fnOM BNL PRA WORh.                                      REQUIREMENTS.
MAXIMUM RISK REDUCTION WILL BE EVALUATED.                        THE POTENTIAL STA TUS TkP hkh khhbkh bh k b 85$ k kkPbRh hb kHk bbhbkkhhbN                                      9/h0/85$ hh FF bbbhkhhh HkVk bkkh RkhblVhh khb k FkhkL ON THE STATUS OF STAFF ' ARK WAS ISSUED ON 2/18/86.                                              DRAFT VERSION OF THE REPORT WAS ISSUED IN THE 3RD QUARTER OF INFORMATION WITH RESPF1,I TO RADIATION LEVELS ANTICIPATED                                        FY-87 AS NUREG/CR-4692. THIS REPORT WAS EXPANDED TO INCLUDE FUNDING. AND SCHEDULE CHANGES INDICATE THAT DATA FROM                                            RESPONSES TO NRC QUESTIONS DURING INTERVIEWS WITH FOUR PORV DISASSEMBLY OF THE idRV FROM TMI-2 WOULD NOT BE AVAILABLE                                        MANUFACTURERS CONDUCTED AT THEIR RESPECTIVE MANUFACTURING FOR APPROXIMATELY 12 MONTHS.                IN ADDITION, THERE WAS                              FACILITIES TO DISCUSS PORV PROBLEMS.          THE FINAL REPORT HAS CONSIDERABLE UNCERTAINTY AS TO WHETHER THE PORV IN ITS                                            BEEN COMPLETED AND WAS ISSUED IN OCTOBER.1987. COMMENTS PRESENT CONDITION (SEVERELY CORRODED FROM EXPOSURE OF SEVEN                                      WERE ALSO FURNISH D ON BNL DRAFT REPORT. "ESTIMATION OF RISK YEARS IN A HIGH HUMIDITY, HIGH RADIATIONI ENVIRONMENT WOULD                                      REDUCTION FROM IMPROVED PORV RELIABILITY IN PWRS." DATED
  ' PROVIDE ANY CONCLUSIVE EVIDENCE AS TO THE CAUSE OF THE MARCH                                      9/85. STAFF COMMENTS HAVE BEEN RESOLVED AND A SECOND DRAFT 1979 FAILURE TO CLOSE.              TAKING THESE FACTORS INTO ACCOUNT,                            VERSION OF THE REPORT WAS PREPARED IN THE SECOND QUARTER OF IT WAS CONCLUDED THAT THE RESOLUTION OF THIS ISSUE SHOULD BE                                      FY-87.      THE FINAL REPORT HAS BEEN COMPLETED AND WAS ISSUED COMPLETED WITHOUT THE DATA FROM THE TMI-2 PORV. COMMENTS                                          AS NUREG/CR-4999 DATED DECEMBER 1987. WORK HAS COMMENCED ON WERE FURNISHED ON ORNL DRA T REPORT. "0PERATING EXPERIE9;E                                        THE PREPARATION OF A NUREG TN LIEU OF A SERIES OF LETTER REVIEW AND ANALYSIS OF FAILURES OF PILOT-OPERATED RELIEF                                          REPORTS. ONE FOR EACH COMPLETED TASK. AS WAS ORIGINALLY VALVES ANP BLOCK VALVES IN NUCLEAR POWER PLANTS." DATED                                          SCHEDULED IN THE TAP. A DRAFT VERSION OF THIS NUREG HAS AS OF FY88 QUARTER 2
 
2 R
E T
R A
8 8
/
h 4
E H
U Q
8 8
Y F
O 1            k 1  0                                                                                                        F
/ 2            N                                                                                            O 5            k                          L AE k 5              5 5        6      6      6        7    7 0                                                                              8      8        8    8      S b                          UT    8    8        8    8      8 k                          TA / /              / /        /      /      /        /    /      A CD h 2              3    4      2      0      1        2    3 E E          b                                                                  1      1        0    0 T  G        h                          A      1    0        0 0        0 A A            S          N D P          k            O I
N              E          T U            h            U Q                          L b            O h            S E
b            R E          /            T L        M            N E            EE                                                            -
RT          -        -    -    -      -      -      -
b            L B            RA          -        -    -    -      -
H        O            UD b            R            C h            P h
b M        h8 E        k8 T                -
S        bY                        L Y        kf                        A S        h                        NE          5        5    4    5      5      5        5    6 8        8    8    8      8      8        8    8 Y      kf                        IT      8
                                                                                                /    /
L  T        PO                    GA / /              / /        /      /      /
ID h        1        3    6    7      9      2        1    4 O  I      k 1              0 R  L        RR                    R          0        0 0        0      0              1 T  I        PE                    O N  B            T O  A      hR                k C  I      kA                  N L  SkU                  h T  E      bQ                  N N R  U E
M E
G A
N E
V L
A V
T A
T h A S
O A
M K  Sk          H C                                                                        S                        D E  O      h        0                                                        V                        N U L      k        7        b                                                R          S            A S B      k          -                                                F      O          E    N    S S                            N                                      O      P          V O        TT I D N
bS b G I
k R            R      S      N L
A    T NN EE C A      b                k                    O            O      U      O          V N        MM I                F        h                    T            T      T                      E    ES R V      k O              k          S        CN            C      A      N          K M        VS E R      b                    R                EO            E      T      O          C    E    OE N O        F    N        b          E        RI            R      S      I          O V        RS E P              O          P                IS            I            T      YL O          PS G        b        I        h          N        DI      P D        N      A      TB R          MAS E    T        b                      V    A          O      M      E        P    I    N E      b U              b          0    R    II      T    I            R      FD M              TO L      h      L          N          b SD                S      N      O      AN      I    DCI T      h O          Sk            T        D        N D        O0    F      SA            EAT I      k      S    T                b        R    I          I7    N              L    DPA T              E    N            Sk        YET            Y    S      I      LS A          NMR k R          Eh                h BHN S BT SI                            AV      I    EIE h            M            E            TE    T      S IG D            TR      T    M/D E    U V              b DOM N DD M                      N      NO N          MEI b H          C R            L        E M      E E          MN U        EP ES OUS k      T    Ob                k      VOO M VO OO OS M                            TE CLN D P            I h OTC M OT C                        RE AF OV EAO b N                            b R            O R            K GV DO PL RVC E O        D R          M        PDR C PD ER                  KL N            A l          Eb              b PEO                PE HO CA US EV EEY b R          T k                    ADF E TAD TW AV FT                          H    HHT h E          C                          R              R          B        N TK TTE k        T    Eh                  P PAS A PA OF                      K EE          C        F H8T        F        E      k AWR R              AW TF        EC NM YO YNA b8E          F    ND                TRO O          TR      A    LO    IE      FL FOS kL            AkI                        OT P          O  TT      BL MR          IB    I Y          [4 U        h      TFC R        LF    RS MB        RI      T/ TDR hFC              hG          k      F    E  O A        O      E      EU NV NEE k        I        h            k ADR C ND PE SD TQ ER ESH FR          hY              R    RNI      N IN        EH SN        EE DO DAT 0      bOE              bR          b DAD            I    FA RT        AA DR          IP    IBO 7      k N              hO RE          kT EG          kA bT                    L R      kRT                    U E      kAF              kG B      kUA              hE O
M        PQR                R U      k        D          P N      kD                bR PRA              tO E            3          k U      k                  VP S      kE              hR S      kH              bS I      hT
 
      .                                                                                                                                                                                                                                  i j                                                                                                                                                                                                                            %g  *
                                                                                                                                                                                                                                      -l i              '
                                                                                                                                                                                                                                      ]
RUN DATEi 05/11/88' GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                              PAGE :-          21                -l
!      ISSUE NUMBER: 70                                              TITLE: PORV AND BLOCK VALVE RELIABILITY                                                                                                                        -
I                                                                                                                                                                                                                                        t t
t ORIGINAL                                                    CURRENT                    ACTUAL MILESTONES                                                      DATE                                                        DATE                    DATE                          ;
i'                    ESTIMATION OF RISK REDUCTION FROM                                                          01/86                                                                      -
09/87                            l IMPROVED PORV/ BLOCK VALVE RELIABILITY NUREG COMPLETED                                                                            05/87                                                      04/88                            --
PREPARE DTR PACKAGE                                                                        03/86                                                      04/88                            --                        !
t DIVISION DEPUTY DIRECTOR REVIEW OF DTR                                                    04/86                                                      04/88                          --                          !
l COMPLETED                                                                                                                                                                                                        I f                      CONCURRENCE ON DTR BY OTHER OFFICES                                                        05/86                                                      05/88                            --
i DTR PACKAGE TO CRGR (29.53)                                                                06/86                                                      05/88                          --
5 ACRS REVIEW OF DTR COMPLETED                                                              06/86                                                      07/88                          --
                                                                                                                                                                                                                                        ?
CRGR REVIEW OF DTR COMPLETED                                                              07/86                                                      07/88                          --
f                      EDO APPROVAL OF DTR                                                                        01/87                                                      09/88                          --
,                      ComISSION PAPER                                                                            12/87                                                      10/88                          --
CLOSE OUT ISSUE                                                                            10/88                                                      10/88 l
i t
e i
j                                                                                  ,.-
i                                                                                                                                                                                                                                      ,
1 4
1 l                                                                                                                                                                                                                        .          :
AS OF FY88 QUARTER 2
}
i t                                                                                                                                                                                                                                      '
1
  }                                                                                                                                                                                                                                      l l                                                                                                                                                                                                                                    l I
a                                                                                                                                                                                                                                    p 4
1 -
t                                                                                              _ _ _ _ .              ___ _ __ _ _ _ _ _ _ _ __ _ __________ ___ _ _ _ _ _ _ _ _ _ _ _ .
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                              PAGE:    22 ISSUE NUMBER: 7S                                      TITLE: GENERIC IMPLICATIONS OF ATWS EVENTS AT SALEM - QA IDENTIFICATION DATE: 06/83C                          PRIORITIZATION DATE 10/83C                          TYPE: GSI                                  PRIORITY:
TASK MANAGER: O. GORMLEY                              OFFICE / DIVISION / BRANCH RES /DRA /ARGI          ACTION LEVEL: ACTIVE                        STATUS: NR TAC NUMBERS:
RESOLUTION DATE 01/90 WORK AUTHORIZATION: MEMO FROM H. DENTON TO R DEYOUNG. "SCHEDULE FOR RESOLVING & COMPLETING GENERIC ISSUE NO. 75." 10/19/83 FIN                CONTRACTOR                                                CONTRACT TITLE NONE                  NONE                    NONE W0R K      SC0P E THE RESOLUTION          TO SUBTASK 1 OF GSI    ------------------
7S IS TO BE ------------ SIDER      BACKFITTING STAFF WILL  CON                  THIS REG. GUIDE REVISION ADDR E SSE D - REVISE REG. GUIDE 1.33 OUALITY ASSURANCE                                  THE WORK SCOPE OF TMI ITEMS I.B.I.116) AND I.B.1.1(7)
PROGRAM REQUIREMENTS (OPERATIONS)* TO CONTAIN MORE                                      RELATIVE TO THE REVISION OF REG. GUIDE 1.33 HAS BEEN DETAILED GUIDANCE FOR OPERATIONAL QA PROGRAMS                        THE                SUBSUMED BY THIS GENERIC ISSUE SUBTASK.
S T A T US            --------------------------------------.---------
- ---- THE ORIGINAL PLAN WAS    ----------------------------------------------
TO ISSUE A REG. GUIDE EXPANDING S VERSION    DRAFT OFANDTHI RECEIVED A TOTAL OF 71 COMMENTS THE        F ROM F OUR REGIONS.        THIS PLUS OTHER PROBLEMS DISCUSSED BELOW ON THE REQUIREMENTS OF THE 1976 VERSION OF ANS 3.2                                      LED THE STAFF TO CONCLUDE THAT THE CURRENT SCHEDULE IS PLAN WAS LATER ALIGNED TO THAT OF ENDORSING THE 1982 VERSION                            UNREALISTIC IF IT IS TO BE TIED TO A NEW VERSION OF ANS 3.2.
WHICH FROVIDED MANY OF THE IMPROVEMENTS. ANS IS CURRENTLY                                THEREFORE. THE STAFF HAS CONCLUDED THAT GSI 75 SHOULD BE PLANNING TO ISSUE AN EVEN MORE COMPREHENSIVE AND SIGNIFICANTLY IMPROVED VERSION OF ANS 3.2 AT THE END OF                                DECOUPLED FROM THE ANS 3.2 REVISION EFFORT IN ORDER TO AVOID 1988        THE STAFF SOLICITED COMMENTS FROM THE REGIONS ON A                        FURTHER SCHEDULE SLIPS.
AFFECTED DOCUMENTS                                                                      PROBLEM / RESOLUTION ANS 3.2 (1982)                                                                                .THE CONTINUED SLIPPAGE OF ANS-3.2 IS A PROBLEM                        IN ADDITION. THE DRAFT CURRENTLY IN PREPARATION RELIES ON NOA-2 WHICH HAS NEVER BEEN ENDORSED BY NRC, AS WELL AS VERSIONS OF OTHER STANDARDS EITHER NOT ENDORSED. E.G.. NOA-I 1986. OR NEVER REVIEWED BY NPC,          E.G., ANSI /ANS-3 3 198X              GSI 7S IS A SALEM ATWS ISSUE WITH TASKS SUBSUMED FROM TMI.
THE STAFF HAS CONCLUDED FROM AN EXAMINATION OF THE AS OF FY88 QUARTER 2 9                                                                            9                                                                            e
 
                                                                                                                                                                )
J                                                                  -                          G) l l
RUN DATE: 05/11/88 l                                                                                                                                        GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                  PAGE:              23
}                        ISSUE NUMBER: 75                                                                                          TITLE: GENERIC IMPLICATIONS OF ATWS EVENTS AT SALEM - QA AFFECTED DOCUMENTS                                                                                                      PROBLEM / RESOLUTION
                          -------------.--------------------------------------~~------                                                                            -----------------------------------------------------------.
SALEM ATWS TASK FORCE THAT ALL THE PERTINENT REQUIREMENIS AND GUIDANCE WERE IMPOSED ON OPERATING PLANTS BY NUREG-0737 AND GL 83-28.                        THEREFORE, THE STAFF IS WORKING ON THE MODIFICATION TO R.G. 1.33 REV. 2 TO MAKE THE PROVISIONS OF NUREG-0737 AND GL 83-28 APPLICABLE TO FUTURE REACTORS AS WELL AS THOSE CURRENTLY LICENSED.                            THIS WILL COMPLETE THE ACTIONS NECESSARY TO CLOSE OUT THIS GENERIC ISSUE AND WILL ALLOW THE STAFF TO APPROACH THE ENDORSEMENT OF QA RELATED REG GUIDES ON A SYSTEMATIC BASIS STARTING WITH NOA-2 WHICH IS AT THE MOST BASIC LEVEL.
ORIGINAL                CURRENT                ACTUAL l
MI LESTONES                                                                                    D%TE            DATE                  DATE ISSUED MEMO TO EDO                                                                                                  07/84                    --
07/84 SUBSUMING TMI ITEM I.B.1.1.
SUBTASKS 6 AND 7 ISSUE DRAFT R.G. 1.33 FOR DIVISION AND                                                                              02/85                    --
02/85 REGION COMMENTS RE-ISSUE DRAFT R.G. 1.33 FOR DIVISION AND                                                                            01/86                    --
02/86 REGION COMMENTS FINAL DRAFT REVISION OF ANS-3.2-1982                                                                                  10/87              04/88                              --
COMPLETED
,                                                                      ISSUE DRAFT R.G. 1.33 FOR DIVISON                                                                                    02/88              05/88                              --
s                                                                      AND REGION COMMENTS RESOLVE COMMENTS AND PREPARE                                                                                          04/88              06/88                              --
REGULATORY ANALYSIS PACKAGE FOR CRGR REVIEW CRGR REVIEW COMPLETED (29]                                                                                            08/R8              08/88                              --
}                                                                      ACRS REVIEW COMPLETED                                                                                                  10/88              09/88                              --
i 2                                                                                                                                                                                                                                                  AS OF FY88 QUARTER 2 1
1 i
i
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM              PAGE:    24 ISSUE NUMBER: 75                    TITLE GENERIC IMPLICATIONS OF ATWS EVENTS AT SALEM - OA ORIGINAL      CURRENT      ACTUAL M I LEST 0N E S                              DATE          DATE        DATE hhSbEFRNbN kVk Lkh LkTY bF 3hb                            2/ h          0/hh        --
PROPOSED R.G. 1 33 REV. 3 FOR COMMENT END OF 60-DAY PUBLIC COMMENT PERIOD                      03/89          12/88        --
RESOLVE COMMENTS AND REVISE GUIDE                        05/89        02/89          --
RE-ISSUE DRAFT R.G. 1.33 FOR                            05/98        03/89          --
DIVISION AND REGION COMMENTS RESOLVE COMMENTS AND PREPARE                            07/89        04/89          --
PACKAGE FOR CRGR REVIEW CRGR RE"IEW COMPLETED 153)                              10/89        05/89          --
ACRS REVIEW COMPLETED                                    12/89        06/89          --
FINALIZE GUIDE                                          12/89        08/89          --
EDO APPROVAL                                            01/90        09/89          --
ISSUE FRN ON ISSUANCE AND                                01/90        01/90          --
AVAILABILITY OF R G. 1.33 REV.3 ISSUE CLOSEOUT MEMO TO RES DIRECTOR                      01/90        01/90          --
AS OF FY88 QUARTER 2 O                                                        O                                                O
 
V"                                                                                    'd                                                  -
v RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                              PAGE:  25 ISSUE NUMBER: 79                                  TITLE- UNANALYZED RX VESSEL THERMAL STRESS DURING NATURAL CONVECT 73N COOLING IDENnIFICATION DATE: 06/83C                        PRIORITIZATION DATE. 07/83C                                          TYPE: GSI                    PRIORITY: M TASK MANAGER: J. PAGE                              OFFICE / DIVISION / BRANCH: RES /DE /EIB                            ACTION LEVEL: ACTIVE        STATUS:
TAC NUMBERS:                                                                                                                                        RESOLUTION DATE- 08/88 WORK AUTHORIZATION: MEMO TO R.VOLLMER FROM H. DENTON DATED 7/25/83 NMR FY-84 OPERATING PLAN. (APPENDIX G),
FIN              CONTRACTOR                                                            CONTRACT TITLE A3822                BNL                  UNANALYZED REACTOR VESSEL THERMAL STRESS W0R K            SC0 PE l1)    PWR NSSS WILL PROVIDE THERMAL-HYDRAULIC, HEAT                                                  [3) EIB WILL VERIFY ACCEPTABILITY OF STRESS ANALYSES.
CONDUCTION AND ASME III STRESS AN/: LYSIS OF THr                                                      EVALUATE RESULTS, AND DETERMINE RESOLUTION OF THE REACTOR VESSEL.                                                                                        ISSUE.
(2) BNL WILL VERIFY ACCEPTABILITY OF THERMAL ANALYSES.
STATUS CONTRACTOR IS PERFORMING THE REVIEW.
AFFECTED CJCUMENTS                                                                              PROBLEM / RESOLUTION PbikkhkkbhkPhhhhbkkhhhhRhhkkhkkPbkhS$                                                                  hY Lkhhkkhbkhkh2hlkh8hkhh3hhh8h$kHkbhhhkkbTbR REQUESTED ADDITIONAL DETAILS TO COMPLETE THE REVIEW OF THE B&W ANALYSES (DOCUMENT NOS.      32-1151155-00 AND 77-1152846-00) WHICH WERE PROVIDED BY LETTER DATED 10/15/84 THIS REQUEST WAS TRANSMITTED TO THE B&W OWNERS GROUP (BWOG)
BY LETTER DATED 3/27/86. REQUESTED INFORMATION INCLUDED 12 REFERENCES. 4 0F WHICH WERE NOT RECEIVED IN EASILY REPRODUCIDLE FORM. ADDITIONAL HARD COPIES WERE RECEIVED FROM BWOG IN LATE JULY 198C AND FORWARDED TO THE CONTRACTOR.
DELAYS ENCOUNTERED IN OBTAINING NECESSARY REVIEW MATERIALS AND THE SUBSTANTIVE NATURE OF QUESTIONS GENERATED BY THE CONTRACTOR NECESSITATED THE ADDITION OF 1 MILESTONE AFTER THE COMPLETION OF THE CONTRACTOR AUDIT CALCS AND ALSO AS OF FY88 QUARTER 2
___      ___-___~_- - - - __ - ___ - _-_ _ ___                  . -    . _  _
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                      PAGE:          26 ISSUE NUMBER: 79                                                                            TITLE- UNANALYZED RX VESSEL THERMAL STRESS DURING NATURAL CONVECTION COOLING AFFECTED DOCUMENTS                                                                                          PROBLEM / RESOLUTION REQUIRED THAT THE SCHEDULE BE EXTENDED TO 4/88.
DURING THE 3RD QUARTER OF FY-87, ADDITIONAL DELAYS WERE ENCOUNIERED BY THE CONTRACTOR DUE TO DIVERSION OF ITS STAFF TO A HIGHER PRIORITY ISSUE FOR NRR. THE SHOREHAM CONTAINMENT FAILURE ANALYSIS (FIN A3772). THIS DELAY WAS COMPOUNDED BY COMPUTER MALFUNCTIONS RESULTING IN A 3-MONTH SLIPPAGE FOR THE COMPLETION OF THE AUDIT CALCULATIONS AND THE MEETING TO DISCUSS THE RESULTS WITH NRC, A 2-MONTH SLIPPAGE IN ISSUING THE RAI. AND A 3-MONTH SLIPPAGE OF 4 0F THE REMAINING 5 MILESTONES-. HOWEVER, THE FINAL MILESTONE REMAINED UNCHANGED (04/88)
DURING THE 4TH QUARTER OF 1987 A MEMO WAS ISSUED FROM G ARLOTTO TO F. MIRAGLIA DATED 7/28/87 REQUESTING THAT A MEETING BE ARRANGED WITH THE BWOG AS SOON AS POSSIBLE.
HOWEVER. DUE TO NUMEROUS DL PERSONNEL CHANGES. THE ATTACHED QUESTIONS WERE MISPLACED.                                  THE TASK MANAGER SUPPLIED ADDITIONAL COPIES OF THE QUESTIONS TO DL ON 9/17/87 AND A
                                                                                                                                'AANSMITTAL WAS MADE TO BWOu ON 10/2/87. THESE DELAYS REQUIRED A 3-MONTH SLIPPAGE FOR ISSUING AN RAI/ MEETING REQUEST TO THE BWOG AND ALSO FOR THE REMAINING S MILESTONES.
DURING THE FIRST QUARTER OF FY-88, BWOG INFORMED DL THAT THEY WOULD BE AdLE TO SUPPORT A MEETING IN MID-JANUARY 1988 HOWEVER. HOLIDAY OUT-OF-COUNTRY ABSENCES BY TWO OF THE THREE COGNIZANT CONTRACTOR PERSONNEL PROHIBITED THIS                                            AN ADDITIONAL COMPLICATION IS THAT ONE OF THESE PERSONS IS NO LONGER EMPLOYED BY THE CONTRACTOR. UPON HIS RETURN ON JANUARY 9. 1988 MEETJNG PLANS WERE COMPLETED. SINCE THE OTHER COGNIZANT CONTRACTOR PERSON DID NOT RETURN UNTIL 2/2/88 THE SCHEDULED MILESTONE FOR MEETING WITH THE BWOG.
AND SUBSEQUENT INTERIM MILESTONES. SLIPPED ONE MONTH.                                          BNL WILL GENERATE PRELIMINARY TECHNICAL EVALUATION BASED ON INFORMATION PROVIDED AT 04/83 MEETING.
ORIGINAL                            CURRENT                    ACTUAL MI LEST0NE S                                              DATE                            DATE                        DATE MEETING WITH B&W TO CLARIFY ISSUE                                                            11/83                                  --
03/84 RECEIPT OF INITIAL B&W ANALYSES                                                            08/84                                  --
12/84
                                                                                                                                                          ,                                                      AS OF FY88 CUARTEP 2 b
O                                                                                                        O                                                                                              O
 
2 R
E
                                                                                  ,                                                                                  7 T
R A
8                N        ~
                                          '                                        -                                                                                          U Q
8 8            -
8
        /                y        C                                                                                                                                          Y 1    ~
w                                                                                                                                                    F 1  7      G                "
        / 2        N                    .                                                                                                                                      F        .
5          I            L'                                                                                                                                            O 0          L O
AE.5 UT_/      8 7
8 7
8 7
8        - -          -    -        -                                                                          S O -
TA_9 7/N 7/ /                          -  -        - -            -                                                                          A E E        C    ,
_,      C                            0 T G                    s r. O _ 0
                                    '            0      0    1                                                                                      ;~
A A        N        _.
D P        C s
N I
T ~
                        ~TN            _
                                                      ~
U          C                                ^                                      s R          E
                                                                                          '.-              ~                                              .
                                                                                                                                                                        .s.
y                V N
O C                    . -
                                                                                                                                                          ~
ys T
L            N      ._                                                                                                      ~
A R
EE_
RT - -          -      -    -
8 8
8 C
8 8 8 8 8
8
_x h
U                    . -      -      -    -    / /          / /            /
l)D RA C .;.N T                                                4 5          6 6            8                                          .~
A                                                0 0          0 0            0                                          c N                    .
                                                                                                                                                ~
G                x                                                                                            T.
N          2                                                                                            -
I                                                                x                                      -
R                                                                                                                                  ,
U
                                                                                                                                                                  \ s'~
M                                      s E      D T                          _
M S      S            L      _                                                                                    ..-          -
Y      S            A      _
S      E      #                    6      7    7      7    6        7    6        6                                            m R            NE__5 IT        8    8      8    8      8    8        8    8        8                                                  _
L      T            GA        / /          / /          / /          / /            /                                            -
                                                                                                                                                            ~          T' O
R S
ID.0 R
9 5 0
4 2 0 0 4
0 0 7        6 0 0 8        9 0
T      L            O      .
N      A                    .
O      N                                        '
C      R E                                                                                                                                                        .
T      H                                                                                                                                            ~
N L
M T
L E      E G      S                    ,
A      S                    .
N      E                    .
A      V .                  .
M                          .
E X
R
                                        , . ,[                S S
N U
S      D,w                  , -
h R
E O
I  '
                                                                                                      -        ,x S      E                      E                  N                    T I      Z                    .      C            W                    S              N      %            w                              y, -
Y                  ..IV    L            O            W        E              G C      L                    .      A                        &        UW            I        <
I R
A N
A SER C                    W B        O &
B S-E
                                                                                                                                              .+                          -
E N
E N
U EEC  .      T I
D B
O P O U
F        G N F O
G
                                                                                                  'W G                      N.NM        U      R    T+      O      .
I T              &                .
E L
0E    M
                                        . O R A        O T
C    T S  e 'G N    L A
V E N E
M O
I B
R T                    .      O      A E          s EW              T        O                                      e I              T_C          T      R U        iE        E  O A            F                      '          s T                            C      T    Q          LI T U S_D  _
N A          N    E      N AV                L        D E_A RT
_              O R C
W CE E A O IR          S V E
U
(.
N            G            N                      S L_T                                            N E                                                                      -
I_C    A C
_ R O
N H N T
I I
T W HF O
                                                                      & CF P LE B EA S AT D S I
                                                                                                                                            ~                      -
M_T
_      FG W E                    TT E CE O N    OI          E      H        S R      IL        M
                                        . O        S G M            T Y                NP E
_ C NE N /                  I    RR L HM M
_      OD      I    I      W AO A CO
_ E I          T A              NF M EC                T
_ T    TW E R              G I          R T            U
_ A E& E                  k MN O n                        N O
                                        . I    LB M EP              I    IG F LG E
                                        . T P                UU T LI                    AI S
_ I    MR C SO E ES W NS O
_  N OO R SR E RE &                            IE L 9
7
_ I    CF N IG M PD B FD C i,
R E
B M                                                                                                                                                      -
i.
e U
N                                                                                                                                                        %
E U                                                                                          s S                                                                                  _.
S
        ":        I 2
 
RUN DATE: 03/II/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                  PAGr:  23 ISSUE NUMBER: 82                            (ITLE: BEYOND DESIGN BASES ACCIDENTS IN SPENT FUEL POOLS
    ~DENTIFICATION DATE: 08/83C                PRIORITIZATION 9 ATE: 12/83C                                                TYPE: GSI                  PRIORITY: M
    's.SK MANAGER: E. THROM                    OFFICE / DIVISION / BRANCH: RES /DRPS/RPSI                                ACTION LEVEL: ACTIVE        STATUS:
    .AC NUMBERS:                                                                                                                                      RESOLUTION DATE: 05/89 WORK AUTHORIZA'. ION: MEMO TO R. MAiTSON FROM H. DENTON DATED I2/7/83; NRP FY 84 OP PLAN ( APPE NDIX G)
FIN          CONTRACTOR                                                              CONTRACT TITLE A08I4            LLNL              EFFECTS OF BEYOND DSN BASIS EVENTS ON SPENT FUEL POOLS A3786            BNL              STUDY BEYOND DESIGN BASES ACCIDENTS IN SPENT FUEL POOLS A3963            BNL              ANAL. OF SPENT FUEL POOL STORAGE A: TERNATIVES W0R K              SCU PE WbkK SCbPk kPPkbVkD hh h PI k bkE hEMb Fkbh                                                    NbbbNSkbERkh R. MATTSON TO T. SPEIS. DATED 2/2/84.1                                                                    THE RANGE OF FIXES WHICH APPEAR TECHNICALLY RESEARCH HAS VERIFIED THE POSSI3ILITY OF IGNITING                                            FEASIBLE INCLUDE DELAYING STORAGE OF FRESH ASSEMBLIES.
ZIRCALOY CLADDING IN THE EVENT RELATIVELY FRESH SPENT                                              OR THE PLACEMENT OF FRESH ASSEMBLIES ONLY NEAR OLDER FUEL IS UNCOVERED DUE TO POOL FAILURF.              THE                                            ONES.        A NUREG/CR WILL BE PREPARED DESCRIBING SAFETY CIRCUMSTANCES OF IGNIsION AND PROPAGATION, AND THE                                                  ISSUES AND COST / BENEFIT ANALYSES ASSOCI4TED WITH CONSEQUENCES AND LIKELIHOCD OF A SEVERE SPENT FUEL POOL                                            ALTERNATTV* FIXES.        IF FIXES ARE WARRANTED, A REGULATORY ACCIDENT WILL BE ASSESSED. SHOULD THE RISX FROM SUCH AN                                            REQUIREV ..(S PACKAGE WILL BE PREPARED FOR CRGR REVIEW ACCIDENT BE JUDGED UNACCEPTABLE ON A COST / BENEFIT BASIS.                                          AND ISSUANCE.
THEN PREVENTIVE AND MITIGATING MEASURES MUST BE DEVISED STAT US
      ' NbRkb/bR-4982$"bkVkREkhbkbkhkbkhhPkhhFbklPbbLbkh                                                khbbhbkhkkkbNWhH HkbbNbhbbkhbEhkVkLbkhkbb.kbbbhbkbkR SUPPORT OF GENE.IC ISSUE 82." WAS PUBLISHED 7/87.                                              - A REGULATORY ANALYSIS WHICH JUSTIFIES NO ACTION (NO FRAGILITY ANALYSES ARE BEING PREFORMED BY LLNL,                        A BWR                VALUE/ IMPACT PTUDY REQUIRED).
AND A PWR SPENT FUEL POOL WILL BE EVALUATED.                                                                  LLNL WORK INDICATE 3 THAT THE SEISMIC MARGINS ARE ABOUT A RFP FOR A VALUE/ IMPACT ANALYSIS WAS SENT TO BNL ON                                        THREE TIMES THE SSE. HIGH CONFIDENCE OF LOW PROBABILITY OF 9/25/87. AUTHORIZED 03/11/88.                                                                    , FAILURE (HCLPF) VALUES OF 0.S TO 0.7 G. HOWEVER. COMBINED TAP WAS REVISED 8/87 TO REFLECT NEW NRC ?RG;                      'ATION                    VITH SEISMIC HAZARD CURVES. ANNUAL FAILURE FREQUENCIES AND T/A WORK FOR VALUE/ IMPACT ANALYSIS.                                                            CONTAIN LARGE UNCERTAINTIES. THE MEAN VALUE FOR AN BNL AND LLNL WORK COMPLETED TO DATE INDICA ~C IHAT THE                                      EXISTING POOL STRUCTURE IS ABOUT E-6 PER RY. MEDIAN VALUE LIKELIHOOD OF A POOL DRAINAGE EVENT MAY BE ACCEPTABLY LOW.                                          E-8 PER RY.
m s
AS OF FY88 OUARTER 2
                                            -        s
~
                                                                                                                                                                  ~
9                                                                                  6                                                    -
O      _ _ _ __ _
 
                                                                                                                                                                                                                    ~
n es                                                                                      [e q l
                                                                                                              \                                                                  -                    %>)
RUN DATE: 05/11/88
,                                                                                            GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                              PAGE:          29 l
ISSUE NUMBER: 82                                                                TITLE: BEYOND DESIGN BASES ACCIDENTS IN SFfNT 1UEL POOLS AFFECTED DOCUMENTS                                                                                PROBLEM / RESOLUTION SRP SECTIONS 9.1.2. 9.1.3                                          AND 15.7.4.                                        PWR LICENSEE WITHDREW FROM COMMITTMENT TO PROVIDE PLANT REGULATORY GUIDE 1.25 AND STS                                                                                DATA FOR TASM 6 FRt.GILITY STUDIES. WITH NRR ASSISTANCE.
ANOIHER LICENSEE HAS BEEN IDENTIFIED AND HAS COMMITTED TO PROVIDE DATA 2/88. THIS SLIPPED TASK 6 FROM 11/87 TO 3/88.
DELAY IN OBTAINING SEISMIC HAZARD CURVE FOR PWR FROM NRR HAS SLIPPED TASK 6 TO 4/88 (1 MONTH).                                    NRR HAS EXPRESSED CONCERN WITH USE OF SHCS PRIOR TO THE COMPLETION OF THE PARALLEL EPRI/ UTILITY PROGRAM. 12/88.                                  Mt" RECOMMENDS SHCS BE USED TO ADDRESS UNCERTAINTIES 'IN RISK, NOT QUANTITATIVE RISK (I E. MARGINS APPROACH).                        NRR MAY NGT ENDORSE SHCS PRIOR TO EPRI WORK. BUDGET DELAY HAS MOVLD BNL START DATE FROM 11/87 TO 1/88: BNL PROPOSAL FOR TASK 7 V/I STUDY BASED
    .                                                                                                              ON ONE STAFF MEMBER RESULTING IN PERIOD Or PERFORMANCE INCREASE FRCH S CALENDAR MONTHS TO 9 MONTHS.                                    (RFP WAS BASED ON A MINIMUM OF TWO STAFF AVAILABLE). OVERALL SLIPPAGE 5 MONTHS.          BNL HAS BEEN REQUESTED iO DETERMINE IF ADDITIONAL SIAFF RESOURCES COULD BE MADE AVAILABLE TO RECOUP 2 MONTHS FROM SLIPPAGE (1/88).
j 2/8/88 - DURING NORMAL MANUAL CHAPTER 1102 REVIEW OF A3963 NMSS MISUNDERSTANDS SOEW AND RECOMMENDS RES NOT FUND PROJECT.          RES MEETING WITH NRR/NMSS 2/10/88. *"S MEETING
?
WITH DOE '/2/88 TO OBTAIN UPDATED SPENT FUEL INi NTORY DATA AND COORDINATE NRC EFFORTS WITH DOE EFFORT ON AT-REACTOR STORAGE COSTS.              RES AMENDS SOEW AND AUTHORIZES WORK 3/11/88 i
OVERALL SCHEDULE SHOULD NOT CHANGE, HOWEVER. BNL START DATE
{                                                                                                                  SLIPS FROM 1/88 TO 3/88.
ORIGINAL                      CURRENT                    ACTUAL MILEST0NES                                            DATE                      DATE                        DATE GSI 82 ASSIGNED TO DSI                                                                  12/83                            --
12/83 i                                        TENTATIVE AGREE. REACHED WITH RES TO INCLUDE                                          01/84                            --                          --
l                                        A TASK TO DETERMINE WHETHER ZIRCALOY IGNITION i                                      AND SOURCE TERM RELEASE ARE POSSIBLE 4
TAP APPROVED BY DSI DIRECTOR                                                            02/84                            --
02/84 RECEIVE RES CONTRACTORS
* ASSESSMENT                                                    04/84                            --
05/84                          r l                                                                                                                                                                                              AS OF FY88 QUARTER 2 4
i f
                                          *                                                                                                                                                                          ~
 
RUN DATE: C5/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                      PAGE          30 ISSUE NUMSER- 32                                            TITLE BEYOND DESIGN BASES ACr    ~5  IN SPENT FUEL POOLS elGINAL            CURRENT            ACTUAL M I LES T 0NE S                                        DATE                DATE                DATE RES CONTRACTORS
* ASSESSMENT SENT TO                                            05/84                    --
05/84 DL, OST. DE AND DSI.CPB AND DSI ASB FOR REVIEW AND COMMENT COMPLETE PID FOR INCLUSION OF T/A                                              04/84                    --
06/84 SUPPORT FOR G,I 82 IN FY-85 BUDGET ISSUE RFP                                                                      08/8t                    --
08/84 ISSUE T/A CONTRACT                                                              09/84                    --
11/84 COMPLETE TASKS 1 & 2A OF TAC AND RECEIVE CONT                                  04/85                    --
05/85 PRELIMINARY ASSESSMENT OF LIMELIH000 AFD CONSEQUENCES OF LOSS OF POOL INTEGRITY PREPARE PRELIMINARY EXPANDED WORK                                                  --                    --
11/85 SCOPE FOR RISK STUDY EVALUATE CONTRACT RESULTS/                                                        --                    --
11/85 DETERMINE WHETHER PROBABILITIES AND PHENOMENA WARRANT RISK STUDY TASK I - INITIATING EVENTS / FREQUENCIES                                          --                    --
08/86 TASK 2 - ZIRCALOY OXIDATION EVALUATION                                            --                    --
10/86 TASK 3 - CONSEQUENCES /RADIONUCLIDE                                                --                    --
02/87 INVENTORY TASK 4 - PRELIMINARY RISK PROFILE                                                  --                    --
02/87 TASK 5 - EVALUATE ALTERNATIVES                                                    --                      --
02/87 nUTHORIZE FRAGILITY STUDIES [LLNL)                                                --                      --
04/87 BNL NUREG/CR REPORT                                                                --                      --
07/87 ISSUE RFP FOR TASK 7                                                            09/87                      --
09/87 AWARD TASK 7 T/A                                                                11/87                      --
03/88 A~ OF FY88 OUARTER 2 O                                                                              O                                                              O
 
m RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                              PAGE:        31 ISSUE NUMBER: 82                                          TITLE- BEYOND DESIGN BASES ACCIDENTS IN SPENT FUEL POOLS ORIGINAL      CURRENT                        ACTUAL MILEST 0NES                                                                  DATE        DATE                            DATE TASK 6 - FRAGILITY STUDIES                                                                          11/87      04/88                                --
DOE DRAFT REPORT ON AT-REACTOR SPENT FUEL                                                          07/88        07/88                                _-
STORAGE COSTS TASK 7 - VALUE/ IMPACT EVALUATION                                                                  06/R7        09/88                                __
i                                  DRAFT REG. ANAL. TO ACRS. TO CRGR AND                                                              07/87        10/88                                __
l                                  OTHER OFFICES / DIVISIONS FOR COMMENT (29)
ISSUE CLOSEOUT MEMORANDUM IF NO                                                                    01/88        12/88                                __
PUBLIC COMMENTS REQUIRED DRAFT REG. ANAL. FOR PUBLIC C0be4ENT                                                              07/88        12/88                                --
INCORPORATE PUBLIC COMMENTS                                                                        09/88        02/89                                --
FINAL REPORT TO ACRS CRGR. OTHER                                                                  10/88      03/89                                --
0FFICE/ DIVISIONS 153)
FINAL CLOSEOUT                                                                                    12/88      05/89                                --
l I
I AS OF FY88 QUARTER 2
 
l RUN DATE: 03/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                              PAGE:    32 ISWJE NUMBER:                83                              TITLE CONTROL ROOM HABITABILITY IDENTIFICATION DATE: 11/83C                                  PRIORITIZATION DATE. 06/84C                                        TYPE- GSI                    PRIORITY:
TASK MANAGER: C. FERRELL                                      OFFICE / DIVISION /0 RANCH RES /DRAA/SAIB                          ACTION LEVEL: ACTIVE          STATUS: NR TAC NUMBERS:                                                                                                                                                    RESOLUTION DATE- 04/90 WORK AUTHORIZATION: MEMO FOR H. DENTON FROM W DIRCKS, DATED 8/15/83 FIN                        CONTRACTOR                                                          CONTRACT TITLE A2328                        ANL                  IN-PLANT REVIEWS ON CONTRCL ROOM HABITABILITY A2334                        ANL                  IN-PLANT REVIEWS ON CONTPOL ROOM HABITABILITY W0R K            SC0P E ASSESS ADEQUACY OF HABITABILITY CRITERIA. NRR REVIEW.                                              OF ACRS CONCERN          A FINAL REPORT WILL BE PREPARED PLANT SYSTEMS AND COMPONENTS. AND TESTING PROCEDURES                                                          SUMMARIZING RESULTS AND PROVIDING RECOMMENDATIONS.
RELATIVE TO CONTROL ROOM HABITABILITY. INCLUDING THOSE AREAS S TA T US A PROGRAM OF SURVEY VISITS TO A TOTAL OF 11 PLANTS WAS                                            WITH ANTICIPATED ISSUANCE DATE OF 06/88. THE CONTRACTOR HAS INI T I A TED IN SE PTEMBER 1985. VISITS TO 11 OPERATING PLANTS                                              INITI ATED WORK ON SOME OF THE OTHER ' ASKS OF THE CONTRACT HAVE BEEN COMPLETED. CONTRACTOR REPORT IS BEING WRITTEN                                                      WHICH WILL BE MONITORED BY RES.
AFFECTED DOCUMENTS                                                                                PROBLEM / RESOLUTION 10 CFR 50 APPENDIX A; 2.3.4.5.19.60                            SRP 6.4                                    THE ORIGINAL TAP FOR GSI 83 CONTAINED A NUMBER OF 9 4 1          12.3 6.5.1. 23                    2.2.1-2.2.3 18 9 5.1;                                      SUBTASKS FOR IMPLEMENTATION OF THE RECOMMENDATIONS IN THE RGS 1 78, I 95                1.29        1.52. 1.101 1.140; NUREG-0737                                    JUNE 1984 CONTROL ROOM HABITABILITY [CRH) REPORT. WORK ON ITEM III D 3.4 II B 2. 10 CFR 50: 50 48. APPENDIX                                                            IMPLEMENTATION OF THESE RECOMMENDATIONS HAS BEEN HALTED DUE R TO 10 CFR 50; NUREG-0700 NUREG-0737 SUPPLEMENT                                      I.                    TO MANAGEMENT CONCERNS OVER :          (1) LACK OF RESOURCES TO PERFORM INDEPENDENT VERIFICATION OF ACCEPTABILITY OF APPLICANTS' SUBMITTALS AND DEGREE OF SAFETY GAIN TO BE ACHIEVED. (2) RELUCTANCE TO DEVOTE RESOURCES TO UPDATING SRP's AND PLANT ORDERS; AND (3) PERTINENT REG GUIDES IN lHE ABSENCE OF NEW IMPLEMENTATION RECDMMENDATIONS THAT MIGHT BE INTERPRETED AS BACKFITTING WITHOUT PROPER BACKFIT ANALYSIS AS OF FY88 QUARTE % 2 O                                                                                            O                                                                        O
 
in
      .s                                                                          %
                                                                                %                                                        -                  '%d RUN DATE: 05/11/88 GENERIC ISSifE MANAGEMENT CONTROL SYSTEM                                          PAGE:      33 ISSUE NUMBER: 83                              TITLE: CONTROL ROOM HA8ITABILITY AFFECTED DOCUMENTS                                                                        PROBLEM / RESOLUTION THE IMPLEMENTATION OF THE RECOMMENDATIONS IN THE JUNE 1984 REPORT WILL BE REEVALUATED IN LIGHT OF THE ABOVE CONCERNS.        ADDITIONAL DELAY WAS ENCOUNTERED IN CONTRACTOR PROVIDING REPORT TO NRC. REPORT IS CURRENTLY BEING REVIEWED BY NRR.
ORIGINAL                CURRENT                  ACTUAL MILEST0NES                                                    DATE                DATE                    DATE AWARD OF CONTRACT                                                            C2/84                    --
01/84 VISIT TO INITIAL PLANT                                                        03/84                    --
05/84 REPORT ON CRH CRITERIA TO NRR DIRECTOR                                      06/84                      --
06/84 COMPLETION OF CONTRACTOR VISITS TO                                            08/84                      --
08/84 OPERATING AND NTOL PLANTS SDW WRITTEN FOR 12-PLANT SURVEY AND                                            11/84                    --
10/84 GENERIC STUDIES RFP SENT TO POTENTIAL CONTRACTOR (S)                                          12/84                    ---
11/84 RECEIPT OF' PROPOSAL (S)                                                      02/85                    --
03/85 INITIATE PROGRAM TO VISIT 12                                                09/85                    --
09/85 ADDITIONAL OPERATING PLANTS
                                                                                                                                                                            ]
COMPLETE VISIT TO 11 OPERATING REACTORS                                      09/86                    --
01/87 ISSUE TRANSFER MEMO TO RES                                                    03/87                    --
12/87 ISSUE REPORT (NUREG/CR) AND                                                  01/87                06/88                      --
(                RECOMMENDATIONS l                RES TO DEVELOP TAP BASED ON REEVALUATION                                    03/87                  06/88                      --
                & PROVIDE MILESTONES INCL. INITIAL WORK ON GENERIC STATUS l
AS OF FY88 QUARTER 2 l
l l
                                                          , _ _ _ _ - _ _ ~ .      .    .        .
 
>                                                                                                                        RUN DATE: 05/11/88 GENERIC ISSUE MANAGE t4 N T CONTROL SYSTEM                  PAGE:          34 ISSUE NUMBER: 83                          TITLE- CON TROL RLs3M HABIT ABILITY l
ORIGINAL      CURRENT          ACTUAL
* i                                    M I L EST 0NES                                                    DATE    DATE              DATE i
l, i
I i
4 t
l 1
I i
i J
l
\
I l
AS OF FY88 CUARTER 2 1
9 i
e l
O                                                                    O
 
s                                                                                                                                                              -
RUM DATE: 05/II/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                            PAGE:      3S ISSUE NUMBER: 84                                                            TITLE: CE PORVS IDENTIFICATION DATE: 11/83C                                                  PRIORITIZATION DATE: 02/85C                                  TYPE: GSI                        PRIORITY:
TASK MANAGER: H. WOODS                                                      OF F ICE / DIVI
* TC.1/8 RANCH : RES /DRPS/RPSI              ACTION LEVEL: INACTIVE            STATUS: NR TAC NUMBERS:
RESOLUTION DATE: -
WORK AUTHORIZATION: MEMO TO R. BERNERO FR0ti H DENTON DATED 2/27/85 FIN                        CONTRACTOR                                                              CONTRACT TITLE W0R K        SC0PE STATUS AWAITING FINAL RESOLUTION OF USI A-45 WITH RESPECT TO                                                    FIRST OUARTER FY-88.
POAV REQUIREMENTS.                      ISSUE TRANSFERRED FROM NRR TO RES DURING AFFECTED DOCUMENTS                                                                                    PROBLEM / RESOLUTION USI A-45 WORK, ORIGINAL                CURRENT                ACTUAL MILEST0NES                                                            DATE                  DATE                  DATE DEVELOP TAP AFTER RESOLUTION Of USI A-45                                                            '480                  TED                    .-
AS OF FY85 QUARTER 2'
- - - - - _ - _ - - _ -                                                                                          - ---        - - * - -                      -,                                u                          &
 
CUN DATE: C5/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                          PAGE:          36 ISSUE NUMBER:      86                                TITLE- *ONG RANGE PLAN DEALING WITH STRESS CORROSION CPACKING IN BWR PIPING IDENTIFICATION DATE: 12/83C                          PRIORITIZATION DATE 10/84C                                            TYPE: GSI                              PRIORITY.
TASK MANAGER. W.      KOO                            OFFICE / DIVISION / BRANCH NRR / DEST /EMTB                            ACTION LEVEL: INACTIVE                  STATUS: 3A TAC NUMBERS:                                                                                                                                                        RESOLUTION DATE 01/88C WORK AUTHORIZATION: MEMO TO R VOLLMER FROM H DENTON DATED 10/3/84 FIN              CONTRACTOR                                                      CONTRACT TITLE WOR K        SC0PE lbNb k hbk PL kFbkbkkLkkbhkkhPkPhhkkhkkkbkb                                              h kkhbf bbkkb bhkh RkV 2 CONT AINE D IN SECY-84-301. JULY 1984-                                                        13] ISSUE GENERIC LETTER INCORPORATING NUREG-0313 REV 2 (1) ISSUE NUREG-1061. VOL. 1 FOR COMMENT                                                      14) PURSUE ASME CODE CHANGES ST A T US
------- -..........------- ..------...-------------------- ----- -- ------------~~--------.----------------------------------
GENERIC LETTER 88-01 AND ITS TECHNICAL BASIS DOCUMENT                                  REACTOR LICENSEES AND CONSTRUCTION PERMIT HOLDERS IN NUREG 0313 REV. 2 WAS ISSUED TO ALL BWR OPERATING                                            JANUARY 1988.
AFFECTED DOCUMENTS                                                                                              PROBLEM / RESOLUTION NUREG-0313      REV. 1                                                                            NONE.
ORIGINAL                              CURRENT              ACYUAL MILEST0NES                                                            DATE                                DATE                DATE SECY 84-301, NUREG-1061 TO COMMISSION                                                  07/84                                    --
07/84 PUBLISH NUREG-1061                VOL. I                                                09/84                                    --
09/84 END OF COMMENT PERIOD                                                                  11/84                                    --
11/84 AS OF FY88 QUARTER 2 O                                                                                O                                                                                            O
 
                                                                ~~.                                      .
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                    PAGE:    37 ISSUE NUMBER: 86                    TITLE: LONG RANGE PLAN DEALING WITH STRESS CORROSION CRACKING IN BWR PIPING ORIGINAL        CURRENT          ACTUAL MILEST0NES                                  DATE          DATE              DATE bbMPLhhhPkEPkkkhhbNbhbkkhh                              bl/8h            --
b9/kh NUREG-0313. REV. 2 PROPOSED GL AND STAFF                                    09/85            --
02/85 POSITION IN DRAFT NUREG 0313 REV. 2 CIRCULATED FOR NRR DIV. SIR REVIEW PROPOSED GL AND STAFF POSITION IN DRAFT                  10/85            --
04/86 NUREG-0313 REV. 2 REVIEWED AND ENDORSED BY CRGR (291 DRAFT NUREG-0313 REV. 2 AND GL                          11/85            --
07/86 ISSUED FOR PUBLIC COMMENT DRAFT MUREG-0313. REV. 2 REVISED                        02/86            --
05/87 TO REFLECT PUBLIC COMMENTS COMMISSION PAPER ON STAFF IMPLEMENTATION                03/86            --
06/87 plt.N AND STAFF POSITION (NUREG-0313 REV 21 REVIEWED AND ENDORSED BY CRGR (53)
COMMISSION PAPER ON STAFF IMPLEMENTATION PLAN            04/86            --
09/87 AND STAFF POSITION (NUREG-0313. REV.2)
SUBMITTED FOR APPROVAL PUBLISH NUREG-0313. REV. 2                              05/86            --
01/88 ISSUE GL 88-01                                          05/86            --
01/88 AS OF FY88 QUARTER 2 8    e                                                                                -                                          -_
 
RUN DATE: 09/11/88 GENERIC ISSUE MANAGEMENT CONVROL SYSTEM                                                      DCGE:    38 ISSUE NUMBER-      47                        TITLE- FAILURE OF HPCI STEAM LINE WITHOUT ISOLATION IDENTIFICATION DATE: 01/84C                    PRIORITIZATION DATE- 09/85C                                      TYPE: GSi                              PRIORITY- H TASK MANAGER: R. WOODS                        OFFICE / DIVISION / BRANCH RES /DRPS/RPSI                        ACTION LEVEL: ACTIVE                  STATUS-TAC NUMBERS;                                                                                                                                          RESOLUTION DATE 12/90 WORK AUTHORIZATION: MEMO TO R. BERNEPO FROM H. DENTON DATED 9/26/85 FIN              CONTRACTOR                                                CONTRACT TITLE NONE                NONE              NONE W 0R K        SC0PE bkkkRhkNkkVPkkhbkZkb/hbbkLbbFVkLVEbkkhbtVkbkN                                              bPhN              PbbkD bkbVRbNM                N    BYb    hkS HPCI. RCIC, RWCU [AND ANY OTHER) SYSTEMS WHERE VALVES                                  OUALIFICATIONI              DETERMINE CONSEQUENCES AND PISK DUE HIGHT NOT BE QUALIFIED TO CLOSE IN THE EVENT OF A                                      TO FAILURE OF HIGH ENERGY LINE ISOLATION VALVES TO DOWNSTREAM BREAK AND WOULD CAUSE AN UNACCE PI ABLE                                      CLOSE        DEVELOF NEW LICENSING CRITERIA TO REDUCE RISK HIGH RISK OF CORE-MELT IF BREAK NOT ISOLATED (DUE                                      TO AN ACL!PTABLE LEVEL. IF NEEDED.
TO INVENs0RY LOSS AND/OR OTHER SAFETY-RELATED STA TUS "LICENSING NEED LETTER SENT 3/11/86 TO R. MINOGUE FROM                          TWO REPRESENTATIVE VALVES IN THE RWCU SYSTEM. THESE WATER H DrNTON        IDENTIFICATION OF VALVES /0PERATORS IN THE HPCI                        FLOW TESTS WILL BE CONDUCTED AT WYLE LABS IN HUNTSVILLE.
AND RCIC THE RES/DI/EFEB CONTRACTOR (INELI IS PLANNING                                  ALABAMA VALVE-CLOSURE-DURING-F LOW TESTS AT FULL F LOW CONDI T IONS F OR AFFECTED DOCUMENTS                                                                            PROBLEM / RESOLUTION IEB 85-03 POSSIBLE SUPPLEMENT. POSSIBLE GENEkIC LETTER                                          SCHEDULE REFLECTS SLIPPAGE OF ONE YEAR TO ACCOMMODATE UNDER GSI II.E.6.I                                                                    STEAM TESTS LIKELY TO BE NEEDED IN ADDITION TO THE SCHFDULED WATER TESTS              PREVIOUS CONSIDERATION OF PERFORMING ALL TESTS AT ONCE ARE NOT POSSI3LE WITHIN THE BUDGET AND WOULD NOT BE AN EFFICIENT USE OF RESOURCES. AN ADDITIONAL FOUR MONTHS HAVE ALSO BEEN ADDED TO THE SCHEDULE TO ACCOMMODATE THE MOST RECENT INEL VALVE TESTING PROGRAM SCHEDULE . THIS ADDED F OUR MONTHS IS NEEDED TO ASSESS DATA BASE AND TRANSLATE TO A REGULATORY ANALYSIS.
AS OF FY88 QUARTER 2 O                                                                        O                                                                                  O
 
  .                                                                          m.,s                                      -
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                      PAGE:        39 ISSUE NUMBER: 87                                      TITLE: FAILURE OF HPCI STEAM LINE WITHOUT ISOLATION
                                                                        ,                  ORIGINAL          CURRENT          ACTUAL MILEST0NES                                              DATE            DATL              DATE SEND LICENSING NEED LETTER TO RES                                            03/86                  --
03/86 RECEIVE REPLY                                                                04/86                --
04/86 RECEIVE RES CONTRACTOR R E I'OR T                                            06/86                --
06/86 IDENf!FYING VALVES                                                                                                                      ,
MEET WITH RES CONTRACTOR TO                                                  07/86                --
07/86 DETERMINE NEXT PHASE OF PROGRAM RES CONTRACT 0F RECEIVES VALVE                                                09/86                --
10/86 OUALIFICATION DATA FROM SELECTED LICENSEES RIS CONTRACTOR MAKES RECOMMENDATION                                          11/86                --
11/86 FOR NEXT PHASE OF PROGRAM DEVZLOP TAP TO CARRY OUT RECOMMENDATION                                      12/86                --
08/87 MIET WITH INEL TO FINALIZE                                                    04/87                --
04/87 VALVE TESTING PROGRAM VALVE TESTING PROGRAM SUBMITTED BY INEL                                      07/87                --
10/87 CDNPLETE VALVE TESTING BY INEL                                                03/89          03/89                  --
j CRGR PACKAGE (IMCLUDING REG. ANALYSIS)                                        10/87          08/89                  --
SIGNED BY DIV. DIRECTOR CRGR PACKAGE TO RES DIRECTOR                                                  12/87            10/89                --
PACKAGE TO ACRS AND CRGR                                                      01/88            11/89                  --
(29.53)
ISSUE GL OR IEB-85-03                                                        06/88            12/90                --
SUPPLEME NT 4
AS OF FY88 OUARTER 2
 
CUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                              PAGE:  40 ISSUE NUMBER: 93                                                TITLE STFAM BINDING OF AFW PUMPS IDENTIFICATTON DATE: 07/84C                                      PRIORITIZATION DATE                  10/84C                                  TYPE. GSI                          PRIORITY: H TASK MANAGER: A. SPANO                                          OFFICE / DIVISION / BRANCH RES /DRPS/RPSI                                    ACTION LEVEL: INACTIVE              STATUS: 3B TAC NUMBERS:                                                                                                                                                                      RESOLUTION DATE- 02/88C WORK AUTHORIZATION: MEMO TO R. BERNERO FROM d DENTON DATED 10/19/84 FIN                    CONTRACTOR                                                              CONTRACT TITLE NONE                      NONE                      NONE W0R K        SC0PE GENERIC PREVENTIVE MAINTENANCE 04 MONITORING                                                          LICENSING. ETC FOR RESOLVING THE IDENTIFIED CONCERNS MEASURES MAY HAVE Tfj BE IMPLEMENTED AT ALL PWR$ ?O                                                                        EVALUATE PLAN 1-SPECIFIC INFORMATION OBTAINED FROM REDUCE THE POTENTIAL FOR BACKLEAKAGE OF STEAM AND HOT                                                          NRC TI-2515/67 AND IEB 85-01 WATER TO THE AFW SYSTEM FROM THE STE AM CONVERSION SYSTEM                                                      CONCERNING ACTIONS TAKEN BY INDIVIDUAL LICENSEES VIA ISOLATION VALVES IN THE AFW SYSTEM                                    IT IS EXPECTED                        RELATING IO SURVEILLANCE PROGRAMS FOR MONITORING THE THAT THESE MEASURES WILL REDUCE IHE LIKELIHOOD OF                                                              ATW SYSTEM FLUID CONDITIONS AND CORRECTIVE OPERATOR STEAM BINDING OF THE AFW PUMP (S) AND POSSIBLE COMMON                                                          ACTIONS FOR RESTORING POTENTIAL STEAM BOUND AFW PUMPS PODE FAILURE OF THE AFW SYSTEM BY ENSURING THAT THE                                                            TO OPERABLE STATUS-VALVES PERFORM THEIR INTENDED FUNCTION                                                                                    BASED ON THE RESULT OF IEB 85-01. DEVELOP SOLICIT RECOMMENDATIONS FROM INTERESTED INTERAGENCY                                                    ADDITIONAL AND/OR ALTERNATIVE GENERIC OR PLANT STxFF SUCH AS RESIDENT I NS PE C T OR S . OEAB STAFF IN NRR.                                                    SPECIFIC MODIFICATION
 
==S. PROCEDURE==
S. AND REVISIONS TO ENGINEERING AND PLANT SYSTEMS STAFF IN THE DIVISIONS OF                                                        PLANT TS AS NECESSARY.
STA TUS FOLLOWING CRGR REVIEW, GENERIC LETTER 88-03                                      RESOLUTION                    THIS CLOSES OUT GENERIC ISSUE 93.
OF GENERIC SAFETY ISSUE 93. WAS ISSUED ON 02/17/88 AFFECTED DOCUMENTS                                                                                                      PROBLEM / RESOLUTION LICENSEE F SAR ' S                                                                                                        AWAITING NRR ISSUANCE OF GL TO CLOSE OUT THE ISSUE AS OF FY88 QUARTER 2 O                                                                                                  O                                                                                    O
 
    .-          _            -                              -=
4 RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                            PAGE:                  41 i
ISSUE NUMBER: 93                                                                                      TITLE: STEAM BINDING OF AFW PUMPS ORIGINAL                                    CURRENT                ACTUAL MILEST0NES                                                                                          DATE                                    DATE                      DATE kbhbkIkh5bMEbTbbbk                                                                                                                    kbhh4                                        --
[bhh4 PREPARE DRAFT TAP                                                                                                                    12/84                                        --
12/84 1
DRAFT TAP APPROVED BY DSI DIRECTOR                                                                                                    12/84                                        --
01/85 INCORPORATE COMMENTS BY VARIOUS                                                                                                      02/85                                        --
06/85 DIVISIONS REVISE AND REISSUE APPROVED TAP                                                                                                      07/85                                        --
06/85 j
. -                  NRR EVALUATION OF PLANT-SPECIFIC RESPONSE                                                                                            04/86                                        --
06/86 TO IEB 85-01 EVALUATION OF IMPACT OF NSSS OWNERS GROUP                                                                                            10/86                                        --
11/86 i
CHECK VALVE PROGRAM AS RELATED TO GSI 93
.                    CONCERNS IDENTIFY GENERIC OR PLANT-SPECIFIC PREVENTIVE                                                                                        04/86                                        --
12/86 MAINTENANCE MEASURES. SURVEILLANCE l                    REQUIREMENTS AND CORRECTIVE ACTIONS EVALUATION OF STEAM BINDING CONTRIBUTION                                                                                              07/86                                        --
01/87 3                    TO AFW UNAVAILABILITY FOR REPRESENTATIVE I                    AFW PIPING CONFIGURATIONS i
i                    OBTAIN ADDITIONAL PLANT-SPECIFIC DATA ON                                                                                              08/86                                        --
01/87 j                    MONITORING PROCEDURES ANALYSIS OF EFFECT OF CONTINUOUS MONITORING /                                                                                        11/86                                        --
01/87
;                    CONTROL ROOM ALARM ON ESTIMATED AFWS A                    RELIABILITY i                    PREPARE INITIAt DRAFT OF VALUE/ IMPACT                                                                                                12/86                                        --
02/87 l                    STATEMENT REG ANALYSIS APPROVED BY DRPS                                                                                                        07/86                                        --
05/87 1
DIRECTOR AND SENT TO RES DIRECIOR J
i                    FINAL RESOLUTION APPROVED                                                                                                            06/87                                        --
05/87                              '
!.                  BY RES i                                                                                                                                                                                                                                                            -
AS OF FY88 QUARTER 2
{,
J
 
RUN DATE: 05/11/88 GEWERIC ISSUE MANAGEMENT CONTROL SYSTEM                  PAGE:          42 l
l  ISSUE NUMBER: 93                                            TITLE- STEAM BINDING OF AFW PUMPS 4
I i                                                                                                  CRIGINAL        CURRENT          ACTUAL
,                                              MI LE S TONE S                                            DATE        DATE            DATE j
;                NRR CONCURS WITH FINAL RESOLUTION                                                    06/87              --
06/87 i
i                NRR ISSUE GL 88-03                                                                  07/87              --
02/88 l
1 1
)
i i
f i
t
!                                                                                                                                                              t' i
i i
4 l                                                                                                                                                              l 1
i I
i l                                                                                                                                                              I AS OF FV88 QUARTER 2 i                                                                                                                                                              [
t A                                                                                                                                                              ;
I l
l 1
9                                                                                9                                                          9
 
m                                                                                                  N                                                                                                      -
ss _,                                                                                            '                                                              '
                                                                                                                                                                                                                                                                \d RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                  PAGE:                              43 ISSUE NUMBER: 94                                                TITLE: ADDITIONAL LOW-TEMP. OVERPRESSURE PROTECTION FOR LWRS IDENTIFICATION DATE: 08/84C                                      PRIORITIZATION DATE- 07/85C                                            TYPE: GSI                          PRIORITY: H TASK MANAGER: E. THROM                                          OFFICE / DIVISION / BRANCH: RES /DRPS/RPSI                            ACTION LEVEL: ACTIVE              STATUS:
TAC NUMBERS:                                                                                                                                                                RESOLUTION DATE- 12/88 WORK AUTHORIZATION: MEMO TO R. BERNERO FROM H DENTON DATED 7/23/85.
FIN                  CONTRACTOR                                                                  CONTRACT TITLE B2238                  PNL                        LDW IEMP OVERPRESS PROT SYS EVAL FOR PWRS WORK              SC0PE EVALUATE CURRENT OPERATING DATA. APPLYING STS                                                        SOLID. LIMITING START OF THE. REACTOR COOLANT PUMP. USING TO ALL SYSTEMS. UPDATING LTOP SET-POINTS TO CURRENT                                                                RHR RELIEF VALVES. REQUIRING THE LTOP TO BE "SAFETY-APPENDIX G CURVES. PROHIBITING OPERATION WITH EITHER LTOP                                                          GRADE" AND VALUE/ IMPACT OF THESE ALTERNATIVES.
TRAIN OUT OF SERVICE OR HPI PUMP IN SERVICE WHILE WATER STA TUS A REVIEW OF LER DATA. AND RECENT MEETING WITH                                                                    TAP REVISED 8/87 TO REFLECT NEW NRR ORGANIZATION.
OWNERS
* GROUPS INDICATED THAT LICENSEES A'AE AWARE OF THE                                                                    TASK 4 THROUGH 7 AND THE TASK 11 VISA CALCULATIONS NEED TO UPDATE LTOP SE T-POINTS TO ACCOl'4T FOR SHIFT IN                                                          REASSIGNED TO PNL.          REQUEST FOR MODIFIED 189 ON 8/25/87,                                  ,
APFINDIX G CURVES DUE TO VESSEL EMBRIr LEMENT.                        a            AND                          AUTHORIZED 2/10/88.                                                                                1 REVISION 2 TO REG. GUIDE 1.99.
AFFECTED DOCUMENTS                                                                                          PROBLEM / RESOLUTION
_--.---          ..-_---.-r----_-_----__              ._-_-_--_ --.-----.-_-_-----                                ....-....---------------.---------....----....-_--....-.....
SRP 5.2.2, BTP 5-2. STS                                                                                            I/19/88 MILLSTONE 3 LER-28-005 - BOTH PORVS AND BOTH RHR SRV'S UNAVAILABLE TO MITIGATE OVERPRESSURE EVENT.
OPERATING EXPERIENCE FOR 1987 AND THIS EVENT WERE REVIEWED BY CONTRACTOR TO DETERMINE IMPACT ON PREVIOUSLY COMPLETED WORK.        COMPLETION OF TASK 10 AND 12 DELAYED SLIGHTLY TO 4/88.        NET IMPACT OF UPDATING PREVIOUSLY COMPLETED ANALYSES WOULD BE ABOUT 10% DECREASE IN OVERALL RISK DUE TO LARGE NUMBER OF ACCUMULATED RYS EXPERIENCE WITH NO ADDITIONAL SIGNIFICANT EVENTS.
AS OF FY88 QUARTER 2
 
CUN DATE: 03/11/88 GENEDIC ISSUE MANAGFMENT CONTROL SYSTEM                      PACE:          44 ISSUE NUMBER: 94                                            T I T Lt_ . ADDITIONAL LOW-TEMP OVERPRESSURE PROTECTION FOR LWRS ORIGINAL          CURRENT          ACTUAL M I LE ST ON E S                                                DATE          DATE            DATE GSI 94 ASSIGNED TO                                                                      07/85                --
07/85 RSB/DSI/NRR DRAFT OF TAP COMPLETED                                                                  11/85              --
05/86 FINAL TAP APPROVED BY DSRO DIRECTOR                                                    02/86                --
06/86 ISSUE RFP                                                                              06/8E                --
06/86 AWARD T/A CONTRACT                                                                      11/86              --
12/86 TASK - 1 UPDATE OPERATING DATA                                                          11/86              --
12/86 D.TERMINE IF REGULATORY ANALYSIS FOR                                                    01/87              --
02/87 TASKS 4 AND 5 SHOULD BE PERFORMED TASK 2 - CDiLATE PLANT DATA                                                              03/87              --
04/87 TASK 3 - UPGRADE TO CURRENT STS                                                        03/86              --
06/87 CSI-99 CONTRACTOR REPORT DUE                                                            02/87              --
07/87 YASK 4 - LTOP SET-POINTS (APPENDIX G)                                                  03/87                --
02/88 TASK 5 - STS FOR BOTH LTOP CHANNELS                                                    04/87                --
02/88 TASK 6 - UPDATE SI STS REQUIREME N T S IF                                              04/87                --
02/88 STS DEFICIENT TASK 7 - UPDATE RCS TS REQUIREMENTS IF                                                  04/87                --
02/88 STS DEFICIENT TASK S - EVALUATION OF E.!R MCDIFICATIONS                                                63/86                --
03/88 TASK 9 - PERFORMANCE EVALUATION FOR RHR                                                06/87                --
03/88 MODIFICATIONS TASK 11 - CORE-MELT FREQUENCY REDUCTION                                                  09/97                --
03/88 YASK 10 - PERFORMANCE EVALUATION OF                                                      06/86          04/88                  --
SAFETY GRADE LTOP AS OF FY88 OUARTER 2 O      -
O                                                              O
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                PAGE:        45 ISSUE NUMBER: 94                                      TITLE: ADDITIONAL LOW-TEMP. OVERPRES$URE PROTECTION FOR LWRS ORIGINAL      CURRENT        ACTUAL MILESTONES                                                  DATE      DATE            DATE TASK 12 - VALUE/ IMPACT EVALUATION                                              12/87      04/88                --
DRAFT REG. ANAL. PREPARED. TO ACRS. TO                                          05/86      05/88                --
CRGR AND TO OTHER OFFICES / DIVISIONS FOR COMMENTS (29)
ISSUE CLOSEOUT MEMORANDUM IF NO                                                  10/86      07/88                --
PUBLIC COMMENTS REQUIRED DRAFT REG. ANAL. FOR PUBLIC COMMENT                                            07/88      07/88                --
INCORPORATE PUBLIC COMMENTS                                                    09/88      09/88                --
FINAL RESPONSE TO ACRS, CRGR,                                                  10/88      10/88                --
OTHER OFFICES / DIVISIONS (53)
FINAL CLOSEOUT                                                                  12/88      12/88              --
i
                                                                                                                                                          .i I
AS OF FY88 OUARTER 2..
i 6
                                                                            .                                                                        ~ .i
 
CUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                PAGE-          46 ISSUE NUMBFA: 99                                                        TITLE: RCS/RHR SUCTION LINE INTERLOCKS ON PWRS IDENTif!LrtION DATE: 09/84C                                            PRIORITIZATION DATE 08/85C                                                          TYPE: GSI                                        PRIORITY. H TASK MANAGi<                      A. SPANO                            OFFICE / DIVISION / BRANCH RES /ORPS/RPSI                                            ACTIOri LEVEL - ACTIVE                            STATUS.
TAC NUMBERS                                                                                                                                                                                                    RES0tOTION DATE 08/88 WORK AUTHORIZATION: MEMO TO R. BERNERO FROM H. DENTON DATED 8/13/85 FIN                              CONTRACTOR                                                                CONTRACT TITLE A3849                                BNL                IMPROVED RELIABILITY OF RHR CAPAFILITY IN PWRS W0R K              SC0PE OPERATING EXPERIENCE SHOWS THAT A CHANGE IN THE                                                                    TO QUANTIF Y THE COST-BENEFIT ASPECTS OF- (A) REPLACING AUTOCLOSURE FEATURE OF THE RCS/RHRS ISOLATION VALVE                                                                              THE EXISTING AUTOCLOSURE INTERLDCn BY ONE THAT INTERLOCKS IS NEEDED TO ELIMINATE A LEADING CAUSE OF                                                                            FULFILLS ITS DESIGN BASIS SAFETY FUNCTION WHILE THE LOSS OF RESIDUAL HEAT REMOVAL DURING PLANT OUTAGE                                                                            RED. THE PROBAB 0F FAILURE OF THE RHR SAFETY FUNCTICN, OPERATIONS.                      ADDITIONAL LOSS-OF-RHR EVENTS HAVE                                                              (31 IMPROVING THE RELIABILITY OF PROCEDURES AND RESULTED FROM INADEQUACIES IN THE RCS WATER LEVEL                                                                                MONITORING DURING DRAINEO RCS OPERATIONS. (Cl ME ASUREMENT AND RELATED MONITORING BY THE OPERATOR                                                                              IMPROVING RELIABILITY OF OPERATOR MONITORING AND AS WELL AS BY OTHER HUMAN ERROR RELATED INADEQUACIES                                                                            MITIGATION OF LOSS OF RHR FLOW CONDITIONS, AND (D)
IN PLANT GUTAGE PROCEDURES. TRAINING AND                                                                                        IMPROVING THE RELIABILITY OF APPROPRIATE ADMINISTRATIVE CONTROLS                                                                                                          ADMINISTRATIVE CONTROL AND OPERATOR PR GCEDURES THE SCOPE OF THIS TASK AS DEFINED IN 2/36 IS                                                                        RELATED TO COLD SHUTDOWN OPERATIONS.
STA TUS PURSUANT TO THE DIABLO CANYON-2 LOS -OF-                                                                            INFORMATION IMPORTANT TO THE RESOLUTION OF GSI $9.
RHR EVENT OF 4/10/81, NRC'S ISSUANCE OF A 50 SAF                                                                                REVIEW OF RESPONSES INITIATED.
LETTER WILL PROVIDE A LARGE BASE OF PLANT-SPECIFIC AFFECTED DOCUMENTS                                                                                                    PROBLEM / RESOLUTION NONE                                                                                                                          REPORT SUBMITTED ON SCHEDULE (1/88) BUT ADDRESSING ADDITIONAL NRC COMMENTS ON THE REPORT DELAYED ISSUANCE OF THE REPORT BY ABOUT 3 MONTHS WITH MINOR IMPACT ON THE FINAL COMPLETION DATES.                          THE MILESTONE REGAPDING THE PROPOSED NRR - INDUSTRY MEETING ON MID-LOOP ISSUES HAS BEEN AS OF FY88 CUARTER 2 O                                                                                                          O                                                                                                            O
 
a                        -_-__            _          LA..                --
                                                                                                                                                                                                                                  \
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                PAGE:    47 ISSUE NUMBER: 99                                                                          TITLE: RCS/RHR SUCTION LINE INTERLOCKS ON PWRS AFFECTED DOCUMENTS                                                                                            PROBLEM / RESOLUTION DROPPED DUE TO UNCERTAINTY IN SCHEDULING.                              ALSO. THE MILESTONE ON REVIEW OF INDUSTRY PROGRAMS HAS BEEN DROPPED DUE TO UNCERTAINTY IN THEIR STATUS. BOTH MILESTONES WILL NOT SIGNIFICANTLY IMPACT THE COMPLETION SCHEDULE.
  ,                                                                                                                                                        ORIGINAL                        CURRENT                  ACTUAL
  !                                                                                                        MILESTONES                                        DATE                          DATE                    DATE bhhh9khhbNEbTbhhhhbbkhNhh                                                                        -
08h8h 4                    -                                            PRELIMINARY DISCUSSION OF WORK PLAN WITH BNL                                              02/86                              --
04/86 DRAFT BNL WORK PLAN                                                                        03/86                              --
05/86 FINAL BNL WORK PLAN APPROVED                                                              04/86                              --
05/86 ISSUE CONTRACT TO BNL                                                                    05/86                              --
06/86 IDENTIFY ALTERNATIVE PATHS FOR RESOLUTION                                                08/86                              --
10/86 0F IDENTIFIED CONCERNS (BASED ON INPO.
EPRI. AEOD AND OTHER STAFF RECOMMENDATIONS)
PRELIMINARY DISCUSSION WITH BNL ON                                                        09/86                              --
10/86
;                                                                MODIFICATION OF CONTRACT WORK PLAN TO ACCOMODATE EXPANDED SCOPE 1                                                                FINAL BNL CONTRACT MODIFICATION APPROVED                                                  11/86                              --
11/86 DRAFT REPORT FROM BNL                                                                      03/87                              --
03/87 REVISED DRAFT REPORT FROM BNL                                                              06/87                              --
07/87 NRC ISSUANCE OF 50.54F LETTER WITH                                                          06/87                              --
07/87 60-DAY RESPONSE TIME INITIATE REVIEW OF 50.54F RESPONSES                                                        09/87                              --
10/87 a
FINAL REPORT FROM BNL ?.N ACCORDANCE                                                        04/87                          04/88                      --
l                                                              WITH EXPANDED WORK SCOPE i
AS OF FYE8 QUARTER 2 l'
1
,i e
t 4
e
_ _ _ _ _ _ _ . _ _            _ . _ _ _ _ _ _ _ _ . _ _ _ _                    _ _ _ _ _ - _ _ _ _ _ _ . _        _-                  m -
 
CUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                PAGE:          48 ISSUE NUMBER: 09                                      TITLE: RCS/RHR SUCTION LINE INTERLOCKS ON PWR$
ORIGINAL      CURRENT        ACTUAL MILEST 0N ES                                              DATE      DATE            DATE PREPARE INITIAL PHASE OF REGULATORY ANALYSIS                                  09/86            --
J3/88 (STATEMENT OF PROBLEM. PROPOSED LICENSEE ACTIONS AND ALTERNATIVES)
INCORPORATE 50 54F INFORMATION AS PART OF                                      10/87      04/88                --
REGULATORY ANALYSIS INTERNAL DRPS REVIEW OF DRAFT CPGR PACKAGE                                    11/87      05/88                --
FINAL REPORT PREPARED /CRGR PACKAGE APPROVED                                  10/87      06/88                --
BY DRPS DIRECTOR AND SENT TO OTHER DIVISIONS FOR COMMENT COMMENTS FROM OTHER DIVISIONS / PACKAGE                                      01/88      06/88                --
SENT TO RES DIRECTOR PACKAGE SENT TO CRGR (29, 53)                                                08/87      07/88                --
ISSUE CLOSE00T MEMO                                                            10/87      08/88                __
AS OF FY88 OUARTER 2 O                                                                          O                                                      O
 
                                                                                                                                                                                                                        -n                      -
s                                                                                            %                                                                    /'~%s T
                                                                                                                    )                                                                                        %                                                    ,                  (%)'
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                              PAGE:        49 ISSUE NUMBER: 101                                                                              TITLE BREAK PLUS SINGLE FAILURE IN BWR WATER LEVEL INSTRUMENTATION IDENTIFICATION DATE: 09/84C                                                                    PRIORITIZAiION DATE: 05/85C                                    TYPE: GSI                      PRIORITY: H TASK MANAGER: A. SZUKIEWICZ                                                                      OFFICE / DIVISION /BRANLH- RES /DE /EIB                        ACTION LEVEL: ACTIVE            STATUS:
TAC NUMBERS:                                                                                                                                                                                    RESOLUTION DATE: 03/90 WORK AUTHORIZATION: MEMO TO R. BERNERO FROM H. DENTON DATED 5/6/85.
FIN                                  CONTRACTOR                                                CONTRACT TITLE D6020                                        INEL          BWR WATER LEVEL REDUNDANCY W0R K                SC0PE PERFORM A DETAILED SURVEY OF ALL BWR PLANTS TO DETERMINE                                                                                      WOULD HAVE PROBLEM WITH EXISTING WATER LEVEL TYPES OF WATER LEVEL INSTRUMENTATION. COMPILE FAILURE                                                                                        INSTRUMENTATION WHEN SUBJECTED TO AN INSTRUMENT LINE DATA FROM LER*S OF INSTRUMENT PIPING LEAKS / BREAKS AND                                                                                        BR[AK AND AN ADDITIONAL SINGLE FAILURE. EVALUATE RISK INSTRUMENT JAILURES FOR ALL BWR PLANTS.                                                                PE RF ORM                            REDUCTION AND COSTS OF VARIOUS FIXES AND PERFORM A SIMPLIFIED RISK ANALYSES POSTULATING INSTRUMENT PIPING                                                                                        VALUE/ IMPACT ANALYSIS. MAKE RECOMMENDATIONS TO RESOLVE LEAKS. SINGLE FAILURE IN INSTRUMENTS AND FEED WATER                                                                                            THIS ISSUE.
CONTROL SYSTEN FAILURE TO DETERMINE WHICH BWR PLANTS STA T US INEL PROPOSAL FOR T/A ON THIS PROJECT WAS ACCEPTED ON                                                    ARE CURRENTLY BEING ADDRESSED BY THE CONTRACTOR.                      THE 11/29/85 AND WORK BEGAN CN 3/1/86. A DRAFT TECHNICAL                                                                                          RESOLUTION OF THE COMMENTS WILL BE INCORPORATED IN THE EVALUATION REPORT WAS RESUBMITTED FOR REVIEW IN DEC. 1987.                                                                                    FINAL REPORT.        THE REPORT INCLUDES THE TECHNICAL FINDINGS THE REPORT WAS REVIEWED BY THE STAFF. STAFF COMMENTS                                                                                          (PART I) AND THE REGULATORY ANALYSIS (PART II),
AFFECTED DOCUMENTS                                                                    PROBLEM / RESOLUTION                                                  ;
DRAFT REPORT: GENERIC ISSUE 101 BOILING WATER REACTOR                                                              NONE LEVEL SENSING LINE BREAK AND N0ZZLE FAILURE DATED. DEC.
1987.                                                                                                            -
AS OF FY88 QU#RTER 2 4
                                                                                                                                                      -                      \
 
RUN DATE: 05/11/8R GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                      PAGE:          50 ISSUE NUMBER 101                                          TITLE- BREAK PLUS SINGLE FAILURE IN BWR WATER LEVEL INSTRUMENTATION ORIGINAL        CURRENT            ACTUAL M ILEST 0NE S                                                  DATE          DATE              DATE GSI-101 ASSIGNED TO RS8/DSI/NRR                                                            --            --
05/85 PRELIMINARY DISCUSSION OF WORK PLAN                                                        --            --
05/85 WITH INEL INEL PROVIDES PRELIMINARY COST                                                        06/85              --
06/85 ESTIMATE OF WORK PLAN                                                                                                                3 DEVELOP WORK PLAN AND CONTRACT PROPOSAL                                              06/!5              --
07/85 DRAFT WORK PLAN TO DSI DIRECTOR                                                      06/85              --
08/85 INCORPORATE COMMENTS INTO WORK PLAN                                                  09/85              --
10/85 FINAL WORK PLAN APPROVED BY DSI DIRECTOR                                              09/85              --
10/85 AND FORWARDED TO DST ISSUE CONTRACT TO INEL                                                                10/85              --
11/85 ASSEMBLE PLANT-SPECIFIC INSTRUMENTATICM                                              07/86                --
08/86 INFORMATION CATEGORIZE ALL BWRS INTO GROUPS                                                      08/86                --
11/86 SINGLE FAILURE ANALYSIS                                                              09/86                --
12/86 PROBABILISTIC RISK ASSESSMENT                                                          10/86              --
03/87 VALUE/ IMPACT ANALYSIS                                                                12/86              --
03/87 DRAFT REPORT FRDM INEL TO NRR                                                        01/87                --
03/87 FINAL REPORT FRDM INEL TO NRR                                                          03/87              --
12/87 DRAFT REGULATORY ANALYSIS                                                            07/87                --
12/87 DTR ISSUED TO STAFF FOR TECHNICAL                                                      04/88        04/88                  --
R E VIEW / COMME NT S OTR PACKAGE ISSUED FOR DIVISION REVIEW                                                06/87        06/88                  --
AND CONCURRENCE AS OF FY88 QUARTER 2 O                                                                              O                                                              O
 
    ..-- ---.c            .  . . . . -    . - . - - . - - . . . ~ .          . . = ~ . . .- - . _  . - .        - . -. . . . ~ - - . . . ._.                          -      .
j                                                                                                                                                                                        s I
l                                                                                                                                                                                                      .
j                                                                                                                                                                                                        ;
j                                                                                                                                                      RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                        PAGE:          51 1
ISSUE NUMBER:    101                                  TITLE: BREAK PLUS SINGLE FAILURE IN BWR WATER LEVEL INSTRUMENTATION I
4 t
j                                                                                                          ORIGINAL                CURRENT                    ACTUAL j                                                    MI LEST0N[ $                                            DATE                    DATE                      DATE j                                bkVkskbhbkPbh[bkkkbhbRkEVk[Ybfbhk                                          bh/hh                  bh/hh                              -                                  f
;                                  COMPLETED DTR CONCURRENCE BY OTHER OFFICES                                          09/88                  09/88                          --
2                                  COMPLETED ISSUE DTR PACKAGE TO CRGR (29)                                            07/87                  09/88                          --
ACRS REVIEW OF DTR COMPLETED                                      ,
02/88                  11/88                        --
  '                                CRGR REVIEW COMPLETED                                                      11/88                  11/88                          --
l 1                                                                                                                                                                                                        ;
5                                  FRN OF ISSUANCE OF DTR FOR PUBLIC                                          02/89                  02/89                          --
}                                COMMENT                                                                                                                                                                  I REVISE RESOLUTION Pt.CKAGE TO                                              07/89                  07/89                          --
i                                REFLECT PUBLIC COMMENTS AND COMPLETE FINAL RESOLUTION PACKAGE.
f                                  DIVISION DEPUTY DIRECTOR                                                  08/89                  08/89                          ---
REVIEW COMPLETED CONCURRENCE SY OTHER                                                      10/89                  10/89                          --
j l'                                OFFICES COMPLETE                                                                                                                                                        .
CRGR REVIEW OF FTR COMPLETED (53)                                          12/89                  12/89                          --
FRN OF ISSUANCE OF FTR                                                    03/90                  03/90                          --
i I
l 4
t, z                                                                                                                                                                  AS OF FY88 QUARTER 2 t
}
                                                                                                                                        . - . ,  . . . .      ,~,          .-m. - . ... m. -.. . .
 
l DUN DATE: 03/11/88 GENERIC ISSUE MANAGE MENT CONTROL SYSTEM                                              PAGE:  52 ISSUE NUMBER-      102                            TITLE: HUMAN ERROR IN EVENTS INVOLVING WRONG UNIT OR WRONG TRAIN IDENTIFICATION DATE: 09/84C                        PRIORITIZATION DATE O2/85C                                                TYPE: GSI                PRIORITY TT.SK MANAGER: R.      FCKENRODE                  OF F ICE / DIVISION /BR ANCH NRR /DLPQ/LP[8                                ACTION LEVEL. ACTIVE    STATUS: NR TAC NUMBERS.      M57269                                                                                                                              RESOLUTION DATE. _-- -
WORK AUTHORIZATION: MEMO FOR R. BERNERO. ET Al FROM H DENTON DATED 2/13/35 FIN              CONTRACTOR                                                                  CONTRACT TITLE W0R K              SC0PE IN JANUARY 1984 AEOD ISSUED A SPECI AL STUDY RE PORT                                                          THE MAINTENANCE AND SURVEILLANCE SECTION (HFMT)
DESCRIBING A NUMBER OF EVENTS THAT RESULTED FROM HUMAM ERROR                                                IDENTIFIED EXISTING PRACTICES THAT MAY LEAD TO HUMAN ERRORS IN REMOVING EQUIPMENT FROM SERVICE OR R E S T OR I NG E QU I PME N T ,                                      INVOLVING WROMG UNIT / WRONG TRAIN AND RECOMMENDED FOLLOWING MAINTENANCE THAT INVOLVED WRONG UNIT OR WRONG                                                    IMPROVEMENTS THAT MAY BE APPROPRIATE. THE SCOPE OF THIS TRAIN OF EQUIPMENT BEING PENDERF.D UNAVAILABLE. ALTHOUGH THE                                                PROJECT INCLUDED REVIEW OF OPERATING EXPERIE NCE . CO NC 'JC T ING SCOPE OF THE STUDY WAS NARROW, AEOD FOUND THAT 19 OUT OF 27                                                SITE VISI)S. INTERVIEWING LICENSEE PERSONNEL AT A SELECT EVENTS IDENTIFIED RESULTED F?OM HUMAN ERROR DURING                                                          NUMBER OF PLANTS TO DETERM'NE THE EXTENT AND NATURE OF LOSS MAINTENANCE AND SURVEILLANCE TESTING.                    AEOD CONSIDERED SUCH                              OF SAFETY FUNCTION RESULTING FROM ERRORS INVOLVING THE WRONG EVENTS TO BE EXAMPLES OF EVENTS THAT COULD HAVE HIGH SAFETY                                                UNIT / WRONG TRAIN AND IDENTIFIED ACTIONS FOR RESOLUTION Of SIGNIFICANCE DUE TO POTENTIAL LOSS OF SAFETY SYSTEM                                                        THE GSI OR FOR FUPTHER INVESTIGATION.
FUNCTIONS.
STA T US A MEETING WITH THf INDUSTRY WAS HELD ON 8/I5/86 TO                                                  DIRECTION TO DEVELOP A POLICY STATEMENT ON MAINTENANCE-PRESENT NRC FIMDINGS AND RECOMMENDATIONS                        THE STAFF WILL                            FURTHER STAFF ACTION ON THIC ISSUE WILL BE ADDRESSED EVAlbATE INDUSTRY INITIATIVES AS A RESULT OF STUDY. IE                                                      FOLLOWING COMMISSION ACPROVal 0F THE POLICY STATEMENT ON INFORMATION NOTICE NO                  87-25 ISSUED 9N 6/11/87                                              MAINTENANCE.
RESOLUTION OF THIS ITEM WAS INCORPORATED INTO STAFF                                                            NRR JNTENDS TO TRANSFER THIS ISSUE TO RES CONSISTENT EFFORTS ON HF-8, MAINTENANCE AND SURVEILLANCE PROGRAM.                                    Hf-8              WITH COMMISSION DF. CISION TO DEVELOP A RULE ON MAINTENANCES IS CURRENTLY BEING REVISED TO ADDRESS JHE COMMISSION                                                        (SEE ISSUE HF8)
As nF FY88 CUARTER 2 O                                                                                          O                                                                  O
 
_____....m..                  ._m._.-..-.._.._                          ___ _.....____... - =-        ._.m._..          .  ._m_              _.....            ._ . _ _ __._.                  . . . _ - . _ . . . . ._
s L
P
                                    %  ..y                                                                                                                                                          A                                                  ,
I P
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                          PAGE:        53'                                ,
L ISSUE NUMBER: 102                                            TITLE: HUMAN ERROR IN EVENTS INVOLVING WRONG t, NIT OR WRONG T2AIN t
i AFFECTED DOCUMENTS                                                                                    PROBLEM / RESOLUTION                                                            r NONE                                                                                              NONE                                                                                                                      i t
i ORIGINAL                          CURRENT                          ACTUAL                                      i MILEST0NES                                                    DATE                            DATE                            DATE                                      :
DEVELOP TAP                                                                      04/85                                --
04/8s                                      I DEVELOP PROTOCOL. CONDUCT SITE VISITS.                                            03/86                                --
03/86                                      j AND WRITE TRIP REPORTS                                                                                                                                                                          1 ISSUE FINAL STUDY REPOR1 CONTAINIri                                              04/86                                --
04/86                                      t RECOMMENDATIONS FIRST MEETING WITH INDUSTRY                                                      08/86                                --
08/86 SECOND MEETING WITH INDUSTRY                                                      03/87                                --
03/87 EVALUATE ErFECTIVENESS OF INDUSTRY                                                10/87                                TBD                              --
INITIATIVES
                                                                                                                                                                                                                                                    . i I
f 8
t i                                                                                                                                                                                                                                                        i AS OF FY88 OUARTER 2
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                      PAGE:  54 ISSUE NUMBER:                103                                  TITLE. DESIGN FOR PROBABLE MAXIMUM PRECIPITATION IDENTIFICATION DATE: 10/84C                                        PRIORITIZATION DATE 09/85C                                                                            TYPE: GSI                              PRIORITY:
TASK MANAGER: R. KORNASIEWICZ                                      OFFICE / DIVISION /0 RANCH RES /DE /EIB                                                              ACTION LEVEL- ACTIVE                    STATUS. NR TAC NUS.BERS:              E                                                                                                                                                                                    RESOLUTION DATE 04/89 WORK AUTHORIZATIOH; MEMO TO J.                              KNIGHT F ROM H DENTON DATED 9/4/85 FIN                      CONTRACTOR                                                                                        CONTRACT TITLE NONE                          NONE                      NONE W0R K                    SC0PE REVISE SRP SECTIONS 2 4.2 AND 2.4 3 INCORPORATING                                                                                DEVELOP RECOMMENDATIONS REGARDING BACKFIT NEW NATIONAL WEATHER SERVICE PROCEDURE S F OR DETERMINATION                                                                              APPLICATION OF NEW PMP VALUES.                                  OBTAIN OF PROBABLE MAXIMUM PRECIPITATION lPMP)                                            PREPARE                                                NECESSARY REVIEW AND APPROVALS. THEN PUBLISH REGULATuRY ANALYSIS (VALUE/ IMPACT) FOR USE OF NEW                                                                                        REVISION 3 OF SRP SECTIONS 2 4.2 AND 2 4 3 PMP VALUES              PREPARE A PACKAGE FOR REVIEW BY CRGR S TA T as S NW      LbENSkkN0hkFkbAkkbNLkkhERBkkNbbkVElbhkbBY                                                                              NhR AFFECTED DOCUMENTS                                                                                                                            PROBLEM / RESOLUTION SRP SECTIONS 2.4.2 AND 2.4.3                                                                                                              DUE TO THE 11/85 NRR REORGANIZATION AND PRIORITY WORK.
A F IVE-MONTH E ELAY DCCURED,                                RE-REVIEW BY NEW NRR DIVISIONS AND OGC REQUIRED A 50.54(F) REQUEST TO BE ISSUED TO LICENSEES. DSRO ASKED FOR A STAFF PRA 0F THE MERIT OF THE 10 CFR 50.54lF) REQUEST BEFORE SENDING PACKAGE TO THE NRR DIRECTOR.              NRC REORGANIZED IN 4/87 BEFORE PACKAGE WAS SENT TO THE NRR DIRECTOR                            AFTER THE REORGANIZATION, NRR DID NOT CONCUR WITH THE ISSUAdCE OF A 50 54(FI LETTER                                    DGC WAS ASKED TO REASSESS THE NEED FOR A 50.54(FI LETTER                                    THEY RESPONDED IN A 10/19/87 MEMORANDUM THAT THEY ~ BELIEVED THAT THERE IS SUFF ICIENT JUSTIFICATION TO ISSUE A 50 54(F)
LETTER                - NRR IS DEVELOPING AN ALTERNATE PROPOSAL THAT WILL THE N HAVE TO BE NEGOTIATED WITH OGC.                                THIS SLOW PROCESS AS OF FY88 OUARTER 2 n
 
        .m . . . . . .      _... _ _ . . .                      . _ _ _ _ _                    _                    _ . . _ _      _                          ,      .                                        . _.
                                                                                                                                                                                                                                                                          ~
h.
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                        PAGE;        55                      m s
ISSUE NUMBER:                      10's TITLE DESIGN FOR PROBABLE ttAMIMUM PRECIPITATION                                                                '
AFFECTED DOCUMENTS                                                                                                                          C'        -
                  . __________ .._______.....-_.._-.._..-------------..------.                                                                    ------.-----------.--------------.- ICM PROBLEM /RESOLUT OF                                                            ------.------              ---------
s REACHING FURTHER        DELAYS AGPEEMENT ON THE PROPOSED RESOLUTION HAS CAUSED .
IN RESGLUTION OF THIS ISSUE.                          IN MARCH. 1988 A PROPOSAL FOR A GENERIC INFORMATION LETTER WAS RECEIVED                                                    i
                                                            ~
FROM NRR AND WAS INFORMAU Y CIRCULATED TD CGC                                          OGC HAS N '
m                                                      ADVISED THAT THEY HAVE NO OBJECTION AND WILL CONCUR ON                                                              "
x                                                                  %,
THE PROPOSED GENERIC LETTER.                                                                                      -.
x M-! L E $ T 0 N E S                                                            ORIGINAL                  CURRENT                          ACTUAL s
DAIE                    DATE                            DATE IDENTIFICATION OF POTENTIAL GENERIC                                                                    05/84
                                                                                                                                                                                                                  .__.......                  s x          RFOUIREMENT CONCERivING DESIGN FOR 05/84        N PMP/ MEMO V. STELLO TO H. TRENTON                                                                                                                                                    ,
                                                                                                                                                                                                                                                                              ^
v PREPARE DRAFT REVISIONS OF SRP SECTIONS                                                                07/85                          --
2.4.2 ALD 2.4.3                                                                                                                                                  07/85
* CRGR PACKAGE SENT DST. DL. OSI. AND PPAS FOR GIVISION REVIEW i            07/85                                                                                                  :
07/85'                                      -
CRGR PACKAGE REVIEWED BY DIVISIONS                                                                      08/85                          --                                                                                  '"
08/85_
DST COMMENTS ON CRGR PACKAGE _                                                                          09/85                        --
09/85 REVISi"D CRG$t PACKACC- 3Asi M N COMMENTS                                                                10/85                                                    10/85 g
REVISED CRGR PACKAGE REVIEk:0 BY 11/85                                                                  09/86 RECRGANIZED NRR DIVISION                                                                                                            --
09/86
!                                                  -BASED CN DIVISION COMMENTS AND OGC                                                                      12/86                                                    01/87 REVIEW. CRGR PACKAGE WILL INCLUDE 30.54tF) REQUEST TO LICENSEES
* ws                                                                                                                                                                                                        ' '1
(                                            m DSRO DIRECTOR REQUEST FOR PRA                                                                            02/87                      --
7
,                                          , _ - LE. ASSESSMENT T TE R TO LICENSEES    OF MERIT OF 50.54(Fl                                                                                                                    03/87
                                                                                                                                                                                                                                ~
l i                              --                  t.DVANCE COPIES OF REVISED CRGR PACKAGE                                            i,                    01/87 I.
ISSUED TO OTHER OFFICES                                                                                                              --
05/87 t                                                                                                                                                                                                                                          2
                                                                                                                                                                                                                ,        %,                  ('~
4,                                                                              '
                                                                                                                                                                                                                        ~-                    % '"
?
4,                                                                                                                                                                                                                      AS OF FY88 QUARTER 2 I                                                                                                                                                                                                                                                                            4
<                                                                                                                                                                                                                                                                          ~ 1g
$                                                                                                                                                                                                                                  h a                                                                                                                                                                                                                                                                                .
s%
4                                                                                                                                                                            .w
                                                                                                                                                                                                ^
_ . _ . _ _ . _ _            _ ._                _.___t.____________________________.______.___._________.-_                              _    -_____.s          ._X.          _.                .-                    , - - .            .m
 
RUN DATE: 05/11/88 PAGE:            56 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM ISSUE NLMdER: 103                    TITLE: DESIGN FOR PROBA6LE MAXIMUM PRECIPITATION ORIGINAL        CURRENT        ACTUAL DATE          DATE          DATE MI LE ST ONE S                            -- -------    --.--- ---      ----------
CRGR PACKA7E CONCURRENCE f. 'NC OFFICES                      11/85        04/88              --
RESOLVE OFFICE DIFFERENCES P
* REVISE PACKAGE                09/87        04/88              --
PACKAGE CONCURRENCE BY NRC OFFICES AND OGC                    10/87        04/88              --
REVIEW AND APPROVAL BY DIRECTOR DE/RES                        11/87        05/88              --
PACKAGE SENT TO CRGR (29)                                    12/87        07/88              --
CRGR REVIEW AND APPROVAL                                      12/85        09/88              --
FRN OF ISSUANCE OF REV. 3 TO SRP SECTIONS                    01/86        10/88              --
2.4.2 AND 2.4.3 FOR PUBLIC COMMENT CRGR PACKAGE REVISED INCORPORATING PUBLIC                    04/86        01/89              --
COMMENT REVISED CRGR PACKAGE REVIEWED AND                            05/86        03/89                --
APPROVED BY CRGR (53)
FRN ISSUING REV. 3 TO SRP SECTIONS                          07/86        04/89                --
2.4.2 AND 2.4 3 GENERIC LETTER ISSUED TO LICENSEES                            11/87        04/89              --
BY NRR LICENSING DIVISIONS 4
AS OF FY88 OUARTER 2 9                        -
9                                                            e
 
y                                                                                                                          N                                                                                                      {g k                                                                                                                  i
                                                                                                                                %                                                                                                              kx  .) .
w/
RUN DATE: 05/II/88 GENERIC ISSUE MANAGEMENT CONTPOL SYSTEM                                                                                    PAGE:    57 ISSUE NUMBER:                105                                      TITLE: INTERFACING SYSTEMS LOCA AT LWRS IDENTIFICATION DATE: IO/84C                                            PRIORITIZATION DATE: 06/85C                                                                TYPE GSI                                      PRIORITY: H TASK MANAGER: O. ROTHBERG                                              OFFICE / DIVISION /BRANC!I: RES /DE /EIB                                                  ACTION LEVEL- ACTIVE                          S TATUS :
TAC NUMBERS:                                                                                                                                                                                                    RESOLUTION DATE: 08/88 VORK AUTHORIZATION: MEMO FOR R. BERNER0 FROM H. DENTON DATED 6/II/85.
FIN                      CONTRACTOR                                                                                  CONTRACT TITLE A3829                        BNL                          INTERFACING SYSTEMS LOCA I
W0RK                  SC0PE PERFORM A DETAILED PRA FOR 3 BWR AND 3 PWR PLANTS TO                                                                          INTERFACING SYSTEMS LOCA. DEVELOP NEW LICEt: SING CRITERIA IF DETERMINE CORE-MELT FPEQUENCIES AND RISK CONTRIBUTED BY                                                                                NECESSARY FOR THE GENERIC RESOLUTION.
STA TUS
                                                                                                                                                                                                                        ~                      ~~      ~
l            BblPRbPbbklFbRh/kbhTHkbPRbJkbhhSkbbkPTkbbh                                                                                  bhbkRhkY I2/2/85 AND MODIFIED ON I/24/86. THE WORK IS CURRENTLY l                                            AFFECTED DOCUMENTS                                                                                                                              PROBLEM / RESOLUTION
* NUREG/CR-5124 NUREG/CR-5IO2                                                                                                                          THE BNL CONTRACT HAS BEEN MODIFIED TO INCLUDE A MORE COMPLETE PRA AND AN ANALYSIS OF 3 PWRS, IN ADDITION TO 3 BWRS.            THE SCHEDULE HAS BEEN EXTENDED TO RECOGN1ZE THE TIME THAT WILL BE NEEEED TO INCLUDE THE 3 PWRS AND TO DEVELOP ANY NEW LICENSING REQUIREMENTS THAT MAY BE INDICATED OR NECESSARY BY THE BNL PRA REPORTS. -8NL WORK HAS BEEN DELAYED ABOUT SIX MONTHS DUE TO CONCURRENT WORK ON THE SEABROOK ANALYSIS OF INTERSYSTEM '0CA'S. AND ABOUT 3 ADDITIONAL MONTHS DUE TO NECESS%RY CORRECTIONS TO EARLIER DRAFTS AND DUE TO REQUIREMENTS TO ADD CONSIDERATION OF PLANTS THAT 00 l                                                                                                                                          NO PIV LEAK TESTING. COMPLETION OF THIS ISSUE ON SCHEDULE i-                                                                                                                                        WAS DELAYED DUE TO A TEMPORARY LACK OF FUNDING DURING TdE LAST QUARTER OF FY-87 FOR AN ADDITIONAL 4 STAFF-MONTHS OF i
EFFORT (PER BNL'S LETTER TO THE TASK MANAGER ON 6/22/87).
                                                                                                                                            !HE REQUESTED F UNDS WERE EVENTUALLY FOUND. BUT NOT BEFORE A AS OF FY88 OUARTER 2 i                                                                                                                                                - _ . _                      _ _ . - _ _ _            _  ___ _          - _ - - - _ _ _ _            -. _ - -
 
QUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                            PAGE:          58 ISSUE NUMBER-                105                                TITLE- INTERFACING SYSTEMS LOCA AT LWRS AFFECTED DOCUMENTS                                                                          PROBLEM / RESOLUTION DELAY OF AT LEAST A MONTH HAD BEEN INCURRED GSI 105 WILL BE CLOSED OUT WITH THF P!V PORTION Or GSI II E6 1 ORIGINAL                      CURRENT                    ACTUAL M ILEST 0 net                                            DATE                      DATE                      DATE GSI 105 ASSIGNED TO RS8/DSI/NRR                                                    --                          --
06/85 PRELIMINARY DISCUSSION OF knRK PLAN WITH BNL                                      --                        --
06/85 BNL PRELIMINARY COST ESTIMATE OF WORK PLAN                                  09/85                            --
08/85 DEVELOP WORK PLAN AND CONTRACT PROPOSAL                                      09/85                            --
08/85 DRAFT WORK PLAN TO DIRECTORS. DSI. DE. DL.                                  09/85                            --
08/85 DHFS. AND AEDD INCORPORATE COMMENTS INTO WORK PLAN                                          10/85                            --
10/85 FINAL WORK PLAN APPROVED BY DSI DIRECTOR AND                                  10/85                            --
11/85 FORWARDED TO DST ISSUE CONTRACT TO BNL                                                        10/85                            --
12/85 MODIFY CONTRACT                                                              01/86                            --
01/86 EXPAND CONTRACT TO INCLUDE PWRS                                              C3/86                            --
03/86 FINAL DRAFT REPORTS RECEIVED FRCH BNL                                        07/86                            --
02/88 INCLUDING VALUE/ IMPACT ANALYSIS PUBLISH NUREG REPORTS                                                        08/88                      08/88                          --
FOR ADDITIONAL MILESTONES RELATING TO THE                                          --                          --                      --
TESTING OF PRESSURE ISOLATION VALVES. SEE GSI II E.6.1.
AS OF FY88 QUARTER 2 O                                                                                  O                                                                                    O
 
w/
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                        PAGE:      61 ISSUE NUMBER:        113                                                            TITLE- DYNAMIC QUALIF. TESTING OF tARGE BORE HYDRAULIC SNUBBERS IDENTIFICATION DATE: 09/82C                                                          PRIORITIZATION DATE. 0//87C                                                              TYPE: GSI                              PRIORITY: H TASK MANAGER: J.        PAGE                                                        OFFICE / DIVISION / BRANCH: RES /DE /EIB                                                  ACTION LEVEL: ACTIVE                    STATUS:
TAC NUMBERS:                                                                                                                                                                                                          RESOLUTION DATE: 09/91  ,
WORK AU)HORIZATION: JULY 2,                1987 MEMO FROM E. BECKJORD TO G. ARLOTTO FIN                CONTRACTOR                                                                                                          CONTRACT TITLE TBD                    TBD                                          TO BE DETERMINED t
W0RK                            SC0PE
: 1. SURVEY INDUSTRY TO DETERMINE TYPES AND NUMBERS OF                                                                                                      AVAILABLE IN U.S. INDUSTRY. IMCLUDING PORTABLE LARGE BORE HYDRAULIC SNUBBERS (LBHS*S) USED IN U.S_                                                                                                    EOUIPMENT AND EQUIPMENT ONLY AVAILABLE AT TEST PLANTS,                                                                                                                                                LABORATORIES.
: 2. OBTAIN DESIGN INFORMATION AND OPERATING LIMITS FROM                                                                                              7 EVALUATE FEASIBILITY OF PERFORMING PERIODIC INSERVICE LBHS MANUFACTURERS.                                                                                                                                    SURVEILLANCE / TESTS ON INSTALLED LBHS*S.
: 3. OBTAIN AND EVALUATE OPERATING EXPERIENCE DATA (NPROS,                                                                                            8. ASSESS THE OVERALL IMPACT OF SNUBBER REDUCTION LERS. FEF. AEOD CASE STUDY AE00/E423. ETC.I                                                                                                            INITIATIVES AND THE GDC-4 BROAD SCOPE RULE a
: 4. OBTAIN AND EVALUATE ENVIRONMENTAL AND DYNAMIC                                                                                                          IMPLEMENTATION ON THE UTILIZATION OF LBHS S.
QUALIFICATION INFORMATION.                                                                                                                      9. IDENTIFY POTENTIAL IMPROVEMENTS IN LBHS'S RELIABILITY S. ASSESS CURRENT LBHS TEST AND SURVEILLANCE REQUIREMENTS                                                                                                  AND THE ASSOCIATED COSTS / BENEFITS.-
l        AS CONTAINED IN PLANT TECHNICAL SPECIFICATIONS                                                                                                10. DEVELOP STAFF RECOMMENDATIONS FOR ENVIRONMENTAL /
INCLUDING APPLICABLE ASME SECTION XI.                                                                                                                DYNAMIC OUALIFICATION AND INSERVICE TESTING /
,    6. DETERMINE STATE-OF-THE-ART TESTING CAPABILITIES                                                                                                        SURVEILI ANCE .
l STATUS DRAFT TAP APPROVED BY DE DIRECTOR AND SUBMITTED TO                                                                                          OTHER RES DIVISIONS AND NRR FOR COMMENT.
AFFECTED DOCUMENTS                                                                                                                                            PROBLEM / RESOLUTION (A) ASME SECTION XI                                                                                                                                  NONE (B) ANSI /ASME OM-4 (C) SRP 3.9.3.
(D) STANDARD TECHNICAL SPECIFICATIONS
;  lE) CUSTOM TECHNICAL SPECIFICATIONS AS OF FY88 QUARTER 2 h
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                    PAGE:          62 ISSUE NUMBEP: 113                                            TITLE: D.1AMIC QUALIF TESTING OF LARGE BORE HYDRAULIC SNUBBERS ORIGINAL        CURRENT          ACTUAL M ILEST0NE S                                                DATE        DATE            DATE DRAFT TAP TO DE DIRECTOR                                                                11/87            --
11/87 DRAFT TAP APPROVED BY DE DIRECTOR                                                      12/87            --
12/87 AND FORWARDED TO OTHER RES DIVISION DIRECTORS AND NRR FOR COMMENT INCORPOPATE COMMENTS IN TAP                                                            03/88              --
03/88 FINAL TAP APP!t0VED BY                                                                04/88        04/88                  --
DE DIRECTOR WITH CONTRACTOR ASSISTANCE. SURVEY                                                      12/88        12/88                --
INDUSTRY TO DETERMINE TYPE AND NUMBERS OF LBHS'S IN U.S PLANTS WITH CONTPACTOR ASSISTANCE. OBTAIN                                                      12/88        12/88                --
DESIGN INFORMATION AND OPERATING LIMITS FROM LBHS MANUFACTURERS.
WITH CONTRACTOR ASSISTANCE. CBTAIN                                                      12/88        12/88                --
AND EVALUATE OPERATING EXPERIENCE DATA WITH CONTRACTOR ASSISTANCE. OBTAIN                                                      12/88        12/88                --
AND EVALUATE ENVIRONMENTAL AND DYNAMIC CtaLIFICATION INFORMATION.
WITH CONTRACTOR ASSIS.*ANCE, ASSESS                                                    12/88        12/88                --
CURRENT LBHS TEST AND SdRVEILLANCE REQUIREMENTS.
WITH CONTRACTOR ASSISTANCE. DETERMINE                                                  03/89        03/89                --
STATE-OF-THE-ART TF_ STING CAPABILITIES AVAILABLE IN U.S INDUSTRY.
WITH CONTRACTOR ASSISTANCE. COMPLETE                                                  04/89        04/89                --
FEASIBILITY EVAL. OF PERFORMING PERIODIC INSERVICE SURVEILLANCE / TESTS ON LBMS'S WITH CONTRACTOR ASSISTANCE. COMPLETE ASSESS.                                          05/89        05/89                --
OF IMPACT OF SNUBBER R EDUC T ION INITIATIVES AND GDC-4 BROAD SCOPE RULE ON USE OF LBHS'S AS OF FY88 CUARTER 2 O                                                                              1 O                                                            O          _ . _ _ _ _ . _
 
  \
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                                    PAGE:                        63 ISSUE NUMBER: 113                                          TITLE: DYNAMIC QUALIF. TESTING OF LARGE BORE HYDRAULIC SNUBBERS ORIGINAL                                                    CURRENT                            ACTUAL MILEST0NES                                                                                                    DATE                                        DATE                                    DATE WITH CONTRACTOR ASSISTANCE. IDENTIFY                                                                                                06/89                                              06/89                                      --
POTENTIAL IMPROVEMENTS IN LBHS RELIABILITY AND 1HE ASSOCIATED COSTS / BENEFITS                                                                                                                                                                                                                                                ,
COMPLETE DTR PACKAGE FOR COMMENT                                                                                                    08/39                                              08/39                                      --
DTR PACKAGE TO OTHER OFFICES FOR                                                                                                    04/89                                              09/89                                      --
CONCURRENCE DTR PACKAGE TO CRGR                                                                                                                  12/89                                              12/89                                      -_
CRGR REVIEW (29)                                                                                                                    02/90                                              02/90                                      --
DTR PACKAGE ISSUED FOR PUBLIC COMMENT                                                                                              05/90                                              05/90                                      --
t PUBLIC COMMENTS RECEIVED                                                                                                            07/90                                              07/90                                      --
                                                                                                                                                                                                                                                                      ~
FTR PACKAGE PREPARED                                                                                                                10/90                                              10/90                                      --
FTR PACKAGE TO OTHER OFFICES                                                                                                      01/91                                                01/91                                      --
FTR PACKAGE TO CRGR                                                                                                                04/91                                                04/91                                      --
CRGR REVIEW 0F FTR (53)                                                                                                            06/91                                                06/91                                      --
FTR PACKAGE ISSUED                                                                                                                09/91                                                09/91                                      --
l AS OF FY88 QUt9TER-2 o
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                    PAGE:          64 ISSUE NUMBER:              115                                    TITLE ENHANCEMENT OF RELIABILITY OF W SOLID STATE PROT. SYSTEM IDENTIFICATION DATE: 04/85C                                        PRIORITIZATION DATE- 07/86C                                                                        TYPE: GSI                                PRIO7ITY: H TASK MANAGER. D. BASDEhAS                                          OFFICE / DIVISION /6 RANCH- RES /DRPS/RPSI                                                        ACTION LEVEL- ACTIVE                      STATUS-TAC NUMBERS:                                                                                                                                                                                                    RESOLUTION DATE 05/89 WORK AUTHORIZATION: MEMO 10 T. SPEIS FROM H DENTON DATED 7/7/86 FIN            CONTRACTOR                                                                                  CONTRACT TITLE A6875              INEL                        GI-115            "ENHANCEMENT OF RELIAB 0F WEST SOLID STATE PROTECTION SYS" W 0R K                SC0PE RkVkkWRkkPbkSkSTbbl8hk8 (bkN RhbkbPLb                                                  bksbF                          bbkkkhkhkF kNEbNbEkVbLhkbhbRkVkRbkRbRkLkIBkLkhYbkN SALEM ATWS EVENTS) TO ASSESS VENDOR-RELATED MODIFICATIONS OF                                                                        BE IMPROVED BY INSTALLING A RELAY DRIVER AND ASSOCIATED THE WESTINGHOUSE SOLIO STATE PROTECTION SYSTEM (SSPS).                                                                              RELAYS TO DUPLICATE THE FUNCTION OF THE UNDERVOLTAGE THEREBY THESE MODIFICATIONS INCLUDE THE RECOMMENDATIONS IDENTIFIED                                                                          PROVIDING DIVERSITY FOR THE FUNCTION.                                      ALSO. PERFORM A IN WESTINGHOUSE TECHNICAL BULLETIN NSID-TB-85-16 DATED                                                                              VALUE/ IMPACT ANALYSIS FOR THOSE MODIFICATIONS THAT SHOW 7/31/85.                PERFORM AN ENGINEERING ANALYS!S (SIMPLIFIED PRA)                                                            POTENTIAL FOR IMPROVEMENT.
STA TUS A SDW FIN A6875 FOR AN INEL PROPOSAL FOR T/A                                                                          ON THIS PROJECT WAS ISSUED IN AUGUST 1987.
AFFECTED DOCUMENTS                                                                                                                                PROBLEM / RESOLUTION TO BE DETERMINED.                                                                                                              NONE ORIGINAL                                  CURRENT              ACTUAL MI LESTON ES                                                                                      DATE                                    DATE                DATE GSI 115 ASSIGNED TO RSIB/DSR0/NRR                                                                                      07/96                                        --
07,86 PRELIMINARY DISCUSSION OF WORK PLAN                                                                                    08/86                                        --
08/86 WITH INEL AS OF FY88 OUARTER 2 O                                                                                                        O                                                                                                      O
 
!          )                                                                              O                                          .
O RUN DATE: 05/11/88
{                                                                        GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                        PAGE:          65 j
d ISSUE NUMBER:  115                                            TITLE: ENHANCEMENT OF RLLIABILITY OF W SOLID STATE PROT. SYSTEM                                        ,
i I
ORIGINAL          CURRENT            ACTUAL
>                                                  MILEST0NES                                              DAIE            DATE              DATE
                      -------------------------------------~~------                                  ----------      ----------          ----------
4 INEL TO PROVIDE PRELIMINARY COST                                                    10/86                --
07/87 j-                  ESTIMATE OF WORK PLAN 1
DEVELOP S0W AND CONidACT PROPOSAL                                                    10/86                --
08/87 DRAFT TAP (ISSUED TO RES/NRR)                                                        08/87                --
08/87 ISSUE CONTRACT TO INEL                                                              12/86                --
08/87 a                    REVISE TAP (SEND 10 RPSID CHIEF)                                                      10/86                --
09/87
                                                                                                                                    ~
DRAFT REPORT FROM INEL TO RES                                                        07/87          07/88                    --
)                  ' FINAL REPORT FROM INEL TO RES                                                        09/87          09/88                    --
i                    FINAL REPORT PREPARED. CRGR PKG.                                                    .11/87            11/88                  --
1                    APPROVED BY DIV. DIRECTOR j                    SENT TO OTHER DIVISIONS FOR COMMENT COMMENTS FROM OTHER OIVISION                                                          12/87            12/88                  --
DIRECTORS INCORPORATED / PACKAGE SENT TO RES DIRECTOR j                    PACKAGE SENT TO CRGR/ACRS (29, 53)                                                  01/88            02/89                    --
1
!                    CRGR/ACRS REVIEW AND EDO APPROVAL                                                    02/88            03/89                    --
                    'IS7UE CLOSEOUT MEMO FROM RES                                                        03/88            05/89                    --
j                    DIRECTOR (GL TO LICENSEES)                                                                                                                          ;
i i
i.
i 1
(
:                                                                                                                                                      ~
AS 0F FY88 QUARTER 2' a                                                                                                                                                                          i
?                                                                                                                                                                        i' i
i i
I i
 
RUN DATE: 03/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                    PAGE:    66 ISSUE NUMBER:      179.1                      TITLE- PIPE RbPTURE REQUIREMENTS IDENTIFICATION DATE: 07/85C                    PRIORITIZATION DATE. 09/85C                            TYPE- RI                      PRIORITY:
TASK MANAGER: TBD                              OFFICE / DIVISION / BRANCH NRW / DEST /EMTB            ACTION LEVEL: ACTIVE          STATUS: 5 TAC NUMBERS:                                                                                                                        RESOLUTION DATE 05/88 WORK AUTHORIZATION: MEMO TO R. MINOGUE FROM H DENTON DATED 9/10/85 FIN              CONTRACTOR                                              CONTRACT TITLE bk33              LLkL              [bIbbbMbkNkkkbh5 W0R K        $C0PE PREPARE REGULATORY ANALYS?S ASSOCIATED WITH                                  RELATIVE TO DECOUPLING OF SSE AND LOCA LOADS PROPOSED SRP REVISIONS AND GDC-4 AMENDMENT.                                        WILL BE ADDRESSED IN THE RESOLUTION OF GSI 119 1.
IN ACCORDANCE WITH A 01/08/87 MEMO FROM R.                                          SUBSEQUENTLY. OtCOUPLING SSE AND LOCA EFFORTS WERE BOSNAK TO K. KNIEL, THE REMAINING PART OF GSI B-6                                  TERMINATED BASED ON INPUT FROM OGC.
S TA T US THE EDO APPROVAL TO BEGIN RULEMAKING (GDC-4) WAS GIVEN                        AUGUST 28. 1987. MANAGEMENT OF SRP 3.6.3 TRANSFERRED TO NRR IN 12/84. THE FRN OF PROPOSED LIMITED SCOPE RULE WAS MADE                      IN MEMO ARLOTIO TO SHA0 DATED SEPTEMBER 28. 1987            FRN OF IN 7/85 WITH THE FINAL RULE PUBLISHED IN 4/86.                THE FRN OF            SRP SECTION 3.6.2 REVISION AND ASSOCIATED GL WERE PUBLISHED.
PROPOSED BROAD SCOPE RULE WAS MADE IN 7/86. COMMISSIONERS                          ALL REMAINING ISSUES RELATE TO NRR - NO TASK MANAGERS APPROVED FINAL BROAD SCOPE RULE ON OCTOBER 1, 1987.                                ASSIGNED.
FRN SOLICITING PUBLIC COMMENT ON SRP 3.6.3 PUBLISHED ON AFFECTED DOCUMENTS                                                                  PROBLEM / RESOLUTION I555bbFR 5b kPPkhbkk              bbbk                                                    S[kPPEbhkbPbbLkbkTkbbbF PRbPbkkbbRbIbSbbPk (2) SRP SECTION 3.6.2                                                              RULE DUE TO PREPARATION OF BACKFIT ANALYSIS AND (3) SRP SECTION 3.6.3 (NEW SECTION)                                                INTEGRATION OF VIEWS FROM THE FEDERAL REPUBLIC OF GERMANY. StIPPAGE IN FINAL BROAD SCOPE RULE DUE TO DELAYS IN PROPOSED BROAD SCOPE RULE AND TO DIFFICULTIES IN RESOLVING TECHNICAL ISSUES, PARTICML3 R L*, RELATING TO HEAVY COMPONENT SUPPORT REDESIGN AS OF FY88 QUARTER 2 O                                                                      O                                                                  O            .
 
  ;        \
Y RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTR01 SYS;EM                                                                                                                              PAGE:    67 ISSUE NUMBER: 119.1                  TITLE: PI?E RUPTURE REQUIREMENTS ORIGINAL                                                            CURRENT      ACTUAL MILEST0NES                                                                                                          OATE                                                    CATE        DATE Pkb FkhkL hPT bbhTkkhhhb hEbbMMEbb Fbk                                                                                    bhhhh                                                          -
Ohhhh CECOUPLING LOCA. SSE & ARSITRARY INTERMED.
PIPE BREAKES ISSUED TO EDO (SKP 3.6.2)                                                                                                                                                                                                                      i SRP REVISION AND REGULATORY                                                                                              04/8S                                                          --
04/86 ANALYSIS COMPLETE (SRP 3.6.2)
J                  DIVISION DIRECTOR REVIEW OF CRGR                                                                                          06f86                                                          --
07/86 PACKAGE COMPLETE (SRP 3.6.2)
!                  DIVISION DIRECTOR'S COMMENTS RESOLVED,                                                                                    07/86                                                          --
08/86 4
CRGR PACKACE TO NRR DIRECTOR
,                  FOR REVIEW (SRP 3.6.2)
'                  NRR DIRECTOR REVIEW COMPLETE.                                                                                            08/86                                                          --
09/86-5 PACKAGE SENT TO CRGR (SRP 3.6.2) i
;                  CRGR REVIEW COMPLETE. PACKAGE SENT                                                                                        I?/86                                                          --
10/86 i                  TO ACRS (SRP 3.6.2) i
;                  ACRS REVIEW COMPLETE (SRP 3.6.2)                                                                                          12/86                                                          --
11/86 1-FRN ISSUED FOR PUBLIC COMMENT                                                                                            01/87                                                          --
12/86 l                  (SRP 3.6.2)
: f.                  ANALYSIS COMPLETE (SRP 3.6.2)                                                                                            03/87                                                          --
03/87 j                  DIVISION DIRECTOR REVIEW                                                                                                  04/87                                                          --
01/87 j                  COMPLETE (SRP 3.6.2).
[                  PUBLIC COMMENTS RESOLVED. FINAL                                                                                          05/87                                                          --
01/87                                                  '
1                  CRGR PACKAGE TO DIVISION DIRECTORS j                  FOR REVIEW (SRP 3.6.2)
COMMENTS RESOLVfD. FINAL CRGR PACKAGE                                                                                    07/87                                                          --
02/87 TO NRR DIR. FOR REVIEW (SRP 3.6.21 PACKAGE SENT TO CRGR (SRP 3.6.2)                                                                                          08/87                                                          --
03/87
.                  PACKAGE SENT TO ACRS (SRP 3.6.2)                                                                                          10/87                                                          --
03/87 AS OF FY88 CUARTER 2 i
I I
i 5
 
RUN DATE: 03/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                        PAGE:          68 ISSUE NUMBER: 119.1                            TITLE: PIPE RUPTURE REQUIREMENTS ORIGINAL        CURRENT                ACTUAL MILEST0NES                                              DATE          DATE                  DATE ACRS REVIEW COMPLETE (SRP 3.6.2)                                          12/87                --
06/87 FRN OF ISSUANCE OF SRP 3.6.2                                              01/88                --
06/87 SRP REVISION AND REGULATORY                                              03/87                --
03/87 ANALYSIS COMPLETE (SRP 3.6.3)
!                CRGR PACKAGE TO DIVISION                                                  04/87                --
04/87 DIRECTORS FOR REVIEW (SR P 3.6.3 )
DIVISION DIRECTOR REVIEW                                                  04/87                --
05/87 COMPLETED (SRP 3.6.3)
CRGR PACKAGE TO RES                                                      05/87                --
06/87 DIRECTOR FOR REVIEW (SRP 3.6.3)
PACKAGE SENT TO CRGR (SRP 3.6.3) (29)                                    05/87                --
06/87 PACKAGE SENT TO ACRS (SRP 3.6.3)                                          06/87                --
06/87 ACRS & CRGR REVIEW COMPLETED (SRP 3.6.3)                                  06/87                --
08/87
                                  ~
FRN ISSUED FOR PUBLIC COMMENT (SRP 3.6.3)                                07/87                --
08/87 MANAGEMENT OF SRP 3.6.3 TRANFERRED TO NRR 09/87 FRN Of FINAL BROAD SCOPE RULE (GDC-41                                      02/87                --
10/87 PUBLIC COMMENTS RESOLVED, CRGR                                            11/87          04/88                      --
PACKAGE SENT TO DIVISION DIRECTORS (SRP 3.6.3)
DIVISION DIRECTORS REVIEW COMPLETED                                        12/87          04/88                      --
(SRF 3.6.3)
NRR OFFICE DIRECTOR REVIEW                                                02/88          04/88                      --
COMPLETED (SRP 3.6.3)
PACKAGE SENT TO CRGR AND ACRS                                            03/88          04/88                      --
(SRP 3.6.31 (53)
                                                                                                                                      %S OF FY88 QUARTER 2 O                                                                      O                                                                O
 
                      . ..._.___._..__,m                                            _ . . . . . . m... _ _ . .      __._m._.._,.            . . - _          _ _ . .  . ._.                  ._. _      __
l~
I 9                                                                                                9                                                        .                          9
]:
a                                                                                                                                                                                                                      i j                                                                                                                                                                          RUN DATE: 05/11/88.                      ..t t
I, '                                                                                                GENERIC IS30E MANAGEMENT CONTROL SYSTEM                                      PAGE:        69                  '!
I                                                                                                                                                                                                                      !
i                ISSUE NUMBER:          119.1                                                TITLE: PIPE RUPTURE REQUIREMENTS 1
                                                                                                                                                                                                                      .i
,                                                                                                                                      ORIGINAL            CURRENT                    ACTUAL
.'                                                                      MILESTONES                                                          DATE            DATE                        DATE-
                                          ..___...__.___________._.... . ..___._...___ _                                            ......____      _________.                -_______ ..                            i
                                        - ACRS AND CRGR REVIEW COMPLETE                                                                  04/88            04/88-                          ---
(                                          (SRP 3.6.3) l                                          FRN OF ISSUANCE OF SRP 3.6.1                                                                    05/88            05/88                            --
                                                                                                                                                                                                                      .l
\.                                                                                                                                                                                                                      i l
t
                                                                                                                                                                                                                    -i I
1 i
l l
                                                                                                                                                                                                                    -l
                                                                                                                                                                                                                      -t I
i I
l                                                                                                                                                                                                                      !
!                                                                                                                                                                                                                      i l                                                                                                                                                                                                                    :l l
                                                                                                                                                                                                                    .i I
i
                                                                                                                                                                                                                .      I l                                                                                                                                                                                            AS OF FY88 OUARTER 2 i
I'
,            .                                            .. ~                                                                                                                                                    .
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                PAGE:  70 ISSUE NUMBER:        119.2                        TITLE: PIPE DAMPING VALUES IDENTIFICATION DATE: 07/85C                        PRIORITIZATION DATE: 09/85C                                              TYPE: RI                                PRIORITY:
TASK MANAGER: D. GUZY                            OFFICE / DIVISION / BRANCH- RES /DE /SSEB                                  ACTION LEVEL- ACTIVE                    STATUS' 5 TAC NUMBERS.      NONE                                                                                                                                              RESOLUTION DATE 06/88 WORK AUTHORIZATION- MEMU TO R MINOGUE FROM H. DENTON OATED 9/10/85 FIN              CONTRACTOR                                                        CONTRACT TITLE A0457                LLNL                PIPE DAMPIEG FOR TIME-HISTORY ANALYSIS A6316                INEL                PIPE DAMPIP'i W0R K            SC0PE bb((kbi b Tk Nb bbNbbbT kkhkkkMkNTk Tb                                                              PRbVkbE hkhkSFhR PkPEbkMPkN CRhThRkk OBTAIN PIPE DAMPING VALUES.                                                                      USED aN TIME-HISTORY ANALYSIS.
S T A T US A MEETING WAS HELD 07/10/86 WITH RES. NRR. AND                                            FURTHER ACTION ON d.G. 1 . 16 1 (THUS THE ESTABLISHMENT OF REPRESENTATIVES OF THE ASME AND PVRC DAMPING TASK                                                AN NRC NON-SEISMIC AND TIME-HISTORY PIPE DAMPING WILL BE GROUPS        THE DECISION WAS MADE TO DELAY WORK ON                                              DROPPED AS A SEPARATE MILESTONE).                              PRDGRESS OF THE REGULATORY GUIDE 1.61 UNTIL THE ASME GROUP COMPLETES                                              EPRI/BECHTEL PROJECT TO EVALUATE DAMPING DATA. DEVELOP ITS NEW EFFOPT.                                                                                  NEW DAMPING CURVES. AND PROVIDE STRAWMAN CRITERIA THE INEL STUDY OF HIGH FRECUENCY PIPE-DAMPING WAS                                          CHANGES TO THE ASME APENDIX WORKING GROUP WAS REVIEWED COMPLETED WITH THE PUBLICATION OF NUREG/CR-4562 IN JULY                                          IN SEPTEMBER 1987. MORE WORK IS NEEDED TO COMPLETE THIS 1986.                                                                                            TASK BUT IT APPEARS NOW THAT THIS IS TECHNICALLY RECOMMENDATIONS FROM THE INEL STUDY ON HIGH                                                FEASIBLE.
FREQUENCY DAMPING WERE APPROVED BY THE PVRC PIPING                                                        SCHEDULE SLIPPAGES IN EPRI/BECHTEL PROJECT HAVE DELAYED COMMITTEES IN JANUARY 1987 BUT THEIR ACTION HAS BEEN TO                                          ASME AND NRC STANDARDS DEVELOPMENT ACTIVITIES.                              THE WORK ON PASS THIS ALONG TO THE ASME TASK GROUP. THE ASME TASK                                            LLNL FIN A0457 WAS PRESENTED TO THE NRC STAFF IN OCTOBER GROUP WILL CONSIDER ALL DAMPING ASPECTS, INCLUDING HIGH                                          1987.        THE FINAL REPORT OF THIS STUDY SHOULD BE PUBLISHED IN FREQUENCY AND ANALYTIC APPLICATION AS A COMPLETE                                                  FEBRUARY 1988.
PACKAGE.      THIS PACKAGE WILL BE CONSIDERED IN SCHEDULING AFF'CTED DOCUMENTS                                                                                          PROBLEM / RESOLUTION REGULATORY GUIDES 1.84 AND 1.61                                                                            SCHEDULE SLIPPAGES IN THE EPRI/BECHTEL PIPE DAMPING AS OF FY88 CUAPTER 2 O                              -
O                                                                                        O
 
_.._m.      m.  .  .__...m.          . ..      m_.      m  -      _.    , . . _ . .    . _            m                . . _ .      -      -        -                .
                                                                                                                                                                                    'l 8                                                                              0                                                            .                  O          i!      !
t RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM.                                    :PAGE:      71                      l l
I ISSUE NUMBER:      119.2                                  T1TLE: PIPE DAMPING VALUES l
1 AFFECTED DOCUMENTS                                                                          PROBLEM / RESOLUTION
                                                                        ~
hkP bEbhkbb b$b52~ ~                                                                            Phbhhbh h5LL PkbbkbLh BEL hTbkkhhkbLkhkNh~bFk~
SCHEDULE TO REVISE R.G.        1. 61..
ORIGINAL          CURRENT                  ACTUAL                  -
MILESTONES                                                          DATE          DATE
                          .__.....__________..._...______ .........__._                                      _. __....-      __........                __-DATE..__ ...                    ;
ISSUE REV. 24 0F R.G. 1.84                                                              05/J6              --
06/86-                          ;
ENDORSING ASMt CODE N-411.                                                                                                                                      j DEVELOP SCHEDULE TO REVISE R.G                                                          11/87          06/88                      '.-                          l 1.61 AND SRP SECTION 3.9.2.                                                                                                                              .]
                                                                                                                                                                                        . .I i
i I
                                                                                                                                                                                      -l
                                                                                                                                                                                        -l l
                                                                                                                                                                                    .l      ,
t it i
t I
I i
e
                                                                                                                                                                                  ' l,
                                                                                                                                                                                    .I f
I AS OF FY88 QUARTER 2        t i
                                                                                                                                                                                      .f i
I l
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                        PAGE:          72 ISSUE NUMBER:            119.3                                        TITLE: DECOUPLING OBE FRCM SSE IDENTICICATION DATE: 07/SSC                                            PRIORITIZATION DATE 09/85C                                                    TYPE- RI                        PRIORITY:
TASK MANAGER: A. MpJRPHY                                                OFFICE / DIVISION /8 RANCH RES /DE /SSE8                                      ACTION LEVEL: ACTIVE            STATUS: 5 TAC NUMBERS: NONE                                                                                                                                                                      RESOLUTION DATE      _ _ _ _ _
WORK AUTHORIZATION: MEMO TO R. MINOGUE FROM H DENTON DATED 9/10/85 FIN                    CONTRACTOR                                                                              CONTRACT TITLE WOR K              SCOP E TO BE PROVIDED LATER.
STA T US RULEMAKING TO START IN 1988.
AFFECTED DOCUMENTS                                                                                                      PROBLEM / RESOLUTION
[bbfR kbb APPkkh k k k kb bF bhHkR bbbUMkhTS                                                                                  kbNk TO BE PROVIDED LATER ORIGINAL              CURRENT              ACTUAL MILESTONES                                                                                DATE                DATE                DATE DEVELOP TAP                                                                                                            TBD                  TBD                  --
AS OF FY88 OUADTER 2 O                                                                                                              O                                                                                O
 
t                                                                                                                          C/                                                                                -            v RUN DATE: 05/11/88.
GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                              PAGE:    73 ISSUE NUMBER:                          11G.4                            TITLE: UWR PIPING MATERIALS
,  IDENTIFICATION DATE: 07/85C                                            PRIORITIZATION DATE: 09/85C                                                                              TYPE: RI                            PRIORITY:
TASK MANAGER: A. TABOADA                                              0FFICE/ DIVISION / BRANCH: RES /DE /MEB                                                                    ACTION LEVEL: ACTIVE                  STATUS: 5 TAC NUMBERS: NONE                                                                                                                                                                                                      RESOLUTION DATE: 05/88 WORK AUTHORIZATION: MEMO TO R. MINOGUE FROM H. DENTON DATED 9/10/85.
FIN                          CONTRACTOR                                                                                                    CONTRACT TITLE A2212                            ANL                    ENVIRONMENTAL? Y ASSISTED CRACKING IN LWRS W0RK                                                    SC0PE DETERMINE TME ACCEPTABILITY OF PROPOSED FIXES TO MITIGATE                                                                                                    INTERGRANULAR STRESS CORROSION CRACKING (IGSCC).
STATUS kb.* b b3kh kE                                2  kEbHhbkhhkPbRhbN              ERkkL                                                            bbbNbkRhPkPkhb              khkPPkbVEbhhhHkbbhkkhkbN bEbh SELECTION AND PROCESSING GUIDELINES FOR BWR COOLANT PRESSURE                                                                                                87-239) FOR IMPLEMENTATION AND ISSUANCE OF GENERIC LETTER.
AFFECTED DOCUMENTS                                                                                                                          PROBLEM / RESOLUTION R.G.      1.44 AND NUREG-0312 "TECHNICAL REPORT ON MATERIAL                                                                                      NONE SELECTION AND PROCESSING GUIDELINES FOR BWR COOLANT PRESSURE BOUNDARY PIPING.*
ORIGINAL                  CURRENT                  ACTUAL MILESTONES                                                                                              DATE                    DATE                      DATE hEbhhkh01Tbbbb5hhkbh                                                                                                          Oh/hk                      7-                    Oh/8k PUBLISH NUREG-1061            VOL. 1                                                                                          09/84                      --
09/84 PUBLISH NUREG-1061. VOL. 5                                                                                                    04/85                      --
                                                                                                                                                                                                                        '04/85 AS OF FY88 QUARTER 2
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                  PAGE:          74 ISSUE NUMBER: 119.4                                  TITLE. BWR PIPING MATEPIALS ORIGINAL      CURRENT          ACTUAL MILEST ONE S                                              DATE        DATE            DATE COMPLETE DRAFT ON NUREG-0113 REV 2                                            09/85              --
09/85 0FFICE REVIEW                                                                01/86              --
01/86 CRGR REVIEW                                                                  03/86              --
04/86 ISSUE FOR PUBLIC COMMENT                                                      G4/86              --
06/86 REVISION OF DFAFT TO REFLECT                                                  07/86            --
02/87 PUBLIC COMMENTS ACRS REVIEW                                                                    03/87              --
03/87 CRGR REVIEW                                                                    09/86            --
06/87 COMMISSION PAPER FOR APPROVAL                                                  12/86              --
09/87 ISSUE GENERIC LETTER-8801                                                    04/87              --
01/88 DEVELOP SCHEDULE TO REVISE REGULATORY GUIDE                                    12/87        05/88                  --
1.44 AS OF FY88 QUARTER 2 9                                                                          9                                                          e
 
s
(                                                                                    v g
(./
RUN DATE: 05/II/88                  4
                                                                                                                                                                                          )
GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                        PAGE:        75              I I
ISSUE NUMBER:            119.5                                    TITLE: LEAK DETECTION REQUIREMENTS IDENTIFICATION DATE: 07/85C                                      PRIORITIZATION DATE: 09/85C                            TYPE: RI                            PRIORITY-1 TASK MANAGER: J. MUSCARA                                          0FFICE/ DIVISION / BRANCH: RES /DE /MEB                ACTION LEVEL: ACTIVE                STATUS: 5                '
TAC NUMBERS:
RESOLUTION DATE- 06/88 WORK AUTHORIZATION: MEMO TO R. MINOGUE FROM H DENTON DATED 9/10/85.                                                                                                                    I FIN                  CONTRACTOR                                                CONTRACT TITLE hh5b                  Eht~                        kV lbIkhbh bF bbRRkNh hb kbVkNhkb LhkK bkkkChkhh hYkTkMb DI658                  BCL                          LEAK RATE EVALUATION W0R K    SC0PE SURVEY EXISTING OPERATING PLANT PRACTICES AND                                        LEAK DETECTION SYSTEMS.                  EVALUATE LEAK RATE ESTIMATION
(  CURRENT ADVANCED METt?ODS TO DETERMINE THE ADEQUAC" 0F                                          MODELS.
STATUS NUREG.0313. REV. 2 APPROVED BY THE COMMISSION AND IN                                PUBLICATION, l
AFFECTED DOCUMENTS                                                                            PROBLEM / RESOLUTION (I) REGULATORY GUIDE 1.45                                                                              RESEARCH PROJECT ON LEAK DETECTION STARTED IN FY-86
{?) SRP SECTION 5.2.5                                                                            BUT DRASTICALLY REDUCED DUE TO BUDGET CUTS (GRAMM/
(3) NUREG-0313, "TECHNICAL REPORT ON MATERIAL                                                    RUDMAN).            REPORT COMPLETED IN FY-86 ONLY ON LIMITED SELECTION AND PROCESSING GUIDELINES FOR BWR                                                ASSESSMENT OF CURRENT PRACTICE IN PLANTS. FUNDING COOLANT PRESSURE BOUNDARY PIPING."                                                        RESUMED IN MID FY-87. REPORT TO BE EXPANDED AND UPDATED IN FY-1988. FINAL VALIDATION OF AN ADVANCED LEAK DETECTION SYSTEM TO BE COMPLETED IN FY-1988. RECOMMENDA-DATIONS FOR REVISION OF SRP AND REG, GUIDE 1.45 TO BE DEVELOPED IN FY-1988.
ORIGINAL                  CURRENT                  ACTUAL MILEST0NES                                                    DATE                  DATE                      DATE
                              --.------------........------ ..------.----~~                                ......----            .... .....              -.........
SECY-84-301 TO COMMISSION                                                          07/84                      --
07/84 AS OF FY88 QUARTER 2
 
RUN DATE: 05/11/d8 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                  PAGE:          76 ISSUE NUMBER: 119.5                                  TITLE: LEAK DETECTION REQUIREMENTS ORIGINAL      CURRENT            ACTUAL MI LEST ONES                                              DATE        DATE              DATE PUBLISH NUREG-1061 VOL 1                                                      09/84            --
09/84 PUBLISH NUREG-1061, VOL 5                                                    04/85            --
04/85 COMPLETE DRAFT OF NUREG-0313 REV. 2                                          09/85            --
09/85 CFFICE REVIEW                                                                01/86              --
01/86 CRGR REVIEW                                                                  03/86            --
04/86 ISSUE FOR PUBLIC COMMENT                                                      04/86            --
06/86 REVISE DRAFT TO REFLECT                                                      07/86              --
02/87 PUBLIC COMMENTS ACRS REVIEW                                                                  03/87              --
03/87 CRGR REVIEW                                                                  09/86              --
06/87 COMMISSION PAPER FOR APPROVAL                                                  12/86            --
09/87 GL ISSUED                                                                    04/87              --
01/88 DEVELOP SCHEDULE TO REVISE R.G.                      1.45                    01/88        06/88                  --
DEVELOP SCHEDULE TO REVISE                                                    01/88        06/88                  --
SRP SECTION 5.2.5.
AS OF FY88 OUARTER 2 O                              -
O                                                      --
O
 
                                        %                                                                                                                      /%    1                                                                                      [m\
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                    PAGE:        77 ISSUE NUMBER:                                                        121                                TITLE: HYDROGEN CONTROL FOR LARGE. DRY PWR CONTAINMENTS IDENTIFICATION DATE: 08/85C                                                                            PRIORITIZATION DATE: 09/85C                                                      TYPE: GSI                              PRIORITY: H TASK MANAGER: J. TELFORD                                                                                OFFICE / DIVISION / BRANCH: RES /DRA /RDB                                        ACTION LEVEL: ACTI'!E                  STATUS:
T AC NL'MBE RS : NONE                                                                                                                                                                                                            RESOLUTION DATE-WORK AUTHORIZATION: MEMO TO F.GILLESPIE FROM T.SPEIS DATED 9/26/85.
i                                      FIN                                                CONTRACTOR                                                                CONTRACT TITLE NONE                                                      NONE                    NONE W0RK              SC0PE ESTABLISH A TECHNICAL POSITION ON THE NEED FOR                                                                                          AND MAKE RECOMMENDATIONS TO THE COMMISSION REGARDING HYDROGEN CONTROL FOR LWR'S WITH LARGE. ORY CONTAINMENTS                                                                                                  RULEMAKING.
STA T US                                                        ,
.                                AT THE COMMISSION MEETING ON 12/10/84 AND IN                                                                                            RESEARCH TASKS WERE SCHEDULED TO BE COMPLETED DURING THE SECY-83-3578. THE STAFF INDICATED THAT RECOMMENDATIONS FOR                                                                                                FIRST HALF OF CALENDAR YEAR 1986. A RECOMMENDATION WAS TO RULEMAKING RELATED TO LWR'S WITH LARGE, ORY CONTAINMENTS                                                                                                  BE MADE TO THE COMMISSION DURING MID-1986.
WOULD BE PROVIDED AT THE CONCLUSION OF ONGOING RESEARCH IN                                                                                                              ADDITIONAL RESEARCH WAS COMPLETED IN 10/87 WITH FINAL 1,              MID-1986. WORK HAS BEEN PROCEEDING AND STAFF MEETINGS WERE                                                                                                REPORTS DUE IN 4/88. STAFF IS PREPARING RECOMMENDATIONS ON j              HELD IN NOVEMBER 1985 TO REVIEW THE PROGRESS.                                                                              THE VARIOUS                    REMAINING EFFORT REQUIRED TO ESTABLISH THE BASIS FOR A RULE.
,                                                                                              AFFECTED DOCUMENTS                                                                                                        PROBLEM / RESOLUTION 1
l                                POSSIBLE NEW AMENDMENTS TO 10 CFR PART 50.44                                                                                            NONE 4
i
)                                                                                                                                                                                        ORIGINAL                              CURRENT            ACTUAL
;                                                                                                        MILEST0NES                                                                          DATE                              DATE DATE RESEARCH COMPLETE                                                                                    06/86                              04/88                    --
TRANSMIT RECOMMENDATIONS                                                                              06/86                                  TBD                  --
i d                                                                                                                                                                                                                                                    AS OF FY88 OVARTER 2 l
1
                                                                                                                                                        ~
 
RUN DATE: 05/11/88 i                                              GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                PAGE:    78 ISSUE NUMBER: 121                    TITLE: HYDROGEN CONTROL FOR LfRGE. DRY PWR CONTAINMENTS ORIGINAL        CURRENT      ACTUAL M I LEST ONE S                                DATE          DATE        DATE kbbbkblbbEbbhhkhbbhPhbhkbhMhthkhbNkb                      bb/bb            kbb
;                NECESSARY TO IMPLEMENT RECOMMENDATIONS i
1 l
l I
i AS OF FY88 Ot'ARTER 2 1
1 A
O                              -
O                                                  O
 
TN                                                                                                                                        N                                                                Cx
(              )
(%a )    r Q ,l RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                  PAGE:    79 ISSUE NUMBER:          122.2                                                                      TITLE: INITIATING FEED-AND-BLEED IDENTIFICATION DATE: 08/85C                                                                      PRIORITIZATION DATE 01/86C                                      TYPE: GSI                          PRIORITY: H TASK MANAGER- W. HODGES                                                                          OFFICE / DIVISION /8 RANCH- NRR / DEST /SRX8                      ACTION LEVEL- ACTIVE              STATUS:
TAC NUMBERS: M61170                                                                                                                                                                                  RESOLUTION DATE- 06/88 WORK AUTHORIZATION: MEMO FOR T. SPEIS AND W. RUSSELL FROM H DENTON DATED 1/28/86.
FIN                  CONTRACTOR                                                                                                      CONTRACT TITLE i
W0R K    SC0PE FEEb bb bLbEb (Fkbh bbbLkbb kb                                                                                  MEhikbbbF CbRE                    kbf bbhEbhkVkbhhHERhSbLbhkbNbhTHbkSbbE hShb COOLING FOLLOWING LOSS OF ALL FEEDWATER AT MOST PWRS.                                                                                              IDENTIFY WHAT. IF ANY, ADDITIONAL REGULATORY GUIDANCE IS IT IS AN OPTION OF LAST RESORT. DUT ONE WHICH CAN                                                                                                  NEEDED FOR: III EMERGENCY OPERATING PROCEDURES, (2)
SIGNIFTCANTLY REDUCE THE CORE-MELT FREQUENCY PREDICTED                                                                                            OPERATOR TRAINING, AND/OR (3) INSTRUMENTATION FOR THE FOR MANY PWRS.            F&B COOLING MUST BE MANUALLY INITIATED;                                                                                  MANUAL INITIATION OF F&B COOLING AT PWRS WITH THE IN NO PWR IS THIS AUTOMATIC.                                                                                                                      CAPABILITY TO COOL THE CORE BY F&B. TO DO THIS.
THE DAVIS-BESSE FEEDWATER TRANSIENT OF 6/9/85                                                                                              IT IS NECESSARY TO: (I) IDENTIFY AND EVALUATE HUMAN CALLED INTO QUESTIOk THE ADEQUACY OF THE EMERGENCY                                                                                                  PEEFORMANCE-SHAPING FACTORS AFFECTING OPERATOR OPERATING PROCEDURES CALLING FOR THE INITIATION OF                                                                                                RELIABILITY IN EFFECTING FSB CCOLING; (2) REVIEW THE FEB COOLING AND THE OPERATORS TRAINING ON THESE                                                                                                    THERMAL-HYDRAULIC CRITERIA FOR COMMENCING FSB EMPLOYED PROCFDURES. WITHOUT BETTER PROCEDURES AND/OR TRAINING.                                                                                            IN THE EMERGENCY RESPONSE GUIDELINES (ERGS) FOR W. CE.
THE RELIABILITY WITH WHICH OPERATORS WILL INITIATE                                                                                                AND 8&W PLANTS: (4) REVIEW AVAILABILITY OF RELEVANT FAB. WHEN IT IS NECESSARY TO AVERT CORE-MELT. MAY                                                                                                  INSTRUMENTATION; (5) FORMULATE RECOMMENDATIONS: AND(6)
BE SIGNIFICANTLY LOWER THAN IT COULD BE WITH BETTER                                                                                                AMEND THE REGULATIONS IF NECESSARY AND APPROPRIATE.
PROCEDURES AND TRAINING.
4 2                                                                                                                                            STATUS DETAILED PLANNING OF TECHNICAL RESOLUTION                                                                                                  THE STAFF REVIEW AND APPROVAL OF VENDORS
* GENERIC UNDERWAY. THE MOST LIKELY TECHNICAL RESOLUTION IS THE                                                                                              PROCEDURE GUIDELINES. MECHANISMS ALREADY EXIST FOR IDENTIFICATION OF MODEST CHANGES NEEDED IN THE GENERIC                                                                                              LICENSEES TO INCORPORATE CHANGES IN THE GENERIC PROCEDURE GUIDELINES COVERING THE INITIATION OF                                                                                                    PROCEDURE GUIDELINES INTO THEIR PLANT-SPECIFIC f&B COOLING.          IF THE CHANGES NEED AND                                                                                                      EMERGENCY OPERATING PROCEDURES THAT ARE EXPECTED WARRANT FORMAL IMPOSITION, A GENERIC LETTER SHOULD                                                                                                  TO SUFFICE IN THIS CASE. TO CARRY THE GENERIC SUFFICE.                                                                                                                                            RESOLUTION THROUGH TO PLANT-SPECIFIC IMPLEMENTATION.
I        THERE ARE CURRENTLY A NUMBER OF OPEN ITEMS IN AS OF FY88 QUARTER 2 h
 
RUN DATE: OS/11/QP GEWERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                      PAGE:          80 ISSUE NUMBER-                        122.2                                          TITLE INITIATING FEED-AND-BLEED AFFECTED DOCUMENTS                                                                                                PROBLEM / RESOLUTION GENERIC ERG *S FOR W. CE. AND B&W PI_ ANTS                                                                          NONE ORIGINAL                                  CURRENT              ACTrJAL MILE ST0N E S                                                  DATE                                    DATE                DATL IDENTIFY PERFORMANCE SHAPING FACTORS                                                    07/8S                                        --
01/87 REVIEW THE CRITERIA                                                                      07/86                                        --
02/87 REVIEW ERGS FOR W. CE. AND B&W                                                            09/86                                        --
03/87 REVIEW RELEVANT INSTRUMENTATION                                                          09/86                                    06/88                    --
IDENTIFY RECOMMENDED IMPROVEMENTS TO ERG'S                                                10/86                                  06/88                    --
AS OF FY88 OUARTER 2 O                                                            -                          -
O                                                                                              O
 
G                                                                                                J                                                                                                                                -
                                                                                                                                                                                                                                                        %.J l
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                                                                PAGE:  81 ISSUE NUMdER:        124                            TITLE AUXILIARY FEEDWATER SYSTEM RELIABILITY IDENTIFICATION DATE 12/85C                            PRIORITIZATION DATE- 02/86C                                                                                                                  TYPE: GSI                              PRIORITY:
l  TASK MANAGER: J. WERMIEL                              OFFICE / DIVISION / BRANCH. NRR / DEST /SFLB                                                                                                ACTION LEVEL: ACTIW                    STAiUS: NR TAC NUMBERS: M60460                                                                                                                                                                                                                      RFSOLUTION DATE: 08/88 WORK AUTHORIZATION: MEMO FOR T. SPEIS FROM H. DENTON DATED 2/5/86 FIN                  CONTRACTOR                                                                                                CONTRACT TITLE WORK                                          SC0PE BECAUSE OF THE SIGNIFICANCE OF THE AFWS IN REDUCING                                                                                                                              (3)  ANO-1                              (7) RANCHO SECO CORE-MELT FREQUENCY. THE STAFF HAS DETERMINED THAT ALL                                                                                                                                  I4)  ANO-2 PWRS SHOULD MEET THE RELIABILITY CRITERION SPECIFIED IN                                                                                                                                  THE FOLLOWING ISSUES WILL BE ADDRESSED IN THE SRP SECTION 10.4.9 WHICH WAS NOT APPLIED TO OPERATING                                                                                                    RESOLUTION OF ISSUE 124 FOR THE ABOVE SEVEN UNITS:
REACTORS.        IN ORDER TO ACHIEVE AND MAINTAIN A HIGH DEGREE                                                                                                                          (1) GSI 68 "POSTULATED LOSS OF AUXILIARY OF RELIABILITY FOR THE AFWS. THE FOLLOWING SHOULD BE                                                                                                                                          FEEDWATER SYSTEM RESULTING FROM TURBINE-COMPLETED:        (1) PWR LICENSEES AND APPLICANTS SHOUlO                                                                                                                                    DRIVFN AUXILIARY FEEDWATER PUMP STEAM SUPPLY DEMONSTRAIE. USING dELIABILITY ANALYSES. THAT THE AFWS IS                                                                                                                                      LINE RUPTURE."
OF HIGH RELIABILITY. E-4 TO E-5 UNAVAILABILITY PER                                                                                                                                      (2) GSI 93    "STEAM BINDING OF AUXILIARY FEED-DEMAND. (2) THE STAFF IS TO REVIEW THE RELIABILITY                                                                                                                                            WATER PUMPS."
ANALYSES AND/OR ANY NECESSARY SYSTEM MODIFICATIONS AND                                                                                                                                  (3) GSI 122.1.A. "FAILURE OF ISOLATION VALVES PROCEDURAL OR MAINTENANCE CHANGES. BASED ON THE STAFF                                                                                                                                          IN CLOSED POSITION."
EVALUATION OF W. CE AND B&W PLANT AFWS (NUREG-0611.                                                                                                                                      (4) GSI 122.1.B. "RECOVERY OF AUXILIARY FEEDWATEd" NUREG-0635. B&W PLANT SERS). THE STAFF HAS DETERMINED                                                                                                                                    (5) GSI 122.1 C. "INTERRUPTION OF AUXILIARY THAT THE AFWS OF THE FOLLOWING PLANTS MAY NOT BE                                                                                                                                              FEEDWATER FLOW" SUFFICIENT 1Y RELIABLE:                                                                                                                                                                  (6) GSI 125.II.1.B. "REVIEW OF EXISTING AFW (1) PRAIRIE ISLAND 1                  (S) FT. CALHOUN                                                                                                                                SYSTEMS FOR SINCLE FAILURES" (2) PRAIRIE ISLAND 2                    (6) CRYSTAL RIVER STA TUS THE REGULATORY ANALYSIS OF GSI 124 WAS DISCUSSED                                                                                                    TEAM WILL COORDINATE ITS EFFORTS FOR THE B&W PLANTS WITH THE NRR DIRECTOR IN JULY 1986.                    IT WAS DECIDED                                                                                  WITH THE OURRENT RANCHO SECO RESTART PROGRAM AND THE                                                      l THAT THE RESOLUTION PLAN WOULO BE CHANGED FRCM                                                                                                          DESIGN REEVALUATION BEING PE RFORMED BY THE B&W OWNERS REQUIRING A PRA FROM EACH LICENSEE TO THE                                                                                                                GROUP. LIMITED PLANT VISITS TO ANO-1 AND RANCHO SECO PERFORMANCE OF AN OVERALL RELIABILITY ASSESSMENT AT                                                                                                      ARE ANTIGIPATED IN VIEW OF PREVIOUS NRC INSPECTIONS THE SITE BY AN NRC REVIEW TEAM. SITE VISITS ARE                                                                                                          OF THESE FACILITIES.
TENTATIVELY SCHEDULED AS SHOWN BELOW.                      THE REVIEW AS OF FY88 QUARTER 2
_______________________.____t_                _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . . . _ _ _ _ _ _ _ _ _ _ . _ _                                      _
 
RUN DOTE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                PAGE:          82 ISSUE NUMBER-                        124                                            TITLE - AUXILIARY FEEDWATER SYSTEM RELI ABILITY AFFECTED DOCUMENTS                                                                                          PROBLEM / RESOLUTION TBD                                                                                                    CANCHO SECO VISIT WILL BE CONDUCTED FOLLOWING RESTART ORIGINAL                            CURRENT              ACTUAL MI LEST ONES                                              DATE                              DATE                DATE PRAIRIE ISLAND 1 & 2 PLANT VISIT                                                          09/86                                  --
09/86 PRAIRIE ISLAND 1 & 2 DRAFT EVALUATION                                                      11/86                                  --
11/86 REPORT ANO-2 PLANT VISIT                                                                          12/86                                  --
12/86 ANO-2 DRAFT EVALUATION REPCOT                                                              01/87                                  --
03/87 CRYSTAL RIVER RELIABILITY ANALYSIS                                                        03/87                                  --
03/87 REVIEW COMPLETED CRYSTAL RIVER PLANT VISIT                                                                  03/87                                  --
03/87 FORT CALHOUN RELIABILITY ANALYSIS                                                          05/87                                  --
05/87 COMPLETED FORT CALHOUN PLANT VISIT                                                                  06/87                                  --
07/87 CRYSTAL RIVER EVALUATION REPORT                                                            05/87                              04/88                    --
FORT CALHOUN EVALUATION REPORT                                                            08/87                              04/88                    --
ANO-2 EVALUATION REPORT                                                                    04/88                              04/88                    --
ANO-1 PLANT VISIT [ LIMITED)                                                              09/87                              05/88                    --
ANO-1 EVALUATION REPORT                                                                    10/87                              06/88                    --
RANCHO SECO PLANT VISIT (LIMITEDI                                                          10/87                              05/88                      --
RANCHO SECO EVALUATION REPORT                                                              11/87                              06/88                    --
PREPARE
 
==SUMMARY==
REPORT                                                                    02/88                              08/88                    --
AS OF FY88 QUARTL1 2 O                                                                                                      O                                                                                        O
 
v RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                PAGE:    83
                                                                                                                                                                            .            I ISSUE NUMBER:              125.II.7                        TITLE- REEVAL, PROV. TO AUTOMATICALLY ISOLATE FEEDWATER FPOM SG IN LINE BREAK IDENTIFICATION DATE: 12/8SC                                rRIORITIZATION DATE- 09/86C                        TYPE: GSI                    PRIORITY: H TASK MANAGER: D. BASDEKAS                                    OFFICE / DIVISION / BRANCH: RES /DRPS/RPSI        ACTION LEVEL: ACTIVE        STATUS:                      '
TAC NUMBERS:
RESOLUTIOF 'DA E - 08/89 WORK AUTHORIZATION: MEMO FROM H. DENTON TO T. SPEIS. SEPTEMBER 10, 1986                                                                                            ''
FIN                    CONTRACTOR                                                CONTRACT TITLE                                                            .
                                                                                                                                                                                -E%
A6881                    INEL                      GI 125.II.7    AU.0 ISGLATION OF FEEDWATER FROM S.G. IN LINE BREAK"                *~~
my W0RK                                                    '
SC0PE                                                                                    -
OBTAIN PLANT INFORMATION RELEVAN', TO ISSUE.
INCLUDING IDENTIFICATION OF ISSUE- AFFECTED PL ANTS.                                          TYPES ON BASIS OF EXPERIENCE AND/OR FAULT TREE RELIABILITY ANALYTIC METHODS.      PERFORM RISK ANALYSES TO QUANTIFY ALL CHAPTER 15 ANALYSES OF STEAM AND FEEDWATER LINE BREAM                                        SIGNIFICANT POSITIVE AND NEGATIVE SAFETY ASPECTS ACCIDENTS. PLANT-SPECIF IC CONTROL SYSTEMS FOR                                                RELATING TO A PROPOSED ELIMINATION OF.THE PROVISION AUTOMATIC FEEDWATER ISOLATION AND ISSUE-RELATED                                              FOR AUTOMATIC ISOLATION. A% A BASIS FOR A REGULATORY OPERATIONAL EXPERIENCE. OBTAIN ESTIMATE OF FREOUENCY OF                                      VALUE-IMPACT RESOLUTION OF THE ISSbE.
INADVERTANT ACTUATION OF REPRESENTATIVE CONTROL SYSTEM y - .;
S TA TUS                                                              '
A S0W l FIN AS881) FOR AN INEL PROPOSAL WAS ISSUED                                            IN AUGUST 1987.
AFFECTED DOCUMENTS                                                                  PROBLEM /RtSOLUTION'
  -------------.........-...------_....--..-..--.-------------                                  --------..- ...---------------................. ...-- -.. 2.
NONE                                                                                            NONE.
s s .. ,
ORIGINAL          CURRENT            ACTUAL MILESTONES                                                DATE              DATE              DATE kkhbEkhhkbNEbTbbhRb                                                                              5 hhfh6 AS OF FY88 OUARTER 2 3          -<
e
 
CUN DATE: 05/11/88 GENEdIC ISSUE MANAGEMENT CONTROL SYSTEM                    PAGE:          6 IS SUF. NUMBER. 125.11.7                        TITLE. REEVAL. PROV TO AUTOMATICALLY ISOLATE TEEDWATER FROM SG IN LINE BREAK ORIGINf4L      CURRENT            ACTUAL M I LE sT Ot E S                                    DATE        DATE              DATE MILESTONE SCHEDULE COMPLETF                                              10/80              --
10/86 PRELIMINARf DISCUSSION OF WORK PLAN WITH                                05/87              --
07/87 CONTRACTOR ISSUE SDW FOR CONTR.TCTOR                                                06/87              --
08/87 ISSUE CONTRACT                                                          07/87              --
08/B7 DRAFT TAP (ISSHED TO RES/NRR)                                            e5/O              --
09/87 2f vI"      'A.    (SEND TO RPSIB CHIEF)                              07/87              --
09,87 "9 AFT              .ACTOP REPORT                                        10/87        06/88                  --
C f'N T R AC T OR REPOPT                                      0~ 88        11/88                  --
                          -      ''At,UE/ IMPACT ANA'.YSIS                                04/88        01/89                  --
4.%          . AGE TO DRPS DIRECTOR                                  0%/8b        02/89                  --
                  ,  GR PACKAGE TO LICENSING DIVISIONS                                    05/88        0?/89                  --
* COMMENTS 3G" PACKAGE TO RES DIRECTOR                                            07/89        03/89                  --
                      " .'  .c  FINALIZED AND SENT TO CRGP (29, 53)                      07/88        05/89                  --
* ACRS REVIEW AND EDO APP 20 VAL COMPLETED                        10/88        07/69                  --
i adE CLOSEOUT MEMO rROM RES DIRECTOR                                    11/88      08/89                    .-
TO LICENSING DIVISIONS (GL 10 RELEVANT LICENSEES)
AS OF FY88 OOARTER 2 9                                                                    9                                                            9
 
m                                                                                                    (%                                                                                                      j%
RUN DATE: 05/11/88 GENERIC ISSUE MANAGCMENT CONTROL SYSTEM                                              PAGE:                              85 ISSUE F. UMBER:        I?8                                                      TITLE: ELECTRICAL POWER RELIABILITY IDENTIFICATION DATE 05/86C                                                      PRIORITIZATION DATE: II/86C                      TYPF: GSI                                                PRIORITY: H TASK MANAGER: D. THATCHER                                                        OFFICE / DIVISION / BRANCH- RES /DE /EIR        ACTION LEVEL: ACTIVE                                    STATUS:
TAC MUMBERS:                                                                                                                                                                              RESOLUTION DATE' 17/09 WORK AUTHORIZATION: MEMO FOR H. DENTON FROM T. SPEIS DATED 11/28/86 FIN                  CONiRACTOR                                                                      CONTRACT TITLE b6hk5                  kkk                                              khTkbR TkbhbkkthbTRhbkl PbWER hSSbkb W0RK    SC0PE INTEGRATION OF OTHER HIGH OR MEDIUM PRIORITY GENERIC                                                            THROUGH SUPPLEMENT 6 MARCH 1987 TO CONSIDER OTHER ISSUES:      A-30 48, 49.                                                                                      DOCUMENTED GSI'S WHICH MAY HAVE AN IMPACT ON THE INTEGRATED TASK 1:      IDENTIF ICATION OF ISSUES.                                                                APPROACH 10 THE ELECTRICAL POWER SYSTEM ISSUES AND CONCERNS.
THE CONTRACTOR REVIEWED THE DOCUMENTATION RELATED TO                                                    BASED ON THE REVIEW OF THE ABOVE-DISCUSSED MATERIALS. INEL THE ELECTRICAL ISSUES AND CONCERNS LISTED BELOW. A NUMBER                                                        PREPARED A DRAFT REPORT SUMMARIZING ALL THE RELATED ISSUES OF GSI S DIRECTLY RELATED TO ONSITE ELECTRICAL PCWER SYSTEMS                                                    AND RECOMMENDED A PLAN FOR PROCEEDING WITH RESOLUTION OF THE HAVE BEEN DOCUMENTEC (NUREG-0933) AND ARE IN VARIOUS STAGES                                                      RELATED ISSUES AND CONCERNS (TASKS 2 AND 3).
OF RESOLUTION.          THESE ISSUES INCLUDE: A-30. "ADEOUACY OF                                                    TASK 2: EVALUATE THE ISSUES AND EXPECTED RESULTS BASED SAFETY-RELATED DC POWER SUP."LIES:" 48 "LCO FOR CLASS lE                                                        ON THE RESULTS OF TASK 1.
VITAL INSTRUMENT BUSES IN OPLEATING REACTORS"; 49                                                                      INEL WILL COMPLETE NESESSARY ANALYSIS AND DEVELOP
* INTERLOCKS AND LCOS FOR REPUNDANT CLASS 1E TIE BREAKERS"                                                      ALTERNATIVES FOR RESOLUTION OF THE ISSUES AND CONCERHS FOR A NUMBER OF OTHER ISSUES AVD CONCERNS CONCERN THE                                                        BOTH EXIMTING AND FUTURE PLANTS. A FINAL REPORT WILL BE ONSITE ELECTRICAL POWER SYSTEMS TO A SOMEWHAT LESSER                                                            PREPARED THAT INCLUDES THE RESULTS OF TASK 1 AND PROVIDES DEGREE        SOME OF THESE ISSUES INCLUDE: USI A-17                                                            THE RECOMMENDED ALTERNATE RESOLUTIONS DETERMINED IN TASK 2.
                                                                          "SYSTENS INTERACTIONS," AND USI A-47, "SAFETY                                                                    PRELIMINARY CONSIDiRATION OF POTENTIAL SAFE 1Y BENEFITS AND IMPLICAIIONS OF CONIROL SYSTEks."                                                                                COSTS OF EACH ALTERNATIVE WILL ALSO BE PROVIDED.
VITH RESPECT TO POSSIBLE RESCLUTION FOR FUTURE                                                                TASK 3: DEVELOP REGULATORY ANALYSIS BASED ON THE PLANTS. CONSIDERATION WAS GIVEN TO THE IEEE STANDARDS AND                                                        PRELIMINARY ANALYSES PERFORMED IN TASK 2.
NRC ENDCRSEPENTS BY REGULATORY GUIDES. SPECIFICAL(Y, THE                                                              INEL WILL COMPLETE NECESSARY ANALYSIS AND PREPARE DRAFT FOLLOWING wtRE CONSIDERED: IEEE 603 AND ITS REFERENCED                                                          DOCUMENTS FOR NRC STAFF SUBMISSION TO CRGR. THE DRAFT STANDARDS. AND IEEE 308 AND ITS REFERENCED STANDARDS.                                                            REGULATORY ANALYSIS TO BE PREPARED SHALL BE BASED ON THE TO OBTAIN AN UP-TO-DATE ASSESSMENT OF ONGOING                                                            h0ST COST-EFFECTIVE ALTERNATIVES EVALUATED IN TASK 2. THE ELECTR7 CAL POWER CONCERNS, AEOD AND NRR WERE CONTACTED.                                                        NRC-WIDE GUICZLINES, AS CONTAINED IN NUREG/BR-0058, RELEVAP: AEOD CASE STUDIES WERE REVIEWED ALONG WITH                                                              "REGULAIORY ANALYSIS CtilDELINES Gi THE U.S.                                                  NUCLEAR BULLE TINS AND NOTICES.                            IN ADDITION. INEL REVIEWED                                    REGULATORY COMMISSION," JANUARY 1983. WILL BE FOLLOWED IN NUREG-0933, "A PRIO*ITIZATION OF GENERIC SAF ETY ISSUES."                                                        PREPARING THE DRAFT DOCUMENTS.
ST A T US THE OBJECTIVE OF THIS EFFORT IS TO DEVELOP A SINGLE                                                      PROGRAM WHICH ADDRESSES THE ISSUES IN AN INTEGRATED MANNER.
AS OF FY88 OUARTER 2
 
RUN DATE: 05/11/88 GENrRIC I'. SUE MANAGEMENT CONTROL SYSTEM                                            FAGE:          86 ISSUE NUMBER:    128                                      TITLE ELECTRICAL POWER RELIABILITY AFFECTED E'OCUMENTS                                                                                        PROBLEM / RESOLUTION ThE FbLIbWkhb hEbHN bL RkPbRh5 hkVk bkkh PbbtISHEb bR                                                                  L bbbbH hN PRbbRkMHkhhhhN kDhREhh5Nb HEkh ARE SCHEDbtED TO BE PUBLISHED-                                                                              ISSUES. THE DRAFT TECHNICAL RESOLUTION FOR GSI'S 48 AND NUREG-0305 TECHNICAL REPORT ON DC POWER SUPPLIES                                                    49 WERE DRAFTED SEPARATEtt FROM A-30.              IT IS EXPECTED IN NUCLEAR POWER PLANTS." JULY 1977.                                                                THAf THE RESOLUTIONS WILL BE MERGED PRIOR TO SUBMISSION NUREG-0666 "A PROBAOILISTIC SAFETY ANALYSIS OF                                                      TO C9GR.
DC POWER SUPPLY REQUIREMENTS FOR NUCLE AR POWER PLANTS. APRIL 1981.
UCID-19469        120 VAC VITAL INSTRUMENT BUSES AND INVERTER TECHNICAL SPECIFICATIONS," 1982 Is IS ANTICIPATED THAT THE PROPOSED RESOLUTION OF THE ELECTRICAL POWER ISSUES WILL INCLUDE A REGULATORY ANALYSIS AND SUPPORTING
 
==SUMMARY==
NUREG.
ORIGINAL                CURRENT            ACTUAL MI LEST 0N ES                                                                  DATE                DATE                DATE PRELIMARY RESOLUTION PACKAGE SENT TO STAFF                                                          12/87              04/88                    --
FOR TECHNICAL REVIEW /COMMFNTS (GSI'S 48 & 49)
PREPARE DTR PACKAGE (GSI'S 48 & 49)                                                                04/88                04/88                    --
DIVISION DEPUTY DIRECT 0ft                                                                          05/88                05/88                        -
REVIEW OF DTR COMPLETED MANAGEMfNT C9NCURRENCE EY                                                                          07/88                07/88                    --
OTHER OFFICiS OTR PACKAGE T" PRGR (29)                                                                            07/88                07/88                    --
ACRS REVIEW OF DTR COMPLETEE                                                                        09/48                09/88                    --
CRGR REVIEW OF DTR COMPLETED                                                                        09/88                09/88                    --
FRN OF ISSUANCE OF PROPOSED RESOLUTION                                                              12/88                12/88                    --
FOR PUBLIC COMMENT COMPLETE DE REVIEW bf PUBLIC                                                                        S4'89                04/89                    --
COMMENTS AND PREPARE FTR PASAAGE AS OF FY88 QUARTER 2 O                                                                                                  O                                                                      O
 
                                                                      '                                                          N
                                                                  \                                        -
N RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                    PAGE;        89 ISSUE NUMBER: 130                      TITLE: ESSENTIAL SERVICE WATER PUMP FAILURES AT MULTIPLANT SITES ORIGINAL          CURRENT          ACMIAL MILEST0NES                                        DATE            DATE            DATE
                  -.---------.-~~------------------------------
ASSIGN TASK MANAGER                                            05/87                --
06/87 DEVELOP TAP                                                    01/87                --
08/87 i,                ASSEMBLE INFORMATION ON SYSTEM LAYOUT                          11/87                --
12/87 FOR MULTI-PLANT SITES PRELIMINARY DISCUSSION OF WORK PLAN WITH                      12/87              .--
01/88 CONIRACTOR ISSUE S0W FOR CONTRACTOR                                      02/88                --
03/88 L 1 SEARCH FOR SERVICE WATER SYSTEM                            12/87                --
03/88
                -MALFUNCTa'1NS DRAFT REGULATORY ANALYSIS FOR TECH SPEC                        05/88          05/88                --
CHANGE                                                                                                                      4 SUBMIT DTR FOR TECH SPEC CHANGE TO RES                        96/88          06/88                --
DIRECTOR CRGR REVIEW (TECH SPLC CHANGE)                                07/88          07/88                --
ISSUE GENERIC LETTER ON TECH SPEC CHANGE                      08/88          08/88                --
PRELIMINARY CONTRACTOR REPORT                                  09/88          09/88                --
FINAL REPORT                                                    11/88          12/88                --
PREPARE VALUE/ IMPACT ANALYSIS                                  11f88          12/88                --
SUBMIT DTR TO RES DIRECTOR                                    02/89          03/89                --
ACRS REVIEW                                                    05/83          04/89                --
CRGR REVIEW (29,53)                                            06/89            04/8C                --
FTR TO NRR                                                    09/89            06/89                --
AS OF FY88 OUARTER 2
 
RUN DATE: CS/II/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                  PAGE:  90 ISSUE NUMBER:            133                              TITLE. UPDATE POLICY STATENENT ON NUCLEAR PLANT STAFF WORKING HOURS IDENTIFICATION DATE: 07/86C                                PRIORITIZATION DATE II/86C                                                TYPE. LI                    PRIORITY:
TASK MANAGER: D. MORRISEAU                                OFFICE / DIVISION / BRANCH- NRR /DLPQ/LHFB                                ACTION LEVEL: ACTIVE        STATUS- S TAC NUMBERS: M40402                                                                                                                                              RESOLUTION DATE 04/88 WORK AUTHORIZATION: SRM DATED 9/30/85 FIN                  CONTRACTOR                                                                    CONTRACT TITLE W0R K              SC0P E SINCE COMMISSION POLICY IS STATED IN SEVERAL                                                              ON THE CURRENT GUIDELINES OlJ OVERTIME AND NORMAL WORKING DOCUMENTS. REVISION OF NRC"5 PRESENT POLICY GUIDANCF                                                              HOURS IS BEING DEVELOPED. A REVISED POLICY STATEMENT ON ON LIMITS ON OVEATIME AND SHIFT SCHEDULING IS NEEDED TO                                                            SHIFT AND SCHEDULING HOURS OF WORK WOULD ELIMINATE CONSOLIDATE CURRENT GUIDANCE INTO A SINGLE DOCUME NT                                                              LICENSEE CONFUSION RESULTING FROM MULTIPLE POLICY AND A'SO. THE RECENT ALLEGATIONS OF OPERATORS SLLE PING ON REQUIREMENT DOCUMENTS AND WOULD CLEARLY IDENTIFY SHIFT AT PEACH BOTTOM. AS WELL AS SIMILIAR OCCURENCES.                                                            L ICE NSE E MANAGEMENT *S RESPONSIBILITY TO ASSCPE THAT POINT TO THE NtED FOR A MORE DEFINITIVE POLICY. FOR                                                                NUCLEAR POWER PLANT STAFF FATIGUE RESULTING FROM EXAMPLE. THERE IS NO SPECIFIC GUIDANCE RELATING TO THE                                                            EXCESSIVE WORKING HOURS DOES NOT ADVERSELY A*FECT PUBLIC USE OF 12-HOUR SHIFTS IN THE CURRENT POLICY STATEMENT                                                              HEALTH OR SAFETY.
THE STAFF HAS REVIEWED AND APPROVED CASE-BY-CASE 8                                                                          THE REVISED POLICY STATEMENT WILL AID THE NRC LICENSEE PROGRAMS FOR ROUTINE 12-HOUR SHIF1s FOR 7                                                                STAFF IN CONDUCTING REVIEWS OF LICENSEE PROGRAMS AND UTILITIES. IN ADDITION, THE CUMULATIVE EFFECTS OF FAT (GUE                                                        IN MONITORING LICENSEE IMPLEMENTATION.
HAVE NOT BEEN ADDRESSED. A POLICY STATENENT WHICH BUILDS ST ATUS
------.---------------------------------------------------------------------------------------------~~-. .---. --------------
CRGR REVIEWED A DRAFT POLICY STATEMENT ON 12/4/86                                                          FACTORS EFFECTS OF ROTATING SHIFTS ON OPERATOR CRGR RECOMMENDATIONS HAVE RESULTED IN SEVERTL REVISIONS.                                                          ALERTNESS WHICH WAS SURMITTED BY THE STAFF ON L/?3/87.
ALSO. THE COMMISSION REQUESTED INFORMAT.'ON ON THE HUMAN AFFECTED DOCUMENTS                                                                                        PROBLEM / RESOLUTION
''~ 'THk PRbPbbkb~PblkbY bT TkhkNh WbbLb bbPERbhDh hHk                                                            N N DOCUMENTS OR SECTIONS OF THE F OLLOWING DOCUME NTS THAT DE AL WI TH SHIF T SCHEDULING AND OVERTIME- POLICY STATE-AS OF FY88 OUARTER 2 O                                                                                                O                                                                    O
 
l                                                                                                                                                                                                          -!
t i
l                                                                                                                                                                    RUN DATE: 05/11/88 r
GENERIC TSSUE MANAGEMENT CONTROL SYSTEM                                                  PAGE:          91 l              ISSUE NUMBER: 133                                        TITLE: UPDATE POLICY STATEMENT ON NUCLEAR PLANT STAFF WORKING HOURS l
i i
i                                                  AFFECTED DOCUMENTS                                                                                    PROBLEM / RESOLUTION                                ,
HENT OF 2/18/82. 147FR7352), REVISED POLICY STATEMENT OF 6/1/82 (47FR23836). NUREG-0737 (ITEM I.A.1.3.1, AND GENERIC LETTERS 82-12, 82-16, 83-02 AND 83-14 l
<                                                                                                                    ORIGINAL                              CURRENT              ACTUAL 3                                                                MILEST0NES                                              DATE                                DATE              'DATE j                                      SUBMIT PAPER TO COMMISSION ON HUr!AN                                          06/87                                    --
                                                                                                                                                                              '06/87 3
FACTORS EFFECTS 07/87                                                    07/87 BRIEF NRR MANAGEMENT ON STAFF POSITION                                                                                  --
1 i                                      SUBMIT DRAFT POLICY STATEME N'T TO NRR DIFECTOR                                03/87                                04/88                      __
1 i                                      SUBMIT DRAFT POLICY STATEMENT TO CRGR FOR                                      04/87                                04/88                    ..
l                                      REVIEW s.
SUBMIT ORAFT POLICY STATEMENT TO EDO                                          05/87                                04/88                      --
l i
i                                                                                          -
4 1
i i
(
4 AS OF FYS8 OUARTER 2 4
1 4
4
: 1.                                                                                                          -
 
CUN DT.TE: 05/11/88 GENERIC ISSUE MANAGEME NT CONTROL SYSTEM                                                          PAGE:  92 ISSUE NUMBER            134                          TITLE RULE 04 DEGREE AND E XPE RIE NCE REO FOR SENIOR OPERATORS IDENTIFICATION DATE: 07/86C                          PRIORITIZATION DATE 07/86C                                                        TYPE GSI                    PRIORITY H TASM MANAGER. M. FLEISHMAN                            OFFICE / DIVISION / BRANCH RES / ORA /RDB                                          ACTION LEVEL: ACTIVE        STATUS:
TAC NUMBERS-                                                                                                                                                        RESOLUTION DATE G8/89 WORK AUTHORIZATION: MEMO (CCMLZ-85-61FROM S CHILK TO V STE LLO DATED 1/23/86 FIN                  CONTRACTOR                                                              CONTRACT TITLE MONE                    NONE              NONE W0R M              SC0P E THIS CONTEMPLATED RULEMAKING ACTION IS DUE TO A                                                      CCMME RC I AL NUCLEAR REACTOR OPERATING AT GREATER THAN TWENTY COMMISSION DECISION TO ENHANCE THE LEVELS OF E NGINE E R ING AMD                                              PERCENT POWER                  SO'S LICENSED PRIOR TO 4 YEARS AFTER ACCIDENT MANAGEMENT EXPERTISE ON SHIFT                          THIS IS BEING DONE                            EFFECTIVE DATE OF RULE WHO DO NOT HOLD DEGREES IN TO F URTHER ENSURE THE PROTECTION Of THE HEALTH AND SAFETY OF                                                ENGINEERING OR PHYSICAL SCIENCE WOULD BE ~GRANDFtTHERED -
THE PUBLIC BY HAVING PERSONNEL ON SHIFT WITH ENHANCED                                                        ONLY ONE REEKAMINATION ALLOWED FOR SO APPLICANTS WHO APPLY QUA L IF ICA T IONS                                                                                          BEFORE 4 YEARS AFTER EFFECTIVE DATE OF RULE.                  NO DEGREE THE CONTEMPLATED RULE WOULD REQUIRE (1 YEARS AFTER                                                    EQUIVALENCY WOULD BE ACCLPTABLE 4 YEARS AFTFR EFFECTIVE DATE EFFECTIVE DATE OF RULE) THAT APPLICANTS F OR LICENSES AS A                                                    0F RULE SENIOR OPERATOR 1S01 0F A NUCLEAR POWER PLANT HOLD A                                                                    THE CONTEMPLATED DEGREE RULE IS RELATED TO THE BACCALAUREATE DEGREE IN ENGINEERING OR PHYSICAL SC IE NCE FRDM                                                COMMISSION POLICY STATEMENT ON ENGINEERING E XPER T ISE ON AN ACCREDITED INSTITUTICN                  OTHER BACCAL AURE ATE DEGRE E S F ROM                            SHIFT (50 FR 43621. 10/28/851                  THIS POLICY STATEMENT IS AN INSTITU'. ION MAY BE ACCEPTED ON A CASE-BY-CASE 8 ASIS                                      THE            SATISFIED By PROVIDING ENGINEERING AMD ACCIDENT MANAGEMENT CURRENT REQUIREMENT (FOR CANDIDATES WiTH A BACCALAUREATE                                                      E XPERTISE ON SHIF T THROUGH THE SEPARATE SHIFT 1ECHNICAL DEGREEl 0F TWO YEARS OF RESPONSIBLE MUCLEAP PCWER PLANT                                                      ADVISOR ISTAI OR BY CCMBINING THE STA/SO FUNCTIONS                    THE EXPERIENCE. WOULD BE AMENDED TO REQUIRE AT LEAST ONE OF THE                                                  POLICY STATEMENT CLOSED OUT ISSUE HF I 2. ENGINEERING TWO YEARS OF OPERATING EXPERIENCE BE WITH A SIMILAR                                                          EXPERTISE ON SHIFT ~
STA T US ANPRM PUBLISHED IN THE FEDERAL REGISTER CN 5/30/85                                                    AN SRM DATED 6/24/87 DIRECTED THE STAFF TO PREPARE A THE COMME NT PERICD ENDED OM 9/29/86                      PUBLIC COMMENTS                                    PR000 SED RULE                FOLLOWING THE NRC REORGANIZATION OF 4/12/87, PROVIDED IN RESPONSE TO THE ANPRM WERE RESOLVED AND                                                          RES NOW HAS THE RESPONSIBILITY FOR DEVELOPING THE RULE RECOPENDATIONS MADE TO THE COMMISSION                          THE CU NISSION IN AS OF FY88 OUARTER 2 O                                        .
O                                                                            O
 
    .~c.._.-                                                                  ._ . .+          -.          __ . . -                      .~ -- .                        _            .                    _. .                        -      _ _ _ _ . -                    -.                -
4
,                                                                                                                                                                                                                                                                                                        RUN DATE: 05/11/88 4
GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                      PAGE:          93                                ,
i
!                                                                                  ISSUE NUMBER: 134                                                                  TITLE: r.sLE ON DEGREE AND EXPERIENCE REO. ~0R SENIOR OPERATORS i                                                                                                                                AFFECTED DOCUMENTS                                                                                                                                        PROBLEM / RESOLUTION
: j.                                                                                  10 CFR PARTS 50 AND 55.                                                                                                                                      NONE.
i
!                                                                                                                                                                                                                                            ORIGINAL                                        CURS ~MT              ACTUAL 1
MILEST0NES                                                                                    DATE                                        DATE                'DATE
}                                                                                                                      - - - _ - - _ - - - - - - - - - - - - - - _ - - - - - - - - - - - - - - - - - - - - . -                              ----------                                  ----------            ----------
j                                                                                                                      ANPRM 151 FR 19561)., COMMENT BEGINS                                                                                      05/86                                            --
05/86
!                                                                                                                    ANPRM (51 FR 19561). COMMENT ENDS                                                                                          09/86                                            --
09/86                                      ~I
,                                                                                                                    ANPPM (51 FR 19561). RESOLUTION OF                                                                                        02/87                                            --
03/87 j                                                                                                                      PUBLIC COMMENTS                                                                                                                                                                                                                          l
}                                                                                                                      SUOMIT OPTIONS TO NRR DIRECTOR IN                                                                                          03/87                                            --
04/87 i                                                                                                                      SECY PAPER i                                                                                                                                                                                                                                                                                                                                                                '
j                                                                                                                      SUBMIT SECY PAPER TO EDO                                                                                                  04/87                                            --
04/87 SUBMIT SECY PAPER TO COMMISSION                                                                                            04/87                                            --
04/87
!                                                                                                                      COMMISSION REVIEW                                                                                                          06/87                                            --
06/87 i
PROPOSED RULE TO CRGR/ACRS (29)                                                                                            05/88                                      05/88                    .--
1                                                                                                                      PROPOSED RULE TO ECO                                                                                                      05/88                                      06/88                      --
I                                                                                                                                                                                                                                                                                                                                                                t
;                                                                                                                      PROPOSED RULE ISSUED                                                                                                      10/88                                      08/88                      --
                                                                                                                                                                                                                                                                                                                                                              -l f                                                                                                                      FINAL RULE FOR CRGR/ACRS REVIEW (53)                                                                                      04/89                                      04/89                      --
j                                                                                                                      FINAL RULE FOR EDO REVIEW                                                                                                  04/89                                      05/89                      --
                                                                                                                                                                                                                                                                                                                                                              -l 1
4 FINAL RULE ISSUED                                                                                                          09/89                                      08/89                  '
                                                                                                                                                                                                                                                                                                                        --                                      i i
                                                                                                                                                                                                                                                                                                        ~
i i
J 4                                                                                                                                                                                                                                                                                                                                                              'i i
j                                                                                                                                                                                                                                                                                                                                                                l 1
i
* t AS OF FY88 OUARTER 2                    i i
k      '
                                                                                                                                                                                                                                                                                                                                                              -l
,                                                                                                                                                                                                                                                                                                                                                            a '
i i
* _ ._ . _ . . ~_.                        ._        ,_    _ , _ _ _ . _ _ - - - -
 
O                                                                                            N e                    e N                    I                                                                      G M                    e                                                                      W m                    e                                                                      >
e                                                                      A e                                                                      4 w                    e                                                                      D
                  >                    i                                O                                      O 4                    i                                E m                  o                    i                  >            0        *                            #
m          I                            i                  a    m      M        M                            #
%                  2                    IM  >w            O    O      k        M                            >
M                  O                  e>>>m            Mk              4      km                              6 M  W      >      M                  e2EMD 0 w4                M MU          m          O N e      > - >                        ewwJH 2 ma                w EM>        MA        22 O            O  6 O        M    e D                    # 1mM WM          DD      m Owe            O      M4      w      w  O O        a D      J                  ewamAOkMHO              MD    MMMMWJW            Q        U      >
O > 0                        emD4OOO4 w x0 e                      m>IwI          m2 Z            w    M M    4 e                    eMUAMUw as                w 3 O M H > i-          WM      w      w  4 w w      w > w                        iD          -wo        20 J wE w                  A        D      J
> 0 4 4 A O e e
e      *O>44 Umw Orm 00 twO WL>D40
                                                                            > MOO 6 M a w' O202W2            O 2 U OO    w M
Q A                          4        Imow2Ob a60HACOMM                        MJ        ZM      Me  w I      e  wIw4www 20 MU6                    wham Me              2>      m 2                            e        aw HO mOZHMwCD MwMmMM 3D 00 D D
w e      eOw        sm6w2pOZOOUmOO36              OJ    UM  >
u                            e      iOJOTED OOJ                M    ZwDUA w JU                        M
              >              i      tumM4wu>            MJwe>4A>            AME JE JMZE M
i      I    (www UEMUOMm M WDMw OM MMOO UMM*
a      ewaerm>4442OwCM O*MMm 6 U              e      IIMHODODwCMUppew3M >                                    J    M4>4 4              e      e>44        UOO*Z            (JMMMMJH wd Omum e      e    >  H    wwOwOwwaDOO6M40                        I>      O ww e      e>< 03 O 19I230436020 >> JFAZ 2 COow J
w i
sw -wwr46EmowOsOJOx4U                                Mw MMZO a      t >mN>MO          OOw4mwkmU J M        >              e      I mO-w>        w U1 mm AZO 4>m                      Me OOM w  M    w              e      e36    OwO22ww63        3 M22mo        wo mOwd dw Y D e      J              a      se          m>MOmmOUpwO          440w MA MO                      e      a    w O ZIM            M    6MEM          H              E      mwd M        2              i      e    U  H    wa>2DN><>4                W > 4 M e' d Omo 663>M M        o              e      e-M    - -ZwuwO20mw WKmawwwoMOOpem W    M              a      eMkOOnwwwwwwCOma MODMOmwk                                              w J  A    >              e      s-Uwo-awh>m1w                      He>>O42                Dw2J6>
I J > U                  eM      i    (MO      MOOM        w 4      O*    dwm4          NJ2O4CM w M  H    4              *w      e    EDI D Z2202                  O Ram I WOwww k
    > w                      eD      e    60*      OOM3OmO6                FOD 4U              OEk2>U M m                      iO      e      ww w2            NO O ROMOw                    Mwm4wk
    > w                    weM        e    >UE -m4m400M                  OMewIOA"OmODEMO O >                    J          eMao Z            COZ2*>N            mum >2mMO              wwww2 O                    H  'e**    e    sm>OMM6J4w2E                  MU4          40        00440m J                      M e J      igMA2Mxw w                  pwwww 4                  M6we>Aw" O
m w        m          we a      sed we mO>wwiEOMMm                              MOOOw4wa>2 Z        M w
eM  we4OOm42DawuswA40 ONewwd (ww32w
    > M                    *  *6      i H 2 2 m O O Q 4 0 2 m m O N D a k o w M e > O mis m e M O 2 J        N          Usa    L e    MMD4Mwo            (MMJ      HadaO>O wO O                      4e w      e
                                            >Um>UF          OMDw OOmw2WA Dw U Y                            0e      00    CUO4-MMO>                  w>440          D*
4 w
w          m 's o>
                          *
* Ewkwwa>MDoww 60AwIZm OZMNM40 O          F      Ua      MMOOWEO-Qato OHCOU44                              MM 2
w e
N    F Q
O'w U 's Z  Os i
1    (    O    M        eM      i w O e w          >        I J    e O 2 m a          4        e      e 4 4 %
a        er  r*
2                0        e4      e 4 m o I          w        ew  k t I O        U    >        e>      e
      >        E    Z        eM  Ce w 4 w 4          M        e      e D m > a          e e      eO  3e O w 4 m              e    e2      i          w e Z O      N        m    e4      e          O                00                                  0 M w        F    JM        e      i          w    .m e      @Mz                .
w          n 0 2 O          w        ea      e          I  -OO        Z    M 3 EMI                M U      O  M    MN        so    e          > 367          Mwok I          O    Op>            AC M T  M    M    TN      eM      e              w om        MAf>        Uws pa                  002 a 4  H    M    E        e4      e      >O      MMMw        WO4M        ZIw 4Da              m>J4 w w 4 >              >    em      #      ww    ->2HH          Ukm      4HW MOO w w Z > N
* 4    ew      e MMOmwoud OOOOem                          Zwww        >>>e w M  M    C    El      i2      e m>wetM43            H    awkm Conk                  +4Dww 0    >    N              ew      e      wMDO >                twkN          w w Mw3OO2 M    W    Os      eO      ed    >>OMMU6w            OmO2 OOZOOwwO                            MM w a U          > -      e e>>wwe-K4wz                wnZMO2wMr COO                      Omd>
J  O    M        M    eE      eMme**          m-WM        A3D    24UJZE      40    wo    2
      >  M    6    Ew      e4      i > U        w=    >J    O      E4 2pw(Fm                  >MwTw M  =    6    4D      ew      eQMO40m        oO          swww mw31wo wem (z
      > A O          20      Ik      ezDZ w3md I wIwWm>DowmM4HMmOwo ed      se      e4040**>>m4                >HwM        20 MMH Mm42WA OM              e    E Z4A020w w >> ww                          M  qweOUMOZ m                8JM>MJDOwkW                Q we 2OODOZO6w O O M            eJNUOwm 14M                    W 40EgGZMM6>w220 m            eM6ZOk          Fwe        ME    >IAOOwdO>O2m4M mm              866w2        womw          404m EU4m mO                      M    pda O me          im4 DOJO MZO                      (mO    > FOmr WMiw Ie    OeI        ewkO JDMDw/                -3MMWowuJ g>OAOwsm I OO    H #U      l > Mw6 k.H Z (PO 4 "2 D O R H            4 's m M U          MMwEs U          tw    Usw        eO mo6 ow                wdJMO4ZU Om Jap 3OMO e          6m    dik        i    06 mmMmI-asO>U3wMO3OwJos 2 m              D a# E      e=w      twok 404AFow HOW                          wIMM HDmO N >      O2    H eW      eO>ww>>Mawww                  OmO6MOZ6>>3kOw w2 A A        E    F'M        *eMI        04WOMMmMUA                O>JMOZ              MEMm14 O    g    ww    Oe0        i-we          mDweQUm              Q mO            M    me4Cwg D    10    UsM        e    U      OwOde DNO40ZM mow                          MO DH4M 4                      erw6EOZ m wJ3 94p>OwOwmOAws>Iw w I M
60A0          wCw Mw O                Um402mH4 LMw >
M  H          2                e>      (IOZ2h ECHOmw4mM4DOw(M maa M 4            o                s4ww > MwcMMw wo60                          >mHM            k2 w4 M  O      -  M                eJ>d        MXMO >=>Mok62MM                            >A      04p>
E    F                tw43 342 MO 4WEdwo40WmCEOFM 4 E          4                eZI4M wwIOMMkMwe U                              OOswaOM636 O          N                *w    UNONU40 WOwwwwwJMMM mwM4m o m M      m    M eOMwEwOMw          wwww2EIOJH34ww>>042 w H w M N                            wmwZ      JW      M    >MWs        W        mDwwUNHO>
M 'Dg>EM O 2)W4WO604kM >
s m 4 O M        O        eW      IEU      >mJ 1 0 4 w I            2ee        14F2wwr e -OMM>w                      00 A        E    M      M    ew D M      Z    >    M eN      ewwo U4 - FIO UkEZ OOmwJOOmEw2J 2  6    4    D    6 eM      e>DMI2de m0 E404MO4UwCJ HO                                        ION H    E    4        80      eOO*UO we*Em4 6wpH                          O>      Mw HMHMm w  H        Z                  e wzDu          MWOM          www3OO OK6I64                          >4 3 2 r          g                i ewo                D>      Maeswwguem>6m 'wMa O W M U a                      e    Z>    6&Jg. MOO        Ww V62m              WW 4W          >MW
      @ O 4 4 O e    OkkskmOEwd              IIkZ6MOOm>ww&4MOA M  M          3                e U404400MJI h>OMwJ3*MOOOOICAO
 
1 Q                                                                                                                                                                                ,                                                                -                              J RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                              PAGE:        95 ISSUE NUMBER:                    135                                                                          TITLE: STEAM GENERATOR AND STEAM LINE OVERFILL ISSUES W0RK      SC0PE
                                                                                                                                                                                                                                                                                                              ~
h        khPkbVEb bbkbkhk hbhihbkkhb                                                                                                                                                      ikkbEhfhbRkbh9hhkhbbbkkbOhkkh T.      REACTOR VESSEL INVENTORY MEASUREMENT                                                                                                                                                      TASK 4:            REVIEW EFFECTS OF WATER HAMMER,
: 8.      REACTOR COOLANT PUMP (RCP) TRIP                                                                                                                                                    OVERFILL AND WATER CARRYOVER ON SECONDARY SYSTEM
: 9.      CONTROL ROOM DESIGN REVIEW                                                                                                                                                        AND CONNECTING SYSTEMS AND DEVELOF PROPOSALS FOR
: 10.      EMERGENCY OPERATING PROCEDURES                                                                                                                                                    MITIGATING THE CONSEQUENCES. CONSIDER THE EFFECTS
: 11.      ORGANIZATIONAL RESPONSES                                                                                                                                                          OF SAGGING DUE TO WATER WEIGHT, OPERABILITY OF VALVES
: 12.        REACTOR COOLANT SYSTEM PRESSURE CONTROL                                                                                                                                            AND OTHER COMPONENTS WHEN SUBJECTED TO TWO-PHASE THIS TASK WILL ENTAIL REVIEW OF THE                                                                                                                                                FLOW OF LIOUID.
PRIORITIZATION AND RELATIONSHIP TO OTHER GENERIC STATUS TECHNICAL CONTRACT HAS BEEN AWARDED TO SCIENTECH                                                                                                                                  4 SATISFACTORILY. DRAFT REPORTS HAVE BEEN RECEIVED FROM INC.          THE CONTRACTOR IS PROGRESSING ON TASKS 1 2 3 AND                                                                                                                                THE CONTRACTOR ON TASK 3 AND TASK 4.
AFFECTED DOCUMENTS                                                                                                                                                              PROBLEM / RESOLUTION ISSUE NUREG/CR-                                                                                                                                                                              NONE REVISE AND ISSUE SRP SECTION 15.6.3 ISSUE DRAFT REGULATORY GUIDE ON EDDY CURRENT TESTING ORIGINAL                  CURRENT                      ACTUAL MILESTONES                                                                                                                                DATE                      DATE                        DATE Shkkh~Phkhkhhkhkbhhbkbh5                                                                                                                                            bkh8h                        --
hhhhh STAFF / CONTRACTOR MEETING WITH ACRS                                                                                                                                07/87                        --
08/87 CONTRACTOR COMPLETES TASKS 1,2,3 & 4                                                                                                                                10/88                    10/88                          --
STAFF COMMMENTS ON DRAFT                                                                                                                                            11/88                    11/88                          --
CONTRACTOR'S REPORT FINAL CONTRACTOR'S REPORT                                                                                                                                          12/98                    12/88                          --
AS OF FY88 OUARTER 2
 
RUN DATE: 05/11/88 GENERfC ISSUE MANAGEMENT CONTROL SYSTEM                  PAGE:          96 ISSUE NUM3ER- 135                      TITLE STEAM GENERAT9R AND STEAM LINE OVERFILL ISSUES ORIGINAL          CURRENT        ACTUAL M ILES T ON E S                                    DATE            DATE          DATE STAFF PREPARE DTR PACKAGE                                      02/89          02/89                --
DIVISION DEPUTY DIRECTOR                                        03/89          03/89                --
RE'JIEW OF DTR COMPLETED CONCUPRENCE ON DTR BY OTHER OFFICES                            05/8)          05/89                --
DTR PACKAGE TO CRGR (29)                                        05/89          05/89                --
ACRS REVIEW OF DTR COMPLETED                                    07/89          07/89                --
CRGR REVIEW OF DTR COMPLETED                                    07/89          07/89                --
FRN OF ISSUANCE OF DTR                                          10/89          10/89                --
FOR PUBLIC COMMENTS COMPLE TE DE REVIEW PUBLIC COMMENTS AND                        03/90          03/90                --
PREPARE FTR PACKAGE DIVISION DEPUTY DIRECTOR                                        04/90          04/90                --
FTR REVIEW COMPLETED CONCURRENCE ON FTR BY OTHER OFFICES                            06/90          06/90                  --
REVIEW FTR PACKAGE TO CRGR [53)                                06/90          06/90                  --
CRGR PEVIEW OF FTR COMPLETED                                    08/90          05/90                  --
FRN OF ISSUANCE OF FTR                                              I/90        11/90                --
AS OF FY88 CUARTER 2 9                                                            9                                                            e
: y.  -
f%                                                                                  ,f
      /          'i                                                                                                                                      l      1 i
-    t            '
s      /                                                                            (3    }
r
      \        ,/                                                                                                                                            Q/                                                                    '
                                                                                                                                                                                                                                                    %/
l l
l                                                                                                                                                                                                                                RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                            PAGE:  97 ISSUE NUMBER-                    A-3, 4 AND 5                                        TITLE STEAM GENERATCR TUBE INTEGRITY IDENTIFICATION DATE: 01/78C                                                          PRIORITIZATION DATE- 01/78C                                                                            TYPE: USI                              PRIORITY: U TASK MANAGER: E. MURPHY                                                              OFFICE / DIVISION / BRANCH NRR / DEST /EMTB                                                            ACTION LEVEL ACTIVE                    STATUS:
TAC NUMBERS-.                  M06114                                                                                                                                                                                                RESOLUTION DATE 06/88 WORK AUTHORIZATION: COMMISSION APPROVAL OF ISSUES A-3                                                                                                  A-4      AND A-S AS USI*S IN IS78.
FIN                          CONTRACTOR                                                                                                            CONTRACT TITLE B2314                            PNL                                    LATER B2315                            PNL                                    LATER LATER                            SAI                                    VALUE-IMPACT ANALYSIS OF REC ON SG TUBE DEGRAD.
W0RK          SC0PE RhPbRhhShbbE PREPkbbbbhkhE NRb b kbRkhhb                                                                                                              H    RkPbRh hS kb kbENhhhh kbhhbNh Hkh Wbbib hh hhhhbhkVh )N PROGRAM FOR THE RESOLUTION OF USI'S A-3. A-4                                                                          AND A-5 TO                                      SIGNIFICANTLY REDUCING THE INCIDENCE OF STEAM GENERATOR TUBE ADDRESS THE AREAS OF STEAM GENERATOR INTEGRITY. PLANT                                                                                                                DEGRADATION. THE FREQUENCY OF TUBE RUPTURES AND THE SYSTEMS RESPONSE, HUMAN FACTORS. RADIOLOGICAL CONSEQUENSES                                                                                                            CORRESPONDING POTENTIAL FOR SIGNIFICANT NON-CORE MELT AND THE RESPONSE OF VARIOUS ORGANIZATIONS TO A STEAM                                                                                                                  RADIOLOGICAL RELEASES, AND OCCUPATIONAL RADIOL UGICAL GENERATOR TUBE RUPTURE. A GENERIC RISM ASSESSMENT IS TO BE                                                                                                            EXPOSURES AND WHICH WOULD BE EFFECTIVE IN MITIGATING THE PROVIDED ON THE RISK FROM STEAM GENERATOR RUPTURE EVENTS.                                                                                                            CONSEQUENCES OF SGTR EVENTS.
STA TUS A PACKAGE HAS BEEN PREPARED THAT CONSISTS OF A                                                                                                              STAFF 'S TECHNICAL RESOLUTION OF USI'S A-3. A-4                            AND A-S.
COMMISSION PAPER TRANSMITTING NUREG-0844 WHICH DOCUMENTS THE                                                                                                          THE PACKAGE WAS DELAYED TO RESOLVE CGC COMMENTS.
AFFECTED DOCUMENTS                                                                                                                                          PROBLEM / RESOLUTION NUREG-0844                                                                                                                                                            MAJOR FINDINGS EMERGING FROM THIS DROGRAM HAVE INCLUDED THE FOLLOWING:
SGIR'S DO NOT CONTRIBUTE A SIGNIFICANT FRACTION OF THF EARLY AND LATENT CANCER FATALITY RISKS ASSOCIATED WITH OTHER REACTOR EVLNTS AT A GIVEN SITE. THE INCREMENT OF RISK ASSOCIATED WITH SGTR EVENTS IS A SMALL FRACTION OF THE ACCIDENTAL AND LATENT CANCER FATALITY RISKS TO WHICH THE AS OF FY88 QUARTER 2 i
                          ._                          . _ _ _ - _ - _ - - . _ _ _ _ _            . _ _ _ _ _ _ _ _ _ - - _ _ _ _ - . _ - _ _ _ _ - _                                                                                                    e
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAuEMENV CONTROL SYSTEM                                            PAGE:        98 ISSUE NUMBE9.                        A-3, 4 AND 5                                  TITLE STEAM GENERATOR TUBE INTEGRITY AFFECTED DOCUMENTS                                                                              PROBLEM / RESOLUTION GENERAL PUBLIC IS ROUTINELY EXPOSED.
THE STAFF HAS RECCMMEh0ED ACTIONS WHICH HAVE BEEN FOUND TO BE EF FECTIVE ME ASURES F OR SIGNIFICANTLY REDUCING (A) THE INCIDENCE OF TUBE DEGRADATION, (81 THE FEEQUENCY OF TUBE RUPTURES AND THE CORRESPONDING POTENTIAL FOR SIGNIFICANT NON-CORE MELT RELExSES. AND (C) OCCUPATIONAL EXPOSURES AND WHICH WOULD BE EFFECTIVE IN MITIGATINS THE CONSEQUENCES OF SGTR'S          THESE ACTIONS ARE CONSISTENT WITH GOOD OFERATING AND ENGINEERING PRACTICES AND ARE COST EFFECTI"E. ADOPTION OF THESE ACTIONS BY LICENSEES WOULD FURTHER REDUCE PUBLIC RISK AND PROVIDE ADDED ASSURANCE THAT RISK WILL CONTINUE TO BE SMALL.
THE STAFF HAS ISSUED GL 85-02 TO INFORM LICENSEES AND APPLICANTS OF THE STAFF RECOMMENDED ACTIONS.                                RE SPONSF.S TO THE GENERIC LETTER INDICATE THAT THE LARGE MAJORITY OF LICENSEES AND APPLICANTS ARE POLLOWING PRDGRAMS. PRACTICES.
AND/OR PROCEDURES WHICH ARE PANTIALLY TO FULLY LONSISTENT OR EQUIVALENT TO THE STP'F RECOMMENDED ACTIONS                                IT APPEARS IHAT BOTH INDUSTRY INITIATIVE AND THE STAFF RECOMMENDATIONS HAVE BEEN RESPONSIBLE FOR SIGNIFICANT IMPWOVEMENTS TO PLANT PROGRAMS OVER THE PAST FEW VEARS.
LOW RISK FROM SGTR .1 ELATED CAUSES CAN CONTINUE TO BE ASSURED THROUGH IMPLEMENTATION OF PROGRAMS WHICH ARE EFFECTIVE IN ENSURING STEAM GENERATOR TUBE INTEGWITY AND SGTR MITIGABILITY IN ACCORDANCE WITH 10 CFR 100 APPENDICES A AND 8. AS HAS BEEN TRUE IN THE >AST. UTILITIES MUST BE VIGILANT AGAINST NEW OP C,;*% L PROBLEMS WHICH MAY NECESSITATE PREVENTIVE. DIAGNOSTIC AND/OR CORRECTIVE ACTIONS BEYOND NORMAL UTILITY PRACTICES AN9/OR REGULATORY REQUIREMENTS.          TtfE S'AFF WILL CONTINUE TO MONITOR STEAM GENERATOR OPERATING EXPERIENCES AS AN INDICATOR OF THE EFFECTIVENESS OF UTILITY PROGRAMS.
FINAL PUBLICATION OF NUREG-0844 WILL CONSTITUTE RESOLUTION Of USI'S A-3. A-4. AND A-5.
ORIGINAL                    CURRENT                      ACTUAL MILESTONES                                                    DATE                      DATE                        DATE DTR ISSUED BY DSRO FOR STAFF COMMENT                                                  11/82                          --
11/82 AS OF FY88 CUARTER 2 O                                                                                                      O                                                                                  O
 
    . m_                                .. - __-                                              - . _ _ ____m--  __        m_._    _ _s      .m            .-      .            . . - . _ _ _ _ _ _  . _ _ _ . . _ _ . . _    _
                                                                                                                                                                                                                                                          .--m        _                        . .
s%
f                                                                                                    [                                                                                ..
l 1
RUN DATE: 05/1I/88, GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                              PAGE:          99 1
i j                                                          ISSUE NUMBER:                              A-3,      4 AhD 5              TITLE: STEAM GENERATOR TUBE INTEGRITY i
i I                                                                                                                                                                                                      ORIGINAL                    CURRENT                              ACTUAL NES                                                            DATE                  DATE                                  DATE                            :t 1                                                                                                                            MILESi                                                                  ....--..--              -.....-...                              -----.....
  ]                                                                                                        - . . . - - . . - . . . . - - . . _ . . . . . ..-----------.......
1                                                                                                        eTAFF COMMENTS TO DSRO                                                                            12/82                      --
12/82
}'                                                                                                                                                                                                                                                                          06/83 DTR COMPLETED PACKAGE TO NRR DIRECTOR                                                            06/83                        --
l                                                                                                                                                                                                                                                                                                              '
d DTR PACKAGE TO CRGR (29.53)                                                                      09/83                      -.
09/83 CRGR REVIEW OF DTR COMPLETE                                                                        10/83                      --
LO/83
)
!                                                                                                          ISSUE DTR FOR PUBLIC COMME NT                                                                    04/85                        --
04/85 f                                                                                                          ISSUE STAFF DTR RECOMMENDED ACTION                                                                04/85                        --
04/85 4                                                                                                          GENERIC LETTER 85-02)
FTR COMMISSION PAPER APPROVED BY NRR DIRf                                                        02/86                        --
02/86 l                                                                                                          (EVALUATION OF RESPONSFS TO GL 85-02).
!                                                                                                          EDO RETURNED COMMISSION PAPE R WITH                                                              03/86                      --
03/86 f
COPSTNTS ON FTR t
1 I                                                                                                        COMrtISSION PAPER TO EDO WITH FTR                                                                03/86                        --
03/86                              .;
k,                                                                                                        EDO APPROVAL OF FTR                                                                              04/86                        --
03/86
}                                                                                                          SUSIIIT FTR PACKAGE TO NRR DIRECTOR                                                              04/87                        --
04/87 N
:                                                                                                          RESUBMIT FTR PACKAGE TO NRR DIRECTOR                                                              12/87                    06/88                                    --
i                                                                                                        SUBP1IT FTR PACKAGE TO EDO                                                                        12/87                    06/18                                      --                            i 4
                                                                                                          . ISSL'E FTR PACMAGE TO COMMISSION                                                                  12/87                    06/88                                      --
f PUS 11SH NUREG-0844                                                                                12/87                    06/88                                      --
a AS OF F Y B 8 ' OUAR TER 2 -
l I
I 1
l-      ._ _ - - _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _                                                  _                      _ _ _ _ _ _                                        _        _      _ _ . _ . .        __..                _
 
CUN DATE: C3/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                    PA.GE :  100 ISSUE NUMBER-    A-1r                  TITLE SYSTEM INTERACTIONS IN NUCLEAR POWER PLANTS IDENTIFICATION DATE: 01/78C            PRIORITIZATION DATE 01/78C                        TYPE: USI                          PRIORITY: U TASK MANAGER    D. THATCHER            OFFICE / DIVISION / BRANCH RES /DE /EIB          ACTION LEVEL- ACTIVE              STATUS.
TAC hlEBERS                                                                                                                  RESOLUTION DATE 09/89 WORK AufMORIZATION. COMMISSION DESIGNATION OF SYSTEM INTERACTIONS AS A USI FIN          CONTRACTOR                                    CONTRACT TITLE 80h89          Okhl            bbRVkY k kVkL bF bYbhfM kN      b bN kVkNSkbbbRbES WOR K    SC0P E THE SCOPE OF WORK TO RESOLVE THE ISSUE INCLUDES.                      COMPARISON: 14) SCREEN EVENTS FOR SAFETY SIGNIFICANCE (1) SEARCH FOR COMMON CAUSE EVENTS. (2lTREMDS/                        151 REVIEW-DEFINE SEARCH METHODS. AND (6 ) COMPARE /
PATTERNS OF COMMON CAUSE EVENTS; l3) INDIAN POINT                      E VALUATE ME THODS S T A T US MEETINGS WERE HELD WITH CRGR IN 4/86 AND WITH                    N0i AGAEE WITH THE PROPOSED RESOLUTION AND IN A S/13/86 THE ACRS IN 6/86 TO REVIEW THE DRAFT OF THE PROP.                      LE TTE R TO THE EDO OUTLINED RATHER BROAD CONCERNS.
RESOLUTION CRGR BASICALLY AGREED WITH THE APPROACH                            THE STAFF ADDRESSEb THE ACRS LETTER. BECAUSE OF BUT CONCLUDED THAT THE PACKAGE NEEDED TO BE REVISED                    THT NATURE OF THE ACRS CONCERNS. THE STAFF HAS INITIATED TO REFLECT THE DISCUSSIONS AT THE MEETING. ACRS DID                  A ScPARATE ACTION TO ADDRESS THEIR CONCERNS.
AFFECTED DOCUMENTS                                                          PROBLEM / RESOLUTION THE FOLLOWING TECHNICAL REPORTS HAVE BEEN OR WILL                      THE ACRS S/13/86 LETTER OUTLINED A NUMBER OF BROAD BE PUBLISHED                                                          CONCERNS      SEE ABOVE.
: 11) NUREG/CR-1321. ~ FINAL REPORT - PHASE I. SYSTEMS                          A PROPOSED RESOLUTION PACKAGE HAS BEEN DEVELOPED. AND INTERACTION METHODOLOGY APPLICATIONS PROGRAM.*                  AN ADVANCED COPY WAS SENT TO OTHER OFFICES IN JULY 1987 SNL (SAND 80-08841. APRIL 1980.                                  OGC CONCURRED BUT NRR HAS NOT              A MEETING WAS HELD WITH NRR (2) NUREG/CR-1859      SYSTEMS INTERACTIONS    STATE-OF-            IN NOVEMBER 1987 AND NRR COMMITTED TO SUPPLY COMMENTS BY THE-ART REVIEW AND METHCDS OF EVALUATION."                      DECEMBER 31. 1987          THE CRGR PACKAGE WAS REVISED TO ADDRESS LLNL. JANUARY 1981.                                            NRR COMME N T S . NRR CONCURRENCE IS EXPECTED 4/88 (3) NUREG/CR-1896      REVIEW OF SYSTiMS INTERACTION MLIN000LOGIES." PNL JANUARY 1981 AS OF FY88 OUARTER 2 9                                                          9                                                                        9
 
A RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTE*4                                                PAGE:      101 ISSUE NUMBER:          A-17                            TITLE: SYSTEM INTERACTIONS IN NUCL(AR POWER PLANTS 1
AFFECTED DOCUMENTS                                                                            PROBLEM / RESOLUTION (4) NUREG/CR-IS01, "REVIEW AND EVALUATION OF SYSTEMS INTERACTION METHODS."            BNL 1981.
(5) NUREG/CR-2915 "INITIAL GUIDANCE ON DIGRAPH MATRIX ANALYSIS FOR SYSTEMS INTERACTION STUDIES."
LLNL (UCID-19457). MARCH 1983.                                                                                                                                                '
(6) NUREG/CR-3593 "SYSTEMS INTERACTION RESULTS FROM THE DIGRAPH MATRIX ANALYSIS OF A NUCLEAR POWER PLANT *S HTGH PRESSURE SAFETY INJECTION SYSTEMS "
ANALYTIC INFORMATION PROCESSING AND 4.LNL, JULY 1984.
(7) NUREG/CR-3922, "SURVEY AND EVALUATION OF SYSTEM INTERACTION EVENTS AND SOURCES." ORNL, t ,          JANUARY 1985.
(8)    NUREG/CR.4179, "DIGRAPH MATRIX ANALYSIS FOR SYSTEMS INTERACTIONS AT INDIAN POINT UNIT 3 ABRIDGED VcRSION," (VOL.1, TO BE PUBLISHED; VOLS.
2=6 WILL 8E AVAILABLE IN THE NRC PUBLIC DOCUMENT ROOM, 1717 H STREET.            N.W., WASHINGTON, DC 1 LLNL j      (9) NUREG/CR-4207, "FAULT TREE APPLICATION TO THF 4
STUDY OF SYSTEMS INTERACTIONS AT IN3IAN POINT 3,"
t            BNL, APRIL 1985.
!    (10) NUREG/CR-4261, "ASSESSMENT OF SYSTEM INTERACTION
.            EXPERIENCE IN NUCLEAR POWER PLANTS, " OPNL,
;            JUNE 1986.
(11) NUREG/CR-4306, "REVIEW AND EVALUATION OF SPATIAL SYSTEM INTERACTTION PROGRAMS, ORNL, DECE MBER 1986.
A PROPOSED RESOLUTION OF SYSTEM INTERACTIONS CONSISTING OF A RFGULATORY ANALYSIL AND SUPPORTIK3 NUREG WILL BE ISSUED FOR PUBLIC COMMENT.
i
* ORIGINAL                          CURRENT                    ACTUAL MILEST0NES                                                DATE                            DATE                      DATE DTR ISSUED BY DSRO FOR STAFF COMMENT                                      03/85                                --
08/85 STAFF COMMENTS TO DSRO ON DTP                                            04/85                                --
11/85 DTR PACKAGE TO NRR DIRECTOR                                              12/85                                --
03/86 i
AS OF FY88 OUARTER 2 i
1
 
i l                                                                                                    KUN DATE: 03/11/88 1
GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                    PAGE:    IOP ISSUE NUMBER: A-17                  TITLE: SYSTEM INTER ACT IONS IN MtCLE AR POWER PLANTS ORIGINAL        CURRENT        ACTUAL
                .____.__..__ N !_b.b_E I_9_U b_h___________,__
_              -                          ___90lb___    __ 901b___    .__96!b___
DTR PACKAGE TO CRGR                                          03/86            --
03/86 PREPARE DTR PACKAGE                                          07/87            --
07/87 CIVISION DE PUTY DIRECTOR                                    08/87            --
08/87 REVIEW COMPLETED CONCURRENCE BY OTHER OFFICES (OGC CONCURRED.                10/87          04/88            --
NRR REVIEW NOT COMPLETEDI REVIEW PACKAGE TO CRGR (29)                                  10/87          04/88            --
i ACRS REVIEW OF DTR COMPLE TED                                12/87          06/88            _-
CRGR REVIEW OF DTR COMPLETED                                05/86          06/88            --
FRN NOTICE OF ISSUANCE OF PROPOSED                          0%/86          09/88            --
RESOLUTION FOR PUBLIC COMMENT COMPLETE DE REVIEW OF PUBLIC COMMENTS                        08/86          02/89            --
AND PREPAnZ FINAL RESOLUTION PACKAGE DIVISION DEPUTY DIRECTOR                                    09/88          03/89            --
REVIEW OF FTR COMPLETED CONCURRENCE BY OTHER OFFICES AND                            10/86          04/89            -.
PACKAGE TO CRGR (s3)
CRGR REVIEW OF FTR COMPLETED                                01/89          06/89            --
FRN OF ISSUANCE OF FTR                                      12/86          09/89            --
AS OF FY88 QUARTER 2 i
i O                                                          O                                                    O
 
7-                                                                                                                                  .
N RUN DATE: 05/II/88 GENERIC ISSUE MANAGEMENT CONTROL SYSIEM                              PAGE: 103 ISSUE NUMBER:      A-29                      TITLE: NUCLEAR POWER PLANT VULNERABILITY TO SABOTAGE IDENTIFICATION DATE: 06/78C                  PRIORITIZATION DATE- II/83C                      TYPE GSI                      PRIORITY: M TASK MANAGER: A. SERKTZ                      OFFICE / DIVISION / BRANCH. RES /DRPS/RPSI      ACTION LEVEL: ACTIVE          STATUS:
TAC NUMBERS:
RESOLUTION DATE: 06/88 WORK AUTHORIZATION: NRR FY-84 OPERATING PLAN FIN            CONTRACTOR                                        CONTRACT TITLE B2995              PNL                EVALUATE PROBABILITY OF NUCLEAR PLANT SABOTAGE W0RK      SC0PE l        GSI A-29 DEALS WITH THE VULNERABILITY OF NUCLEAR POWER PLANT SYSTEMS TO INSIDER TAMPERING                                OFFSET SUCH POTENTIAL SABOTAGE (TASK 2): AND (C) l AND SABOTAGE. AND THE RISK RESULTING FROM SUCH                                  AN ESTIMATE OF CMF AND RISKS FOR THE MOST IMPORTANT ACTIONS.                                                                        SYS TEMS (TASK 31    THE RESULTS OF THESE TASKS I
k              THE CURRENTLY PLANNED EFFORT EXTENDS                              (IE.. ESTIMATED CMF*S AND RELEASES) WILL BE A MEY THE PRIOR WORK TO OBTAIN:            (Al A BETTER ESTIMATE                      FACTOR IN ESTABLISHING THE NEED FOR A DETAILED OF THE PROBABILITY OF SABOTAGE UTILIZING FIELD                                  REGULATORY ANALYSIS WHICH WOULD INCLUDE AN EXTENSIVE
, EXPERIENCE (TASK 11; (B) A MANKING OF THOSE                                    COST ESTIMATING EFFORT.
SYSTEMS MOST VULNERABLE AND POSSIBLE METHODS TO i
STA TUS DROPPED AND NOT SCHEDULED DUE TO UNAVAILABILITY OF                      ARE RFPORTED IN NUREG/CR-4392 AND NUREG/CR.4462 TASK MANAGER THE RESULTS OF PRIOR STUDIES BY BNL AND PNL                        RESPECTIVELY.
AFFECTED DOCUMENTS                                                          PROBLEM / RESOLUTION TO BE DETERMINED PLANNED FY-86 FUNDING WAS CANCE' LED: PROJECT START WAS DEFERRED TO FY-87. RESOLUTION WILL BE PACED BY AVAILABILITY AND OBLIGATION OF FUNDS. FY-87 FUNDING WAS NOT MADE AVAILABLE.      TASK VANAGER UNAVAILABLE. CURRENT TASK MANAGER WORKING ON A-44 B-56. AND II.E.4.3.            NO OTHER TASK MANAGER AVAILABLE.
AS Of FY88 OUARTER 2
_._C
 
RUN DATE: 03/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                PAGE:      104 ISSUE NUMBER: A-29                  TITLE- NUCLEAR POWER PLANT VULNERABILITY TO SABOTAGE ORIGINAL        CURRENT        ACTUAL MILEST0N ES                                  DATE          DATE          DATE hkP khbbhh fhR bbbkN                                                      --
                                                                                                            / 3 FINAL TAP ISSUED                                        04/84            --
02/84 CONTRACTOR SUPPORT (A) PROPOSAL SOLICITED                02/84            --
02/84 (D) PROPOSAL EVALUATED              03/84            --
08/84 (C) CONTRACT ISSUED                  04/84            --
08/84 DFVELOP METHOD TO EVALUATE SABCTAGE                      04/85            --
04/85 VULNERABILITY REDUCTION MLASURES NUREG/CR-4392 EVALUATE ALTERNATIVF MEANS OF                            11/85            --
11/85 SABOTAGE REDUCTION NUREG/CR-4462 RECEIVE 198A PROPOSAL                                    05/86            --
05/86 ISSUE CLOSE00T MEMO                                      06/88          06/88            --
AS OF FY88 QUARTER 2 9 -
9                                -      -      -
9
 
        \j                                                                                                (.                                                  '
ks RUN DATE: 05/II/88 GENERIC ISSUC P ANAGEMENT CONTROL SYSTEM                                            PAGE:  IOS ISSUE NUMBER:              A-40                                TITLE. SEISMIC DESIGN CRITERIA IDENTIFICATION DATE: 01/79C                                    PRIORITIZATION DATE- OI/79C                                            TYPE: USI                PRIORITY: U TASK MANAGER: K. SHAUKAT                                      OFFICE / DIVISION / BRANCH- RES /DE /EIB                                ACTION LEVEL: ACTIVE      STATUS:
TAC NUMBERS:                                                                                                                                                    RESOLUTION DATE - 06/89 l WORK AUTHORIZATION: COMMISSION DESIGNATION OF SEISMIC DESIGN CRITERIA AS A USI l
1 FIN                    CONTRACTOR                                                                  CCNTRACT TITLE A044I                      LLNL                      VALUE/ IMPACT ASSESSMENT FOR SEISMIC DESIGN CRITERIA l
l                                                                                              W0RK              SC0PE kHk PRbbkkM FbR RkbbLb bh bh bh k 4b bb hkh b b                                                          khCbRPbRNhEb 5hhb kHk kRP hh k bkbkR LRkVkhkbhkhk98k TWO PHASES:            (Il TASKS CONCERNING SEISMIC INPUT                                                                  A VALUE / IMPACT ANALYSIS HAS BEEN COMPLE TED F OR THE DEFINITIONS. AND (2) TASKS CONCERNING THE RESPONSE OF                                                              ASSESSMENT OF THE SAFETY IMPACT OF IMPLEMENTING THE STRUCTURES. SYSTEMS. AND COMPONENTS. ALL TECHNICAL                                                                SRP CHANGES PROPOSED AS A RESULT OF THE TECHNICAL WORK HAS BEEN COMPLETED ON BOTH PHASES.                                  THE TECHNICAL                            FINDINGS (NUREG/CR-3480).        THE SUPPORTING DOCUMENTS I WORK ACCOMPLISHED ON EACH OF THE TASKS DESCRIBED BELOW                                                            REQUIRED FOR REVIEW BY !HE CRGR HAVE BEEN PREPARED AND l  IS SUMMARIZED AND EVALUATED IN NUREG/CR-II61                                                                      INCLUDE ALTERNATIVES TO THE STAFF POSITION ON SOIL-
  "RECOMMENDED REVISIONS TO NOCLEAR REGULATORY COMMISSION                                                            STRUCTURE INTERACTION (SSI). A WORKSHOP ON THE SUBJECT SEISMIC DESIGN CRITERIA.",THIS REPORT WAS PREPARED BY                                                              OF SSI WAS HELD IN JUNE 1986 BY RES WITH COORDINATION LLNL FOR THE NRC,                REFERENCE TO TECHNICAL REPORTS                                                  BY NRR IN THE WASHINGTON. D.C. METROPOLITAN AREA.          THE DOCUMENTING COMPLETION OF A-40 TASKS AND OTHER PERTINENT                                                          OBJECTIVES OF THIS SSI WORKSHOP WERE TO REVIEW THE TECHNICAL WORK IS INCLUDED IN NUREG/CR-II61.                                      IN                              ALTERNATIVES SUGGESTED BY THE STAFF ON SSI AND RELATED DEVE LOPING THE SPECIF IC RECOMMENDATIONS. THE LLNL STAFF                                                          LICENSING CONCEPNS JOINTLY BY REGULATORS. PRACTITIONERS.
AND THEIR TEAM OF EXPERT CONSULTANTS CONSIDERED ALL                                                                RESEARCHERS. UTILITIES AND OTHER INTERESTED GROUPS, AND i AVAILABLE AND APPROPRIATE TECHNICAL LITERATURE IN                                                                  TO DISCUSS SUGGESTIONS TO IMPROVE THE LICENSING CRITERIA l ADDITION TO THE RESULTS OF USI A-40 TASKS. IN SOME                                                                ON SSI.        THE OUTCOME OF THE SSI WORKSHOP HELPED THE CASES. RECDMMENDATIONS WERE DEVELOPED BY CONSENSUS OF                                                              STAFF DECIDE THE LICENSING CRITERIA TO BE INCLUDED IN E APERT OPINION AND STEMMED FROM UNPUBLISHED DATA.                                                                )HE PROPOSED REVISION TO THE SRP.        THE CRGR PACKAGE RESE ARCH AND EXPERIENCE .                                                                                        WHICH INCLUDES THE TECHNICAL FINDINGS (NUREG/CR-3480).
l          A REVIEW OF THE RECOMMENDATIONS BY THE NRC $TAFF                                                          AND THE PROPOSED SRP CHANGES WILL BE SUBMITTED TO CRGR HAS BEEN MADE AND A PROPOSED STAFF POSITION DEVELOPED                                                              FOR REVIEW AND APPROVAL.        FOLLOWING APPROVAL BY CRGR.
IN A FORM OF RECOMMENDED CHAhGES IN SRP FOR REVISION.                                            IN                THE PROPOSED AMENDMENTS WILL BE SUBMITTED FOR PUBLIC SOME CASES. THE RECOMMENDATIONS HAVE ALREADY BEEN                                                                  COMMENT PRIOR TO IMPLEMENTING.
I STA TUS BASED ON THE OUTCOME OF AN SSI WORKSHOP. JUNE 1986 AND                                                    NRR STAFF COMMENTS. THE CRGR PACKAGE HAS BEEN REVISED TO l
AS OF FY88 OUARTER 2 l
l 1
 
CUN DATE 05/11/88 GENERIC ISSUE MANAGEMENT CONTPOL SYSTEM                                                      PAGE-        ICS ISSUE NUMBER-        A-40                              TITLE SEISMIC DESIGN CRITERIA S T A T US INCLUDE MODIFIED SRP REQUIREMENTS WITH SUGGESTED OPTIONS AND                              LARGE ABOVE-GROUND TANKS IN THEIR FACILITIES.
ACCE PT ANCE CRITERIA FOR SSI ANAiVSIS                        IN ADDITION THE STAFF                  THE PROPOSED RESOLUTION WAS REVIEWED BY CRGR IN FT E T ING IT PROPOSING A REVISED POSITION ON SE'SMIC DESIGN OF TANMS                                NO        130 ON MARCH 9. 1988                              CRGR RECOMME NDE D ISSUING THE WHICH IS INCLUDED IN THE PROPOSED SRP                          THE CRGR PACKAGE          PACMAGE FOR PUBLICATION FOLLOWING CLARIFICATION OF ALSO INCLUDES A PROPOSED 10 CFR SO S4fF) LETTER TO BE SENT                                IMPL E ME N T A T ION SCHEDULE.
TO SELECTED LICENSEES ASKING FOR 'NFORMATION ON DESIGN OF AFFECTED DOCUMENTS                                                                                      PROBLEM / RESOLUTION THE FOLLOWING IECHNICAL RE PORTS HAVE BEEN PUBLISHED                                NONE (1) NUREG/CR-1161. RECOMMEND REVISIONS TO NUCLEAR RfG-ULATORY COMMISSION SEISMIC DESIGN CRITERIA.- MAY 1980 (2) NUREG/CR-1717            SOIL-STRUCTURE INTERACTION METHODS SIM CCDE.      SEPTEMBER 1979.
(3) NUREG/CR-4182            VERIFICATION OF SOIL-STRUCTURE INTERACTION METHCDS." MAY 1985.
(4) NUREG/CR-4329. ~ RELIABILITY EVALUATION OF CONTAINMENTS INCLUDING SOIL-STRUCTURE INTERACTION."
DECEMBER 1985.
(S] NUR E G/CR - 3 4 8 0    VALUE/ IMPACT ASSESSMENT FOR SEISMIC DESIGN CRITERIA. USI A-40.* AUGUST 1984
{6) NUREG/CP-0054 "PROCEEDINGS OF THE WORKSHOP DN SSI'. BETHESDA. MD. 6/16-6/19/86.
(7) REVISIONS TO SRP SECTIONS 2.5 2. 3.7.1 3 7.2.
AND 3 7.3. WILL BE ISSUED AS THE FINAL RESOLUTION OF USI A-40.
ORIGINAL                              CURRENT                  ACTUAL MILEST 0N E S                                                  DATE                                DATE                    DATE DTR ISSUED BY DST r0R STAFF COMMENT                                            09/83                                    --
03/83 STAFF COMMENTS ON DTR TO DST                                                    10/83                                    --
10/83 COMPLETED DTR PACKAGE TO NMR DIRECTOR                                          11/83                                    --
12/84 REVISED DTR STAFF POSITION                                                      03/86                                    --
04/86 AS OF TY88 QUARTER 2 9                                                                            9                                                                                            e
 
RUN DATL: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                  PAGE:        107 ISSUE NUMBER: A-40                                          TITLE- SEISMIC DESIGN CRITERIA ORIGINAL        CURRENT          ACTUAL MILEST0NES                                                DATE          DATE              DATE SSI WORKSHOP TO SUPPORT DTR                                                      06/86              --
06/86                    .;
ISSUE DTR FOR STAFF COMMENT                                                      08/86              --
08/86 SUSMIT PROPOSED RESOLUTION PACKAGE                                                08/86              --
08/87 FOR MRC OFFICES REVIEW PROPOSED RESOLUTION PACKAGE                                                      09/86              --
01/88 TO CRGR (29l                                                                                                                                i CRGR REVIEW OF DTR COMPLETE                                                      10/46              --
03/88 ISSUE PROPOSED RESOLUTION FOR                                                    11/86        06/88                  -~
PUBLIC COMMENT END OF PUBLIC COMNENT PERIOD                                                      02/87        08/88                  --
ISSUE FINAL RESOLUTTON PACKAGE FOR                                                04/87        II/88                  --
,l                COMCL''*ENCE BY OTHER OFF ICES                                                                                                              i I
FINAL PACKAGE TO CRGR (53)                                                        07/87        02/89                  --
CRGR REVIEW OF FINAL RESOLUTION                                                  08/87        04/89                  ..
COMPLETE
,                  ISSUE FINAL RESOLUTION                                                            10/87        06/89                  --
i I                                                                                                                                                              '
i i
i i
k                                                                                                                                                              l 4
I, r
AS OF FY88 OUA*TER 2 i
I I
1 l                                                                                .
 
RUN DATE: G5/II/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                              PAGE:    108 ISSUE NUMBER:    A-44                  TITLE STATION BLACMOUT PRIORITIZATION DATE 01/19C                          TYPE. USI                  PRIORITY. U IDENTIFICATION DATE: 01/79C OFFICE / DIVISION /8 RANCH. RES /DRPS/RPSI          ACTION LEVEL: ACTIVE      STATUS:
TASK MANAGER: A. SERKIZ RESOLUTION DATE 05/88 TAC NUMBERS:
WORK AUTHORIZATION: COMMISSION DESIGNATION OF STATION BLACKOUT AS A USI FIN          CONTRACTOR                                    C1NTRACT TITLE A1302          LLNL            STATION BLACKOUT ACCIDENT ANALYSIS.
80744          LLNL            RELIABILITY OF AC POWER SUPPLIES W0R K      SC0PE kHE ShbPkbhWbRK b hkkblVk Hh kbbbE NblbbES                                kNklYb    bh b kbkl bkNkhk bR RbLkkbkLkhYbkk AND LOSSES OF OFFSITE POWER DATA (1) EVALUATING THE EXPECTED FREQUENCY AND DURATION                        (4) E VALUA TIPlG ElSKS POSED BY ST ATION BLACKOUT 0F OFFSITE POWER LOSSES AT NUCLEAR POWER PLANTS.                          ACCIDF_ NTS AND ASSESSING THE EFFECTIVENESS OF (2) ESTIMATING THE RELIABILITY AND EVALUATING THE                              SAF E T Y IMPROVEMENTS IN REDUCING THOSE RISKS.
DOMINANT FACTORS AFFECTING THE RELIABILITY OF ONSITE EMERGENCY AC POWER SUPPLILS.                                (5) EVALUATING RISK REDUCTION AND COSTS OF VARIOUS FIXES TO PERFORM VALUE/ IMPACT ANALYSIS.
(3) PERF ORMING STATISTICAL CORRELATION AND TREND STA TUS THEbhMMhhhhNWkhhR EFEDhNh31/88 AFFECTED DOCUMENTS                                                        PROBLEM / RESOLUTION THE FOLLOWING TECHNIAL REPORTS HAVE BEEN                                COMMISSION DELAY OF AT LEAST 'NE FONTH MAY PULLISHED-                                                              AFFECT DATE OF ISSUING RULE.
(1) NUREG/CR-2989 "RELIABILITY OF EMERGENCY JULY  AC POWER SYSTEMS AT NUCLEAR POWER PLANTS.
1983 (2)  NUREG-CR/3992, "COLLECTION ANO EVALUATION OF COMPLETE AND PARTIAL LOSSES OF OFFSITE POWER AT NUCLEAR POWER PLANTS.~ FEBRUARY 1985 (3) NUREG-CR/3226 "SiATION BLACKOUT ACCIDENT ANALYSES.- MAY 1983.
AS OF FY88 OUARTER 2 O                                                              O                                                              O
 
L                                                                                                  >
                                                                                                                                                                                                      -                              J RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                  PAGE.        109 ISSUE NUMBEP:                    A-44                                          TITLE: STATION BLACK 00T J
AFFECTED DOCUMENTS                                                                                        PROBLEM / RESOLUTION (4) NUREG-CR/4347 "EMERGENCY DIESEL GENERATOR OPERATING EXPERIENCE. 1981-1983." DECEMBER 1985.
(5) NUREG-1032 "EVALUATION OF STATION BLACKOUT ACCIDENTS AT NUCLEAR POWER PLANTS. TECHNICAL FINDINGS RELATED TO USI A-44." DRAFT REPORT FOR COMMENT, MAY 1986.
1
: 46)        NUREG-1109,
* REGULATORY ANALYSIS FOR THE RESOLUTION OF UNRESOLVED SAFETY ISSUE A-44, STATION BLACKOUT." DRAFT REPORT FOR COMMENT.                                                                                                                        -
JANUARY 1986.
A PROPOSED RULE AND A DRAFT REGULATORY GUIDE ON STATION BLACKOUT WERE PUBLISHED FOR PUBLIC COMMENT
    ,      IN THE FEDERAL REGISTER ON MARCH 21 AND APRIL 3.
1986 RESPECTIVELY.                            THE REGULATORY GUIDE PPOVIDES                                                                                                                                .
GUIDANCE ON ACCEPTABLE MEANS TO COMPLY WITH THE PROPOSED RULE.
GRIGINAL                          CURRENT                                  ACTUAL MILEST0NES                                                        DATE                          DATE                                    DATE DTR ISSUED BY DST FOR STAFF COMMENT                                                      10/83                              --
12/83 STAFF COMMENTS ON DTR TO DST                                                              11/83                              --
12/83 COMPLETED DTR PACKAGE TO NRR DIRECTOR                                                    11/83                              --
12/83 DTR PACKAGE TO CRGR (29)                                                                  12/83                              --
03/84 CRGR REVIEW OF DTR COMPLETED                                                            01/84                                --
05/84
                                                                                                            ~
PROPOSED RULE TO COMMISSION                                                              02/85                                --
05/85 EVALUATION OF NUGSB0 PROPOSAL                                                                  --                            --
09/85 COMMISSION MEETING ON LTR                                                                04/85                                --
09/85 COMMISSION MEETING ON DTR                                                                04/85                                --
11/85 COMPLETE DTR BACKFIT ANALYSIS                                                                  --                            --
01/86 AS Of FY88 OUARTER 2
 
RUN DATE. 05/11/88 GE NE P IC ISSUE MANASEMENT CONTROL SYSTEM                            PAGE-        11G ISSUE NUMP,ER A-44                                          TITLE STATION ELACFOUT ORIGINAL        CURRENT                  ACTUAL M ILEST oN E S                                                  DATE          DATE                    DATE COMMISSION DECISION TO ISSUE PULE                                                      08/85              --
03/86 ISSUE PROPOSED RULE FOP PUB L I C C OMPE N T                                          09/85              --
03/86 E ND OF PUBLIC COMMENT ON FTR                                                          12/85            --
06/86 FTP ISSUED BY DSRO FOR STAFF COMMENT                                                  03/86              --
02/87 STAFF COMMENTS ON FTR TO DSPD                                                          12/86            --
03/87 CCMPLETED FTR PACKAGE TO NoR DIRECTOR                                                  03/86              --
04/87 FTR PACKAGE TO CPGR AND ACPS [53]                                                      05/86              -
04/87 CDGR AND ACRS FTR PEVIEW CCMPLETED                                                    06/86              --
06/87 i
l                FINAL PULE TO CCMMISSION                                                              08/*6              --
01/88                    '
1 COMMISSION DECISION ON RULE                                                            11/86        04/88                          --
1 ISSUE FINAL RULE                                                                      12/86        05/88                          --
l
!                                                                                                                                                                        I AS OF FY88 CUAPTEP 2 O                                                                                O                                                                    O
 
LJ M V M V O                                                                                O                                                  -
O RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                PAGE:        111 ISSUE NUMBER:      A-45                                  TITLE SHUIDOWN DECAY HEAT REMOVAL REQUIREMENTS IDENTIFICATION DATE: 12/80C                              PRIORITIZATION DATE 12/20C                          TYPE. USI                        PRIORITY: U TASK MANAGER: R. WOODS                                  OFFICE / DIVISION / BRANCH' RES /DRPS/RPSI          ACTION LEVEL- ACTIVE              STATUS TAC NUMBERS.
RESOLUTION DATE 04/90 l WORK AUTHORIZATION: COMMISSION APPROVAL OF USI A-45 IN 12/80 l
i FIN                CONTRACTOR                                                  CONTRACT TITLE 1        .----                --- ----..
l        A1309                  $NL                      SHUTDOWN DECAV HEAT REMOVAL (DOE INTERAGENCY) l l
W0R K      SC0PE                                                                              '
h/kbbhkRkbhhbPRbVkbEbVhRkL PRbhEbhMkN                                  Nk            5 PbbRkM kNbbbNbbE[kbkkbbkkbhkkkbbMhbhbh TECHNICAL DIRECTION AND INTEGRAIION FOR THE ENTIRE USI                                      SUBCONIRACTORS ST A T US kPhbPbShhRhbbLbkkhbPkbKkbk                              N PkE PkRkh kbN k PLkN hPkbkhkbPkkkbBkkNbPkbPbkEbTbhhkbH GENERAL AGREEMENT HAS NOW BEEN REACHED THAT RESOLUTION WILL                                INDIVIDUAL PLANT TO DETERMI!;E WHAT IMPROVEMLNTS ARE NOT BE ACCOMPLISHED BY THE. GENERIC REQUIREMENT TO INSTALL A                                NEEDED AS PART OF THF IPE PROGRAM.
DEDICATED DECAY HEAT REMOVAL SYSTEM ON ALL PLANTS. RATHER.
AFFECTED DOCUMENTS                                                                      PROBLEM / RESOLUTION (I) NUREG/CR-2883 STUDY GF IMPACT AND VALUE OF                                                    IF PUBLIC COMMENTS ARE NOT REQUIRED. SCHEDULE ALTERNATIVE DECAY HEAT REMOVAL CONCLPIS FOR LWR'S                                    IMPROVEMENT WOULD BE EXPECTED (EST.          FTR 2/89).
(SANDIA)
(2) SECY 84-134 PORV*S FOR CE PLANTS (3) RE LATED REG GUIDES. SRP. AND SEVERE ACCID POLICY (4) SIX INDIVIDUAL PLANT CASE STUDIES (NUREG/CRS -
4458    4713, 4767 4710 4767 AND 4762)
ORIGINAL              CURRENT              ACTUAL M I LESTONE S                                                DATE                DATE                DATE FINAL VALUE/ IMPACT REPORT FOR QUAD                                            07/85                    --
08/85 CITIES AS OF FY88 OUARTER 2
 
CUN DATE 05/11/88 CENE2IC ISSUE MANAGEMENT CONTROL SYSTEM                                                      PAGE:          112 ISSUE NU"BER: A-45                                    TITLE SHUTDOWN DECAY HEAT REMOVAL REQUIPEMENTS ORIGINAL        CURRENT            ACTUAL M I LEST 0N E S                                                                            DATE        DATE              DATE FINAL VALUE/ IMPACT REPORT FOR POINT BEACH                                                                      10/85            --
11/85 DRAFT VALUE/ IMPACT REPORT FOR COOPER                                                                            11/85            --
12/85 DRAFT VALUE/ IMPACT REPORT FOR TURMEY POINT                                                                      11/85                -
12/85 DRAFT VALUE/ IMPACT REPORT FOR TROJAN                                                                          01/86              --                --
(DELETEDI DRAF T VALUE/ IMPACT REPORT F02 ST LUCIE                                                                        04/86              --
08/86 DRAFT VALUE/ IMPACT REPORT FOR ANO-1                                                                            05/86              --
10/86 CONTRACTOR DRAFT
 
==SUMMARY==
REPORT OF ALL                                                                          06/86              --
12/86 PL At:T S DSRO DRAFT REGULATORY ANALYSIS ISSUED                                                                          08/36              --
09/86 FOR STAFF COMMENTS STAFF COMMENTS ON REG ANALYSIS TO DSRO                                                                          09/86              --
12/86 DTR ISSUED FOR STAFF COMMENTS                                                                                  08/86              --
02/87 COMPLETE REVIEW OF NUMARC PRA CRITIQUE                                                                          03/88        03/88                  --
COMPLETED REGULATORY ANALYSIS PACKAGE                                                                            10/86        04/88                  --
TO MES DIRECTOR REVIEW BY ACRS SUBCCMMITTEE                                                                                    05/88        05/88                  --
REVIEW BY FULL ACRS COMMITTEE                                                                                  06/88        06/88                  --
DTR TO CPGR                                                                                                      11/86        07/88                  --
ACRS LETTER                                                                                                    02/87        09/88                  --
CRGR REVIEW COMPLETE                                                                                            01/87        10/88                    --
DTR ISSUED FOR PUBLIC COtHENT                                                                                  03/87        12/88                  --
l AS OF FY88 OUARTER 2 O                                                                    _
O                                                                            O
 
!. 9                                                                              9                                                    .                  O          ~"s, 3,                                                                                                                                      RUN DATE: 05/11/88                    -.
GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                    PAGE: 113 i                                                                                                                                                                              -j ISSUE NUMBER: A-45                                  TITLE: SHUTDOWN DECAY HEAT REMOVAL REQUIREMENTS i
                                                                                                                                                                              -l j                                                                                                          ORIGINAL            CURRENT        ACTUAL                        'l j                                              -MILEST0NES                                                      DATE              DATE            DATE
,                  __.._ ......._....._______.______.___________                                          .._..___._          ..._____..    ...__...__                          i j                  FTR TO RES DIRECTOR                                                                                                                                            '
04/88            08/89              --
i l                  FTR TO CRGR/ACRS (53)                                                                        09/88            11/89              - - -
l                  ACRS LETTER                                                                                  08/88            12/89              --                          l t TR TO COMMISSION                                                                          12/88            01/90                --                          i i
ISSUE FTR                                                                                    02/89            04/90                --                          !
                                                                                                                                                                                >t i
I I
I e!
I 5
y q
AS OF FY88 QUARTER 2        l r
t a
                              . - . _ _ - . - . .- -                ..__m.- *._ .. _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . - _ _
 
9                                                                                  2 8                              -                                            -
                  /                              -                                            -    R 4                                -                                            -    E 0                                -                                            -    T
                                                  -            S                              - S  R
                                                    -            T    S S                        - T  A E                                -            N    E    E        b          -  N U
                                                    - S                XSR          k                C O
T                                            E                              -  A A                              - I    T    M    IEU            bS          -  L 8                  D                              - S N        E    FPL            bT          -  P 8 8          U                                      . A AEV              UIE        bN          -  8
/                  N                              - B CHO SLAC                      kE          -W  Y 1                  O                              -      ITR        UIFN              M      - & F 1  4      Y      I                              - N    F    P    OA      E      kM          - B
/  I      T      T                              - G IGM            IFEP          hO          -  F 5  1      I  S U                                - I    NEI e            HE          C        - E O 0          R  U L                                - S GI            AETF            L          - H O  T  C                              - E    IRF        VH      E        LS        - T S I  A S                                - D SUO              TFP        kE          -  A E E        R  T  E                                          D      F    O          WI        - F T  G      P S R              -                      D Y S OF                E          F        - O A A                            -                  - N LDS              OYH        bI bR      N .-
D P N
                                                  - A LEE S AIN        TSI TT kE      O.T I    N
                              -                  - S IFE            SILF          hV      T . E U                              -                  - T    TIV        OSIO          b        UM C              E              -                  - N    NTI CYB                    LR    LS V              -                  - E ENT              LAW        bG      OS SE I              -                  - I    TEC DACE                  kR T              -                  . S ODE NNII                      kC      ES C              -                  - N      PIF        AALV            P      R - S A              -                  - A          F        PE            S    /A
                              -          )      - R      YSESNTPR                  bA      ME
                              -          7      - T      BE KOCA                  k        EP L              -          4      -          RESIA          E      kN      L        .
E              .            -    - L DUHITPCH                      bO      B.P V              .          A      - A ELTRCMIT                        PO    OU I  E              -                  - N      SI        UIR            bS      R - O S  L              -          I      - O OASED/EG                        k      D P - R U                  -          S      . I      PFSSEENN                    PSE      - G N              -          U      - T            EORUEI                  AT      -
O              -      SI        - A SMSH LGR                              A    - S E  I              -      ES        - P      FESTKA            U        HTR      - R P  T              -      D Y      - E      STA        SVED          hNO        . E M      Y  C              -      US        - P      IS      GI      H            EP      - N E S    T  A              .      L        -- O RYDNPMTD                          MR      -W T  M                      -      IL                S SNI R              E          MO      - C S E                        - 7    AT        - LTE        ACEOEI              bOC        -
Y T                    E4          FN        - ANTL          UTFTF            kCN        -W S S                    L - -          C      - MEAOWDARAIS                        V I      - &
Y                  T - A      S        - RDUREEUEUTT                        lC        - B L S                    I -        Y'        - OILTIRLPLNN                      BIN        -
0          B          T - SSSSE            - NCANV A                AEA      bLE        - E 0  L      I              - MMM D        E BCVOENVOVDL                          kBE        - H T O        E          T . EEELA              - AAEC*IETEIP                      h UB        - T N P        /          C TTTOR            P -                                        P      -
O T                    A - SSSRG            -                                  k      E    -
C  N              0  R - YYYT -        0-          )          )    )          EPV      -
O        E      8  T - SSSNY            -        2          3    4      S EDA          -
T C        D      9  N-          OT    C-          (          (    (        bFH        -
N          /      1  O    LLLCE            -                              U E F                    C OOO          F  5-O M O C S            R      - kRRTA            -                              T r      0  E      E      - TTTNS            -
q N    8  P      B      - NNNA-          -                                A A  t /            M      - OOOCN        e -                                                -
N I    2          E      - CCCIO          -                                T              -
A T    1  H      C      -      FN    R -                                                -
M A        C      E      - FFFI-          -              E                S              -
C        N      D      - OOON        0-            EH                                  - D E I    E  A              -      GF        -      E  BTRA          1 S      - E U
S L
P T  R      N      - SSSIO        W-        C        O      4        bAE        - H A B        I      - NNNS            - SNION              F    (
kWV          - S S M D /                    - OOO L          -      EESTIDO                    k A          - I I I        N      7      .          A      -      DRR        E      R            WH      - L N O        4      .IIIF              -    UEOSDME C                    bE C Y    O  I        -    .TTTON AAA A            -    LFDTEUS                R    kIR
                                                                                                - B
                                                                                                - U I T    I  S      A      .CCCS            -      CENNISR              .AO      PVG      - P R E    T  I              - IIIIT          -      NREEFSULD              F    bER        -
E F    A V        I      - LLLSC                I    VDIAOAET                    LRC      . N C A    Z  I      S      - PPPYA            -      8  IT      CCDAD        k            -  E E S    I  D      U      - MMMLP            - EUSCNY              IE      E  hRY          -  E G      T  /              - IIIAM            -
UOSCENENECH                    kGB        -  B I  E      F      -      NI        - SFSADAHHCUS                    bP          -
E    P  C      O      - YYYA/          - S N          I    TCXCI              CS      - E L    O  I                TTT      E      - IN      R    T    EECL                T    - V T    I  F      L        EEEKU            -      OEOECGT CB                k      N S.A I    R  F      A        FFFSL            - S H        SEN        F A      k E      T - H T    P  O      V        AAAIA            - ISTSOFIEBOT                    hSM      N-O        SSSRV                HF THFRS                TS        NM  ES R                          - TRFNTAUUO                  E  bOC      MT P                          -      UOE          DATS          kIC      UR P                                                C TE                  CO A                        .EL
                                                  -          INY VIHSALN SNS
                                                .LACNHEO)TEO hS I    OP hV        DE N  R .                        OFAATSI3IDH                    bI7        -
O I
O-T -
                                                  - S ER EM TEEC IC RT(MIT            kD8 9
D.R E - L C Z        S  C-                    - RER        RVA      ,L C F      CD1    T    A 0  C      S  A-                    -      TOEED          T    AO    kN      CC 8  I      I  R -                    . OSFSVARNY                        hA      EI
          / W        M  T - LLL                . TY        UE OETRS                      3 F - N 2  E      M  N ENNLL                .      SEAS)TDEOS                  h S2    F - H 1  I      O  O NRRNN                    K NC 2AIF                E  bE        AC K      C  C IOOPP                    RLO E1RCASC                    kCR        - E U                                  - OO(lR            ECSTX          HIE        - T 7    E Z                                    - WR        iO    .P A    NE    bFB        -
4    T  S      %                          .      TStMSO            NE          tFM      - G
        -  A          O                              FNN          I    ROIN        bOE        - N A D              I                          - OOG YSDOISI                      b C        .I A      T                          -      CIDLYE TN                  kCE        -W N          A                          - E SLLLTTAAY                      hRD        - O O          Z                          - PEEUAAANCRC                          %      - L R    I  R      I                          - OTDDINPEITN                      h      N    - L E    T  E  S R                            - CA      CTAIIF            E      FYO      - O B A G
* O        77665            - SUT N            CSIEU          IB          - F M CI A      E  H      -                  -      LNTERINCSG                    p    D U        N B    T  N.76I82 I    44839            - EAAATATAEUE                      bDE
                                                                                                  - E O
N    F  A M U      F .60022              . HVLHOSNRPAR                          ET      - H I  M U A            ABBB8            . TEPTPFATSCF                      kWC          - T E    T      N                              .                                      EU      -
U N      K      M                          .                                      ID      -
S    E  S C    R                          -      l VM      .
S D A A          O                          -      I                              EC      -
I    I  T  T  V                          -      (
PC      -
 
MI #M V O                                                                      O                                              -
O RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                            PAGE:  115 ISSUE NUMBER:      A-47                        TITLE- SAFETY IMPLICATION OF CONTROL SYSTEMS AFFECTED DOCUMENTS                                                          PROBLEM / RESOLUTION (1)  NUREG/CR-4262. EFFECTS OF CONTROL SYSTEM F AILURES ON                            HAS BEEN COMPLETED. THE REASSESSMENT OF THE INTEGRATED TRANSIENTS AND ACCIDENTS AT A GENERAL ELECTRIC                                  CONTROL SYSIEMS WAS COMPLETED ON MARCH 31        1988.
BOILING WATER REACTOR " VOLUMES 1 AND 2 MAY 1985.                              CUMPLE TION OF THESE ACTIVITIES AND ANY RESULTING (2)  NOREG/CR-4326, "EFFECTS OF CONTROL SYSTEM F AILURES RECOMMENDATIONS ARE HANDLED INDEPENDENTLY OF JSI A-47.
ON TRANSIENTS AND ACCIDENTS AT A 3-LOOP WESTINGHOUSE                            THE PROPOSED RESOLUTION PACKAGE HAS BEEN REVISED TO PRESSURIZED WATER REACTOR." VOLUME 1 AUGUST 1985,                              REFLECT CRGR COMMENTS      SUBJECT TO RESOLUTION OF CRGR VOLUME 2 OCTOBER 1985                                                          COMME N I S , THE PACKAGE WILL BE ISSUED FOR PUBLIC (3)    NUREG/CR-4047, "AN ASSESSMENT OF THE SAFETY                                    COMMENTS IN APRIL. A REVISED SCHEDULE HAS BEEN IMPLICATIONS OF CONTROL AT THE OCONEE 1                                        PROVIDED NUCLEAR PL ANT FINAL RE PORT ," MARCH 1986.
(4)    NUREG/CR-3991, "FAILURE MODES AND EFFECTS ANALYSIS lFMEA) 0F THE ICS/NNI ELECTRIC POWER DISTRIBUTION CIRCUITRY AT THE OCONEE 1 NUCLEAR PLANT," 10/85 (5)    NUREG/CR-3692, *POSSIBLE MODES OF STEAM GENERATOR OVERFILL RESULTING FROM CONTROL SYSTEM MALFUNCTIONS AT OCONEE-1 NUCLEAR PLANT." JULY 1984.
(6)    NUREG/CR-4449, "A PWR HYBRID COMPUTE R MODE L FOR ASSESSING THE SAFETY IMPLICATIONS OF CONTROL SYSTEMS," MARCH 1986.
(7) NUREG/CR-4265          "AN ASSESSMENT OF SAFETY IMPLICATIONS OF CONTROL AT THE CALVERT CLIFFS 1 NUCLEAR PLANT "
VOLUME 1 APRIL 1986, VOLUME 2 JULY 1986 (8)    NUREG/CR-4387, "EFFECTS OF CONTROL SYSTEM F AILURE ON 1RANSIENT. ACCIDENT AND CORE-MELT FRFOUENCIES AT A GENERAL ELECTRIC BOILING WATER REACTOR." DECEMBER 1985.
(9)    NUREG/CR-438S. "EFFECTS OF CONTROL SYSTEM FAILURES ON TRANSIENTS, ACCIDENTS, AND CORE-MELT FREQUENCIES AT A WESTINGHOUSE PWR, "NOVEMBER 1985.
l  (10) NUREG/CR-4386, "EFFECTS OF CONTROL SYSTEMS FAILURES CORE-MELT FREQUENCIES AT A BABCOCK AND WILCOX PRESSURIZED WATER REACTOR," DECEMBER 1985 (11) NUREG/CR-3958, "EFFECTS OF CONTROL SYSTEM FAILURES CORE-MELT FREQUENCIES AT A COMBUSTION ENGINEERING PRESSURIZED WATER REACTOR," MARCH 1986.
(12) ORNL/NRC/LTR-86119. "GENERIC EXTENSIONS TO PLANT-SPECIFIC FINDINGS OF THE SAFETY IMPLICATIONS OF CONTROL SYSTEMS" (ORNL PROGRAM).
l A DRAF T STAFF REPORT ON THE TECHNICAL FINDINGS RELATED TO USI A-47 AND THE REGULATORY ANALYSIS REPORT WILL BE                                                                                                    i i
ISSUED FOR PUBLIC COMMENT                                                                                                                              j AS OF FY88 OUARTER 2
 
C U'') DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                        PAGE:        116 ISSUE NUMBER- A-47                              TITLE. SAFETY IMPLICATION OF CONTROL SYSTEMS ORIGINAL          CURRENT          ACTUAL M ILES T ON f S                                                                                              DATE        DATE              DATE DTR ISSUED BY DSRO FOR STAFF COMMENT                                                                                            09/86              --
09/86 STAFF COMMENTS ON DTR TO DSRO                                                                                                    10/86              --
01/87 ISSUE DTR PACMAGE FOR DIVISION                                                                                                11/86              --
05/87 REVIEW AND CONCURRENCE DIVISION DEPUTV DIRECTORS REVIEW OF DTR                                                                                        05/87              --
05/87 COMPLETED CONCURRENCE BY OTHER OFFICES CCMPLETED                                                                                          10/87              --
11/87 ISSUE DTR PACKAGE TO CRGR (79)                                                                                                  01/87              --
11/87 ACRS REVIEW OF DTR COMPLE TE                                                                                                    01/87              --
11/87 CRGR REVIEW OF DTR COMPLETE                                                                                                    02/87              --
12/87 FRN OF ISSUANCE OF PROPOSED                                                                                                    03/87          04/88                  --
RESOLLITION FOR PUBLIC COMMENT REVISE DTR TO REFLECT PUBLIC COMMENTS                                                                                          06/87          09/88                  --
AND COMPLETE FTR PACKAGE DIVISION DEPUTY DIRECTOR                                                                                                      06/87          10/88                --
REVIEW COMPLETED CONCURRENCE BY OTHER OFFICES COMPLETE                                                                                          07/87          11/88                --
CRGR REVIEW COMPLETED (53]                                                                                                    10/87          01/89                --
FRN OF ISSUANCE OF FINAL RESOLUTION                                                                                            11/87          04/89                --
l i
Y88 arf (R }
l l
 
l    (
f                                                                f 1
l RUN DATE: 05/11/88 l
* GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                        PAGE:  117 ISSUE NUMBER:      A-48                    TITLE. HYDROGEN CONTROL MEASURES AND EFFECTS OF HYDROGEN BURNS IDENTIFICATION D' ATE: 12/kOC              PRIORITIZATION DATE' 12/80C                                      TYPE: USI                PRIORITY: U TASK MANAGER: C. FERRELL                  OFFICE / DIVISION / BRANCH: RES /DRAA/SAIB                      ACTION LEVEL: ACTIVE    STATUS:
TAC NUMBERS:                                                                                                                        RESOLUTION DATE 06/88 WORK AUTHORIZATION: COMMISSION DESIGNATION OF HYDROGEN CONTROL AS A USI IN DECEMBER 1980.
FIN              CONTRACTOR                                              CONTRACT TITLE B8686                NAS            REVIEW & ANALYSIS OF NUCLEAR ENERGY & REG. ISSUES                                t WORK          SC0PE THIS ISSUE WAS ORIGINALLY RELATED TO ALL TYPES OF                                        WHETHER ALL IMPORTANT AREAS HAVE BEEN PROPERLY LWR AND CONTAINMENT COMBINATIONS. WITH PUBLICATION OF                                        COVERED.
RULE CHANGES (10 CFR 50) RELATED TO DEGRADED CORES. THE                                (3) DETONATION ISSUE WAS REDEFINED TO BE ONLY RELATED TO BWR/ MARK III                                      A. COMMENT ON THE NEED FOR EXTENDING EXPERIM2NTAL AND ICE CONDENSER PLANTS.                                                                          WORK TO INCLUDE EFFECTS OF DETONATION ON GSI 121 RELATES TO HYDROGEN ISSUES FOR LARGE.                                                  EQUIPMENT RECOGNIZING THAT MOST WORK TO DRY CONTAINMENTS THAT AROSE AFTER THE RULE CHANGES WERE                                            DATE HAS CONCENIRATED ON DEFLAGRATION. IN ISSUED      TMI ITEM II.B.5(3) HAS GENERALLY BEEN                                                  VIEW Of THE DIFFICULTY OF DETONATION WORK AND CONSIDERED A RESEARCH (PHEHOMENOLOGY) ISSUE. NOT A                                                  THE LOW PROBABILITY ASCRIBED TO SUCH AN EVENT REGULATORY DECISION-MAKING ITEM.                                                              B. PROVIDE AN INDEPENDENT ASSESSMENT OF THE THE ENERGY ENGINEERING BOARD OF THE NATIONAL                                                  FOLLOWING RESEARCH: RECENT RESEARCH BY SNL ACADEMY OF SCIENCES ASSESSED THE TECHNICAL ISSUES RELATED                                            HAS ESTABLISHED LOWER LIMITING CONCENTRATIONS TO THE FATE AND CONTROL OF HYDROGEN GENERATION IN LWR                                                OF HYDROGEN (APPROX. 13.5%l IN AIR WHICH ACCIDENTS.      THE EVALUATION INCLUDED THE FOLLOWING:                                              WOULD SUPPORT A DETONATION. FURTHERMORE.
(I) SCALE-UP                                                                                        ADDITIONAL TESTING WITH STEAM IN THE A. EVALUATE EXPERIMENTAL DATA FROM VARIOUS TEST                                            DEBATED DETONATION TUBE FACILITY HAS FACILITIES (FITS. %EGES, NTS) WITH RESPECT TO                                          PROVIDED RESULTS INDICATING THAT STEAM ADDITION THE FOLLOWING OUESTIONS:    (I) HOW TYPICAL ARE                                        TO HYDROGEN-AIR MIXTURES HAD LITTLE EFFECT ON THE COMBUSTION MECHANISMS IN SMALL ENCLOSURES                                          THE DETONABILITY OF MIXTURES.
AS COMPARED WITH FULL-SIZE CONTAINMENTS? (2)                              (4) JET FLAMES HOW WELL CAN THEY BE SCALED TO FULL-SIZE                                        DEVELOP INFERENCES AND COMMENT ON THE QUALITY OF CONTAINMENTS?                                                                      THE INFERENCES WITH RESPECT TO THE FOLLOWING B. EVALUATE THE ABILITY TO SCALE THE INSTRUMENT                                      QUESTION: WHAT ARE TKi CONDITIONS UNDER WHICH TEMPEPATURES OBTAINED FROM SMALL-SCALE TESTS                                      AUTO IGNITION OF FLAMES MIGHT OCCUR F OR RELEASE THROUGH ANALYTIC CODES TO THE TEMPERATURES                                        OF A STEAM-HYDROGEN OR HYDROGEN JET INTO AN PREDICTED FOR FULL-SIZE REACTOR CONTAINMENTS.                                    AMBIENT MIXTURE 7 (2) COMPLETENESS                                                                      (5) SUSPENDED WATER EVALUATE SNL'S PROGRAM AND THE PROGRAMS SPONSORED                                        EVALU4TE THE INFLUENCE OF SUSPENDED WATER DROPLETS BY THE INDUSTRV WITH RESPECT TO THE QUESTION OF                                          ON HYDROGEN COMBUSTION IN A HYDROGEN-NITROGEN-AS OF FY88 OUARTER 2
 
N e                            t                                                    a t                            i                                                    i              O                      3 t                                                    iO w                                  w e
i                                                      i#we                                  w e
i            e              i                                                    iMwo                                  a i34s                                  4 e            U              i iCav                                  D i            w              i O
t            M              4            O                                        isQ2 i me                        6Im                                                    is wK                                w w              i            Dw              I Uw                                                  t ow                                  w w              i            ON              i 4>                                                  twIOc                                >
  %              i 4              M          iOM>                          0                      i          H4 tard                          2 a                    sw 3 -                                w M                i we                                                                              IIF O M  w          tOI                          saO3 w                        M    ww                                            i w
N  M          44p>                          iaM                  OH > Is                          twoI4                J i
o e  M          i                wh          84            w        H    O w4                    i              VI          e t          4W Ow a aDe                              i          OMO      4Wew o                ICRJF                                            em A Das                        i>>I                E Desw            O awMAC                        t >Om                                                                    O e41 %          4 I I            OM          i n 4 Ca 1 640                                        t aM)UH        00eM w w              imKap                        t owW 44                      M      >A              to 4    to 404Q4                        t>OO                        p        ww              iA            F O 4
Q%            eww                J                                    nQ            a      Few OJD M    O i
HJD            tQDOMWM i        4            O I a'ww J                Osa                            t O A              e UMOI 16040                        twWwMH IOlak HQOs OJW  Ma M t kt>                DH R                tw M4 D                4>4ho                        tMM                4k >            03            DiaQJzoT O
O 44CMU 3 F 6>
i d . of
                                                              <rdae                w ou Zu al di et 405) w Q a' 2        6          RMw            tekOHHRa                                          We              3sK
          &        6QC O                      i          wMW OwvW 40 W                        aiOw MI                          i D        twMW                        I41              QOM*We                        Ne              MUaO      H    #
e        appaa                      i en MMMae 00                                                              R t J44>                      iMa>w                  4R >                      KiU>MOh                          I N        i wO U                      iMDROCHOweUwe                                    w'MwaZw                  wwi kH i s W        8 ARHW                      e w                WOMw      WIN              WlanWW                    adi o Q        i Ow46                      se              'he        Haap                Wlw FA4                  DQ8 O        i DOga                      tw                us ewww w              2      Ot Xsw U
: a.        i        OtJw                sa MM4*IM*O                              M      sewadma                  U i o                    U                eWO4anM>                        Me              Ator w4                          i i
i wR=w                      4 1FHM M                        2 WOO                4            wm>
IM i
MI            4 2ONWKew 044F                                        iw I        t o                                                                                t I >
i          EMe            iMMO4wwaQM wo                                          iHO              'O w        t wsM                        e 4 > U ni s w q                  waM O        i nD=w                      i H *C            OmQXwww4>                          s          wwh I            i DN a                      eW#waO                        ION 4                    twaOMO
                                                                                                                >M        W iIUHJ  OOK        a aPMw#O Q >- HaO 6
w  O          e>              4
      >  >          i 4wn                                        a#w                                    6wpHI4                    6 WJw 4D e I                                                      J      e O  U          iWOOH                      e p                stawOn  u u n' U - 4      i
      >  w          i              w4            i        OOIw O J                                                        Mwsm O  w          suka2                        i            >erw3wM >mp            O                IKaA40 to wKs            Mm ew 6          'IsD3                        i >                Or                                                    Ote%
s  w          t >De                      isFIw                  M    M4      NU                I Uwa w O                        Omp              iOwbu                  Ob>Mw            w            I        a wM    MQsM i
i>>MDais4s12m                                          i O4 min            a      *M a  Q    wiOwMt                                                                                  is          a>I    C      e W  .          ' Mai4                      a        wQQwFwawkM                    w                              u        e aJa .w>Owwa                                            e O
2 O
4    A i 6                          sua a                    MA        WO                e        1 g* I W J u C' w aw                    I                D U  O w
Oi e q O.3020                      sFR1        OI                i        ej wf>Ma H  a    Ui                                i O>M*IMDMr                    3e                a Me)U E  D          i                      3 w  O    Oi 1  4          i                      >+
w  y          a                            e s
O  ,          i                    4                                                            e                          i 4        Wi                                  i a
J  a          i                    es                                                          e a
q  O    ae                                  i l
e t
1  &          a                    OiO ta=  Ot                                  iw O                  a                              i                          4 w    F          i OOV e                      aU          *(    Iw                                  6                          i i
D  O    3e #wM                    4        is 3              Um                                  i O  U          i MOA 7 3              ew                &4                                <
i t
O              e l#W                        6 M        t    al l
* UO -                                                t #                        tY M
w F          eDww i .J a ) =                  i Ote Osw wi F                  i k                        44 i er U  O            i .s O J          M        i        34 > wII et w                                i et 6 0 M    O          iODw              M        t w F aOHM O O F                                      e ee&
a    n          swoon-                      i OJw                      w      O    M            i
                                    >O              I      OO wJw                    a                  iO                        em W    O i
eVaM              e    O w Q w                      e                  wea 2                i ww w w    I          a 200
* sirU ow                      4      *>n              sw                          e
                                    #00            iwFU              4m>        I>IFw                    e                    Feb O                ip
                                                                                                          *F                          iO i        WMFF                i Q O st e. w e so                  I a                                Otw I          w            eOU 00                      e4U            w>O            U>                    i se w            i>#wMM                      I V a Qwk Q>4              w41MO 0
Oi 6 M He e                    wNre                i 4RO Me M
i t b P M 4 *C                i      w*        O OFOswg1                  W e1                                vF e            susday                      iWOU R*woDD      OM&MJO>F4 HH    Fi it Miw iO t ww          H0            6 404                                                                    WiO sa#HFw                      i Faw U weUwWO      R>OFawup e
tw                          in I Owwww                      loca                                                                      Wic tw sOQ                      IMF              woODO            E    a    Us OiH                                  t w inwA#                      iHIa            IMO ' UmMww                                              M 6I e      1000                84        w HH                RJOF          Ol I Ipaud                    eXwe                Ow awF              M            sw                          a
* H        O 4              6    04 HDJUwaDW                          Os                          Kew i HO O                      iw      3 4 )m In e7                        wiQ                                  is i10tsI 'wFwp>D4                            we                                  in i 3 Muse                    6ewem>                AwmUag                Ui                                  tw i          OMN                                                          we                                  i i ww        WO            e UIo UOQU IUw                              waw                                  sw i ndFMM                      swwcMO aOw                            O i  DfoIH                    iOaw woAm                    O' Mw O        w*                                  ir irJMM4                      i es 0W OOOIIw                              die                                tw in esa                      e94 ND40wdM 90                                      i                          sa iM-U            O            in        wMs 4%In>                    3            i                          sn w              iKMPwd                      iO4a UWT                    4Mww                    i                          e3 w            i      -DIa                  th4wIPO Owr me                                      4 0                        60 i            eI www                      twu)UOmO2www w                                      I                          tu ik 4            ed s w (FO w            e aNO i      M w O**M>Utom at FR2 Hogs 4                        i 6HO        O              IJI        %>OwAM              L W
i e#                                ;
iOFO F                      i nt O R mVOw eE O,                    I            i M I
a              i *OM>w                    I XwMNO              MU wp                                                        I w              iRM        ed              iMW        OhKU#                      e              i W                              I iweaMO                      swe F wwuCUQFF                                        i iOOwOm                      i        Oca04U Mpo                                  e i
i>we # 6)                  *WOMw              O      W U J. M 2              i    mD4w*                'IwHIwaaO%Uwww                                        i i 00301                    i M .J O O I O u r k d aMFD        *( o              e W              i                          i    HNMe>>U                                          e D              i                          e    M      u IUw4A    e90J OOpM 4
0              e                          i w      )e                                          e e              e                          i    2 D Fwo Owwd                                    i M              i                          i wva Omd Zaow                                        6
 
      . ., ._ ..          _.._.m.                _ . - . . _ .          .m__  . . _ _ _ _ _ . . . . _..    ~_              . . _ _            . _ _          ._                _ __ .          - _
1                                                                                                    _
l 4
6 j                                                                                                                                                                                                        ,
i                                                                                                                                                          RUN DATE: 05/11/88
+
GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                  PAGE: 119
                                                                                                                                                                                                        ^!
a ISSUE NUMBER:    A-48                              TITLE: HYDROGEN CONTROL MEASURES AND EFFECTS OF HYDROGEN BURNS i
ORIGINAL                  CURRENT                      ACTUAL MILESTONES                                                      DATE                  DATE DATE
                                                                                                                                                                                                        'L j                                ISSUE HYDROGEN RULE                                                                07/83                        --
02/85 NATIONAL RESEARCH COUNCIL HYDROGEN                                                  09/86                        --
09/86 4                                REPORT ON FINDINGS RECOMMENDATIONS RES ISSUE NOTICE OF PROPOSED COURSE OF ACTION                                      01/88                        --
01/88          <                l FOR STAFF REVIEW 3                                NRR RESPONSE TO PROPOSED COURSE OF ACTION                                          02/88                        --
03/88
:l ISSUE GENERIC
 
==SUMMARY==
REPORT FOR STAFF                                              06/87                        --
03/88                      i!
C0tNENT i
!                                  STAFF COPMENTS TO RES/SAIB                                                          07/87                -04/88                              --
COMPLETED PACKAGE TO RES DIRECTOR                                                  08/87                  04/88                            --                          l j                                  ISSUE
 
==SUMMARY==
REPORT                                                                09/87                  06/88                            --
t j                                                                                                                                                                                                        -9 b
i l-                                                                                                                                                                                                          r l
\                                                                                                                                                                                                        Li
                                                                                                                                                                                                        .b I
AS OF FY88 QUARTER 2 i
l l
 
ee                                                                                                                            N es                            e                              t          y                      i N                              i                              iw MO                              i            >            ct 4                              e                              eIEEE                              i            4            w O                              i                                                                  i            10 w        w i                              i H o. w e          0%M                    i                >- O _J  m i                              a        M***                      i 2 0 3 Co    at w                              i                              e        U .J M                    iO Uwwd                    D
                        >-                            I                              tWW            6                  I at          >e .J ,-i .J U at                            e                O                              r                  iI            Hw>M 90                      O                              i                O            aUMO00 12          >                      i tw O w w et kJ a c6 >
so m
8u            E                                        t >- Ow                        e w CL 4 at iO O                    4  >
N                        2                              i at O w m'                    i oc or o c0 3 M                        O                              t        KZZO                  emew                                e4 ex MO eM2>
w
.* O          >          M                              . .sMMO                        iD 000 N re        >= -- >-                                  e          U      *1            iUCDRH                              8 O m              >*.J  w O =*        H      O D                                s C oc                          i Ew                E              s at MIOM                  o o            et 3        .J                            e >- O O                        i000                                i (L            02O O > 0                                      i w u r-                      eUMw                                e            C D w et    e M      4 0                                tb2                            i > cc >-                            t E wOuw                  it w w          a      H    w                              e ( w et o                      etw3EM                              iO MIM H    O      CL M                        i            a          w w                  tomo 4                              iM          M >* .J E at  at CL i            i w a: O                        t6          w e                E i 6-            >        O O EL                                      e            iw                w            e        et U F                OeD w I >= M i            i4OOW                          t oc O *e O                    M i J            k. kJ E k R                                        t            iH2wM                          i en 0 06 4 0                  >= tO                > wJ 4 3                                        i            i H e( 0                        t E w tL F                      D60 w w U >-
a                  w                    i            i            be                e g y .J                      .J l w I wE
                    >                    6              Iwe              M              t 0 ;a 3 O w                  Osa >- mw M                    6            : I nc a                        s b. .J w v w                  Oe wiO                  WK H>OJ H                    t            iHOOK                            I      UM          P-CL tw 4M2U U                    e            4          P. D et              i >= 2 > J O                  NeO IHMO st                    a            i > U I ac                      : EMuJw i            e a) et H O                      ew a. w 0                      EiO              t- et et O t            t          w ga o                tow e2                        w a CL                >D
                    .J                  t              i2          L' CL              t      O kJ O M              .J e O O a O kJ w                    e              Iw>              EL            t o at I            6-        CD e oc w i.J              0)
                    >                    i              i>HO                            e 2 g e at O                  Ot EL            >00 e swa J                        e et U              M          oc e              wEwp
              >< w                        i (L iw MOOO O      .J                  i            i O w M et                      i 4Ewx O                          i              e        et > >-              t O EL O O w                        6 I            JUDE F                    4              e w O cc Z                      ew              3                  i >= w O                    e              eU et w                        e (L E O 2                          i            03 > O >
W >=                        i            e 2 ce > 1.                    8 O O kJ D- O                      ew              .J r et O CL        M                    i            e et w          M              i                                  e O O 3 at O E E  >- > U                          t                                              i 6..JJ M >- eatetI E                e      wOwM w  Z >- et                          i            e e60.*O0w    J >uJct            t > D a) >- O                      e 3 D E > 6- W 3 ta w (L                t w .;              M              iwO              OME O
p                                i
                                          .            e O cL O x                      iOOOOH                              i M O a.            Ow
    >  M                            wi                e            ** w E            e      O M *-      M              i>HewOI O  M                            .J >                                              eOw rd                              iw r a3 o. >-
4                            >- i              e O O 3.Nw
                                                        *2w                JJ          e et or >- et O                      iaO J >-                          M i                i        w w 4 to              e3          et .J CL
* 3 O  F          to              H i                i O D ar u o                    e      01 (L          Q            i et > -              -
a  O          **                    8        w i M *- et M at                    a w w >.                            ea          M        N e-  U          w                H i                i        M      > 86          iOO            6. He Ow              azo-    w w
2              N                Ui            (L e w >- w >                      e 31 O N 2 I C                      t o    J                          <t t                i a O ct .J O                  i r ct          w >- CL              i        O a-*        i O 0 00 V O                                  **
U  w                            ai            Ot w E w at                                                              e w          w                > s                *IOIFI                    O4 at a w w at                          i        et H  >-          O                F*            U i >- U >- et >-                  t CL CL M a' O EL                    6        et E  O          N                Oi                  i                          Di w                                Ui            e+                              >- a i
1  6    O O                          i            +
w  O r3 w                            i            e                              i O        90    QL                    i            i                          et i y
et  er  N                            e        g i                                  e                                  e 2  O    M                              i            4                          >= s        O          w                e q  M    a.*    I          -
* tr e                                i      MO I                        e I  >          U          O            i            e ee >- 2 U >- F MO i
et          7                      e      Oi                                  iOMMM                              e w  I w 4                  w            i            i              >-              ayOOOOwM                            e D  w >-        a-        ><          e 3eiJO        2      M      a        i at O E at 2 et >=                e O  Q)  at    Q3        O            i                            E w            e      CL w g) w        D          e O        O      N        E            i            i J M O M st >                aO U O oc J                        t M  O            F        64          e              i w H 2 st            us      tHwMOMOO                            e E F o                  (L          i            i I M H D- 0 .3                i U w .J w > w n                    e O  M    O      M          CL          i            e O O .J er 6J O                I at et      aw w                  I H  .J  Pe    O          4            i            t      O E w GL I              eEr>= F M a g a                    e CE  E    >-    M          -            e            t    .J LL U U M                i >= 0 M D en                      a w  U et        >                      e              i et      DFD                iE            O an O O              i 2  O          M              -
e              i U w Q3 3 0                  t04ww03w                            i w  a3  N.
P      O          e            i            ems              wI          tU Onw O                            i O        >-      N        st            i                                            I      >~ D          IO            e
              >a      w          J          e            e i aHr  at. atOIw atO >-        iww w 0 0 EL                        e w a          O        Q.            i            6 giJ O w >- 6 2              6 0 4 -J D H m O                    i J  O    M                        i            i  g,            ww          e 2 m et O O at tu                  a H    M      w        (7            i LJ          e A > .J k' a( gg              e at Q m O at w Q,            Og
        >d    OL    w          /            t 2          4 > E 6J O > >-                Ik      us >< n3 0          F i
        >*    (L    O        M            t O          4Ow WOO                        i00E                w at    Ei
                                >=            i 2          4 et a                        4 M t= w U w k                      i et                          e      or wwO                  iO OMI                  O      'e a                          i 2 :.)        >- 1 2          iOO or H w 2                        e W                          e E! U J et >- >4              I et nnJ (E kJ      I et    () e a                          e            JO      .J        e    002O*-                OI O                          4OwwR                *E        i .J D w w W O                Os of I                  iMIIWEU                        t at        O1Ow                  e 4    Oe                  t      9 0 (L O 3                U w uJ at w >            0e so    >- t                  Iw            E M O3          i M ac >= 0 O b- M          we U                  i    Ui                    e as        J O *=            tRpwMwUw                    >- e m                >    st i                  a3 at U EL F iH00                            t I .E ct-JHI S. gDUw        U6 4Li2 M OKO N                w      at i                                                                              wi                              I N >=                    >= 3W                                  J            e U.J t6      01      4am        wi to 4              oc    riz                  e S cot >-O n                  i>-t- O u 1 0                wi                              1 o E              a    OeO                  taMW              O to        I    UUOMUF                  1 iN D          Y    Ui2                  i >=>.y          at N        I og et                w            i
                      *(                                                                    t k tr > F Q O w                      i es W I                                          l O aA I      at [ 2 O w              I R > J O K at DJ                    e to >- O                F                          i >= >- > O E O                t      F>=MMI                            M                    ,
e  4                O                          i 2 w O M **                  I T O E W .J            w            i                        l Co O                  M                          i      z *- > m                iSUwDrO>                            aF                      '
O          >=                          i w2  W et et w O              a at    MJ        p et              iO                      l F                4                            e 2 (L      D ha >=          84OUO AI                            e ><
O                N                            iM      w .J .J U            i w M O Q) et                        i 6-(K  H      et        M                          i at W O 4 (L a(                i e ir 6 w          .J O            eU W >= w O at                                        i HO >Ew                      I >= 4 m F et H                      ew (D  *t O dr O                        i            I 2 a kJ w H                  4 =J E D O            (k            6 O w I        F w                    i o et :/t eF                  5 D O O -.A        00
{  U J **    2 et
                            - >-      >* I P                i U .J Q I O                  6 O m.      at I O CL i
e n 2  6      4      ;  D    wiO                    t            >OM              6 w w 0 0 U J a.J                    sa
              >4    E    _1    a(            e f2          i et O O t S M >-              ea M ** ca ta                        iO w D-            E                                  i    >-32IV                  e >= F4                              t D E        E          E                          4        U w >* D              8    D >= I w          J            e O    laJ    O O a                                  8    kJ .J m O                I    (L 84 U O Ok E                  e OO          at  a(    p                            4    3 A >- F w              i    X I 6.J w te s(                e M    M      >-  p      3                          e    OstOMm                  i    M *- >- a O J                  t l
 
                                                                                                                                                    =
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                PAGE:      121 ISSUE NUMBER:    8-5                            TITLE BUCKLING BEHAVIOR OF STEEL CONTAINMENTS AFFECTED DOCUMENTS                                                                  PROBLEM / RESOLUTION TO ENABLE THE STAFF TO CONCLUDE THAT ALL EXISTING CONTAINMENTS ARE ADEOUATE REGARDING BUCKLING BEHAVIOR.
BY LETTER FROM S. BAGCHI TO R, BAER DATED 3/1/88 NRR STATED ITS CONCLUSION THAT:
(1) ALTHOUGH THE REVISED SRP DID REFLECT CURRENT STAFF PRACTICE. THERE WAS A LACK OF CONSENSUS AMONG THE NRR REVIEW STAFF REGARDING THE VALUES OF FACTORS OF SAFETY,.THAT BASES FOR THE PROPOSED CHANGES WERE LACKING. AND THERE WAS LITTLE SAFETY
                                                                                                  *MPROVEMENT TO BE DERIVED FRDM THE PROPOSED LHANGES.
(2) 8ASED ON A QUALITATIVE REVIEW. NRR HAD CONCLUDED THAT EXISTING CONTAINMENT DESIGNS HAD ADEOUATE MARGINS AGAINST BUCKLING.
(3) ITEMS (1) AND (2) SHOULD BE USED AS THE TECHNICAL BASIS FOR RESOLVING THIS ISSUE .
RES HAS ACCEPTED THE NRR RECOMMENDATIONS AND A CLOSEOUT MEMORANDUM AND MEMORANDUM DOCUMENTING HISTORY AND CONTENT OF THE PROPOSED SRP REVISIONS ARE IN PREPARATION.                IT IS EXPECTED THAT THESE MEMORANDA WILL BE ISSUED IN APRIL. 1988.
ORIGINAL                CURRENT              ACTUAL MILEST0NES                                              DATE                DATE                DATE LOS ALAMOS DRAFT REPORTS RECEIVED BY RES                                07/86                    --
11/86 RESULTS RECEIVED FROM RES                                              07/86                    --
11/86 PROPOSED SRP REVISION PREPARED                ,                      08/87                      --
08/87 VALUE/ IMPACT STATEMENT PREPARED                                      07/85                      --
08/87 DTR PACKAGE TO OTHER OFFICES FOR                                      07/87                      --
09/87 REVIEW AND CONCURRENCE REQUEST NRR INPUT MEMO FOR CRGR PACKAGE                                10/87                    --
11/87 RECEIVE NRR RECOMMENDATION FOR ISSUE                                  03/88                      --
03/88 RESOLUTION AS OF FY88 QUARTER 2 J
 
6.,m2+Aem      sa.emmmmaa m , am saMra,a_mmsu=-s s .ama                        wn.-.-m e a w    ---m        an,sn_,aw,nwsm,,..Am.asva---eamw            -w-_wmm_ws_,,._am,aw_ w-w wma, -w- _,w---ww---
m bei D-6 61 s
O
                        ~
Utp                                                                                                                                                                                          sw
                        \                                                                                                                                                                                            *
                        +4                                                                                                                                                                                            h
                        *1              f(                                  4 j                        %N                                                  t                                                                                                                                        %s O              +4                            J    n                                                                                                                                        Q o                                            .g e
I                                                                    ," w*
                                                                          $ %    0                                                                                                                                    %S
                                                                      > = et I t                                                                                                                                      *(
WW                                          t.) Q l
                        >=              (9                          *(      l 4                                                    8 o ab                                                e
                        .i i
b*      I
                                                                      #      8 w wn e u h k-    4 818 f> *( 9 %
8 **
U) 4.)6o 4                                                                            9 49
                                        )
w t*
e
: e.                                  e 4%                          e4
* b                            q      e 49                      D4          t fir q  .$...6J . w
                                        .J                      D1  (9 q e %
e                                        t*                      P  ** g.3 s wi A                        4)  $      6 to
                                        **                      g4  (3      e W                                    9 t)                      .J 4,'                    b4 w
                                        $.                      p.
F                      6%
v-h 9.1 4 4a
                                                                .s.
et (p
1 4 p3 n..
6 64 9 4i e
44                      hi          l **
L9                                    6 se                      Q            e Q
o                        .O 4        ,I .e.
                                      **                        .J          t >
b                        %      bN '  w.A gg e                                  4 45
                                        @                                wI LS w                        tu          i w O                                8I b 4
b        kh I
                                                                  .2          s ss D*      > t 6- 4        4 y j
ba      %15 g I O LsJ l (J 43
                                                                          .J l W 6 )
64 4 4 >=
10 D iO iw t g4 iO 9 oJ t U t
t
                                                                              , o e            i 64 0        4 64 un ab 60 i..
64 9
i 1
  - - - - - , - - - - -                                                            , _ -              _ _ _ __- ~ - - - _                            _ _ , , , -                                      ,,.e,w,,er._    . - - -.- -
 
m                                                                                                                                                  %                                                                                                                                                                m m                                                                                                                                                  s                                                                                                                    -
v RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                                  PAGE: 123 ISSUE NUMBER:      8-17                                                      TITLE- CRITERIA FOR SAFE TY-RELATED OPERATOR ACTIONS IDENTIFICATION OATE: 06/78C                                                  PRIORITIZATION DATE. II/83C                                                                                                                                            TYPE: GSI                  PRIORITY:.M TASK MANAGER: C. GODDMAN                                                      OFFICE / DIVISION / BRANCH- RES /DRPS/RHFD                                                                                                                            ACTION LEVEL: ACTIVE        STATUS:
TAC NUMBERS:                                                                                                                                                                                                                                                                    RESOLUTION DATE                                                  __
WORK AUTHORIZATION: NRR FY-84 OPERATING PLAN (APPENDIX G)
FIN                  CONTRACTOR                                                                                                                  CONTRACT TITLE NONE                    NONE                                  NONE W0R K    SC0PE THE WORK SCOPE INCLUDES: (Il DEVELOP TIME CRITERION                                                                                                  MANUAL OPERATOR ACTION OR AUTOMATIC ACTION.                                                                              THE SCOPE OF FOR SAFETY RELATED OPERATOR ACTIONS: (2) DETERMINE WHi.NER                                                                                                  THIS GENERIC ISSUE COVERS DESIGN BASIS ACCIDENTS OR EVENTS.
OR NOT AUTOMATIC ACTUATION WILL BE REQUIRED; AND (3) LEVELOP                                                                                                CRITERI A FOR SAFE TY RELATED OPERATOR ACTIONS DURING SEVERE GUIDANCE AND REVIEW CRITERIA FOR LICENSEE PROPOSALS TO USE                                                                                                  ACCIDENTS WILL BE COVERED UNDER THE SEVERE ACCIDENT PROGRAM.
STATUS THIS ISSUE WAS TRANSFERRED FROM NRR TO RES WITH THE 4/87 NRC                                                                                                RESPONSE TIMES.                                                                            ANSI /ANS 58.8 WAS PUBLISHED IN SEPTEMBER REORGANIZATION ( 4 /13/ 87 MEMO F ROM W RUSSELL TO T. SPEIS).                                                                                                1984.                                                            THE GENERIC ISSUE WAS LATER TRANSFERRED TO NRR                                                                      NO NO WORK HAD BEEN COMPLETED ON THE ISSUE PRIOR TO TRANSFER.                                                                                                  WORK WAS COMPLETED BY NRR ON THIS ISSUE. WORK HAS BEGUN ON DURING 1983 AND 1984 RES WORKED ON THIS ISSUE.                                                                                              DURING    DEFINING THE SCOPE OF THE PROBLEM AND DECIDING ON AN THAT TIME DATA WERE COLLECTED BY RES CONCERNING OPERATOR                                                                                                    APPROACH FOR RESOLUTION OF THIS ISSUE.
                      -          AFFECTED DOCUMENTS                                                                                                                                                                                                        PROBLEM / RESOLUTION TO BE PROVIliD LATER                                                                                                                                        LACK OF RESOURCES PREVENTED WORK DN THIS ISSUE BY RES.
RES IS CURRENTLY ATTEMPTING TO FILL A POSITION WHICH WILL MAKE MORE RESOURCES AVAILABLE FOR THE RESOLUTION OF GENERIC ISSUES. WHEN RESOURCES BECOME AVAILABLE. RES WILL PLAN AND SCHEDULE RESOLUTION OF THIS ISSUE CONSISTENT WITH ITS PRIORITY.
AS OF FY88 QUARTER 2 i  -          __        _ _ _ _            _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                    _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                              _    _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _
 
i PUM DATE: C5/11/88
,I                                                                                GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                        PAGE:        124 i
1 i              IS0UE NUtdBER B-17                                          TITLE CRITERIA rce SAFETY-9 ELATED CPERATOR ACTIONS l
l OPIGINAL        CURRENT        ACTUAL I                                                          M I L EST 0N E 5                                                DATE          DATE          DATE i                            _____________________________________________                                        __________    ________        __________
l                            DEVELOP TAP                                                                                08/87        05/88                --
i                                                                                                                                                                                  ,
l I
I l
1 i
J
}
i i
l, 1
1 l
) ,
As cr rys8 CUARTER 2 4
4 I
  \              O                                                                  - -
O          -- -
O
 
                                                                                                                                                                                            %                                                                                                                                              A RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                        PAGE: 125 ISSUE NUMBER:              B-55                                            TITLE: IMPROVE RELIABILITY OF TARGET ROCK SAFETY-RELIEF VALVES IDENTIFICATION DATE: 06/78C                                                  PRIORITIZATION DATE: 11/83C                                                                  TYPE. GSI                  PRIORITY: M TASK MANAGER: F. CHERNY                                                      OFFICE / DIVISION / BRANCH: RES /DE /EIB                                                      ACTION LEVEL: ACTIVE      STATUS:
TAC NUMBERS.                                                                                                                                                                                          RESOLUTION DATE 03/89 l                                                                                WORK AUTHORIZATION; NRR FY-84 OPERATING PLAN. (APPENDIX G) l l                                                                                                  FIN                        CONTRACTOR                                                      CONTRACT TITLE NONE                          NONE                      NONE l
I
,                                                                                                                                                                                W0R K        SC0PE REVIEW BWR UTILITY APPROACHES TO INCREASING SRV                                                CONFORMANCE TO NSSS VENDOR INSTRUCTIONS: (2)
RELIABILITY TO OBTAIN SUFFICIENT DATA BASE TO SUPPORT                                                          DEMONSTRATING SUFFICIENT RELIABILITY OF 2-STAGE VALVES THE CONCLUSION THAT THIS ISSUE HAS BEEN RESOLVED.                                                              AFTER DESIGN AND/OR SYSTEM MODIFICATIONS, AND (3)
THE UTILITY APPROACHES MAY INCLUDE:                                            (1) DEMONSTRATING                USING DIFFERENT VALVES AND DEMONSTRATING THEIR SUFFICIENT RELIABILITY OF 3-STAGE VALVES BY STRICT                                                              RELIABILTY, STA TUS A REPORT WAS SUBMITTED BY THE OWNERS GROUP (OG)                                                  TAMING THE LARGE SETPOINT DRIFT INTO ACCOUNT FOR THE 06/08/85 THAT WAS EXPECTED TO RESOLVE THE ISSUE.                                              A                WORST CASE DESIGN BASIS TRANSIENT. BRUNSWICK 2 WOULD SUBSEQUENT BOSTON EDISON REPORT ON EXPERIENCE AT PILGRIM                                                        STILL HAVE MET THE APPLICABLE ASHE PRESSURE LIMIT. THE INDICATED THAT THE RECOMMENDATIONS OF THE OG REPGRT WERE                                                        NRR STAFF IS IN AGREEMENT WITH THE OG THAT THE SELECTION NOT SUFFICIENT TO RESOLVE THIS ISSUE.                                            THE OG HAS                    OF NEW PILOT DISK MATERIAL IS AN ACCEPTABLE WAY TO RECOGNIZED THE NEED TO PURSUE THIS PROBLEM FURTHER AND                                                          RESOLVE THE STUCK PILOT DISK CONCERN,                                                  BASED UPON THE HAS EVALUATED SEVERAL POTENTIAL NEW PILOT DISK MATERIALS                                                        ASSUMPTION THAT PH 13-8MO PILOT DISKS WILL ELIMINATE THE THAT COULD ELIMINATE EXCESSIVE SETPOINT DRIFT RESULTING                                                          STUCK PILOT DISK CONCERN, A DRAFT RESOLUTION MEMO WAS FROM PILOT DISKS. THEY HAVE ASSEMBLED A MATERIAL                                                                PREPARED AND DISTRIBUTED TO NRR AND IE FOR COMMENTS ON SELECTION PANEL COMPOSED OF EXPERTS IN BOTH MATERIALS                                                            6/4/86.        THE CLOSEOUT MEMO WAS FORWARDED TO DSRO UPPER TECHNOLOGY AND NUCLEAR VALVE DESIGN.                                            THE PANEL HAS                  MANAGE ME N T FOR CONCURRENCE IN MID-JUNE 1986.                                                                            COMMENTS SELECTED PH 13-SM STAINLESS STEEL AS THE CANDIDATE                                                              WERE RECEIVED FROM THE DSRO DEPUTY DIRECTOR.                                                                                IN ORDER MATERIAL 70 BE TO BE TESTED IN SEVERAL PLANIS DURING                                                            TO RESPOND TO ALL COMMENTS. A LETTER WAS REQUESTED FROM UPCOMING FUEL CYCLES.                            IN JANUARY 1986 CAROLINA POWER                                THE BWROG THAT FORMALLY DOCUMENTED THE TRIAL DISK AND LIGHT (CP&L) REPORTED THE CONTROVERSIAL RES'JLTS OF                                                          REPLACEMENT PROGRAM AND ITS SCHEDULE .
RECENTLY COF9LETED 2 BRUNSWICK SRV TESTS. SIX OF ELEVEN                                                                THE TASK MANAGER RECEIVED A LETTER FROM THE BWROG SRVS FAILED (0 OPEN AT 10 PERCENT OR MORE ABOVE NORMAL                                                          DATED 4/2/87,                                                THE LETTER INCLUDED THE FOLLOWING:
SETPOINT.              ON MAY 7, 1986, CP&L SUBMITTED AN LER WHICH                                                    A) BACKGROUND AND DESCRIPTION OF THE STUCK PILOT DOCUMENTED THE SRV FAILURE DATA.                                  IN ADDITION, THE LER                                        DISK CONCERN.
INCLUDED THE RESULTS OF ANALYSES THAT INDICATE THAT.                                                                  B) DESCRIPTION OF ONGOING BWR OG PROGRAM OF BOTH AS OF FY88 OUARTER 2 l
_ _ - _ _ . _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ . _ - _ . . _ _ _ _ _ _ .                              _________.________c      m__-  ,-__4 -.__--_u_____=          _        _    _ _-              __ _ -__ _ - _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _                              _ _ . . _ _ _ _ _ _ _ . _ _ _ _ . _ . _ _ _ . _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _
 
CUM DATE: CS/11/83 GEME9IC ISSUE MANAGEME NT CO*TPCL SYSTEM                                                PAGE    126 ISSUE NU*"BER. B-55                    TITLE IFP80VE DELIABILITy or TADGET 80CK SArETf-PELIEF VALVES S T A T US IN PEACTCP AC ACCELERATED CC''CSIC% TESTI%G                            ADDITIC4 ALLY THE $[TPOINT DWIFT COP 94ITTEE CHAIPwAN OF PM 13-t MO DISK MATERIAL                                    HAS ADVISED THAT A PPOGPAM OF ACCELEPATED C0'R00104 Cl 8ESULTS OF Im SE RVICE EXPERIEEE IE VALVE                        TE ST I%G IS BEI%G PLA4%ED ACTUATIO%S IN RESPONSE TO PLAMT PRESSU*E                                AF TE R THE 4/12/87 h8C PECPGANIZATIC4 THIS ISSUE WAS TPAMSIENTS UP TO 1/87                                          TFAMSFEPPED WITH EIB TO DE/ PES                            IN MAY. 1937 A DECISIO4 ADDITIO4 ALLY. RE PCpTS wERE PECE IVED F 8 0+' N*C *E SION          WAS Mt-DE BV R E S MANAGE ME N T TO POSTPCME ISSUAMCE OF THE II A C AECD C4 THE RESULTS OF SURVEILLA%CE T E S T I 5G OF                PESOLUTION t'EF3 UNTIL ADOITICMAL TEST DAT A E X PECTED OVE R 2-STAGE 08V S PEMOVED FROM MATCH I AND TESTED AT THE                      APPPOXIMATELY THE NEXT lt McMTHS COULD BE EVALUATED WYLE LAS      FIVE OF E LE VE N SpV S TESTED **AD PH 13-t*3                ASS',*4I%G THAT TEST DATA IS FAVCRABLE. IT IS (XPECTED THAT PILOT DISFS      404E OF THESE EXHIBITED PILCT D I S r. TO SEAT            THE RESCLUTIGN PEMO CCULD BE ISSUED IM THE 2 ND Q8 JAP T E R OF STICRI%G      THE SIX OTHEP SPV S TESTED HAD STEL'.ITE                    Fv-90          A DETAILED STATUS REPCRT DISCUSSING THE INDUSTPY DISKS. A C CEE GF THESE DID EXHIBIT ST I CF.1%        AS F OUC .          EFFOeT WAS PREPAPED IN DECEMBER 1987                            A FEW CHAMGES WEPE 0ET P*ESSUPi FCR ALL OF THE PH-13 EMO SPV S DID %OT                        SEEDED TO PESPOND TO MANAGEME NT CC**"JE NTS AND THE STATUS DEVIATE F#CM THE NOMINAL VALUE BY M08E THA% PLUS/MINUS                    REpoPT WILL BE ISSUED IN JANUARf 1938                              IT IS ANTICIPATED Two PE PCENT                                                              THAT THEPE WILL NOT BE FU97HER UPDATES IN GIPCS UMTIL THE THE % EXT PLANT WITH PH13-IMO PILOT DIS *S SCHEDULED                Ek# 0G F INA L D E CO't"E CA T IO N 04 PILOT DISK MATEPIAL IS TO BE SHUT DLb4 IS BRUNSWICR 2- DATA FPCw THE $8v TESTS                    *ECEIVED SHOULD BE A(AILABLE 14 JA4UARY- 1988.
AF FECTED DDCL*ENTS                                                                    PPCBLEM/DESOLUTION wnE                                                                          THE RESOLUTICN OF THIS ISSUE IS AIFED AT IMCPEASIM THE RELIABILITY OF THESE VALVES TO MEET THE CURRENT PLANT TECHNICAL SPECIFICATIOTS. PILOT DISMS OF PH 13-M0 WILL BE TESTED Im CEPTAI4 PLANTS WITH THE OBJECTIVE Cr ELIMIMATING EXCESSIVE SETPCINT D*IFT                              T HE ACT IOMS T AP.E N T HUS F A9 BY THE OG AMD TME OG PROGFAM APE RESPOMSIVE TO ISSUE        VE E*PECT THAT THIS ISSUE WILL BE RESOLVED WITH MINIMUM STAFF EFFCET NEEDED ONLY TO MCMITO8 THEIR PROG 2AM        VE wtLL WGPK WITH THE CG A%D PROVIDE THEM WITH OUR EVALUATIGN OF THEIS PROGR Aw AND ICICATE CU5t INTENT TO PELY C4 THEIP PPGG8AM TO DESOLVE THE ISSUE                                A GEuE8IC ISSUE CLOSEDUT FEMO WAS ISSUED THAT PEF LECTED THIS UCEPSTACIMS                AT THE COMPLETIOM OF THE OG P1t0GPAM. THE STAFF WILL PEVIEw THE I CUS T R Y PESOLUTIow AMD ISSUE A CLOSE 0UT MEMO IF *HE STAFF CONCUPS WITH THE PESOLUTICs AS Cr FVft CUAPTEP 2 O                                                              O                                                                                    O
 
_                                                            _. _. _. .                              . _ . . _. ._  m .  . _ _ . _              ___ .m      _._ _ _ _.
4 l
l RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                          PAGE:        127 f
j                                ISSUE NUMBER:              B-55                                          TITLE: IMPROVE RELIABILITY OF TARGET ROCK SAFETY-RELIEF VALVES i
ORIGINAL              CURRENT                    ACTUAL j
M ILESTONES DATE DATE DATE I                                                              MEETING WITH BWR OWNERS SETPOINT DRIFT                                                      12/83                    --
11/83                              i
!                                                              COMMITTEE a
l                                                              BWR OWNERS REPORT SUBMITTED                                                                07/84                    --
06/84                              ;
4 BOSTON EDISON REPORT SUBMITTED                                                                  --                  --
08/84                                t
,                                                              COMPLETION OF NRR EVALUATION OF OWNERS                                                      10/84                    --    <
10/84                                '
1                                                              GROUP AND BOSTON EDISON REPORTS 1
e                                                              COMMUNICATION TO OG RE: NRC                                                                      --                  --
03/85
!,                                                              COMMENTS / CONCERNS i
l                                                              OG PRESENTATION TO THE STAFF                                                                10/85                    --
10/85
!                                                              STAFF RECEIVES OWNERS' PROGRAM FOR                                                          10/85                    --
10/85
!                                                              ELIMINATING SET POINT DRIFT t
j                                                              OWNERS BEGIN TO INSTALL NEW PILOT DISKS                                                    01/86                      --
01/86 A                                                              TO TEST IN PLANT FOR ONE FUEL CYCLE                                                                                                                                            !
4                                                                                                                                                                                                                                              .
l                                                              ISSUE STATUS REPORT ON INDUSTRY EFFORTS                                                  '12/87                      -. '
01/88                              4 EVALUTE INDUSTRY DATA & RECOMMENDATIONS                                                    10/85              03/89                          --
;                                                              AND ISSUE CLOSEOUT MEMO                                                                                                                                                        ,
i 4
e a                                                                                                                                                                                                                                              e Y
1                                                                                                                                                                                                                                              e l                                                                                                                                                                                                                                              i 1
* 4 1
i                                                                                                                                                                                                                                              '
I, 4
i                                                                                                                                                                                                            AS OF FY88 OUARTER 2' s                                                                                                                                                                                                                                              i i
j j
l i
i
                                                                                                                                                                                              ~
i i                                                          -                                                                              -
 
CUN DATE- CS/II/88 GE NE R IC ISSUE MANAGEMENT CONTROL SYSTEM                                                      PAGE:  128 ISSUE NUMBER.      B-56                        TITLE      D.ESEL GENERATOR RELIABILITY IDENTIFICATION DATE: 06/78C                    PRIORITIZATION DATE            II/83C                              TYPE GSI                              PRIORITY. H TASK MANAGER- A. SERKIZ                        OFFICE / DIVISION /8 RANCH RES /DRPS/RPSI                          ACTION LEVEL ACTIVE                    STATUS-TAC NUMBERS.                                                                                                                                              RESOLUTION DATE 04/89C WORK AUTHORIZATION- NRR FY-83 OPERATING PLAN ( APPE NDI X G]
FIN              CONTRACTOR                                                    CONTRACT TITLE A1806              SNL                GUIDELINES FOR EMERG DIESEL GENERATOR (EDG) RELIABILITY PROGRAMS W0R K          SC0P E THk hbRK bbbPk bF b 56 kSb[bSE[Y bbbRbkNkT[b                                                  THE bbNCLbbkN EFFbRhbN BSkWk((bkbkRkbkkb WITH THE PESOLUTION OF USI A-44            STATION BLACKOUT            THE                AT DEFINING THE PRINCIPAL ELEMENTS OF AN EDG PROPOSED RESOLUTION OF USI A-44 INCLUDES. AMONG OTHER                                      RELIABILITY PROGRAM AND TECHNICAL GUIDELINES FOR THINGS. A RECOMMENDATION THAT THE RELIABILITY LEVEL OF                                    NRC TO USE IN THE REVISION OF REGULATORY GUIDES.
EMEPGENCY DIESEL GENERATOR (EDG) BE MAINTAINED AT OR                                      INSPECTION MODULES AND SRP SECTIONS DEEMED ABOVE SPECIFIED ACCEPTABLE RELIABILITY LEVELS                                              APPROPPIATE STA TUS kbfPRkN Pkt kHkbhkFbR kHkkkhbtbhkbbbF                                              PLkkkh          PRbbRkkShkbbhbRk"MkRCH IhkB Hkh B-36 IS TO DEVELOP GUIDELINES FOR AN ACCEPTABLE EDG                                        BEEN PREPARED AND WILL BE PUBLISHED                          THIS TECHNICAL RLLIABILITY PROGRAM TO ENSURE CONFORMANCE WITH THE EDG                                    F INDIPGS REPOR T WILL BE UTILIZED BY THE STAFF IN TARGE T RE LIABILITY (0 95 TO 0.975) IDENTIFIED IN THE                                    UNDERTAKING THE REVISIONS NOTED ABOVE. A SECOND PROPOSED RESOLUTION OF USI A-44.                                                          VOLUME. WHICH DEALS IN MORE DETAIL WITH UNDERLVING NUREG/CR-5078 VOL. I. "A RELIABILITY PROGRAM                                        CAUSES AND PERFORMANCE MONITORING. IS SCHEDULED FOR EMERGENCY DIESEL GENERATORS AT NUCLEAR POWER                                          FOR THE THIRD QUARTER OF FY-88.
AFFECTED DOCUMENTS                                                                                PROBLEM / RESOLUTION REGULATORY GUIDES (E.G. RG I 108 I 91. SRP                                                    THE SCHEDULE FOR RESOLUTION OF GSI B-56 HAS SLIPPED SECTIONS WILL BE REVISED AS REQUIRED                REVISIONS                              DUE TO APPLICATION OF STAFF RESOURCES TO RESOLVE USI A-44 TO TECH SPECS. INSPECTION GUIDANCE AND PREPARATION                                        IN FY-87 OTR 4 AND FY-88. QTR. I.                            THE REVISED CURRENT OF A GENERIC LETTER WILL ALSO BE NEEDED. NRR HAS                                          DATES REFLECT THIS SLIPPAGE.
THE LEAD ON REVISING SUCH DOCUMENTS.                                                                THE CONCLUDING ACTIVITIES (I E.. CHANGES TO AS OF FY82 QUARTER 2 O                                                                            O                                                                                  O
 
__.-__ ___                                                                          - _ = _ _ . _    _      =_ _                    . _ . _ _ _ . _ _                _._____m__                      1 ... . _ _ _  ,_.          . _ _                            . ~ .                      _ . . . . - ..
I i
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                            PAGE:          129 l
1 j                      ISSUE NUMBER:                                                        8-56                                  TITLE. DIESEL GENERATOR RELIABILITY I
AFFECTED DOCUMENTS                                                                                                    PROBLEM / RESOLUTION REGULATORY GUIDANCE AND RELATED REQUIREMENTSI WILL BE l                                                                                                                                                                                    PACED BY NRR INPUT. WHICH IS SCHEDULED FOR 4/88 BY l                                                                                                                                                                                    GILLESPIE TO SPEIS MEMO OF 2/23/88,
}
l I                                                                                                                                                                                            ORIGINAL                          CURRENT                          ACTUAL MILEST0NES                                                                            DATE                        DATE                                DATE
-i                                                                                            ----------------.....-------------.---------.                                                ----------                    ------.---                          -------- -
DTR IDENTIFIED                                                                                    02/83                            --
02/83 i                                                                                              ISSUED BY DSI DIRECTOR FOR STAFF COMMENT                                                          02/83                            --
02/83 1
;                                                                                            PACKAGE TO NRR DIRECTOR                                                                            04/83                            --
03/83 I                                                                                              PACKAGE TO CRGR (29)                                                                              05/83                            --
07/83 CRGR REVIEW COMPLETE                                                                              06/83                            --
07/83
,                                                                                              SCOPE OF ISSUE MODIFIED TO C00RDINATE                                                              09/83                          --
09/83
;                                                                                              TECHNICAL RESOLUTION OF B-56 WITH USI i                                                                                              A-44 SCOPE OF ISSUE MODIFIED TO CONSIDER                                                                  11/83                          --
11/83 NUMBER OF COLD FAST START SURVEILL.ANCE TESTS h
4                                                                                              COORDINATED GSI B-56 AND USI A-44 CRGR                                                          _02/84                            --
01/84 j                                                                                              PAchAGE SENT TO NRR DIRECTOR I                                                                                              REVISED PACKAGE TO CRGR                                                                            04/84                          --
03/84 j                                                                                              CRGR REVIEW COMPLETE                                                                                05/84                            --
05/84 i                                                                                              ISSUED S0.54tF) GL 84 15 TO LICENSEES                                                              06/84                            --
07/84 1
{                                                                                            RECEIVED PUBLIC COMMENTS                                                                            09/84                            --
11/84 t
j                                                                                              ISSUED T/A CONTRACT TO BNL                                                                        06/85                            --
06/85 l                                                                                            PUBLISH CONTRACTOR REPORT ON LICENSEE                                                              04/86                            -.                              04/86                                              ;
.j                                                                                            RESPONSE TO 50.54tF]
                                                                                                                                                                                                                                                                                                                    .F
                                                                                                                                                                                                                                                                                                                      .t.
i AS OF FY88 OUARTER.2 i
)
.i I
 
1 PUN DATE. 05/11/88 i
GE%E8IC IS0UE MA%AGEMENT CCNTROL SYSTEM                  PAGE            130 1    ISSUE E'MER - B-56                                                      TITLE DIESEL GENE 8AT08 PELIABILITv C8IGINAL        CURRENT          ACTUAL M I LE ST CN E S                              DATE          DATE            DATE PEVISE ssPS AND PEG GUICES 1%P*)                                                              03/88          04/88                --
DE VE L O P DIESEL GENE 8 ATOP #ELIABILITY                                                    10/t5          08/38                --
I                  PROG 8AM GUIDELI%ES FT* TO DIVISICMS FC# CO**"E N T                                                                11/t6          05/88                --
j                  STAFF CGMMENTS TO CR PS                                                                        12/85          C6/tt                --
!                  C8GR W AGE TO #ES DIPE T08                                                                    01/27          07/88                --
1
!                  FImA. PACFAGE TO C8GP 153)                                                                    03/E7          08/81                  --
i CPGs *EVIEW C & pLETE                                                                          05/17          09/18                  --
!                  ISSUE F0# PUBLIC COMP"F=T                                                                      05/87          10/E8                  --
1                  PECEIVE PUBLIC CC***ENTS                                                                      09/87          11/88                --
FTP TO #ES DIRECTOR                                                                            C9/a7          12/88                  --
l FTP TO CSGR                                                                                    10/27        01/89                  --
ISSUE FEG GUICE A C S*P                                                                      G4/23          04/89                  --
1 I
l i
i 1
i i
i l
i
  '                                                                                                                                                      AS OF F Y t 3 C'J A R TE R 2 i
l' i
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                  PAGE: 131 ISSUE NUMBER:      8-61                                TITLE: ALLOWABLE ECCS EQUIPMENT OUTAGE PERIODS IDENTIFICATION DATE: 06/78C                            PRIORITIZATION DATE- 11/83C                                                TYPE: GSI                                PRIORITY; M TASK MANAGER: R. BUSLIK                                OFFICE / DIVISION / BRANCH: RES /DRAA/PRAB                                  ACTION LEVEL: ACTIVE                      STATUS:
TAC NUMBERS:                                                                                                                                                                RESOLUTION DATE: 04/90 WORK AUTHORIZATION: NRR FY-84 OPERATING PLAN [ APPENDIX G)
FIN              CONTRACTOR                                                                    CONTRACT TITLE NONE                NONE                      NONE WORK                SCOPE IN GENERAL, PLANTS WILL BE CLASSIFIED SUCH THAT                                                      CHANGES IN ALLOWABLE ECCS OUTAGE PERIOD. CONSIDERATION IN EACH CLASS SIMILAR ECCS OUTAGE UNAVAILABILITIES                                                          OF SUPPORT SYSTEM OUTAGES MUST BE INCLUDED. DETAILS WILL HAVE SIMILAR IMPACTS ON RISK. THE EFFECT OF A                                                          OF THE WORK SCOPE ARE CONTAINED IN THE DRAFT ACTION GIVEN ECCS AVAILABILITY ON RISK WILL BE DETERMINED.                                                          PLAN.
FOR EACH CLASS OF PLANT. AS WELL AS THE IMPACTS OF ANY STATUS TASK I HAS BEEN CDMPLETED.
AFFECTED DOCUMENTS                                                                                                PROBLEM / RESOLUTION TECHNICAL SPECIFICATION CHANGES ARE POSSIBLE.                                                                ALTHOUGH TASK I. METHODOLOGY REVIEW AND DEVELOFMENT. IS LISTED AS COMPLETED. NO METHODOLOGY FOR THE ANALYSIS OF THE COSTS TO THE UTILITY OF THE IMPLMENTATION OF A CUMULATIVE OUTAGE REQUIREMENT HAS BEEN DEVELOPED.                            ALSO. THE FINAL REPORT FROM BNL ON THIS TASK HAS NOT SEEN RECEIVED. ALTHOUGH A DRAFT REPORT HAS BEEN RECEIVED. THE MAJOR PROBLEM ASSOCIATED WITH B-61 RESOLUTION IS THE ANALYSIS OF THE COSTS AND BENEFITS OF THE IMPOSITION OF A CUMULATIVE OUTAGE                                          i REQUIREMENT.            THE CONSIDERATION OF ANALYTICALLY BASED                    -
CUMULATIVE OUTAGE REQUIREMENTS WAS INCORPORATED INTO B-61 AS PART OF THE RESOLUTION OF TMI ACTION ITEM IIRK.3.17.                              ISEE MEMOR ANDUM F OR G .            C. LAINAS FROM F. H. ROWSOME DATED JUNE
: 17. 1983.) NO WORK HAS BEEN PERFORMED ON TASK II OF THIS AS OF F)$8 QUARTER 2
 
N iO                    Op tw                w 2A                                                                  O i>          wnm      MM yw w
i M          OM ow          40*      au                                                                a I V          wwl      Ow                                                                4 i m          DWOWwa                                                                      7 i w w O          MUh                                                                    b e4      Zw CEwwh                                                                        w w              i MIww hAO w              to        >> On        w                                                              w N              ; 2 w        MweQ>                                                                      >
M              e4 Ot>meUWO                                                                              w M  N          4 04Wa          R N N            i - wws3 www                                                                            w O  M          to 2              was*                                                                  O O              t>      Mb 'EM4DM                      4  W    4  O iR      OQ &k        Q4      _-    e w w      w w        i    4    I    I    e  i  O IM      ACOOAOw)            M *( eN N        N N        e    i    e    i    e  i  4 WW            4 4        s 34wl            UQiM        w    N  w e 0            es wC4              -Uw      4      io o      o o 4 4        F*>          wo 62qdh                    i Q 4        OsOpeOwMML                  (J          l M I FOMIC              Mw    2 N          wiOF          H      EHZum D          DIUDawr OOwJ u          We        wwECOMw              I OtO              Hw>      0 0 OI iw@A4pAww2 &
wIMOw MOWLMww A i g        >>OwnMr                    6 NI KFO4CwZWM                  M  M      t teDO31L>O Q                      R      s w*wM          MIwuJw E          wwa                          e e        w    e e e at        ww Mc dawO            awi n        i    i  i    w w        e    w w w Oswd1>                WlMO4      h44 4        0    4  i    N N        N    N N N OtOUmaw2DMw >                    DQi                          M    M    N    M  @    N
          #
* O W1 WOO J            V i                          OO        o    O O O AlwW>UWwdMWWF                            i I    OJ4m      mMkdMO              e i    D4 ww Op O *3*
i    4 >
i    Uwa - OwwAww O      i    w11we2D1KOO A  O      '                OrwDa w  O      i CD > b9    s
* mow 3OOO b  M      i                                    e a          w'4Cawv1 D O O tt M w w 1 h O
O w
A i
5 .' m i <i wUwk1 1      W M4'J R 2 M et s
* 4
                                            # wig 9
4    W  4      OO        N    O O O
* OMEOQ2ew4                2  Mw a m      W    w w        w w        w    w w w J  w      4 Mwd          w  w    EM  C at s N N        N N        N N        N    N N N O  O
* M  uwkFm <mw          MQs      M  w    O  M      N w        w    w o >
61 4      i UwwdewoMap                n. so o      o  M      o o        o    o o o
    >  W      i M M 3 F e( m twjw          O      e F  D      i sa      MIMwO>          1        i O  O      i wo OMD40www U
eFM        MMOQ4/1 i wa mOwowoOw
    >  2      i OE      Owaw&100 2  y w  A 1  w w  M O  D                                            i    7 4  O      e                                    s    a F  w      a                                    e    M                          w t        i                                    i    >                          w 1  O
* i    D                          4 U      i                                    e    s                          F w  U      i                                    i    O                          O D  w      i                                    i    O O          i                                    i    w                          &
O  w      e                                    e    &                          O M  a      e
* w    w M      i                                    i    J                    O                  7 O  at      i                                  a    4    &                    R            O M  1      e                                    is U      O                F    O            M Q  &.)    i                                Oe4      M    >              O    M            O w  J        e                                  s %  7    U              M    >            M
    #  w        i                              wiO      1    w p          ' >    4            >
w  4        e                                    ia  U    a 4            O                  M O          i                              FiA      w    M  4          w    p#            Q i                                    e4  >    c                a    w w        e                              On4                3      h    w w        i                                    i    w    F w        OO                      W e  O-                                  >-
* O O      O *=
M  e i                                      *Q        M  >            (    O            w e  Ri                                  ea        F  0 wQ                  w            0 we                                        as O      M  aw          O    m        w 4 weo      M    >      >      >              0  E
: 4) 4 6                                    tw  H    M  kw 4              J        4 O Un                                  de        4    O OJ            >    4        E  4 Os                                        40 W          On    OQ        M        U k oni                                  M ew      M    > si e O              >        4 e3 4      m 00            a    M        E a 0                                    K'O      h        QU > 0            R            O wi                                        80 0      0 0        J O        M        E  h
          >e                                        tM  O    g IM A          O        k O U Un                                        e    O    .=  hX    A    I    R    > a we                                        th        OW        4 >        <    Q U we w i                                      *4  WV tu E          e    w      e          Ok wt                                        se kw A        e    M    1    Ep  w w        O di                                        i    wa a    MO    M      O Or a a 3r i                                    is    a  4      .s      >> s      4    4  wO i                                    e6 &Z          Mw W        WE  W    E    &  Mw M        e                                    6 4 Ik k      O>    0 A4 >          W    w  >&
w        e                                    6 4  OM  4 (w 4          kJ  W    k    E  wM
        .      i to 03    > NG >          <h  QU A E to m        i                                                                                        '
l e
e                                                                                        1 3
W        G W        4 h
a        i 2        e                                                                                        i I
i W        4 D        i                                                                                        l O        i O        e M        i 1
i l
 
                                                                                            . _ . _ _ _ _      ..___.__m                          ..__m.                    .  .____.,_m-    __ .        .._._m      _                      _ . _ _ _ ..- _. ___ ___ _ .=~_
1 i
1                                                                                                                                                                                                                                                                          .
j                                                                                                                                                                                                                                                    2UN DATE: 05/11/88                                          ,;
i                                                                                                                                                                                                                                                                                                                    i j                                                                                                        GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                                                  PAGE:              133 ISSUE NUMBER:                        8-61                                      TTILE- ALLOWABLE ECCS EQUIPMENT 0UTAGE PERIODS ORIGINAL                    CURRENT                                                    ACTUAL                                  f l                                                                          MILESTONES                                                                                                    DATE                    DATE                                                        DATE                                  ;
i RES DIRECTOR REVIEW COMPLETE /                                                                                                    08/86                    08/89                                                              --
!,                                                  PACKAGE TO CRGR                                                                                                                                                                                                                                                  ;
1 j.
CRGR REVIEW AND EDO APPROVAL COMPLETED                                                                                              09/86                    09/89                                                              -.                                !
6 l                                                  ISSUANCE OF FRN FOR PUBLIC COMMENT                                                                                                  11/86                    10/89                                                            -.                                !
4
!                                                  SI TY-DAY COP 99ENT PERIOD ENDS                                                                                                    01/87                    12/89                                .                            --                                !
DIVISION REVIEW OF PUBLIC COMMENTS                                                                                                  02/87                    0I/90                                                              -.
COMPLETED. AND FINAL CRGR PACKAGE COMPLETED RES REVIEW OF CRGR PACKAGE COMPLETED                                                                                                04/87                    02/90                                                              --
{                                                  (DIVISION REVIEW AND RES DIRECTOR REVIEW)                                                                                                                                                                                                                        [
l                                                                                                                                                                                                                                                                                                                    L CRGR REVIEW AND EDO APPROVAL COMPLETED                                                                                              05/87                    03/90                                                              .-                                i 1,                                                                                                                                                                                                                                                                                                                  i i                                                  ISSUANCE OF PROPOSED CHANGES TO                                                                                                  07/87                    04/90                                                              -.
1                                                  TECitNICAL SPECIFICATIONS f                                                                                                                                                                                                                                                                                                                    I
;                                                                                                                                                                                                                                                                                                  o                i f
1 l
l i
i                                                                                                                                                                                                                                                                                                                  i j                                                                                                                                                                                                                                                                            .AS OF FY88 OUARTER 2
[
l
 
Cui N
w                            I                      i                  e
                          %                            e                      i                  4                                                h
                          *9                            I                      e                  i                                                beJ p                            i                      e                  i b
aF                    i                  4 i O                    e                  e w                            iM th i                  e 4
M                                                    4 a *(                                      ,
                          <                                                    . w w
m se o                            ep i M
                                                                                # 1 i s e
e                                                ao
%                    &    F                            e .J                  6                  i                                                >
M                    g Q                                t >.e                  ag                  g                                                6.
e M  et        >          **
* U                    iO                  i N m            6          e                            i4                    6                  e                                    i            w e  M          M    O D                                ew                    e0                  e                            .J    I            O O              &    D J                                4                      4 1                  i                              W I *i O >- O                                    I&                    a>                  e3                              >- t **          O O                            40                                        Iw                            W4                  *(
LnJ 4eJ M
66 et
                    >=    taJ                          'w t F 4O                          **                  UQ'N 4 eo i se
> 0            A e a                        i            i                    eE                  i>                                  t a(  *(                                      l            t had                i              Fl            *J iF              Oee                                      i O &                                        i            eU I                                    I beJ          M i 4
e .y(                  aw              >- eF F                                          4 D                                          i            tO                    6>              D6 O a                    w                    i            eM                    e en            .J e **
                    >                      l            iD                    eD            Cie M                      e            i O                    eO            Oie
                    >                      6            e                      aw              weM i
U                      6            0 I                    e              & i i            ee                    i F 6.J        %#                                >-      t et                                                                                                          F      I 4            iM                    iMJ            Kt e            e .J                  t 1D            weU                              wwi
                    .J                    4            i CD                  t >= m          .J *                              &*i p                      6            ad                    iM            Di l k                            #4 8 8 7                      1            e >*                  I ) .=3        O i had                          DO8 M    w                      i            eO                    e          et  h                                U '
IA    .J                    t            Iw                    aQFM          A    e (/)
0                                    I O                            t            i                      e                    eD                                  i ss, F                      e iO                    s                  e iO O                      I            ig                    4 w    M                      a            , a( O                  eOw                eM CL  >=                      6            6          /          t >= 1              6 I          > o                                      .        -M          i        e-        i m w          - g                          ,            ,Or                    i w                eo
    >                                      e            iFG                    r co w              a r1
* O                                      i            e M e*                e        C        e t                          .J      e
    >                                baJ #      3      4 F bi                i enJ                i b                        at      8 O                                .                  t OO                  6      .J F        4 su                        F taJ i *f o g >- i sue W.JieM w          i      ><M            EMU                  e s
    .J                                M e >              eOT                    i *3 **              e>                          0 sf    a N O              to                >- i w            iO7                    i        e          iU aw M Q i ao a        eo a
e
    #    0 o.a 0*O e        w e ** O ae 3. w 7, U s CL et inO inM iO i
O        e O    n                            s4
* F              s 00              h        J        e U    O                            cu eM          Oe U                        i w to              e
          >-          w                *- 4 F              e w 6.            Oe 1D                    e
    >                O                FeO            OiOO                        e >- A              e F    U.t        N                O e **              i                De p    w                            UaO            Oi                          e L    Sa    O O                          i O          8                >= l w          n w                          ee4          e                      i e
O    w    e6    &                      I            4                4 4 O    N                                    n. t                                            e                                    i
    =(                                      e                                  i
    #          .*                            i            e                F e                      e                                    i I
et  O .* 1                -
t U    & I                          e                  i Z    #          t)        O            i w          i                Oi                        i                                    e M          F                      eQ      O*w                          e                  i                      3            i O w    F    W    mi        =            4            i 2                    s                  a                      w            e#
3    O >- a                M                    3 e >- Q                    e                  i                      M            iM O    M    4    co                      ai r/        a        wa          iws                e                      >            eF O    O    fi    N          o/          4 *(          + wJO                  6 & 80              i                      w            6O M    O          F          W            I            e 61 M w              I p (46            l                g    g            g  >4
          .4    F O            $k            i F          i *( mL                t J **              t                O                  t O U
* O **            h            i O          e & >- O              e                  e            gaJ w    (.i          i O
    *e        M    O          at            t M          ewwF                  i .J da              e            O        F            4M
    &      . >- **            -            i e-          e aQO            edw                  e            F >+    H      Oe w    U    .t    >                        i .t        aa **                  e ** (p              i            et # F                i F    w N **                              i F          i            O        ia1                  i            nw o            we be.f O    M    Q          F            i **        i            M        i baJ w            4            D >* >*                ed O          *-    N          at            eY            6 > >- U              ieU                e            OF O            Faw M    w            J          e 4
* U w                  a *( w              i            OO00                    eo n.J  e    O          $6            4 *-                M GL Q          t EO
* 4 U F **        Oi
          ~J    O **                          I F          I =J O                I                  e                  94 '              1 F e ** w                0              i O          i OdO                  et#          O6 -                .J ApCLa        >- t O M      cx  6.        #              *O          i (L w #              e w **      >- iO              e(
* H      h O            M              rw            i        >M          eX          F I >= ** 4 O                        O4Q
                                >-            6O          4 (1 w 0              eeF                6 F O Ow                            6w 4                            iFQR                  eOO                e        FFe2o              w a >=
a                            eO w                  e      M          i        O of og M                  ew w                            s >< O                i es O            t        Md>Fm              .e s .J a                            e e e **              eVO                i        eMaCO                      i st O                            1 O F .J              s =( H      QtwMwUMw                            >* i 3 mi                    i MO                  e                  # 1> wO                              iO et    Oe                    e        MF            60          Q 4 a( w F 0F                        3, e U se    >= 6                  6        **M          iw          baJ t            & O O M *(                l O                      Ue                    i        et            e00        >= i **                F    .J              e3 aw i
ee              >-    et t                i U .J w              eF          U t O to e 4                h 6              h      ae                    tWDO                  t at W      wI              es kn>                      lM*
                %                      >- e                  iOOD                  i 1 a 0,I-      weO O O U ~3                                6 >m to a            a      F i .;              e        w                        weWMM>ww                                    + w rg o w              a      Oe F                e .J a a              t          4 i af              DwOM                    e en --
                      >          F      V i dL              t *(        O        i baJ O              6      w O '> >                    4 w                                      6mFw                  i  .J>=            10Q ou m W                          $mw 99    nnJ  >+                                      t w **                I D                  etoM>QOh                            40J 49    >= 0            F                            iy        Q          t W >=              4      D G O >*                    4hD e  4                O                            iwdw                  i      F            i000 UQ                            iUm to O                  M                            eOwo                  e .J w              I >- >- F a( m g          >-                          i      Ow            e et 0              i a > af O w ai F              e(                          l *( F w              a#                  4 e( 4 d M E O O                N                            e      et #          # MO                t k o D e-          i a M        a          M                            i CL 1                ewe                8      >~ O et a et baJ  >*    hn4  O $                                i OOF                i      a(          t n 8I haJ / e( >=
CD    en(  0 m        O              4 N            i =J      O          i **                8    t>  J m ** ted O U 4        w    I    New                    swwM                  iwQ                6 0S            3a                              i
          ))
          . M    #      )  >-    M tm                  i > F >-              t =( w              i      O 3 cm p '3
          # w        et          D    win                    i    wwt            i t e              i o w w 6. ) w
                **    I -        =(            i cu          i Q i ,1              e  .o.Jw          i i
M. F >- a e w    v.          F                                  i Fe                  .                                                                  i D F a                  W                            e      wo            e      A            e 4 = = = = =        =
l O w O O a                                            i >- w                e      3 0 Q        e(    *(      )                          4      >= F          I      O            t ** Pg fi          40 M      *. >. >-                                      i      =( H          e      U            e-
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                      PAGE: 135 ISSUE NUMBER: 8-64                                    TITLE: DECOMMISSIONING Or REACTORS ORIGINAL      CURRENT              ACTUAL MILESTONES                                                DATE        DATE                DATE EDO APPROVAL OF DECOMMISSIONING - SECY -                                      09/84              --
09/84 34-354 COMMISION APPROVAL OF SECV-84-354                                              12/84            --
12/84 ISSUANCE OF DRAFT RULE CHANGE FOR                                            02/85              --
02/85 PUBLIC COMMENT                                                                                                                          I FORMAT AND CONTENT FOR DECOMMISSIONING                                        02/84              --
06/85 l
EXTENDED PUBLIC COMMENT PERIOD ON RULE                                        07/55              --
07/85
,                COMPLETE ISSUE ThANSFER MEMO TO RES (SRP)                                              01/86              --
01/86 l                REVISE DRAFT RULE INCORPORATING PUBLIC                                        02/86              --
11/86
,                COMMENTS PREPARE FOR RES MANAGEMENT REVIEW l
l                REVISE DRAFT RULES /PUBLIC COMMENTS                                          08/86            --
08/87 REVIEWED AND APPROVED BY CRGR 1535 FTR TO EDO FOR TRANSMITTAL TO COMMISSION                                      10/86            --
12/87 FRN OF FINAL RULE                                                            01/87        06/88                    --
ISSUE MEMO TO WRR TRANSFERRING                                                11/87        07/88                    --
RESPONSIBILITY FOR SRP CHANGE DEVPLOP MILESTONES FOR SRP CHANGE                                            12/87        08/88                    --
ISSUE SRP CHANGE                                                              01/89        04/89                    --
AS OF FYS8 OUARIER 2 N    N
 
e                                                                                                                    N es                      t                    I                                                    a N                        I                    e                                                    1w Q              O J                        6                    e                                                    it,        w    w
                      *)                      6                    i                                                    I e(        ns e b-i                    e                                                    i          e    a a                    e                                                    i cm F          es w                        i                    t          w                                          iw4w            7
                      >                        e                    t        wm                              H N
                                                                                                                            'M          1    D el                      i                    t      O                                            *i
* O *=
ee                    O                        e                    t > *( $                                  -
eOg
                                                                                                                                *F          e8 e          I                                  e                    8 g.          4                                                      ei
%                      y                        i -                  e O og >= w              0                          tw w            &
**                    O                        i e                  a w w oe st w
* 00                                    emOO            w
=e  to    >          M                        e      w0            s et .J m o n            MwFFU                      i 3- e(
% ri        s          >-                      e      ** w          : .a M qwa10                                          i F>a            6e t?)  **    M    O D                          ewpa                  eDF 0 1awMOU                                          8      M et    O O          a    D    .J                      t IMD                                      )>- w Oww                      i R ii w O > O                              i6JJ                  e twd O  ei> kO (# ) O O O .J                          B M A .J        O M    et  0                        i      MM            ea4Kt4r M =E D w                                      i                er w w        a w w                              i s4                  e      e O                      Uw                  'Oww a w I,1
>= O        CL    0 m              i          i      Dw            ew4N es U00g e(  e(                            i          eO                    e 1 O M .J es F W >*                            I 4 M M >*
O E                                i          i700                  e >=          4 et O Li >= c e k                O*O i          4 O 6.,s 0            t      3mO#*M&h                    be O        >* I A h in W                                  i          iMOJ                  t 6 M w **            *wwO            ha.      ** ewoO b                                  e          i >. D                e O ki M w 14.J ak N O                          DtMw O                y                  e i M .J f)            4      K .J U a 41 *( *4 w                      .J I O >=
                  .a                e          i nU#                t y dLwmOOO 00                                  OiMON M                e          iy#4                  e O >= a I a( b W M D* > P                      Oiwww
                  >=
* 8 OM                  e M E D H K h db X e -J 4                        w I w >- K U                e          iO w                  i O e( O              O      e- 0 4 o          a
* 0 4 >-
4                6          i      OO            e as .J            00J      CL # 0              NI          m *t i          e O at                a w (L w          g K et O w a                  1I .J W e          e i
a n;          e>
e > e m w er M t 7 m ( MO w =* .J w ietw m d*UO-
                  .J                e                  44 w                e          a .J        w        e .J ar        *J > m > a w *( w                41 1 ** e(
M w
e e
i w .J i&D e et et          . aOwQ1Aa
* W W * *e *( w O O H O O oiF4O
                                                                                                                      # i I *( H H w                    i          ewO>                  eM - tr ~ '                          Ms          4eUwp (3                      e          iOOM                s6                  v J        Ow>w                    e w .J O ee y                e          aFMO                  i                  e  't    i O
* e a)                          M O                  i          ea L                es.                    AMD                            i      't    J w    M                  e          6      0            i e                      ** O 3        >            8 .J IJ M si    o                  i eIMw                ss                  .- >0mw              is            e et .a a) 1      > U                      e          t *- I U            e            a      J a) > >= O                      8 h        4 w      *. g                    i          i .t r D            e ,i            ,, M          w>        c6            i .*
* ui
    >-                              i          e&          Q        e e i , F .U            Q4&W w                        ' (l& O O                              e          e      aw          e        14 O p W p cm a                              i Fwa
    >                          w*              4 1Q&                4 Q >
* i w ind .1 el .3 e                            t ** > (L e                            Je            e4                    iw            wMw              at w                an w e            awaO                      b        ) w .J .* > e            2            i 86 w w i>O>                  ,i        (# .J CL > k ins w *~                              Ow
    .J .J        **            M e                                        4                                                e O  O        O            >a              ieM                  i p O es si sk w o M O m                              i w et a  a        IL                e      wi          ee          iOM            y, O e *= ** no                        i 1w9 e  t-        a            >- i                  J et b          i ex O 00                4+e#U                      4 *- O D F  #        N            Ui          a e q ;J cm              i e>OU                  O .J 0 .J w                    i      * ) t, O  O        O            at e            i 1.J O              i U Je              w33wDIa                            a          i U  U        EL            ta e        O e a et w              e      t es O P- a M O sk O p &                      i      w4 m            e- e            io>w              0 F # O O p w w D w ** O
* 13 b  w        O            F*          Ue 4ww                    - M et U F .5 Eu a 7 sa 3 U                          i      t- p F  0        %            Oi              i                ~> >
p  et                      ue          0i                        +
A  E  U O                      *w        a                >.
* w  et  rm w                    ie        i                    i O  w as      b                  e)        e                4( t et .J                          i .,J  s' e                      i                                                    e p      .%*                      e **      .                oe                                                        t
    =( w  M    I
* et  ai                        n                                                    i 1  #        U        --      aw        i                Oe                                                        e e+                  O        8      O6                        e      w                                            i w    J w    .Ec                i O        i          >- w      iww            o                                      e D      *- a            m        i U    3 e e-          F1        e w et w                                              e O  Y  of    tu        M        $ .J      4 U w >-              t e >- w (2                  FO                      e O  4 O      %        O        i iw          1        e > O n. M                ar O r a                    i M  w        F        #                  e da        OO        e*a        p>          w w =*        *( F w          e
        >- # O              w        e (#)
* ee OD                e      w>= 0 F > > ** w dL CD                        6            O U  e O **              s6      e .(      iw w0                e      1 3 a M M w =(            J                  e M      M    O        &        s eab O O a            a      e n. 4        >wT      to bJ                e            to b  W >-      Pt        4        ew        6      76w          4 V                O O .J h e( w (Q .J                e w  M  et    >        -        8 0        e I *( et >            i      OOIww O .J D >=                              i            O X  q N **
* 4            >=              6 * ** # U 1 n. O s. M M Q :S                        e            -4 w  I  w    O        F        i a        iMOyO                i g MMOwMs4Ow eM                                      e O      e    N        et      i e4        i 3 w et u          e    o # # 7 ** w e-I M et                  wi
* en M    w        .J        ew        i u          .J      i y o n ,3 .J                          et >-        e      m es w a      U        CL        i  .2      iO**w                e 4 Miw          D10 a w EL d                      i J O    M                  i ew>Ow                6(D>-t)            Dh        UO1n                    i      *e ta) 6  ** w            0        i >        s a U ** 1            i - *( # em (k O wy>a 'p.                      Oa M  a w            y        eM        eD4>s                  i      t O go OP                O              > i          wO
        >*  &    O        >9        i O        e d& D                4 & R U ** O
* O >= w            #l          Q **
                            >-        6A        6 M b se 0            eDw ** et O e w e C O U                              i      M et                  i e( (L 2            i0006 3 e ec w EL et                                e      D&
a                    ewO **                eawpO                    sw e O F '3 w          . i          d'#
w                    6      2 0            4 0 mow es
* O      te_ Ui                et
                            &                    i M *i y D            e sL M ar a e es w 0 M O *(                    Oe >
0 ae eueC e .J eg we 0
                                                                      *-    >-  D e O et et y O
                                                                                    . U  w  U  w t.MMDOO
                                                                                                        >-  **    >-  O*
e a P.
O et  O4              e      k F 6.J        64        Q O O > .J w .J >                    Qt          p to es  >- i            eowdO                ewwa              www            M O .J m .J p >- M e( iO wa          og U                i U*              t # EL > O            e                                              we            .J F ee              >  et i            + =( O a ca          e              7mm            aaw              ui            DO
: p.              w  me              +          w          e              O O w U ba w mt e# et            we          OM N                  >- e                wAMw              6              Mwggv            O          O  we w p-ep 6            m    F e .J          i O W e *-            a      .J U H        u a .J M .J > 0          g i eU es py          n  O*F              i a( et O M          t      O w D e # e J .J            *( e 6      at a              w
                            #  U e dL          e e'          O        e    a m .J O 4 # (              # O 's            6 p@
at                            i et w J w a w g (d u.
i >- O#aw to M e- O                                  e        2 w k                                                        t11Ow N g ebaJ  MOH O O**co@ w et                    i 60 ee >- 0            F                    G .J K 4 O                                                    .J    w      4      M >=
e                O                    I    o                                                                    1      M U Q ain' M                    i  > r{ y U          i 6- U et k MK m3 e                    .J w0**0O2D(L      3.-                    O
: r. t      e                    iMwOM                e    w'5wwO wsMw                                    e sm O O
F              et e4 ieggOO O r. M *.          a to O w D i se 4 M O .J wDwCh7                      4 to 7 4 .g** et .
V O al er O e  M      h        M                      i >* t.4 M          l N a > O *( F O O t.J p e                          4          e(
w >- w O qw                                e "I et O .J        e e. 4 w M U to M M D- EL 16                          t awI co .: O n          O          i cm        awT      or        e .* w e M an i U >-                                  e000 1  U      et  w 1      ken              4 eg    >= w        6 Nt            Fe                        et D
g w M      #      ) e  M iO              i
                                                    > >- F, e i e
                                                                              >M aO1.eOOO 4.
O es      w w >-
I w e4 e
i.p) >.a e sk
                  .(        D  w i re            i wF                  i                V      M 3 7 w O .3 M      K .      4          6 to        e as g .. w          e F M w w w e-                  MO        Q          i y an O w >-
D F        g N
W i
6
                                                        .J
                                                        & M e.
Z        e O&He 5
t'i l O *-D O  i.J Uh >I ges s e.t. >          e 4
0 baJ O O          dh                    6        3            4            D i.J                                  i * " * *
* O O < <                                    .                    e    F F O I ki W >* JFM        U et M            * ** N n M  M    r    t. h>                    . .. O .boi          . O Q U p- w w 3 O w ol*                        . -
 
l T                                                                                              f-                                                                                        C}
J                                                                                                v                                                                    .                    J RUN DATE: 05/II/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                  PAGE: I37 ISSUE NUMBER:                    C-8                                              TITLE: MAIN STEAM LINE LEAKAGE CONTROL AFFECTED DOCUMENTS                                                                                        PROBLEM / RESOLUTION (4) STS CHANGES (TBD)                                                                                          FOR ANALYSIS AND/OR DISCUSSION OF CONTROL ROOM DOSES. THE NEED FOR INCLUSION OF SEISMIC EVENTS IN THE RISK ANALYSIS.
AND CONSIDERATION OF THE EFFECTS OF HYDROGEN DETONATION IN THE COMPONENTS DOWNSTREAM OF THE MSIV*S ON THE USE OF THE VARIOUS MITIGATION PATHS. THERE IS ALSO A NEED FOR SOME PART I00 AND PART 50 DOSE CALCULATIONS WITH TACT III INSTEAD OF CRAC2 TO PROVIDE GUIDANCE FOR THE REGULATORY APPROACH.
PROBLEMS INVOLVING THE REGULATORY APPROACH ARE Il THE CREDIT TAKEN FOR NON SAFETY-GRADE COMPONENTS TO MITIGATE THE CONSEQUENCES OF MSIV LEAKAGE AND 2) THE USE OF A TID I4844 SOURCE TERM WITH THE IODINE CONTRIBUTION MODIFIED FROM THAT GIVEN IN RG I.3.                    RECENT WORK TO RESOLVE SOME OF THESE PROSLEMS INCLUDES USC OF NEW DA A FROM THE BWROG ALONG WITH A NEW MONTE CARLO TREATMENT OF vfULTIPLE VALVE LEAKAGE.
REVIEW OF EXTERNAL EVENT ANALYS"S FOR BWR*S FROM TWO USI A-45 RISK ANALYSES AND DISCUSSIONS WITH PERSONNEL INVOLVED WITH USI A-M6 ON APPLICABILITY OF THE USI A-46 APPROACH FOR QUALIFICATI0W OF NON-SEISMIC EQUIPMENT TO GSI C-8. WORK ON                                        l THESE PROBLEMS IS LIMITED BY LACK OF FUNDS (APPROXIMATELY                                        l SI6.000 CURRENTLY AVAILABLE). THE PLAN AND SCHED',LE FOR '                                        t RESOLUTION OF THIS ISSUE WILL BE RECONSIDERED AS 'tRT OF THE MANAGEMENT REVIEW.
ORICINAL                          CURRENT                  ACTUAL MILESTONES                                                    DATE                            DATE                      DATE TAP APPROVED CY DSI DIRECTOR                                                              IO/83                                --
10/83 DEVELOP MINIMUM DESIGN CRITERIA FOR                                                        03/84                                --
04/84 ALTERNATIVE EQUIPMENT 'OR LOCA MITIGATION RECEIVE INITIAL BWROG SUBMITTAL                                                            04/84                                --
04/84 REVISE WORK PLAN BASED ON SUBMITTAL                                                        05/84                                --
05/84 REVISED WORK PLAN APPROVED BY DD                                                          06/84                                --
06/84 REVISED TA REQUEST APPROVED BY DD                                                          08/84                                --
07/84 AS OF FY88 QUARTER 2
 
OUN DATE: 05/11/80 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                  PAGE:        138 ISSUE NUMBER: C-8                                            TITLE MAIN STEAM LINE LEAKAGE CONTROL ORIGINAL        CURRENT          ACTUAL M I LE STON E S                                              DATE          DATE            DATE COMPLETE REVIEW OF LITERATULE SEARCH                                                08/84              --
08/84 COMPLETE REVIEW OF BWROG RECOMPENDATIONS                                            09/84              --
06/85 REVIEW PNL MODEL FOR FILLING. DEPOSITION                                            07/85              --
08/85 AND RELEASI PROCESSES IN EWR STEAM LINES UNDER LEAKING MSIV CONDITIONS COMPLETE REVIEW OF EFFECTIVENESS OF                                                  10/84              --
11/85 BWROC RECOMMENDATIONS COMPLETE REVIEW OF PRA STUDY OF DIFFERENT                                            11/84              --
11/85 ALTERNATIVES COMPLETE REV. OF: (1) BASELINE OFFSITE DOSE                                          03/85              --
11/85 CALCS. (2) THERM-HYD MCDEL., 13) ALT OFF SITE DOSE CALCS TO DETER EFFECTS OF LOCA COMPLETE REVIEW OF COMPARTMENT                                                      10/85              --
11/85 CONTAMINATION COMPLETE NUREG                                                                      12/85              --
06/86 ISSUE MEMORANDUM TO NOTIFY CRGR OF INTENT                                            07/86              --
08/86 TO ?UBLISH NUREG-1169 AND ISSUE A GENERIC LETTER FOR INFORMATION ONLY ISSUE TRANSFER MEMO TO DSRO (EFFECTIVE                                              08/86              --
08/86 AFTER ISSUANCE OF GENERIC LETTER)
COMPLETE REVIEW OF LITERATURE SEARCH                                                08/84              --
08/84 CRGR RESPONSE TO ISSUE GENERIC LETTER                                              09/86              --
09/86 AND PUBLISH NUREG-1169 NUREG-1169 ISSUED                                                                  09/86              --
09/86 CRGR BRIEFING                                                                      09/86              --
09/86 INCORPORATE CRGR COMMENTS AND ISSUE                                                  10/86              --
10/86 GENERIC LETTER TO BWR LICENSEES FOR INFORMATION AS OF FY88 CUARTER 2 O                                                                                O                                                          O
 
e
~    ]                                                                                                                                                                                                                    #%
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                              PAGE: 139 j ISSUE NUMBER: C-8                                            TITLE: MAIN STEAM LINE LEAKAGE CONTROL i
ORIGINAL                                    CURRENT                                        ACTUAL
;                                            MI LEST0NES                                                  DATE                                    DATE                                            DATE PNL DRAFT REG. ANALYSIS TO RES FOR                                                    10/86                                        --
11/86 COMMENT RES COMMENTS TO PNL                                                                    11/86                                        --
11/86 j                  PNL FINAL REG. ANALYSIS TO RES                                                        12/86                                        --
01/87 1
j                  RES COMMENTS TO PNL                                                                  02/87                                          --
                                                                                                                                                                                      .          02/87 j                  ON FINAL REGULATORY ANALYSIS f                  RES REQUESTED BWR OWNERS GROUP                                                        02/87                                          --
02/87 j,                PROVIDE MSIV LEAKAGE DATA
;                  MEETING WITH BWROG                                                                    08/87                                          --
08/87 l                  BWR OWNERS GROUP MSIV DATA TO DSRO                                                    05/87                                          --
02/88 MEET WITH BWR OWNERS GROUP                                                            05/87                                    04/88                                                  --
4 TO DISCUSS MSIV LEAKAGE DATA FINAL REGULATORY ANALYSIS TO RES                                                      01/87                                    04/88                                                --
FROM PNL                                                                                                                                                                                                      1
: i.                DRAFT CRGR PACKAGE                                                                    03/87                                    04/as                                                __
1                  CRGR PACKAGE APPROVED BY RES DIRECTOR. SENT                                          01/86                                    05/88                                                --
TO DIVISION DIRECTORS FOR COMMENT
!                  COMMENTS INCORPORATED. CRGR PACKAGE SENT                                              02/86                                    07/88                                                --
i                  TO RES DIRECTOR t                  RES DIRECTOR REVIEW COMPLETE. PACKAGE                                                03/86                                    08/88                                                --
SENT TO CRGR (29) l                  CRGR REVIEW COMPLETED                                                                04/86                                    09/88                                                --
i ACRS REVIEW COMPLETED                                                                04/86                                    09/88                                                --
,                  EDO APPROVAL                                                                          05/86                                    10/88                                                --
4 I
,i I
j                                                                                                                                                                                                      AS OF FY88-OUARTER 2 l
I                                                                                                                                                                                                                                -
4 1
                                                                                    -    _      _            _ _ _ _ _ _ _ _ _ __ _ _ _ _              _ _ _ _ _ _ _ _ _ _ _ _ . _                      ______,_______u__  ?__
 
i RUN DATE: 05/11/88
,                                                                      GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                  PAGE:          140 ISSUE nut 4BER. C-8                                            TITLE MAIN STEAM LINE LEAKAGE CONTROL ORIGINAL        CURRENT          ACTUAL M I LEST 0N E S                                          DATE          DATE            DATE FRN ISSUED FOR PUBLIC COMMENT                                                        05/86          11/88                --
INCORPORATE COMMENTS AND SEND PACKAGE                                                09/86        02/89                --
TO RES DIRECTOR RES DIRECTOR REVIEW COMPLETE.                            PACKAGE                    10/86        02/89                    -
SENT TO CRGR 153)
CRGR REVIEW COMPLETED                                                                11/86        03/89                --
EDO APPROVAL                                                                          12/86        03/89                --
FRN NOTICE ISSUED                                                                    12/86        04/89                --
4 e
4 4
AS OF FY88 CUARTER 2 1
l    0                                    -_                    _  -
e                                                            e
 
            )                                                                                                                                  j^                                                                                                                                                                                        %
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONIROL SYSTEM                                                                                                                                                      PAGE: 141 ISSUE NUMBER: HF 1.1                                                                            TITLE: SHIFT STAFFING IDENTIFICATION DATE- 08/83C                                                                      PRIORITIZATION DATE: 10/84C                                                                                                                                                              TYPE: GSI                        PRIORITY: H TASK MANAGER: D. SERIG                                                                          OFFICE / DIVISION / BRANCH: RES /DRPS/RHFB                                                                                                                                              ACTION LEVEL: ACTIVE              STATUS:
TAC NUMBERS:                                                                                                                                                                                                                                                                                                                RESOLUTION DATE 06/88 WORK AUTHORIZATION: MEMO TO H. THOMPSON FROM H. DENTON DATED 10/1/84                                                                                                                                                      "HUMAN FACTORS PROGRAM PLAN" FIN                                                            CONTRACTOR                                                                                CONTRACT TITLE NONE                                                              NONE            NONE i
W0R K                          SC0PE THE ISSUE CONSISTS OF TWO SUBISSUES: (1) THE "STAFFING                                                                                                                              CONFORMING AMENDMENTS TO R.G.                                                                                                1.114 AND SRP 13.1 2 RULE.          WHICH BECAME EFFECTIVE IN 1934; AND (2) THE                                                                                                                          WHICH ARE PE NDI NG j
STA TUS THE "STAFFING RULE" WHICH IS KNOWN OFFICIALLY AS "LICENSE                                                                                                                            THE GENERAL COUNSEL (OGC) FOR REVIEW. UPON OGC APPROVAL THE OPERATOR STAFFING AT NUCLEAR POWER UNITS' WAS ISSUED IN THE                                                                                                                          FINAL DRAFT OF REG. GUIDE 1.114 REV. 2 WILL BE SENT TO THE FEDERAL REGISTER (48 FR 31611) ON 7/11/63. WITH AN EFFECTIVE                                                                                                                        CRGR AND ACRS FOR FINAL REVIEW / APPROVAL.
DATE OF 1/1/84                                              REG. GUIDE 1.114 REV. 2 WAS PUBLISHED AS                                                                                                                    A PROPOSED REVISION TO SPP SECTION 13.1.2 WILL BE DEVELOPED AND FORWARDED TO NRR CONCURRENT WITH THE FINAL A DRAFT FOR COMMENT IN 1/87: THREE COMMENTS WERE RECEIVED.
THESE COMMENTS HAVE BEEN RESOLVED AND THE FINAL DRAFT ON                                                                                                                            REVIEW / APPROVAL PROCESS FOR REG. GUIDE 1.114.
REG. GUIDE 1.114 REV. 2 HAS BEEN FORWARDED TO THE OFFICE OF i
AFFECTED DOCUMENTS                                                                                                                                                                                                      PROBLEM / RESOLUTION g  (1) RULE: LICENSED OPERATOR STAFFING AT NUCLEAR                                                                                                                                      NONE 1
POWER UNITS (48 FR 31611)
(2) R.G. 1.114 (3) SRP SECTION 13.I.2 k
t AS OF FY88 OUARTER 2 e
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                  PAGE:        142 ISSUE NUMBER: HF 1.1                                  TITLE: SHIFT STAFFING ORIGINAL        CURRENT        ACTUAL M ILEST0N ES                                              DATE          DATE            DATE DTR COMPLETED                                                                  11/84            --
11/84 CRGR REVIEW OF DTR                                                            02/8S              --
02/85 ACRS REVIEW OF DTR                                                            08/86              --
08/86 PUBLISH FRN OF PROPOSED REV. 2 0F RG 1 114                                    01/87              --
01/87 FOR PUBLIC COMMENT PUBLIC COMMENT RESOLVED                                                      04/87              --
03/88 FINAL REG. GUIDE PUBLISHED                                                    06/87        06/88                --
AS OF FY88 QUARTER 2 O                                                                          O                                                          O
 
2 Y                                                                      -
J RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                              PAGE:        143 4
8 ISSUE NUMBER: HF 4.1                                                                TITLE: INSPECTION PROCEDURE FOR UPGRADED EMERGENCY OPERATING PROCEDURES (EOPS IDENTIFICATION DATE: 08/83C                                                          PRIORITIZATION DATE: IO/84C                                            TYPE: GSI                                PRIORITY: H TASK MANAGER: J. BONGARRA                                                          OFFICE / DIVISION / BRANCH: NRR /DLPQ/LHFB                              ACTION LEVEL: ACTIVE                      STATUS:
TAC NUMBERS:-                                                                                                                                                                                        RESOLUTION DATE: 07/88 J-WORK AUTHORIZATION: MEMO TO H. THOMPSON FROM H. DENTON DATED 10/1/84                                                                        "HUMAN                                                                                        ,
FACTORS PROGRAM PLAN"                                                                                                                                                                        i FIN            CONTRACTOR                                                                      CONTRACT TITLE NONE              NONE                          NONE WOR K            SCOPE TO DEVELOP AN INSPECTION PROCEDURE TO GUIDE                                                            PLANT-REVISED EMERGENCY OPERATING PROCEDURES.
2 INSPECTORS IN THE REVIEW AND INSPECTION OF
                                                                                                                                                                                                                                                                                                                                  ' $1 r
l STATUS WALK-DOWN INSPECTIONS BEING CONDUCTED. EXPECTED                                                        REQUIREMENTS ON QUIDANCE EXPECTED.
COMPLETION IN 6/88.                            FINAL REPORT IN 7/88 WITH NO NEW i
AFFECTED DOCUMENTS                                                                                                        PROBLEM / RESOLUTION NONE                                                                                                                            NONE ORIGINAL                          CURRENT                  ACTUAL M ILEST ON ES                                                                        DATE                          DATE                      DATE
                                                                                                                                  . ISSUE REVISED INSPECTION PROCEDURES                                                                    06/86                                --
06/86 (TEMPORARY INSTRUCTION)
I IMPLEMENT REVISED INSPECTION                                                                            08/86                                --
08/86
,                                                                                                                                  PROCEDURES ON TRIAL BASIS
                                                                                                                                                                                                                                                                                                                                    ' h AS OF FY88 QUARTER 2 i
1 .
1 I
5 a
4
 
l l
1 N
ac l
W W
e.
                                                  =t 8
en                                                en ee                                                eo N                                                  >
M        d                                        w M    wp  CL        i
% or    o
* w in  M  w    .J    a                              C o        =    at w i D >= t e        e        a      e M    h44 i            e        e      s  4 w w      w    UQs
> 0      cc  at    t 4 4      3          6 Q CL    Q          i w
2        U D        C cc      et CL O
2          i M    H    e
        >-  2    e 4    w w e en        so      e      se Cm  oc > a se      so      ao      es w    cc 4 i N        N        N      N CL  3 0 e er        e        e      N O    O eo            o        o      o e
        >          a O
2 w
0 I  Cr w  w w  X          e v  w    w    a
    >        at    e O  O    2 win          N        N      ed w    M-    i ao    ao      so      ao w  Q    Q a( l N        N        N      N O  at  Moe ri          e        e      N ac  Cc  o. eo      o        o      o M  O    O      i 2  CL          i O  D V
o
    -  O 2  w W
w  or o  D          e 4  O          e 2  w
* t v          e K  O          e 0,          a w  a          e D              i e    2          i O  O          iw M  o-o        aO                    O
        >=          eM                Nw U  U          i >          M    O M  w          aw      N2      M2 cc  CL      O e oc      OO      QO w  O          4        MM      OM 2    2      weO          C0      MM w  M          i >-    OM      oc M O          2s          MS      W>
t M      Oc w    CL w w      Oiw          w at        oc
          .J        i e      o.        oc
        >-      >= s 2          L    ow w            I et    oc Q    wQ
        >=      me10 C iOw w2            M2 Wi        et    o    wO e>D    0M        cc M J e oc O wW          DH s4w 0:O          OO M eeO Dw              ww    w eeO    00-      Ua    D E i w at w0            0M    O e U CL  v2        ac 2  m aw      QM        CL M  M e22 oc a    o cO        HO    *-    '
tww        w    2w      D      I i>-> 0DO wD              o    !
awU C 2 CL        32            j l
e        e .J w    JMo wM - W ias w .- w        W-a e
          =f          iEO      >2      CL 2 CL O eO2 woo Xoo              .J w            aUM QUM Muw U Z
oc w
3.
D M
I 1
l
 
p                                                                                                                                                                          /m h                                                                              )                                                                                  G G                                                                                  s                                                                        -
RUN DATE: 05/11/88        q GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                        PAGE:  145 ISSUE NUMBER: HF 4.4                                        TITLE: GUIDELINES FOR UPGRADING OTHER PROCEDURES IDENTIFICATION DATE: 08/83C                                  PRIORITIZATION DATE: 10/84C                                        TYPE: GSI                            PRIORITY: H TASK MANAGER: D. SERIG                                      OFFICE /DIVIS' ION / BRANCH: RCS /DRPS/RHFB                        ACTION LEVEL: ACTIVE                  STATUS:
TAC NUMBERS:                                                                                                                                                          RESOLUTION DATE: 06/89 WORK AUTHORIZATION: MEMO FOR H. THOMPSON FROM H. DENTON DATED 10/1/84 "HUMAN FACTORS PROGRAM PLAN" FIN                            CONTRACTOR                                        CONTRACT TITLE b236b                            Phl            hkVktbP bbfb hbk kNb RkbbLkhbRY kbTkbN FbR BPS k kbPS                                            .
82966                            PNL            DEVELOP GUIDANCE & REGULATORY ACTION FOR OPS & AOPS I2005                            PNL            DEVELOP GUIDANCE & REGULATORY ACTION FOR OPS & AOPS WOR K        SC0PE RECOMMEND IMPROVEMENTS IN NUCLEAR POWER PLANT                                                    NECESSARY FOR EACH TYPE OF PROCEDURE BASED ON OPERATING PROCEDURES AND DEVELOP AN IMPLEMENTATION                                                A CONTRACTOR INTERIM REPORT AND INDUSTRY PLAN FOR UPGRADING OPERATING PROCEDURES NRC                                                      INPUTS WITH RESPECT TO COST AND BENEFITS..
WILL DETERMINE THE AMOUNT OF UPGRADE EFFORT ST A T US HS ShbhhkSTRkhhFERREbFRbMNRR kbkEShkhH Hk                                          hRR WkRbEb kN kbbkhkbhkL CbN R Ch Tb Phl kh 3bNh [98h hb 4/12/87 NRC REORGANIZATION (4/10/87 MEMO FROM W. RUSSELL                                          CONDUCT THAT ANALYSIS UNDER FIN I-2005.                                RESPONSIBILITY FOR TO T.        SPEIS). CONTRACTOR EFFORTS ON FIN B2360/PNL AND                                    THAT CONTRACT WAS TRANSFERRED TO RES BY NOVEMBER 16 1987 FIN 82966/PNL WERE COMPLETED AT THAT TIME. NUREG/CR'S-                                            MEMORANDUM FR0f t L . RUTH TO H. KALTMAN.                            RES IS IN THE 3968 AND -4613 WERE PUBLISHED IN FEBRUARY 1987 AS A                                              PROCESS OF DETERMINING ANY NECESSARY SCHEDULE AND BUDGET i
RESULT OF WORK UNDER THESE FINS. REVIEW OF NUREG/                                                ADJUSTMENTS.                  PLANS FOR ACTIVITIES BEYOND THE REGULATORY CR'S-3968 AND -4613 PRIOR TO THE NRC REORGANIZATION                                              ANALYSIS WILL BE DEVELOPED WHEN THE NEED FOR THEM IS INDICATED THE NEED FOR A REGULATORY ANALYSIS OF TH'IS ISSUE.                                      CONFIRMED.
.                                                AFFECTED DOCUMENTS                                                                                PROBLEM / RESOLUTION POSSIBLE REVISION TO SRP SECTION 13.5.2                                                                      PNL SCOPING ANALYSIS INDICATED NEED FOR GREATER SCOPE.
RHFB INVESTIGATING PEANS OF PREVENTING OR MINIMIZING i                                                                                                  SLIPPAGE DUE TO INCREASED SCOPE.
TASK MANAGER DIVERTED TO PJMAN FACTORS RESEARCH PROGRAM AS OF FY88 QUARTER 2
 
RUN DAYE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                            PAGE: 146 ISSUE NUMBER: HF 4.4                                                              TITLE: GUIDELINES FOR UPGRADING OTHER PROCEDURES AFFECTED DOCUMENTS                                                                                  PROBLEM / RESOLUTION PLAN          RHf B INVESTIGATING WHETHER DEDICATED TM CAN BE ASSIGNED ORIGINAL                      CURRENT                  ACTUAL M I LESTONE S                                          DATE                        DATE                    DATE PUBLISH FINAL REPORT ON OPERATING                                                        12/85                            --
02/87 PROCEDURES PROJECT AS NUREG/CR PUBLISH FINAL REPORT ON PROCEDURES                                                      05/R6                            --
02/87 INTERFACE PROJECT AS NUREG/CR CONDUCT REGULATORY ANALYSIS FOR                                                          02/87                        09/S3                          _-
OPERATING PROCEDURES, ABNORMAL GPERATING PROCEDURES CLOSE OUT ISSUE                                                                          06/89                        06/89                          --
i AS OF FY88 QUARTER 2 f
9                                                                                                    O                                                                                    O
 
l                                                      \                                                                                                                                                                                                                  f    \
G J                                                                                                                                      'wJ                                                                -                          ;
RUN DATE: 05/II/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                      PAGE: I47 ISSUE NUMBER: HF 5.1                                                                                          TITLE. LOCAL CONTROL STATIONS IDENTIFICATION DATE: 08/83C                                                                                  PRIORITIZATION DATE: 10/84C                                    TYPE: GSI                                PRIORITY: H TASK MANAGER: L. BELTRACCHI                                                                                  0FFICE/ DIVISION / BRANCH: RES /DRPS/RHFB                      ACTION LEVEL: ACTIVE                    STATUS:
TAC NUMBERS:                                                                                                                                                                                                          RESOLUTION DATE- 09/90 WORK AUTHORIZATION: MEMO TO H. THOMPSON FROM H. DENTON DATED 10/1/84
                                                                                                                  " HUMAN FACTORS PROGRAM PLAN
* t FIN                                                        CONTRACTOR                                                                CONTRACT TITLE 39bh                                                      bbl                        LbbLbbbhRbLbhkkkbbb I
l WOR K          SC0PE hHE FhRShbbk[bF hHbhbhK kb b bE hRkkbE kHERkbK Tb                                                                                        V  LbE/kkPkb kNklYbhb hhl bhhbhkkbb                              bNkLhbhK b i
PUBLIC HEALTH AND SAFETY RESULTING FROM HUMAN ERROR AT LOCAL % RESOLVE THE LOCAL CONTROL STATIONS ISSUE. THE OBJECTIVE OF CONTROL STATIONS WITHIN A NUCLEAR POWER PLANT AND THE COST                                                                                            THIS WORK IS TO DEVELOP A REGULATORY GUIDE ON LOCAL CONTROL OF POTENTIAL MODIFICATIONS.                                                        THE METHOD TO TO DETERMINE RISK (/) STATIONS AND REVIEW GUIDELINES                                                          THE  FOR EVALUATION OF LOCAL IS THROUGH THE USE OF PROBABILISTIC RISK ANALYSIS (PRA).                                                                                              CONTROL STATIONS.
FOR PLANNING PURPOSES. WE ASSUME THE RESULTS OF THE l
(
ST A 1 US l                                                    BY LETTER DATED DECEMBER 29 1987 THE SOW WAS                                                                                              AUTHORIZED BNL TO BEGIN PROGRAM.
l i
FORWARDED TO BNL.                                                      BY LETTER DATED MARCH 25 1988 NRC
(
AFFECTED DOCUMENTS                                                                                            PROBLEM / RESOLUTION I.      A REGULATORY GUIDE ON LOCAL CONTROL STATIONS.                                                                                                NEW TASK IDENTIFIED WHICH MAY DELAY COMPLETION.
: 2.      REVIEW GUIDELINE FOR THE EVALUATION OF LOCAL CONTROL                                                                                        THE PROCESSING OF THE CONTRACTOR TOOK LONGER THAN STATIONS (MODIFICATION OF STANDARD REVIEW PLANI.                                                                                              EXPECTED. RHFB IS INVESTIGATING MEANS OF PREVENTING j                                                                                                                                                                                              OR REDUCING ANY SLIPPAGE.
I ORIGINAL                    CURRENT                    ACTUAL l                                                                                                                          MILESTONES-                                                                      DATE                      DATE                        DATE bEbibV[bk/kkPbhShbbYbF [bbklbbbhkbl                                                        Chh88                      bhh8h l
STATIONS i
[                                                                                                                                                                                                                                                                  AS OF FY88 OUARTER 2
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                PAGE:          148 ISSUE NUMBER: HF 5.1                              TITLE: LOCAL CONTR01 *TATIONS ORIGINAL        CURRENT        ACTUAL M ILE S T0N E                'a                            DATE        DATE            DATE COMPLETE VALUE/ IMPACT STUDY                                                  07/88        07/88                --
NRC C0t:PLETE REVIEW OF STUD, RESULTS                                        09/88        09/88                --
ISSUE S0W FOR DEVELOPMENT 6F REVIEW                                          11/88        11/88                --
GUIDELINES AND DRAFT REG, GUIDE COMPLETE DEVELOPMENT OF REVIEW GUIDELINES AND                                09/89        09/98                --
DRAFT MODIFICATION TO SRP AND DRAFT REGULATORY GUIDES REVIEW OF DRAFT REG. GUIDE AND DRAFT                                          11/89        11/89                --
MODIFICATION TO SRP BY DIVISION DIRECTOR REVIEM OF DRAFTS BY OFFICE DIRECTOR                                            12/89        12/89                --
REVIEW 0F DRAFTS BY OTHER OFFICES                                              12/89        12/89                --
REVIEW OF CRAFTS BY ACRS                                                      01/90        01/90                --
REVIEW OF DRAFTS BY CRGR (29)                                                  02/90        02/90                --
FINAL REG. GUIDE AND MODIFICATION TO SRP                                      04/90        04/90                --
REVIEW OF FINALS BY DIVISION DIRECTOR                                        05/90        05/90                --
REVIEW OF FINALS BY OFFICE DIRECTOR                                          06/90        06/90                --
REVIEW OF FINALS BY OTHER OFFICES                                            06/90        06/90                --
REVIEW OF FINALS BY ACRS                                                      07/90        07/90                  --
REVIEW OF FINALS BY CRGR (53)                                                  08/90        08/90                --
ISSUE SRP MODIFICATION AND REG. GUIDE                                        09/90        09/90                  --
AS OF FY88 OUARTER 2 O                                                                          O                                                          O
 
e                                                                                                                                Q                                                                                          sy RUN DATE: 05/II/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                        PAGE: I49 ISSUE NUMBER: HF S.2                                                  TITLE: REV. CRIT _ FOR HUMAN FACTORS ASPECTS OF ADV CONTROLS AND INSTRUMENT.
IDENTIFICATION DATE: OP/83C                                            PRIORITIZATION DATE: 10/84C                                                                                        TYPE: GSI                    PRIORITY: H TASK MANAGER: L. PELTRACCHI                                            0FFICE/ DIVISION / BRANCH: RES /DRPS/RHF8                                                                          ACTION LEVEL: ACTIVE          STATUS-TAC NUMBERS:                                                                                                                                                                                                            RESOLUTION DATE- 05/91 WORK AUTHORIZATION: MEMO TO H. THOMPSON FROM H. DENTON DATED 10/I/84, "HUMAN FACTORS PROGRAM PLAN" FIN                        CONTRACTOR                                                                                                                        CONTRACT TITLE A3967                        BNL                          ANNUNCIATORS WORK                                                        SC0PE
    -------__-----------_-_-----_------------_-__---------------------------------------_------_---------------.---------~~_-----
THIS ISSUE COMBINES THE ISSUES FROM THE HUMAN FACTORS                                                                                                                      RESULTS FROM A PRA WILL ESTABLISH THE MAGNITUDE OF THE RISK PROGRAM PLAN OF SECTION I.S.2                                                                                                                                              INVOLVED AND THE POTENTIAL REDUCTION IN RISK EXPECTED. A (A) COMPUTER AND COMPUTER DISPLAYS                                                                                                                                  VALUE/ IMPACT ANALYSIS WILL ESTIMATE THE COST OF POTENTIAL (8) EVALUATION OF OPERATOR AID SYSTEMS                                                                                                                              MODIFICATIONS TO ANNUNCIATORS AND SERVE TO DETERMINE IF THE.
(C) ANNUNCIATORS                                                                                                                                                    NRC NEEDS TO DEVELOP NEW REGULATIONS TO RESOLVE H'JMAN (D) SAFETY STATUS INDICATION AND APPLICATIONS OF AUTO-                                                                                                              FACTORS CONCERNS ON ANNUNCIATORS.
MATION AND ARTIFICIAL INTELLIGENCE.                                                                                                                                WE ASSUME THE RESULTS OF THE VALUE/ IMPACT ANALYSIS A MANAGEMENT REVIEW OF THESE ISSUES RESULTED IN A                                                                                                          WILL REQUIRE ADDITIONAL WORK TO RESOLVE THE ANNUNCIATOR DECISION TO RETAIN OPILY THE ANNUNCIATOR ISSUE AS A GENERIC                                                                                                                ISSUE. THE OBJECTIVE OF THIS ADDED WORK WILL BE TO EVALUATE ISSUE.          THIS DECISION ALSO CONCLUDED THAT THE REMAINING                                                                                                          ALARM REDUCTION TECHNIQUES.      IN EVALUATING ALARM RfDUCTION ISSUES BE REASSIGNED AS RESEARCH ISSUES.                                            A RESEARCH                                                                            TECHNIOUES. WE PLAN TO USE THE RESEARCH RESULTS ON ADVANCED PROJECT ENTITLED "REVIEW CRITERIA FOR HUMAN FACTORS ASPECTS                                                                                                                ALARM SYSTEMS CONDUCTED AT THE HALDEN PROJECT.        THE RESULTS OF ADVANCED CONTROL AND INSTRUMENTAION." FIN 80852,                                                                                                                        FROM THIS EFFORT WILL DEVELOP GUIDELINES ON COMPUTER-BASED ADDRESSES THESE ISSUES.                                                                                                                                                    ANNUNCIATOR SYSTEMS.      THESE GUIDELINES WILL SERVE AS THE THE GOAL OF THIS WORK IS TO DETERMINE THE RISK TO                                                                                                          BASIS FOR A MODIFICATION TO THE STANDARD REVIEW PLAN AND FOR 4  PUBLIC HEALTH AND SAFETY RESULTING FROM HUMAN FRROR IN THE                                                                                                                  A NUREG ON ANNUNCIATORS.
USE OF INFORMATION FROM CONTROL BOARD ANNUNCIATORS. THE i
1 STA TUS
  -------------------------------------------------------------------------~~----------------------------~~--------------------
A S0W FOR THE VALUE/ IMPACT STUDY EXISTS.                                            BY LETTER                                                                        PROJECT AND BUDGET PROPOSAL FOR NRC WORK (NRC FORM 189)
DATED DECEMBER 29 1987 THE S0W WAS FORWARDED TO BNL.                                                                                                                        RECEIVED MARCH 7, 1988.
1 4
AS OF FY88 QUARTER 2
 
N h
a                                                                                                  w e                                                                                                  W e                                                                                                  a.
                  *                                                                                                  *(
m
                  ;                                                                                                  b i
eo                i                                                                                                  M to                e                                                                                                  N e                                                                                                  >
.N.e              I                                                                                                  w w    O            I                I N c              eO                i                                                                                w e    og  >=      s2          J    e                                                                                o O        2        I w        at W I eo        p >. e e      i    e    i      e    s    i  e    i    e    i  e  i  a  e  i    i M i3        w ar i i      e    i    e      i    l    i  e  i    i    e  i  e  i  e  i    t at w w              i4        00i 9    0  oc      iV        4      i et  et  >-  2i                    e O Ch    O    O i se                e z    w 2        w    v. iIse  N O            D.%
u        g    .J e N Oin et  B5 wiF O    su e o                I
        .J  %i            >= i o    Isa            2      e w        -
a    wio            wwi=          so = m e O                  O O O        O O o        O  O      -4
        >+    J s >=        gr > t to    to  go  80      M  e G @ mm                @  @  mm      @  MO Z    {D i Q        a. at i N N            N N N N N N N N N N N N N N O    O i et        3Qt es e          .N* .* m == to            @  N    00  m  Ch  O N ** N N O    a. I a        V      iO O ** O O O O O O O                                OO      w  -g  O O      O EL s>                i
        >        iR                i O        io st
                  'e U k        i[
I  O        eo w            i a:
    >=  0        iw                I O  >=      a          J    e
    >  U        i 0 4L    at    i O  w        i ww      2wiw w oo so e &                          O  O O      O    O  O  o O O O          O CL      8    >J    w ** i se    e6  80  se      ed ee    O  @  @    m m e        @  @  @  O    @
J M        i-O      O of i N N N N N N                        N N N        N    N N N N N N N o  et      i w        woiN >=            @    oa    =* == **      *t  e    @    @  A  ** C ** N N Q.            I VI      a. iO    O O      w      O "      O  O Q      O    O O O      w  ** ** **
    >. e        i ww      o i F  a
* 06 7            e C,  o        I    O u  w        eei o        e so
    >. 4        i -e N 2  6 w
1    2 w    4 0    1                          I et  O      i                  i 2    I      e                  i et            i                a 1  a        e                i o        e                ie              r W  w        i                ia              o D            i                io              -                                              O o            e                is        e >-                          a                      w w e  >-        i                i4        >- et                                                a. o w  -        e                iw          .J  n                        o.
p    n                p w w
: a.        i                su        D    .J                      U o                    a u o O  U        e                i2        O    *I                      w >= 0                    w >- O w            I                eD        w >                            A    O w              w  at  O w or            i            eir            a w                            w  w v                .t  w  w v w    >        e                  i2                          >            Q a; ><                E O ac      w Z  w        e            W i et          > 2                                m u          -= w        >* w w
0 au        i 2iw i
p    o J w >    >
9>          2 o u O          o e w ro a w o e                                                                              N D 0 0 J QO e                  iO  O >+ >=                            be    LJ          ==      wW w        i            oe                                            O O        a.          Q:=
                                                                                                      . 0 U      a,
          .J      i                  e> b            D b- F                  i-4  w    LJ  O &    et w >< w
        >-  Oi                w6 0 O w o O O                                >  w    I oc 0            > w I w    >= i                    e3        o w              >= 7        w    w w o cr 2 w w e
        >    2i                M19        >          a E        k    o O O O o              *t  O O O O O wi                    iO O 3                  o O w w                                  w l            Wi        et    w I w D >- >= > > > > > >= > > >
[t J                      e*  (L  w a
* O ** w to to to co to q co cc to oi oe J$0 I > < U w 0                          -J                        u i et w w w a c' N a J  D a ** a M M M e                        w e o e oi                                      *t    o        w I    b-    >- >- >- M.> w J a .a i  -              ir w                  w I >< o w w w w w w                              c  .t 0i          o    Iiw D M              a' at a-            U .I < =t .c .c o 2 x z wi          w          iN    J w O                *t          cu e: oc at        a-  O w w w si          2          iw < >- w I                .J      O o o o o o I w w w oe **                  io > w
                                                .a 1 4 a at          w
: n. w w w a w w                o, a w w wi          I          i .J w e 2 oc                Iq w      o. b _J w a p o o o o o g o o o wi<w                    i>  b-w o X o        .t  s w
O  2                            a N  4 ' CL w ab            i i2  _J  U w R 3 3 3 3 3                  3 3 3 i                                              .J  >. H w w w w w                .J  w w w i o                is    et        a w        a. w w w w w w w or                  w w w e        e3                  iO r u o O I .* < > > > > > :d > > >
eww                iw 6 a o w o er as w w ikw w01; w GLw w w w w          i w Q3            i (D Q 2 m CD Q Q Q                                    06  tr w    G6  k Cr I        i>
iwo e ag w a    ==
tu        so w          i ok O cu        I tw
          )J        iOa i #R I
i 2        e 4 of                                                                                              i i>                                                                                                  i w          I M *t                                                                                              '
D          i o        e == =
i  *4 N 0.e k        I ww i
l
 
9                                                                                      0                                          1                  9 RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                        PAGE:        151 ISSUE NUMBER: HF 5.2                                            TITLE: REV. CRIT. FOR HUMAN FACTORS ASPECTS OF ADV CONTROLS ~AND INSTRUMENT.
ORIGINAL        CURRENT            ACTUAL MILEST0NES                                                      DATE        DATE              DATE REVIEW OF FINALS BY ACRS                                                              01/91        03/91                    --
REVIEW OF FINALS BY CRGR 153)                                                          02/91        04/91                    --
ISSUE SRP MODTFICATION AND NUREG                                                      03/91        05/91                    --
e 4
4 4
AS OF.FY88 QUARTER 2
                      '                                                                                                                                    =          *.
 
N                                                                                            N m                    t                                                          I N
* V        i 9        k e
* Ot              0        i O        w o                    i                              3          www          i            *
                                        *                        >            O >Om              a  FM      &
                                        '        O      *
* N204 0                  6  Om      4 w
* Wha              022          M2MEO              i  MN      D
                  >                    e        22w              >Ow      >gwrDa                e  ON      O 4                    4 4WO                ME    ks3MMA                i>O w
#                  O                    e ZWE2      M EOw      Mwb2>                        eUM2
=        I                              iwCMAADM E                JO-      DasM4>                iMvM        =
N                  F                    I I2              e4      M M eg    R    J em              eJI        >
w M                  O                    8H4EWQW      m    I  I  H  N  at  O  O J 2 >            4 0000 M  N    >        M                    t      MOOmwo UEOmMJwdWO                                  I AUww N O      H    - >                      twwzOw4XO                    V e o MED                    4      >a  w 14wCO O -UFMPI        -3wo A  M    M  M 3                        ICAkE            Hm                                                  O O        a -s    J
* O      J      M4        U C              J2          i  Ind O > 0                          tIUw 4 3                    (M - 2HwAM                    i  Haw    O M  4 0                      eMO>        I        3 % JOOO26E
* a>  4 Ww        a > w                        em Meks mJ mACMw w4MJ                                      4004w H  O    A M a                  a      eDwOwCOOZ OOA wwIk                                J        tJe O 6J O 4 4                              I      ICIEMwCH                  wa kwmwe>4 O A                              e      awwwa mza                    wMww4>            mm          ewo4w i      es    >HwAMC              N>Mmm          (www            tHw3m n                                a      ew      MM>        JM wwIEmMMIO>w                          100 D                                e      02                                      weWDOU            i EQW u            w e      tOJ    WDMwaI OOu            mOHwUOs M
O wdM>
o 2
                                                                                      'Z w d t>34D ted e      i    40222>
M                  i      i +%MMw(RO                    >    03>UMMH2                e    a-    t
              >                  e      tMMw H242                  N    w      MM2      4w      400=
U 4
e e
tX2WaxWE4 s4M www NOUF2HJWmD>
w2OOOOKOJ2 4Hw44 i      M i      emEwI ZHw Jeg                        M4Aw><M              I EMMH i      iO    a>OM40              MUEEM            >M>q          IJ4 I4 J                  e      eOwdOOg 4 mwwoMMw42WE                                      I M3NI w                  e      iam            EOJ                                        i r er
              >                  e      14    000 wa              A  m -MM MI MMEM          Hef r 'Gx2H      IUwe U>O M  w                  e      e C Z F e* O                  OMM w                        e O    d                e      6 w e 4 et        20 w gM 0 6 > C =14                    e    2Uw 0
F e      50          C O'st 2 NOEEQ400H                    MA J    eO4ww 200 e      iFO>Mww1M 4t E I                            M            i O                  e      e4wswaOUM Q32OwaJJO2                                      eEwww w  M                  e      1 2Owwa>            4          OUIeMOwWa                SOM        a a  H                  i      swpOmMJJW Ku                            =>AZXw            142NM E    > U                    i      s>DM>D44                  Jwww        >O      Owl                No w
W E
          > 4                    i 6
e2%320ZMOOO42I i w      Dw492w2Wws -wAIO4A JkwMkD                e i w "4 &
sNEME O 4                          e      set w > O n        20>40%            =2Abwp                t w        O
    > h                      we        I Emausp>4M4m                  WO4wd kOMO2                t  e?
O O                F    d i        I    w4    .J . WMO                                    I M O O' OM O                O    *a        i w 3 > m p 44.s4 H E {. HetW M        k Mm2OO>M              e      me J a      O        M    M i        t >      wJ        ONMw>>OI DO wu>                        t    >    M O a      w        0    p s        eMawI ODMEE OwAUMwMMO                                      eN2m v
* w a
J O
M    H i e  wsHEOw>20FM e 2*14COM            *C    >O>as
                                                                        - Op OUpda 02Moa 6
e NwwI Emo V
P U      N              Ui      (L ewma 2 OtS O O m .J U =t > ' M et > A E                    t .JwEO O
U 2
4 O
a I
O 4 I mi t >Oww        2de2 Oswo>EwwMOM wJEwwEO*w JM3UMEDM                  M      6 MWw skqvw J      J        V    M e        saaOOmoOww HOOO@OOUIE                                  Ot A>wI
* J      Q              2e      VeAAUOMMOmm                      OAw= MUM 4WO                1400H 2 M      N        >    Os        i                                                      De w w                a    Os      Oe                                                            i I > U a            C4        e      e                                                      k i w a w a            >w        s      e                                                          t O D  #  2        46        i      i                                                      4' 4 O  N            JM
* to                                                            I y    O            D        e      6                                                      k iw 4 O  M  1        Q>        0  at                                                            i I 2      U        wa        i
* eiw 4      2        cL 4      i  Ci                                                            eOY w    w 4              D    i      i O                                  8 4000 D w
* a            ar        i  3ei                        O          10              J      er      kw e U 4 m            44        i                              Oh        br        w      q). iar >
O 2 O    N        wM        e      *      >                Om        I        O
* Ow4 M 4      2        a        e      i um                      >      Oww 24 a                6 wMwO 2 Z O            VI        e      e aw Q ti            me        w D>
C M w'    4 pO      9004 O w O    M        D        e      e    NO    2E wCD                          sO26          i    M*O M H  M  O        rw        i swd3 (w JOwQ                      w    NUJM4              sOMOX a 2 >    M            U    e
                                        *UDO                      k      (w22M            w      es e W M  4 >              2    0 8 2O2 Um            W@M          MUW4WW >                I J    W 2 et  N  M        04        i      e42M*ko              J2            M2>2>m          et    I DOI w I  M  O            Q    t      eZM      22a CowW                    gwwaw I              400*>
0    -  N        DM        i aw kw A              MMC 2 wra-DIa                          iw        m M  w        l D      I      i>OMEw                  H    4 Ia4ZOHOO                    6 mwd W  a O              O    I      1 2Hwwow wdOJ NO                          M      Ok      i Iww J  O  M          -
4      eM    J>      I I004                6>*                  twHHU H  M  w        MO        ew    e et a V O
* k      >2w          >AJE(Ohm  244g          a1 U2 M  N  6            2    e 2    t ECDak                    2A WWW MI                s    t > O w at
      > a O            wM        to    e    >2A4W          w w            A40 HwD                i em2 D2        e2    IHD      Ea>        2 >          w MWh UO                40 Mw O .2 s et m W M J        M    M      UEUAMO2w                82>O%
01              eIMIewo 6094 2 W w m 4 w at                                i MZ      Z Ma              ik=HwIO              wwu          WHAC432w                sew 2M A            i    b    JHW ORWm MMO6WOwk                                IMOOq e22Iw m                    w4 m>wamIs4                    sk ME
                      @O    =I        e 1 C L70 2          016w          WO=w        O2          6000 m2    Ot        450.0 00 powJ A                          AC MO            se402 w4    si        I I 06 e                J U MOWI Z M et s                  tw3HO U            O    si        iOwrOO                twwD wwu>M Er                        so v m
M e%
00 et t
                            = 0 t    2>
4W(d>OMMWWW 2>          >IZ          Q2 daw C44mDMk 4
MkW l&MO2 N er        wM    H  'W    4>U4kM4              >O O 2=2WQ42A                          t w UW w 2          ad          M    e4M wwOww w2 Mown I4                                        saw I O  M        DO    2'o Ot        t Iw MOOON E4W4U>d>
                                                                  +M      HwW o ' A JM            e40ww J        2a    Os2        i    M                            MO2ma AM                ta4IF 4    N                    B0204 UIwkDO                      E    MAQw o              e  194 m w 1 N                          IMOE>OwAMWJM                      ww(EmO2K M              # 2A >
          > b c F                      sJMw w2 mudA ACEMm                                          ic        O w  et      e O                  IDMJ4D 004>E O                              WM w          eME I O          O  M                80 m Zw2 OwM                        kwO        >>J        iOOw>
0 I      H                twwCOMkw                          uvoz2JsM                iOwmu 2            et              i k mm wk 4 k -+2 Q2 O2 4                      DMT        I M    OM o            N                e      AI2        DMMzM            wW        043        t EMMJ A  M  =        M                IMO      MobOM 4                  OQU=    wM              I E2 O w w w O m                        e    kbMUm              w Mw304WImm                        IOt 4 m 4 O E          O        l      tw HJ HOWU 'WUwWJU                              4        I UJN
      )                                IOOMO                                                          AN4 J U    42 w 'I >      RI W                                                20 MM            t M                  M t 2      6 4 w d 4 0'O  D Mwa(  d2*tOw >" 24M> aW W 4 2    aw      ew            I 2  6  *(      D    weO        I IDM*AOw22UWZW ZZMOMU                                      t IWho M  E    . 4        e2    iA2mO42MAWM4wkIWWO2>M                                      iMIwo w H          2                    i    M et w a M k      HHMW        O HDM H                e  uma      i D 2    X        M                e    HM    Q 2 ZUw2 MI2dHWQ                                4      OW O w O O          k                i    EJOOWw            M4MM        I > M O O Q st        I  pH>
M O 4 4          O                e    OwetgIO gm2$                      042wMa              i 2Ow M  M  H    H  4                6    vaIA-M            EaME      4mEMH34                  e  400 l
l l
l
 
    -                                              .~.              ..            .        _            _.                              _  .                                                                      -
l                                                                                                                                                                                    RUN DATE: 05/11/88
                                                                                                                                                                                                                        .t l                                                                                              GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                  PAGF:        153 ISSUE NUMBER:                    HF 8                                            TITLE- MAINTENANCE AND SURVEILLANCE PROGRAM I                                                      AFFECTED DOCUMENTS                                                                                      PROBLEM / RESOLUTION
;                NONE                                                                                                            NONE i
f                                                                                                                                ORIGINAL                        CURRENT                    ACTUAL j                                                                        M ILEST0NES                                                    DATE                        DATE                      DATE PREPARE AND ISSUE PROGRAM PLAN                                                            04/85                              --
04/85 (SECY-85-129)
.                                        CONDUCT SITE SURVEY OF EIGHT PLANTS                                                        01/86                              --
01/86 l                                        DEVELOP MAINTENANCE DATA BASE                                                              01/86                              --
01/86 t
;                                        DEVELOP. ADMINISTER AND ANALYZE RESIDENT                                                  03/86                              --
03/86 j                                        MAINTENANCE QUESTIONNAIRE I                                        SUBMIT MSPP PHASE I REPORT TO THE EDO                                                      05/86                              --
05/86 t                                          PREPARE REPORT ON MAINTENANCE TRENDS                                                      09/86                              --
09/86 l                                        AND PATTERNS j                                          PREPARE COMMISSION PAPER ON PHASE I                                                      09/86                              --
10/86
;                                        RESULTS AND PHASE II PLANS DEVELOP POLICY STATEMENT ON MAINTENANCE                                                    10/87                                                    12/87 f
ISSUE POLICY STATEMENT                                                                    01/88                        05/88                          --
a l                                                                                              *
)                                                                                                                                                                                                                        '
i s
I
}
AS OF FY88 QUARTER 2 i
 
l RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                      PAGE: 154 ISSUE NUMBER.                        I.A.4.2(4)                                      TITLE. REVIEW SIMULATORS FOR CONFORMANCE TO CRITERIA IDENTIFICATION 3 ATE: 05/80C                                                          PRIORITIZATION DATE- 11/83C                                              TYPE GSI                                        PRIORITY: H TASK MANAGER: J. WACHTEL                                                                OFFICE / DIVISION / BRANCH- NRR /DLPQ/LOLB                              ACTION LEVEL: ASTIVE                            STATUS.
TAC NUMBERS: M42454                                                                                                                                                                                            RESOLUTION DATE 06/88 WORK AUTHORIZATION: TMI ACTION PLAN. NUREG-0660 FIN                                CONTRACTOR                                                                CONTRACT TITLE b53$h                                MkbRbbbbh                          bEVkLbPhkhh bk NRb ShMbl TkbbkkbkLkhY kVkt PRbbRkM WOR K            SC0PE THIS ITEM IS ADDRESSED BY ACTIVITES CURRENTLY UNDERWAY IN                                                                        OPERATOR LICENSE EXAMINATIONS. AND RESULTS EXPECTED RESPONSE TO SECTION 306 PL 97-425 AND BY FIN D-1317.                                                                              F ROM A T/A CONTRACT TITLED DEVELOPMENT SPECIFICALLY, PROPOSED CHANGES TO 10 CFR PART 55                                                                                  OF AN NRC SIMULATION FACILITY EVALUATION PROGRAM,-
RECOMMENDED CHANGES TO REGULATORY GUIDE 1 149.                                                                                    ADDRESS THIS ISSUE NUCLEAR POWER PLANT SIMULATOR FACILITIES FOR USE IN STA TUS CONTRACT BEGAN 9/16/85. STEERING COMMITTEE HAS HELD FOUR                                                                          NUREG-1258 ISSUED IN DRAFT FORM ON 3/25/87. FOUR SETS OF MEETINGS.                  SIMULATION FACILITY EVALUATION PLAN HAS BEEN                                                          COMMENTS WERE RECEIVED AND REVIEWED. COMMENTS WERE PILOT-TESTED AT THE NORTH ANNA SIMULATOR. 10 CFR PART 55                                                                          INCORPORATED AS APPROPRIATE. AND THE NUREG WAS ISSUED 12/87.
AND REG                  GUIDE 1.149 WERE PRESENTED TO THE ACRS HUMAN                                                            FINAL MEMO TO EDO APPROVED BY DLPO DIRECTOR ON 3/11/88-FACTORS SUBCOMMITTEE (11/851 FULL ACRS COMMITTEE (12/85).                                                                        AWAITING APROVAL FROM NRR ASSOCIATE DIRECTOR FOR INSPECTION CRGR (2/86). AND TO THE COMMISSION (4/861                                                        COMMISSION VOTED                AND TECH ASSISTANCE.
IN 2/87 AND RULE PUBLISHED (52 FR 94531 ON 3/25/87.
AFFECTED DOCUMENTS                                                                                                          PROBLEM / RESOLUTION NUREG-IO21 NUREG-1258                                                                                                            NONE ORIGINAL                              CURRENT                        ACTUAL MI LEST0NES                                                                DATE                              DATE                          DATE 10 CFR 55 AND RG 1 149-                                                                                03/85                                    --
03/85 END OF PUBLIC COMMENT PERIOD AS OF FY88 OUARTER 2 O                                                                                                              O                                                                                                              O
 
-                -s
)
i
    ,                                                                                                                          RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                PAGE:        155 i
ISSUE NUMBER: I.A.4.2(4)                          TITLE: REVIEW SIMULATORS FOR CONFORMANCE TO CRITERI.\
l 1
ORIGINAL      CURRENT          ACTUAL ll                                                MILEST0NES                                                  DATE      DATE DATE D-1317 RFP ISSUED                                                            03/85            --
03/85 CONTRACT AWARDED (D-1317)                                                    08/85            --
09/85
                            ' DIVISION REVIEW OF 10 CFR 55                                                  10/85          --
10/85 ACRS REVIEW                                                                    12/85          --
12/85 I
,                            OFFICE REVIEW OF 10 CFR 55                                                    12/85          --
12/87 CRGR REVIEW OF 10 CFR 55                                                      12/85          --
02/86 l                            COMMISSION VOTE ON 10 CFR 55 CHANGE                                          01/87            --
02/87 i                            EVALUATE PLAN FOR ANS 3.5                                                      12/86          --
01/87 l                            SIMULATORS (D-1317)
PUBLISH NUREG OF PROPOSED PLAN FOR                                            03/87            --
03/87 EVALUATION OF ANS 3.5 SIMULATORS j                            (D-1317)
EVALUATE COMMENTS ON PROPOSED PLAN                                            08/87            --
08/87 4~
4                            PUBLISH FINAL PLAN FOR EVALUATION OF ANS 3.5                                  09/87            --
12/87 j                            SIMULATORS ISSUE CLOSE00T MEMO TO EDO                                                    06/87      06/88                  --
i i
i i
AS OF FY88 OUARTER 2 j-i i
i i
j I                                                                                        .
 
l l
l RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SVSTEM                                                          PACE:  156 ISSUE NUMBER:                I.D.3                                    TITLE- SAFETY SYSTEM STATUS MONITORING IDENTIFICATION DATE: 05/80C                                            PRIORITIZATION DATE 11/83C                                                            TYPE. GOI                    PRIORITY N TASK MANAGER: S. AGGARWAL                                              OFFICE / DIVISION / BRANCH RES /DE /MEB                                              ACTION LEVEL: ACTIVE        STATUS TAC NUMBERS:                                                                                                                                                                              RESOLUTION DATE C2/89 WORK AUTHORIZATION: TMI ACTION PLAN. NUREG-0660 FIN                      CONTRACTOR                                                                                          CONTRACT TITLE B2360                        PNL                          VERIFICATION, SYSTEM STATUS. AUTOMATIC VS MANUAL WOR K                    SCOP E PNL HAS REVIEWED THE EFFECTIVENESS OF SYSTEMS AND                                                                                  NECESSLARY AND FURTHER THAT THIS NEW REVISION SHOULD BE PROCEDURES RELATED TO SAFETY SYSTEM STATUS MONITORING                                                                                        APPLIED TO ALL PLANTS.      BASED ON THE PNL AND HAS RECOMMENDED A REGULATORY POSITION ON THIS ISSUE                                                                                      RE COMME NDAT IONS , DHFS TRANSF ERRED RESPONSIBILITY PNL F INDINGS INDICATE THAT A REVISION OF RG 1 47 IS                                                                                        FOR THIS ISSUE TO RES (REVISE R G. 1.47)
S T A TUS ALL TECHNICAL REPORTS ON THIS ISSUE ARE COMPLETE.                                                                                  WILL BE VOLUNTARY THE PROJECT FINAL REPORT INCLUDES GUIDELINES FOR                                                                                                  A DRAFT OF THE PROPOSED REVISION I TO R.G 1 47 WAS IMPROVING SYSTEM STATUS MONITORINS AS WELL AS THE                                                                                            DISTRIBUTED IN JULY. 87 FOR STAFF REVIEW. A MEETING WAS FINAL RECCMMENDATION OF PNL ON A REGULATORY POSITION                                                                                        HE LD ON SEPTEMBER 23. 1987 TO RESOLVE NRR (HUMAN FACTOPS THEIR RECOMMENDATION IS TO REVISE R G. 1.47 AND APPLY                                                                                        ASSESSMENT BRANCH l PERTAINING TO PROPOSED REVISION 1 IT TO ALL PLANTS.                    STAFF PROPOSES TO APPLY NEW                                                                            STAfr CONSENSUS IS HOWEVER NOT REACHED.
REQUIREMENTS FOR FUTURE PLANTS ONLY. COMPLIANCE BY OL*S AFFECTED DOCUMENTS                                                                                                          PROBLEM / RESOLUTION REVkhkbh hb R b k kh                                                                                                                      hHk EbhNkbIL RkhbLbhkbh bF kH h hhhh h L hk THE DEVELOPMENT OF AN NRC POSITION REGARDING THE NEED TO PEVISE R G 1 47 AS OF FY88 OUAPTER 2 O                                                                                                                        O                                                                    O
 
wg                                                                  -
s s                                                                    -
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                  PAGE: 157 ISSUE NUMBER: I.D.3                          TITLE: SAFETY SYSTEM STATUS MONITORING ORIGINAL                                CURRENT                              ACTUAL MILEST0NES                                            DATE                                  DATE                                DATE COMPLETE DRAFT REPORT OF CURRENT                                      06/82                                      --
06/82 INDUSTRY PRACTICES SUBMIT PRELIMINARY RECOMMENDATION FOR                                  09/82                                      --
09/82 REGULATORY POSITION SUBMIT TECH REPORT ON EFFECTIVENESS OF                                11/82                                      --
11/82 EXISTING SYSTEMS SUBMIT REPORT ON EFFECTIVENESS OF                                      12/82                                      --
12/82
: j.                    VERIFICATION PROCEDURES l*                    SUBMIT DRAFT ACCEPTANCE CRITERIA                                      04/83                                        --
04/83 SUBMIT DRAFT GUIDELINES FOR
* INTERIM-                                07/83                                      --
07/83 l                      IMPROVEMENT SUBMIT PROGRAM PLAN FOR DEVELOPING                                    09/83                                      --
11/83 "FULL IMPLEMENTATION" GUIDELINES SUBMIT FINAL RECOMMENDATIONS FOR                                      09/83                                      --
02/84 REGULATORY POSITION COMPLETE DRAFT MEMO TRANSFERRING ISSUE                                06/84                                      --
06/84 TO RES TRANSFEP MEMO APPROVED BY DD'S                                        07/84                                      --
10/84 TRANSFER MEMO TD RES APPROVED                                        08/84                                      --
10/84 BY NRR DIRECTOR RES PROVIDED MILESTONE NECESSARY TO'                                  09/84                                      --
04/85 COMPLETE ISSUE AND OUTLINED PROBLEMS WITH ISSUING REG GUIDE REVISION ISSUED MEMO FOR PROVIDING MILESTONES                                  11/85                                      --
11/85 PREPARE TASK CONTROL FORM (TCF)                                        10/85                                      --
03/86 OBTAIN TCF APPROVAL                                                    10/85                                      --
05/86 AS OF FY88 QUARTER 2 g                                                                  ___
 
RUC] DATE : 05/11/88 CENERIC ISSUE MANAGEMENT CONTROL SYSTEM                  PAGE:          158 ISSUE NUMBER ID3                                    TITLE- SAFETY SYSTEM STATUS MONITORING ORIGINAL        CURRENT          ACTUAL M I LES T ON ES                                          DATE        DATE            DATE RES PROVIDES NEW MILESTONE DATES                                              05/86              --
01/87 NECESSARY TO RESOLVE ISSUE INITIAL DRAFT COMPLETE (INFO COPY                                              10/85            --
07/87 TO CRGR/ACRS)
DIVISION REVIEW COMPLETE                                                      10/85      04/88                  --
DEVELOP REGULATORY ANALYSIS                                                  03/86        04/88                  --
OFFICE CONCURRENCE OF CRGR PACKAGE                                            02/88        04/88                  --
CRGR. EDO. ACRS. REVIEW / APPROVAL (29)                                      07/86        05/88                  --
RESOLUTION OF COMMENTS                                                        09/86        05/88                  --
PRINTING & DISTRIBUTION AUTHORIZED                                            09/86        06/88                  --
PRINTED & ISSUED FOR COMMENT                                                  10/86        07/88                  --
COMMENT PERIOD                                                                01/87        09/88                  --
RESOLUTION OF COMMENTS                                                        02/87        10/88                  --
DIVISION OF ELD REVIEW COMPLETE                                                04/87        10/tB                  --
CRGP REVIEW COMPLETE [53)                                                      07/87        12/88                  --
ACRS REVIEW COMPLETE                                                          07/87        01/89                  --
RESOLUTION OF COMMENTS                                                        09/87        01/8S                  --
0FFICE CONCURRENCE DBTAINED                                                    10/87        02/89                  --
PRINTED AND ISSUED                                                            12/87        02/85                  --
AS OF FY88 OUARTER 2 9                                                                        9                                                          9
 
h                                                                                                                h V                                                                                                                  [V                                                                                                                                        -
U[h RUN DATE: 05/11/88
,                                                                                                                                                                        GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                                                                        PAGE:        159 1
ISSUE NUMBER:      I.D.4                                                    TITLE: CONTROL ROOM DESIGN STANDARD IDENTIFICATION DATE: 05/80C                                                  PRIORITIZATION DATE- 11/83C                                                TYPE: GSI                                                                                                      PRIORITY: M TASK MANAGER: D. SERIG                                                      OFFICE / DIVISION / BRANCH- RES /DRPS/RHFB                                ACTION LEVEL: INACTIVE                                                                                          STATUS: 38 TAC NUMBERS:                                                                                                                                                                                                                                                            RESOLUTION DATE. 03/88C WORK AUTHORIZATION: TMI ACTION PLAN. NUREG-0660 FIN              CONTRACTOR                                                                                        CONTRACT TITLE NONE              NONE                                              NONE W0RK    SC0PE DEVELOP REGULATORY GUIDE ON HUMAN FACTORS ENGINEERING                                                                        CONTROL ROOM AND REMOTE SHUTDOWN PANELS.
STANDARDS AND PRACTICES FOR USE ON NEW (CP APPLICATION)
STATUS THIS ISSUE WA' EANSFERRED FROM NRR TO RES WITH THE                                                                    SECTION 18.1 WHICH ADDRESSES CONTROL ROOM DESIGN AND 4/87 NRC REORGANI'            . 14/10/87 MEMO FROM W. RUSSELL TO T                                                          REFERENCES NUREG-0700 AS APPROPRIATE GUIDANCE FOR CONTROL SPEIS). NO WORK                EN COMPLETED ON THE ISSUE PRIOR TO                                                          ROOM DESIGN.
TRANSFER. SUBSEye          TS REVIEW INDICATED THAT ALL                                                                                    THIS ISSUE HAS BEEN RESOLVED BY INDUSTRY COMPLIANCE
;                                                                                    OPERATING AND NT4              TS ARE CONDUCTING DETAILED CONTROL                                                          WITH TMI ITEM I.D.1 10 CFR 50.34(G). AND THE REVISION OF ROOM DESIGN REVI                RESPONSE TO TMI ITEM I.D.I.                                                                  SRP 18.1 TO INCLUDE REFERENCE TO NUREG-0700. THIS ISSUE WAS NUREG-0700 AND          "FABLE SUBSTITUTES ARE BEING USED AS                                                                CLOSED BY A MARCH 28 1988 MEMORANDUM FROM E. BECKJORD TO CONTROL ROOM DE' <" STANDARDS FOR THIS EFFORT. APPLICATIONS                                                                  V. STELLO. DESIGNS WILL BE ADDRESSED BY THE HUMAN FACTORS FOR FUTURE LIGHs W.;fER REACTORS SHALL INCLUDE. PER 10 CFR                                                                  RESEARCH PROGRAM PLAN WHICH IS CURRENTLY UNDER DEVELOPMENT.
50.34(G), AN EVALUATION OF THE FACILITY AGAINST THE SRP 1
i i                                                                                                              AFFECTED DOCUMENTS                                                                                                                                                                            PROBLEM / RESOLUTION
                                                                                    --------------------------~~.-------------------------------                                                                ------------------------------------------------------------
NONE                                                                                                                        NONE k
i ORIGINAL                                                                            CURRENT                              ACTUAL MILEST0NES                                                                              DATE                                                                                        DATF                          DATE CLOSE OUT ISSUE                                                                                                            09/91                                                                                                  --
03/88 AS OF FY88 QUARTER 2
 
l                                                                                                                                                  CUN DATE 05/11/8f GENERIC ISSUE MANAGEMENT CO : TROL SYSTEM                                                  PACE:        160 ISSUE NUMBER:      I.D.5(3)                      TITLE    ON-LINE REACTOR SURVEILLANCE SYSTEMS IDENTIFICATION DATE: 05/80C                      PRIORITIZATION DATE 11/83C                                  TYPE: GSI                                  PRIORITY.
TASK MANAGER. W. FARMER                          OFFICE / DIVISION /SPANCH PES /DE /MEB                      ACTION LEVEL: ACTIVE                      STATUS NR TAC NUMBERS.      NONE                                                                                                                                  RESOLUTION DATE 12/88 WORK AUTHORIZATION- TMI ACTION PLAN. P4UR E G- 0 6 6 0 FIN              CONTRACTOR                                              CONTRACT TITLE bbh2h              bhbL                bbb bbbbb bb          NE  hEEbhbhbbkbEbhbkEMEVILbkkkhbb W0R K    SC0P E THk b83EChkVk bF THkk REPbRh kS kb PEPFbRM PEbE RbH                          bN t E bbkbE bbhvEkLLkNCEbYShEMAhDTOPERFbhM TO DETERMINE THE FEASIBILITY OF DETECTING AND DIAGNOSING                            DE MO?.S TR AT IONS OF SUCH A SYSTEM IN AN NRC-LICENSED NUCLEAR POWER PLANT OPERATING ANOMALIES USING A CONTINUOUS                          CCMMEPCIAL BWR PLANT.
                                                                            $TA T US A DEMONSTRATION OF SYSTEM FEASIBILITY AT AN                                  BEF0DE THE FALL OF 1988.                            IT IS BELIEVED THAT SUFFICIENT OPE R AT ING PWR HAS BEEN COMPLETED            THE SURVE I L L ANCE                DATA IS AVAILABLE FROM THE ON-LINE REACTOR SURVEILLANCE INSTRUMENT SYSTEM HAS BEEN INSTALLED AT PEACH BOTTOM UNIT                          TESTS AT THE SEQUOYAH UNIT 2 IN 1983/84 ALONG WITH THE 2 A ND IS TO BE USED TO DEMONST RATE SYSTM F E ASIBILIT Y AT A                      SINGLE LOOP MEASUPEMENTS AT THE BROWNS FERRY BWP TO DEVELOP BWR    (PEACH BOTTOM 15 MONTHS OUTAGES AND EQUIPMENT AND                          AN ACCEPTABLE EVALUATION OF THE ON-LINE REACTOR SURVEILLANCE DEGRADATION HAVE DELAYED PLANT MEASUREMENTS 18 MONTHS.)                            SYSTEM PEACH BOTTOM UNIT 2 IS NOW NOT EXPECTED TO PESTART AFFECTED DOCUMENTS                                                                              PROBLEM / RESOLUTION NONE                                                                                A PIL WILL BE PREPAPED SUMMAPIZING THE CONCLUSIJNS AND RECOMrdENDATIONS FPCM THE RESEARCH ON THIS ACTION ITEM ORIGINAL                        CURRENT                    ACTUAL M I LEST 0NES                                                DATE                          DATE                      DATE INSTALL SYSTEM AT A PWR                                                          --                            --
09/80 AS OF FV88 OUARTER 2 O                                                                        O                                                                                        O
 
              - . . _ . .      .. - . .._- - - _ ~ - _ . - . .--                . . .. -    - .            . _ . .            _ - - . . .                              .
( _ .. . - .                                                                                                                                                                          __,
i                                                                                                                                                                                      !
I
'.                                                                                                                                                .RUN DATE: 05/11/88                  4 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                  PAGE:        161.            '!
ISSUE NUMBER:      I.D.5(3)                                TITLE: ON-LINE REACTOR SURVEILLANCE SYSTEMS ORIGINAL            CURRENT                      ACTUAL MILEST0NES                                          DATE DATE DATE
(                              COMPLETE PWR DATA ACQUISITION                                                06/84                  --
01/84 INSTALL' SYSTEM AT A BWR                                                      04/84                  --
06/85 ISSUE RIL TO NRR WITH CONCLUSIONS AND                                        09/88            09/88                              --
RECOMMENDATIONS                                                                                                                                          .
t ISSUE CLOSEOUT AND REMOVAL OF SYSTEM FROM                                    12/88            12/88                              --
PEACH BOTTOM                                                                                                                                            ;
I
                                                                                                                                                                                      *+
i l                                                                                                                                                                                    .
l t
J                                                                                                                                                                                      !
i                                                                                                                                                                                      !
t                                                                                                                                                                                      .
4                                                                                                                                                                                      i i                                                                                                                                                                                      !
I AS OF FY88 QUARTER 2
{,
f P
e                                                                                .
O
 
RUN DATE: 05/II/88 GENERIC ISSUE MANAGEME NT CON 700L SYSTEM                                                      PAGE:        I62 ISSUE NUMBER:          I.D.S(S)                            TITLE. DISTURBANCE ANALYSIS SYSTEMS IDENTIFICATION DATE: 05/80C                                  PRIORITIZATION DATE II/83C                                            TYPE- LI                                  PRIORITY TASK MANAGER-.        L. BELTRACCHI                      0FFICE/ DIVISION / BRANCH RES /DRPS/RHFB                            ACTION LEVEL: ACTIVE                      STATUS: 5 TAC NUMBERS:                                                                                                                                                                  RESOLUTION DATE 06/89 WORK AUTHORIZATION: TMI ACTION PLAN, NUREG-0660 FIN                    CONTRACTOR                                                  CONTRACT TITLE bO352                    bkbl                      KEV bRkhhbR hbMkh hkbhbRb kbPEbhb bF kbVIbbEb bbkhRbLb k khbTRbM W0R K    SC0PE THOSE FACETS OF THE DISTURBANCE ANALYSIS SYSTEM (DAS)                                          DIF FICUL TIE S IN GENERATING AND VERIFYING THE ACCURACY OF DEALING WITH UPSET DIAGNOSIS AND REMEDIAL ACTION AhE                                            THE LOGIC MODELS MUST BE OVERCOME BEFORE APPLYING A BASED ON DETAILED LOGIC MODELS THAT TRACE THE TIME-                                            DAS TO A COMMERCIAL REACTOR ON A TOTAL PLAN! BASIS DE PE NDE N T CONSEQUENCES OF COMPONENT F AILURES.                          THE STA TU S BY M"40RANDUM DATED DECEMBER I2, 1987 IFOR THEMIS P                                    EXISTS IN THIS AREA.                                  A CURRENTLY FUNDED RESEARCH PROJECT.
SPEIS. FROM BRIAN W. SHERON.
 
==SUBJECT:==
RECOMMENDED                                              FIN 0852. REVIEW CRITERIA FOR HUMAN FACTORS ASPECTS OF CONVERSION OF GENERIC ISSUES TO RESEARCH ISSUESI SPEIS                                          ADVANCED CONTROLS AND INSTRUMENTATION. WILL EVALUATE AGXEES WITH THE DIVISION OF REACTOR AND PLANT SYSTEMS                                          DISTURBANCE ANALYSIS SYSTEMS ALONG WITH OTHER ADVANCED RECOMMENDATION THAT THIS ISSUE BE *ECLASSIFIED AS A RESEARCH                                    TECHNOLOGIES. SUCH AS COMPUTER-BASED OPERATOR AIDS AND ISSUE      THE REASON GIVEN FOR THE f                      OMME NDA T I ON IS THE NEED        ARTIFICIAL I NT E L L IGE NCE .                              THIS ISSUE WILL CONTINUE TO BE FOR SPECIFIC RESEARCH TO DETERMIy                            r A SAFETY PROBLEM                TRACKED AS A LICENSING ISSUE TO FOLLOW THE RESEARCH WORK AFFECTED DOCUMENTS                                                                                                PROBLEH/ RESOLUTION ORIGINAL                                  CURRENT                ACTUAL M ILESTONES                                                        DATE                                    DATE                  DATE NUREG/CR ON RESULTS OF SURVEY ON HG;4AN                                              06/89                                  06/89                      --
FACTORS ASPECTS OF ADVANCED CONTROLS /
INSTRUMENTATION AS OF FY88 QUARTER 2 e
O                                                                                  O                                                                                                O
 
                                                                                                                                                                                          /~%
[
      ~J                                                                                                G                                                                              U RUN DATE: 05/II/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                      PAGE: I63 ISSUE NUMBER                      I.F.1                              TITLE EXPAND QA LIST IDENTIFICATION DATE: 05/80C                                          PRIORITIZATION DATE- II/83C                                          TYPE: GSI                            PRIORITY: H TASK MANAGER; O. GORMLEY                                            OFFICE / DIVISION / BRANCH: RES /DRA /ARGI                            ACTION LEVEL: ACTIVE                STATUS:
TAC NUMBERS:                                                                                                                                                                    RESOLUTION DATE: _ _ _ _ _ _
WORK AUTHORIZATION: TMI ACTION PLAN. NUREG-0660 FIN                          CONTRACTOR                                                            CONTRACT TITLE W0R K          SC0PE DEVELOP GUIDANCE FOR LICENSEES TO EXPAND THEIN QA LIST                                                    TO COVER EQUIPMENT IMPORTANT TO SAFETY.
STA TUS kHkShFFHkskkbkkPkkkkhkhkkhkEhhEhbF kHkbkkbkh                                                              hMPbRhkkh hb hkFkkh kkL hhk kkbbkkEb bhkbh5 kkh HkVk OF THIS ISSUE AND THE QUALITY RELATED ACTIVITIES WHICH HAVE                                                          ALREADY BEEN TAKEN.            THE NEXT STEP IS TO MAKE A MORE CAREFUL ALREADY TAKEN PLACE IN THE SUBSEQUENT EIGHT YEARS AND HAS                                                            REVIEW AND PROPOSE A PLAN OF ACTION TO RESOLVE THIS ISSUE.
CONCLUDED THAT, WITH THE EXCEPTION OF THE DEFINITION OF AFFECTED DOCUMENTS                                                                                    PROBLEM / RESOLUTION IMPORTANT TO SAFETY REULEMAKING.                    THE FIRST STEP IN THE RESOLUTION IS TO EXAMINE THE RECORD TO SEE WHAT WAS REQUIRED AT THE BEGINNING, HOW MUCH OF THAT HAS BEEN ACCOMPLISHED BY OTHER MEANS, AND WHAT RELEVANT DECISIONS HAVE ALREADY BEEN MADE_      THIS INFORMATION WILL BE USED TO DEVELOP A PLAN OF ACTION FOR RESOLVING THIS ISSUE.
ORIGINAL                CURRENT                  ACTUAL MILEST0NES                                                        DATE                  DATE                      DATE hhkk                bkVkLbPFkkhhhbRK                                                      bhh8h                      --
bhh8h AS OF FY88 QUARTER 2
 
RUN DATE: 05/11/89 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                    PAGE:          164 ISSUE NUM8ER I.F.1                                          TITLE EXPAND OA LIST ORIGINAL        CURRENT          ACTUAL MILE ST ON E S                                      DATE          DATE            DATE REVIEW NRC INTERNAL COMMENTS                                                        04/83              --
07/83 ON NUREG/CR-2631 (REWRITE SCOPE /189 IF NECESSARY) AND PUBLISH NUREG TASK 2-                START METHOD DEVELOPMENT                                      10/83            --
10/83 DEVELOP (ISSUE CONTRACT TO SANDIA)
COMPLETION OF TASK 2                                                                09/84              --
05/85 ISSUE SECY-85-119. PROPOSED RULE                                                    04/85              --
04/85 ON IMPORTANCE TO SAFETY ISSUE COMMISSION DISAPPROVED SECY-85-119                                                        --            --
12/85 ISSUE REVISED PAPER FOR PROPOSED                                                    05/86              --
05/86 RULE ON IMPORTANCE TO SAFETY ISSUE CONr4:SSION APPROVES REVISED RULE                                                    06/86              TBD              --
COMPLETE STAFF PLAN EXTABLISHING NEEDED                                              12/86          10/88                --
ACTIONS REMAINING AND PLAN FOR ACCOMPLISHING THEM
                                                                                                                                                      \
AS OF F Y'J 8 OU.*.R T E R 2 O          -
9                                                              O
 
RUN DATE: 05/II/88.
GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                            PAGE: 165 ISSUE NUMBER:                                                          II.B.5(1)                          TITLE: BEHAVIOR OF SEVERELY DAMAGED FUEL IDENTIFICAVION DATE: 05/80C                                                                              PRIORITIZATION DATE: II/83C                                          TYPE: LI                  PRIORITY:
9 TASK MANAGER: M. SILBERBERG                                                                              OFFICE / DIVISION / BRANCH: RES /DRAA/AEB                            ACTICN LEVEL: ACTIVE      STATUS: 5 TAC NUMBERS:                                                                                                                                                                                            RESOLUTION DATE- 06/94 WORK AUTHORIZATION: TMI ACTION PLAN. NUREG-0660 FIN                                                                  CONTRACTOR                                                        CONTRACT TITLE NONE                                                                    NONE                NONE W0RK          SC0PE
      -......--.---.---.-------...-.--.---......--.....-...--.--..---.-------------...--------.~.--------...............------...--
ISSUES II.B.5(I) AND II.B.5(2) ARE BEING RESOLVED                                                                                            CONTAINMENT ANALYSIS, AND FISSION PRODUCT RELEASE AND TOGETHER.                      RESEARCH IS SEING PERFORMED ON PHENOMENA                                                                                  TRANSPORT AS DESCRIGED IN DETAIL IN SECY-86-369. THIS ASSOCIATED WITH CORE DEGRADATION, FUEL MELTING, AND                                                                                                      PROGRAM INVOLVES BOTH IN-PILE AND OUT-OF-PILE TESTS WITH EX-VESSEL PHENOMENA. CONDUCT AN EXTENSIVE EXPERIMENTAL AND                                                                                              ACTUAL AND SIMULATED CORE AND REACTOR STRUCTURAL MATERIALS, ANALYTICAL PROGRAM ON THE BEHAVIOR OF DAMAGED FUEL. HYDROGEN                                                                                            AND THE DEVELOPMENT CODES TO MODEL TPE PHENOMENA EXPECTED IN GENERATION AND CONTROL, FUEL STRUCTURE INTERACTION,                                                                                                      THE REACTOR.
                                                                                                      ,                                        STATUS NUREG-0956 IDENTIFIED EIGHT AREAS OF UNCERTAINTY IN                                                                                            OUT IN MARCH 1987 TO OVER 900 NRC. INDUSTRY. UNIVERSITY, AND REGULATORY INFORMATION NEEDED TO RESOLVE THE SOURCE TERM                                                                                                FOREIGN ADDRESSES.          THE COMMENT PERIOD ENDED ON 8/2I/87.
ISSUE.          THE RESEARCH PROGRAM FOR FY 1987 AND OUT YEARS IS                                                                                      MEANWHILE. RISK ANALYSIS OF A SIXTH PLANT (LASALLE) IS BEING REORIENTED TO RESOLVE THOSE AREAS OF UNCERTAINTY.                                                                                                  UNDERWAY AND EXTERNAL EVENTS ANALYSIS OF TWO OF THE FIRST SECY-86-369 PROVIDES THE INITIAL RESEARCH PLAN.                                                                              AN                        FIVE PLANTS WILL BE DONE. YHE LASALLE STUDY WILL BE EVALUATION OF THE RESEARCH RESOLUTION OF THESE AREAS OF                                                                                                  PUBLISHED SEPARATELY FROM NUREG-1150.          THIS GENERIC ISSUE UNCERTAINTY HAS BEEN CONDUCTED BY BNL, AND WAS REPORTED IN                                                                                              WILL BE CLOSED OUT (IN A LETTER TO EDO) AND ITS RESOLUTION APRIL 1987 AS NUREG/CR-4883.                                                                      THE STAFF HAS USED THIS                              WILL CONTINUE IN ACCORD WITH SECY-86-369 IN SUPPORT OF EVALUATION TO EXAMINE THE NEED TO MAKE FURTHER REORIENTATION                                                                                            SEVERE ACCIDENT POLICY STATEMENT IMPLEMENTATION AP'D THE OF THE RESEARCH PROGRAM TO ASSURE THE MOST COMPLETE ISSUE                                                                                                SEVERE ACCIDENT PLAN. IN ACCORDANCE WITH A MEMO FOR T.
RESOLUTION POSSIBLE, GIVEN AVAILABLE RESOURCES.                                                                                THIS                      SPEIS FROM R. HOUSTON ON 11/4/87 THIS ISSUE WAS D:TERMINED REVISED PROGRAM HAS BEEN DOCUMENTED IN A COMMISSION PAFER .                                                                                              TG BE WITHIN THE REALM OF SEVERE ACCIDENT RESEARCH.
WHOSE ISSUANCE HAS BEEN DEFERRED-TO THE EDO. REACTOR RISK                                                                                                THEREFORE, IT WILL CONTINUE TO BE TRACKED AS A LICFNSING REFERENCE DOCUMENT, NUREG-1150. DRAFT FOR COMMENT WAS MAILED                                                                                            ISSUE TO FOLLOW TNE RESEARCH WORK.
AS OF FY88 OUARICR 2-J
 
CUN DATE: C5/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                            PACE:        166 ISSUE NUMBER:.                  II.B.5(1)                                      TITLE BEHAVIOR OF SEVERELY DAMAGED FUEL AFFECTED DOCUMENTS                                                                                                        PROBLEM / RESOLUTION (1)        NUREG-0956 REASSESSMENT OF TECHNICAL BASES FOR                                                      NONE LWR ACCIDENT SGURCE TERM (JULY 1986)
(2)        NUREG-1150 NEW RISK PROFILES FOR FIVE REFERENCE PLANTS l DRAFT FOR COMMENT FEBRUAPY 1981)
(3)        SECY-86-369                  "PLAN TO ADDRESS SOURCE TERM TECHNICAL UNCERTAINTY AREAS.-
ORIGINAL                                        CURRENT              ACTUAL MILEST 0N ES                                                    DATE                                        DATE                DATE INITIAL DRAFT CONTRACTOR SOURCE TERM REPORT                                                01/83                                              --
01/83 SOURCE TERM ESTIMATES FOR SELECTED PLANTS                                                  08/83                                              --
01/84 AND ACCIDENT SEQUENCES THOROUGH PEER REVIEW OF THE ABOVE                                                            12/83                                            --
02/85 SCIENTIFIC BASES FOR REASSESSMENT DRAFT REASSESSMCNT OF THE TECHNICAL                                                          12/83                                            --
07/85 BASES FOR ESTIMATING SOURCE TERMS (NUREG-0956)
NRC SEVERE ACCIDENT POLICY                                                                  11/85                                              --
07/85 COMPLETE DTR                                                                                12/86                                            --
12/86 SEVERE ACCIDENT RISK REBASELINING                                                            12/83                                            --
03/87 PROGRAM DRAFT REPORT lNUREG-1150)
FINAL REASSESSMENT OF THE TECHNICAL BASES FOR                                              07/86                                        04/88                    --
ESTIMATING SOURCE TERMS (NUREG-0956)
FINAL RECS TO THE COMMISSION DN SEVER"                                                      06/84                                        08/88                    --
ACCIDENT CONT. PERFORMANCE RQMNTS F OR (MARKI)
OPERATING PLANTS & PLANTS UNDER CONSTRUCTION ISSUE CLOSEOUT MEMO TO EDO                                                                  06/88                                        06/94                    --
AS OF FY88 QUARTER 2 O                                                                                                  O                                                                                                    O
 
i i
e RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                      PAGE: 167                        ?
ISSUE NUMBER:                              II.B.5(2)                                      TITLE: BEHAVIOR OF CORE-MELT IDENTIFICATION DATE: 05/80C                                                                PRIORITIZATION DATE: 11/83C                                    TYPE: LI                                    PRIORITY:
;            TASK MANAGER: M. SILBERBERG                                                                OFFICC/ DIVISION / BRANCH: RES /DRAA/PRAB                      ACTION LEVEL: ACTIVE                        STATUS: 5 TAC NUMBERS:                                                                                                                                                                                          RESOLUTION DATE: 06/94      !
WORK A"THORIZATION: TMI ACTION PLAN. NUREG-0660 FIN                                                  CONTRACTOR                                                  CONTRACT TITLE NONE                                                          NONE                  NONE I
  )
W0RK          SC0PE i            SEE SCHEDULE FOR RESOLVING ISSUE II.B.5(1) i i
STA T US 3
4                  IN ACCORDANCE WITH A MEMO TO T. SPEIS FROM R. HOUSTON                                                                        OF SEVERE ACCIDENT RESEARCH. THEREFORE. IT WILL CONTINUE TO
;              ON 11/4/87, THIS ISSUE WAS DETERMINED TO BE WITHIN THE REALM                                                                        BE TRACKED AS A LICENSING ISSUE TO FOLLOW ThE RESEARCH WORK.
i AFFECTED DOCUMENTS                                                                                PROBLEM / RESOLUTION l,            __..__.._-_...........___-.--__ ....___........--_------- __                                                                        -.____ ......-...-_... ____..___.. .___.. .______ .____.....
;                  SEE ISSUE II.B. Sill.                                                                                                                                            *** NONE ***
4 4
ORIGINAL                    CURRENT                      ACTUAL l                                                                                            MILEST0NES                                                        DATE                      DATE                          DATE 1
j                                                                _____.____....... _..... _____.._._..__....._                                          ..---- ...                ___ ---_ .
j                                                                  SEE, ISSUE II.B.i-(I)                                                                            --
i 3
4 i
4 1
AS OF FY88 OUARTER 2 t
 
RUN DATE: 03/II/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                    PAGE:    I68 ISSflE NUMBER:                  II.B.513)                            TITLE- EFFECT OF HYDROGEN COMBUSTION ON CONTAINMENT STRUCTURES IDENTIFICATION DATE- 05/80C                                          PRIORITIZATION DATE II/83C                                      TYPE- LI                              PRIORITY TASK MANAGER:                  P. WORTHINGTON                        OFFICE / DIVISION / BRANCH RES /DRAA/AEB                        ACTION LEVEL: ACTIVE                  STATUS. 5 TAC NUMBERS                                                                                                                                                                RESOLUTION DATE 09/91 WORK AUTHORIZATION: TMI ACTION PLAN. NUREG-0660 FIN                          CONTRACTOR                                                        CONTRACT TITLE AI246                            SNL                    HYDROGEN BEHAVIOR PROGRAM AI2TO                            SNL                    HYDROGEN BURN SURVIVAL AIJ36                            SNL                    HYDROGEN MIXING STUDIES A7247                            LANL                    HYDROGEN MITIGATION AND PREVENTIVE SCHEMES B8208                            SNL                    HYDROGEN COM8USTION AND CONTROL DEMO. EXPER.
WOR K          SC0PE PPOVIDE THE NRC EXPERIMENTS AND ANALYTICAL ME THODS FOR                                                DETONATIONS. FLAME ACCELERATION. THE TRAdSITION TO UNDERSTANDING OF THE THREAT POSED BY HYOROGEN BURNING DURING                                                      DETONATION IDDT). THE EFFECT OF BURNING ON EclIPMENT. AND POSTULATED LWR ACCIDENTS.                                    THIS WORK INCLUDES AN                                THE EFFICIENCY OF H2 CONTROL SYSTEMS UNDERSTANDING OF DEFLAGRATIONS. GLOBAL AND LOCAL STA TUS PROGRAMS ARE UNDERWAY WITH STATE-OF-THE-ART PAPERS                                                    WITH REVISED SECY-86-369 IN SUPPORT OF SEVERE ACCIDENT EXPECTED FOR FLAME ACCELERATION AND DDT AND DETONATION IN                                                        POLICY STATEMENT IMPLEMENTATION AND THE SEVERE ACCIDENT F Y- 8 8 AND F Y- 8 9 . PERFORMING EXPERIMENTS AND ANALYSIS TO                                                    CLOSURE PLAN.
PROVIDE ANALYTICAL TOOLS TO PREDICT COM8USTION MODE (IE.,                                                                IN ACCORDANCE WITH A MEMO FOR T. SPEIS FROM R. HOUSTON DEFLAGRATION. DIFFUSION FLAMES. FLAME ACCELER-ATION AND DDT                                                      ON II/4/87 THIS ISSUE WAS DETERMINED TO BE WITHIN THE REALM AND DETONATION) FOR VARIOUS TYPES OF PLANTS UNDER SEVERE                                                          OF SEVERE ACCIDENT RESEARCH.                THEREFORE. IT WILL CONTINUE TO ACCIDENT CONDITIONS.                              THIS ISSUE WILL BE CLOSED OUT WITH A                            BE TRACKED AS A LICENSING ISSUE TO FOLLOW THE RESEARCH WORK.
LETTER TO EDO AND ITS RESOLUTION WILL CONTINUE IN ACCORD AFFECTED DDCUMENTS                                                                                PROBLEM / RESOLUTION SEVERE ACCIDENT RESEARCH PLAN [NUREG-0900 REV                                          I. 4/86)                      NONE AS OF FY88 OUARTER 2 O                                                                                                O                                                                              O
 
      --              .        - .            -                  . . =
e                                                                                                                      %
(s
            \,                                                          s.
                                                                                                                ~
                                                                                                                                  ,e
                                                                                                                                      )
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                        PAGE:  169 ISSUE NUMBER: II.B.5(3)              TITLE- EFFECT OF HYDRUGEN COMBUSTION ON CONTAINMENT STRUCTURES l
ORIGINAL        CURRENT            ACTUAL MILESTONES                                  DATE            DATE                DATE REVkEhbhbRkhbbbLhPLkhhHYbRbbEN                          10/hh            --
bb/83 IGNITOR SYSTEM ANALYSIS OF SEQUOYAH PLANT                              09/83            --
02/84 l                        ANALYSIS OF HYDROGEN AND STEAM RELEASES TO              02/82            --
02/84 CONTAINMENT DURING DEGRADED CORE COOLING ACCIDENIS                                                                          -
HYDROGEN BURN EQUIPMENT SURVIVAL REPORT                  09/83            --
I!/84 FOR ICE CONDENSER HYDROGEN COMBUSTION EXPERIMENTS IN 12/86            --
12/86 FITS FACILITY 4
REPORT ON POSSIBILITY OF LOCAL DETON.                    01/84            --
01/87 UNCERTAINTY PAPER ON H2 COMBUSTION                      05/87            --
05/87 MARCH-HECTR ANALYSIS OF SELECTED ACCIDENT                12/84            --
02/85 j                        IN AN ICE-CONDENSER CONTAINMENT l
HECTR VERSION 1.0                                        02/85            --
02/85 HECTR VERSION 1.5                                        04/86            --
04/86
!                        HYDROGEN-STEAM JET FLAME FACILITY                        02/85            --
02/85 AND EXPERIMENTS
}                        REPORT ON DETONATION EXPERIMENTS SERIES I                09/87            --
06/87 1                        NTS DATA ANALYSIS FOR CONTINUOUS                        05/85            --
11/87 INJECTION TESTS l
EFFECT OF SPRAYS ON IGNITORS REPORT                      09/83          05/88                --
09/86          05/88 EFFECTIVENESS OF NONPOWERED IGNITORS                                                          --
]
EFFECT OF H2 BURNS IN AEROSOLS SCOPING                  10/83          05/88                --
4                      STUDY REPORT 1
4 AS OF FY88 QUARTER 2 i
I i
 
RUN DATE: 05/11/88
-                                                      GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                  PAGE:          170 ISSUE NUMBER: II.B.5(3)                      TITLE. EFFECT OF HYDROGEN COMBUSTION ON CONTAINMENT STRUCTURES ORIGINAL        CURRENT        ACTUAL MILEST0N ES                                            DATE          DATE            DATE NTS H2 DEMONSTRATION TEST REPORT                                      03/84        05/88                --
NTS DATA ANALYSIS FOR PREMIVED TESTS                                  05/85        05/88                --
LARGE SCALE FLAME ACCELERATION TESTS                                  05/84          05/88                --
REPORT HECTR VERSION 2.0                                                      09/87        09/88                --
REPORT ON DETONATION EXPERIMENTS                                      05/87          09/88                --
SERIES II RIL TO NRR AND ISSUE CLOSEOUT MEMO                                    07/87          09/91                --
TO EDO AS OF FY88 QUARTER 2 9                          --    --
9                                                          9
 
w                                                                                                                                                                                    J RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                        PAGE: 171 ISSUE NUMBER:        II.C.4                        TITLE: RELIABILITY ENGINEERING IDENTIFICATION DATE: 05/80C                        PRIORITIZATION DATE- 11/83C                                                              TYPE: GSI                        PRIORITY: H TASK MANAGER: C. JOHNSON                          OFFICE / DIVISION / BRANCH: RES /DRPS/RHFB                                              ACTION LEVEL: ACTIVE              STATUS:
TAC NUMBERS:                                                                                                                                                                  RESOLUTION DATE' 09/88 WORK AUTHORIZATION: TMI ACTION PLAN. NUREG-0660 FIN                CONTRACTOR                                                                              CONTRACT TITLE A3282                BNL                  OPERATIONAL SAFETY RELIABILITY I                                                                                    WORK                                    SCOPE EVAL _ THE EFFECT. OF RELIABILITY PROGRAM ELEMENTS                                                              (3) EVALUAIE RELIABILITY TECHNOLOGY FROM OTHER AND TECHNIQUES APPLICABLE TO MAINTAINING LWR SAFETY                                                                    INDUSTIRES APPLICATION TO LWRS. (IN PROCESS)
DURING THE OPER LIFE OF THE PLANT.                  TASKS INCLUDE:                                              (4) EVALUATE THE EFFECTIVENESS OF A RELIABILITY PROGRAM
[      (1) SURVEY GENERIC ISSUES AND PRECURSORS TO ASSESS THE                                                                        THROUGH TRIAL APPLICATIONS. (IN PROCESS) l            EFFECTIVENESS OF RELIABILITY TECHNOLOGY TO HELP                                                                  (5l PUBLISH A TECHNICAL REPORT (NOREG/CR) THAT l            RESOLVE CURRENT SAFETY ISSUES. (COMPLETE)                                                                              INTEGRATES INTERIM FESULTS FROM THE ABOVE TASKS TO j      (2) VISIT 5 PLANTS TO IDENTIFY RELIABILITY TECHNIOUES                                                                          IDENTIFY THE ESSENTIAL ELEMENTS OF A RELIABILITY i            THAT UTILITIES HAVE FOUND TO BE EFFECTIVE. AND                                                                          PROGRAM. EVALUATE THEIR EFFECTIVENESS. AND IDENTIFY IDENTIFY THE ATTRIBUTES OF SUCCESSFUL RELIABILITY                                                                      ATTRIBUTES OF SUCCESSFUL RELIABILITY PROGRAMS.
!            PROGRAMS. (COMPLETE).                                                                                                  (DRAFT ISSUED)
STA TUS THIS RESEARCH HAS:                                                                                                            THESE RESULTS ARE DESCRIBED IN BNL*S DRAFT NUREG/
IDENTIFIED THE ESSENTIAL ELEMENTS OF A CLOSED-LOOP                                                              CR-4618 5/86. AFTER PRESENTING THE RESULTS TO NRC STAFF RELIABILITY PROGRAM APPLICABLE TO LWR OPERATIONAL                                                                IN 6/86 AND 7/86 BNL WORK ON THIS PROJECT STOPPED FOUND THAT USE OF RELIABILITY TECHNOLOGY WITHIN                                                                  TEMPORARILY. PENDING NRC REVIEW OF THE RESULTS.
l            THIS TYPE OF CLOSED-LOOP FRAMEWORK CAN HELP TO                                                                          WE COMPLETED THIS INTERNAL REVIEW IN 2/87 AND l            PREVENT PROBLEMS F ROM OCCicRRING.                                                                              AUTHORIZED BNL TO RESTART THE RESEARCH IN 3/87.
AFFECTED DOCUMENTS                                                                                                    PROBLEM / RESOLUTION TO BE DETERMINED                                                                                                        TASK MANAGER AVAILABILITY LIMITED BY OTHER WORK (RISK BASED PERFORMANCE INDICATORS). RESULTED IN 2-MONTH SLIP IN CONTRACTOR REPORT.
l f                                                                                                                                                                                      AS OF FY88 OUARTER 2 l
l
 
l 1
i                                                                                                                            CUN DATE: 03/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                  PAGE          172 ISSUE NUMBER: II C.4                                          TITLE- RELIABILITY ENGINEERING ORIGINAL        CURRENT          ACTUAL M I LEST ON ES                                        DATE        DATE            DATE DISCUSS WITH INPO THE NEEDS TO DEV AGREEMENT                                          06/83              --
11/83 ISEE NRC POLICY & PLANNING GUID_ 1983 NUREG 0885 ISSUE 2 PGS, 11 & 12)
RESEARCH GENERIC RELIABILITY METHOD                                                    12/83            --
04/J4 SURVEY / ADAPT. OF RELIABILITY TECHNIQUES &                                            06/84              --
02/85 IDENTIFICATION OF RELIABILITY PRCGRAM ELEMENTS FOR DETAILED EVALUATION BEGIN TRIAL USE                                                                        12/84            --
07/85 COMPLETE CASE STUDY OF 5 PLANTS TO IDENTIFY                                            02/86              --
03/86 RELIABILITY TECHNIQUES THAT INDUSTRY HAS FOUND TO BE EFFECTIVE DRAFT INTERIM TECH RPT IDENT. ELEMENTS OF                                              04/86              --
05/86 RELIAB. PROGRAM,                              EVAL EFFECTIVENESS &
TECHNIQUES & APPS. ISS DRAF T RPT FOR REVIEW STAFF MEMO TO EDO EVALUATING REGULATORY                                                06/86              --
02/87 NEEDS FOR RELIABILITY ASSURANCE AND OUTLINING PLAN FOR IMPLEMENTATION PUBLISH FINAL NUREG                                                                    12/87        06/88                --
ISSUE CLOSEOUT MEMO TO EDO                                                            12/87        09/88                --
AS OF FY88 QUARTER 2 O                                                                                  O                                                          O
 
3                                                                  O                                                                                            (^)
J                                                                            G                                                                          -                  v RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                    PAGE:    173 ISSUE NUMBER:                      II.E.4.3              TITLE: CONTAINMENT DESIGN-INTEGRITY CHECK IDENTIFICATION DATE: 05/80C                                PRIORITIZATION DATE- 11/83C                                              TYPE: GSI                                  PRIORITY: H TASK MANAGER: A. SERKIZ                                    OFFICE / DIVISION / BRANCH: RES /DRPS/RPSI                                ACTION LEVEL: INACTIVE                      STATUS: 38 TAC NUMBERS:                                                                                                                                                                    RESOLUTION DATE: 03/88C WORK AUTHORIZATION: NRR FY-84 OPERATING PLAN (APPENDIX G)
FIN          CONTRACTOR                                                    CONTRACT TITLE A1802          SNL            FEASIBILITY STUDY OF ALTERNATIVE CONTAINMENT TEST MTHDS
'I W0RK            SC0PE TO DETEkMINE WHETHER ALTERNATIVE OR ADDITIONAL                                                  METHODS CONTAIMENT LEAKAGE TESTS ARE NEEDED FOR VERIFICATION                                                      TASK 2-          FEASIBILITY ASSESSMENT OF ALTERNATIVE LEAKAGE OF CONTAIMENT INTEGRITY, AND WHETHER IMPROVEMENTS                                                                          DETECTION METHODS AND COSTS TO INSTALL IN PLANT ADMINISTRATIVE AND OPERATIONAL IMPLEMENTATION                                                    TASK 3: ATTAINMENT OF CONTAINMENT ISOLATION THROUGH OF PROCEDURES COULD BE MADE TO IMPROVE CONTAINMENT                                                                          ADMINISTRATIVE AND PROCEDURAL CHANGES AVAILABILITY.                                                                                              TASK 4: PREPARATION OF A TECHNICAL FINDINGS REPORT TASK 1; SURVEY AND EVALUATION OF CONTAINMENT LEAKAGE ST A TUS THE RESULTS Of SNL*S LETTER REPORTS FOR TASKS 1, 2 AND                          CFR 100 ARE NOT EXCEEDED.
3 HAVE BEEN COMBINED WITH THE RISK ANALYSES ASSOCIATED WITH                                                          REVIEW AND CONCURRENCE ON NUREG-1273 "TECHNICAL CONTAINMENT LEAKAGE RATES WHICH ARE REPORTED IN                                                            FINDINGS AND REGULATORY ANALYSIS FOR GENERIC SAFETY ISSUE NUREG/CR-4330 TO DEVELOP A TECHNICAL FINDINGS AND REGULATORY                                              II.E.4.3. CONTAINMENT INTEGRITY CHECK, HAVE BEEN COMPLETED.
ANALYSIS FOR THIS SAFETY ISSUE. THESE FINDINGS SUPPORT                                                    THESE FINDINGS SUPPORT CLOSURE OF GSI II.E.4.3.                                  A MEMO FROM MAINTAINING THE CURRENTLY-EMPLOYED TYPE A. 8 AND C TESTS                                                  THE DIRECTOR /RES TO THE EDO WAS ISSUED ON 3/22/88, THIS j                                              WITH SOME FOTENTIAL FOR RELAXATION OF ALLOWABLE LEAKAGE                                                    ISSUE IS RESOLVED.
;                                              RATES PROVIDED RADIOACTIVITY DOSE LIMITS AS REQUIRED BY 10 AFFECTED DOCUMENTS                                                                                      PROBLEM / RESOLUTION 10 CFR PART 50 APPENDIX J                                                      NONE AS OF FY88 QUARTER 2 l
4
 
K U'1 DA T E - 05/11/88 GENERIC ISSUE MANAGEMENT C04 TROL SYSTEM              PAGE:    174 ISSUE NUMBER' II.E 4.3              TITLE CONTAINMENT DESIGN-INTEGRITY CHECK ORIGINAL    CURRENT        ACTUAL M I LE S T 0N E S                            DATE      DATE          DATE hhShkhbN RkhhkhkVktbkhkhkkhkhkthhY bh                    b4/85        --
05/85 TEST METH005 INTERIM REPORT ON THE FEASIBILITY OF                      03/S6        --
05/86 ALTERNATIVE CONTAINMENT LEAK TESTS TASK I DRAF T REPORT                                      03/87        --
12/86 TASK 2 DRAFT REPORT                                      06/87        --
12/86 TASK 3 DRAFT REPORT                                      05/87        --
12/86 DRAFT REGULATORY ANALYSIS                                10/87        --
05/87 RECEIVE CONTRACTORS FINAL REPORT ON THE                  09/86        --
12/86 FEASIBILITY STUDY FOR ALTE9 NATIVE CONTAINMENT TEST METHODS EVALUATE REPORT ON ALTERNATIVE CONT AINME NT              10/86        --
05/87 TEST METHODS FEASIBILITY DTR                                                      12/87        --
03/88 CLOSEOUT PACKAGE TO RES DIRECTOR                          01/87        --
03/88 RESOLUTION OF ISSUE                                      02/88        --
03/88 AS OF FY88 CUARTER 2 O                                                        O                                                  O
 
fm                                                                                                                                                                                                                          m      ~
                  \                                                                                                                                                                                                                f (V                                                                                                            V
                                                                                                                              )                                                                          .
U}
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                PAGE:        17S ISSUE NUMBER:                II.E.6.1                                  TITLE. IN-SITU TESTING OF VALVES IDENTIFICATION DATE: 05/80C                                            PRIORITIZATION DATE- II/E3C                                                          TYPE. GSI                                        PRIORITY- M TASK MANAGER: 0. ROTHBERG                                              OFFICE / DIVISION / BRANCH. RES /DE /EIB                                            ACTION LEVEL; ACTIVE                              STATUS-.
1  TAC NUMBERS:                                                                                                                                                                                                  RESOLUTION DATE- 10/89 WORK AUTHORIZATION: NRR FY-84 OPERATING PLAN (APPENDIX G)
FIN                        CONTRACTOR                                                                            CONTRACT TITLE A3821                        BNL                          ADEOUACY OF CURRENT VALVE INSERVICE TEST METHODS W0RK                SC0PE (1) SURVEY INDUSTRY PRACTICES AND REQUIREMENTS FOR                                                                              (3) IDENTIFY PERFORMANCE REQUIREMENTS THAT ARE NOT DESICM, SPECIFICATION, QUALIFICATION. AND PRE-                                                                                  ADEQUATELY VERIFIED BY ANALYSIS OR TEST.
OPERA 110NAL AND SURVEILLANCE TESTING OF VALVES                                                                        (4) EVALUATE ALTERNATE MEANS OF VERIFYING PERFORMANCE.
IN SAFETY-RELATED SYSTEMS.                                                                                              (5) DEVELOP STAFF POSITIONS FOR ADDITIONAL PERIODIC (2) COMPARE THE TESTS WITH PERFORMANCE REQUIREMENTS                                                                                      CAPABILITY TESTS.
AND SPECIFICATIONS.
STA TUS
_.-__-~-_....._...___-.____._.-_.__......____._______.----_-.-.------_-___-_._---.-_..._-._._.---.._----_-._.-.-__._.-_--_
: 1. CHECK VALVES                                                                                                                  2.      THERMAL OVERLOAD DEVICES THIS ITEM IS BEING RESOLVED BY INDUSTRY EFFORTS. A JOINT                                                                        A DRAFT REPORT OF THE INVESTIGATION BY EIB 0F REG. GUIDE OWNERS GROUP TASK FORCE FOR CHECK VALVES WAS FORMED BASED ON                                                                      1.106 HAS BEEN PREPARED AND SUBMITTED TO INTERESTED PARTIES MEETINGS IN 1986 BETWEEN THE INDUSTRY AND NRC. THE TWO                                                                          WITHIN NRC FOR TECHNICAL REVIEW.                                    THE CONCLUSION OF THE I
MAJOR COMPONENTS OF THE INDUSTPY PROGRAM ARE SOER 86-03 FROM                                                                    STUDY WAS THAT THE GUIDANCE CONTAINED IN REG. GUIDE I 106 INPO AND APPLICATIONS GUIDE.                              SOER 86-03 0F 10/15/86                                                IS TECHNICALLY CORRECT. HOWEVER, LICENSEES HAVE BEEN ENTITLED "CHECK VALVE FAILURES OR DEGRADATION.* HAS BEEN                                                                        DESIGNING THERMAL OVERLOAD DEVICES POORLY, MOSTLY DUE TO IMPLEMENTED WITH MIXED RESULTS, ACCORDING TO NRR.                                                  .NRR                        LACK OF INDUSTRY GUIDANCE. ACCORDINGLY. IT WILL BE PROPOSED INSPECTORS HAVE SURVEYED TWO PLANTS AND HAVE THREE OTHERS                                                                        TO ASK THAT INDUSTRY GROUPS SUCH AS NMAC/EPRI, ASME/0M.
SCHEDULED. A DRAFT OF THE APPLICATIONS GUIDE WAS SUBMITTED                                                                      IEEE. OR INP0/NUMARC DEVELOP SUCH STANDARD GUIDANCE FOR USE TO NRC AND GIVEN APPROVAL ON 9/3/87. ACRS (SUBCOMMITTEE)                                                                        0F THERMAL JVERLOAD PROTECTION. TOL DRAFT IS COMPLETE AND WAS BRIEFED IN 3/88.                        AS OF NOW, NO FURTHER ACTION IS                                                      IS BEING PROCESSED FOR. ISSUANCE.
PLANNED FOR THIS ITEM UNDER II.E.6.1. ASSUMING THAT THE                                                                          3.      MOTOR OPERATED VALVES IMPLEMENTATION OF THE INDUSTRY PROGRAM PROVES TO BE                                                                              THE STAFF HAS CONTRACTED WITH BNL TO PREPARE A EFFECTIVE. THIS ITEM WILL BE CONSIDERED RESOLVED.                                                                                COST-BENEFIT / REGULATORY ANALYSIS IN ORDER TO SUPPORT RES/EIB IS TO RECEIVE FINAL VERSION OF EPRI APPLICATIONS                                                                        EXTENDING REQUIREMENTS TO VERIFY SWITCH SETTINGS AND VERIFY GUIDE FOR REVIEW. NRR IS ISSUING PERIODIC PROGRESS REPORTS                                                                      OPERATING PARAME TERS FOR ALL SAFE TY-RELATED MOTOR-OPERATED TO THE COMMISSION DESCRIBING INDUSTRY IMPLEMENTATION                                                                            VALVES.          THIS WOULD BE AN EXiENSION OF IE BULLETIN 85-03 J
EFFORTS.                                                                                                                        REQUIREMENTS. A DRAFT OF THE BNL REG. ANALYSIS WAS RECEIVED AS OF FY88 OUARTER 2
* e y
 
2
              -              D        -
              -              W        -                                                                            R
              -              A        -                                                                            E
              -                        - E                                    E                  Y      K          T
              -      SER      N        - V      Y                            P                  B      C S        R
              - NITA          O        - L      T                P            U      E              D  E    E      A MDL HMV O
              - EHAL          I        - A      E                OL          T      P                            U
              - ETDUET                - V      F                JA          A      U        EEU CAL              C
              - B NGBA                -        A                AM          N    STH        LTO        RA 8            -      FAE      R        - U S                L  MR N G
* UC                  BNWKDGV D            8 8            - EJMRYU                - T        Y S      L      ESORI VFU SOE CED                            A 8
/            - V          AG        - I      DN A A OHE ESRO S TRMSETPM                          O              V 1                ATLTMI                - S FA                    TTV3H OMG                  RPETHAPC              L F 1  6            HLLA T                - -      O        .E  R  N    L0TTF          NF    O LRCL          E    R
/ 7          -      UI TN            - N N . SDE              I  .A OA DIO FFPO EOH                          E F 5  1            6SWSSO                - I      ED EID              SV5 HDED                FOMFDRPC V              O 0                0E EEC                -        TE    VVN      D~      8STETRE            E    IFE      N      O
              -      RTVT              - ETNS . LOU EVN A TAAS                                N ETYID              S 7    AL M            - KAIOSAR                DOON NPLGU YOE AT                          E  L  A E  E            8LHANE                - OH LNVPY                IMIILOOEE                  RIRELEET              A TTESEFHA              M T
A A G        -
              - RN ATVET ES    NN
                                      - VTRCO I    IGOI T
V .TTLIDRRY I    AEESA-            B SAWERATL R                  .
D P              EISNWY            O IEEYTNTL DSLLWU YD                                    UC HS            E    E
              - TFTOTS            I -      RHAII          I      EOL LETED DINTY                          R H N            - T      NIE        T - DUTTDTRB GVSUSCBETE FOI                      NFO TL IIITELMY
                                                                                                              -  T U                EEETBS            UNS SNSAA NLIBAN                                            TTAFAAT Q                LHMA A            L ASM OEER                    IA          ODANF                              F
              -      TELL          O-        AR .CTPE            EVEE ,CLS              S    .NCHA        RE O C ROAH            SP ON                  PP B        RIS    U  SI  SEETSTGF
              - ITISVC            E OYFESUAO                      KU GEOLNT EDP                      AOA D RAUIRU            R - LLRPIT                    SCSONHHLRA VISDGHPS            NENTP E
EHQ ES            / EEEOSI                ,E  IEST!TSAES                L L C T
              - NTEET              M VTP ASIV                      HE    !        C      AFITI
              - E      RRNS        E      EA YB XL ICRSTOYFNE        PEETLOOB VO SDEEL DERPHA U          D
              - GD UIN            L      DSLA N A                                        KMEGAUT              N
              -      EES O        B-        CLTNINV 6G IS B C
              - GTSSCI            O OEISG O                      .NDL      DAG N CACGGS O O
              - NCOEIT            R TDW            IFIF          INPHEBNEA ERNUESNT C
              - IEPRFA            P-        A      , SOTOS      E.DAECLOIHC    RTT HGASRAI COH              D N DPOPIR                - S SEE C              NIR
                                                                        .R T
              - PXR        CE        - ILESDSEEOIA                      I EPS  S          RNSSDDE E
              - AEPLED                -    LVO DSCI GNEWV                        EF*      OPEANLED              E
              - G        LPI          - EILLRO              NTFEOHSASTOV                  T      HPUDN B
              - ESOASS                -I VWACEHEAIORIT                      HE        O      AH  EOUE N                                      T    V UULM D TFCWLT S TS V .DTMRD M        - RIT E        -          FEO                        MESUNNTCFO                .Q T L      RDIFN Cx A T
S
              - STEOHC                    CODNUMASOOREOMSIIAF EOEE ANWAOONE NNS O GU H
TCPI
              - EIB        T                                SCIOT Y          - E        G N              JHTPITNA              TFOSFOH            T      EOGS N N Y S        - S LN O                - BTAONNI DUFREOICNOY                                RRN      EIEE        D
              - N      LI        E        OEL(OE            EELEPI          TEINTS          AOEH        RE7U L        - EDITSTP                -    ME IRDiTO                  DEAT          IEH      LHTFEB8T O        - CEWSLNY                    E    PNTREAASFDUCG CFLUTDAT IW /S                          Y P        - IT        EAET        - HG OAUBUPEOATNIGIIIQIE                                              T3 FSSO A T
N
              - LATTVD
              -      UR    RNE
                                      - TNYINCICIR
                                      -    ITTI        REC SL RSIO OSATND .BIWRS    AN    EE SEENF O        - MLOKEEV                -    TECB        CDI      AR    UECITRH TVOIVV O C S      - OAFATPL                -    SFNM        SAT      EE      SVARSEC            NLPTLLS E  S      RVFENEA              -    EAUO ENN RV                  SNPEOPE EANAAAAS T V      -  FEELIDV              -    TSFC DIA              AO AITPMOT                CVISVVHA N L  U-O E A      -
M V  T -
E          -
G F  A-A 6      -            S S        -
N    T -                RE      -
A G        -            PAI        -
M N  SE                WLL        -
I        -  V        BIP        -
E T        -  O          IE        -
U S      -  RR        TMR        -
S E        -  PE        AS        -
S T        - MD                    -
I          - IN        AA        -
U      -      U      C    8      -
C T        - O          D    8    -
I I        - TY        L    /      -
R S        -    A        D4        -
E  -
              - TW        ME        -
N N        - eR        EWF        -
E I        - OE        TEO        -
G          - FD        SI          -
              - FN        YVS        -
E        - EU        SEA        -
L        -            RP          -
T        - YS        E    D S-I        - RI        TGE    T -          S T        - T          NNW    N-          N
              - SS        IIE    E-          O
              - UE          EI  M-          I
              - DV        GBV    U-          T
              - NL        N E    C-          A
              - IA        ISR    O-          C
              - V          DI    D-          I
              - L          R G        -      F
              - ED SADN          D-          I
              - LE      EGNI    E -          C
              - LT      VEAE    T -          E
              -  AA LR B        C-          P
              -  RR A C          E-          S
              -  AE VYRO        F I        -  PP        DNS    F    _      L
              -    O NU        L A-          A 6        -  A-    OTOA          -    )C
              -    R    IST          -    GI E        -    O  .T      S      -    IN
              -    TPALDI            - AH I        - 8OILNE                -    5C I        - 8MHOBTS                -    5E
              - 9 SS        T"        - 6    T
              . 1FRIEIR                - 00
              -                        - 15D R        -    .O SETBP O HMW          -      R E        - YENR          U        - IRA B        - RCOUFSR                -    FD M        - ANPSO O                -    CN U
N E
U S
S
              - UASS NF
              - RN
              - BECRFET
              - ETRPABR
              - FNA
              - NAU ETE IM DSF R
AF O
                                        - G A
_ R1S
                                        - )))
                                        - I23 0T O
I        - IMN4AHE                - I((
 
O                                                                                      f%
* I
                                                                                                                  \
                                                                                                                                                                                                          \,,e)
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                              PAGE: 177 ISSUE NUMBER:                        II.E.6.I                                        TITLE. IN-SITU TESTING OF VALVES AFFECTED DOCUMENTS                                                                                  PROBLEM / RESOLUTION STANDARD GUIDANCE FOR THE APPLICATION OF THESE DEVICES TO SAFETY-RELATED VALVE OPERATORS.
PRESSURE ISOLATION VALVES. WHICH ARE TWO VALVES IN SERIES AT EACH INTERFACE SEPARATING THE HIGHER PRESSURE l                                                                                                                        RCS FROM ATTACHED LOWER PRESSURE SYSTEMS, MUST BE PERIODICALLY TESfED. SOME OLDER PLANTS DO NOT PERFORM SUCH TESTS ON ALL PIV'S.                        STUDIES ARE BEING PERFORMED TO JUSTIFY IMPOSING SUCH PERIODIC TESTING ON ALL PIV'S.
ORIGINAL                      CURRENT                    ACTUAL                    l i                                                                        MILEST0N ES                                                    DATE                      DATE                        DATE INSERVICE TESTING OF CHECK VALVES                                                            --                          --                          --
(INPO) ISSUE SOER REGARDING                                                            07/86                            --
10/86 AUGMENTED TESTING OF CHECK VALVES I
(NRR/RES) REVIEW SOER TO SEE IF NRC                                                    10/86                            --
02/87                    ,
CONCERNS ON IN-SITU TESTING OF "SIMPLE" CHECK 4
VALVES SATISFIED. ISSUE RPT &/OR LTR (NSSS OWNERS GROUP) ISSUE OWNERS                                                      OS/87                            --
11/87 GROUP APPLICATION GUIDE FOR CHECK j                                            VALVES (NRR/RES) REVIEW DWNERS GROUP APPL GUIDE TO                                            08/87                            --
01/88
,                                          SEE IF NRC CONCERNS ON IN-SITU TEST OF "SIMPLE" CHECK VALVES ARE SATIFIED
]
]                                            (NRR/RES) REPORT (ACRS)                                                                08/87                            --
03/88 INSERVICE TESTING OF MOV*S                                                                    --                          --                        --
tRES) ISSUE MOVATS REPORT REGARDING                                                    09/85                            --
01/86 USE OF SIGNATURE TRACING TECHNIQUES
;                                          10 EVAL. THE OPERABILITY OF MOV'S 1
l                                            (NRR/RES) REVIEW MOVATS REPORT AND AEOD                                                  11/85                            --
08/86 j                                          COMMENTS ON MOVATS REPORT t
AS OF FY88 QUARTER 2 I
i 4
f                                                                                                            .
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                    PAGE:          178 ISSUE nut 48ER. II.E.6.1                                      TITLE  IN-SITU TESTING OF VALVES ORIGINAL        CURRENT          ACTUAL M I LES T 0N E S                                            DATE          DATE              DATE (NRR) REVIEW RESPCNSES TO IE BULLETIN                                              01/87          06/89                  --
85-03 FPOM LICENSEES AND APPLICANTS (RES/EIBl PREPARE STAFF POSITION                                                  02/86              --
10/87 ON ADDITIONAL AND/OR MODIFIED IN SITU TESTING OF MOV"S (RES/EIB) PREPARE VALUE/ IMPACT STMT & CnST/                                      04/87              --
02/88 BENEFIT ANALYSIS FOP STAFF POSITION ON MOV IN-SILO TEST COMPLETE PROPOSED RESOLUTION PACKAGE                                              03/88          06/88                  --
DIVISION DEPUTY DIRECTOR RES REVIEW COMPLETED                                      04/88          07/88                  --
PACKAGE TO CRGR (29)                                                            06/88          09/88                  --
CRGR REVIEW COMPLETE                                                              08/88          10/88                  --
ISSUANCE OF FINAL RESOLUTION MEMO ON MOV'S                                        09/89          12/88                  --
THERMAL OVERLOAD PROTECTION OF MOV'S                                                    --            --                --
lRES/EIB) STAFF COMPLETES REVIEW TO                                                05/85              --
10/87 DETERMINE REQUIRED MOD, IF ANY. TO REG GUIDE 1.106 REGARDING TOL PROTECTION (RES/EIB) STAFF PREPARES POSITION VALUE/                                            02/86              --
10/87 IMPACT STMT. COST / BENEFIT ANAL., DRAFT RG MOD AND/OR GEN LTR PKG ON PESULTS RES DIRECTOR COMPLETE REVIEW OF TOL                                                08/87        04/88                  --
PROTECTION PACKAGE & ISSUE NUPEG FOR PUBLIC COMMENT PUBLIC COMMENTS RECEIVED ON DRAFT NUREG                                            05/88        05/88                  --
FINAL NUREG ISSUED WITH C0t1MENTS                                                  07/98        07/88                  --
PRESSURE ISOLATION VALVES                                                                --            --                --
AS OF FY88 OUARTER 2 O                                                                                O                                                            O
 
                                                                                                                        -                    O RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONIROL SYSTEM                  PAGE;        179 ISSUE NUMBER: II.E.6.1                                    TITLE: IN-SITU TESTING OF VALVES ORIGINAL      CURRENT          ACTUAL MILESTONES                                                DATE        DATE              DATE (RES/EIB) REVIEW RES PROPOSALS FOR PRLSSURE                                      05/84              --
05/84 ISOLATION VALVE LEAK TESTS & OTPERS. PROVIDE RECS TO RES FOR REVS TO TEST SCOPE & LAB SEL.
(RES) INITIATE CONTRACT FOR PIV                                                  05/84              --
10/84 LEAK RATE TESTING (ETEC)                                                                                                                    ,
(RES/EIB) ISSUE INTERIM MEMO. TO VENDOR                                          07/86              --
07/86 DIVISIONS CALLING FOR PIV TESTING AT                                                                                                        i MTOL*S IN ACC. WITH 10CFR 50.109 r
(RES/EIB) PREPARE GENERIC LETTER TO ALL                                          08/86              --
08/86 LICENSEES ASKING FOR PROOF OF VERIF. OF RCPB BY TESTING PIV'S (NRR) DIRECTOR, NRR FORWARD 50.54(F)                                              08/86              --
02/87 GENERIC LETTER FOR CRGR APPROVAL (CRGR) REVIEW AND APPROVE 50.54(F)                                                09/86              --
03/87 LETTER TO ALL LICENSEES REGARDING VERIFICATION SF PIV'S (NRR/DSRO) ISSUE 10 CFR 50.54(F)                                                  09/86              --
03/87 LETTER ON PIV VERIFICATION (RES) REVIEW LIC RESP TO 10CFR 50.54(F)                                          01/87              --
10/87 ON PIV VERIF. DETERM)NE PROCS ARE ADEQUATE TO ASSURE INTEG OF RCTR COOLANT PRES BNDRY IRES) ISSUE ETEC/ DOE LABORATORY REPORTS                                          07/86        04/88                  --
ON PIV TESTING.(1) CHECK VALVES; 32)
GATE VALVES (RES/EIB) COMPLETE GSI 105 "INTERSYSTEM                                        .04/88        09/88                  --
LOCA IN LWR'S" PACKAGE TO CRGR (RES/EIB) PREPARE POSITION FOR PIV BOUNDARY                                      06/88              --
02/88 VERIFICATION TESTING BASED ON RESULTS OF GSI 405 & ETEC TESTS AS OF FY88 QUARTER 2
 
l
!                                                                                                                        RUN DATE. 05/11/88 1
j                                                                    GENERIC ISTUE PENAGEME NT CONTPOL SYSTEM                PAGE          180                    ,
i                                                                                                                                                                !
j  ISSUE NUMBER-    II E.6.1                            TITLE- IN-SITU TESTING OF VALVES ORIGINAL      CURRENT        ACTUAL
!                                          M ILEST 0N E S                                              DATE        DATE            DATE
* j                      __._. ____.....__...___._____________._______
i                      DIVISION DEPUTY DIPECTOR PES REVIEW COMPLETED                                  05/88        10/88                --
CONCURRENCE BY OTHER OFFICES                                                  07/88        01/89                --
i l                    PROPOSED RESOLUTION SENT TO CRGR BY PES /E IB                                  10/88      03/89                --
  ,                                                                                                                                                                i j                      CPGR CCMPLETES REVIEW OF PROPOSED PIV TESTING                                  10/88      06/89                --
FRN OF ISSUANCE OF FINAL PESOLUTION                                            04/89        10/89                --
i
!                                                                                                                                                                l 1
I I
l                                                                                                                                                                  !
1                                                                                                                                                                i l.
I                                                                                                                                                                !
e
'l i
I AS OF FV88 CUARTER 2 I
1 l
\
O                                                                                O                                                      O
 
_ _ _ _ _ _ _ _          __    _ _ _ _      =                  _-  .                  _              _ _ .        _                _                          _.                                                                                            .m
                                                                    ,s                                                                                                        -s                                                                                                                              . s
                                                                                                                                                                                                                                                                                                              \s RUN DATE: 05/II/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                                                                                  PAGE: 181 l                                                        ISSUE NUMBER:            II,F.S                                    TITLE- CLASSIFICATION OF INSTRUMENTATION CONTROL AND ELECTRICAL EQUIPMENT l                                                        IDENTIFICATION DATE: 05/80C                                        PRIORITIZATION DATE- II/83C                                                        TYPE: LI                                                                          PRIORITY:
i                                                        TASK MANAGER: TBD                                                  OFFICE / DIVISION / BRANCH- RES /DE /EIB                                          ACTION LEVEL: INACTIVE                                                              STATUS: 5 l
l                                                        TAC NUMBERS:                                                                                                                                                                                                                              RESOLUTION DATE-    _ _ _ _ _
WORK AUTHORIZATION: TMI ACTION PLAN. NUREG-0660 FIN                  CONTRACTOR                                                                              CONTRACT TITLE A3249                  BNL                              CLASSIFICATION OF SYSTEMS IMPORTANT TO SAFETY                                                                                                  .
W0RK              SC0PE TO DEVELOP A METHODOLOGY FOR THE CLASSIFICATION OF                                                                        SYSTEMS IMPORTANT TO SAFETY.
5TA !US kkkkNkkhbhhkkkhkhkbkhhkhbIRhbhbtEbbkhkbkkkbhhk                                                                                khE kkhHh b L Rkhhlb hh hh kHkh kkkk hkh hk kbHkkVkb SYSTEMS IMPORTANT TO SAFETY.                          IEEE STD. P-827 HAS BEEN                                            BY THE ISSUANCE BY THE IEEE OF A SUITABLE STANDARD WHICH MAY ABANDONED IN FAVOR OF A DIFFERENT APPROACH INVOLVING THE                                                                  SUBSEUENTLY BE ENDORSED IN WHOLE OR IN PART BY A REGULATORY DEVELOPMENT OF A NEW STANDARD TAKING INTO ACCOUNT APPLICABLE                                                              GUIDE. OR ALTERNATIVELY BY THE ISSUANCE OF A REGULATORY WORK DONE BY OTHER TECHNICAL SOCIETIES SUCH AS ASME AND ANS.                                                              GUIDE IRRESPECTIVE OF WHAT OR WHEN IEEE MIGHT ISSUE A NRC IS PARTICIPATING IN THIS EFFORT AS STIPULATED BY ITEM                                                                  STANDARD IN THIS AREA. AT THIS TIME WE ARE CONTINUING OUR II.F.S_      THE PARALLEL NRC EFFORT TO DEVELOP A DRAFT                                                                    PARTICIPATION IN THE IEEE EFFORT TO DEVELOP A DRAFT STANDARD REGULATORY GUIDE ON CLASSIFICATION OF SYSTEMS IMPORTANT TO                                                                P-1409 UNDER IEE/NREC/SC_6.2. WORKING GROUP ON SYSTEM SAFETY HAS BEEN DESIGNATED AS PRIORITY C AND HAS BEEN TAKEN                                                                CLASSIFICATION.
OFF THE LIS' 0F ACTIVE RES TASKS.
AFFECTED DOCUMENTS                                                                                                                        PROBLEM / RESOLUTION l
DRAFT REGULATORY GUIDE FOR THE CLASSIFICATION OF                                                                                    FOR THE PAST FIFTEEN YEARS IEEE/NPEC AND NRC STAFF HAVE INSTRUMENTATION. CONTROL AND ELECTRICAL SYSTEMS AND                                                                        BEEN ATTEMPTING TO DEVELOP A STANDARD TO DEFINE REQUIREMENTS COMPONENTS (ICES /El IMPORTANT TO SAFETY.                                                                                  FOR EQUIPMENT AND SYSTEMS THAT ARE NOT SAFETY-RELATED. BUT ARE SUFFTCIENTLY IMPORTANT TO SAFETY TO WARRANT SPECIAL CONSIDERATION. .THESE EFFORTS HAVE NOT MEY WITH SUCCESS; NOR HAS BNL BEEN ABLE. IN THE OPINION OF E ME B . TO DEVELOP AN l
ACCE P TABLE ' STANDARD' OVER THE PAST SEVERAL YEARS UNDER CONTRACT TO NRC.                                IEEE/NPEC WORKING GROUP 6.2 IS CURRENTLY AS OF FY88 OUARTER 2 l
i o
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEFENT CONTROL SYSTEM                                              PAGE:            182 ISSUE NUFFEP-          II.F 5                        TITLE CLASSIFICATION Or INSTRUMENTATION CONTROL AND ELECTRICAL EQUIPMENT AFFECTED DOCUMENTS                                                                        PROBLEM / RESOLUTION TRVING TO DEVELOP A STANDAPD. WE WILL PARTICIPATE IN THIS ACTIVITY BY APPOINTING AN NRC STAFF MEMBER TO THE WORKING GROUP i                                                                                                  ORIGINAL                    CURRENT                      ACTUAL M ILEST 0N ES                                            DATE                      DATE                          DATE
                            !  ,UE TRANSFER MEMO TO NPR                                              02/86                          --
12/85 ISSUE CLOSEOUT MEMU TO EDO                                                05/86                          TBD                          --
1 l
l 1
a l
i AS OF ryg8 OUARTER 2 4
!      9                                                                          O                                                          - - -                -- --
9    -
 
_ = .    -                        .                    _            ._.
q                                                        -            %s i
RUN DATE: 05/11/88 1
GENERIC ISSUE MANAGEME NT CONTROL SYSTEM                                        PAGE: 153 ISSUE NUMBER:    II.H.2                      TITLE: OBTAIN DATA CN CONDITIONS INSIDE TMI-2 CONTAINMENT l        IDENTIFICATION DATE: 05/80C                    PRIORITIZATION DATE- II/83C                          TYPE: GSI                          PRIORITY: H TASM MANAGER: R. VAN HOUTEN                  OFFICE / DIVISION / BRANCH. RES /DRAA/AEB            ACTION LEVEL: ACTIVE                STATUS:
TAC NUMBERS:
RESOLUTION DATE I2/89 WORK AUTHORIZATION: TMI ACTION PLAN. NUREG-0660 FIN          CONTRACTOR                                              CONTRACT TITLE D2072            MPR                  TMI-2 BOTTOM HEAD SAMPLING NONE              NONE                  NONE W0RK      SC0PE hRbHkbbbbPkkkhkbWkkbbbk                b hbbb RY b      EbhhbH            VEbbkl hHkbbhkRkbbbhhbN                  bRkbbkkhbbkbbN hh bh AND DATA-GATHERING PROGRAMS WITHIN THE THI-2 CONTAINMENT.                          AND VARIOUS MECHANICAL. ELECTRICAL. AND INSTRUMENTATION THESE PROGRAMS CONCENTRATE ON RETRIEVING DATA WHICH                              EQUIPMENT.      PRIOR TO CY88 NRC PRIMARILY PROVIDED TECHNICAL CHARACTERIZE THE PROGRESSION OF THE ACCIDENT AND THE                              EXPERTISE AND HOT-CELL EXAMINATION OF CORE MATERIALS. THE PESULTING RADIOLOGICAL SOURCE TERM.              THE PROGRAMS ADDRESS              PROGRAMS WERE GENERALLY CARRIED OUT WITH FUNDS FROM DOE AND T Hi EXAMINATION OF THE REACTOR INTERNALS (ESPECIALLY THE                        OTHERS. EARLY IN CY88, NRC INITIATED ITS OWN COOPERATIVE REACTOR CORE AND FUEL). THE PRIMARY SYSTEM PIPING AND                              PROGRAM TO EXAMINE THE DAMAGED BOTTOM HEAD.
STATUS PRkbhkkkbRhbbbhbkkhRkhkbbhhhk-2bbhkkXkhkhkhhhh                            kFhkR kHkkbbkbkkhHkbkkkhkhPRbbRkkhkbhkhbbThh5 BOTH ON-SITE AND OFF-SITE.            A PLANNING BASIS FOR WORK                  MINUTES. DOE HAD NOT BUDGETED FOR THE ADDITIONAL RESEARCH SUPPORTED BY NRC AND SEPARATELY BY DOE INCLUDED A PRIORITY                        TO EXAMINE THE EFFECTS OF THIS MOLTEN MATERIAL ON THE VESSEL ANALYSIS. DEPENDING UPON AVAILABILITY OF SAMPLES FROM DOE.                        BOTTOM AND VESSEL COMPONENTS.              THE CHARIMAN INDICATED THAT NRC IS CONDOCTING: A SERIES OF OFF-SITE EXAMINATIONS OF                          HE BELIEVED TilIS EXAMINATION TO BE VERY IMPORTANT. NRC SELECTED CORE MATERIALS AT A NATIONAL LABORATORY.                                ASMED DOE TO PERFORM THE EXAMINATION BUT DOE DECLINED _
RECENT CORE EXAMINATIONS INDICATE A LARGE FLOW OF                                NRC INITIATED A COOPERATIVE PROGRAM JANUARY 15 1988.
MOLTEN MATERIAL (HORE THAN 15 TONS) INTO THE LOWER PLENUM                        NEGOTIATIONS WITH PROSPECTIVE PROGRAM PARTNERS CONTINUE.
AFFECTED DOCUMENTS                                                                  PROBLEM / RESOLUTION DEVELOPED AND DEMONSTATED PRIOR TO THE 10/15/89-12/1/89 AS OF FY88 QUARTER 2
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                                      PAGE-        184 ISSUE NUMBER:                    II.H.2                                        TITLE. OBTAIN DATA ON CONDITIONS INSIDE THI-2 CONTAINMENT AFFECTED DOCUMENTS                                                                                                  PROBLEM / RESOLUTION SAMPLING WINDOW ORIGINAL                                  CURRENT              ACTUAL M I LEST 0N E S                                                  DATE                                    DAeE                DATE REVISED CORE EXAMINATION PLAN IDOE                                                      04/83                                        --
10/84 RESPONSIBILITY HEAD REMOVAL                                                                              07/83                                        --
07/84 PLENUM REMOVAL                                                                          07/85                                        --
05/85 BEGIN DEFUELING                                                                          10/85                                        --
12/85 REVISE CORE EXAMINATION PLAN                                                              12/85                                        --
02/86 CORE DRILLING                                                                            07/86                                        --
03/87 COMPLETE DEFUE8 ING              -                                                        06/87                                    12/88                    --
FINAL FUEL ANALYSIS REPORT                                                              09/87                                    10/89                    --
ISSUE CLOSEOUT MEMO TO EDO                                                                12/87                                  I2/89                    --
AS OF FY88 OUARTER 2 O                                                                                                  O                                                                                              O
 
                                                                                \
                                                                                                                                                    }
                                                                                                                              ,                    /
RUN DATE: 05/11/88 8
GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                                  PAGE: 185 ISSUE NUMBER:      II.J.4.1                  TITLE: REVISE DEFICIENCY REPORTING REQUIREMENTS IDENTIFICATION DATE: 05/80C                  PRIORITIZATION DATE: 11/83C                        TYPE: GSI                        PRIORITY:
TASK MANAGER: W. JONES                        OFFICE / DIVISION / BRANCH: AE00/SPDV/SPRO        ACTION LEVEL: ACTIVE              STATUS. NR TAC NUMBERS:
RESOLUTION DATE: 11/88 WORK AUTHORIZATION: TMI ACTION PLAN, N9 REG-0660 l
!          FIN              CONTRACTOR CONTRACT TITLE I
NONE                                    --- ..-------.......-.......-------------.------. -------...----------
NONE              NONE W0RK      SC0PE NRC WILL REVISE THE REPORTING REQUIREM'NTS OF 10 CFR                      REPORTS RECEIVED AS A RESULT OF THESE RULE CHANGES WILL 50.55(El AND 10 CFR 21 TO ASSURE THAT ALL REPORTABLE ITEMS                      PROVIDE INCREASED INF ORMATION ON COMPONENT F AILURES THAT ARE REPORTED PROMPTLY AND THAT THE INFORMATION SU8MITTED IS                    AFFECT    SAFETY SO THAT PROMPT AND EFFECTIVE CORRECTIVE ACTION COMPLETE.      A MAJOR OBJECTIVE WILL BE TO ELIMINATE                          CAN  BE TAKEN.
DUPLICATIVE EVALUATION AND REPORTING AND ESTABLISH                                                THE INFORMATION wit.L ALSO BE USED AS INPUT TO CONSISTENT SAFETY DEFICIENCY REPORTING REQUIREMENTS. THE                        AN AUGMENTED ROLE OF THE NRC*S VENDOR AND CONSTRUCTION-INSPECTION PROGRAM.
STA TUS
  --.---CRGR  -----.........------.-----...------        ---....-.--..---- ...------ ..---........--.----------.......---...--...---.......
REVIEWED THE PROPOSED 10 CFR 21 AND 50.55tEl RULE AMELJMENTS ON 11/12/87 AND CRGR COMMENTS WERE PROVIDED IN A                    SUBMITTED TO THE CRGR STAFF ON 12/29/87 FOR REVIEW AND 12/17/8 7 MEMO.                                                                FORWARDING TO THE EDO.          FORWARDED TO COMMISSION ON 3/9/88.
THE PROPOSED AMENDMENTS WERE REVISED TO ACCOMMODATE THE CRGR COMMENTS.            THE AMENDMENTS WERE                  COMMISSION PROCEEDING.
VOTING COMPLETED ON 4/18/88. AWAITING SRM BEFORE AFFECTED DOCUMENTS
  .......--......--....---------.----...----.-----....--------                                              PROBLEM / RESOLUTION 10 CFR 50.55tE), 10 CFR 21                                                ------.--....--...------------.--......---------.----..-..--
THE SCHEDULE HAS BEEN REVISED TO REFLECT DELAYS IN THE REVIEW AND CONCURRENCE PROCESS.        THE SCHEDULE FOR FINAL PUBLICATION OF THE RULE IS NOT EXPECTED TO CHANGE.
ORIGINAL              CURRENT              ACTUAL MILEST0NES                                          DATE                DATE                DATE 0FFICE CONCURRENCE COMPLETE                                        04/83                  --
06/85 AS OF FY88 OUARTER 2
_ a
 
N Cl w
b ut 8
.e                                                                                                                      -
so                                                                                                                      se N                                                                                                                        >
M                                                                                                                        w M    @            t N ee              e                                                                                                    u O    M      .J    e                                                                                                    O O            (wac O e e                        P. N      N      N    5        N      N  se os es        es Up t se se es se                  se se      se    es es        es    se se se te          se  i    e O kWl N N N N                        N N        N      N    N      N      N N N N              N    t    i et W    W      UQtW          N    N O          W    W      @      W    @        m      m N N N              M N    O      et    i O O          M    M      O O        O      O O          O      O O        OO        O
(    (              l O E                I E
D U
t b      a E      t se **
wwe                                                                  I                              e8  83 eL > 6 4        4    4    I      (    0      I      l    i              4    4    5  %    I i    I                        I  I    I  N N
            &( 6 I          I    e    4      4    4      4                    a      4    9 N
30t                                                                                                @
Q      l                                                                                            OO e
i O
1  7 w  w H  1          6 0  w  .J    e
    >  h  at    t O  M  2wi@            m    M    w      N    N      N      >= >.        N      N    N    N  N    >= se se D  M>      e 90    se se se          op se      e3    em se        se    se so te Se          et  EO  95 J O  04iN N N N                        N N        N      N N          N      N N N N              N N N O  w  MOie            e e o              w    et    c      e e          ch    m ==      M  N    N  H    M h  M      I O O        O    M      O O        O      O    O        O      O    M    M  M    M  O O k.
    >      O      e R  Ci          i O  Z U  M e
b-  et k?  O W  h 1  W w  a O              5 et  >          i F  U          e 4  2          i 1  w            i i                                                          O w  U
* b D  M          i                      e O  w          i                      se                                  O                    O O  w          i                      NW              3                    2                    H M  Q            6                4O >                w                    O i                  MN      M          M                    M                    O O  w          i            F    >N      >-          >                    0                    et M  O            I          O        O U            w            .J    O                    et e  M      O4                M    QM w          .J    06          at      D                    3 w  >            a 3        0 w            a    at                  2      O                    E 2  w      w6 w              O    at O    M    2    7            O      O                    O w  at          6 M        M    hw Q O              O            M      M                    w 0
* i >                  D>            M    M      O O          O                O ew            . *- it    2 OO O            W-    wO                      OO            >- O w      Oea                    wO O ww w                  2 mw w                        w >-          E O J          t          U a            M    aD e                  D U        ~                            at
        >      >t      at                O e          O                OO    M      cm        O w                w M            iO        O        JK O AO O z                    YO w          N          >= U
        >-    eiw w
                                  *- (w M MM          (            U (M    w      -              a    r      O e                >E                  et                  O          3 > w            O O O w e er >= 0 0                            >-              w >=      e  O w 0 et              M      M i O w > et O                  w0 w          w UO at            w M        w er      O U er
                .J e e      .J    R CL >- U Uw U                  O Mw w              D > D D              O  M  w i U ct w e6 R                  MD    M      DJ w2 >-            O w O O              M J A M e          E I (w > wO w                                wU r          O e6      w a            tu iO O O EOA Mw      w w6wC etw O            U Ow MO            M          er O          D k-E * >= U                                            2        m        W      tr        O          6 F i          w Om 1                            M    O      OD > 0 3                    O iO    3  1          M        Ow O                Fw rO O es w O                          ar aw w        ( rD O NO          F              O DU DO w U                    M  or O O              i i>    M          00      p    DR D          >- 02        OM    D          > wo >- w O              l i> > 0 Mw                      Ow Cw              as w as      O w w            M            U    i s.e          4 M  W w Ok w k EE                  k >* W          &        WW    W. E    WO O I              l 4 7 m O O                >=      or    w t- OE O>              et w            >O    at  O U        1 g            6d          O Mw          M    >- D H .J M        23 PJ                J w ** M      ( M M        j eZ m a              w p OO OA &                  OO OO e A D w                      p .J .J      i
        *1            e( 0 O              ( .3 es 7 er K 3 U2 UO O E O O                                    m  du in    i 6 e6  er er          > w MO MO w wO ww er O O w                                        O D D        i M            i - U a UO = wu wu = OU                                    O=    U U        M    =U    w a a        i M                                                                                                                  I h
w h
O M
 
RUN DATE: 05/11/88 GENERIC ISSUE MANAGEMENT CONTROL SYSTEM                            PAGE:            187 ISSUE nut 48ER : II.J.4.1                      TITLE. REVIS[ DEFICIENCY REPORTING REOUIREMENTS ORIGINAL      CURRENT                    ACTUAL MILESTONES                                            DATE      DATE                        DATE RESOLUTION OF PUBLIC COMMENTS COMPLETE                              06/88      09/88                            --
PACKAGE TO EDO                                                                                                                                    '
EDO CONCURRENCE PACKAGE TO COffilSSION                              01/88      10/88                            --
FINAL RULE PUBLISHFD                                                09/88      11/88                            --
e a
e a
AS OF FY88 OUARTER 2
_ _ - - - - _ - _ _ - _ _ , _ _ _ _ _ _ _ - _ _ _ - _ . -}}

Latest revision as of 23:14, 10 December 2024

Generic Issue Mgt Control Sys,Second Quarter FY88 Update
ML20154Q924
Person / Time
Issue date: 05/31/1988