ML20204J490: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:a .
{{#Wiki_filter:a OPERATING DATA REPORT DOCKET NO.
OPERATING DATA REPORT DOCKET NO.     50-269 DATE     04-15-85 COMPLETED BY       J.A. Renvis.
50-269 DATE 04-15-85 COMPLETED BY J.A.
TELEPHONE       704-373-7567 OPERATING STATUS
Renvis.
: 1. Unit Name:         Oconee 1                                       Notes 1 Reporting Period: March 1. 1985-March 31, 1985                       Year-to-date and cumulative
TELEPHONE 704-373-7567 OPERATING STATUS
: 3. Licensed Thermal Power (31Wt):         2568                         capacity factors are calcu-
: 1. Unit Name:
: 4. Nameplate Rating (Gross'31We):             934                     lated using a wea.ghted
Oconee 1 Notes 1 Reporting Period: March 1. 1985-March 31, 1985 Year-to-date and cumulative
: 3. Licensed Thermal Power (31Wt):
2568 capacity factors are calcu-
: 4. Nameplate Rating (Gross'31We):
934 lated using a wea.ghted
: 5. Design Electrical, Rating (Net MWe): -
: 5. Design Electrical, Rating (Net MWe): -
886                    average for maximum
average for maximum 886 dependable capacity.
: 6. Maximum Dependable Capacity (Gross MWe):         899               dependable capacity.
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):           860
899
: 7. Maximum Dependable Capacity (Net MWe):
860
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
None
: 9. Power Level To Which Restricted,if Any (Net MWe):           Monn
: 9. Power Level To Which Restricted,if Any (Net MWe):
Monn
: 10. Reasons For Restrictions.If Any:
: 10. Reasons For Restrictions.If Any:
This Month         Yr..to-Date         Cumulative i1. Hours In Reporting Period                               744.0         2 160.0               102 649.0
This Month Yr..to-Date Cumulative i1. Hours In Reporting Period 744.0 2 160.0 102 649.0
: 12. Number Of Hours Reactor Was Critical                     744.0         2 157.2                 74 150.2
: 12. Number Of Hours Reactor Was Critical 744.0 2 157.2 74 150.2
: 13. Reactor Reserve Shutdown Hours                         ---              ---
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On.Line                                 744.0         2 151.6                 70 855.6
: 14. Hours Generator On.Line 744.0 2 151.6 70 855.6
: 15. Unit Reserve Shutdown Hours                           ---                ---                    ---
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal Energy Generated (MWH)                 1 916 447         5 507 756             170 381 520
: 16. Gross Thermal Energy Generated (MWH) 1 916 447 5 507 756 170 381 520
: 17. Gross Electrical Energy Genanted (MWH)                 667 610         1 915 920             59 252 600
: 17. Gross Electrical Energy Genanted (MWH) 667 610 1 915 920 59 252 600
: 18. Net Electrical Energy Generated (MWH)                 639 209         1 832 685               56 164 971
: 18. Net Electrical Energy Generated (MWH) 639 209 1 832 685 56 164 971
: 19. Unit Service Factor                                     100.0               99.6                 69.0
: 19. Unit Service Factor 100.0 99.6 69.0
: 20. Unit Availability Factor                               100.0               99.6                 69.1
: 20. Unit Availability Factor 100.0 99.6 69.1
: 21. Unit Capacity Factor (Using MDC Net)                       99.9             98.7                 63.5
: 21. Unit Capacity Factor (Using MDC Net) 99.9 98.7 63.5
: 22. Unit Capacity Factor (Using DER Net)                       97.0             95.8                 61.8
: 22. Unit Capacity Factor (Using DER Net) 97.0 95.8 61.8
: 23. Unit Forced Outage Rate                                     0.0               0.4                 15.7
: 23. Unit Forced Outage Rate 0.0 0.4 15.7
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
* None
None
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status iPrior to Commercial Operation):                   Forecast             Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION
: 26. Units in Test Status iPrior to Commercial Operation):
                                                                                                                /77) 8504250045 850331                                                                                 g/
Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION
[DR ADOCK 05000269 PDR                                                                     I(
/77) 8504250045 850331
[DR ADOCK 05000269 g/
PDR I(


                                                  .% .            2 4     _ . - -      -
2 4
                                                                                                      %    . -m.-                                           _ . _ . ,                      . _ - _  m.- ._
-m.-
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.               50-269 i                                                                                                                                                      UNIT             Oconee 1 DATE             4/15/85 COMPLETED BY               J. A. Reavis
m.-
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-269 UNIT Oconee 1 i
DATE 4/15/85 COMPLETED BY J. A. Reavis
~
~
TELEPHONE               704-373-7567 MONTH             -March, 1985 DAY               AVERAGE DA'lLY POWER LEVEL.                                     DAY         AVERAGE DAILY POWER. LEVEL
TELEPHONE 704-373-7567 MONTH
;.-                                                    (MWe-Net)                                                                             (MWe-Ne t) 1 1                                   '862                                         17                                         861 4
-March, 1985 DAY AVERAGE DA'lLY POWER LEVEL.
                            ~
DAY AVERAGE DAILY POWER. LEVEL (MWe-Net)
                    ' 2.                                     862                                       18                                         860 3                                       862                                       19                                         860 4
(MWe-Ne t) 1 1
4                                       862                                       20                                         856
'862 17 861 4
,                    _5                                       862                                       21                                       859 6                                     863                                         22                                       839 4
~
7                                     863                                         23                                       861 l'                   8                                     862-                                       24                                         862 9                                     862                                       25                                         862
' 2.
: 10.                                     862 ~                                     26                                         858 862 27
862 18 860 3
,                                                                                                                                                  854
862 19 860 4
                . 12                                         862                                       28                                       -854-13                                       861                                       29                                         853
4 862 20 856
{                                                                                                                  _
_5 862 21 859 6
14                                       860                                       30                                         852-15                                       860                                       31                                         858                         _
863 22 839 4
16-                                     860 INSTRUCTIONS
7 863 23 861 l'
                ~
8 862-24 862 9
On this' format, list the average daily unit power level in MWe-Net for each day p                  in the reporting month. Compute to the nearest whole megawatt.
862 25 862 10.
1:                                                                                                                                                                                                           .
862 ~
26 858
, 862 27 854
. 12 862 28
-854-
{
13 861 29 853 14 860 30 852-15 860 31 858 16-860 INSTRUCTIONS On this' format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
p
~
1:
4 a
4 a
f
h f
$                                                                                                                                                          h
..,_.,, _.._,_. ~.
  . ;  - - ,            ,  ... .._,..-,-,_- -._._              ,.,._...,. -- . ... _ .-,,..._ _ _.                .. ,_ . , , _ .._,_. ~.                         .._. -.__, _ .... _ _ _ .__


UNTT SHUTDOWNS AND POWER REDUCTIONS                 DOCKET NO. 50-269               -
UNTT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME   Oconee 1 DATE   4/15/85 REPORT MONTH March 1985           COMPLETED BY     J. A. Reavis
50-269 UNIT NAME Oconee 1 DATE 4/15/85 REPORT MONTH March 1985 COMPLETED BY J. A. Reavis TELEPHONE-704-373-7567 "s_
_ _ _ _ _ _ . . . . _ _                    _ _ _ _                              , _  . . _ .                                  TELEPHONE- 704-373-7567 "s_
O t my License Cause & Corrective y
O c                        t my                 License           y                        Cause & Corrective
c
                                                            .? ?               "c       a .5 8                       m         e                                           -
.? ?
No.           Date                         ~.     %h                 g     _g g c               Event   pe,       g                           Action to Report # h       bb                       Prevent Recurrence 4-p     85-03-22                             S           --
"c a.5 8 m
B       -
e No.
CC     VALVEX     Turbine Control & Stop Valve Movement pts i
Date
i
~.
                                      --.- -,--._. _                            _1._.-_           i 1                                         2                                                                     3                         4 Reason:                                                             Method:                   Exhibit G - Instructions SS               led                       A-Equipnent Failure (Explain)                                       1-Manual                 for Preparation of Data B-Maintenance or Test                                               2-Manual Scram           Entry Sheets for Licensee C-Refueling                                                         3-Automatic Scram         Event Report (LER)
%h g
D-Regulatory Restriction                                             4-Other (Explain)         File (NUREG-0161)
_g g c Event pe, g
E-Operator Training 6 License Examination F-Administrative                                                                             5 G-Operational Error (Explain)                                                                 Exhibit I - Same Source II-Other (Explain)
Action to Report #
h bb Prevent Recurrence 4-p 85-03-22 S
B CC VALVEX Turbine Control & Stop Valve Movement pts i
i i
_1._.-_
1 2
3 4
Reason:
Method:
Exhibit G - Instructions SS led A-Equipnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training 6 License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source II-Other (Explain)
, (Q/771
, (Q/771


i                                                                   DOCKET NO: 50-269 LUNIT: Oconee'l DATE: 4/15/85 NARRATIVE  
i DOCKET NO: 50-269 LUNIT: Oconee'l 4/15/85 DATE:
NARRATIVE  


==SUMMARY==
==SUMMARY==
 
: Month:
: Month: March 1985
March 1985
            - Oconee Unit 1 operated at 100% during this period except for 3/22/85 when the unit reduced power to perform a Control and Stop valve movement test.
- Oconee Unit 1 operated at 100% during this period except for 3/22/85 when the unit reduced power to perform a Control and Stop valve movement test.
e w.
e w.


MONTHLY REFUELING INFORMATION REQUEST
MONTHLY REFUELING INFORMATION REQUEST 1.
: 1. Facility name:       Oconee Unit 1                                                                                                   ,
Facility name:
: 2. - Scheduled next refueling shutdown:                                                               March 1986                         ,
Oconee Unit 1
: 3. Scheduled restart following refueling:                                                             May 1986                         ,
: 2. - Scheduled next refueling shutdown:
3
March 1986 3.
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?                                                               Yes       .
Scheduled restart following refueling:
If yes, what will these be?                                           Technical                   Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?                                                               N/A     ,
May 1986 3
: 5. Scheduled date(s) for submitting proposed licensing action and supporting                                                                                   .
4.
information:       N/A                                                                                                             .
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Yes If yes, what will these be?
Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
i l
i l
      -7.     Number of fuel assemblies (a) in the core:                                                               177         ,
-7.
(b) in the spent fuel pool:                                 1067*     ,
Number of fuel assemblies (a) in the core:
: 8. Present licensed fuel pool capacity:                                                             1312                             ,
177 (b) in the spent fuel pool:
Size of requested or planned increase:                                                                                             .
1067*
: 9. Projected date of last refueling which can be accommodated by present licensed capacity:                  August 1991                                                                                    .
8.
Present licensed fuel pool capacity:
1312 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present
[
[
i DUKE POWER COMPANY                                                                                     Date:   April 15, 1985     .
licensed capacity:
Name of
August 1991 i
DUKE POWER COMPANY Date:
April 15, 1985 Name of


==Contact:==
==Contact:==
J. A. Reavis                                                                   Phone:   704-373-7567 1
J. A. Reavis Phone:
704-373-7567 1


OPERATING DATA REPORT DOCKET NO. 50-270 DATE 04-15-85 COSIPLETED BY     J. A. Reavis TELEPHONE - 704-373-7567 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name:         Oconee 2                                       Notes 2.' Reporting Period: March I'. 1985-March 31. 1985' Year-to-date and cumulative
50-270 DATE 04-15-85 COSIPLETED BY J. A.
: 3. Licensed Thermal Power (31Wt):       2568                           capacity factors are calcu-
Reavis TELEPHONE - 704-373-7567 OPERATING STATUS
: 4. Nameplate Rating (Gross 31We):           934                       lated using a weighted
: 1. Unit Name:
        . 5. Design Electrical Rating (Net alWe):     886                       awrage for m h                           .
Oconee 2 Notes 2.' Reporting Period: March I'. 1985-March 31. 1985' Year-to-date and cumulative
: 6. 31:.ximum Dependable Capacity (Gross SIWE):     899                 dependable capacity.
: 3. Licensed Thermal Power (31Wt):
: 7. Maximum Dependable Capacity (Net SIWE):         860
2568 capacity factors are calcu-
: 4. Nameplate Rating (Gross 31We):
934 lated using a weighted
. 5. Design Electrical Rating (Net alWe):
886 awrage for m h
: 6. 31:.ximum Dependable Capacity (Gross SIWE):
899 dependable capacity.
: 7. Maximum Dependable Capacity (Net SIWE):
860
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Giye Reas
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Giye Reas
                    -None
-None
        . 9. Power Level To Which Restricted,if Any (Net .\lWe):       *" 't -
. 9. Power Level To Which Restricted,if Any (Net.\\lWe):
: 10. Reasons For Restrictions.If Any:                                                                                 l This >!anth           Yr.-to-Date       Cumulative i1. Hours in Reporting Period                             744.0           2 160.0             92 569.0
*" 't -
: 12. Number Of Hours Re::ctor Was Critical                     0.0         1 714.R           67 119.2
: 10. Reasons For Restrictions.If Any:
      - 13. Reactor Reserve Shutdown Hours -                      ---
l This >!anth Yr.-to-Date Cumulative i1. Hours in Reporting Period 744.0 2 160.0 92 569.0
: 14. Hours Generator On Line                                   0.0         1 229.7             66 173.9
: 12. Number Of Hours Re::ctor Was Critical 0.0 1 714.R 67 119.2
      - 15. Unit Reserve Shutdown Hours                           ---
- 13. Reactor Reserve Shutdown Hours -
: 16. Gross Thermal Energy Generated (SIWH)                               2 990 901
: 14. Hours Generator On Line 0.0 1 229.7 66 173.9
    . 17; Gross Electrical Energy Generated (MWH) 157 759 206 1 nns n10           s1 712 946
- 15. Unit Reserve Shutdown Hours
: 18. Net Electrical Energy Generated (51WH)             - 1 927               956 756         51 066 289
: 16. Gross Thermal Energy Generated (SIWH)
: 19. Unit Service Factor                                       0.0             -56.9
--- 2 990 901 157 759 206
: 20. Unit Availability Factor                                                                         71.5 0.0               56.9                 71.5 21.- Unit Capacity Factor (Using .\lDC Net)                   0.0               51.5                 64.0 22; Unit Capacity Factor (Using DER Net)                       0.0               50.0                 62.3
. 17; Gross Electrical Energy Generated (MWH) 1 nns n10 s1 712 946
: 23. Unit Forced Outage Rate                                     0.0                 0.0               14.4
: 18. Net Electrical Energy Generated (51WH)
- 1 927 956 756 51 066 289
: 19. Unit Service Factor 0.0
-56.9 71.5
: 20. Unit Availability Factor 0.0 56.9 71.5 21.- Unit Capacity Factor (Using.\\lDC Net) 0.0 51.5 64.0 22; Unit Capacity Factor (Using DER Net) 0.0 50.0 62.3
: 23. Unit Forced Outage Rate 0.0 0.0 14.4
: 24. Shutdowns Scheduled Over Next 6 Slonths (Type.Date,and Duration of Each1:
: 24. Shutdowns Scheduled Over Next 6 Slonths (Type.Date,and Duration of Each1:
Currently Refueling
Currently Refueling
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:       Pril 24, 1985
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Pril 24, 1985
: 26. Units in Test Status iPrior to Commercial Operation):
: 26. Units in Test Status iPrior to Commercial Operation):
Forecast           Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COM5IERCIAL OPERATION (9/77)
Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COM5IERCIAL OPERATION (9/77)


E, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-270 UNIT Oconee 2
E, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
  , -s                                                                                      DATE na /t s/8s COMPLETED BY         J.A. Reavis TELEPHONE   704-373-7567 MONTH       March, 1985 DAY         AVERAGE DAILY POWER LEVEL               DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
50-270 UNIT Oconee 2 DATE na /t s/8s
(MWe-Ne t) 1                   ---
-s COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH March, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
17 2                   ---
(MWe-Ne t) 1 17 2
18               ---
18 3'
3'                                               19               ---
19
          .4                     ---
.4 20 5.
20               ---
21 6
: 5.                 ---
22 7
21               ---
23 8
6                   - - - -
24 9'
22               ---
25 10 26 11 27 12 28 13 29 14 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
7                   ---
Compute to the nearest whole megawatt.
23               ---
8                   ---
24               ---
9'                   ---
25 10                   ---
26 11                   ---
27               ---
12                 .---
28               ---
13                   ---
29               ---
14                   ---
30               ---
15                   ---
31               ---
16                   ---
INSTRUCTIONS On in thethisreporting format, list month. the average daily unit power level in MWe-Net for each day Compute to the nearest whole megawatt.
O
O


UNIT SHUTDOWNS AND POWER REDUCTIONS                     DOCKET NO. 50-270-             .
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Oconee 2-DATE 4/15/85 REPORT MONTH March 1985             COMPLETED BY   J. A. Reavis
50-270-UNIT NAME Oconee 2-DATE 4/15/85 REPORT MONTH March 1985 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s_
_ -_ _ . _      _ _ _ _ .                  _ . _ _ _                                              TELEPHONE 704-373-7567 "s_
O o en]
O c                  o en]               License               y                     Cause & Corrective 22          "c     o.52                             *
License y
* No. Date             ~.     % i;           g     _g g c               Event     pe,       p,                       Action to Report #   h         $b                     Prevent Recurrence   .
Cause & Corrective c22 "c
1    85-03-01           S         744.00       C     1                             RC '     FUELXX   End of Cycle 7 Refueling Outage 1
o.52 No.
Date
~.
% i; g
_g g c Event pe, p,
Action to Report #
h
$b Prevent Recurrence 1
85-03-01 S
744.00 C
1 RC '
FUELXX End of Cycle 7 Refueling Outage 1
i i
i i
                        .-          ,-_...___.....a_                       .
,-_...___.....a_
1                     2                                                                   3                       4 Reason:                                                             Method:                 Exhibit G - Instructions SS     led           A-Equipment Failure (Explain)                                       1-Manual               for Preparation of Data B-Maintenance or Test                                               2-Manual Scram         Entry Sheets for Licensee C-Refueling                                                         3-Autanatic Scram       Event Report (LER)
1 2
D-Regulatory Restriction                                             4-Other (Explain)       File (NUREG-0161)
3 4
E-Operator Training f, License Examination F-Adninistrative                                                                           5 G-Operational Error (Explain)                                                               Exhibit I - Same Source II-Other (Explain)
Reason:
Method:
Exhibit G - Instructions SS led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autanatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training f, License Examination F-Adninistrative 5
G-Operational Error (Explain)
Exhibit I - Same Source II-Other (Explain)
(Q /77)
(Q /77)


DOCKET NO: 50-270 UNIT: Oconee 2 DATE: 4/15/85 NARRATIVE SUPDfARY Month: March 1985
DOCKET NO: 50-270 UNIT: Oconee 2 DATE: 4/15/85 NARRATIVE SUPDfARY Month: March 1985 Oconee Unit-2's' refueling outage continued throughout this period.
-                            Oconee Unit-2's' refueling outage continued throughout this period.
L i'
L i'
i t
i t
l-c i
l -
                            . . . . .      _ . . . , . . . _ . .    . - . . _ , _ , _ _ _ . _ ~ . . . , _ . , _ . . . , _ . . , _ _ _ _ . . _ _ _        . - . , _ . _ _ _ . . . _ . . . _ . . . _ _ _ _ . . . , _ . _
c i
.. _, _, _ _ _. _ ~..., _., _


MONTHLY REFUELUiG INFORMATION REQUEST
MONTHLY REFUELUiG INFORMATION REQUEST 1.
: 1. Facility name:     Oconee Unit 2                                                                       ,
Facility name:
: 2. Scheduled next refueling shutdown:                         Currently Refueling                         ,
Oconee Unit 2 2.
: 3. Scheduled restart following refueling:                                                                 .
Scheduled next refueling shutdown:
: 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?                         Yes                   .
Currently Refueling 3.
If yes, what will these be?                         Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Consittee regarding unreviewed safety questions? N/A                                         .
Scheduled restart following refueling:
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information:     N/A                                                                                   .
4.
: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
: 7. Number of fuel assemblies (a) in the core:                           177       .
Yes If yes, what will these be?
(b) in the spent fuel pool:       1067 *           .
Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Consittee regarding unreviewed safety questions?
: 8. Present licensed fuel pool capacity:                         1312                                     .
N/A 5.
Size of requested or planned increase:                                                                 .
Scheduled date(s) for submitting proposed licensing action and supporting information:
: 9. Projected date of last refueling which can be accommodated by present licensed capacity: August 1991                                                                         .
N/A 6.
DUKE POWER COMPANY                                                 Date:   April 15, 1985             .
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Name of
7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool:
1067
* 8.
Present licensed fuel pool capacity:
1312 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
August 1991 DUKE POWER COMPANY Date:
April 15, 1985 Name of


==Contact:==
==Contact:==
J. A. Reavis                               Phone: 704-373-7567
J. A. Reavis Phone:
704-373-7567
* Represents the combined total for Units 1 and 2.
* Represents the combined total for Units 1 and 2.
                                -.,_,,_ . - . , _ _ ~ . _ _.                             __      , . _ _ _ _ _ _
-.,_,,_. -., _ _ ~. _ _.


OPERATING DATA REPORT DOCKET NO.     50-287 DATE     04-15-85 COMPLETED BY --     J.A. Reavis TELEPIIONE     704-373-7567 OPERATING STATUS oconee 3                                  Notes
OPERATING DATA REPORT DOCKET NO.
: 1. . Unit Name:
50-287 DATE 04-15-85 COMPLETED BY --
: 2. Reporting Period: ' March 1. 1985-Marr.h 11_ 1999                     Year-to-date and cumulative
J.A.
: 3. LicensedThermalPower(MWt):                 2568                       capacity factors are calcu-
Reavis TELEPIIONE 704-373-7567 OPERATING STATUS
          '4. Nameplate Rating'(Gross MWe):                   934                   lated using a weighted
: 1.. Unit Name:
: 5. Design Electrical Rating (Net MWe):             886                    average for maximum 899              dependable capacity.
oconee 3 Notes
: 2. Reporting Period: ' March 1.
1985-Marr.h 11_ 1999 Year-to-date and cumulative
: 3. LicensedThermalPower(MWt):
2568 capacity factors are calcu-
'4. Nameplate Rating'(Gross MWe):
934 lated using a weighted 886 average for maximum
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):               860
899 dependable capacity.
: 7. Maximum Dependable Capacity (Net MWe):
860
: 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report.Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report.Give Reasons:
None
None
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 10. Reasons For Restrictions. If Any:
: 10. Reasons For Restrictions. If Any:
This Month           Yr to.Date         Cumulative
This Month Yr to.Date Cumulative
        - 11. Hours in Reporting Period                                 744.0           2 160.0               90 216.0
- 11. Hours in Reporting Period 744.0 2 160.0 90 216.0
: 12. Number Of Hours Reactor Was Critical                     490.5           1 906.5               65 137.0
: 12. Number Of Hours Reactor Was Critical 490.5 1 906.5 65 137.0
: 13. Reactor Reserve Shutdown Hours                                                                     ---
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator'On-Line                                 486.3           1 902.3         _ 63 960.4
: 14. Hours Generator'On-Line 486.3 1 902.3
: 15. Unit Reserve Shutdown Hours                                                                       ---
_ 63 960.4
: 16. Gross Thermal Energy Generated (MWH)               1 088 501           a 71A onn           ~s6 511 941
: 15. Unit Reserve Shutdown Hours
      .17. Gross Electrical Energy Generated (MWH)                 372 450         1 621 700           54 046 634
: 16. Gross Thermal Energy Generated (MWH) 1 088 501 a 71A onn
: 18. Net Electrical Energy Generated (MWH)                 351 921         1 550 426           51 471 799
~s6 511 941
: 19. Unit Service Factor                                         65.4             8H_1                   70 9
.17. Gross Electrical Energy Generated (MWH) 372 450 1 621 700 54 046 634
: 20. Unit Availability Factor                                   65.4             88.I                   70.9
: 18. Net Electrical Energy Generated (MWH) 351 921 1 550 426 51 471 799
: 21. Unit Capacity Factor (Using MDC Net)                       55.0               83.5                   66.2
: 19. Unit Service Factor 65.4 8H_1 70 9
: 22. Unit Capacity Factor (Using DER Net)                       53.4             81 0                   64.4
: 20. Unit Availability Factor 65.4 88.I 70.9
: 23. Unit' Forced Outage Rate                                     34.6             11.9                   14,3
: 21. Unit Capacity Factor (Using MDC Net) 55.0 83.5 66.2
        - 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):
: 22. Unit Capacity Factor (Using DER Net) 53.4 81 0 64.4
: 23. Unit' Forced Outage Rate 34.6 11.9 14,3
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):
Refueling - August 28, 1985 - 9 Weeks
Refueling - August 28, 1985 - 9 Weeks
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:   April 1, 1985
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):                     Forecast           Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIA L OPER ATION (9/77)
April 1, 1985
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIA L OPER ATION (9/77)


n-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-287 UNIT Oconee 3 DATE na /19 /gs COMPLETED BY       J.A. Reavis TELEPHONE 704-373-7567 MONTH     March, 1985 DAY AVERAGE DAILY POWER LEVEL           DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t)
n-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
(MWe-Ne t) 1             849                       17               364 2             849                       18               482 3             849                       19               399 4             849                       20               ---
50-287 UNIT Oconee 3 DATE na /19 /gs COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH March, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t)
5            848                       21               ---
(MWe-Ne t) 1 849 17 364 2
6              gas                       22               ---
849 18 482 3
7              849                       23               ---
849 19 399 4
8              848                       24 9             847                       25               ---
849 20 5
10'             848                       26               ---
848 21 6
11             848                       27               ---
gas 22 7
12'             848                       28               ---
849 23 8
13             847                       29               ---
848 24 9
14             805                       30               ---
847 25 10' 848 26 11 848 27 12' 848 28 13 847 29 14 805 30 15 601 31
15               601                       31             ---
'16 258 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day
        '16               258 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day
'in the reporting month. Compute to the nearest whole megawatt.
      'in the reporting month. Compute to the nearest whole megawatt.


UNIT SHUTDOWNS AND POWER REDUCTIONS                     ' DOCKET NO. 50-287               -
UNIT SHUTDOWNS AND POWER REDUCTIONS
UNIT NAME Oconee 3 DATE 4/15/85 REPORT MONTH March 1985               ' COMPLETED BY   -J. A. Reavis
' DOCKET NO.
_ . _ . _ _                                _ _ . . _                                              TELEPHONE 704-373-7567 "s. o e                  oj               License                 y                         Cause & Corrective-22    '"c       v .c a                         a           e No. Date             ~. %h                         8       jgc                 Event     ,Be,         g                             Action to R o~              he       2. zoo  t3R                             ai         g=-
50-287 UNIT NAME Oconee 3 DATE 4/15/85 REPORT MONTH March 1985
H                           =                           Report #   d?u .       oO                       Prevent Recurrence   -
' COMPLETED BY -J. A. Reavis TELEPHONE 704-373-7567 "s.o oj License y
4-p   85-03-14           F                     --
Cause & Corrective-e22
A.           -
'"c v.c a a
HJ       HTEXCH     Moisture Separator Reheater Isolation to Check for Tube Leaks 5-p   85-03-14           F                     --
e No.
A             -
Date
HG       DEMINX     Place Powdex back into service 6-p   85-03-15           F                     --
~.
A             -
%h 8
CH       HTEXCH     Temperature change limit reached on High Pressure Feedwater Heater 7-p   85-03-15           F                     --
jgc Event
A                                     HC       HTEXCH     Main Condenser Waterbox Isolated to Test for-Tube Leaks 8-p   85-03-15           F                     --
,Be, g
F             -
Action to R
CH       ZZZZZZ     Feedwater Chemistry out of Specification (Silica and Sodium) 9-p   85-03-16           F                     --
he 2.
F             -
t3R ai g=-
CH       ZZZZZZ     Feedwater Chemistry Evaluations 10-p     85-03-17           F                     --
H o~
F             -
=
CH-     ZZZZZZ     Feedwater Chemistry Evaluations ll-P     85-03-18           F'                   --
zoo Report #
F-           -
d?u.
CH       ZZZZZZ     Feedwater Chemistry Evaluations 12-p     85-03-19           F                     --
oO Prevent Recurrence 4-p 85-03-14 F
F             -
A.
CH       ZZZZZZ     Feedwater Chemistry Restrictions 13-p     85-03-19           F                     --
HJ HTEXCH Moisture Separator Reheater Isolation to Check for Tube Leaks 5-p 85-03-14 F
F             -
A HG DEMINX Place Powdex back into service 6-p 85-03-15 F
CH       ZZZZZZ     Feedwater Chemistry Restrictions 4
A CH HTEXCH Temperature change limit reached on High Pressure Feedwater Heater 7-p 85-03-15 F
1                     2                                                                           3                           4 Reason:                                                                     Method:                     Exhibit G - Instructions-SS     led             A-Equipment Failure (Explain).                                             1-Manual                   for Pre mration of Data B-Maintenance or Test                                                       2-Manual Scram             Entry Sieets for Licensee C-Refueling                                                                 3-Automatic' Scram         Event Report (LER)
A HC HTEXCH Main Condenser Waterbox Isolated to Test for-Tube Leaks 8-p 85-03-15 F
D-Regulatory Restriction                                                   4-Other (Explain)           File (NLREG-0161)
F CH ZZZZZZ Feedwater Chemistry out of Specification (Silica and Sodium) 9-p 85-03-16 F
E-Operator. Training G License Examination F-Adninistrative                       .
F CH ZZZZZZ Feedwater Chemistry Evaluations 10-p 85-03-17 F
5 G-Operational Error (Explain)                                                                           Exhibit.I - Same Source II-Other (Explain)
F CH-ZZZZZZ Feedwater Chemistry Evaluations ll-P 85-03-18 F'
F-CH ZZZZZZ Feedwater Chemistry Evaluations 12-p 85-03-19 F
F CH ZZZZZZ Feedwater Chemistry Restrictions 13-p 85-03-19 F
F CH ZZZZZZ Feedwater Chemistry Restrictions 4
1 2
3 4
Reason:
Method:
Exhibit G - Instructions-SS led A-Equipment Failure (Explain).
1-Manual for Pre mration of Data B-Maintenance or Test 2-Manual Scram Entry Sieets for Licensee C-Refueling 3-Automatic' Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NLREG-0161)
E-Operator. Training G License Examination F-Adninistrative 5
G-Operational Error (Explain)
Exhibit.I - Same Source II-Other (Explain)
(O /7 71
(O /7 71


UNIT SHUTDOWNS AND POWER REDUCTIONS               DOCKET NO.     50-287               .
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME     Oconee 3 DATE   4/15/85 REPORT MONTH March 1985           COMPLETED BY     J. A. Reavis Page 2 TELEPHONE     704-373-7567 iO c                  gj               License               y                        Cause & Corrective 37      "c           o.52
50-287 UNIT NAME Oconee 3 DATE 4/15/85 REPORT MONTH March 1985 COMPLETED BY J. A. Reavis Page 2 TELEPHONE 704-373-7567 i
* g No.         Date       %
O gj License Cause & Corrective y
                                  $ o~
c37 "c
                                                %b 5E g
o.52 g
E
No.
                                                                    ;yc US$
Date
Event      h RE gm,
%b g
                                                                                                            $3 Action to H                       a:       Emo               Report #   mo         oo                     Prevent Recurrence    -
;yc Event h
14-p   85-03-19           F             --
gm, Action to 5E E
A                 -
US$
HV     HTEXCH   Shutting down for Moisture Separator Reheater Repairs, Dispatcher Hold I     85-03-19           F             257.67     A                   1                 HV     HTEXCH   Moisture Separator Reheater Tube Leak Repairs l
RE
15-p ' 85-03-31           F             --
$3 H
A                 -
o~
CH     VALVEX   Feedwater Swing Caused by Feedwater Pump Recirculation Valves 4
a:
i 1                     2                                                                     3                         4 Reason:                                                               Method:                   Exhibit G - Instructions S   e led             A-Equipment Failure (Explain)                                         1-Manual                 for Preparation of Data B4faintenance or Test                                                 2-Manual Scram           Entry Sheets _for Licensee C-Refueling                                                           3-Automatic Scram         Event Report (LER)
Emo Report #
D-Regulatory Restriction                                             4-Other (Explain)         File (NUREG-0161)
Prevent Recurrence mo oo 14-p 85-03-19 F
E-Operator Training 6 License Examination F-Adninistrat ive                                                                           S G-Operational Error (Explain)                                                                   Exhibit I - Same Source II-Other (Explain) j (Q/771
A HV HTEXCH Shutting down for Moisture Separator Reheater Repairs, Dispatcher Hold I
85-03-19 F
257.67 A
1 HV HTEXCH Moisture Separator Reheater Tube Leak l
Repairs 15-p ' 85-03-31 F
A CH VALVEX Feedwater Swing Caused by Feedwater Pump Recirculation Valves 4
i 1
2 3
4 Reason:
Method:
Exhibit G - Instructions S
e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B4faintenance or Test 2-Manual Scram Entry Sheets _for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training 6 License Examination F-Adninistrat ive S
G-Operational Error (Explain)
Exhibit I - Same Source II-Other (Explain) j (Q/771


    . . .        -=.,.
- =.,.
DOCKET NO:   50-?R7 UNIT: Oconee 3 DATE: 4/15/85 NARRATIVE SUFMARY Month:   March''1985-Oconee Unit 3 experienced Chemistry problems during this period beginning on 3/14/85 when the Moisture Separator Reheaters were isolated because of tube leaks. The unit shut down on 3/19. The leaks were repaired and the unit returned to service on 3/30/85.
DOCKET NO:
50-?R7 UNIT:
Oconee 3 DATE:
4/15/85 NARRATIVE SUFMARY Month:
March''1985-Oconee Unit 3 experienced Chemistry problems during this period beginning on 3/14/85 when the Moisture Separator Reheaters were isolated because of tube leaks. The unit shut down on 3/19. The leaks were repaired and the unit returned to service on 3/30/85.
4
4


MONTHLY REFUELING INFORMATION REQUEST
MONTHLY REFUELING INFORMATION REQUEST 1.
: 1. Facility name:       Oconee Unit 3
Facility name:
: 2. Scheduled next refueling shutdown:     August 1985                         ,
Oconee Unit 3 2.
: 3. Scheduled restart following refueling:     October 1985                     ,
Scheduled next refueling shutdown:
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?       Yes     ,
August 1985 3.
If yes, what will these be? . Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?       N/A     ,
Scheduled restart following refueling:
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information:         N/A                                                   .
October 1985 4.
: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
2
Yes If yes, what will these be?. Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
: 7. Number of fuel assemblies (a) in the core:       177         ,
N/A 5.
(b) in the spent fuel pool:   255       .
Scheduled date(s) for submitting proposed licensing action and supporting information:
: 8. Present licensed fuel pool capacity:       875                           .
N/A 6.
Size of requested or planned increase:                                     .
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
: 9. Projected date of last refueling which can be accommodated by present licensed capacity:       August 1991                                     .
2 7.
DUKE POWER COMPANY                               Date:   April 15, 1985   ,
Number of fuel assemblies (a) in the core:
Name of
177 (b) in the spent fuel pool:
255 8.
Present licensed fuel pool capacity:
875 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
August 1991 DUKE POWER COMPANY Date:
April 15, 1985 Name of


==Contact:==
==Contact:==
J. A. Reavis               Phone: 704-373-7567
J. A. Reavis Phone: 704-373-7567


fe: .y
fe:
                                                            -0CONEE NUCLEAR STATION ~
.y
-0CONEE NUCLEAR STATION ~
Monthly' Operating Status Report.
Monthly' Operating Status Report.
    . c
. c 1.
                                    ~
~
: 1. Personnel-Exposure For the month ~of February, noLin'dividual(s). exceeded 10 percent
Personnel-Exposure For the month ~of February, noLin'dividual(s). exceeded 10 percent
                                    .of_.their allowable annual-radiation dose limit.
.of_.their allowable annual-radiation dose limit.
2.' =The total station' liquid release for. February has been compared
2.'
                                  ;with the Technical Specifications maximum annual dose commitment
=The total station' liquid release for. February has been compared
                                  .and was less than 10 percent of this limit.
;with the Technical Specifications maximum annual dose commitment
                                  'The total. station gaseous-release-for February.has.been. compared with the. Technical Specifications maximum annual dose commitment and was_less than 10 percent of this limit.-
.and was less than 10 percent of this limit.
'The total. station gaseous-release-for February.has.been. compared with the. Technical Specifications maximum annual dose commitment and was_less than 10 percent of this limit.-
l 1
l 1
D l           s it L
D l
s it L
h-L
h-L
}d '^                   -
}d '^


rc DUKE POWER GOMPANY P.O. BOX 33189 CHAMLOTTE, N.C. 28242 HAL B. TUGKER                                                                       Tzt.Ernown vna rarement                                                                   (704) 373-4531
rc DUKE POWER GOMPANY P.O. BOX 33189 CHAMLOTTE, N.C. 28242 HAL B. TUGKER Tzt.Ernown vna rarement (704) 373-4531 April 15, 1985
        "=a' -                                 April 15, 1985 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
"=a' -
          . Attention: Document Control Desk Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287
Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
. Attention: Document Control Desk Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287


==Dear Sir:==
==Dear Sir:==
Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of March, 1985.
Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of March, 1985.
Very truly yours,
Very truly yours,
: d. [           //g Hal B. Tucker JAR:scs Attachments cc: Regional Administrator                       Ms. Helen Nicolaras, Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Region II                               U. S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900     Washington, D. C. 20555 Atlanta, Georgia 30323 Mr. Phil Ross                           INPO Records Center U. S. Nuclear Regulatory Commission     Suite 1500 MNBB-5715                               1100 circle 75 Parkway Washington, D. C. 20555                 Atlanta, Georgia 30339 American Nuclear Insurers               Senior Resident Inspector c/o Dottie Sherman, ANI Library         Oconee Nuclear Station The Exchange, Suite 245 270 Farmington Avenue-Farmington, Connecticut 06032
: d. [
                                                                            /I
//g Hal B. Tucker JAR:scs Attachments cc: Regional Administrator Ms. Helen Nicolaras, Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Washington, D. C.
                                                                                  &}}
20555 Atlanta, Georgia 30323 Mr. Phil Ross INPO Records Center U. S. Nuclear Regulatory Commission Suite 1500 MNBB-5715 1100 circle 75 Parkway Washington, D. C.
20555 Atlanta, Georgia 30339 American Nuclear Insurers Senior Resident Inspector c/o Dottie Sherman, ANI Library Oconee Nuclear Station The Exchange, Suite 245 270 Farmington Avenue-Farmington, Connecticut 06032
/I
'' &}}

Latest revision as of 19:41, 7 December 2024

Monthly Operating Repts for Mar 1985
ML20204J490
Person / Time
Site: Oconee  
Issue date: 03/31/1985
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8504250045
Download: ML20204J490 (18)


Text

a OPERATING DATA REPORT DOCKET NO.

50-269 DATE 04-15-85 COMPLETED BY J.A.

Renvis.

TELEPHONE 704-373-7567 OPERATING STATUS

1. Unit Name:

Oconee 1 Notes 1 Reporting Period: March 1. 1985-March 31, 1985 Year-to-date and cumulative

3. Licensed Thermal Power (31Wt):

2568 capacity factors are calcu-

4. Nameplate Rating (Gross'31We):

934 lated using a wea.ghted

5. Design Electrical, Rating (Net MWe): -

average for maximum 886 dependable capacity.

6. Maximum Dependable Capacity (Gross MWe):

899

7. Maximum Dependable Capacity (Net MWe):

860

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe):

Monn

10. Reasons For Restrictions.If Any:

This Month Yr..to-Date Cumulative i1. Hours In Reporting Period 744.0 2 160.0 102 649.0

12. Number Of Hours Reactor Was Critical 744.0 2 157.2 74 150.2
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 744.0 2 151.6 70 855.6
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1 916 447 5 507 756 170 381 520
17. Gross Electrical Energy Genanted (MWH) 667 610 1 915 920 59 252 600
18. Net Electrical Energy Generated (MWH) 639 209 1 832 685 56 164 971
19. Unit Service Factor 100.0 99.6 69.0
20. Unit Availability Factor 100.0 99.6 69.1
21. Unit Capacity Factor (Using MDC Net) 99.9 98.7 63.5
22. Unit Capacity Factor (Using DER Net) 97.0 95.8 61.8
23. Unit Forced Outage Rate 0.0 0.4 15.7
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status iPrior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION

/77) 8504250045 850331

[DR ADOCK 05000269 g/

PDR I(

2 4

-m.-

m.-

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-269 UNIT Oconee 1 i

DATE 4/15/85 COMPLETED BY J. A. Reavis

~

TELEPHONE 704-373-7567 MONTH

-March, 1985 DAY AVERAGE DA'lLY POWER LEVEL.

DAY AVERAGE DAILY POWER. LEVEL (MWe-Net)

(MWe-Ne t) 1 1

'862 17 861 4

~

' 2.

862 18 860 3

862 19 860 4

4 862 20 856

_5 862 21 859 6

863 22 839 4

7 863 23 861 l'

8 862-24 862 9

862 25 862 10.

862 ~

26 858

, 862 27 854

. 12 862 28

-854-

{

13 861 29 853 14 860 30 852-15 860 31 858 16-860 INSTRUCTIONS On this' format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

p

~

1:

4 a

h f

..,_.,, _.._,_. ~.

UNTT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-269 UNIT NAME Oconee 1 DATE 4/15/85 REPORT MONTH March 1985 COMPLETED BY J. A. Reavis TELEPHONE-704-373-7567 "s_

O t my License Cause & Corrective y

c

.? ?

"c a.5 8 m

e No.

Date

~.

%h g

_g g c Event pe, g

Action to Report #

h bb Prevent Recurrence 4-p 85-03-22 S

B CC VALVEX Turbine Control & Stop Valve Movement pts i

i i

_1._.-_

1 2

3 4

Reason:

Method:

Exhibit G - Instructions SS led A-Equipnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training 6 License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source II-Other (Explain)

, (Q/771

i DOCKET NO: 50-269 LUNIT: Oconee'l 4/15/85 DATE:

NARRATIVE

SUMMARY

Month:

March 1985

- Oconee Unit 1 operated at 100% during this period except for 3/22/85 when the unit reduced power to perform a Control and Stop valve movement test.

e w.

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name:

Oconee Unit 1

2. - Scheduled next refueling shutdown:

March 1986 3.

Scheduled restart following refueling:

May 1986 3

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

i l

-7.

Number of fuel assemblies (a) in the core:

177 (b) in the spent fuel pool:

1067*

8.

Present licensed fuel pool capacity:

1312 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present

[

licensed capacity:

August 1991 i

DUKE POWER COMPANY Date:

April 15, 1985 Name of

Contact:

J. A. Reavis Phone:

704-373-7567 1

OPERATING DATA REPORT DOCKET NO.

50-270 DATE 04-15-85 COSIPLETED BY J. A.

Reavis TELEPHONE - 704-373-7567 OPERATING STATUS

1. Unit Name:

Oconee 2 Notes 2.' Reporting Period: March I'. 1985-March 31. 1985' Year-to-date and cumulative

3. Licensed Thermal Power (31Wt):

2568 capacity factors are calcu-

4. Nameplate Rating (Gross 31We):

934 lated using a weighted

. 5. Design Electrical Rating (Net alWe):

886 awrage for m h

6. 31:.ximum Dependable Capacity (Gross SIWE):

899 dependable capacity.

7. Maximum Dependable Capacity (Net SIWE):

860

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Giye Reas

-None

. 9. Power Level To Which Restricted,if Any (Net.\\lWe):

  • " 't -
10. Reasons For Restrictions.If Any:

l This >!anth Yr.-to-Date Cumulative i1. Hours in Reporting Period 744.0 2 160.0 92 569.0

12. Number Of Hours Re::ctor Was Critical 0.0 1 714.R 67 119.2

- 13. Reactor Reserve Shutdown Hours -

14. Hours Generator On Line 0.0 1 229.7 66 173.9

- 15. Unit Reserve Shutdown Hours

16. Gross Thermal Energy Generated (SIWH)

--- 2 990 901 157 759 206

. 17; Gross Electrical Energy Generated (MWH) 1 nns n10 s1 712 946

18. Net Electrical Energy Generated (51WH)

- 1 927 956 756 51 066 289

19. Unit Service Factor 0.0

-56.9 71.5

20. Unit Availability Factor 0.0 56.9 71.5 21.- Unit Capacity Factor (Using.\\lDC Net) 0.0 51.5 64.0 22; Unit Capacity Factor (Using DER Net) 0.0 50.0 62.3
23. Unit Forced Outage Rate 0.0 0.0 14.4
24. Shutdowns Scheduled Over Next 6 Slonths (Type.Date,and Duration of Each1:

Currently Refueling

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

Pril 24, 1985

26. Units in Test Status iPrior to Commercial Operation):

Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COM5IERCIAL OPERATION (9/77)

E, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-270 UNIT Oconee 2 DATE na /t s/8s

-s COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH March, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ne t) 1 17 2

18 3'

19

.4 20 5.

21 6

22 7

23 8

24 9'

25 10 26 11 27 12 28 13 29 14 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

O

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-270-UNIT NAME Oconee 2-DATE 4/15/85 REPORT MONTH March 1985 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s_

O o en]

License y

Cause & Corrective c22 "c

o.52 No.

Date

~.

% i; g

_g g c Event pe, p,

Action to Report #

h

$b Prevent Recurrence 1

85-03-01 S

744.00 C

1 RC '

FUELXX End of Cycle 7 Refueling Outage 1

i i

,-_...___.....a_

1 2

3 4

Reason:

Method:

Exhibit G - Instructions SS led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autanatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training f, License Examination F-Adninistrative 5

G-Operational Error (Explain)

Exhibit I - Same Source II-Other (Explain)

(Q /77)

DOCKET NO: 50-270 UNIT: Oconee 2 DATE: 4/15/85 NARRATIVE SUPDfARY Month: March 1985 Oconee Unit-2's' refueling outage continued throughout this period.

L i'

i t

l -

c i

.. _, _, _ _ _. _ ~..., _., _

MONTHLY REFUELUiG INFORMATION REQUEST 1.

Facility name:

Oconee Unit 2 2.

Scheduled next refueling shutdown:

Currently Refueling 3.

Scheduled restart following refueling:

4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

Yes If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Consittee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

177 (b) in the spent fuel pool:

1067

  • 8.

Present licensed fuel pool capacity:

1312 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

August 1991 DUKE POWER COMPANY Date:

April 15, 1985 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

  • Represents the combined total for Units 1 and 2.

-.,_,,_. -., _ _ ~. _ _.

OPERATING DATA REPORT DOCKET NO.

50-287 DATE 04-15-85 COMPLETED BY --

J.A.

Reavis TELEPIIONE 704-373-7567 OPERATING STATUS

1.. Unit Name:

oconee 3 Notes

2. Reporting Period: ' March 1.

1985-Marr.h 11_ 1999 Year-to-date and cumulative

3. LicensedThermalPower(MWt):

2568 capacity factors are calcu-

'4. Nameplate Rating'(Gross MWe):

934 lated using a weighted 886 average for maximum

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

899 dependable capacity.

7. Maximum Dependable Capacity (Net MWe):

860

8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report.Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr to.Date Cumulative

- 11. Hours in Reporting Period 744.0 2 160.0 90 216.0

12. Number Of Hours Reactor Was Critical 490.5 1 906.5 65 137.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator'On-Line 486.3 1 902.3

_ 63 960.4

15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1 088 501 a 71A onn

~s6 511 941

.17. Gross Electrical Energy Generated (MWH) 372 450 1 621 700 54 046 634

18. Net Electrical Energy Generated (MWH) 351 921 1 550 426 51 471 799
19. Unit Service Factor 65.4 8H_1 70 9
20. Unit Availability Factor 65.4 88.I 70.9
21. Unit Capacity Factor (Using MDC Net) 55.0 83.5 66.2
22. Unit Capacity Factor (Using DER Net) 53.4 81 0 64.4
23. Unit' Forced Outage Rate 34.6 11.9 14,3

- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):

Refueling - August 28, 1985 - 9 Weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

April 1, 1985

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIA L OPER ATION (9/77)

n-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-287 UNIT Oconee 3 DATE na /19 /gs COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH March, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t)

(MWe-Ne t) 1 849 17 364 2

849 18 482 3

849 19 399 4

849 20 5

848 21 6

gas 22 7

849 23 8

848 24 9

847 25 10' 848 26 11 848 27 12' 848 28 13 847 29 14 805 30 15 601 31

'16 258 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day

'in the reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS

' DOCKET NO.

50-287 UNIT NAME Oconee 3 DATE 4/15/85 REPORT MONTH March 1985

' COMPLETED BY -J. A. Reavis TELEPHONE 704-373-7567 "s.o oj License y

Cause & Corrective-e22

'"c v.c a a

e No.

Date

~.

%h 8

jgc Event

,Be, g

Action to R

he 2.

t3R ai g=-

H o~

=

zoo Report #

d?u.

oO Prevent Recurrence 4-p 85-03-14 F

A.

HJ HTEXCH Moisture Separator Reheater Isolation to Check for Tube Leaks 5-p 85-03-14 F

A HG DEMINX Place Powdex back into service 6-p 85-03-15 F

A CH HTEXCH Temperature change limit reached on High Pressure Feedwater Heater 7-p 85-03-15 F

A HC HTEXCH Main Condenser Waterbox Isolated to Test for-Tube Leaks 8-p 85-03-15 F

F CH ZZZZZZ Feedwater Chemistry out of Specification (Silica and Sodium) 9-p 85-03-16 F

F CH ZZZZZZ Feedwater Chemistry Evaluations 10-p 85-03-17 F

F CH-ZZZZZZ Feedwater Chemistry Evaluations ll-P 85-03-18 F'

F-CH ZZZZZZ Feedwater Chemistry Evaluations 12-p 85-03-19 F

F CH ZZZZZZ Feedwater Chemistry Restrictions 13-p 85-03-19 F

F CH ZZZZZZ Feedwater Chemistry Restrictions 4

1 2

3 4

Reason:

Method:

Exhibit G - Instructions-SS led A-Equipment Failure (Explain).

1-Manual for Pre mration of Data B-Maintenance or Test 2-Manual Scram Entry Sieets for Licensee C-Refueling 3-Automatic' Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NLREG-0161)

E-Operator. Training G License Examination F-Adninistrative 5

G-Operational Error (Explain)

Exhibit.I - Same Source II-Other (Explain)

(O /7 71

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-287 UNIT NAME Oconee 3 DATE 4/15/85 REPORT MONTH March 1985 COMPLETED BY J. A. Reavis Page 2 TELEPHONE 704-373-7567 i

O gj License Cause & Corrective y

c37 "c

o.52 g

No.

Date

%b g

yc Event h

gm, Action to 5E E

US$

RE

$3 H

o~

a:

Emo Report #

Prevent Recurrence mo oo 14-p 85-03-19 F

A HV HTEXCH Shutting down for Moisture Separator Reheater Repairs, Dispatcher Hold I

85-03-19 F

257.67 A

1 HV HTEXCH Moisture Separator Reheater Tube Leak l

Repairs 15-p ' 85-03-31 F

A CH VALVEX Feedwater Swing Caused by Feedwater Pump Recirculation Valves 4

i 1

2 3

4 Reason:

Method:

Exhibit G - Instructions S

e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B4faintenance or Test 2-Manual Scram Entry Sheets _for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training 6 License Examination F-Adninistrat ive S

G-Operational Error (Explain)

Exhibit I - Same Source II-Other (Explain) j (Q/771

- =.,.

DOCKET NO:

50-?R7 UNIT:

Oconee 3 DATE:

4/15/85 NARRATIVE SUFMARY Month:

March1985-Oconee Unit 3 experienced Chemistry problems during this period beginning on 3/14/85 when the Moisture Separator Reheaters were isolated because of tube leaks. The unit shut down on 3/19. The leaks were repaired and the unit returned to service on 3/30/85.

4

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name:

Oconee Unit 3 2.

Scheduled next refueling shutdown:

August 1985 3.

Scheduled restart following refueling:

October 1985 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If yes, what will these be?. Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

2 7.

Number of fuel assemblies (a) in the core:

177 (b) in the spent fuel pool:

255 8.

Present licensed fuel pool capacity:

875 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

August 1991 DUKE POWER COMPANY Date:

April 15, 1985 Name of

Contact:

J. A. Reavis Phone: 704-373-7567

fe:

.y

-0CONEE NUCLEAR STATION ~

Monthly' Operating Status Report.

. c 1.

~

Personnel-Exposure For the month ~of February, noLin'dividual(s). exceeded 10 percent

.of_.their allowable annual-radiation dose limit.

2.'

=The total station' liquid release for. February has been compared

with the Technical Specifications maximum annual dose commitment

.and was less than 10 percent of this limit.

'The total. station gaseous-release-for February.has.been. compared with the. Technical Specifications maximum annual dose commitment and was_less than 10 percent of this limit.-

l 1

D l

s it L

h-L

}d '^

rc DUKE POWER GOMPANY P.O. BOX 33189 CHAMLOTTE, N.C. 28242 HAL B. TUGKER Tzt.Ernown vna rarement (704) 373-4531 April 15, 1985

"=a' -

Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

. Attention: Document Control Desk Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Sir:

Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of March, 1985.

Very truly yours,

d. [

//g Hal B. Tucker JAR:scs Attachments cc: Regional Administrator Ms. Helen Nicolaras, Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Washington, D. C.

20555 Atlanta, Georgia 30323 Mr. Phil Ross INPO Records Center U. S. Nuclear Regulatory Commission Suite 1500 MNBB-5715 1100 circle 75 Parkway Washington, D. C.

20555 Atlanta, Georgia 30339 American Nuclear Insurers Senior Resident Inspector c/o Dottie Sherman, ANI Library Oconee Nuclear Station The Exchange, Suite 245 270 Farmington Avenue-Farmington, Connecticut 06032

/I

&