ML20206C648: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:N K800,                                 UNITED STATES
{{#Wiki_filter:N K80 ,
UNITED STATES
0
's
's
    #     ,
#
              Ie,                 NUCLEAR REGULATORY COMMISSION
Ie,
  [           $                               REGION HI
NUCLEAR REGULATORY COMMISSION
  $
,
  *            f                         799 5800$EVELT RO AD
[
                                      GLEN ELLYN, ILUNOl$ 401 U
$
      *****
REGION HI
                                                  NOV 0 41988
$
      Docket. No. 50-341
f
      The Detroit Edison Company
799 5800$EVELT RO AD
      ATTH:     B. Ralph Sylvia
*
                Senior Vice President
GLEN ELLYN, ILUNOl$ 401 U
                Nuclear Operations
*****
      6400 North Dixie Highway
NOV 0 41988
      Newport, MI 48166
Docket. No. 50-341
      Gentlemen:
The Detroit Edison Company
      This refers to the safety inspections of activities at Fermi 2 Nuclea* Power
ATTH:
      Plant, authorized by NRC Operating 1.icenso 'No.uNPF-43, and documentad: in
B. Ralph Sylvia
      Inspectioe. keport Nos. 50-341/87048(DRP), 50,-341/88006(ORP), P 341/88012(DRP)?
Senior Vice President
      and 50-341/88017(DRP). The inspections, covered the period of i ,tober 18, 1987;
Nuclear Operations
      through August 26, 1988.
6400 North Dixie Highway
      During these inspections, certain of your activities appeared to be in
Newport, MI 48166
      violation of NRC requirements, as specified ir. the enclosed Notice. A written
Gentlemen:
                                                                                      .
This refers to the safety inspections of activities at Fermi 2 Nuclea* Power
      response is required. Escalated enforcernont was considered for the apparent
Plant, authorized by NRC Operating 1.icenso 'No.uNPF-43, and documentad: in
      violations and an Enforcement Conference was held on October 20, 1988, in the
Inspectioe. keport Nos. 50-341/87048(DRP), 50,-341/88006(ORP), P 341/88012(DRP)?
      Region 111 office between you and members of your staff and Mr. Carl Papriello
and 50-341/88017(DRP). The inspections, covered the period of i ,tober 18, 1987;
      and members of the Region III staff. During the Enforcement Conference the
through August 26, 1988.
      apparent violations, corrective actions, and root causes were discussed.
During these inspections, certain of your activities appeared to be in
      The NRC has been concerned with the number of surveillance problems identified
.
      cver the post year at the Fenni facility. As a result of the Enforcement
violation of NRC requirements, as specified ir. the enclosed Notice. A written
      Conference, "RC is encouraged that the corrective actions you have taken
response is required.
      dppear to have resolved the programatic problems of your surveillance program.
Escalated enforcernont was considered for the apparent
      The ongoing Technical Specification Improvement Program is scheduled for
violations and an Enforcement Conference was held on October 20, 1988, in the
      completion on December 31, 1968. While the NRC acknowledges the results of
Region 111 office between you and members of your staff and Mr. Carl Papriello
      the program to date, NRC will closel; monitor your final results in order to
and members of the Region III staff.
      detennine if future enforcement action is warranted.
During the Enforcement Conference the
      In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
apparent violations, corrective actions, and root causes were discussed.
      this letter, the enclosure, and your response to this letter will be placed
The NRC has been concerned with the number of surveillance problems identified
      in the NRC Public Document Room.
cver the post year at the Fenni facility. As a result of the Enforcement
      We will gladly discuss any questions you have concerning these inspections.
Conference, "RC is encouraged that the corrective actions you have taken
                                                    Sincerely,
dppear to have resolved the programatic problems of your surveillance program.
                                                      hQ k $. . : - a
The ongoing Technical Specification Improvement Program is scheduled for
                                                    Edward G. Greenman, Director
completion on December 31, 1968. While the NRC acknowledges the results of
                                                    Division of Reactor Projects
the program to date, NRC will closel; monitor your final results in order to
      Enclosure:     Notice of Violation
detennine if future enforcement action is warranted.
      See Attached Distribution
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
                                                                                  '6f
this letter, the enclosure, and your response to this letter will be placed
        8911150360 891104                                                         '
in the NRC Public Document Room.
        PDR     ADOCK 05000341                                                       l
We will gladly discuss any questions you have concerning these inspections.
        0                   PDC
Sincerely,
                                                                                        1
hQ k $. . : - a
Edward G. Greenman, Director
Division of Reactor Projects
Enclosure:
Notice of Violation
See Attached Distribution
'6f
8911150360 891104
PDR
ADOCK 05000341
l
'
0
PDC
1


    -
-
.,   a.
a.
              .
.,
          The Detroit Edison Company     2
.
#       Distribution
The Detroit Edison Company
        cc w/ enclosure:
2
        Patricia Anthony, Licensing
#
        P. A. Marquardt, Corporate
Distribution
            Legal Department
cc w/ enclosure:
      0.DCD/DCB.(RIDS)
Patricia Anthony, Licensing
        Licensing Fee Management Branch
P. A. Marquardt, Corporate
        Resident Inspector, Rill
Legal Department
        Ronald Callen, Michigan
0.DCD/DCB.(RIDS)
            Public Service Comission
Licensing Fee Management Branch
        Harry H. Voight, Esq.
Resident Inspector, Rill
        Michigan Department of
Ronald Callen, Michigan
            Public Health
Public Service Comission
        Monr'oe County Office of
Harry H. Voight, Esq.
            Civil Preparedness
Michigan Department of
        J. Lieberman, OE
Public Health
        'L. J. Chandler, OGC
Monr'oe County Office of
        0. M.. Crutchfield, NRR
Civil Preparedness
J. Lieberman, OE
'L. J. Chandler, OGC
0. M.. Crutchfield, NRR
}}
}}

Latest revision as of 02:14, 7 December 2024

Discusses Safety Insp Repts 50-341/87-48,50-341/88-06, 50-341/88-12 & 50-341/88-17 on 871018-880826 & Forwards Notice of Violation.Corrective Actions Appear to Have Resolved Programmatic Problems of Surveillance Program
ML20206C648
Person / Time
Site: Fermi 
Issue date: 11/04/1988
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20206C652 List:
References
NUDOCS 8811160360
Download: ML20206C648 (2)


See also: IR 05000341/1987048

Text

N K80 ,

UNITED STATES

0

's

Ie,

NUCLEAR REGULATORY COMMISSION

,

[

$

REGION HI

$

f

799 5800$EVELT RO AD

GLEN ELLYN, ILUNOl$ 401 U

NOV 0 41988

Docket. No. 50-341

The Detroit Edison Company

ATTH:

B. Ralph Sylvia

Senior Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to the safety inspections of activities at Fermi 2 Nuclea* Power

Plant, authorized by NRC Operating 1.icenso 'No.uNPF-43, and documentad: in

Inspectioe. keport Nos. 50-341/87048(DRP), 50,-341/88006(ORP), P 341/88012(DRP)?

and 50-341/88017(DRP). The inspections, covered the period of i ,tober 18, 1987;

through August 26, 1988.

During these inspections, certain of your activities appeared to be in

.

violation of NRC requirements, as specified ir. the enclosed Notice. A written

response is required.

Escalated enforcernont was considered for the apparent

violations and an Enforcement Conference was held on October 20, 1988, in the

Region 111 office between you and members of your staff and Mr. Carl Papriello

and members of the Region III staff.

During the Enforcement Conference the

apparent violations, corrective actions, and root causes were discussed.

The NRC has been concerned with the number of surveillance problems identified

cver the post year at the Fenni facility. As a result of the Enforcement

Conference, "RC is encouraged that the corrective actions you have taken

dppear to have resolved the programatic problems of your surveillance program.

The ongoing Technical Specification Improvement Program is scheduled for

completion on December 31, 1968. While the NRC acknowledges the results of

the program to date, NRC will closel; monitor your final results in order to

detennine if future enforcement action is warranted.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of

this letter, the enclosure, and your response to this letter will be placed

in the NRC Public Document Room.

We will gladly discuss any questions you have concerning these inspections.

Sincerely,

hQ k $. . : - a

Edward G. Greenman, Director

Division of Reactor Projects

Enclosure:

Notice of Violation

See Attached Distribution

'6f

8911150360 891104

PDR

ADOCK 05000341

l

'

0

PDC

1

-

a.

.,

.

The Detroit Edison Company

2

Distribution

cc w/ enclosure:

Patricia Anthony, Licensing

P. A. Marquardt, Corporate

Legal Department

0.DCD/DCB.(RIDS)

Licensing Fee Management Branch

Resident Inspector, Rill

Ronald Callen, Michigan

Public Service Comission

Harry H. Voight, Esq.

Michigan Department of

Public Health

Monr'oe County Office of

Civil Preparedness

J. Lieberman, OE

'L. J. Chandler, OGC

0. M.. Crutchfield, NRR