ML20206C648
| ML20206C648 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 11/04/1988 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Sylvia B DETROIT EDISON CO. |
| Shared Package | |
| ML20206C652 | List: |
| References | |
| NUDOCS 8811160360 | |
| Download: ML20206C648 (2) | |
See also: IR 05000341/1987048
Text
N K80 ,
UNITED STATES
0
's
Ie,
NUCLEAR REGULATORY COMMISSION
,
[
$
REGION HI
$
f
GLEN ELLYN, ILUNOl$ 401 U
NOV 0 41988
Docket. No. 50-341
The Detroit Edison Company
ATTH:
B. Ralph Sylvia
Senior Vice President
Nuclear Operations
6400 North Dixie Highway
Newport, MI 48166
Gentlemen:
This refers to the safety inspections of activities at Fermi 2 Nuclea* Power
Plant, authorized by NRC Operating 1.icenso 'No.uNPF-43, and documentad: in
Inspectioe. keport Nos. 50-341/87048(DRP), 50,-341/88006(ORP), P 341/88012(DRP)?
and 50-341/88017(DRP). The inspections, covered the period of i ,tober 18, 1987;
through August 26, 1988.
During these inspections, certain of your activities appeared to be in
.
violation of NRC requirements, as specified ir. the enclosed Notice. A written
response is required.
Escalated enforcernont was considered for the apparent
violations and an Enforcement Conference was held on October 20, 1988, in the
Region 111 office between you and members of your staff and Mr. Carl Papriello
and members of the Region III staff.
During the Enforcement Conference the
apparent violations, corrective actions, and root causes were discussed.
The NRC has been concerned with the number of surveillance problems identified
cver the post year at the Fenni facility. As a result of the Enforcement
Conference, "RC is encouraged that the corrective actions you have taken
dppear to have resolved the programatic problems of your surveillance program.
The ongoing Technical Specification Improvement Program is scheduled for
completion on December 31, 1968. While the NRC acknowledges the results of
the program to date, NRC will closel; monitor your final results in order to
detennine if future enforcement action is warranted.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter, the enclosure, and your response to this letter will be placed
in the NRC Public Document Room.
We will gladly discuss any questions you have concerning these inspections.
Sincerely,
hQ k $. . : - a
Edward G. Greenman, Director
Division of Reactor Projects
Enclosure:
See Attached Distribution
'6f
8911150360 891104
ADOCK 05000341
l
'
0
1
-
a.
.,
.
The Detroit Edison Company
2
Distribution
cc w/ enclosure:
Patricia Anthony, Licensing
P. A. Marquardt, Corporate
Legal Department
0.DCD/DCB.(RIDS)
Licensing Fee Management Branch
Resident Inspector, Rill
Ronald Callen, Michigan
Public Service Comission
Harry H. Voight, Esq.
Michigan Department of
Public Health
Monr'oe County Office of
Civil Preparedness
J. Lieberman, OE
'L. J. Chandler, OGC
0. M.. Crutchfield, NRR