ML20206C648: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000341/1987048]]
{{Adams
| number = ML20206C648
| issue date = 11/04/1988
| title = Discusses Safety Insp Repts 50-341/87-48,50-341/88-06, 50-341/88-12 & 50-341/88-17 on 871018-880826 & Forwards Notice of Violation.Corrective Actions Appear to Have Resolved Programmatic Problems of Surveillance Program
| author name = Greenman E
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name = Sylvia B
| addressee affiliation = DETROIT EDISON CO.
| docket = 05000341
| license number =
| contact person =
| document report number = NUDOCS 8811160360
| package number = ML20206C652
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000341/1987048]]
 
=Text=
{{#Wiki_filter:N K80 ,
UNITED STATES
0
's
#
Ie,
NUCLEAR REGULATORY COMMISSION
,
[
$
REGION HI
$
f
799 5800$EVELT RO AD
*
GLEN ELLYN, ILUNOl$ 401 U
*****
NOV 0 41988
Docket. No. 50-341
The Detroit Edison Company
ATTH:
B. Ralph Sylvia
Senior Vice President
Nuclear Operations
6400 North Dixie Highway
Newport, MI 48166
Gentlemen:
This refers to the safety inspections of activities at Fermi 2 Nuclea* Power
Plant, authorized by NRC Operating 1.icenso 'No.uNPF-43, and documentad: in
Inspectioe. keport Nos. 50-341/87048(DRP), 50,-341/88006(ORP), P 341/88012(DRP)?
and 50-341/88017(DRP). The inspections, covered the period of i ,tober 18, 1987;
through August 26, 1988.
During these inspections, certain of your activities appeared to be in
.
violation of NRC requirements, as specified ir. the enclosed Notice. A written
response is required.
Escalated enforcernont was considered for the apparent
violations and an Enforcement Conference was held on October 20, 1988, in the
Region 111 office between you and members of your staff and Mr. Carl Papriello
and members of the Region III staff.
During the Enforcement Conference the
apparent violations, corrective actions, and root causes were discussed.
The NRC has been concerned with the number of surveillance problems identified
cver the post year at the Fenni facility. As a result of the Enforcement
Conference, "RC is encouraged that the corrective actions you have taken
dppear to have resolved the programatic problems of your surveillance program.
The ongoing Technical Specification Improvement Program is scheduled for
completion on December 31, 1968. While the NRC acknowledges the results of
the program to date, NRC will closel; monitor your final results in order to
detennine if future enforcement action is warranted.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter, the enclosure, and your response to this letter will be placed
in the NRC Public Document Room.
We will gladly discuss any questions you have concerning these inspections.
Sincerely,
hQ k $. . : - a
Edward G. Greenman, Director
Division of Reactor Projects
Enclosure:
Notice of Violation
See Attached Distribution
'6f
8911150360 891104
PDR
ADOCK 05000341
l
'
0
PDC
1
 
-
a.
.,
.
The Detroit Edison Company
2
#
Distribution
cc w/ enclosure:
Patricia Anthony, Licensing
P. A. Marquardt, Corporate
Legal Department
0.DCD/DCB.(RIDS)
Licensing Fee Management Branch
Resident Inspector, Rill
Ronald Callen, Michigan
Public Service Comission
Harry H. Voight, Esq.
Michigan Department of
Public Health
Monr'oe County Office of
Civil Preparedness
J. Lieberman, OE
'L. J. Chandler, OGC
0. M.. Crutchfield, NRR
}}

Latest revision as of 02:14, 7 December 2024

Discusses Safety Insp Repts 50-341/87-48,50-341/88-06, 50-341/88-12 & 50-341/88-17 on 871018-880826 & Forwards Notice of Violation.Corrective Actions Appear to Have Resolved Programmatic Problems of Surveillance Program
ML20206C648
Person / Time
Site: Fermi 
Issue date: 11/04/1988
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20206C652 List:
References
NUDOCS 8811160360
Download: ML20206C648 (2)


See also: IR 05000341/1987048

Text

N K80 ,

UNITED STATES

0

's

Ie,

NUCLEAR REGULATORY COMMISSION

,

[

$

REGION HI

$

f

799 5800$EVELT RO AD

GLEN ELLYN, ILUNOl$ 401 U

NOV 0 41988

Docket. No. 50-341

The Detroit Edison Company

ATTH:

B. Ralph Sylvia

Senior Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to the safety inspections of activities at Fermi 2 Nuclea* Power

Plant, authorized by NRC Operating 1.icenso 'No.uNPF-43, and documentad: in

Inspectioe. keport Nos. 50-341/87048(DRP), 50,-341/88006(ORP), P 341/88012(DRP)?

and 50-341/88017(DRP). The inspections, covered the period of i ,tober 18, 1987;

through August 26, 1988.

During these inspections, certain of your activities appeared to be in

.

violation of NRC requirements, as specified ir. the enclosed Notice. A written

response is required.

Escalated enforcernont was considered for the apparent

violations and an Enforcement Conference was held on October 20, 1988, in the

Region 111 office between you and members of your staff and Mr. Carl Papriello

and members of the Region III staff.

During the Enforcement Conference the

apparent violations, corrective actions, and root causes were discussed.

The NRC has been concerned with the number of surveillance problems identified

cver the post year at the Fenni facility. As a result of the Enforcement

Conference, "RC is encouraged that the corrective actions you have taken

dppear to have resolved the programatic problems of your surveillance program.

The ongoing Technical Specification Improvement Program is scheduled for

completion on December 31, 1968. While the NRC acknowledges the results of

the program to date, NRC will closel; monitor your final results in order to

detennine if future enforcement action is warranted.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of

this letter, the enclosure, and your response to this letter will be placed

in the NRC Public Document Room.

We will gladly discuss any questions you have concerning these inspections.

Sincerely,

hQ k $. . : - a

Edward G. Greenman, Director

Division of Reactor Projects

Enclosure:

Notice of Violation

See Attached Distribution

'6f

8911150360 891104

PDR

ADOCK 05000341

l

'

0

PDC

1

-

a.

.,

.

The Detroit Edison Company

2

Distribution

cc w/ enclosure:

Patricia Anthony, Licensing

P. A. Marquardt, Corporate

Legal Department

0.DCD/DCB.(RIDS)

Licensing Fee Management Branch

Resident Inspector, Rill

Ronald Callen, Michigan

Public Service Comission

Harry H. Voight, Esq.

Michigan Department of

Public Health

Monr'oe County Office of

Civil Preparedness

J. Lieberman, OE

'L. J. Chandler, OGC

0. M.. Crutchfield, NRR