ML20207T170: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:U.S. NUCLEAR REIULATORY COMMISSION                     NRc FotA REcutsi Nuustnist f.
{{#Wiki_filter:U.S. NUCLEAR REIULATORY COMMISSION NRc FotA REcutsi Nuustnist f.
e, b
e, w_ gg-g f
w_ gg-g               atsrONst (vre f             't,,
't,,
i i                  RESPON!E TO FREED M CF                                  V' 's         '
b atsrONst (vre V 's M*h^'
M*h^'                           l I'^*'
l I'^*'
ene.    /               INFORMATION ACT (FOlA) REQUEST MAR 19137 DOCKET NUMBER (Sp l# app 6canet REQUESTER                                   1 IT M '             AUb i               PART1.
i i
D@
RESPON!E TO FREED M CF
/
INFORMATION ACT (FOlA) REQUEST MAR 19137 ene.
DOCKET NUMBER (Sp l# app 6canet REQUESTER 1
IT M '
AUb i D@
PART1.
pORDS RELEASED OR NOT LOCATED (See checked bones)
pORDS RELEASED OR NOT LOCATED (See checked bones)
No agency records subject to the request have been located.
No agency records subject to the request have been located.
No additional agency records subject to the request have been located.
No additional agency records subject to the request have been located.
Agency records subject to the request that are ident#ied in Appendia           E           are already available for public inspection and copying in the NRC Public Document R orn, 1717 H Street, N.W., Washington, DC.
Agency records subject to the request that are ident#ied in Appendia E
Agency records subject to the request that are identified in Appendia         A             a,e being made avawe fm puu.c insp.ction end copying in the NRC Puwie Document Room,1717 H Street, N.W., Washington, DC, in a folder under this FOIA nurnber and requester name.
are already available for public inspection and copying in the NRC Public Document R orn, 1717 H Street, N.W., Washington, DC.
Agency records subject to the request that are identified in Appendia A
a,e being made avawe fm puu.c insp.ction end copying in the NRC Puwie Document Room,1717 H Street, N.W., Washington, DC, in a folder under this FOIA nurnber and requester name.
The nonproprietary version of the proposal (s) that you agreed to accept in a telephone conversation with a mornber of my staff is now being made avalable for public inspection and coying at the NRC Public Document Room,1717 H Street, N W., Washington, DC, in a folder under thia FOIA number and requester name.
The nonproprietary version of the proposal (s) that you agreed to accept in a telephone conversation with a mornber of my staff is now being made avalable for public inspection and coying at the NRC Public Document Room,1717 H Street, N W., Washington, DC, in a folder under thia FOIA number and requester name.
Enclosed is information on how you rnay obtain access to and the charges for copying records placed in the NF:C Public Document Room,1717 H Street, N.W., Washington, DC.
Enclosed is information on how you rnay obtain access to and the charges for copying records placed in the NF:C Public Document Room,1717 H Street, N.W., Washington, DC.
Agency records subject to the request are enclosed. Any applicable charge for copies of the records provides1 and payment procedures are noted in the commerus section.
Agency records subject to the request are enclosed. Any applicable charge for copies of the records provides1 and payment procedures are noted in the commerus section.
Records subject to the request have been referred to another Federal egency(ies) for rwiew and direct response to you.
Records subject to the request have been referred to another Federal egency(ies) for rwiew and direct response to you.
In view of NRC's response to this request, no further action is being taken on appeal lettei .4ated PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain information in the requested records is being withheld from public disclosure pursuant to the FOIA exemptions described in and for the reasons stated in Part li, sec-tions B, C, and D. Any released portions of the documents for which only part of the record is being wi thheld are being made available for public inspecta and copying in the NRC Public Document Room,1717 H Street, N.W., Washington, DC, in a folder under this FOIA number and requester t'ame.
In view of NRC's response to this request, no further action is being taken on appeal lettei.4ated PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain information in the requested records is being withheld from public disclosure pursuant to the FOIA exemptions described in and for the reasons stated in Part li, sec-tions B, C, and D. Any released portions of the documents for which only part of the record is being wi hheld are being made available for public inspecta and copying in t
the NRC Public Document Room,1717 H Street, N.W., Washington, DC, in a folder under this FOIA number and requester t'ame.
Comments l
Comments l
I l
I l
l                       8703230275 870319
l 8703230275 870319
                                                -68               PDR NGE A     E, DIRECTOR. OMS       OF RULES A     RECORDS M                     .                          w
-68 PDR NGE A
                                                              .            J
E, DIRECTOR. OMS OF RULES A RECORDS M
                                                              * . ' . " .::c
w J
::: . ..::s::::.
*. '. ".::c
NRC FORM 464 (Pyt U                                                                                                   ,
:::...::s::::.
is 86.
NRC FORM 464 (Pyt U is 86.


Re: F01A-87-68 APPENDIX A DATE                           DESCRIPTION
Re: F01A-87-68 APPENDIX A DATE DESCRIPTION 1.
: 1.             12/30/85 Memorandum from J. Knight to K. Jabbour regarding the Safety Evaluation Report Concerning the Catawba Safety
12/30/85 Memorandum from J. Knight to K. Jabbour regarding the Safety Evaluation Report Concerning the Catawba Safety
                                                            .ParameterDisplaySystem.(19pages)
.ParameterDisplaySystem.(19pages)
              ' 2.           4/18/86                         Draft memorandum from H. Denton to V. Stello concerning the Backfit Determination Regarding the Safety Parameter Display System - McGuire and Catawba Nuclear Stations, Units 1 and 2. (7 pages)
' 2.
: 3.           Undated                         Draft letter from H. Denton to E. Utley regarding Shearon Harris Backfit Considerations. (3 pages)
4/18/86 Draft memorandum from H. Denton to V. Stello concerning the Backfit Determination Regarding the Safety Parameter Display System - McGuire and Catawba Nuclear Stations, Units 1 and 2. (7 pages) 3.
: 4.             8/18/86                         Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant - S Activities - July 1986. (27 pages)pecificBackfitting
Undated Draft letter from H. Denton to E. Utley regarding Shearon Harris Backfit Considerations. (3 pages) 4.
: 5.             9/19/86                         Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant-Specific Backfitting Activities - August 1986. (29 pages)
8/18/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant - S Activities - July 1986. (27 pages)pecificBackfitting 5.
: 6.             10/24/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant-Specific Backfitting -
9/19/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant-Specific Backfitting Activities - August 1986. (29 pages) 6.
Activities - September 1986. (29 pages)
10/24/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant-Specific Backfitting -
: 7.             11/21/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant-Specific Backfitting Activities - October 1986. (30 pages)
Activities - September 1986. (29 pages) 7.
: 8.           8/13/85                         Letter to H. Denton from H. Tucker regarding the Response to NRC Request for Additional Information concernin E-MAX Isolation Devices for McGuire SPDS. (5 pages)g the l
11/21/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant-Specific Backfitting Activities - October 1986. (30 pages) 8.
l
8/13/85 Letter to H. Denton from H. Tucker regarding the Response to NRC Request for Additional Information concernin E-MAX Isolation Devices for McGuire SPDS. (5 pages)g the l
: 9.           3/29/84                         Letter from H. Tucker to H. Denton transmitting Revision 3 to Response to Supplement I to NUREG-0737; SPDS data, McGuire docket. (25 pages)
l 9.
: 10.           11/84                         Page 18.2-A11 of SRP Section 18.2 w/ note regarding CRGR Approval.(1page) l ~ -
3/29/84 Letter from H. Tucker to H. Denton transmitting Revision 3 to Response to Supplement I to NUREG-0737; SPDS data, McGuire docket. (25 pages) 10.
: 11. 6/13/86                                 Memorandum from H. Denton to V. Stello concerning the Backfit Detennination Regarding the Safety Parameter Display System - McGuire and Catawba Nuclear Stations, Units 1 and 2. (1 page)                                     .
11/84 Page 18.2-A11 of SRP Section 18.2 w/ note regarding CRGR Approval.(1page) l
: 12. 8/28/84                                 Letter from E. Adensam to H. Tucker transmitting NRC request for Additional Information concerning the Safety i                                                           ParameterDisplaySystem.(4pages) l l
: 11. 6/13/86 Memorandum from H. Denton to V. Stello concerning the
~ -
Backfit Detennination Regarding the Safety Parameter Display System - McGuire and Catawba Nuclear Stations, Units 1 and 2. (1 page)
: 12. 8/28/84 Letter from E. Adensam to H. Tucker transmitting NRC request for Additional Information concerning the Safety i
ParameterDisplaySystem.(4pages) l l
I l
I l
i
i


l Re: F01A-87-68 APPENDIX B DATE         DOCUMENT DESCRIPTION
l Re: F01A-87-68 APPENDIX B DATE DOCUMENT DESCRIPTION 1.
: 1. 3/25/86     Letter from H. Tucker to H. Denton requesting plant -
3/25/86 Letter from H. Tucker to H. Denton requesting plant -
specific backfit for McGuire and Catawba SPDS, PDR 8603270319
specific backfit for McGuire and Catawba SPDS, PDR 8603270319 2.
: 2. 11/7/85     Letter from E. Adensam (signed by L. Kintner) to H.
11/7/85 Letter from E. Adensam (signed by L. Kintner) to H.
Tucker, " Supplemental Request for Additional Information on Safety Parameter Display System - McGuire Nuclear Station, Units 1 and 2", (1 enclosure) PDR 8511180606
Tucker, " Supplemental Request for Additional Information on Safety Parameter Display System - McGuire Nuclear Station, Units 1 and 2", (1 enclosure) PDR 8511180606 3.
: 3. 2/28/86     Letter from B.Youngblood (signed by D. Hood) to H. Tucker,
2/28/86 Letter from B.Youngblood (signed by D. Hood) to H. Tucker,
                                                  " Corrected Report Regarding Safety Parameter Display System - McGuire Nuclear Station, Units 1 and 2",
" Corrected Report Regarding Safety Parameter Display System - McGuire Nuclear Station, Units 1 and 2",
(1 enclosure) PDR 8603120180
(1 enclosure) PDR 8603120180 4.
: 4. 2/6/86       Letter from B.Youngblood (signed by D. Hood) to H. Tucker,
2/6/86 Letter from B.Youngblood (signed by D. Hood) to H. Tucker,
                                                  " Staff Interim Acceptance of Safety Parameter Display System - McGuire Nuclear Station, Units 1 and 2",
" Staff Interim Acceptance of Safety Parameter Display System - McGuire Nuclear Station, Units 1 and 2",
(1 enclosure)PDR 8602180556
(1 enclosure)PDR 8602180556 5.
: 5. 2/27/86     Memorandum from C.Rossi to D. Hood, " Corrections to the McGuire Safety Parameter Display System SER",
2/27/86 Memorandum from C.Rossi to D. Hood, " Corrections to the McGuire Safety Parameter Display System SER",
(1 enclosure) PDR 8603050519
(1 enclosure) PDR 8603050519 6.
: 6. 11/27/85 Letter to H. Denton from H. Tucker - Catawba 2, McGuire 1&2, (2 attachments) PDR 8512040080
11/27/85 Letter to H. Denton from H. Tucker - Catawba 2, McGuire 1&2, (2 attachments) PDR 8512040080 7.
: 7. 11/2/84     Letter to H.Denton from H. Tucker responding to 8/28/84 request for information on McGuire SPDS, (1 enclosure with one attachment) PDR 8411080243
11/2/84 Letter to H.Denton from H. Tucker responding to 8/28/84 request for information on McGuire SPDS, (1 enclosure with one attachment) PDR 8411080243 8.
: 8. 12/19/84 Letter to H. Tucker from E.Adensam, " Supplemental Request for Additional Information Regarding Safety Parameter Display System". McGuire docket, (1 enclosure) PDR 8501030229
12/19/84 Letter to H. Tucker from E.Adensam, " Supplemental Request for Additional Information Regarding Safety Parameter Display System". McGuire docket, (1 enclosure) PDR 8501030229 9.
: 9. 11/28/84 Memorandum to E.Adensam from V. Moore, " Request for Additional Information Concerning the SPDS Parameter Selection for McGuire", (1 enclosure) PDR 8412060628
11/28/84 Memorandum to E.Adensam from V. Moore, " Request for Additional Information Concerning the SPDS Parameter Selection for McGuire", (1 enclosure) PDR 8412060628
: 10. 2/13/86       IE Information Notice No. 86-10: SPDS Malfunctions.
: 10. 2/13/86 IE Information Notice No. 86-10: SPDS Malfunctions.
PDR 8602100408
PDR 8602100408


Re: FOIA-87-68 APPENDIX B (Continued)
Re: FOIA-87-68 APPENDIX B (Continued)
DATE     DOCUMENT DESCRIPTION
DATE DOCUMENT DESCRIPTION 11.
: 11. 12/17/82 NRC Generic Letter No. 82-33, " Supplement il to NUREG-0737 - Requirements for Emergency Response Capability,"(1 enclosure)PDR 8212060349 12, 5/15/85   Letter to H. Tucker from E.Adensam, " Supplemental Request for Additional Information Regarding E-Max Isolation Devices for the McGuire SPDS," (1 enclosure) PDR 8505310383
12/17/82 NRC Generic Letter No. 82-33, " Supplement il to NUREG-0737 - Requirements for Emergency Response Capability,"(1 enclosure)PDR 8212060349 12, 5/15/85 Letter to H. Tucker from E.Adensam, " Supplemental Request for Additional Information Regarding E-Max Isolation Devices for the McGuire SPDS," (1 enclosure) PDR 8505310383
: 13. 4/26/85     Memorandum from F. Rosa to W.Regaa "McGuire 1 & 2 - Review of Isolation Devices That Interface with the SPDS",
: 13. 4/26/85 Memorandum from F. Rosa to W.Regaa "McGuire 1 & 2 - Review of Isolation Devices That Interface with the SPDS",
PDR 8505020185
PDR 8505020185
: 14. 4/14/83     Letter from H. Tucker to H.Denton transmitting Response to Supplement 1 to NUREG - 0737 (2 volumes),
: 14. 4/14/83 Letter from H. Tucker to H.Denton transmitting Response to Supplement 1 to NUREG - 0737 (2 volumes),
Catawba, McGuire and Oconee dockets, PDR 8304190003
Catawba, McGuire and Oconee dockets, PDR 8304190003
: 15. 6/15/84     Letter from E.Adensam to H. Tucker, " Issuance of Order Confirming Licensee Comitments on Emergency Response Capability", McGuire 1 & 2 dockets, (one enclosure and oneattachment)PDR 8406280276
: 15. 6/15/84 Letter from E.Adensam to H. Tucker, " Issuance of Order Confirming Licensee Comitments on Emergency Response Capability", McGuire 1 & 2 dockets, (one enclosure and oneattachment)PDR 8406280276
: 16. 9/8/83     Letter from H. Tucker to H.Denton transmitting Revision 1 to Response to Supplement I to NUREG-0737, McGuire docket, PDR 8309150125
: 16. 9/8/83 Letter from H. Tucker to H.Denton transmitting Revision 1 to Response to Supplement I to NUREG-0737, McGuire docket, PDR 8309150125
: 17. 2/16/84   Letter from H. Tucker to H.Denton transmitting Revision 2 to Response to Supplement I to NUREG-0737, McGuire docket, PDR 8402220325
: 17. 2/16/84 Letter from H. Tucker to H.Denton transmitting Revision 2 to Response to Supplement I to NUREG-0737, McGuire docket, PDR 8402220325
: 18. 6/13/86   Letter from H.Denton to H. Tucker, "Backfit Determination Regarding Safety Paran.eter Display System - McGuire and Catawba Nuclear Stations, Units 1 and 2". PDR 8606230486
: 18. 6/13/86 Letter from H.Denton to H. Tucker, "Backfit Determination Regarding Safety Paran.eter Display System - McGuire and Catawba Nuclear Stations, Units 1 and 2". PDR 8606230486 19.
19. 10/29/85 Memorandum from W.Regan to E.Adensam " Request for Additional Information Concerning the Safety Parameter Display System for McGuire", PDR 8511010146
10/29/85 Memorandum from W.Regan to E.Adensam " Request for Additional Information Concerning the Safety Parameter Display System for McGuire", PDR 8511010146
: 20. 2/8/85     Letter to H. Denton from H. Tucker responding to 12/19/84 request for information on McGuire SPDS (one enclosure)
: 20. 2/8/85 Letter to H. Denton from H. Tucker responding to 12/19/84 request for information on McGuire SPDS (one enclosure)
PDR 8502150184 l
PDR 8502150184 l
  -}}
.-}}

Latest revision as of 19:07, 6 December 2024

Final Response to FOIA Request.App B Documents Available in Pdr.App a Documents Re plant-specific Backfitting & SPDS Encl & Being Placed in PDR
ML20207T170
Person / Time
Site: Mcguire, Catawba, McGuire, 05000000
Issue date: 03/19/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Stenger D
BISHOP, COOK, PURCELL & REYNOLDS
Shared Package
ML20205H658 List:
References
FOIA-87-68, RTR-NUREG-0737, RTR-NUREG-737, RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8703230275
Download: ML20207T170 (4)


Text

U.S. NUCLEAR REIULATORY COMMISSION NRc FotA REcutsi Nuustnist f.

e, w_ gg-g f

't,,

b atsrONst (vre V 's M*h^'

l I'^*'

i i

RESPON!E TO FREED M CF

/

INFORMATION ACT (FOlA) REQUEST MAR 19137 ene.

DOCKET NUMBER (Sp l# app 6canet REQUESTER 1

IT M '

AUb i D@

PART1.

pORDS RELEASED OR NOT LOCATED (See checked bones)

No agency records subject to the request have been located.

No additional agency records subject to the request have been located.

Agency records subject to the request that are ident#ied in Appendia E

are already available for public inspection and copying in the NRC Public Document R orn, 1717 H Street, N.W., Washington, DC.

Agency records subject to the request that are identified in Appendia A

a,e being made avawe fm puu.c insp.ction end copying in the NRC Puwie Document Room,1717 H Street, N.W., Washington, DC, in a folder under this FOIA nurnber and requester name.

The nonproprietary version of the proposal (s) that you agreed to accept in a telephone conversation with a mornber of my staff is now being made avalable for public inspection and coying at the NRC Public Document Room,1717 H Street, N W., Washington, DC, in a folder under thia FOIA number and requester name.

Enclosed is information on how you rnay obtain access to and the charges for copying records placed in the NF:C Public Document Room,1717 H Street, N.W., Washington, DC.

Agency records subject to the request are enclosed. Any applicable charge for copies of the records provides1 and payment procedures are noted in the commerus section.

Records subject to the request have been referred to another Federal egency(ies) for rwiew and direct response to you.

In view of NRC's response to this request, no further action is being taken on appeal lettei.4ated PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain information in the requested records is being withheld from public disclosure pursuant to the FOIA exemptions described in and for the reasons stated in Part li, sec-tions B, C, and D. Any released portions of the documents for which only part of the record is being wi hheld are being made available for public inspecta and copying in t

the NRC Public Document Room,1717 H Street, N.W., Washington, DC, in a folder under this FOIA number and requester t'ame.

Comments l

I l

l 8703230275 870319

-68 PDR NGE A

E, DIRECTOR. OMS OF RULES A RECORDS M

w J

  • . '. ".::c
...::s::::.

NRC FORM 464 (Pyt U is 86.

Re: F01A-87-68 APPENDIX A DATE DESCRIPTION 1.

12/30/85 Memorandum from J. Knight to K. Jabbour regarding the Safety Evaluation Report Concerning the Catawba Safety

.ParameterDisplaySystem.(19pages)

' 2.

4/18/86 Draft memorandum from H. Denton to V. Stello concerning the Backfit Determination Regarding the Safety Parameter Display System - McGuire and Catawba Nuclear Stations, Units 1 and 2. (7 pages) 3.

Undated Draft letter from H. Denton to E. Utley regarding Shearon Harris Backfit Considerations. (3 pages) 4.

8/18/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant - S Activities - July 1986. (27 pages)pecificBackfitting 5.

9/19/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant-Specific Backfitting Activities - August 1986. (29 pages) 6.

10/24/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant-Specific Backfitting -

Activities - September 1986. (29 pages) 7.

11/21/86 Memorandum from J. Funches to H. Denton transmitting the Monthly Status Report on Plant-Specific Backfitting Activities - October 1986. (30 pages) 8.

8/13/85 Letter to H. Denton from H. Tucker regarding the Response to NRC Request for Additional Information concernin E-MAX Isolation Devices for McGuire SPDS. (5 pages)g the l

l 9.

3/29/84 Letter from H. Tucker to H. Denton transmitting Revision 3 to Response to Supplement I to NUREG-0737; SPDS data, McGuire docket. (25 pages) 10.

11/84 Page 18.2-A11 of SRP Section 18.2 w/ note regarding CRGR Approval.(1page) l

11. 6/13/86 Memorandum from H. Denton to V. Stello concerning the

~ -

Backfit Detennination Regarding the Safety Parameter Display System - McGuire and Catawba Nuclear Stations, Units 1 and 2. (1 page)

12. 8/28/84 Letter from E. Adensam to H. Tucker transmitting NRC request for Additional Information concerning the Safety i

ParameterDisplaySystem.(4pages) l l

I l

i

l Re: F01A-87-68 APPENDIX B DATE DOCUMENT DESCRIPTION 1.

3/25/86 Letter from H. Tucker to H. Denton requesting plant -

specific backfit for McGuire and Catawba SPDS, PDR 8603270319 2.

11/7/85 Letter from E. Adensam (signed by L. Kintner) to H.

Tucker, " Supplemental Request for Additional Information on Safety Parameter Display System - McGuire Nuclear Station, Units 1 and 2", (1 enclosure) PDR 8511180606 3.

2/28/86 Letter from B.Youngblood (signed by D. Hood) to H. Tucker,

" Corrected Report Regarding Safety Parameter Display System - McGuire Nuclear Station, Units 1 and 2",

(1 enclosure) PDR 8603120180 4.

2/6/86 Letter from B.Youngblood (signed by D. Hood) to H. Tucker,

" Staff Interim Acceptance of Safety Parameter Display System - McGuire Nuclear Station, Units 1 and 2",

(1 enclosure)PDR 8602180556 5.

2/27/86 Memorandum from C.Rossi to D. Hood, " Corrections to the McGuire Safety Parameter Display System SER",

(1 enclosure) PDR 8603050519 6.

11/27/85 Letter to H. Denton from H. Tucker - Catawba 2, McGuire 1&2, (2 attachments) PDR 8512040080 7.

11/2/84 Letter to H.Denton from H. Tucker responding to 8/28/84 request for information on McGuire SPDS, (1 enclosure with one attachment) PDR 8411080243 8.

12/19/84 Letter to H. Tucker from E.Adensam, " Supplemental Request for Additional Information Regarding Safety Parameter Display System". McGuire docket, (1 enclosure) PDR 8501030229 9.

11/28/84 Memorandum to E.Adensam from V. Moore, " Request for Additional Information Concerning the SPDS Parameter Selection for McGuire", (1 enclosure) PDR 8412060628

10. 2/13/86 IE Information Notice No. 86-10: SPDS Malfunctions.

PDR 8602100408

Re: FOIA-87-68 APPENDIX B (Continued)

DATE DOCUMENT DESCRIPTION 11.

12/17/82 NRC Generic Letter No. 82-33, " Supplement il to NUREG-0737 - Requirements for Emergency Response Capability,"(1 enclosure)PDR 8212060349 12, 5/15/85 Letter to H. Tucker from E.Adensam, " Supplemental Request for Additional Information Regarding E-Max Isolation Devices for the McGuire SPDS," (1 enclosure) PDR 8505310383

13. 4/26/85 Memorandum from F. Rosa to W.Regaa "McGuire 1 & 2 - Review of Isolation Devices That Interface with the SPDS",

PDR 8505020185

14. 4/14/83 Letter from H. Tucker to H.Denton transmitting Response to Supplement 1 to NUREG - 0737 (2 volumes),

Catawba, McGuire and Oconee dockets, PDR 8304190003

15. 6/15/84 Letter from E.Adensam to H. Tucker, " Issuance of Order Confirming Licensee Comitments on Emergency Response Capability", McGuire 1 & 2 dockets, (one enclosure and oneattachment)PDR 8406280276
16. 9/8/83 Letter from H. Tucker to H.Denton transmitting Revision 1 to Response to Supplement I to NUREG-0737, McGuire docket, PDR 8309150125
17. 2/16/84 Letter from H. Tucker to H.Denton transmitting Revision 2 to Response to Supplement I to NUREG-0737, McGuire docket, PDR 8402220325
18. 6/13/86 Letter from H.Denton to H. Tucker, "Backfit Determination Regarding Safety Paran.eter Display System - McGuire and Catawba Nuclear Stations, Units 1 and 2". PDR 8606230486 19.

10/29/85 Memorandum from W.Regan to E.Adensam " Request for Additional Information Concerning the Safety Parameter Display System for McGuire", PDR 8511010146

20. 2/8/85 Letter to H. Denton from H. Tucker responding to 12/19/84 request for information on McGuire SPDS (one enclosure)

PDR 8502150184 l

.-