      -                          OPERATING DATA REPORT DOCKET NO. 86-354 UNIT HoDe Creek Gen. Sta.
OPERATING DATA REPORT DOCKET NO.
DATE 3/96/87 COMPLETED BY   H. Jensen TELEPHONE   (6091339-5261
86-354 UNIT HoDe Creek Gen. Sta.
  - OPERATING STATUS
DATE 3/96/87 COMPLETED BY H.
: 1. REPORTING PERIOD   Jan '87 GROSS HOURS IN REPORTING PERIOD           744
Jensen TELEPHONE (6091339-5261
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt)     3293 MAX. DEPEND. CAPACITY (MWe-Net)             1939 DESIGN ELECTRICAL RATING (MWe-Net)         1967
- OPERATING STATUS 1.
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net)           None
REPORTING PERIOD Jan '87 GROSS HOURS IN REPORTING PERIOD 744 2.
: 4. REASONS FOR RESTRICTION (IF ANY)
CURRENTLY AUTHORIZED POWER LEVEL (MWt) 3293 MAX. DEPEND. CAPACITY (MWe-Net) 1939 DESIGN ELECTRICAL RATING (MWe-Net) 1967 3.
THIS       YR TO MONTH       DATE       . CUMULATIVE
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net)
: 5. NO. OF HOURS REACTOR WAS CRITICAL           744.0       744.0           1932.0
None 4.
: 6. REACTOR RESERVE SHUTDOWN HOURS                 0           0               0
REASONS FOR RESTRICTION (IF ANY)
: 7. HOURS GENERATOR ON LINE                     744.0       744.8           1932.9
THIS YR TO MONTH DATE
: 8. UNIT RESERVE SHUTDOWN HOURS                     0           0               0
. CUMULATIVE 5.
: 9. GROSS THERMAL ENERGY GENERATED (MWH)       2.406.653   2.406.653       3.337 a61
NO. OF HOURS REACTOR WAS CRITICAL 744.0 744.0 1932.0 6.
: 19. GROSS ELECTRICAL ENERGY GENERATED (MWH)     821.641     821.641       1.119.281
REACTOR RESERVE SHUTDOWN HOURS 0
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)       790.623     799.623     11.136.469
0 0
: 12. REACTOR SERVICE FACTOR                         100.0       100.0           les.s 13     REACTOR AVAILABILITY FACTOR                     100.9       les.e           lee.e
7.
: 14. UNIT SERVICE FACTOR                             100.0       les.n           len a
HOURS GENERATOR ON LINE 744.0 744.8 1932.9 8.
! 15. UNIT AVAILABILITY FACTOR                       100.0       1EE.S           1Ga a
UNIT RESERVE SHUTDOWN HOURS 0
: 16. UNIT CAPACITY FACTOR (Using Design MDC)         102.2.     192.3           les_a
0 0
: 17. UNIT CAPACITY FACTOR (Using Design MWe)           99.6       99.6           47_A
9.
: 18. UNIT FORCED OUTAGE RATE                           B           B               G i
GROSS THERMAL ENERGY GENERATED (MWH) 2.406.653 2.406.653 3.337 a61 19.
l 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION): None 1
GROSS ELECTRICAL ENERGY GENERATED (MWH) 821.641 821.641 1.119.281 11.
( 29. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 1
NET ELECTRICAL ENERGY GENERATED (MWH) 790.623 799.623 11.136.469 12.
REACTOR SERVICE FACTOR 100.0 100.0 les.s 13 REACTOR AVAILABILITY FACTOR 100.9 les.e lee.e 14.
UNIT SERVICE FACTOR 100.0 les.n len a 15.
UNIT AVAILABILITY FACTOR 100.0 1EE.S 1Ga a 16.
UNIT CAPACITY FACTOR (Using Design MDC) 102.2.
192.3 les_a 17.
UNIT CAPACITY FACTOR (Using Design MWe) 99.6 99.6 47_A 18.
UNIT FORCED OUTAGE RATE B
B G
i l
19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION): None 1
(
29.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 1
Revised cumulative values for Commerical operation date 12/20/86, in accordance with Reg. guide 1.16.
Revised cumulative values for Commerical operation date 12/20/86, in accordance with Reg. guide 1.16.
1 i
1 i
8703240625 B70313 PDR   ADOCK 05000354 I       R               PM L}}
8703240625 B70313 PDR ADOCK 05000354 I
R PM L}}

Latest revision as of 18:57, 6 December 2024

Corrected Monthly Operating Rept for Jan 1987
ML20207U110
Person / Time
Site: Hope Creek 
Issue date: 01/31/1987
From: Jensen H
Public Service Enterprise Group
To:
Shared Package
ML20207U098 List:
References
NUDOCS 8703240625
Download: ML20207U110 (1)


Text

' '

OPERATING DATA REPORT DOCKET NO.86-354 UNIT HoDe Creek Gen. Sta.

DATE 3/96/87 COMPLETED BY H.

Jensen TELEPHONE (6091339-5261

- OPERATING STATUS 1.

REPORTING PERIOD Jan '87 GROSS HOURS IN REPORTING PERIOD 744 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt) 3293 MAX. DEPEND. CAPACITY (MWe-Net) 1939 DESIGN ELECTRICAL RATING (MWe-Net) 1967 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net)

None 4.

REASONS FOR RESTRICTION (IF ANY)

THIS YR TO MONTH DATE

. CUMULATIVE 5.

NO. OF HOURS REACTOR WAS CRITICAL 744.0 744.0 1932.0 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

7.

HOURS GENERATOR ON LINE 744.0 744.8 1932.9 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (MWH) 2.406.653 2.406.653 3.337 a61 19.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 821.641 821.641 1.119.281 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 790.623 799.623 11.136.469 12.

REACTOR SERVICE FACTOR 100.0 100.0 les.s 13 REACTOR AVAILABILITY FACTOR 100.9 les.e lee.e 14.

UNIT SERVICE FACTOR 100.0 les.n len a 15.

UNIT AVAILABILITY FACTOR 100.0 1EE.S 1Ga a 16.

UNIT CAPACITY FACTOR (Using Design MDC) 102.2.

192.3 les_a 17.

UNIT CAPACITY FACTOR (Using Design MWe) 99.6 99.6 47_A 18.

UNIT FORCED OUTAGE RATE B

B G

i l

19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION): None 1

(

29.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 1