ML20207U107

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Dec 1986
ML20207U107
Person / Time
Site: Hope Creek 
Issue date: 12/31/1986
From: Jensen H
Public Service Enterprise Group
To:
Shared Package
ML20207U098 List:
References
NUDOCS 8703240621
Download: ML20207U107 (1)


Text

OPERATING DATA REPORT DOCKET NO.86-354 UNIT Hope Creek Gen. Sta.

DATE 03/06/87 COMPLETED BY H.

Jensen TELEPHONE (609)339-5261 OPERATING STATUS Dec 20-1.

REPORTING PERIOD Dec 31 '86 GROSS HOURS IN REPORTING PERIOD 288 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt) 3293 MAX. DEPEND. CAPACITY (MWe-Net) 1939 DESIGN ELECTRICAL RATING (MWe-Net) 1967 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net)

None 4.

REASONS FOR RESTRICTION (IF ANY)

THIS YR TO MONTH DATE CUMULATIVE ~

5.

NO. OF HOURS REACTOR WAS CRITICAL 288.0 288.0 288.0 6.

REACTOR RESERVE SHU7DOWN HOURS 0

0 0

7.

HOURS GENERATOR ON LINE 288.0 288.0 288.0 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (MWH) 930,408 930,408 930,408 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 297,640 297,640 297,640 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 285,824 285,824 285,824 12.

REACTOR SERVICE FACTOR 100.0 100.0 100.0 13.

REACTOR AVAILABILITY FACTOR 100.0 100.0_

100.0 l

14.

UNIT SERVICE FACTOR 100.0 100.0 100.0 15.

UNIT AVAILABILITY FACTOR 100.0 100.0 100.0 16.

UNIT CAPACITY FACTOR (Using Design MDC) 95.5 95.5 95.5 17.

UNIT CAPACITY FACTOR (Using Design MWe) 93.0 93.0 93.0 18.

UNIT FORCED OUTAGE RATE O

O O

i l

19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION) : None 20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 6/28/86 INITIAL ELECTRICITY 8/1/86 COMMERCIAL OPERATION 12/20/86 87038Yd60fhf0$I3 PDR ADOCK 05000354 R

PDR

_