Corrected Monthly Operating Rept for Jan 1987
ML20207U110
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/31/1987
From: Jensen H
Public Service Enterprise Group
To:
Shared Package
ML20207U098 List:
References
NUDOCS 8703240625
Download: ML20207U110 (1)


Text

- OPERATING DATA REPORT DOCKET NO.86-354 UNIT HoDe Creek Gen. Sta.

DATE 3/96/87 COMPLETED BY H. Jensen TELEPHONE (6091339-5261

- OPERATING STATUS

1. REPORTING PERIOD Jan '87 GROSS HOURS IN REPORTING PERIOD 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) 3293 MAX. DEPEND. CAPACITY (MWe-Net) 1939 DESIGN ELECTRICAL RATING (MWe-Net) 1967
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net) None
4. REASONS FOR RESTRICTION (IF ANY)

THIS YR TO MONTH DATE . CUMULATIVE

5. NO. OF HOURS REACTOR WAS CRITICAL 744.0 744.0 1932.0
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 744.0 744.8 1932.9
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.406.653 2.406.653 3.337 a61
19. GROSS ELECTRICAL ENERGY GENERATED (MWH) 821.641 821.641 1.119.281
11. NET ELECTRICAL ENERGY GENERATED (MWH) 790.623 799.623 11.136.469
12. REACTOR SERVICE FACTOR 100.0 100.0 les.s 13 REACTOR AVAILABILITY FACTOR 100.9 les.e lee.e
14. UNIT SERVICE FACTOR 100.0 les.n len a

! 15. UNIT AVAILABILITY FACTOR 100.0 1EE.S 1Ga a

16. UNIT CAPACITY FACTOR (Using Design MDC) 102.2. 192.3 les_a
17. UNIT CAPACITY FACTOR (Using Design MWe) 99.6 99.6 47_A
18. UNIT FORCED OUTAGE RATE B B G i

l 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION): None 1

( 29. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 1

Revised cumulative values for Commerical operation date 12/20/86, in accordance with Reg. guide 1.16.

1 i

8703240625 B70313 PDR ADOCK 05000354 I R PM L