ML20210A003: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_         _                               - - . _ _ _ -     -   -     -_
{{#Wiki_filter:,
                  ,
_
  re      ,          ,
_
                                      .
- - . _ _ _
  '
-
                    ,
-
              "
-
      .9'
-_
                                        '
re
                        : Docket No. 50-508                           OCT 2 21985
,
                                                                              ,
,
                          s
.
                .         Washington:Public~ Power Supply System
'
                          P. 0; Box 1223
,
  L                       Elma, Washington 98541
.9'
                                                                            -
"
                                                                                .
OCT 2 21985
                          Attention:     Mr. D. W..Mazur                               :+
'
                                                                                          '
: Docket No. 50-508
                                          Managing Director        ,
,
                          Gentlemen:                       ,     .     *
s
                        . Subject: NRC Inspection.=WNP3                   b
.
                                                                                  ;- -
Washington:Public~ Power Supply System
                          ThisreferstotheroutineinspectionconductedbyMr.W.P."Angofthis
P. 0; Box 1223
                          office on October 7-11', 1985, of activities authorized by NRC Construction
L
                          Permit No. CPPR-154, and tofthe discussion;of our findings held by Mr. Ang
Elma, Washington 98541
                          with Mr. R. N. Williams and other members "of,your staff at the conclusion of
-
                                                                      '            ~~
.
                        .the inspection.
Attention:
                                                                                              .
Mr. D. W..Mazur
                          Areas examined during,this inspection are described in the enclosed inspection
:+
                            report. Within these areas,'the inspection' consisted of selective
Managing Director
                                                    ~
'
    -
,
                          examinations of procedures and representative -records, interviews _ with
Gentlemen:
                          personnel, and observations by the inspector.
,
                          No violations of NRC requirements were identified within the scope of this .
.
                            inspection.
*
                          In accordance with 10 CrR 2.790(a), a copy of this IcLLer and. Lhc enclosurc                                   ,
. Subject: NRC Inspection.=WNP3
                                                                                                                                              '
b
                          will be placed in the NRC Public Document Room.                         ,
;- -
                          Should you have any questions concerning this inspection, we will b'e glad-to
ThisreferstotheroutineinspectionconductedbyMr.W.P."Angofthis
                          discuss them with you.
office on October 7-11', 1985, of activities authorized by NRC Construction
                                                                    : Sincerely,-
Permit No. CPPR-154, and tofthe discussion;of our findings held by Mr. Ang
                                                                                                      o
with Mr. R. N. Williams and other members "of,your staff at the conclusion of
                                                                    CQnol'stgnelgg
.the inspection.
                                                                    . D. 0FI.IManggh ,, Acting 'Directo r
'
                                                                      Division of Reactor Safety and Projects
~~
                          Enclosure:
.
                          Inspection Report No.-50-508/85-07-                                 ~
Areas examined during,this inspection are described in the enclosed inspection
                          cc;w/ enclosure:
report. Within these areas,'the inspection' consisted of selective
                        .A. D. Kohler,_WPPSS; R.;B. Glasscock, WPPSS; L..J. Garvin, WPPSS
~
                          J.JD. Martin, WPPSS; State ~of,WA.
-
            ~
examinations of procedures and representative -records, interviews _ with
                        -bec w/ enclosure:.                   ..
personnel, and observations by the inspector.
                                                                                            .                                               ,
No violations of NRC requirements were identified within the scope of this .
inspection.
In accordance with 10 CrR 2.790(a), a copy of this IcLLer and. Lhc enclosurc
'
,
will be placed in the NRC Public Document Room.
,
Should you have any questions concerning this inspection, we will b'e glad-to
discuss them with you.
: Sincerely,-
o
CQnol'stgnelgg
. D. 0FI.IManggh ,, Acting 'Directo r
Division of Reactor Safety and Projects
Enclosure:
Inspection Report No.-50-508/85-07-
~
cc;w/ enclosure:
.A. D. Kohler,_WPPSS; R.;B. Glasscock, WPPSS; L..J. Garvin, WPPSS
J.JD. Martin, WPPSS; State ~of,WA.
~
-bec w/ enclosure:.
..
.
,
. RSB/ Document Control Desk (RIDS); .Mr. Martin; Resident'Insp'ector;
e
'
. Mr. Faulkenberry; Greg Cook,
q
,
bec w/o enclosure: LFMB
: lyys,. .
^
'
-
_
ANG/ dot ~ .DO
'KIRS
j,
10/2s/85' 10/2/ /85 10/p/85,
,
,
85111f0
fg
,
PDR
_
/g
a
e
e
,
~
.
.
_ 2)_
'
'
                        . RSB/ Document Control Desk (RIDS); .Mr. Martin; Resident'Insp'ector;
                        . Mr. Faulkenberry; Greg Cook,                                                                  ,          q
                          bec w/o enclosure: LFMB
                                                ^
                                                                                                        '
                          : lyys,. .                  _
                                                                                                                          -
      j,                  ANG/ dot ~ .DO        'KIRS
                          10/2s/85' 10/2/ /85 10/p/85,                            ,
                                                                                                                                  ,
                          85111f0
                            PDR
                                          fg                                                          ,
                .
                    a
                        _ 2)_
                        _
                                        ~    '
                                              ,                                                                e
                                                                                                                              /g
                                                                                                                              .
}}
}}

Latest revision as of 17:22, 6 December 2024

Forwards Insp Rept 50-508/85-07 on 851007-11.No Violations Noted
ML20210A003
Person / Time
Site: Satsop
Issue date: 10/22/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20210A006 List:
References
NUDOCS 8511140101
Download: ML20210A003 (1)


See also: IR 05000508/1985007

Text

,

_

_

- - . _ _ _

-

-

-

-_

re

,

,

.

'

,

.9'

"

OCT 2 21985

'

Docket No. 50-508

,

s

.

Washington:Public~ Power Supply System

P. 0; Box 1223

L

Elma, Washington 98541

-

.

Attention:

Mr. D. W..Mazur

+

Managing Director

'

,

Gentlemen:

,

.

. Subject: NRC Inspection.=WNP3

b

- -

ThisreferstotheroutineinspectionconductedbyMr.W.P."Angofthis

office on October 7-11', 1985, of activities authorized by NRC Construction

Permit No. CPPR-154, and tofthe discussion;of our findings held by Mr. Ang

with Mr. R. N. Williams and other members "of,your staff at the conclusion of

.the inspection.

'

~~

.

Areas examined during,this inspection are described in the enclosed inspection

report. Within these areas,'the inspection' consisted of selective

~

-

examinations of procedures and representative -records, interviews _ with

personnel, and observations by the inspector.

No violations of NRC requirements were identified within the scope of this .

inspection.

In accordance with 10 CrR 2.790(a), a copy of this IcLLer and. Lhc enclosurc

'

,

will be placed in the NRC Public Document Room.

,

Should you have any questions concerning this inspection, we will b'e glad-to

discuss them with you.

Sincerely,-

o

CQnol'stgnelgg

. D. 0FI.IManggh ,, Acting 'Directo r

Division of Reactor Safety and Projects

Enclosure:

Inspection Report No.-50-508/85-07-

~

cc;w/ enclosure:

.A. D. Kohler,_WPPSS; R.;B. Glasscock, WPPSS; L..J. Garvin, WPPSS

J.JD. Martin, WPPSS; State ~of,WA.

~

-bec w/ enclosure:.

..

.

,

. RSB/ Document Control Desk (RIDS); .Mr. Martin; Resident'Insp'ector;

e

'

. Mr. Faulkenberry; Greg Cook,

q

,

bec w/o enclosure: LFMB

lyys,. .

^

'

-

_

ANG/ dot ~ .DO

'KIRS

j,

10/2s/85' 10/2/ /85 10/p/85,

,

,

85111f0

fg

,

PDR

_

/g

a

e

,

~

.

.

_ 2)_

'