ML20210D458: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:(%Mich C.L SEP 151986 Duke Power Company
{{#Wiki_filter:(%Mich C.L SEP 151986 Duke Power Company
  . ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
. ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:


==SUBJECT:==
==SUBJECT:==
Line 24: Line 24:
The meeting will be conducted on September 25,1986 at 10:00 a.m. in the Region II office.
The meeting will be conducted on September 25,1986 at 10:00 a.m. in the Region II office.
Should you have any questions regarding these arrangements, we will be glad to discuss them with you.
Should you have any questions regarding these arrangements, we will be glad to discuss them with you.
Sincerely, Original Signed by Luis A. Reyes /for Roger D. Walker, Director
Sincerely, Original Signed by Luis A. Reyes /for Roger D. Walker, Director Division of Reactor Projects cc: J. S. Tuckman, Station Manager bec:tjiRC Resident Inspector J.Pastis,NRR State of South Carolina Document Control Desk l
'                                                        Division of Reactor Projects cc: J . S. Tuckman, Station Manager bec:tjiRC Resident Inspector J.Pastis,NRR State of South Carolina Document Control Desk l
A. Herdt T. Conlon W. Miller P. Madden G. Wiseman l
A. Herdt T. Conlon W. Miller P. Madden l
8609190202 860915 PDR ADOCK 05000269 G
G. Wiseman 8609190202 860915 PDR ADOCK 05000269 G                       PDH RIIgfl     f RIJ                 RII           RII                   RII             ,  L1
PDH RIIgfl f
_C     ger:dm     Theebles                       r   VBrownlee           / Reyes               tG f
RIJ RII RII RII L1
9/jA/86         9/p/86               9/p /86       941 /86               9//486 1
_C ger:dm Theebles r
VBrownlee
/ Reyes tG 9/jA/86 9/p/86 9/p /86 941 /86 9//486 f
1
=W'6(
i
i
                                                                                                      =W'6(}}
-..}}

Latest revision as of 16:39, 6 December 2024

Confirms 860911 Telcon Between Pf Guill & Wh Miller to Arrange Meeting to Discuss App R Insp on 861027-31.Meeting Scheduled for 860925 at Region II
ML20210D458
Person / Time
Site: Oconee  
Issue date: 09/15/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8609190202
Download: ML20210D458 (1)


Text

(%Mich C.L SEP 151986 Duke Power Company

. ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING TO DISCUSS 10 CFR 50 APPENDIX R, OCONEE -

DOCKET NOS. 50-269, 50-270, AND 50-287 This confirms the September 11, 1986 telephone conversation between Mr. P. F. Guill of your staff, and Mr. W. H. Miller, Jr. of this office in which your staff requested a technical meeting >..ith Region II personnel to discuss the Appendix R inspection scheduled for your Oconee Facility on October 27-31, 1986.

The meeting will be conducted on September 25,1986 at 10:00 a.m. in the Region II office.

Should you have any questions regarding these arrangements, we will be glad to discuss them with you.

Sincerely, Original Signed by Luis A. Reyes /for Roger D. Walker, Director Division of Reactor Projects cc: J. S. Tuckman, Station Manager bec:tjiRC Resident Inspector J.Pastis,NRR State of South Carolina Document Control Desk l

A. Herdt T. Conlon W. Miller P. Madden G. Wiseman l

8609190202 860915 PDR ADOCK 05000269 G

PDH RIIgfl f

RIJ RII RII RII L1

_C ger:dm Theebles r

VBrownlee

/ Reyes tG 9/jA/86 9/p/86 9/p /86 941 /86 9//486 f

1

=W'6(

i

-..