ML20210D458
| ML20210D458 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/15/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8609190202 | |
| Download: ML20210D458 (1) | |
Text
(%Mich C.L SEP 151986 Duke Power Company
. ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT:
CONFIRMATION OF MEETING TO DISCUSS 10 CFR 50 APPENDIX R, OCONEE -
DOCKET NOS. 50-269, 50-270, AND 50-287 This confirms the September 11, 1986 telephone conversation between Mr. P. F. Guill of your staff, and Mr. W. H. Miller, Jr. of this office in which your staff requested a technical meeting >..ith Region II personnel to discuss the Appendix R inspection scheduled for your Oconee Facility on October 27-31, 1986.
The meeting will be conducted on September 25,1986 at 10:00 a.m. in the Region II office.
Should you have any questions regarding these arrangements, we will be glad to discuss them with you.
Sincerely, Original Signed by Luis A. Reyes /for Roger D. Walker, Director Division of Reactor Projects cc: J. S. Tuckman, Station Manager bec:tjiRC Resident Inspector J.Pastis,NRR State of South Carolina Document Control Desk l
A. Herdt T. Conlon W. Miller P. Madden G. Wiseman l
8609190202 860915 PDR ADOCK 05000269 G
PDH RIIgfl f
RIJ RII RII RII L1
_C ger:dm Theebles r
VBrownlee
/ Reyes tG 9/jA/86 9/p/86 9/p /86 941 /86 9//486 f
1
=W'6(
i
-..