{{#Wiki_filter:A
{{#Wiki_filter:A October 24, 1997
  ^~
* Mr. George A. Hunger, Jr.
* Mr. George A. Hunger, Jr.                                                   October 24, 1997 Director-Licensing, MC 62A-1 PEC0 Energy Company f             Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19007-0195
^~
              $UBJECT:     EMERGENCY DIESEL GENERATOR EDG) SURVEILLANCE REQUIREMENTS, PEACH 80TTOM ATOMIC POWER STATION (, UNIT NOS. 2 AND 3 (TAC NOS. M98910 M98911)
Director-Licensing, MC 62A-1 PEC0 Energy Company f
Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19007-0195
$UBJECT:
EMERGENCY DIESEL GENERATOR EDG) SURVEILLANCE REQUIREMENTS, PEACH 80TTOM ATOMIC POWER STATION (, UNIT NOS. 2 AND 3 (TAC NOS. M98910 M98911)


==Dear Mr. Hunger:==
==Dear Mr. Hunger:==
 
The Commission has issued the anclosed Amendment Nos. 221 and 226 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Botton Atomic Power Station, Un't Nos. 2 and 3.
The Commission has issued the anclosed Amendment Nos. 221 and 226 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Botton Atomic Power Station, Un't Nos. 2 and 3. These amendments consist of changes to the Technical Specifications (TSs) in response to your application dated June 4, 1997.
These amendments consist of changes to the Technical Specifications (TSs) in response to your application dated June 4, 1997.
These amendments change the TSs to eliminate an inconsistency between emergency core cooli                 ystem-(ECCS)         erability requirements and the auto-start and protective r p bypass of t EDGs on an ECCS initiation signal during certain plant configurations.
These amendments change the TSs to eliminate an inconsistency between emergency core cooli ystem-(ECCS) erability requirements and the auto-start and protective r p bypass of t EDGs on an ECCS initiation signal during certain plant configurations.
A copy of the Safety Evaluation is also enclosed. Notice of issuance will be included in the Commission's Bi-Weekly Federal Register Notice.
A copy of the Safety Evaluation is also enclosed. Notice of issuance will be included in the Commission's Bi-Weekly Federal Register Notice.
Sincerely,
Sincerely,
                                                                                      /s/                   >
/s/
L. Mark Padovan, Project Manager Project Directorate I-2 Division of Reactor. Projects - 1/II Docket Nos. 50-277 and 50-278
L. Mark Padovan, Project Manager Project Directorate I-2 Division of Reactor. Projects - 1/II Docket Nos. 50-277 and 50-278


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 221 to DPR-44
1.
: 2. Amendment No. 226 to DPR-56
Amendment No. 221 to DPR-44 2.
: 3. Safety Evaluation cc w/encis: See next page                                                                       /
Amendment No. 226 to DPR-56 3.
DISTRIB1T:ON:                                                                                   ~
Safety Evaluation cc w/encis: See next page
Docket PUBLIC rj' ,.       M0'Brien LPadovan 0Chopra ACRS Ig/
/
PDI-2 Reading         OGC                             -CAnderson, RGN-!
DISTRIB1T:ON:
B   er               GHill JSt la           ^
~Ig/
WBeckn(4)         er 0FFICE     P01-2/PM     _                  P01-2/LA     h               0GC M     P b 2/D         ,
Docket rj',.
NAME       LPadovan: b , ,M0' Brian                     SEdh           k         JSt! M DATE       10/ %/97                 I 10/f /97-         9/18/97 \       10/9/97   10/b97 0FFICIAL RECORD. COPY DOCUMENT NAME:     PB98910.AMD
M0'Brien 0Chopra PUBLIC LPadovan ACRS PDI-2 Reading OGC
                                                          ~
-CAnderson, RGN-!
          "@     MA 37b"'77                                                       M P ~F B W A E GI? Y ll l 1,Ill,Ill@ill'
B er GHill JSt la
_ ___ _ _ _ _---                                                        i
^
WBeckn(4) er 0FFICE P01-2/PM P01-2/LA h
0GC M P b 2/D NAME LPadovan: b,,M0' Brian SEdh k
JSt!M DATE 10/ % 97 I 10/f /97-9/18/97 \\
10/9/97 10/b97
/
0FFICIAL RECORD. COPY DOCUMENT NAME:
PB98910.AMD
~
@ MA 37b"'77 M P ~F B W A E GI? Y ll l 1,Ill,Ill@ill' i


f%g g-       4                           UNITED STATES i
f%g g-4 UNITED STATES i
l g           }           NUCl. EAR REGULATORY COMMISClON WASHINQToN, D.C. 306 #.0001 o          f
g
          % ,,,,,*                          October 24, 1997 Mr. George A. Hunger, Jr.
}
NUCl. EAR REGULATORY COMMISClON l
o f
WASHINQToN, D.C. 306 #.0001 October 24, 1997 Mr. George A. Hunger, Jr.
Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195
Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195


Line 56: Line 71:


==Dear Hr. Hunger:==
==Dear Hr. Hunger:==
 
The Commission has issued the enclosed Amendment Nos. 221 and 226 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station, Unit Nos. 2 and 3.
The Commission has issued the enclosed Amendment Nos. 221       and 226 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic                 .
These amendments consist of changes to the Technical Specifications (TSs) in response to your application dated June 4, 1997.
Power Station, Unit Nos. 2 and 3. These amendments consist of changes to the Technical Specifications (TSs) in response to your application dated June 4, 1997.
These amendments change the TSs to eliminate an inconsistency between emergency core cooling system (ECCS) operability requirements and the auto-start and protective trip bypns of the EDGs on an ECCS initiation signal during certain plant configurations.
These amendments change the TSs to eliminate an inconsistency between emergency core cooling system (ECCS) operability requirements and the auto-start and protective trip bypns of the EDGs on an ECCS initiation signal during certain plant configurations.
A copy of the Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's Bi Sleekly Federal Reaister Notice.
A copy of the Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's Bi Sleekly Federal Reaister Notice.
Sincerely, OM     .
Sincerely, OM L. Mark Padovan, Project Manager Project Directorate 1-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
L. Mark Padovan, Project Manager Project Directorate 1-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 221 to DPR-44
1.
: 2. Amendment No. 226 to DPR-56
Amendment No. 221 to DPR-44 2.
: 3. Safety Evaluation cc w/encis:   See next page
Amendment No. 226 to DPR-56 3.
Safety Evaluation cc w/encis:
See next page
_____-___-________________________________-______-___________________D
_____-___-________________________________-______-___________________D


4 Mr. George A. Hunger, Jr.               Peach Bottom Atomic Power Station, PECO Energy Company                       Units 2 and 3 cc:
4 Mr. George A. Hunger, Jr.
J.W.Durham,Sr.lCounselEsquire             Chief Division of Nuclear Safety Sr. V.P. & Genera                         PA Dept. of PECO Energy Company                         Environmental Resources 2301 Market Street, S26-1                 P.O. Box 8469 Philadelphia, PA 19101                   Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station         Peach Bottom Township 1848 Lay Road                             R. D. #1 Delta, PA 17314                           Delta, PA 17314 PECO Energy Company                       Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-55         Engineering Division Peach Bottom Atomic Power Station         Chief Engineer 1848 Lay Road                             6 St. Paul Centre Delta, PA 17314                           Baltimore, MD 21202-6806 Resident inspector                       Mr. Richard McLean U.S. Nuclear Regulatory Commission       Power Plant and Environmental Peach Bottom Atomic Power Station           Review Division P.O. Box 399                             Department of Natural Resources Delta, PA 17314                           B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission       Dr. Judith Johnsrud 475 Allendale Road                       National Energy Committee King of Prussia, PA 19406                 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher                       State College, PA 16803 Department of Environment 201 West Preston Street                   Manager-Business & Co-owner Affairs Baltin. ore, MD 21201                     Public Service Electric and Gas Company A. F. Kirby, 111                         P.O. Box 236 External Operations - Nuclear             Hancocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899                     Manager-Peach Bottom Licensing PECO Energy Company PECO En9rgy Company                       Nuclear Group Headquarters-Plar' lanager                             Correspondence Control Desk Piaco Bottom Atomic Power Station         P.O. Box No. 195 1848 L.;y Road                           Wayne, PA 19087-0195 Delta, PA 17314
Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3 cc:
_ _ - - _ _ o}}
J.W.Durham,Sr.lCounselEsquire Chief Division of Nuclear Safety Sr. V.P. & Genera PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-55 Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Manager-Business & Co-owner Affairs Baltin. ore, MD 21201 Public Service Electric and Gas Company A. F. Kirby, 111 P.O. Box 236 External Operations - Nuclear Hancocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO En9rgy Company Nuclear Group Headquarters-Plar' lanager Correspondence Control Desk Piaco Bottom Atomic Power Station P.O. Box No. 195 1848 L.;y Road Wayne, PA 19087-0195 Delta, PA 17314 o}}

Latest revision as of 06:06, 4 December 2024

Forwards Amends 221 & 226 to Licenses DPR-44 & DPR-56 & Se. Amends Change TSs to Eliminate Inconsistency Between ECCS Operability Requirements & Autostart & Protective Trip Bypass of EDGs on ECCS Initiation Signal
ML20212G816
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/24/1997
From: Padovan L
NRC (Affiliation Not Assigned)
To: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20212G820 List:
References
TAC-M98910, TAC-M98911, NUDOCS 9711070111
Download: ML20212G816 (3)


Text

A October 24, 1997

  • Mr. George A. Hunger, Jr.

^~

Director-Licensing, MC 62A-1 PEC0 Energy Company f

Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19007-0195

$UBJECT:

EMERGENCY DIESEL GENERATOR EDG) SURVEILLANCE REQUIREMENTS, PEACH 80TTOM ATOMIC POWER STATION (, UNIT NOS. 2 AND 3 (TAC NOS. M98910 M98911)

Dear Mr. Hunger:

The Commission has issued the anclosed Amendment Nos. 221 and 226 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Botton Atomic Power Station, Un't Nos. 2 and 3.

These amendments consist of changes to the Technical Specifications (TSs) in response to your application dated June 4, 1997.

These amendments change the TSs to eliminate an inconsistency between emergency core cooli ystem-(ECCS) erability requirements and the auto-start and protective r p bypass of t EDGs on an ECCS initiation signal during certain plant configurations.

A copy of the Safety Evaluation is also enclosed. Notice of issuance will be included in the Commission's Bi-Weekly Federal Register Notice.

Sincerely,

/s/

L. Mark Padovan, Project Manager Project Directorate I-2 Division of Reactor. Projects - 1/II Docket Nos. 50-277 and 50-278

Enclosures:

1.

Amendment No. 221 to DPR-44 2.

Amendment No. 226 to DPR-56 3.

Safety Evaluation cc w/encis: See next page

/

DISTRIB1T:ON:

~Ig/

Docket rj',.

M0'Brien 0Chopra PUBLIC LPadovan ACRS PDI-2 Reading OGC

-CAnderson, RGN-!

B er GHill JSt la

^

WBeckn(4) er 0FFICE P01-2/PM P01-2/LA h

0GC M P b 2/D NAME LPadovan: b,,M0' Brian SEdh k

JSt!M DATE 10/ % 97 I 10/f /97-9/18/97 \\

10/9/97 10/b97

/

0FFICIAL RECORD. COPY DOCUMENT NAME:

PB98910.AMD

~

@ MA 37b"'77 M P ~F B W A E GI? Y ll l 1,Ill,Ill@ill' i

f%g g-4 UNITED STATES i

g

}

NUCl. EAR REGULATORY COMMISClON l

o f

WASHINQToN, D.C. 306 #.0001 October 24, 1997 Mr. George A. Hunger, Jr.

Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195

SUBJECT:

EMERGENCY DIESEL GENERATOR (EDG) SURVE!LLANCE REQUIREMENTS, PEACH BOTTOM ATOMIC POWER STATION, UNIT N05. 2 AND 3 (TAC N05. M98910 AND M98911)

Dear Hr. Hunger:

The Commission has issued the enclosed Amendment Nos. 221 and 226 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station, Unit Nos. 2 and 3.

These amendments consist of changes to the Technical Specifications (TSs) in response to your application dated June 4, 1997.

These amendments change the TSs to eliminate an inconsistency between emergency core cooling system (ECCS) operability requirements and the auto-start and protective trip bypns of the EDGs on an ECCS initiation signal during certain plant configurations.

A copy of the Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's Bi Sleekly Federal Reaister Notice.

Sincerely, OM L. Mark Padovan, Project Manager Project Directorate 1-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278

Enclosures:

1.

Amendment No. 221 to DPR-44 2.

Amendment No. 226 to DPR-56 3.

Safety Evaluation cc w/encis:

See next page

_____-___-________________________________-______-___________________D

4 Mr. George A. Hunger, Jr.

Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3 cc:

J.W.Durham,Sr.lCounselEsquire Chief Division of Nuclear Safety Sr. V.P. & Genera PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-55 Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Manager-Business & Co-owner Affairs Baltin. ore, MD 21201 Public Service Electric and Gas Company A. F. Kirby, 111 P.O. Box 236 External Operations - Nuclear Hancocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO En9rgy Company Nuclear Group Headquarters-Plar' lanager Correspondence Control Desk Piaco Bottom Atomic Power Station P.O. Box No. 195 1848 L.;y Road Wayne, PA 19087-0195 Delta, PA 17314 o