{{#Wiki_filter:Distribution
{{#Wiki_filter:'
                -                                                                  Docket File
Distribution Docket File
                                'C( i 3- gg                                       ASB Rdg. File ASB Members p g _,                                                           LRubenstein u , v -t i HEMORANDUM FOR: William V. Johnston, Assistant Director for Materials and Qualifications Engineering, "ivision of Engineering, finR FROM:                 L. S. Rubenstein, Assistant Director for Core and Plant Systems, Division of Systems Integration, flRR                                                           i
'C( i 3-gg ASB Rdg. File ASB Members LRubenstein p g _,
u, v -t i HEMORANDUM FOR: William V. Johnston, Assistant Director for Materials and Qualifications Engineering, "ivision of Engineering, finR FROM:
L. S. Rubenstein, Assistant Director for Core and Plant i
Systems, Division of Systems Integration, flRR


==SUBJECT:==
==SUBJECT:==
Line 27: Line 30:
==Reference:==
==Reference:==
Memorandum from W. V. Johnston to L. S. Rubenstein, et al, subject as above, dated April 1,1982 In accordance with the requestein the referenced memorandum, we are submitting a list of equipment for the Washington Nuclear Project No. 2 which is within the Auxiliary Systems 3 ranch's area of review responsibility and should be included in the equipment qualifications program.
Memorandum from W. V. Johnston to L. S. Rubenstein, et al, subject as above, dated April 1,1982 In accordance with the requestein the referenced memorandum, we are submitting a list of equipment for the Washington Nuclear Project No. 2 which is within the Auxiliary Systems 3 ranch's area of review responsibility and should be included in the equipment qualifications program.
                                                                                                      ^6sigfril iif.p.ed b7
^6sigfril iif.p.ed b7
                                                                                                      ' . S. Kuben:tclu L. S. Rubenstein, Assistant Director for Core and Plant Systems Division of Systems Integration Office of Nuclear Reactor Regulation
'. S. Kuben:tclu L. S. Rubenstein, Assistant Director for Core and Plant Systems Division of Systems Integration Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
As Stated cc w/ enclosures:
As Stated cc w/ enclosures:
R. Mattson
R. Mattson
: 0. Parr Z. Rosztoczy R. Lobel                                                                             \
: 0. Parr Z. Rosztoczy 4
4      o' J. Ridgely                                                                 (             %? '.
o' R. Lobel
S I
\\
S J. Ridgely
(
%? '.
474 4ig, 2


==Contact:==
==Contact:==
J. Ridgely                                                         y 9              474 4ig, et,.. PJg 2
9 J. Ridgely y
l X29566
et,.. PJg I
{               cc.g.g. 824 gy im %?,l4 QijnN i
l
DSI:ASBg" DS I.: SB 4             DSI:A                 Dy1,ASB
{
                                                                                                                              '                ~
cc.g.g.
SURNAME )
824 gy X29566 im %?,l4 QijnN i
            ."IR53'g'51:ab     RL bell           . . , , . . . . . 'L, ," . . ' iEE
DSI:ASBg" DS I.: SB 4 DSI:A Dy1,ASB SURNAME )."IR53'g'51:ab RL bell Q. ;,.........[...... 9. t.....
                                                .ODParr
'L "
              .........[...
iEE
5/ /82 ' N ...       9. t....""7"/82 5/.
~
                            ...........f.......
ODParr
d                             5/f/82                                 5/D/82 Q. ; os2eosis nac
...........f.......
          -ADOC}LO5000g7 e26sii"~Jg"' "''FFICIAL R ECO R D COPY
d 5/ /82 ' N 5/f/82
                                                                          " -""" "" " l                          "-
""7"/82 5/D/82 5/
T      -
" -""" "" " l T
um m _m.a
os2eosis e26sii"~Jg"' "''FFICIAL R ECO R D COPY
-ADOC}LO5000g7 nac um m _m.a


WASHINGTON NUCLEAR PROJECT NO. 2                                                                   7 a       -
7 WASHINGTON NUCLEAR PROJECT NO. 2 a
POST ACCIDENT SYSTEM / COMP 0NENTS                                       SAFETY FUNCTION                             DBA REQUIRthtNTS                           AVAILABILITY     .
POST ACCIDENT SYSTEM / COMP 0NENTS SAFETY FUNCTION DBA REQUIRthtNTS AVAILABILITY 1.
: 1. Reactor System                                                                                                                                 Immediately-Safe Reactor Shutdown (SRS)                   DBA-1, LOCA
Reactor System
      .7 Contml rods                                                                                DBA-2, Main Steam Line Break                     (short term)
.7 Contml rods Safe Reactor Shutdown (SRS)
      .8 Contrpi .ordrives                                                           -
DBA-1, LOCA Immediately-DBA-2, Main Steam Line Break (short term)
DBA-3, Steam Line Break Outside Containment DBA-4, Feedline Break                                                     k
.8 Contrpi.ordrives DBA-3, Steam Line Break Outside Containment k
: 2. Nuclear Boiler System                                                                                                                           Innediately
DBA-4, Feedline Break 2.
      .5 Piping, main steam and                       SRS                                           SSE feedwater within outeN                                                                   DBA-1 through 4                                 (short term) most isolation valve 9 Safety / relief valves
Nuclear Boiler System
      .10 Valves, main steam                                   ,
.5 Piping, main steam and SRS SSE Innediately feedwater within outeN DBA-1 through 4 (short term) most isolation valve 9 Safety / relief valves
isolation valves                                       .
.10 Valves, main steam isolation valves 1
1
4.
: 4. CRD liydraulic System                                                                                                                           Immediately i
CRD liydraulic System
      .1 Valves, scram discharge                       SRS                                           SSE volume lines                                                                             DBA-1 through 4                                 (short term)         .
.1 Valves, scram discharge SRS SSE Immediately i
        .2 Valves, insert and withdraw lines                                               .
volume lines DBA-1 through 4 (short term)
        .3 Valves, other                                                                                                                                                   1-
.2 Valves, insert and withdraw lines
        .4 Piping discharge volume lines
.3 Valves, other 1-
        .5 Piping insert and with-                                                                                                                                             ;
.4 Piping discharge volume lines
draw lines                                       '                                                                                                                ;
.5 Piping insert and with-draw lines
        .6 Piping, other.
.6 Piping, other.
        .7 flydraulic control unit                                           ..
.7 flydraulic control unit I
I
5.
: 5. Standby Liquid Control                                                                                                                                                   ~
Standby Liquid Control
i      System                                                                                                                                         Immediately             {'
~
        .1 Standby liquid control                       SRS                                         SSE (short term) l             tank                                                                                   DBA-1 through 4
System Immediately
        .2 Pump
{
        .3 Pump notor                                                                                                                                                         ;
i
        .4 Valves, explosive
.1 Standby liquid control SRS SSE (short term) l tank DBA-1 through 4
                                        - -e w swge                                 a   , we re e* ** smes.,es..p reppurrgege1pf 3pg*w 4W.ew sgrew ,-     *a'
.2 Pump
                                                                                                                                                            ,  sc 1 4
.3 Pump notor
.4 Valves, explosive
-e w swge a
, we re e* ** smes.,es..p reppurrgege1pf 3pg*w 4W.ew sgrew,-
*a' sc 1
4


                                                                                                                                                                                                  .L POST ACCIDENT SAFETY FUNCTION                                                         DBA REQUIREMENTS                                     AVAILABILITY ,
.L POST ACCIDENT SYSTEH/ COMPONENTS SAFETY FUNCTION DBA REQUIREMENTS AVAILABILITY,
SYSTEH/ COMPONENTS i       .5 Valves, isolation and
i
    ,          within containment
.5 Valves, isolation and within containment
            .6 Valves, beyond isolation valves                                                                                                                                                                             j
.6 Valves, beyond isolation valves j
            .7 Piping, within isolation                                                                                                                                                             '
.7 Piping, within isolation valves to reactor vessel
valves to reactor vessel
.8 Piping, beyond isolation valves Minimize release of radioactivity SSE Innediately 8.'
            .8 Piping, beyond isolation valves                                                                                                                                                                     ,
Leak Detection System (MRR)
8.'       Leak Detection System       . Minimize release of radioactivity                                            SSE                                                      Innediately (MRR)                                                                         DBA-1 through 4                                         (long term)
DBA-1 through 4 (long term) 14.
: 14.       Fuel Service Equipment                                                                                                                                                                 '
Fuel Service Equipment
            .1 Fuel preparation machine   None SSE
.1 Fuel preparation machine None SSE
            .2 General purpose grapple                                                                                                                                                               ,
.2 General purpose grapple 15.
: 15.       Reactor Vessel Service                                                                                                                                                                   ,
Reactor Vessel Service l
l
! Equipment
      ! Equipment                                                                                                                                                                                   -
.1 Steam line plugs None SSE
            .1 Steam line plugs           None                                                                         SSE
.2 Dryer and separator sling MRR SSE and head strongback f
        '    .2 Dryer and separator sling   MRR                                                                           SSE and head strongback                                                   .
16.
f
In-Vessel Service Equipment
: 16.       In-Vessel Service Equipment
.1 Control rod grapple None SSE 17.'
            .1 Control rod grapple         None                                                                         SSE 17.'       Refueling Equipment                 ,
Refueling Equipment
: .1 Refueling equipment           None                                                                         SSE l
.1 Refueling equipment None SSE l
        !      platform assembly                                                                                 ''
platform assembly
              .2 Refueling bellows 18.i Storage Equipment
.2 Refueling bellows 18.i Storage Equipment
          !  .1 Fuel storage racks         None                                                                         SSE                                                                         '
.1 Fuel storage racks None SSE
              .2 Defective fuel storage container I
.2 Defective fuel storage container I


                  ~
~
POST ACCIDENT SAFETY FUNCTION                                             DBA REQUIREMENTS AVAILABILITY SYSTEM / COMP 0NENTS fl. Fus) Pool Cooling and Cleanup System
POST ACCIDENT SYSTEM / COMP 0NENTS SAFETY FUNCTION DBA REQUIREMENTS AVAILABILITY fl.
    .1 Vessels, filter /demineral-   None izers
Fus) Pool Cooling and Cleanup System
    .2 Vessels, other                 None
.1 Vessels, filter /demineral-None izers
    ;3 ileat exchangers               MRR                                                           SSE                                   .
.2 Vessels, other None
    .4 Piping                         MRR                                                           SSE
;3 ileat exchangers MRR SSE
    .5 Pumps                         MRR                                                           SSE                               .
.4 Piping MRR SSE
    .6 Makeup system (normal)         None
.5 Pumps MRR SSE
    .7 RilR connection               HRR                                                           SSE
.6 Makeup system (normal)
    .8 Makeup system (emergency)     MRR                                                             E
None
    .9 Piping, suppression pool       MRR                                                           Sc$L S
.7 RilR connection HRR SSE
to outer isolation valves                                                                                                         '
.8 Makeup system (emergency)
: 25. Standby Service Water System     SRS                                                           SSE
MRR Sc$L E
    .1 Piping                                                                                       DBA-1 through 4       Immediately   l
.9 Piping, suppression pool MRR S
    .2 Pumps                                                                                                               (long term)
to outer isolation valves 25.
    .3 Pump motors                                                                                                                       ,.
Standby Service Water System SRS SSE
    .4 Valves
.1 Piping DBA-1 through 4 Immediately l
: 26. Turbine Plant Service Water       Hone                                                     -
.2 Pumps (long term)
    .1 Piping and Valves
.3 Pump motors
    .2 Pumps                                                                                                 .       -    -
.4 Valves 26.
: 27. Reactor Building Closed           None Cooling Water System                   ,
Turbine Plant Service Water Hone
      .1 lleat exchangers                                                                                                                     <
.1 Piping and Valves
      .2 Pumps                                                                                   ,,
.2 Pumps 27.
      .3 Tanks
Reactor Building Closed None Cooling Water System
      .4 Piping and Valves Inside Containment
.1 lleat exchangers
      .5 Containment isolation valves and associated piping
.2 Pumps
      .6 Piping and valves in reactor building
.3 Tanks
      .7 Piping and Valves Other
.4 Piping and Valves Inside Containment
.5 Containment isolation valves and associated piping
.6 Piping and valves in reactor building
.7 Piping and Valves Other


POST ACCIDENT       ..
POST ACCIDENT SYSTEM / COMPONENTS SAFETY FUNCTION DBA REQUIREMENTS AVAILABILITY
SYSTEM / COMPONENTS                                     SAFETY FUNCTION                     DBA REQUIREMENTS                                 AVAILABILITY
: 31. Other HVAC
: 31. Other HVAC                                                                                                                                                                   ,
.1 Reactor building (non-None essential)
                      .1 Reactor building (non-                         None essential)
.2 Reactor building SRS SSE Imediately (essential)
                      .2 Reactor building                               SRS                                       SSE                                                 Imediately (essential)                                                                             DBA-1 through 4                                     (long term)
DBA-1 through 4 (long term)
                      .3 Turbine building                               None
.3 Turbine building None
                      .4 Radwaste Building                             None
.4 Radwaste Building None
                      .5 Control room, critical                         None                                                                                                       .              ,
.5 Control room, critical None switchgear area, cable spreading area (non-essential)
switchgear area, cable spreading area (non-                     **
. 6 Control room, critical SRS SSE Immediately switchgear area, cable MRR DBA-1 through 4 (long term) spreading area
essential)                                                                                                                                 Immediately
.7 Diesel generator building SRS SSE Imediately tna DBA-1 through 4 (long tem)
                      . 6 Control room, critical                         SRS                                       SSE                                                                           .
.8 Standby service water SRS SSE Immediately pumphouse MRR DBA-1 through 4 (long term)
(long term) switchgear area, cable                       MRR     "
: 32. Condensate Storage and Transfer (Figure 9.2-9)
DBA-1 through 4                                                         -
None
spreading area                                                 .
.1 Condensate Storage Tank
Imediately
.2 Piping and valves
                      .7 Diesel generator building                     SRS                                       SSE (long tem) tna                                       DBA-1 through 4
.3 Pumps 34.
                      .8 Standby service water                         SRS                                       SSE                                                 Immediately pumphouse                                   MRR                                       DBA-1 through 4                                     (long term)
Fuel Storage Facilities
: 32. Condensate Storage and                                                 .
.1 Fuel pool / dryer separator MRR SSE liner
Transfer (Figure 9.2-9)                           None
.2 Storage racks and supports MRR SSE 35.
                      .1 Condensate Storage Tank
Building Cranes
                      .2 Piping and valves
.1 Raactor building MRR SSE
                      .3 Pumps
.2 Turbine building hone
: 34. Fuel Storage Facilities
.3 Radwaste building None
                        .1 Fuel pool / dryer separator                   MRR                             ''
.4 Standby service water None pumphouse
SSE liner
.5 Miscellaneous areas None
                      .2 Storage racks and supports                     MRR                                       SSE                                                     .
: 35. Building Cranes
                        .1 Raactor building                             MRR                                       SSE
                        .2 Turbine building                               hone
                        .3 Radwaste building                             None
                        .4 Standby service water                         None pumphouse
                        .5 Miscellaneous areas                           None


  .-    -... y n..;n           --~
-... y n..;n
                                                --      -        . = .
--~
POST ACCIDENT
. =.
* SAFETY FUNCTION         DBA REQUIREMENTS AVAILABILITY SYSTEM / COMPONENTS
POST ACCIDENT SYSTEM / COMPONENTS SAFETY FUNCTION DBA REQUIREMENTS AVAILABILITY 36.
: 36. Instrument and Service Air Hone
Instrument and Service Air Hone
          .1 Piping and valves                                                                                     :
.1 Piping and valves
          .2 Compressors
.2 Compressors
          .3 Vessels r
.3 Vessels r
: 37. Containment Instrument Air System           .                  None
37.
* i
Containment Instrument Air i
          .1 Piping and valves inside containment to and       .
None System
including outboard isolation valves
.1 Piping and valves inside containment to and including outboard isolation valves
          .2 Piping as,d valves to                                                                           ',
.2 Piping as,d valves to main steam relief valves
main steam relief valves             -
.3 Other piping and valves
          .3 Other piping and valves
.4 Compressors
          .4 Compressors
.5 Receiver
          .5 Receiver                                                   .
.6 Piping and valves outside containment isolation valves to nitrogen bottles
          .6 Piping and valves outside containment isolation valves to nitrogen bottles                                     -                                                      .
: 44. Circulating Water and None Cooling Tower Makeup Water System (s)
: 44. Circulating Water and               None Cooling Tower Makeup Water System (s)
.1 Piping and valves
            .1 Piping and valves                   .
.? Pumps
            .? Pumps
: 45. Main Steam Isolation Valves Leakage Control System MRR SSE short term to
: 45. Main Steam Isolation Valves                                                           short term to Leakage Control System           MRR                           SSE
.1 Piping and valves within DBA-1 through 4 long term primary containment and out through ~the outermost iso'lation valves
            .1 Piping and valves within                                     DBA-1 through 4     long term primary containment and                                                                         '
.2 Piping and valves beyond the outermost isolation valves
out through ~the outermost iso'lation valves
.3 Blowers
            .2 Piping and valves beyond the outermost isolation valves
            .3 Blowers


e
e POST ACCIDENT
      '      ~~                                                                       POST ACCIDENT SAFETY FUNCTION         DBA REQUIREMENTS AVAILABILITY   -    $ ':
~~
SYSTEH/ COMP 0NENTS                                                                              .
SYSTEH/ COMP 0NENTS SAFETY FUNCTION DBA REQUIREMENTS AVAILABILITY 4/.
SRS                         SSE                 Imediately 4/. Buildings                                                                      (long term)-
Buildings SRS SSE Imediately
      .5 Spray ponds and standby                               DBA-1 through 4                               ;
.5 Spray ponds and standby DBA-1 through 4 (long term)-
service water pumphouse flon-Listed Systems Demineralized Water Makeup         None System
service water pumphouse flon-Listed Systems Demineralized Water Makeup None System Potable and Sanitary. Water Systems Equipment and Floor Drainage Systems e
* Potable and Sanitary. Water Systems                       -
Equipment and Floor Drainage Systems e
D I
D I
0 4 e 1}}
0 4 e 1}}

Latest revision as of 03:26, 4 December 2024

Forwards Info Requested in 820401 Memo Re Equipment Qualification Program.Sys List Should Be Included in Equipment Qualification Program
ML20213E150
Person / Time
Site: Columbia 
Issue date: 05/11/1982
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Johnston W
Office of Nuclear Reactor Regulation
References
CON-WNP-0512, CON-WNP-512 NUDOCS 8205280518
Download: ML20213E150 (7)


Text

'

Distribution Docket File

'C( i 3-gg ASB Rdg. File ASB Members LRubenstein p g _,

u, v -t i HEMORANDUM FOR: William V. Johnston, Assistant Director for Materials and Qualifications Engineering, "ivision of Engineering, finR FROM:

L. S. Rubenstein, Assistant Director for Core and Plant i

Systems, Division of Systems Integration, flRR

SUBJECT:

SYSTEMS LIST FOR EQUIPMENT QUALIFICATIONS PROGRAM -

WASHINGTON NUCLEAR PROJECT NO. 2

Reference:

Memorandum from W. V. Johnston to L. S. Rubenstein, et al, subject as above, dated April 1,1982 In accordance with the requestein the referenced memorandum, we are submitting a list of equipment for the Washington Nuclear Project No. 2 which is within the Auxiliary Systems 3 ranch's area of review responsibility and should be included in the equipment qualifications program.

^6sigfril iif.p.ed b7

'. S. Kuben:tclu L. S. Rubenstein, Assistant Director for Core and Plant Systems Division of Systems Integration Office of Nuclear Reactor Regulation

Enclosure:

As Stated cc w/ enclosures:

R. Mattson

0. Parr Z. Rosztoczy 4

o' R. Lobel

\\

S J. Ridgely

(

%? '.

474 4ig, 2

Contact:

9 J. Ridgely y

et,.. PJg I

l

{

cc.g.g.

824 gy X29566 im %?,l4 QijnN i

DSI:ASBg" DS I.: SB 4 DSI:A Dy1,ASB SURNAME )."IR53'g'51:ab RL bell Q. ;,.........[...... 9. t.....

'L "

iEE

~

ODParr

...........f.......

d 5/ /82 ' N 5/f/82

""7"/82 5/D/82 5/

" -""" "" " l T

os2eosis e26sii"~Jg"' "FFICIAL R ECO R D COPY

-ADOC}LO5000g7 nac um m _m.a

7 WASHINGTON NUCLEAR PROJECT NO. 2 a

POST ACCIDENT SYSTEM / COMP 0NENTS SAFETY FUNCTION DBA REQUIRthtNTS AVAILABILITY 1.

Reactor System

.7 Contml rods Safe Reactor Shutdown (SRS)

DBA-1, LOCA Immediately-DBA-2, Main Steam Line Break (short term)

.8 Contrpi.ordrives DBA-3, Steam Line Break Outside Containment k

DBA-4, Feedline Break 2.

Nuclear Boiler System

.5 Piping, main steam and SRS SSE Innediately feedwater within outeN DBA-1 through 4 (short term) most isolation valve 9 Safety / relief valves

.10 Valves, main steam isolation valves 1

4.

CRD liydraulic System

.1 Valves, scram discharge SRS SSE Immediately i

volume lines DBA-1 through 4 (short term)

.2 Valves, insert and withdraw lines

.3 Valves, other 1-

.4 Piping discharge volume lines

.5 Piping insert and with-draw lines

.6 Piping, other.

.7 flydraulic control unit I

5.

Standby Liquid Control

~

System Immediately

{

i

.1 Standby liquid control SRS SSE (short term) l tank DBA-1 through 4

.2 Pump

.3 Pump notor

.4 Valves, explosive

-e w swge a

, we re e* ** smes.,es..p reppurrgege1pf 3pg*w 4W.ew sgrew,-

  • a' sc 1

4

.L POST ACCIDENT SYSTEH/ COMPONENTS SAFETY FUNCTION DBA REQUIREMENTS AVAILABILITY,

i

.5 Valves, isolation and within containment

.6 Valves, beyond isolation valves j

.7 Piping, within isolation valves to reactor vessel

.8 Piping, beyond isolation valves Minimize release of radioactivity SSE Innediately 8.'

Leak Detection System (MRR)

DBA-1 through 4 (long term) 14.

Fuel Service Equipment

.1 Fuel preparation machine None SSE

.2 General purpose grapple 15.

Reactor Vessel Service l

! Equipment

.1 Steam line plugs None SSE

.2 Dryer and separator sling MRR SSE and head strongback f

16.

In-Vessel Service Equipment

.1 Control rod grapple None SSE 17.'

Refueling Equipment

.1 Refueling equipment None SSE l

platform assembly

.2 Refueling bellows 18.i Storage Equipment

.1 Fuel storage racks None SSE

.2 Defective fuel storage container I

~

POST ACCIDENT SYSTEM / COMP 0NENTS SAFETY FUNCTION DBA REQUIREMENTS AVAILABILITY fl.

Fus) Pool Cooling and Cleanup System

.1 Vessels, filter /demineral-None izers

.2 Vessels, other None

3 ileat exchangers MRR SSE

.4 Piping MRR SSE

.5 Pumps MRR SSE

.6 Makeup system (normal)

None

.7 RilR connection HRR SSE

.8 Makeup system (emergency)

MRR Sc$L E

.9 Piping, suppression pool MRR S

to outer isolation valves 25.

Standby Service Water System SRS SSE

.1 Piping DBA-1 through 4 Immediately l

.2 Pumps (long term)

.3 Pump motors

.4 Valves 26.

Turbine Plant Service Water Hone

.1 Piping and Valves

.2 Pumps 27.

Reactor Building Closed None Cooling Water System

.1 lleat exchangers

.2 Pumps

.3 Tanks

.4 Piping and Valves Inside Containment

.5 Containment isolation valves and associated piping

.6 Piping and valves in reactor building

.7 Piping and Valves Other

POST ACCIDENT SYSTEM / COMPONENTS SAFETY FUNCTION DBA REQUIREMENTS AVAILABILITY

31. Other HVAC

.1 Reactor building (non-None essential)

.2 Reactor building SRS SSE Imediately (essential)

DBA-1 through 4 (long term)

.3 Turbine building None

.4 Radwaste Building None

.5 Control room, critical None switchgear area, cable spreading area (non-essential)

. 6 Control room, critical SRS SSE Immediately switchgear area, cable MRR DBA-1 through 4 (long term) spreading area

.7 Diesel generator building SRS SSE Imediately tna DBA-1 through 4 (long tem)

.8 Standby service water SRS SSE Immediately pumphouse MRR DBA-1 through 4 (long term)

32. Condensate Storage and Transfer (Figure 9.2-9)

None

.1 Condensate Storage Tank

.2 Piping and valves

.3 Pumps 34.

Fuel Storage Facilities

.1 Fuel pool / dryer separator MRR SSE liner

.2 Storage racks and supports MRR SSE 35.

Building Cranes

.1 Raactor building MRR SSE

.2 Turbine building hone

.3 Radwaste building None

.4 Standby service water None pumphouse

.5 Miscellaneous areas None

-... y n..;n

--~

. =.

POST ACCIDENT SYSTEM / COMPONENTS SAFETY FUNCTION DBA REQUIREMENTS AVAILABILITY 36.

Instrument and Service Air Hone

.1 Piping and valves

.2 Compressors

.3 Vessels r

37.

Containment Instrument Air i

None System

.1 Piping and valves inside containment to and including outboard isolation valves

.2 Piping as,d valves to main steam relief valves

.3 Other piping and valves

.4 Compressors

.5 Receiver

.6 Piping and valves outside containment isolation valves to nitrogen bottles

44. Circulating Water and None Cooling Tower Makeup Water System (s)

.1 Piping and valves

.? Pumps

45. Main Steam Isolation Valves Leakage Control System MRR SSE short term to

.1 Piping and valves within DBA-1 through 4 long term primary containment and out through ~the outermost iso'lation valves

.2 Piping and valves beyond the outermost isolation valves

.3 Blowers

e POST ACCIDENT

~~

SYSTEH/ COMP 0NENTS SAFETY FUNCTION DBA REQUIREMENTS AVAILABILITY 4/.

Buildings SRS SSE Imediately

.5 Spray ponds and standby DBA-1 through 4 (long term)-

service water pumphouse flon-Listed Systems Demineralized Water Makeup None System Potable and Sanitary. Water Systems Equipment and Floor Drainage Systems e

D I

0 4 e 1