==Dear Ms. Adensam:==
==Dear Ms. Adensam:==
Members of my staff met with the Brunswick Project Manager on April 16,1987 to discuss the status of licensing issues concerning the Brunswick Plant. As a follow up to that meeting, I am revising the Brunswick Plant Licensing Action Priority List as I indicated I periodically would. Therefore, the revised list is enclosed.
Members of my staff met with the Brunswick Project Manager on April 16,1987 to discuss the status of licensing issues concerning the Brunswick Plant. As a follow up to that meeting, I am revising the Brunswick Plant Licensing Action Priority List as I indicated I periodically would. Therefore, the revised list is enclosed.
Since my last submittal, Technical Specification License Amendments for Diesel Generator Operability, Standby Liquid Control System, and Special Nuclear Material have been issued. . Your assistance and that of the Project Manager are appreciated in these matters.
Since my last submittal, Technical Specification License Amendments for Diesel Generator Operability, Standby Liquid Control System, and Special Nuclear Material have been issued.. Your assistance and that of the Project Manager are appreciated in these matters.
Yours very truly, gen _ -
Yours very truly, gen _ -
                                                            . n. im rman M     er Nuclear Licensing Section SRZ/RWS/lah     (5138RWS)
. n.
Enclosure cc:   Dr. 3. Nelson Grace (NRC-RII)
im rman M
er Nuclear Licensing Section SRZ/RWS/lah (5138RWS)
Enclosure cc:
Dr. 3. Nelson Grace (NRC-RII)
Mr. W. H. Ruland (NRC-BNP)
Mr. W. H. Ruland (NRC-BNP)
Mr. E. Sylvester (NRC) 8705270230 87051E PDR   ADOCK 05000324 P                     PDR m r.y.it.v n. sir..t . e o. so issi . nm.gn. N. c. 27eo2
Mr. E. Sylvester (NRC) 8705270230 87051E PDR ADOCK 05000324 P
[j
PDR
[j m r.y.it.v n. sir..t. e o. so issi. nm.gn. N. c. 27eo2


    -,.          .      .        .. m . ._                       .
m.._
: m.              . _ ._ ._ .
m.
8
8 TABLE 1 BRUNSWICK LICENSING ACTION PRIORITY LIST APPROVAL CP&L DATE DATE PRIORITY LETTER TITLE SUBMITTED REQUESTED 1.
      .                                                                                                TABLE 1 BRUNSWICK LICENSING ACTION PRIORITY LIST APPROVAL CP&L                                                                                                             DATE             DATE PRIORITY                 LETTER                                                   TITLE                                               SUBMITTED       REQUESTED
- NLS-86-338(a)
: 1.       - NLS-86-338(a)                           Reload TSC (86TSB16) Unit 1                                                   10/21/86         04/22/87
Reload TSC (86TSB16) Unit 1 10/21/86 04/22/87 2.
: 2.         NLS-86-337(a)                           D.C. Distribution TSC (86TSB14)                                               11/07/86         04/22/87
NLS-86-337(a)
: 3.         NLS-86-440I ")                           CAC-V172 Relocation TSC (86TSB21)                                             12/16/86         04/22/87
D.C. Distribution TSC (86TSB14) 11/07/86 04/22/87 3.
: 4.           NLS-87-080                             Exemption from 10CFR73.57(bXI)                                               04/15/87   ,
NLS-86-440 ")
05/07/87
CAC-V172 Relocation TSC (86TSB21) 12/16/86 04/22/87 I
: 5.           NLS-87-074                             ATWS RPT Design                                                               04/14/87         07/03/87
4.
: 6.           NLS-87-006                             3.0.3/3.0.5 TSC (86TSB18)                                                     03/02/87           ASAP
NLS-87-080 Exemption from 10CFR73.57(bXI) 04/15/87 05/07/87 5.
: 7.           NLS-85-374                             Appendix 3 Exemption Request                                                   10/25/85         07/03/87
NLS-87-074 ATWS RPT Design 04/14/87 07/03/87 6.
: 8.           NLS-86-312                             Containment Isolation Valve Stroke                                           08/29/86         07/03/87 Testing (86TSB09)
NLS-87-006 3.0.3/3.0.5 TSC (86TSB18) 03/02/87 ASAP 7.
: 9.           NLS-85-204                             Reactor Material Surveillance TSC                                             03/05/86         08/07/87
NLS-85-374 Appendix 3 Exemption Request 10/25/85 07/03/87 8.
                                                                  - (85TSBlF)
NLS-86-312 Containment Isolation Valve Stroke 08/29/86 07/03/87 Testing (86TSB09) 9.
: 10.           NLS-85-189                             Rod Block Monitor TSC (84TSB12)                                             08/28/85(c)       09/04/87       ,
NLS-85-204 Reactor Material Surveillance TSC 03/05/86 08/07/87
: 11.           NLS-85-177                             Mechanical Vac. Pump Testing                                                 11/25/85         09/18/87 TSC (85TSB15)
- (85TSBlF) 10.
: 12.           NLS-86-225                             3et Pump Surveillance Requirements                                           03/13/87         09/30/87 TSC (84TSB32)
NLS-85-189 Rod Block Monitor TSC (84TSB12) 08/28/85(c) 09/04/87 11.
: 13.           NLS-86-399                             Second Interval ISI Program                                                   11/10/86                 -
NLS-85-177 Mechanical Vac. Pump Testing 11/25/85 09/18/87 TSC (85TSB15) 12.
: 14.           NLS-86-366                             Second Interval IST Program                                                   10/23/86                 -
NLS-86-225 3et Pump Surveillance Requirements 03/13/87 09/30/87 TSC (84TSB32) 13.
I
NLS-86-399 Second Interval ISI Program 11/10/86 14.
: 15.           NLS-86-388                             Thermal Hydraulic Stability TSC                                               01/28/87                 -
NLS-86-366 Second Interval IST Program 10/23/86 I
(85TSB28)
15.
: 16.           NLS-87-070                             Nitrogen Backup System TSC (87TSB05)                                         03/27/87                 -
NLS-86-388 Thermal Hydraulic Stability TSC 01/28/87 (85TSB28) 16.
: 17.           NLS-86-081                             Temp. Sensor Response Time TSC(c)                                                 _                    _
NLS-87-070 Nitrogen Backup System TSC (87TSB05) 03/27/87 17.
NLS-86-081 Temp. Sensor Response Time TSC(c)
(85TSB22)
(85TSB22)
(a) Required for Unit Start Up from Current Refueling Outage (b) TSC - Technical Specification Change Request *
(a) Required for Unit Start Up from Current Refueling Outage (b) TSC - Technical Specification Change Request
* i                   (c) Awaiting AdditionalInformation from CP&L 1
* i (c) Awaiting AdditionalInformation from CP&L 1
(5138RWs/lah)
(5138RWs/lah)
          , - -            . .-            . . - , . - , - . - ,              .... - _- - , - - - - - - - -- - . = _ - - . .-- - .- - --. -}}
.... - _- -, - - - - - - - -- -. = _ - -..-- -.- - --. -}}

Latest revision as of 02:02, 4 December 2024

Forwards Revised List of Licensing Action Priorities for Facility,Per 870416 Project Manager Meeting
ML20214G979
Person / Time
Site: Brunswick  
Issue date: 05/15/1987
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Adensam E
Office of Nuclear Reactor Regulation
References
NLS-87-040, NLS-87-40, NUDOCS 8705270230
Download: ML20214G979 (2)


Text

m N

cp&L Carolina Power & Light Company MAY 14'- B87 SERIAL:' NLS-87-040 Ms;Elinor:AdensamiDirector.;n BWR Project Directorate 11-1 Division of BWR Licensing United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2-DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 BRUNSWICK LICENSING ISSUES

Dear Ms. Adensam:

Members of my staff met with the Brunswick Project Manager on April 16,1987 to discuss the status of licensing issues concerning the Brunswick Plant. As a follow up to that meeting, I am revising the Brunswick Plant Licensing Action Priority List as I indicated I periodically would. Therefore, the revised list is enclosed.

Since my last submittal, Technical Specification License Amendments for Diesel Generator Operability, Standby Liquid Control System, and Special Nuclear Material have been issued.. Your assistance and that of the Project Manager are appreciated in these matters.

Yours very truly, gen _ -

. n.

im rman M

er Nuclear Licensing Section SRZ/RWS/lah (5138RWS)

Enclosure cc:

Dr. 3. Nelson Grace (NRC-RII)

Mr. W. H. Ruland (NRC-BNP)

Mr. E. Sylvester (NRC) 8705270230 87051E PDR ADOCK 05000324 P

PDR

[j m r.y.it.v n. sir..t. e o. so issi. nm.gn. N. c. 27eo2

m.._

m.

8 TABLE 1 BRUNSWICK LICENSING ACTION PRIORITY LIST APPROVAL CP&L DATE DATE PRIORITY LETTER TITLE SUBMITTED REQUESTED 1.

- NLS-86-338(a)

Reload TSC (86TSB16) Unit 1 10/21/86 04/22/87 2.

NLS-86-337(a)

D.C. Distribution TSC (86TSB14) 11/07/86 04/22/87 3.

NLS-86-440 ")

CAC-V172 Relocation TSC (86TSB21) 12/16/86 04/22/87 I

4.

NLS-87-080 Exemption from 10CFR73.57(bXI) 04/15/87 05/07/87 5.

NLS-87-074 ATWS RPT Design 04/14/87 07/03/87 6.

NLS-87-006 3.0.3/3.0.5 TSC (86TSB18) 03/02/87 ASAP 7.

NLS-85-374 Appendix 3 Exemption Request 10/25/85 07/03/87 8.

NLS-86-312 Containment Isolation Valve Stroke 08/29/86 07/03/87 Testing (86TSB09) 9.

NLS-85-204 Reactor Material Surveillance TSC 03/05/86 08/07/87

- (85TSBlF) 10.

NLS-85-189 Rod Block Monitor TSC (84TSB12) 08/28/85(c) 09/04/87 11.

NLS-85-177 Mechanical Vac. Pump Testing 11/25/85 09/18/87 TSC (85TSB15) 12.

NLS-86-225 3et Pump Surveillance Requirements 03/13/87 09/30/87 TSC (84TSB32) 13.

NLS-86-399 Second Interval ISI Program 11/10/86 14.

NLS-86-366 Second Interval IST Program 10/23/86 I

15.

NLS-86-388 Thermal Hydraulic Stability TSC 01/28/87 (85TSB28) 16.

NLS-87-070 Nitrogen Backup System TSC (87TSB05) 03/27/87 17.

NLS-86-081 Temp. Sensor Response Time TSC(c)

(85TSB22)

(a) Required for Unit Start Up from Current Refueling Outage (b) TSC - Technical Specification Change Request

  • i (c) Awaiting AdditionalInformation from CP&L 1