Forwards Revised List of Licensing Action Priorities for Facility,Per 870416 Project Manager Meeting
ML20214G979
Person / Time
Site: Brunswick  
Issue date: 05/15/1987
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Adensam E
Office of Nuclear Reactor Regulation
References
NLS-87-040, NLS-87-40, NUDOCS 8705270230
Download: ML20214G979 (2)


Text

m N

cp&L Carolina Power & Light Company MAY 14'- B87 SERIAL:' NLS-87-040 Ms;Elinor:AdensamiDirector.;n BWR Project Directorate 11-1 Division of BWR Licensing United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2-DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 BRUNSWICK LICENSING ISSUES

Dear Ms. Adensam:

Members of my staff met with the Brunswick Project Manager on April 16,1987 to discuss the status of licensing issues concerning the Brunswick Plant. As a follow up to that meeting, I am revising the Brunswick Plant Licensing Action Priority List as I indicated I periodically would. Therefore, the revised list is enclosed.

Since my last submittal, Technical Specification License Amendments for Diesel Generator Operability, Standby Liquid Control System, and Special Nuclear Material have been issued.. Your assistance and that of the Project Manager are appreciated in these matters.

Yours very truly, gen _ -

. n.

im rman M

er Nuclear Licensing Section SRZ/RWS/lah (5138RWS)

Enclosure cc:

Dr. 3. Nelson Grace (NRC-RII)

Mr. W. H. Ruland (NRC-BNP)

Mr. E. Sylvester (NRC) 8705270230 87051E PDR ADOCK 05000324 P

PDR

[j m r.y.it.v n. sir..t. e o. so issi. nm.gn. N. c. 27eo2

m.._

m.

8 TABLE 1 BRUNSWICK LICENSING ACTION PRIORITY LIST APPROVAL CP&L DATE DATE PRIORITY LETTER TITLE SUBMITTED REQUESTED 1.

- NLS-86-338(a)

Reload TSC (86TSB16) Unit 1 10/21/86 04/22/87 2.

NLS-86-337(a)

D.C. Distribution TSC (86TSB14) 11/07/86 04/22/87 3.

NLS-86-440 ")

CAC-V172 Relocation TSC (86TSB21) 12/16/86 04/22/87 I

4.

NLS-87-080 Exemption from 10CFR73.57(bXI) 04/15/87 05/07/87 5.

NLS-87-074 ATWS RPT Design 04/14/87 07/03/87 6.

NLS-87-006 3.0.3/3.0.5 TSC (86TSB18) 03/02/87 ASAP 7.

NLS-85-374 Appendix 3 Exemption Request 10/25/85 07/03/87 8.

NLS-86-312 Containment Isolation Valve Stroke 08/29/86 07/03/87 Testing (86TSB09) 9.

NLS-85-204 Reactor Material Surveillance TSC 03/05/86 08/07/87

- (85TSBlF) 10.

NLS-85-189 Rod Block Monitor TSC (84TSB12) 08/28/85(c) 09/04/87 11.

NLS-85-177 Mechanical Vac. Pump Testing 11/25/85 09/18/87 TSC (85TSB15) 12.

NLS-86-225 3et Pump Surveillance Requirements 03/13/87 09/30/87 TSC (84TSB32) 13.

NLS-86-399 Second Interval ISI Program 11/10/86 14.

NLS-86-366 Second Interval IST Program 10/23/86 I

15.

NLS-86-388 Thermal Hydraulic Stability TSC 01/28/87 (85TSB28) 16.

NLS-87-070 Nitrogen Backup System TSC (87TSB05) 03/27/87 17.

NLS-86-081 Temp. Sensor Response Time TSC(c)

(85TSB22)

(a) Required for Unit Start Up from Current Refueling Outage (b) TSC - Technical Specification Change Request

  • i (c) Awaiting AdditionalInformation from CP&L 1

(5138RWs/lah)