LIMITING CONDITIONS FOR OPERATION                       SURVEILLANCE RE0UIREMENTS 3.10. REFUELING                               4.10. REFUELING Applicability                                 ADDlicability The Limiting Conditions for                   The Surveillance Requirements apply Operation apply to the fuel                     to the periodic testing of those handling and associated core                   interlocks and instrumentation used reactivity limitations.                       during refueling and core alterations.
.+
Objective                                       Objective The objective of the Limiting                   The objective of the Surveillance Conditions for Operation is to                 Requirements is to verify the assure that core reactivity is                 operability of instrumentation and within the capability of the                   interlocks used in refueling and control rods and to prevent                     core alterations, criticality during refueling.
~-~
Specifications                                 Specifications A. Refueling Interlocks                       A. Refueling Interlocks
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE RE0UIREMENTS 3.10.
: 1. Reactor Mode Switch                       1. Reactor Mode Switch The Mode Switch shall                         Prior to any core alterations, be locked in the REFUEL posi-                 the reactor mode switch refuel-tion during core alterations                   ing interlocks shall be function-and the refueling interlocks                   ally tested. They shall be tested shall be operable except as                   at weekly intervals thereafter stated in Specification                       until no longer required. They 3.10.E.                                       shall also be tested following any repair work associated with the interlocks.
REFUELING 4.10.
: 2. Fuel Grapple Hoist Load                   2. Fuel Grapple Holst load Settinq Interlock                             Setting Interlock The fuel grapple hoist load                   Prior to any movement of fuel setting interlock switch                     assemblies or control rods shall be set at 485 1 30 lbs.                 within the reactor pressure vessel, this refueling interlock shall be functionally tested. It shall be tested at weekly intervals thereafter until no longer required and following any repair work associated with this interlock.
REFUELING Applicability ADDlicability The Limiting Conditions for The Surveillance Requirements apply Operation apply to the fuel to the periodic testing of those handling and associated core interlocks and instrumentation used reactivity limitations.
: 3. Auxiliary Hoists load Settina             3. Auxiliary Hoists load Settinq Interlock                                     Interlock If the frame-mounted auxiliary                 Prior to any movement of fuel hoist, the monorail-mounted                   assemblies or control rods within auxiliary hoist, or the service               the reactor pressure vessel, this platform hoist is to be used                   refueling interlock shall be for handling fuel with the                     functionally tested. It shall be head of f the reactor vessel,                 tested at weekly intervals there-the load setting interlock                     after until no longer required and on the hoist to be used shall                 following any repair work associated be set at 485 1 30 lbs.                       with this interlock.
during refueling and core alterations.
B. Fuel loading Fuel shall not be loaded into the reactor core unless all control rods are fully inserted.
Objective Objective The objective of the Limiting The objective of the Surveillance Conditions for Operation is to Requirements is to verify the assure that core reactivity is operability of instrumentation and within the capability of the interlocks used in refueling and control rods and to prevent core alterations, criticality during refueling.
HAICH - UNIl 1                                 3.10-1               Proposed TS/0069q/8619-1 8609240113 860909 PDR     ADOCK 05000321 P                       PDR
Specifications Specifications A.
                                                                                                          . _ .}}
Refueling Interlocks A.
Refueling Interlocks 1.
Reactor Mode Switch 1.
Reactor Mode Switch The Mode Switch shall Prior to any core alterations, be locked in the REFUEL posi-the reactor mode switch refuel-tion during core alterations ing interlocks shall be function-and the refueling interlocks ally tested. They shall be tested shall be operable except as at weekly intervals thereafter stated in Specification until no longer required. They 3.10.E.
shall also be tested following any repair work associated with the interlocks.
2.
Fuel Grapple Hoist Load 2.
Fuel Grapple Holst load Settinq Interlock Setting Interlock The fuel grapple hoist load Prior to any movement of fuel setting interlock switch assemblies or control rods shall be set at 485 1 30 lbs.
within the reactor pressure vessel, this refueling interlock shall be functionally tested. It shall be tested at weekly intervals thereafter until no longer required and following any repair work associated with this interlock.
3.
Auxiliary Hoists load Settina 3.
Auxiliary Hoists load Settinq Interlock Interlock If the frame-mounted auxiliary Prior to any movement of fuel hoist, the monorail-mounted assemblies or control rods within auxiliary hoist, or the service the reactor pressure vessel, this platform hoist is to be used refueling interlock shall be for handling fuel with the functionally tested. It shall be head of f the reactor vessel, tested at weekly intervals there-the load setting interlock after until no longer required and on the hoist to be used shall following any repair work associated be set at 485 1 30 lbs.
with this interlock.
B.
Fuel loading Fuel shall not be loaded into the reactor core unless all control rods are fully inserted.
HAICH - UNIl 1 3.10-1 Proposed TS/0069q/8619-1 8609240113 860909 PDR ADOCK 05000321 P
PDR
.}}

Latest revision as of 01:06, 4 December 2024

Proposed Tech Specs,Modifying Surveillance Requirements for Functional Testing of Certain Refueling Interlocks to Achieve Consistency W/Unit 1 Limiting Conditions for Operations & Unit 2 Tech Specs
ML20214P949
Person / Time
Site: Hatch 
Issue date: 09/09/1986
From:
GEORGIA POWER CO.
To:
Shared Package
ML20214P944 List:
References
TAC-63572, NUDOCS 8609240113
Download: ML20214P949 (1)


Text

e

.+

~-~

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE RE0UIREMENTS 3.10.

REFUELING 4.10.

REFUELING Applicability ADDlicability The Limiting Conditions for The Surveillance Requirements apply Operation apply to the fuel to the periodic testing of those handling and associated core interlocks and instrumentation used reactivity limitations.

during refueling and core alterations.

Objective Objective The objective of the Limiting The objective of the Surveillance Conditions for Operation is to Requirements is to verify the assure that core reactivity is operability of instrumentation and within the capability of the interlocks used in refueling and control rods and to prevent core alterations, criticality during refueling.

Specifications Specifications A.

Refueling Interlocks A.

Refueling Interlocks 1.

Reactor Mode Switch 1.

Reactor Mode Switch The Mode Switch shall Prior to any core alterations, be locked in the REFUEL posi-the reactor mode switch refuel-tion during core alterations ing interlocks shall be function-and the refueling interlocks ally tested. They shall be tested shall be operable except as at weekly intervals thereafter stated in Specification until no longer required. They 3.10.E.

shall also be tested following any repair work associated with the interlocks.

2.

Fuel Grapple Hoist Load 2.

Fuel Grapple Holst load Settinq Interlock Setting Interlock The fuel grapple hoist load Prior to any movement of fuel setting interlock switch assemblies or control rods shall be set at 485 1 30 lbs.

within the reactor pressure vessel, this refueling interlock shall be functionally tested. It shall be tested at weekly intervals thereafter until no longer required and following any repair work associated with this interlock.

3.

Auxiliary Hoists load Settina 3.

Auxiliary Hoists load Settinq Interlock Interlock If the frame-mounted auxiliary Prior to any movement of fuel hoist, the monorail-mounted assemblies or control rods within auxiliary hoist, or the service the reactor pressure vessel, this platform hoist is to be used refueling interlock shall be for handling fuel with the functionally tested. It shall be head of f the reactor vessel, tested at weekly intervals there-the load setting interlock after until no longer required and on the hoist to be used shall following any repair work associated be set at 485 1 30 lbs.

with this interlock.

B.

Fuel loading Fuel shall not be loaded into the reactor core unless all control rods are fully inserted.

HAICH - UNIl 1 3.10-1 Proposed TS/0069q/8619-1 8609240113 860909 PDR ADOCK 05000321 P