ML20214P949
| ML20214P949 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/09/1986 |
| From: | GEORGIA POWER CO. |
| To: | |
| Shared Package | |
| ML20214P944 | List: |
| References | |
| TAC-63572, NUDOCS 8609240113 | |
| Download: ML20214P949 (1) | |
Text
e
.+
~-~
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE RE0UIREMENTS 3.10.
REFUELING 4.10.
REFUELING Applicability ADDlicability The Limiting Conditions for The Surveillance Requirements apply Operation apply to the fuel to the periodic testing of those handling and associated core interlocks and instrumentation used reactivity limitations.
during refueling and core alterations.
Objective Objective The objective of the Limiting The objective of the Surveillance Conditions for Operation is to Requirements is to verify the assure that core reactivity is operability of instrumentation and within the capability of the interlocks used in refueling and control rods and to prevent core alterations, criticality during refueling.
Specifications Specifications A.
Refueling Interlocks A.
Refueling Interlocks 1.
Reactor Mode Switch 1.
Reactor Mode Switch The Mode Switch shall Prior to any core alterations, be locked in the REFUEL posi-the reactor mode switch refuel-tion during core alterations ing interlocks shall be function-and the refueling interlocks ally tested. They shall be tested shall be operable except as at weekly intervals thereafter stated in Specification until no longer required. They 3.10.E.
shall also be tested following any repair work associated with the interlocks.
2.
Fuel Grapple Hoist Load 2.
Fuel Grapple Holst load Settinq Interlock Setting Interlock The fuel grapple hoist load Prior to any movement of fuel setting interlock switch assemblies or control rods shall be set at 485 1 30 lbs.
within the reactor pressure vessel, this refueling interlock shall be functionally tested. It shall be tested at weekly intervals thereafter until no longer required and following any repair work associated with this interlock.
3.
Auxiliary Hoists load Settina 3.
Auxiliary Hoists load Settinq Interlock Interlock If the frame-mounted auxiliary Prior to any movement of fuel hoist, the monorail-mounted assemblies or control rods within auxiliary hoist, or the service the reactor pressure vessel, this platform hoist is to be used refueling interlock shall be for handling fuel with the functionally tested. It shall be head of f the reactor vessel, tested at weekly intervals there-the load setting interlock after until no longer required and on the hoist to be used shall following any repair work associated be set at 485 1 30 lbs.
with this interlock.
B.
Fuel loading Fuel shall not be loaded into the reactor core unless all control rods are fully inserted.
HAICH - UNIl 1 3.10-1 Proposed TS/0069q/8619-1 8609240113 860909 PDR ADOCK 05000321 P
.