ML20214W808: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:._   _   _ _ _ _ _ _ _ - _ _ _ _ _ _ _
{{#Wiki_filter:._
  .f'
_
  :y
_ _ _ _ _ _ _ - _ _ _ _ _ _ _
  .
.f'
      _
:y
      '
_
                                                                    JUN 0 91987
JUN 0 91987
.
'
'
        L Docket Nos. 50-245
'
                      50-336
L Docket Nos. 50-245
                      50-423
50-336
        Northeast Nuclear Energy Company
50-423
        ATTN: Mr. E. J. Mroczka
Northeast Nuclear Energy Company
p                ~ Senior Vice President - Nuclear
ATTN: Mr. E. J. Mroczka
                Engineering and Operations Group
~ Senior Vice President - Nuclear
        P. O. Box 270
p
        Hartford, Connecticut 06141-0270
Engineering and Operations Group
        Gentlemen:
P. O. Box 270
        Subject: Combined Inspection 50-245/87-02; 50-336/87-02; 50-423/87-03
Hartford, Connecticut 06141-0270
        This refers to your letter dated May 12, 1987, in response to our letter
Gentlemen:
        dated April 10, 1987.
Subject: Combined Inspection 50-245/87-02; 50-336/87-02; 50-423/87-03
        Thank you for informing us of the corrective and preventive actions documented
This refers to your letter dated May 12, 1987, in response to our letter
        in your letter. These actions will be examined during a future inspection of
dated April 10, 1987.
        your licensed program.
Thank you for informing us of the corrective and preventive actions documented
        Your cooperation with us is appreciated.
in your letter. These actions will be examined during a future inspection of
                                                                    Sincerely,
your licensed program.
                                                                                                      .
Your cooperation with us is appreciated.
                                                                                                  n0:
Sincerely,
                                                                    Thomas T. Martin, Director
.
                                                                    Division of Radiation Safety
n0:
                                                                                        and Safeguards
Thomas T. Martin, Director
        cc:
Division of Radiation Safety
        W. D. Romberg, Vice President, Nuclear Operations
and Safeguards
        S. E. Scace, Station Superintendent
cc:
        D. O. Nordquist, Manager of Quality Assurance
W. D. Romberg, Vice President, Nuclear Operations
        R. M. Kacich, Manager, Generation Facilities Licensing                                                   '
S. E. Scace, Station Superintendent
        Gerald Garfield, Esquire
D. O. Nordquist, Manager of Quality Assurance
        Public Document Room (PDR)
'
        Local Public Document Room (LPDR)
R. M. Kacich, Manager, Generation Facilities Licensing
        Nuclear Safety Information Center (NSIC)
Gerald Garfield, Esquire
        NRC Resident Inspector
Public Document Room (PDR)
        State of Connecticut
Local Public Document Room (LPDR)
                                                              "~~
Nuclear Safety Information Center (NSIC)
          8706160191 870609
NRC Resident Inspector
          PDR    ADOCK 05000245
State of Connecticut
          G                   PDR
8706160191 870609
                                                                                                          I
"~~
                                                                                                        *
PDR
                                                                  -   _ _ _ _ _ _ _ _ _ _ _ _ _ _
ADOCK 05000245
                                                                                                            IE04
G
PDR
I
*
IE04
-
_ _ _ _ _ _ _ _ _ _ _ _ _ _


h
h
g-_
g-_
  9-   Northeast Nuclear Energy' Company           2
9-
      bec:
Northeast Nuclear Energy' Company
    - Region .I. Docket Room (with concurrences)
2
              -
bec:
      DRP Section Chief
- Region .I. Docket Room (with concurrences)
      M. McBride, RI, Pilgrim
-
      P.~ Swetland,. SRI, ..Haddam Neck
DRP Section Chief
      J..Shediosky, SRI, Millstone 3
M. McBride, RI, Pilgrim
    :J.- Shea, LPM, NRR.
P.~ Swetland,. SRI, ..Haddam Neck
      D.-Jaffe, LPM, NRR
J..Shediosky, SRI, Millstone 3
      L. Prividy, RI,_BV-2
:J.- Shea, LPM, NRR.
    1T.-Rebelowski, SRI, Millstone 1&2
D.-Jaffe, LPM, NRR
      B. Doolittle, LPM, NRR-
L. Prividy, RI,_BV-2
      -R. Bores, DRSS
1T.-Rebelowski, SRI, Millstone 1&2
                                    e
B. Doolittle, LPM, NRR-
          ,
-R. Bores, DRSS
        :DRSS                 RI:   S                 RSS         RI ASS
e
      Madden /lp               Keimig             J ner             M tin
,
      6/f,/87                 6/2 /87             6/~a./87         6/ v/87
:DRSS
                                    0FFICIAL RECORD COPY     RL NORTHEAST NUCLEAR - 0001.1.0
RI:
                                                            05/29/87
S
RSS
RI ASS
Madden /lp
Keimig
J ner
M tin
6/f,/87
6/2 /87
6/~a./87
6/ v/87
0FFICIAL RECORD COPY
RL NORTHEAST NUCLEAR - 0001.1.0
05/29/87


  r
r
    .* *
.*
        MAST tlTILITIES                                   o.nor.i ome.. . seio.n sir..t. s.riin. conn.ciicut
*
    ,                )$C[U2EiYeI[co-=~                               P.o. Box 270
MAST tlTILITIES
                      .m ..'ea wa cow-
o.nor.i ome.. . seio.n sir..t. s.riin. conn.ciicut
                                                                      HARTFORD. CONNECTICUT 06141-0270
)$C[U2EiYeI[co-=~
          L   L   J C'.'' C"'.",,',O g                               (203) ses-5000
,
                                                            May 12,1987
P.o. Box 270
                                                            Docket Nos. 50-245
.m ..'ea wa cow-
                                                                              50-336
HARTFORD. CONNECTICUT 06141-0270
                                                                              50-423
L
                                                                              A06502
L
                                                            Re: Region I Inspection
J C'.'' C"'.",,',O g
            U.S. Nuclear Regulatory Commission
(203) ses-5000
            Attn: W. T. Russell, Administrator
May 12,1987
                    Region I
Docket Nos. 50-245
            631 Park Avenue
50-336
            King of Prussia, Pa. 19406
50-423
          Gentlemen:
A06502
                      Millstone Nuclear Power Station, Unit Nos. 1,2 & 3
Re: Region I Inspection
                                      Response to Region I Inspection
U.S. Nuclear Regulatory Commission
                      Nos. 50-245/87-02, 50-336/87-02 and 50-423/87-03
Attn:
          In a letter dated April 10, 1987'23, the NRC Staff informed
W.
          Northeast Nuclear Energy Company (NNECO) as to the results of
T.
          their routine physical security related inspection conducted at
Russell, Administrator
          the Millstone Nuclear Power Station on January 27-29, 1987.
Region I
          Reference (1) stated that one of our activities was not conducted
631 Park Avenue
          in full compliance with NRC requirements.                       Pursuant to the
King of Prussia, Pa. 19406
          provisions of 10 CFR 2.201, NNECO hereby provides the following
Gentlemen:
          response to the " Notice of Violation" contained in Reference (1).
Millstone Nuclear Power Station, Unit Nos. 1,2 & 3
          NOTICE OF VIOLATION:
Response to Region I Inspection
          10   CFR   73.21(d)(2) states, in part, that when Safeguards
Nos. 50-245/87-02, 50-336/87-02 and 50-423/87-03
          Information is left unattended, it shall be stored in a locked
In a letter dated April
          security storage container.
10,
          Licensee Administrative Control Procedure ACP 7.11, dated June
1987'23,
          28, 1985 and titled, " Control of Safeguards Information" states,
the NRC Staff informed
          in part, in paragraph 6.1.4.3, that safeguards Information will
Northeast Nuclear Energy Company (NNECO) as to the results of
          be stored in accordance with the requirements of 10 CFR 73.21.
their routine physical security related inspection conducted at
          Contrary to the above, at 12:28 p.m. on January 29, 1987, a
the Millstone Nuclear Power Station on January 27-29,
          licensee designated Safeguards Information security container
1987.
Reference (1) stated that one of our activities was not conducted
in
full
compliance with NRC
requirements.
Pursuant
to
the
provisions of 10 CFR 2.201, NNECO hereby provides the following
response to the " Notice of Violation" contained in Reference (1).
NOTICE OF VIOLATION:
10
CFR
73.21(d)(2)
states,
in
part,
that
when
Safeguards
Information is left unattended, it shall be stored in a locked
security storage container.
Licensee Administrative Control Procedure ACP 7.11,
dated June
28, 1985 and titled, " Control of Safeguards Information" states,
in part, in paragraph
6.1.4.3,
that safeguards Information will
be stored in accordance with the requirements of 10 CFR 73.21.
Contrary to the above,
at 12:28
p.m.
on January 29,
1987,
a
licensee designated Safeguards
Information
security
container
'
'
          containing Safeguards Information, located in an office complex
containing Safeguards Information, located in an office complex
          in the site protected area, was found unlocked and unattended.
in the site protected area, was found unlocked and unattended.
          NNECO RESPONSE:
NNECO RESPONSE:
l
l
          NNECO agrees with the inspection finding.             The root cause of this
NNECO agrees with the inspection finding.
The root cause of this
'
'
          (1) Thomas       T. Martin letter to E.J. Mroczka, " Combined Inspection
(1) Thomas
                Nos. 50-245/87-02, 50-336/87-02 & 50-423/87-03," dated April
T.
                10, 1987.
Martin letter to E.J.
Mroczka, " Combined Inspection
Nos. 50-245/87-02, 50-336/87-02 & 50-423/87-03," dated April
10, 1987.
i
i
                                                                            $ A.l                             g
$ A.l
                                                                        G { Q2 V I V
g
                                                                                                            '
I V
                                                                                          ap.
'
G { Q2 V
ap.


                          - _ _ _ _ - _ _ _ _ _ _ _                 _ _ _                                                                                 _         . _ _
- _ _ _ _ - _ _ _ _ _ _ _
                        .
_ _ _
    g..     1
_
    5 ..
. _ _
              U.S. Nuclear Regulatory Commission
.
              Ao6502/Page 2
g..
              May 12,'1987
1
              violation appears to be that the container in question (a file
5 ..
              cabinet) was' being used to store both Safeguards and
U.S. Nuclear Regulatory Commission
              non-Safeguards .Information.                                 The individual responsible for'the
Ao6502/Page 2
              repository supervises several - departments, including ~ security,
May 12,'1987
              and maintained'a variety of material in the repository. The need
violation appears to be that the container in question (a file
              for frequent access to non-Safeguards Information resulted in the
cabinet)
              repository being accessed routinely.                                                                                     On .the - date in question,
was'
              through_an oversight on the part of the two individuals working
being
              in the repository, it was left unlocked and unattended.
used
              Corrective Action-
to
              The Safeguards Information repository was immediately locked upon
store
              identification of the violation. The individual-responsible for
both
          '
Safeguards
              the repository was advised of the violation ud was requested to
and
              inventory the contents to ensure that safeguards Information had
non-Safeguards .Information.
              _not been removed.                             The results of the inventory indicated that
The individual responsible for'the
              the contents of the repository had not been disturbed and that
repository supervises several - departments,
              no Safeguards Information was missing.
including ~ security,
              Actions to Prevent Recurrence -
and maintained'a variety of material in the repository.
              All   Safeguards Information contained in the repository in
The need
              question was subsequently relocated to a designated repository in
for frequent access to non-Safeguards Information resulted in the
              the main of fice area, which is used exclusively for storage of
repository being accessed routinely.
              Safeguards Information.                                   The file cabinet identified in the
On .the - date in question,
l.            violation                               is- no longer being maintained as a Safeguards
through_an oversight on the part of the two individuals working
              Information repository.
in the repository, it was left unlocked and unattended.
              We trust that the above information                                                                                         addresses the   concerns
Corrective Action-
              identified in Reference (1).
The Safeguards Information repository was immediately locked upon
                                                                            Very truly yours,
identification of the violation.
                                                                            NORTHEAST NUCLEAR ENERGY COMPANY
The individual-responsible for
                                                                            E.3f Mrocska
the repository was advised of the violation ud was requested to
                                                                            SenW]or ViceP [] resident
'
              cc: J.J.Shea, NRC Project Manager, Millstone Unit No. 1
inventory the contents to ensure that safeguards Information had
                  D.H. Jaffe, NRC Project Manager, Millstone Unit No. 2
_not been removed.
                  R.L.Ferguson,-NRC Project Manager, Millstone Unit No. 3
The results of the inventory indicated that
                  T. Rebelowski, Resident Inspector, Millstone Unit Nos. 1& 2
the contents of the repository had not been disturbed and that
                  J.T.Shedlosky, Resident inspector, Millstone Unit No. 3
no Safeguards Information was missing.
..         .
Actions to Prevent Recurrence -
                                                    ..                           _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _
All
Safeguards
Information
contained
in
the
repository
in
question was subsequently relocated to a designated repository in
the main of fice area, which is used exclusively for storage of
l.
Safeguards Information.
The
file
cabinet identified in the
violation
is- no
longer
being
maintained
as
a
Safeguards
Information repository.
We
trust
that
the
above
information
addresses
the
concerns
identified in Reference (1).
Very truly yours,
NORTHEAST NUCLEAR ENERGY COMPANY
SenW]or Vice [] resident
E.3f Mrocska
P
cc: J.J.Shea, NRC Project Manager, Millstone Unit No. 1
D.H.
Jaffe, NRC Project Manager, Millstone Unit No. 2
R.L.Ferguson,-NRC Project Manager, Millstone Unit No. 3
T.
Rebelowski, Resident Inspector, Millstone Unit Nos. 1& 2
J.T.Shedlosky, Resident inspector, Millstone Unit No. 3
..
.
..
_ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _
}}
}}

Latest revision as of 23:34, 3 December 2024

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-245/87-02, 50-336/87-02 & 50-423/87-03
ML20214W808
Person / Time
Site: Millstone  
Issue date: 06/09/1987
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8706160191
Download: ML20214W808 (2)


See also: IR 05000245/1987002

Text

._

_

_ _ _ _ _ _ _ - _ _ _ _ _ _ _

.f'

y

_

JUN 0 91987

.

'

'

L Docket Nos. 50-245

50-336

50-423

Northeast Nuclear Energy Company

ATTN: Mr. E. J. Mroczka

~ Senior Vice President - Nuclear

p

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Combined Inspection 50-245/87-02; 50-336/87-02; 50-423/87-03

This refers to your letter dated May 12, 1987, in response to our letter

dated April 10, 1987.

Thank you for informing us of the corrective and preventive actions documented

in your letter. These actions will be examined during a future inspection of

your licensed program.

Your cooperation with us is appreciated.

Sincerely,

.

n0:

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

cc:

W. D. Romberg, Vice President, Nuclear Operations

S. E. Scace, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

'

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

8706160191 870609

"~~

PDR

ADOCK 05000245

G

PDR

I

IE04

-

_ _ _ _ _ _ _ _ _ _ _ _ _ _

h

g-_

9-

Northeast Nuclear Energy' Company

2

bec:

- Region .I. Docket Room (with concurrences)

-

DRP Section Chief

M. McBride, RI, Pilgrim

P.~ Swetland,. SRI, ..Haddam Neck

J..Shediosky, SRI, Millstone 3

J.- Shea, LPM, NRR.

D.-Jaffe, LPM, NRR

L. Prividy, RI,_BV-2

1T.-Rebelowski, SRI, Millstone 1&2

B. Doolittle, LPM, NRR-

-R. Bores, DRSS

e

,

DRSS

RI:

S

RSS

RI ASS

Madden /lp

Keimig

J ner

M tin

6/f,/87

6/2 /87

6/~a./87

6/ v/87

0FFICIAL RECORD COPY

RL NORTHEAST NUCLEAR - 0001.1.0

05/29/87

r

.*

MAST tlTILITIES

o.nor.i ome.. . seio.n sir..t. s.riin. conn.ciicut

)$C[U2EiYeI[co-=~

,

P.o. Box 270

.m ..'ea wa cow-

HARTFORD. CONNECTICUT 06141-0270

L

L

J C'. C"'.",,',O g

(203) ses-5000

May 12,1987

Docket Nos. 50-245

50-336

50-423

A06502

Re: Region I Inspection

U.S. Nuclear Regulatory Commission

Attn:

W.

T.

Russell, Administrator

Region I

631 Park Avenue

King of Prussia, Pa. 19406

Gentlemen:

Millstone Nuclear Power Station, Unit Nos. 1,2 & 3

Response to Region I Inspection

Nos. 50-245/87-02, 50-336/87-02 and 50-423/87-03

In a letter dated April

10,

1987'23,

the NRC Staff informed

Northeast Nuclear Energy Company (NNECO) as to the results of

their routine physical security related inspection conducted at

the Millstone Nuclear Power Station on January 27-29,

1987.

Reference (1) stated that one of our activities was not conducted

in

full

compliance with NRC

requirements.

Pursuant

to

the

provisions of 10 CFR 2.201, NNECO hereby provides the following

response to the " Notice of Violation" contained in Reference (1).

NOTICE OF VIOLATION:

10 CFR 73.21(d)(2)

states,

in

part,

that

when

Safeguards

Information is left unattended, it shall be stored in a locked

security storage container.

Licensee Administrative Control Procedure ACP 7.11,

dated June

28, 1985 and titled, " Control of Safeguards Information" states,

in part, in paragraph

6.1.4.3,

that safeguards Information will

be stored in accordance with the requirements of 10 CFR 73.21.

Contrary to the above,

at 12:28

p.m.

on January 29,

1987,

a

licensee designated Safeguards

Information

security

container

'

containing Safeguards Information, located in an office complex

in the site protected area, was found unlocked and unattended.

NNECO RESPONSE:

l

NNECO agrees with the inspection finding.

The root cause of this

'

(1) Thomas

T.

Martin letter to E.J.

Mroczka, " Combined Inspection

Nos. 50-245/87-02, 50-336/87-02 & 50-423/87-03," dated April

10, 1987.

i

$ A.l

g

I V

'

G { Q2 V

ap.

- _ _ _ _ - _ _ _ _ _ _ _

_ _ _

_

. _ _

.

g..

1

5 ..

U.S. Nuclear Regulatory Commission

Ao6502/Page 2

May 12,'1987

violation appears to be that the container in question (a file

cabinet)

was'

being

used

to

store

both

Safeguards

and

non-Safeguards .Information.

The individual responsible for'the

repository supervises several - departments,

including ~ security,

and maintained'a variety of material in the repository.

The need

for frequent access to non-Safeguards Information resulted in the

repository being accessed routinely.

On .the - date in question,

through_an oversight on the part of the two individuals working

in the repository, it was left unlocked and unattended.

Corrective Action-

The Safeguards Information repository was immediately locked upon

identification of the violation.

The individual-responsible for

the repository was advised of the violation ud was requested to

'

inventory the contents to ensure that safeguards Information had

_not been removed.

The results of the inventory indicated that

the contents of the repository had not been disturbed and that

no Safeguards Information was missing.

Actions to Prevent Recurrence -

All

Safeguards

Information

contained

in

the

repository

in

question was subsequently relocated to a designated repository in

the main of fice area, which is used exclusively for storage of

l.

Safeguards Information.

The

file

cabinet identified in the

violation

is- no

longer

being

maintained

as

a

Safeguards

Information repository.

We

trust

that

the

above

information

addresses

the

concerns

identified in Reference (1).

Very truly yours,

NORTHEAST NUCLEAR ENERGY COMPANY

SenW]or Vice [] resident

E.3f Mrocska

P

cc: J.J.Shea, NRC Project Manager, Millstone Unit No. 1

D.H.

Jaffe, NRC Project Manager, Millstone Unit No. 2

R.L.Ferguson,-NRC Project Manager, Millstone Unit No. 3

T.

Rebelowski, Resident Inspector, Millstone Unit Nos. 1& 2

J.T.Shedlosky, Resident inspector, Millstone Unit No. 3

..

.

..

_ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _