{{#Wiki_filter:yY       '
{{#Wiki_filter:yY TVA EMPLOYEE CONCERNS REPORT NUMBER:
TVA EMPLOYEE CONCERNS       REPORT NUMBER:
235.4(B)
    <      ' -                                                                                235.4(B)
SPECIAL PROGRAM REPORT TYPE:
SPECIAL PROGRAM REPORT TYPE:       SEQUOYAH ELEMENT                       REVISION NUMBER: 1 NON-RESTART JUSTIFICATION  
SEQUOYAH ELEMENT REVISION NUMBER: 1 NON-RESTART JUSTIFICATION  


==SUMMARY==
==SUMMARY==
 
TITLE:
TITLE:       Exposed HV Cable Routed without Raceway-Personnel Hazard PAGE 1 0F 2 REASON FOR REVISION:
Exposed HV Cable Routed without Raceway-Personnel Hazard PAGE 1 0F 2 REASON FOR REVISION:
Revised per TVA coments.
Revised per TVA coments.
i PREPARATION PREPARED 8 -
i PREPARATION PREPARED 8 -
  .ew  ,
"d b
                                        "d b                                             /O[d2//Pc;,
/O[d2//Pc;,
(
.ew,
                            /     /     4ISNATURE                                         DATE C
/
/
4ISNATURE DATE (C
REVIEWS MiT~
REVIEWS MiT~
id       5 SIGNATURE                                       DATE TAS
id 5
                      $$                                                                  /7       (f
SIGNATURE DATE TAS
                          , -              SIGNATURE                                       DATE CONCURRENCES                   _
/7 (f
Ye f i               /fqrf(,
SIGNATURE DATE CONCURRENCES Ye f i
CEG-H:         W*             /0 '2y-r6 SIGNATURE                  DATE SRP:         I                 /2-8-66 SIGNATURE
/fqrf(,
CEG-H:
W*
/0 '2y-r6 SRP:
I
/2-8-66 SIGNATURE DATE SIGNATURE
* DATE APPROVED BY:
* DATE APPROVED BY:
      $I Mofa4fd ECSPMANA$1 iz-ss DATE a
Mofa4fd iz-ss a
MANAGER OF NUCLEAR POWER       DATE CONCURRENCE (FINAL REPORT ONLY)
$I ECSPMANA$1 DATE MANAGER OF NUCLEAR POWER DATE CONCURRENCE (FINAL REPORT ONLY)
                      *SRP Secretary'e signature denotes SRP concurrences are in files.
*SRP Secretary'e signature denotes SRP concurrences are in files.
10/21/86 - 01540 hok       OO       J h7 P
10/21/86 - 01540 hok OO h7 J
P


  .9     ,
.9 SEQUOYAH NUCLEAR PLANT ENGINEERING RELATED EMPLOYEE CONCERNS SPECIAL PROGRAM NON-RESTART JUSTIFICATION  
SEQUOYAH NUCLEAR PLANT ENGINEERING RELATED EMPLOYEE CONCERNS SPECIAL PROGRAM NON-RESTART JUSTIFICATION  


==SUMMARY==
==SUMMARY==
 
SUBCATEGORY / ELEMENT 235.4(8)
SUBCATEGORY / ELEMENT                             235.4(8)
This issue was raised on WBN and is considered generic to SQN due to the similarity of the two plants.
This issue was raised on WBN and is considered generic to SQN due to the similarity of the two plants.
The high voltage cables referenced in the concern are 480V temporary construction cables. Since these cables have no effect                                   A on plant safety, they are not considered a restart issue.                                           m
The high voltage cables referenced in the concern are 480V temporary construction cables. Since these cables have no effect A
  ')
on plant safety, they are not considered a restart issue.
4 ATTACHMEN1:                                     List of Issues for Electrical           ELEMENT NO. 235.4(B)
m
Date:       10. /03/86 0
')
4 ATTACHMEN1:
List of Issues for Electrical ELEMENT NO.
235.4(B)
Date:
: 10. /03/86 0
0154D - Page 2
0154D - Page 2


            .g.                                                  LIST OF  p        ISSUES                                                ]           ']'   '
]
SQN RESTA       NO                           ELEENT NupeER     235.4                                     BY:   I. Don-Doncow                                   .
']'
Date: 10/03/86                                 *t' + '
p LIST OF ISSUES
Exposed HV Cable Routed without Raceway-Personnel Hazard                         ELEENT idHERE     RESPON-                                                     .
.g.
CONCERN NUMBER (S)                                     ISSUES                 ADDRESSED     SIBLE         GENERAL' APPROACH / METHODOLOGY FOR ELEMNT REPORT IN-85-749-001                       1. High vdtage cables laid unprotected   235.4         RP       1. Perform walkdown to determine whether this N gh voltage cables are laid         around edge of rooms,     '
SQN RESTA NO ELEENT NupeER 235.4 BY:
situation exists at SQN.
I. Don-Doncow Date: 10/03/86
around edge of rooms (such as raceway in Reactor #2) without   2. Damage to insulation of these cables 235.4         RP     - 2. Discuss with Safety Engineer their program to
*t'
  ' protection from damage to in-         along with floodings may result in                                 enforce good housekeeping requirements.
+ '
sulation. These areas are'of ten     personnel hazard.
Exposed HV Cable Routed without Raceway-Personnel Hazard ELEENT idHERE RESPON-CONCERN NUMBER (S)
flooded, and could pose a threat of shock hazard to workers if                                                                       3. Review copy of housekeeping requirements, insulation were damaged.
ISSUES ADDRESSED SIBLE GENERAL' APPROACH / METHODOLOGY FOR ELEMNT REPORT IN-85-749-001 1.
4   Review Employee Safety Handbook.
High vdtage cables laid unprotected 235.4 RP 1.
DOCU;fNTS NEEDED FOR REVIEW
Perform walkdown to determine whether this N gh voltage cables are laid around edge of rooms, situation exists at SQN.
: 1. Housekeeping requirements procram - SQA66 Rev. 8.
around edge of rooms (such as raceway in Reactor #2) without 2.
: 2. TVA, Office of Nuclear Power, Employee Safety Handbook.
Damage to insulation of these cables 235.4 RP
                                                                                                    =
- 2.
Discuss with Safety Engineer their program to
' protection from damage to in-along with floodings may result in enforce good housekeeping requirements.
sulation. These areas are'of ten personnel hazard.
flooded, and could pose a threat of shock hazard to workers if 3.
Review copy of housekeeping requirements, insulation were damaged.
4 Review Employee Safety Handbook.
DOCU;fNTS NEEDED FOR REVIEW 1.
Housekeeping requirements procram - SQA66 Rev. 8.
2.
TVA, Office of Nuclear Power, Employee Safety Handbook.
=
0978d-7
0978d-7
                        ,}}
,}}

Latest revision as of 22:48, 3 December 2024

Rev 1 to Exposed HV Cable Routed W/O Raceway Personnel Hazard
ML20215D911
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/08/1986
From: Mcnutt G, Nesbitt P, Stewart D
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20215D785 List:
References
235.4-(B), 235.4-(B)-R01, 235.4-(B)-R1, NUDOCS 8612170124
Download: ML20215D911 (3)


Text

yY TVA EMPLOYEE CONCERNS REPORT NUMBER:

235.4(B)

SPECIAL PROGRAM REPORT TYPE:

SEQUOYAH ELEMENT REVISION NUMBER: 1 NON-RESTART JUSTIFICATION

SUMMARY

TITLE:

Exposed HV Cable Routed without Raceway-Personnel Hazard PAGE 1 0F 2 REASON FOR REVISION:

Revised per TVA coments.

i PREPARATION PREPARED 8 -

"d b

/O[d2//Pc;,

.ew,

/

/

4ISNATURE DATE (C

REVIEWS MiT~

id 5

SIGNATURE DATE TAS

/7 (f

SIGNATURE DATE CONCURRENCES Ye f i

/fqrf(,

CEG-H:

W*

/0 '2y-r6 SRP:

I

/2-8-66 SIGNATURE DATE SIGNATURE

  • DATE APPROVED BY:

Mofa4fd iz-ss a

$I ECSPMANA$1 DATE MANAGER OF NUCLEAR POWER DATE CONCURRENCE (FINAL REPORT ONLY)

  • SRP Secretary'e signature denotes SRP concurrences are in files.

10/21/86 - 01540 hok OO h7 J

P

.9 SEQUOYAH NUCLEAR PLANT ENGINEERING RELATED EMPLOYEE CONCERNS SPECIAL PROGRAM NON-RESTART JUSTIFICATION

SUMMARY

SUBCATEGORY / ELEMENT 235.4(8)

This issue was raised on WBN and is considered generic to SQN due to the similarity of the two plants.

The high voltage cables referenced in the concern are 480V temporary construction cables. Since these cables have no effect A

on plant safety, they are not considered a restart issue.

m

')

4 ATTACHMEN1:

List of Issues for Electrical ELEMENT NO.

235.4(B)

Date:

10. /03/86 0

0154D - Page 2

]

']'

p LIST OF ISSUES

.g.

SQN RESTA NO ELEENT NupeER 235.4 BY:

I. Don-Doncow Date: 10/03/86

  • t'

+ '

Exposed HV Cable Routed without Raceway-Personnel Hazard ELEENT idHERE RESPON-CONCERN NUMBER (S)

ISSUES ADDRESSED SIBLE GENERAL' APPROACH / METHODOLOGY FOR ELEMNT REPORT IN-85-749-001 1.

High vdtage cables laid unprotected 235.4 RP 1.

Perform walkdown to determine whether this N gh voltage cables are laid around edge of rooms, situation exists at SQN.

around edge of rooms (such as raceway in Reactor #2) without 2.

Damage to insulation of these cables 235.4 RP

- 2.

Discuss with Safety Engineer their program to

' protection from damage to in-along with floodings may result in enforce good housekeeping requirements.

sulation. These areas are'of ten personnel hazard.

flooded, and could pose a threat of shock hazard to workers if 3.

Review copy of housekeeping requirements, insulation were damaged.

4 Review Employee Safety Handbook.

DOCU;fNTS NEEDED FOR REVIEW 1.

Housekeeping requirements procram - SQA66 Rev. 8.

2.

TVA, Office of Nuclear Power, Employee Safety Handbook.

=

0978d-7

,