TVA EMPLOYEE CONCERNS REPORT NUMBER:
235.2(B)
SPECIAL PROGRAM
[O'.[
REPORT TYPE:
SEQUOYAH ELEMENT REVISION NUMBER:
0 NON-RESTART JUSTIFICATION
SUMMARY
TITLE:
ELECTRICAL SAFETY Exposed 480V Bus at Panel Top PAGE 1 0F 2 REASON FOR REVISION:
PREPARATION
__PREPAR fY:&L0bwayd tol14 lf4 t
N SIGNATURE IDATEl REVIEWS U
l SIGNATURE
' OKIC TAS-V PRM l}
W SIGNATURE DATE 1
CONCURRENCES b
/0/bWfd D
A OCK 50 7
CEG-H:
Q.N 10 M A acitA N
/2-8-8(o SRP:
SIGNATURE DATE Q
SIGNATURE
- DATE APPROVED BY:
N'")
/["['h_
N/A ECSP M NAGEW DATE MANAGER OF NUCLEAR POWER DATE CONCURRENCE (FINAL REPORT ONLY)
- SRP Secretary's signature denotes SRP concurrences are in files.
T
[
(
f._
SEQUOYAH NUCLEAR PLANT i
ENGINEERING RELATED EMPLOYEE CONCERNS SPECIAL PROGRAM NON-RESTART JUSTIFICATION
SUMMARY
SUBCATEGORY / ELEMENT 235.2(B)
This issue was raised on WBN and is considered generic to SQN due to the similarity of the two plants.
The concern regarding the exposed 480V buses located at the top of the shutdown boards was determined not to be a restart issue. A walkdown by the evaluator of the 480V Class lE Shutdown Boards at the SQN plant revealed that established procedures for cable er.try in 480V shutdown boards were followed and, therefore, no exposed buses were identified.
O V
a ATTACHMENT:
List of Issues for Electrical ELEMENT NO.
235.2(B)
Date:
09/09/86 01770
d
^
LIST OF EL ISSUES I..
r? '
SQN RESTAR ELEMENT NUMBER 235.2 BY:
J. Wheeler m,
Date: 09/09/86 Exposed 480V Bus at Panel Top ELEMENT WHERE RESPON-CONCERN NUMBER (S)
ISSUES ADDRESSED SIBLE GENERAL APPROACH / METHODOLOGY FOR ELEMENT REPORT e IN-85-064-002 1.
Top 480v cabinet are open at conduit 235.2 AR "480V shutdown boards (E1. 757 (cable) entry.
'AZR and A14T) feeders to bus bar compartments. The cabinets are open on top where the conduits enter the MCC.
DOCUMENTS NEEDED FOR REVIEW f
a O
0978d-6 I
I i.