PROCEDURES GENERATION PACKAGE PUBLIC SERVICE COMPANY OF COLORADO FORT ST. VRAIN NUCLEAR GENERATING STATION 8704200438 870410 PDR ADOCK 05000267 P             PDR
PROCEDURES GENERATION PACKAGE PUBLIC SERVICE COMPANY OF COLORADO FORT ST. VRAIN NUCLEAR GENERATING STATION 8704200438 870410 PDR ADOCK 05000267 P
PDR


4 TABLE OF CONTENTS Section                 Title                                                                                 Page 1.0 I N T RO DU C T I O N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.1   Purpose..............................................2 1.2   Scope.................................................2 1.3   Organization.................                       .................. ..... 2 2.0 PROGRAM DESCRIPTION.................................                                           .......          2 2.1   General......................................... .. .. 2 2.2   Structure of Emergency Operations.....................                                                   3 2.3   Mechanics of Writing             Procedures.......................                                     3 l 3.0 VERIFICATION AND VALIDATION.................................                                                       5 1         3.1   Verification Activities..............                               ........ .......                    6 l         3.2   Validation   Activities......................... ....... 8 l 4.0 TRAINING PR0 GRAM........................                               ...................                      9 l         4.1   General Requirements................... .............. 9 l         4.2   Program Description........... ....................... 9 l         4.3   Training Evaluation. .................. .............. 11 l         4.4   Training Program Changes............                               ................. 12 l  
4 TABLE OF CONTENTS Section Title Page 1.0 I N T RO DU C T I O N.............................................. 2 1.1 Purpose..............................................2 1.2 Scope.................................................2 1.3 Organization.................
....................... 2 2.0 PROGRAM DESCRIPTION.................................
2 2.1 General.........................................
.... 2 2.2 Structure of Emergency Operations.....................
3 2.3 Mechanics of Writing Procedures.......................
3 l 3.0 VERIFICATION AND VALIDATION.................................
5 1
3.1 Verification Activities..............
6 l
3.2 Validation Activities.........................
....... 8 l 4.0 TRAINING PR0 GRAM........................
9 l
4.1 General Requirements...................
.............. 9 l
4.2 Program Description.................................. 9 l
4.3 Training Evaluation................................. 11 l
4.4 Training Program Changes............
................. 12 l  


==5.0     REFERENCES==
==5.0 REFERENCES==
.................................................. 12 1
12 1


      ~
~
r i
r i


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==
 
1.1 PURPOSE The purpose of this Procedures Generation Package (FGP) is to describe the development of emergency procedures at Public Service Company's Fort St. Vrain Nuclear Generating Station.
1.1     PURPOSE The purpose of this Procedures Generation Package (FGP) is to describe the development of emergency procedures at Public Service Company's Fort St. Vrain Nuclear Generating Station. The Fort St. Vrain nuclear plant is a High-Temperature     Gas-Cooled   Reactor                 (HTGR)   located near Platteville. Colorado.
The Fort St. Vrain nuclear plant is a High-Temperature Gas-Cooled Reactor (HTGR) located near Platteville. Colorado.
1.2   SCOPE This document was developed in response to Supplement 1 to NUREG-0737, Item 7.2b, page 15.
1.2 SCOPE This document was developed in response to Supplement 1 to NUREG-0737, Item 7.2b, page 15.
!                            1.3 . ORGANIZATION This document consists of the following parts:
1.3. ORGANIZATION This document consists of the following parts:
Introductien
Introductien Program Description Verification and Validation Program Training Program I
* Program Description
References Attachments:
* Verification and Validation Program
I l
* Training Program
: 1. Guidelines For Preparation of Emergency l
'.            I
Procedures (SOAP-2) l
* References I
: 2. E0P Verification Worksheet l
* Attachments:
: 3. E0P Verification / Resolution Record l
l
: 4. Evaluation Criteria Checklist 2.0 PROGRAMOj,50R!cT!0N 2.1 GENERAL in conjunction with other activities related to NUREG-e 1
: 1. Guidelines For Preparation of Emergency l                                           Procedures (SOAP-2) l                                     2. E0P Verification Worksheet l                                     3. E0P Verification / Resolution Record l                                     4. Evaluation Criteria Checklist 2.0 PROGRAMOj,50R!cT!0N
0737, Supplement 1, most notably the Control Room Design i
!                            2.1   GENERAL e
Review (CRDR) and Safety Parameter Display System (SPDS),
in conjunction with other activities related to NUREG-1                                     0737, Supplement 1, most notably the Control Room Design i                                     Review (CRDR) and Safety Parameter Display System (SPDS),
Public Scrvice Company (PSC) is in the process of defining Critical Safety Functions (CSFs) and rewriting certain i
'                                    Public Scrvice Company (PSC) is in the process of defining Critical   Safety Functions (CSFs) and rewriting certain the i                                     plant procedures.     This     document               pertains     to
plant procedures.
!                                    methodology for generating a particular subset of plant procedures that deals with emergency operations and 4
This document pertains to the methodology for generating a particular subset of plant procedures that deals with emergency operations and monitoring and restoration of CSFs. These procedures are 4
monitoring and restoration of CSFs. These procedures are l                                     part of a much more comprehensive set of operational, maintenance, and administrative procedures at Fort St.
l part of a much more comprehensive set of operational, maintenance, and administrative procedures at Fort St.
i                                     Vrain.
i Vrain.
l i
l i
l                                                               2
l 2


1 2.2   STRUCTURE OF EMERGENCY OPERATIONS Emergency plant operation at Fort St.                     Vrain will be
1 2.2 STRUCTURE OF EMERGENCY OPERATIONS Emergency plant operation at Fort St.
!'              conducted using a parallel path approach. On one path are event-oriented emergency procedures. On the parallel path are symptom-oriented CSF restoration procedures.
Vrain will be conducted using a parallel path approach. On one path are event-oriented emergency procedures. On the parallel path are symptom-oriented CSF restoration procedures.
A symptom-oriented diagnostic procedure, invoked when i               certain transient conditions, such as reactor scram,
A symptom-oriented diagnostic procedure, invoked when i
;                occur, determines which path is initially used by control room operators. The diagnostic procedure will instruct operators to take certain immediate actions.               It will then direct the operators to verify                 that     the   symptoms
certain transient conditions, such as reactor scram, occur, determines which path is initially used by control room operators.
.                indicating normal CSFs are present.                   If the CSFs are i               normal, the diagnostic               procedure   will     direct   the systematic identification of the precipitating event and
The diagnostic procedure will instruct operators to take certain immediate actions.
;                indicate which event-specific procedure should be used.
It will then direct the operators to verify that the symptoms indicating normal CSFs are present.
If the CSFs are i
normal, the diagnostic procedure will direct the systematic identification of the precipitating event and indicate which event-specific procedure should be used.
4 If CSFs are threatened, the operators will be instructed to use the appropriate symptom-oriented CSF restoration procedure.
4 If CSFs are threatened, the operators will be instructed to use the appropriate symptom-oriented CSF restoration procedure.
)
)
The event-oriented emergency procedures will be used when a particular precipitating event can be unambiguously identified using the diagnostic procedure.                     While an
The event-oriented emergency procedures will be used when a particular precipitating event can be unambiguously identified using the diagnostic procedure.
-                event-oriented procedure                 is being     conducted,     one i               individual in the control room will                 be responsible for monitoring the status of all Fort St.               Vrain CSFs.     The SPOS will be used as the primary monitoring tool, but CSF monitoring procedures will also be provided. If any CSF is lost,     or is in imminent danger of being lost, the event-oriented procedure will be abandoned and one, or more, CSF restoration procedure (s) will be immediately invoked and will dictate further operator actions.                 This parallel     path approach takes advantage of the best characteristics of both event-                 and     symptom-oriented procedures.
While an event-oriented procedure is being conducted, one i
2.3   MECHANICS OF WRITING PROCEDURES Since generic guidelines do not exist for HTGR, the t
individual in the control room will be responsible for monitoring the status of all Fort St.
mechanics of the generation of a new emergency procedures set will be somewhat different than those used by light i               water plants, but will accomplish the same objectives.
Vrain CSFs.
The SPOS will be used as the primary monitoring tool, but CSF monitoring procedures will also be provided.
If any CSF is lost, or is in imminent danger of being lost, the event-oriented procedure will be abandoned and one, or more, CSF restoration procedure (s) will be immediately invoked and will dictate further operator actions.
This parallel path approach takes advantage of the best characteristics of both event-and symptom-oriented procedures.
2.3 MECHANICS OF WRITING PROCEDURES Since generic guidelines do not exist for HTGR, the mechanics of the generation of a new emergency procedures t
set will be somewhat different than those used by light i
water plants, but will accomplish the same objectives.
4 i
4 i
}
}
Line 70: Line 96:
O l
O l
i
i
:2.3.1 Preparation Because Fort St. Vrain is a unique type of plant, there are no owner's group emergency procedure guidelines from which to generate plant-specific procedures. There is, however,     an   existing l       approved set of Emergency Operating Procedures l       (E0Ps) implemented at Fort St. Vrain.
:2.3.1 Preparation Because Fort St. Vrain is a unique type of plant, there are no owner's group emergency procedure guidelines from which to generate plant-specific procedures.
During the CRDR task analysis, it was noted that many procedures in the existing E0P set do not, in     ,
There is, however, an existing l
fact,   relate to " emergencies", but to abnormal situations that can be (and are) dealt with on a fairly routine- basis (e.g., single circulator trip). To   meet   the   CRDR task   analysis requirements, a basis for a new set of procedures, dealing   strictly     with   symptom-oriented   CSF monitoring and restoration was developed and analyzed in the Fort St. Vrain Control Room mock-up.
approved set of Emergency Operating Procedures l
Subsequent to the CRDR, PSC has undertaken to restructure their old emergency procedures set into -those that are truly " emergency" procedures and those that       really   deal with abnormal operational events. In preparation for rewriting the E0Ps for the present effort, a set of existing procedures dealing with emergency events will be defined. Also, a complete set of CSF Monitoring and Restoration Procedures will be defined - based       i on the analysis done for SPOS development and for the   CRDR. From that point, the methodology described in the remainder of this PGP will be used to generate the new procedures, 2.3.2 Writing New procedures A procedures writing team will convert those procedures that have been retained through the selection process into the format defined by the Emergency Procedure Writer's Guide to be described in section   2.3.3. One new procedure will be generated for each event represented in the retained procedure       set. Since the existing procedure set has already been approved by the Nuclear   Regulatory     Commission (NRC), no new analysis will be required to convert to the new procedure format.
(E0Ps) implemented at Fort St. Vrain.
4                                       i t
During the CRDR task analysis, it was noted that many procedures in the existing E0P set do not, in
: fact, relate to " emergencies", but to abnormal situations that can be (and are) dealt with on a fairly routine-basis (e.g.,
single circulator trip).
To meet the CRDR task analysis requirements, a basis for a new set of procedures, dealing strictly with symptom-oriented CSF monitoring and restoration was developed and analyzed in the Fort St. Vrain Control Room mock-up.
Subsequent to the CRDR, PSC has undertaken to restructure their old emergency procedures set into -those that are truly " emergency" procedures and those that really deal with abnormal operational events.
In preparation for rewriting the E0Ps for the present effort, a set of existing procedures dealing with emergency events will be defined. Also, a complete set of CSF Monitoring and Restoration Procedures will be defined - based i
on the analysis done for SPOS development and for the CRDR.
From that point, the methodology described in the remainder of this PGP will be used to generate the new procedures, 2.3.2 Writing New procedures A procedures writing team will convert those procedures that have been retained through the selection process into the format defined by the Emergency Procedure Writer's Guide to be described in section 2.3.3.
One new procedure will be generated for each event represented in the retained procedure set.
Since the existing procedure set has already been approved by the Nuclear Regulatory Commission (NRC), no new analysis will be required to convert to the new procedure format.
4 i
t


N If any events are identified during the selection process that are deemed important enough                               to l                                                               require                       procedural   guidance, then additional l                                                               procedures will be writter..
N If any events are identified during the selection process that are deemed important enough to l
l                                                               If additional events are identified that require l                                                               new E0Ps, a technical basis will be established l                                                               and submitted for NRC Staff Review. In addition, I                                                               a Task Analysis will be completed to ensure that l                                                               the information and controls required to carry out l                                                               the procedures are available in the control                       room.
require procedural
The CSF Monitoring and Restoration Procedures will be formatted in accordance with the Writer's Guide.                     The CSF Monitoring Procedure will be adapted from the algorithms used in the SPDS to define the status of individual CSFs. The flow charts and task analyses that were produced by the CRDR will be used in the development of the CSF Restoration Procedures. A check will be performed on the CSF Restoration Procedures to make certain they are appropriate and complete.
: guidance, then additional l
2.3.3                   Writer's Guide A guide for writing Fort St. Vrain emergency and CSF procedures has been developed                           from   the following references:
procedures will be writter..
                                                                                                          *              " Emergency Operating Procedures Writing Guideline" (INPO-82-017)
l If additional events are identified that require l
                                                                                                          *              " FORT ST. VRAIN PROCEDURE SYSTEM, Procedure G-2".
new E0Ps, a technical basis will be established l
This guide is entitled " Guidelines For Preparation of Emergency Procedures",                       and includes detailed requirements for procedure format, organi:ation, level of detail, content, and style.                       This guide is included in this PGP as Attachment 1.
and submitted for NRC Staff Review.
l 3.0 VERIFICATION AND VALIDATION l                   The               E0P               Verification                           and   E0P   Validation Programs arv I                   interdependent, however separate in that the E0P Verification is l                   considered to exist at the component level and the Validation of l                   E0Ps is part of the Integrated Validation effort.
In addition, I
a Task Analysis will be completed to ensure that l
the information and controls required to carry out l
the procedures are available in the control room.
The CSF Monitoring and Restoration Procedures will be formatted in accordance with the Writer's Guide.
The CSF Monitoring Procedure will be adapted from the algorithms used in the SPDS to define the status of individual CSFs. The flow charts and task analyses that were produced by the CRDR will be used in the development of the CSF Restoration Procedures. A check will be performed on the CSF Restoration Procedures to make certain they are appropriate and complete.
2.3.3 Writer's Guide A guide for writing Fort St. Vrain emergency and CSF procedures has been developed from the following references:
" Emergency Operating Procedures Writing Guideline" (INPO-82-017)
" FORT ST. VRAIN PROCEDURE SYSTEM, Procedure G-2".
This guide is entitled " Guidelines For Preparation of Emergency Procedures",
and includes detailed requirements for procedure format, organi:ation, level of detail, content, and style.
This guide is included in this PGP as Attachment 1.
l 3.0 VERIFICATION AND VALIDATION l
The E0P Verification and E0P Validation Programs arv I
interdependent, however separate in that the E0P Verification is l
considered to exist at the component level and the Validation of l
E0Ps is part of the Integrated Validation effort.
5
5


O
O s
* s l     3.1 VERIFICATION ACTIVITIES l         This section describes the E0P Verification Program for l         evaluating the E0Ps for written correctness and technical l         accuracy.         The evaluation of useability and operational I         correctness is addressed in the " Program Plan for the l         Integrated Validation of NUREG-0737 Initiatives". This l         division of           the       evaluation     for these four (4) l         characteristics is based on the type of evaluation to be l         used. The E0P Verification Program encompasses the l         efforts necessary to support a comparative evaluation of l         each E0P to the source documents, whereas the                                                                                                                                 E0P l         Validation Program encompasses tne efforts necessary to I         support a performance evaluation of t*e FOPS.
l 3.1 VERIFICATION ACTIVITIES l
l         A verification team will be established before (or during) l       the procedures writing effort.                 The verifica+. ton team will l       include one or more of the individuals cr the procedure I       writing team, a human factors specialist, and at least one l       licensed control room operator who did not participate in                               -
This section describes the E0P Verification Program for l
l        the procedures writing effort.
evaluating the E0Ps for written correctness and technical l
l       The verification activity will utilize the team concept in l       conjunction with visual inspections of the control room.
accuracy.
I       One member will be designated as the team leader and this l       designee may assign specific duties to individual members.
The evaluation of useability and operational I
l       3.1.1   Obj ec t _i_ve l               The objective of the verification activity is to I               ensure the written and technical                                                                               corre:tness of I               the         emergency         procedures.                                       Verification will I               consist of a series of static checks to ensure i               that the following conditions are met:
correctness is addressed in the " Program Plan for the l
I
Integrated Validation of NUREG-0737 Initiatives".
* Each procedure is technically correct, i.e.,
This l
l                           it accurately reflects either the existing l                           procedure or a           flowchart developed for a l                           particular CSF.
division of the evaluation for these four (4) l characteristics is based on the type of evaluation to be l
l
used.
* Each procedure is written correctly according l                           to the Writer's Guide.
The E0P Verification Program encompasses the l
l
efforts necessary to support a comparative evaluation of l
* The       language     and         level of                                                                                                     information I                         presented           are     compatible                                                                                                         with     the l                         Qualifications, training,                                                           and experience of I                         the range of individuals on                                                                                         the operating l                         staff.       (The validation of this condition is l                         part of the Integrated Validation Program.)
each E0P to the source documents, whereas the E0P l
Validation Program encompasses tne efforts necessary to I
support a performance evaluation of t*e FOPS.
l A verification team will be established before (or during) l the procedures writing effort.
The verifica+. ton team will l
include one or more of the individuals cr the procedure I
writing team, a human factors specialist, and at least one l
licensed control room operator who did not participate in l
the procedures writing effort.
l The verification activity will utilize the team concept in l
conjunction with visual inspections of the control room.
I One member will be designated as the team leader and this l
designee may assign specific duties to individual members.
l 3.1.1 Obj ec t _i_ve l
The objective of the verification activity is to I
ensure the written and technical corre:tness of I
the emergency procedures.
Verification will I
consist of a series of static checks to ensure i
that the following conditions are met:
Each procedure is technically correct, i.e.,
I l
it accurately reflects either the existing l
procedure or a flowchart developed for a l
particular CSF.
Each procedure is written correctly according l
l to the Writer's Guide.
The language and level of information l
I presented are compatible with the l
Qualifications,
: training, and experience of I
the range of individuals on the operating l
staff.
(The validation of this condition is l
part of the Integrated Validation Program.)
6
6


0
0 The information and control requirements l
* l
l embodied in each procedure are available from l
* The     information and control       requirements l
embodied in each procedure are available from l
the displays and controls in the Fort St.
the displays and controls in the Fort St.
l             Vrain Control Room.
l Vrain Control Room.
l   3.1.2 P_r_ogram Structure l         The     verification       activity   consists     of the l         following four (4) phases:
l 3.1.2 P_r_ogram Structure l
The verification activity consists of the l
following four (4) phases:
PREPARATION:
Preparation includes developing l
l (or determining) the criteria needed to l
parform the comparative evaluation between l
the E0Ps and their applicable source l
documents, determining how to apply the l
developed evaluation criteria, designating l
the personnel to perform the comparative l
evaluation, and scheduling the assessment.
ASSESSMENT:
Assessment generally includes I
l the performance of the comparative evaluation i
between designated source documents and the l
E0Ps using the evaluation criteria to l
identify any discrepancies between them.
l This assessment shall be conducted by the l
following steps:
l Make a general review of the E0P using the l
" PROCEDURE GENERAL" portion of the evaluation l
criteria checklist ( Attachment 4) and source l
documents.
l
l
* PREPARATION:      Preparation includes developing l              (or determining) the criteria needed                to l              parform the comparative evaluation between l              the E0Ps        and    their  applicable    source l              documents,        determining how to apply the l              developed evaluation criteria, designating l              the personnel to perform the comparative l              evaluation, and scheduling the assessment.
- Indicate on Form #1 of the E0P Verification l
I
Worksheet (Attachment 2) that the evaluation l
* ASSESSMENT:        Assessment generally includes l              the performance of the comparative evaluation i              between designated source documents and the l              E0Ps using the          evaluation  criteria      to l              identify any discrepancies between them.
was performed, either by checking the l
l        This    assessment      shall    be conducted by the l        following steps:
acceptable column or by designating the l
l Make a general review of the E0P using the l
appropriate discrepancy sheet for any l
                                      " PROCEDURE GENERAL" portion of the evaluation l              criteria checklist ( Attachment 4) and source l              documents.
l              - Indicate on Form #1 of the E0P Verification l             Worksheet (Attachment 2) that the evaluation l             was     performed,     either   by checking the l
acceptable column or by designating               the l             appropriate discrepancy           sheet   for   any l
discrepancies identified.
discrepancies identified.
l
l
                                      - Make a step-by-step review of the E0P using l
- Make a step-by-step review of the E0P using l
the step, caution, note-specific portion of l             the evaluation criteria ( Attachment 4) and l             source documents.
the step, caution, note-specific portion of l
the evaluation criteria ( Attachment 4) and l
source documents.
7
7


l
Indicate for each step on Form #2 of the l
                                                                            -    Indicate for each step on Form #2 of the l                                                                     E0P Validation Forms (Attachment 2) that the l                                                                     comparative evaluation was performed, either l                                                                     by checking the acceptable column or by l                                                                     designating the appropriate discrepancy sheet l                                                                       for any discrepancies identified.
l E0P Validation Forms (Attachment 2) that the l
l
comparative evaluation was performed, either l
* RESOLUTION:       Resolution     includes     the l
by checking the acceptable column or by l
determination of the appropriate solution for l                                                                     any discrepancy and the incorporation of the l                                                                     solutions into the E0Ps.
designating the appropriate discrepancy sheet l
l                                                                     The       E0P   Verification   Worksheets   (and l                                                                     resolutions) will       be   returned   to   the l                                                                     procedure writer for rewriting or otherwise l                                                                     correcting the       procedure   or   applicable l                                                                     section.
for any discrepancies identified.
                                                                      =      00CUMENTATION:         The   results     of   the verification activity shall be recoroed using the following forms:
RESOLUTION:
l E0P Verification Worksheet (Sample included l                                                                         as Attachment 2) l E0P Verification / Resolution Record (Sample l                                                                         included as Attachment 3) l                                                             All     records shall be retained in accordance with l                                                           Quality Procedure Q-17, " Quality Records".
Resolution includes the l
I     3.2                               VALIDATION ACTIVITIES l                                       The validation of all changes to the Fort St. Vrain l
l determination of the appropriate solution for l
Control Room and E0Ps is to be accomplished through an l                                         Integrated Validation effort as described by the " Program l                                       Plan for the                     Integrated Validation of         NUREG-0737 l                                         Initiatives".
any discrepancy and the incorporation of the l
I                                         3.2.1             Objective l
solutions into the E0Ps.
l The E0P Verification Worksheets (and l
resolutions) will be returned to the l
procedure writer for rewriting or otherwise l
correcting the procedure or applicable l
section.
00CUMENTATION:
The results of the
=
verification activity shall be recoroed using the following forms:
l E0P Verification Worksheet (Sample included l
as Attachment 2) l E0P Verification / Resolution Record (Sample l
included as Attachment 3) l All records shall be retained in accordance with l
Quality Procedure Q-17, " Quality Records".
I 3.2 VALIDATION ACTIVITIES l
The validation of all changes to the Fort St. Vrain l
Control Room and E0Ps is to be accomplished through an l
Integrated Validation effort as described by the " Program l
Plan for the Integrated Validation of NUREG-0737 l
Initiatives".
I 3.2.1 Objective l
Validation objectives as applicable to the E0Ps I
Validation objectives as applicable to the E0Ps I
are defined in Section 2.2.1 of the " Program Plan l                                                           for the Integrated Validation of NUREG-0737 l                                                           Initiatives".
are defined in Section 2.2.1 of the " Program Plan l
l                                         3.2.2           Methodology l                                                         The methodology to be utilized in conducting the l                                                           Integrated Validattor. activity is defined             in l                                                         Section       3.0   of   the " Program Plan for the l                                                         Integrated Validation of NUREG-0737 Initiatives".
for the Integrated Validation of NUREG-0737 l
Initiatives".
l 3.2.2 Methodology l
The methodology to be utilized in conducting the l
Integrated Validattor. activity is defined in l
Section 3.0 of the " Program Plan for the l
Integrated Validation of NUREG-0737 Initiatives".
8
8


a-v 4.0 TRAINING PROGRAM 4.1   GENERAL REQUIREMENTS l               Subsequent to the completion of the Integrated Validation l               activities and prior to implementation of ~the E0Ps into l               the control room, all operators scheduled for control room l               operating assignments will receive training on the full l               complement of E0Ps.
a-v 4.0 TRAINING PROGRAM 4.1 GENERAL REQUIREMENTS l
A   training     segment   will   be developed that deals specifically with emergency plant operation. This course segment will be made a part of the Reactor Operator Training Program, the Senior Reactor Operator Training Program and the Licensed Operator Requalification Program.
Subsequent to the completion of the Integrated Validation l
l               (NOTE:   PSC presently has a course segment which addresses I               the existing set of emergency procedures.           This same l               course segment will be revised to address the new E0P set
activities and prior to implementation of ~the E0Ps into l
                -l               structure and use.)
the control room, all operators scheduled for control room l
l               The requalification training sessions conducted after the l               start of E0P generation will include segments to introduce j               the concepts of CSF monitoring and restoration.
operating assignments will receive training on the full l
4.2 PROGRAM DESCRIPTION Training     for   both   licensed   operators and license candidates will consist of classroom instruction and control room / mock-up walk-throughs.       Implementation of training will be conducted in the following manner:                 ,
complement of E0Ps.
4.2.1   Classroom instruction sessions for the Reactor-Operator Training Program and the Senior Reactor Operator Training Program will be conducted to introduce operators to the concepts of CSFs and the emergency procedures.
A training segment will be developed that deals specifically with emergency plant operation. This course segment will be made a part of the Reactor Operator Training Program, the Senior Reactor Operator Training Program and the Licensed Operator Requalification Program.
l (NOTE:
PSC presently has a course segment which addresses I
the existing set of emergency procedures.
This same l
course segment will be revised to address the new E0P set
-l structure and use.)
l The requalification training sessions conducted after the l
start of E0P generation will include segments to introduce j
the concepts of CSF monitoring and restoration.
4.2 PROGRAM DESCRIPTION Training for both licensed operators and license candidates will consist of classroom instruction and control room / mock-up walk-throughs.
Implementation of training will be conducted in the following manner:
4.2.1 Classroom instruction sessions for the Reactor-Operator Training Program and the Senior Reactor Operator Training Program will be conducted to introduce operators to the concepts of CSFs and the emergency procedures.
Procedures will be presented during classroom l
Procedures will be presented during classroom l
sessions to enable the operator to understand the l
sessions to enable the operator to understand the l
structure of the E0Ps, to understand the parallel l                       path approach to emergency operation, to obtain a l                       working knowledge of the technical content of the l                       E0Ps, to understand the technical basis of the l                       E0Ps, and to understand the responsibilities of l                       the operators in executing the E0Ps.
structure of the E0Ps, to understand the parallel l
path approach to emergency operation, to obtain a l
working knowledge of the technical content of the l
E0Ps, to understand the technical basis of the l
E0Ps, and to understand the responsibilities of l
the operators in executing the E0Ps.
9 i
9 i


                                                                      =
r
r 4
=
    \
4
4.2.2 Control room / mock-up walk-throughs for the Reactor Operator Training Program and the Senior Reactor Operator Training Program will be conducted to familiarize the operator with the               particular displays and controls to be used when performing emergency tasks.
\\
The walk-throughs will enable the operator to be exposed to the EOPs .in an operational setting and will     provide the opportunity for the operator to demonstrate the use of the emergency procedures.
4.2.2 Control room / mock-up walk-throughs for the Reactor Operator Training Program and the Senior Reactor Operator Training Program will be conducted to familiarize the operator with the particular displays and controls to be used when performing emergency tasks.
l                         The walk-throughs will be performed by the minimum                     ,
The walk-throughs will enable the operator to be exposed to the EOPs.in an operational setting and will provide the opportunity for the operator to demonstrate the use of the emergency procedures.
l                        cperating staff as required by the Technical l                         Specification.         Each participant will be assigned l                         the role of a particular shift position while l                         performing emergency procedure walk-throughs.
l The walk-throughs will be performed by the minimum l
l                       Walk-through sessions shall exercise all possible l                         procedure paths to assure that each operator is                         ,
cperating staff as required by the Technical l
l                        familiar with the full extent of the procedure.
Specification.
The     operator's training in the use of each 4
Each participant will be assigned l
l                        procedure in the control room / mock-up setting will be documented using Job Performance Measures in accordance with the Fort St. Vrain                   Training Management Procedures.
the role of a particular shift position while l
l                         Training walk-throughs will           be performed in the l                         following manner:
performing emergency procedure walk-throughs.
l
l Walk-through sessions shall exercise all possible l
* The minimum operating staff (as required by l                                 Technical Specification) shall assume their l                                 normal operating positions and duties.               This
procedure paths to assure that each operator is l
[                               may include routine CSF monitoring.
familiar with the full extent of the procedure.
l
The operator's training in the use of each l
* The trainer shall       iniciate (via the SPDS l
procedure in the control room / mock-up setting will 4
simulator) or verb &lly present the initiating l                               symptom or event.
be documented using Job Performance Measures in accordance with the Fort St.
          ]
Vrain Training Management Procedures.
                                    =      The       operating   staff   shall   assess the i                               postulated challenging event or symptom of l                               such event and perform (simulate performance) l                               all procedure steps and contingency actions l                               required under actual conditions to place the l                               plant is a safe condition and assure public l                               safety.       Changing plant conditions may be l                               described to the operating staff in order to l                               dynamically simulate plant onfigurations.
l Training walk-throughs will be performed in the l
following manner:
The minimum operating staff (as required by l
l Technical Specification) shall assume their l
normal operating positions and duties.
This
[
may include routine CSF monitoring.
The trainer shall iniciate (via the SPDS l
l simulator) or verb &lly present the initiating l
symptom or event.
The operating staff shall assess the
]
=
i postulated challenging event or symptom of l
such event and perform (simulate performance) l all procedure steps and contingency actions l
required under actual conditions to place the l
plant is a safe condition and assure public l
safety.
Changing plant conditions may be l
described to the operating staff in order to l
dynamically simulate plant onfigurations.
10
10


9 +
9
Y 4.2.3   After all licensed operators have received initial training on the emergency procedures,       they will receive a course segment related to emergency operation during requalification training.       This course segment will consist of a condensed version of the classroom portion of initial training.
+
Additionally,       the   classroom     segment   for requalification will     include:   training on new E0Ps, descriptions of any significant transients or accidents (since the previous requalification class) that have required the use of emergency procedures and solicitation of feetoack           from operators concerning their use of the emergency procedures. The requalification training segment will   also include walk-throughs in the control room / mock-up similar to those       conducted   for initial training.
Y 4.2.3 After all licensed operators have received initial training on the emergency procedures, they will receive a course segment related to emergency operation during requalification training.
4.2.4   Training on minor emergency operating procedure revisions is conducted through required reading using material derived from the plant Operational Information Assessment Group. Training for major revisions to the E0Ps will be conducted as pre-shift sessions or as operations seminars.
This course segment will consist of a condensed version of the classroom portion of initial training.
l             Pre-shift sessions or operations seminars are i             special informational sessions convened for the l             purpose     of providing operator briefings and l             training relative to recent changes in procedures, l             materials and/or policies.
Additionally, the classroom segment for requalification will include:
l             Pre-shift sessions or operations seminars convened l             for the purpose of training operators on major E0P l             revisions   will     include walk-throughs of the l             procedure changes with the minimum operating staff I             as required by the Technical Specifications.
training on new E0Ps, descriptions of any significant transients or accidents (since the previous requalification class) that have required the use of emergency procedures and solicitation of feetoack from operators concerning their use of the emergency procedures.
4.3 TRAINING EVALUATION l     4.3.1   Evaluation of the effectiveness of the training l             sessions will be accomplished by the Fort St.
The requalification training segment will also include walk-throughs in the control room / mock-up similar to those conducted for initial training.
Vrain training staff.       The training staff will determine whether the objectives of the training program have been met by using a combination of written tests and the satisfactory completion of the Job Performance Measures associated with the emergency procedures.
4.2.4 Training on minor emergency operating procedure revisions is conducted through required reading using material derived from the plant Operational Information Assessment Group. Training for major revisions to the E0Ps will be conducted as pre-shift sessions or as operations seminars.
l Pre-shift sessions or operations seminars are i
special informational sessions convened for the l
purpose of providing operator briefings and l
training relative to recent changes in procedures, l
materials and/or policies.
l Pre-shift sessions or operations seminars convened l
for the purpose of training operators on major E0P l
revisions will include walk-throughs of the l
procedure changes with the minimum operating staff I
as required by the Technical Specifications.
4.3 TRAINING EVALUATION l
4.3.1 Evaluation of the effectiveness of the training l
sessions will be accomplished by the Fort St.
Vrain training staff.
The training staff will determine whether the objectives of the training program have been met by using a combination of written tests and the satisfactory completion of the Job Performance Measures associated with the emergency procedures.
11
11


O o 3
O o
A minimum grade of 80% on the written test and a satisfactory on the Job Performance Measures will be   required             for     successful   course segment completion.
3 A minimum grade of 80% on the written test and a satisfactory on the Job Performance Measures will be required for successful course segment completion.
4.4 TRAINING PROGRAM CHANGES 4.4.1     Incorporation of changes to training materials which relate to the emergency procedures and operator feedback will' be accomplished using the Training Development process outlined in the Fort St. Vrain Training Management Procedures.
4.4 TRAINING PROGRAM CHANGES 4.4.1 Incorporation of changes to training materials which relate to the emergency procedures and operator feedback will' be accomplished using the Training Development process outlined in the Fort St. Vrain Training Management Procedures.
l  
l  


==5.0 REFERENCES==
==5.0 REFERENCES==
 
l 5.1 Administrative Procedure G-2, "FSV PROCEDURE SYSTEMS",
l       5.1 Administrative Procedure G-2, "FSV PROCEDURE SYSTEMS",
l Fort St.
l           Fort St. Vrain Nuclear Generating Station, Issue 21, l           January 27, 1987.
Vrain Nuclear Generating Station, Issue 21, l
l         l       5.2 INP0     82-017, " Emergency Operating Procedures Writing l           Guideline", July, 1982.
January 27, 1987.
l l      5.3 Quality Procedure, Q-17,                   " QUALITY RECORDS",                   Issue 10, l           January 30, 1987 l     5.4 " Guidelines for Preparation of Emergency Procedures",
l l
l           SOAP-2, (Attachment 1) l     5.5 " Program Plan for the Integrated Validation of NUREG-0737 l           Initiatives" l       5.6 NUREG-0737, Supplement                 1,   " Clarification of TMI Action l           Plan Requirements".
5.2 INP0 82-017, " Emergency Operating Procedures Writing l
l Guideline", July, 1982.
l 5.3 Quality Procedure, Q-17,
" QUALITY RECORDS",
Issue 10, l
January 30, 1987 l
5.4
" Guidelines for Preparation of Emergency Procedures",
l SOAP-2, (Attachment 1) l 5.5
" Program Plan for the Integrated Validation of NUREG-0737 l
Initiatives" l
5.6 NUREG-0737, Supplement 1,
" Clarification of TMI Action l
Plan Requirements".
12
12
_ _ _ _ _ .}}
_ _ _ _ _.}}

Latest revision as of 22:13, 3 December 2024

Procedures Generation Package:Public Svc Co of Colorado Fort St Vrain Nuclear Generating Station
ML20215H595
Person / Time
Site: Fort Saint Vrain 
Issue date: 04/10/1987
From:
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20215H588 List:
References
PROC-870410, NUDOCS 8704200438
Download: ML20215H595 (12)


Text

i

.}

PROCEDURES GENERATION PACKAGE PUBLIC SERVICE COMPANY OF COLORADO FORT ST. VRAIN NUCLEAR GENERATING STATION 8704200438 870410 PDR ADOCK 05000267 P

PDR

4 TABLE OF CONTENTS Section Title Page 1.0 I N T RO DU C T I O N.............................................. 2 1.1 Purpose..............................................2 1.2 Scope.................................................2 1.3 Organization.................

....................... 2 2.0 PROGRAM DESCRIPTION.................................

2 2.1 General.........................................

.... 2 2.2 Structure of Emergency Operations.....................

3 2.3 Mechanics of Writing Procedures.......................

3 l 3.0 VERIFICATION AND VALIDATION.................................

5 1

3.1 Verification Activities..............

6 l

3.2 Validation Activities.........................

....... 8 l 4.0 TRAINING PR0 GRAM........................

9 l

4.1 General Requirements...................

.............. 9 l

4.2 Program Description.................................. 9 l

4.3 Training Evaluation................................. 11 l

4.4 Training Program Changes............

................. 12 l

5.0 REFERENCES

12 1

~

r i

1.0 INTRODUCTION

1.1 PURPOSE The purpose of this Procedures Generation Package (FGP) is to describe the development of emergency procedures at Public Service Company's Fort St. Vrain Nuclear Generating Station.

The Fort St. Vrain nuclear plant is a High-Temperature Gas-Cooled Reactor (HTGR) located near Platteville. Colorado.

1.2 SCOPE This document was developed in response to Supplement 1 to NUREG-0737, Item 7.2b, page 15.

1.3. ORGANIZATION This document consists of the following parts:

Introductien Program Description Verification and Validation Program Training Program I

References Attachments:

I l

1. Guidelines For Preparation of Emergency l

Procedures (SOAP-2) l

2. E0P Verification Worksheet l
3. E0P Verification / Resolution Record l
4. Evaluation Criteria Checklist 2.0 PROGRAMOj,50R!cT!0N 2.1 GENERAL in conjunction with other activities related to NUREG-e 1

0737, Supplement 1, most notably the Control Room Design i

Review (CRDR) and Safety Parameter Display System (SPDS),

Public Scrvice Company (PSC) is in the process of defining Critical Safety Functions (CSFs) and rewriting certain i

plant procedures.

This document pertains to the methodology for generating a particular subset of plant procedures that deals with emergency operations and monitoring and restoration of CSFs. These procedures are 4

l part of a much more comprehensive set of operational, maintenance, and administrative procedures at Fort St.

i Vrain.

l i

l 2

1 2.2 STRUCTURE OF EMERGENCY OPERATIONS Emergency plant operation at Fort St.

Vrain will be conducted using a parallel path approach. On one path are event-oriented emergency procedures. On the parallel path are symptom-oriented CSF restoration procedures.

A symptom-oriented diagnostic procedure, invoked when i

certain transient conditions, such as reactor scram, occur, determines which path is initially used by control room operators.

The diagnostic procedure will instruct operators to take certain immediate actions.

It will then direct the operators to verify that the symptoms indicating normal CSFs are present.

If the CSFs are i

normal, the diagnostic procedure will direct the systematic identification of the precipitating event and indicate which event-specific procedure should be used.

4 If CSFs are threatened, the operators will be instructed to use the appropriate symptom-oriented CSF restoration procedure.

)

The event-oriented emergency procedures will be used when a particular precipitating event can be unambiguously identified using the diagnostic procedure.

While an event-oriented procedure is being conducted, one i

individual in the control room will be responsible for monitoring the status of all Fort St.

Vrain CSFs.

The SPOS will be used as the primary monitoring tool, but CSF monitoring procedures will also be provided.

If any CSF is lost, or is in imminent danger of being lost, the event-oriented procedure will be abandoned and one, or more, CSF restoration procedure (s) will be immediately invoked and will dictate further operator actions.

This parallel path approach takes advantage of the best characteristics of both event-and symptom-oriented procedures.

2.3 MECHANICS OF WRITING PROCEDURES Since generic guidelines do not exist for HTGR, the mechanics of the generation of a new emergency procedures t

set will be somewhat different than those used by light i

water plants, but will accomplish the same objectives.

4 i

}

3

O l

i

2.3.1 Preparation Because Fort St. Vrain is a unique type of plant, there are no owner's group emergency procedure guidelines from which to generate plant-specific procedures.

There is, however, an existing l

approved set of Emergency Operating Procedures l

(E0Ps) implemented at Fort St. Vrain.

During the CRDR task analysis, it was noted that many procedures in the existing E0P set do not, in

fact, relate to " emergencies", but to abnormal situations that can be (and are) dealt with on a fairly routine-basis (e.g.,

single circulator trip).

To meet the CRDR task analysis requirements, a basis for a new set of procedures, dealing strictly with symptom-oriented CSF monitoring and restoration was developed and analyzed in the Fort St. Vrain Control Room mock-up.

Subsequent to the CRDR, PSC has undertaken to restructure their old emergency procedures set into -those that are truly " emergency" procedures and those that really deal with abnormal operational events.

In preparation for rewriting the E0Ps for the present effort, a set of existing procedures dealing with emergency events will be defined. Also, a complete set of CSF Monitoring and Restoration Procedures will be defined - based i

on the analysis done for SPOS development and for the CRDR.

From that point, the methodology described in the remainder of this PGP will be used to generate the new procedures, 2.3.2 Writing New procedures A procedures writing team will convert those procedures that have been retained through the selection process into the format defined by the Emergency Procedure Writer's Guide to be described in section 2.3.3.

One new procedure will be generated for each event represented in the retained procedure set.

Since the existing procedure set has already been approved by the Nuclear Regulatory Commission (NRC), no new analysis will be required to convert to the new procedure format.

4 i

t

N If any events are identified during the selection process that are deemed important enough to l

require procedural

guidance, then additional l

procedures will be writter..

l If additional events are identified that require l

new E0Ps, a technical basis will be established l

and submitted for NRC Staff Review.

In addition, I

a Task Analysis will be completed to ensure that l

the information and controls required to carry out l

the procedures are available in the control room.

The CSF Monitoring and Restoration Procedures will be formatted in accordance with the Writer's Guide.

The CSF Monitoring Procedure will be adapted from the algorithms used in the SPDS to define the status of individual CSFs. The flow charts and task analyses that were produced by the CRDR will be used in the development of the CSF Restoration Procedures. A check will be performed on the CSF Restoration Procedures to make certain they are appropriate and complete.

2.3.3 Writer's Guide A guide for writing Fort St. Vrain emergency and CSF procedures has been developed from the following references:

" Emergency Operating Procedures Writing Guideline" (INPO-82-017)

" FORT ST. VRAIN PROCEDURE SYSTEM, Procedure G-2".

This guide is entitled " Guidelines For Preparation of Emergency Procedures",

and includes detailed requirements for procedure format, organi:ation, level of detail, content, and style.

This guide is included in this PGP as Attachment 1.

l 3.0 VERIFICATION AND VALIDATION l

The E0P Verification and E0P Validation Programs arv I

interdependent, however separate in that the E0P Verification is l

considered to exist at the component level and the Validation of l

E0Ps is part of the Integrated Validation effort.

5

O s

l 3.1 VERIFICATION ACTIVITIES l

This section describes the E0P Verification Program for l

evaluating the E0Ps for written correctness and technical l

accuracy.

The evaluation of useability and operational I

correctness is addressed in the " Program Plan for the l

Integrated Validation of NUREG-0737 Initiatives".

This l

division of the evaluation for these four (4) l characteristics is based on the type of evaluation to be l

used.

The E0P Verification Program encompasses the l

efforts necessary to support a comparative evaluation of l

each E0P to the source documents, whereas the E0P l

Validation Program encompasses tne efforts necessary to I

support a performance evaluation of t*e FOPS.

l A verification team will be established before (or during) l the procedures writing effort.

The verifica+. ton team will l

include one or more of the individuals cr the procedure I

writing team, a human factors specialist, and at least one l

licensed control room operator who did not participate in l

the procedures writing effort.

l The verification activity will utilize the team concept in l

conjunction with visual inspections of the control room.

I One member will be designated as the team leader and this l

designee may assign specific duties to individual members.

l 3.1.1 Obj ec t _i_ve l

The objective of the verification activity is to I

ensure the written and technical corre:tness of I

the emergency procedures.

Verification will I

consist of a series of static checks to ensure i

that the following conditions are met:

Each procedure is technically correct, i.e.,

I l

it accurately reflects either the existing l

procedure or a flowchart developed for a l

particular CSF.

Each procedure is written correctly according l

l to the Writer's Guide.

The language and level of information l

I presented are compatible with the l

Qualifications,

training, and experience of I

the range of individuals on the operating l

staff.

(The validation of this condition is l

part of the Integrated Validation Program.)

6

0 The information and control requirements l

l embodied in each procedure are available from l

the displays and controls in the Fort St.

l Vrain Control Room.

l 3.1.2 P_r_ogram Structure l

The verification activity consists of the l

following four (4) phases:

PREPARATION:

Preparation includes developing l

l (or determining) the criteria needed to l

parform the comparative evaluation between l

the E0Ps and their applicable source l

documents, determining how to apply the l

developed evaluation criteria, designating l

the personnel to perform the comparative l

evaluation, and scheduling the assessment.

ASSESSMENT:

Assessment generally includes I

l the performance of the comparative evaluation i

between designated source documents and the l

E0Ps using the evaluation criteria to l

identify any discrepancies between them.

l This assessment shall be conducted by the l

following steps:

l Make a general review of the E0P using the l

" PROCEDURE GENERAL" portion of the evaluation l

criteria checklist ( Attachment 4) and source l

documents.

l

- Indicate on Form #1 of the E0P Verification l

Worksheet (Attachment 2) that the evaluation l

was performed, either by checking the l

acceptable column or by designating the l

appropriate discrepancy sheet for any l

discrepancies identified.

l

- Make a step-by-step review of the E0P using l

the step, caution, note-specific portion of l

the evaluation criteria ( Attachment 4) and l

source documents.

7

Indicate for each step on Form #2 of the l

l E0P Validation Forms (Attachment 2) that the l

comparative evaluation was performed, either l

by checking the acceptable column or by l

designating the appropriate discrepancy sheet l

for any discrepancies identified.

RESOLUTION:

Resolution includes the l

l determination of the appropriate solution for l

any discrepancy and the incorporation of the l

solutions into the E0Ps.

l The E0P Verification Worksheets (and l

resolutions) will be returned to the l

procedure writer for rewriting or otherwise l

correcting the procedure or applicable l

section.

00CUMENTATION:

The results of the

=

verification activity shall be recoroed using the following forms:

l E0P Verification Worksheet (Sample included l

as Attachment 2) l E0P Verification / Resolution Record (Sample l

included as Attachment 3) l All records shall be retained in accordance with l

Quality Procedure Q-17, " Quality Records".

I 3.2 VALIDATION ACTIVITIES l

The validation of all changes to the Fort St. Vrain l

Control Room and E0Ps is to be accomplished through an l

Integrated Validation effort as described by the " Program l

Plan for the Integrated Validation of NUREG-0737 l

Initiatives".

I 3.2.1 Objective l

Validation objectives as applicable to the E0Ps I

are defined in Section 2.2.1 of the " Program Plan l

for the Integrated Validation of NUREG-0737 l

Initiatives".

l 3.2.2 Methodology l

The methodology to be utilized in conducting the l

Integrated Validattor. activity is defined in l

Section 3.0 of the " Program Plan for the l

Integrated Validation of NUREG-0737 Initiatives".

8

a-v 4.0 TRAINING PROGRAM 4.1 GENERAL REQUIREMENTS l

Subsequent to the completion of the Integrated Validation l

activities and prior to implementation of ~the E0Ps into l

the control room, all operators scheduled for control room l

operating assignments will receive training on the full l

complement of E0Ps.

A training segment will be developed that deals specifically with emergency plant operation. This course segment will be made a part of the Reactor Operator Training Program, the Senior Reactor Operator Training Program and the Licensed Operator Requalification Program.

l (NOTE:

PSC presently has a course segment which addresses I

the existing set of emergency procedures.

This same l

course segment will be revised to address the new E0P set

-l structure and use.)

l The requalification training sessions conducted after the l

start of E0P generation will include segments to introduce j

the concepts of CSF monitoring and restoration.

4.2 PROGRAM DESCRIPTION Training for both licensed operators and license candidates will consist of classroom instruction and control room / mock-up walk-throughs.

Implementation of training will be conducted in the following manner:

4.2.1 Classroom instruction sessions for the Reactor-Operator Training Program and the Senior Reactor Operator Training Program will be conducted to introduce operators to the concepts of CSFs and the emergency procedures.

Procedures will be presented during classroom l

sessions to enable the operator to understand the l

structure of the E0Ps, to understand the parallel l

path approach to emergency operation, to obtain a l

working knowledge of the technical content of the l

E0Ps, to understand the technical basis of the l

E0Ps, and to understand the responsibilities of l

the operators in executing the E0Ps.

9 i

r

=

4

\\

4.2.2 Control room / mock-up walk-throughs for the Reactor Operator Training Program and the Senior Reactor Operator Training Program will be conducted to familiarize the operator with the particular displays and controls to be used when performing emergency tasks.

The walk-throughs will enable the operator to be exposed to the EOPs.in an operational setting and will provide the opportunity for the operator to demonstrate the use of the emergency procedures.

l The walk-throughs will be performed by the minimum l

cperating staff as required by the Technical l

Specification.

Each participant will be assigned l

the role of a particular shift position while l

performing emergency procedure walk-throughs.

l Walk-through sessions shall exercise all possible l

procedure paths to assure that each operator is l

familiar with the full extent of the procedure.

The operator's training in the use of each l

procedure in the control room / mock-up setting will 4

be documented using Job Performance Measures in accordance with the Fort St.

Vrain Training Management Procedures.

l Training walk-throughs will be performed in the l

following manner:

The minimum operating staff (as required by l

l Technical Specification) shall assume their l

normal operating positions and duties.

This

[

may include routine CSF monitoring.

The trainer shall iniciate (via the SPDS l

l simulator) or verb &lly present the initiating l

symptom or event.

The operating staff shall assess the

]

=

i postulated challenging event or symptom of l

such event and perform (simulate performance) l all procedure steps and contingency actions l

required under actual conditions to place the l

plant is a safe condition and assure public l

safety.

Changing plant conditions may be l

described to the operating staff in order to l

dynamically simulate plant onfigurations.

10

9

+

Y 4.2.3 After all licensed operators have received initial training on the emergency procedures, they will receive a course segment related to emergency operation during requalification training.

This course segment will consist of a condensed version of the classroom portion of initial training.

Additionally, the classroom segment for requalification will include:

training on new E0Ps, descriptions of any significant transients or accidents (since the previous requalification class) that have required the use of emergency procedures and solicitation of feetoack from operators concerning their use of the emergency procedures.

The requalification training segment will also include walk-throughs in the control room / mock-up similar to those conducted for initial training.

4.2.4 Training on minor emergency operating procedure revisions is conducted through required reading using material derived from the plant Operational Information Assessment Group. Training for major revisions to the E0Ps will be conducted as pre-shift sessions or as operations seminars.

l Pre-shift sessions or operations seminars are i

special informational sessions convened for the l

purpose of providing operator briefings and l

training relative to recent changes in procedures, l

materials and/or policies.

l Pre-shift sessions or operations seminars convened l

for the purpose of training operators on major E0P l

revisions will include walk-throughs of the l

procedure changes with the minimum operating staff I

as required by the Technical Specifications.

4.3 TRAINING EVALUATION l

4.3.1 Evaluation of the effectiveness of the training l

sessions will be accomplished by the Fort St.

Vrain training staff.

The training staff will determine whether the objectives of the training program have been met by using a combination of written tests and the satisfactory completion of the Job Performance Measures associated with the emergency procedures.

11

O o

3 A minimum grade of 80% on the written test and a satisfactory on the Job Performance Measures will be required for successful course segment completion.

4.4 TRAINING PROGRAM CHANGES 4.4.1 Incorporation of changes to training materials which relate to the emergency procedures and operator feedback will' be accomplished using the Training Development process outlined in the Fort St. Vrain Training Management Procedures.

l

5.0 REFERENCES

l 5.1 Administrative Procedure G-2, "FSV PROCEDURE SYSTEMS",

l Fort St.

Vrain Nuclear Generating Station, Issue 21, l

January 27, 1987.

l l

5.2 INP0 82-017, " Emergency Operating Procedures Writing l

l Guideline", July, 1982.

l 5.3 Quality Procedure, Q-17,

" QUALITY RECORDS",

Issue 10, l

January 30, 1987 l

5.4

" Guidelines for Preparation of Emergency Procedures",

l SOAP-2, (Attachment 1) l 5.5

" Program Plan for the Integrated Validation of NUREG-0737 l

Initiatives" l

5.6 NUREG-0737, Supplement 1,

" Clarification of TMI Action l

Plan Requirements".

12

_ _ _ _ _.