                                                                                  DOCUMENT CONTAINS
.
.
,
I
'
DOCUMENT CONTAINS
L
JUN -7 M
SAFEGUARDS INFORMATION
In Reply Refer'To:
Dockets: 50-313/89-20
50-368/89-20
Arkansas . Power & Light Company
ATTN:
Mr. Gene Campbell
L
L
                                                  JUN -7 M                    SAFEGUARDS INFORMATION
Vice President, Nuclear
          In Reply Refer'To:
Operations
          Dockets: 50-313/89-20
P.O. Box 551
                      50-368/89-20
Little Rock, Arkansas 72203
          Arkansas . Power & Light Company
Gentlemen:
          ATTN:    Mr. Gene Campbell
This refers to the inspection conducted by Mr. J. A. Kelly of this office
L                  Vice President, Nuclear
                    Operations
          P.O. Box 551
          Little Rock, Arkansas 72203
          Gentlemen:
,
,
          This refers to the inspection conducted by Mr. J. A. Kelly of this office
during the period May 1-5, 1989, of activities authorized by NRC Operating
          during the period May 1-5, 1989, of activities authorized by NRC Operating
Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the
          Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the
discussion ~of our findings with Mr. S. M. Quennoz and other members.of your
          discussion ~of our findings with Mr. S. M. Quennoz and other members.of your
staff at the conclusion of the inspection.
          staff at the conclusion of the inspection.
Areas within the security program were examined during this inspection. Within
          Areas within the security program were examined during this inspection. Within
these areas, the inspection consisted of selective examination of procecures
          these areas, the inspection consisted of selective examination of procecures
and representative records, interviews with personnel, and observations by the
          and representative records, interviews with personnel, and observations by the
NRC inspector.
          NRC inspector. The' inspection findings are documented in the enclosed
The' inspection findings are documented in the enclosed
          inspection report.
inspection report.
          During.this inspection, it was found that certain of your activities were in
During.this inspection, it was found that certain of your activities were in
          violation of NRC requirements. Consequently, you are reauired to respond to
violation of NRC requirements.
          these violations, in writing, in accordance with the provisions of
Consequently, you are reauired to respond to
          Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
these violations, in writing, in accordance with the provisions of
          Federal Regulations. Your response should be based 6n the specifics contained
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
          in the Notice of Violation enclosed with this letter.
Federal Regulations.
          The material enclosed herewith contains Safeguards Information as defined by
Your response should be based 6n the specifics contained
          10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
in the Notice of Violation enclosed with this letter.
          by Section 147 of the Atomic Energy Act of 1954, as amenced. Therefore, the
The material enclosed herewith contains Safeguards Information as defined by
          material, with the exception of the report cover page which is an inspection
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
          summary, will n_cto be placed in the Public Document Room.
by Section 147 of the Atomic Energy Act of 1954, as amenced. Therefore, the
          RIV:SEPS             C:SEPS           C:RPB           D:DRSS         D
material, with the exception of the report cover page which is an inspection
          *JAKelly/tw         *RJEverett       pMurray           BBeach       JMilhoan
summary, will n_ct be placed in the Public Document Room.
                              h/
o
                                                                                                      4
RIV:SEPS
C:SEPS
C:RPB
D:DRSS
D
*JAKelly/tw
*RJEverett
pMurray
BBeach
JMilhoan
h d /89*Previouslyconcurred}/89
0 /~/ /89
(,/7/89
(p /
89
h/
4
i
i
I         h d /89*Previouslyconcurred}/89
I
                                  .
.
                                                0 /~/ /89        (,/7/89        (p /  89
8906140107 890607
                8906140107 890607                                                             [     ,
[
                PDR   ADOCK 05000313                 ENCLOSURE CONTAINS                           1
PDR
                Q                   PDC               SAFEGUARDS INFORMATION                 'l,l
ADOCK 05000313
                MNT CONTAINS_                         UPON SEPARATION THIS
ENCLOSURE CONTAINS
,
1
Q
PDC
SAFEGUARDS INFORMATION
'l,l
MNT CONTAINS_
UPON SEPARATION THIS


                                                  -_     _     - _ _ _ _ _ _ _ _ _     . _ _ _ _ _ _ _ _ _ _ _ _ _
-_
                                                                                        -
_
        .,         .
- _ _ _ _ _ _ _ _ _
    u; . ..         ..
. _ _ _ _ _ _ _ _ _ _ _ _ _
              :
-
1 .
.,
        ,
.
                . Afkansas Power & Light' Company               -2-
u;
                  Should you ha'e v    any questions concerning this inspection, we will be pleased to.
. ..
                " discuss them with you.
..
                                                                        Sincerely,
:
                                                                                    6
1
                                                                      James L. Milhoan, Director
.
                                                                  ' Division of Reactor Projects
. Afkansas Power & Light' Company
                  Enclosures:
-2-
                  1.   Appendix A - Notice of. Violation
,
Should you ha'e any questions concerning this inspection, we will be pleased to.
v
" discuss them with you.
Sincerely,
6
James L. Milhoan, Director
' Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of. Violation
~"
~"
                  2.     Appendix B - NRC Inspection Report
2.
                          50-313/89-20
Appendix B - NRC Inspection Report
                          50-368/89-20
50-313/89-20
                .cc w/ summary page'only:
50-368/89-20
                  Arkansas Nuclear One
.cc w/ summary page'only:
                  ATTN:     J.. M. Levine, Executive.
Arkansas Nuclear One
                                Director, Nuclear Operations
ATTN:
                  P.O. Box 608
J.. M. Levine, Executive.
                .Russellville, Arkansas .72801
Director, Nuclear Operations
;       o
P.O. Box 608
                  Arkansas Radiation Control' Program Director
.Russellville, Arkansas .72801
                :bec' copy.of entire report:
;
                          RIV Security File
o
                          P. A. Starener, RSGB/NRR
Arkansas Radiation Control' Program Director
                          - R. D. . Martin, RA
:bec' copy.of entire report:
                          B Beacn. DRSS
RIV Security File
                          Chief, RPB
P. A. Starener, RSGB/NRR
                          Section Chief, SEPS:RPB
- R. D. . Martin, RA
                          Security Inspector
B Beacn. DRSS
                          Resident Inspector
Chief, RPB
                          SEPS:RPB Fi.le
Section Chief, SEPS:RPB
                          G. F. Sanborn, EO
Security Inspector
                          D. M. Crutenfield, NRR
Resident Inspector
                  bec copy of letter and inspection summary only w/766:
SEPS:RPB Fi.le
                  DRP                                 Lisa Shea, RM/ALF
G. F. Sanborn, EO
                  RIV File                           Section Chief, DRP/A
D. M. Crutenfield, NRR
                  MIS                                 R. E. Hall, DRSS
bec copy of letter and inspection summary only w/766:
                .RSTS Operator                       Project Engineer, DRP/A
DRP
                  bec copy of letter and inspection summary only w/out 766:
Lisa Shea, RM/ALF
                  DMB IE-04
RIV File
                  DRS
Section Chief, DRP/A
                  C. Harbuck, NRR Project Manager
MIS
                                                        ENCLOSURE CONTAINS
R. E. Hall, DRSS
                                                        SAFEGUARDS !NFORMATION
.RSTS Operator
                                                        UPON SEPARATION THIS
Project Engineer, DRP/A
                                                        PArJ 19 nrenNTenH rn
bec copy of letter and inspection summary only w/out 766:
DMB IE-04
DRS
C. Harbuck, NRR Project Manager
ENCLOSURE CONTAINS
SAFEGUARDS !NFORMATION
UPON SEPARATION THIS
PArJ 19 nrenNTenH rn
}}
}}

Latest revision as of 04:15, 2 December 2024

Forwards Insp Repts 50-313/89-20 & 50-368/89-20 on 890501-05 & Notice of Violation.Rept Details & Notice of Violation Withheld (Ref 10CFR73.21)
ML20244C194
Person / Time
Site: Arkansas Nuclear  
Issue date: 06/07/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20244C196 List:
References
NUDOCS 8906140157
Download: ML20244C194 (2)


See also: IR 05000313/1989020

Text

g

.

.

. . -

.

.

,

I

'

DOCUMENT CONTAINS

L

JUN -7 M

SAFEGUARDS INFORMATION

In Reply Refer'To:

Dockets: 50-313/89-20

50-368/89-20

Arkansas . Power & Light Company

ATTN:

Mr. Gene Campbell

L

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. J. A. Kelly of this office

,

during the period May 1-5, 1989, of activities authorized by NRC Operating

Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the

discussion ~of our findings with Mr. S. M. Quennoz and other members.of your

staff at the conclusion of the inspection.

Areas within the security program were examined during this inspection. Within

these areas, the inspection consisted of selective examination of procecures

and representative records, interviews with personnel, and observations by the

NRC inspector.

The' inspection findings are documented in the enclosed

inspection report.

During.this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are reauired to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Your response should be based 6n the specifics contained

in the Notice of Violation enclosed with this letter.

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amenced. Therefore, the

material, with the exception of the report cover page which is an inspection

summary, will n_ct be placed in the Public Document Room.

o

RIV:SEPS

C:SEPS

C:RPB

D:DRSS

D

  • JAKelly/tw
  • RJEverett

pMurray

BBeach

JMilhoan

h d /89*Previouslyconcurred}/89

0 /~/ /89

(,/7/89

(p /

89

h/

4

i

I

.

8906140107 890607

[

PDR

ADOCK 05000313

ENCLOSURE CONTAINS

,

1

Q

PDC

SAFEGUARDS INFORMATION

'l,l

MNT CONTAINS_

UPON SEPARATION THIS

-_

_

- _ _ _ _ _ _ _ _ _

. _ _ _ _ _ _ _ _ _ _ _ _ _

-

.,

.

u;

. ..

..

1

.

. Afkansas Power & Light' Company

-2-

,

Should you ha'e any questions concerning this inspection, we will be pleased to.

v

" discuss them with you.

Sincerely,

6

James L. Milhoan, Director

' Division of Reactor Projects

Enclosures:

1.

Appendix A - Notice of. Violation

~"

2.

Appendix B - NRC Inspection Report

50-313/89-20

50-368/89-20

.cc w/ summary page'only:

Arkansas Nuclear One

ATTN:

J.. M. Levine, Executive.

Director, Nuclear Operations

P.O. Box 608

.Russellville, Arkansas .72801

o

Arkansas Radiation Control' Program Director

bec' copy.of entire report:

RIV Security File

P. A. Starener, RSGB/NRR

- R. D. . Martin, RA

B Beacn. DRSS

Chief, RPB

Section Chief, SEPS:RPB

Security Inspector

Resident Inspector

SEPS:RPB Fi.le

G. F. Sanborn, EO

D. M. Crutenfield, NRR

bec copy of letter and inspection summary only w/766:

DRP

Lisa Shea, RM/ALF

RIV File

Section Chief, DRP/A

MIS

R. E. Hall, DRSS

.RSTS Operator

Project Engineer, DRP/A

bec copy of letter and inspection summary only w/out 766:

DMB IE-04

DRS

C. Harbuck, NRR Project Manager

ENCLOSURE CONTAINS

SAFEGUARDS !NFORMATION

UPON SEPARATION THIS

PArJ 19 nrenNTenH rn